CN201236516Y - Broken rod connection device for power distribution line - Google Patents
Broken rod connection device for power distribution line Download PDFInfo
- Publication number
- CN201236516Y CN201236516Y CN 200820037212 CN200820037212U CN201236516Y CN 201236516 Y CN201236516 Y CN 201236516Y CN 200820037212 CN200820037212 CN 200820037212 CN 200820037212 U CN200820037212 U CN 200820037212U CN 201236516 Y CN201236516 Y CN 201236516Y
- Authority
- CN
- China
- Prior art keywords
- hoop
- broken
- pole
- hoops
- connection device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Connection Of Batteries Or Terminals (AREA)
Abstract
一种配电线路断杆连接装置,设有一段0.8~1.5长的抱箍,抱箍是由左右两片扣合而成,抱箍的上口小下口大,所述抱箍的上口直径为270mm~310mm,抱箍的下口直径为290mm~320mm。左右两片抱箍对接处设有连接板,连接板相对应的开有连接孔,相应连接孔之间通过螺栓连接。左右两片抱箍对接处的连接板之间设有1~15cm的调节间隙。为了实现特殊条件下的快速抢修,根据经常出现断杆的位置,特设计安装使用方便的定形的产品抱箍,现场实现快速抢修、快速恢复供电,待条件成熟时再安排检修计划,对电杆进行后续处理。在断杆事故处理中,将抢修时间从单杆4小时左右降低到1小时左右,即将抢修时间降低75%。
A broken rod connection device for distribution lines, which is provided with a hoop with a length of 0.8 to 1.5. The hoop is formed by fastening two left and right pieces. The diameter is 270mm-310mm, and the diameter of the lower opening of the hoop is 290mm-320mm. A connection plate is provided at the butt joint of the left and right hoops, the connection plates are correspondingly provided with connection holes, and the corresponding connection holes are connected by bolts. An adjustment gap of 1 to 15 cm is provided between the connecting plates at the butt joints of the left and right hoops. In order to achieve quick repair under special conditions, according to the position where the broken poles often occur, specially designed and installed easy-to-use fixed-shaped product hoops, realize quick repairs on site, and quickly restore power supply. When the conditions are ripe, arrange maintenance plans. Follow up. In the handling of broken pole accidents, the emergency repair time was reduced from about 4 hours to about 1 hour for a single pole, that is, the emergency repair time was reduced by 75%.
Description
技术领域 technical field
本实用新型涉及一种电力公司在配网运行及抢修过程中使用的抢修设备,特别是一种配电线路断杆连接装置。The utility model relates to emergency repair equipment used by electric power companies in the process of distribution network operation and emergency repair, in particular to a broken rod connection device for distribution lines.
背景技术 Background technique
在10kV及以下配网运行及抢修过程中,经常发生遭受外力(如汽车撞杆等)破坏等原因引起的断杆事故,常规抢修需要立即换杆或采取帮扎,由于此类事故往往发生在夜间或恶劣天气下,给抢修带来极大不便,大大增加了修复供电的时间。In the process of 10kV and below distribution network operation and emergency repair, there are often accidents of broken rods caused by external forces (such as car collision rods, etc.). At night or in bad weather, it brings great inconvenience to emergency repairs and greatly increases the time for repairing power supply.
发明内容 Contents of the invention
本实用新型要解决的技术问题是针对现有技术的不足,提出了一种使用方便、加快恢复供电的配电线路断杆连接装置。The technical problem to be solved by the utility model is to aim at the deficiencies of the prior art, and propose a broken pole connection device for power distribution lines which is easy to use and quickens the restoration of power supply.
本实用新型要解决的技术问题是通过以下技术方案来实现的,一种配电线路断杆连接装置,其特点是:设有一段0.8~1.5长的抱箍,抱箍是由左右两片扣合而成,抱箍的上口小下口大,所述抱箍的上口直径为270mm~310mm,抱箍的下口直径为290mm~320mm。The technical problem to be solved by the utility model is achieved through the following technical scheme, a broken rod connection device for power distribution lines, which is characterized in that: a section of 0.8-1.5 long hoop is provided, and the hoop is made of two left and right buckles The upper mouth of the hoop is small and the lower mouth is larger. The diameter of the upper mouth of the hoop is 270mm-310mm, and the diameter of the lower mouth of the hoop is 290mm-320mm.
本实用新型要解决的技术问题还可以通过以下技术方案来进一步实现,左右两片抱箍对接处设有连接板,连接板相对应的开有连接孔,相应连接孔之间通过螺栓连接。The technical problem to be solved by the utility model can be further realized through the following technical solutions. A connecting plate is provided at the butt joint of the left and right hoops, and the connecting plates are correspondingly provided with connecting holes, and the corresponding connecting holes are connected by bolts.
本实用新型要解决的技术问题还可以通过以下技术方案来进一步实现,左右两片抱箍对接处的连接板之间设有1~15cm的调节间隙。The technical problem to be solved by the utility model can also be further realized through the following technical scheme, an adjustment gap of 1-15 cm is provided between the connecting plates at the butt joints of the left and right hoops.
本实用新型与现有技术相比,为了实现特殊条件下的快速抢修,根据经常出现断杆的位置,特设计安装使用方便的定形的产品抱箍,现场实现快速抢修、快速恢复供电,待条件成熟时再安排检修计划,对电杆进行后续处理。在断杆事故处理中,将抢修时间从单杆4小时左右降低到1小时左右,即将抢修时间降低75%。Compared with the prior art, in order to realize quick repair under special conditions, the utility model specially designs and installs a fixed-shaped product hoop which is convenient for installation and use according to the position where broken rods often occur, so as to realize quick repair and quick recovery of power supply on the spot. When it is mature, arrange the maintenance plan and carry out follow-up processing on the poles. In the handling of broken pole accidents, the emergency repair time was reduced from about 4 hours to about 1 hour for a single pole, that is, the emergency repair time was reduced by 75%.
附图说明 Description of drawings
图1为本实用新型的结构简图。Fig. 1 is a structural diagram of the utility model.
图2为图1的A—A剖面图。Fig. 2 is a cross-sectional view along line A-A of Fig. 1 .
具体实施方式 Detailed ways
一种配电线路断杆连接装置,:设有一段0.8~1.5长的抱箍1,抱箍1是由左右两片扣合而成,抱箍1的上口小下口大,所述抱箍1的上口直径为270mm~310mm,抱箍1的下口直径为290mm~330mm。由于断杆的位置不同,及断裂隙的大小不同,可设计不同口径,不同长短的抱箍,以备使用。下面例举三个实施例,但本实用新型的产品不局限于以下实施方式中的尺寸大小。A broken rod connection device for distribution lines: a hoop 1 with a length of 0.8 to 1.5 is provided. The hoop 1 is formed by fastening two left and right pieces. The diameter of the upper opening of the hoop 1 is 270 mm to 310 mm, and the diameter of the lower opening of the hoop 1 is 290 mm to 330 mm. Due to the different positions of the broken rods and the different sizes of the broken gaps, hoops of different diameters and lengths can be designed for use. Three examples are given below, but the product of the present invention is not limited to the size in the following embodiments.
实施例1:Example 1:
15的米电杆,由工程力学计算可知:在断杆为终端杆,受单相承载力时,其杆根所受的力距最大,按此条件设计的抱箍壁厚为12mm,高度1米,断面离上部与下部的距离均为500mm,抱箍由角钢铸造而成,分为两片,由螺栓连接。左右两片抱箍对接处设有连接板,连接板相对应的开有连接孔,相应连接孔之间通过螺栓连接。左右两片抱箍对接处的连接板之间设有1~15cm的调节间隙。抱箍上、下底面的内直径Φ计算公式如下:It can be known from the calculation of engineering mechanics that when the broken pole is the terminal pole and bears the single-phase bearing capacity, the force distance on the pole root is the largest. According to this condition, the wall thickness of the hoop designed according to this condition is 12mm, and the height is 1 The distance between the section and the upper part and the lower part is 500mm. The hoop is cast from angle steel and divided into two pieces, which are connected by bolts. A connection plate is provided at the butt joint of the left and right hoops, the connection plates are correspondingly provided with connection holes, and the corresponding connection holes are connected by bolts. An adjustment gap of 1 to 15 cm is provided between the connecting plates at the butt joints of the left and right hoops. The formula for calculating the inner diameter Φ of the upper and lower bottom surfaces of the hoop is as follows:
上部的内直径Φ1:Upper inner diameter Φ1:
下部的内直径Φ2:The inner diameter of the lower part Φ2:
其中:in:
h——电杆断面距杆根的距离,单位为mm。h——the distance from the section of the pole to the root of the pole, in mm.
注:15米杆埋深为2.5米,假设断面距地面1米,则h可为3500mm。由上可知:抱箍上部内直径Φ1=304mm,下部内直径Φ2=317mm。连接螺栓采用M16长度25mm。Note: The burial depth of the 15-meter pole is 2.5 meters, assuming that the section is 1 meter above the ground, then h can be 3500mm. It can be seen from the above that the inner diameter of the upper part of the hoop is Φ 1 =304mm, and the inner diameter of the lower part is Φ 2 =317mm. The connecting bolts are M16 with a length of 25mm.
实施例2:Example 2:
12的米电杆,由工程力学计算可知:在断杆为终端杆,受单相承载力时,其杆根所受的力距最大,按此条件设计的抱箍壁厚为10mm,高度0.8米,断面离上部与下部的距离均为400mm,抱箍由角钢铸造而成,分为两片,由螺栓连接。抱箍上、下底面的内直径Φ计算公式如下:According to the calculation of engineering mechanics, it can be known from the calculation of engineering mechanics: when the broken pole is the terminal pole and bears the single-phase bearing capacity, the force distance on the pole root is the largest. According to this condition, the wall thickness of the hoop designed according to this condition is 10mm, and the height is 0.8 The distance between the section and the upper part and the lower part is 400mm. The hoop is cast from angle steel and divided into two pieces, which are connected by bolts. The formula for calculating the inner diameter Φ of the upper and lower bottom surfaces of the hoop is as follows:
上部的内直径Φ1:Upper inner diameter Φ1:
下部的内直径Φ2:The inner diameter of the lower part Φ2:
其中:in:
h——电杆断面距杆根的距离,单位为mm.h——the distance from the section of the pole to the root of the pole, in mm.
注:12米杆埋深为2米,假设断面距地面1米,则h可为3000mm.。由上可知:抱箍上部内直径Φ1=304mm,下部内直径Φ2=315mm。连接螺栓采用M16长度25mm.。Note: The burial depth of the 12-meter rod is 2 meters, assuming that the section is 1 meter above the ground, then h can be 3000mm. It can be seen from the above that the inner diameter of the upper part of the hoop is Φ 1 =304mm, and the inner diameter of the lower part is Φ 2 =315mm. The connecting bolts are M16 with a length of 25mm.
实施例3:Example 3:
10的米电杆:10 meters electric pole:
由工程力学计算可知:在断杆为终端杆,受单相承载力时,其杆根所受的力距最大,按此条件设计的抱箍壁厚为10mm,高度1.5米,断面离上部与下部的距离均为750mm,抱箍由角钢铸造而成,分为两片,由螺栓连接。抱箍上、下底面的内直径Φ计算公式如下:According to the calculation of engineering mechanics, it can be seen that when the broken rod is the terminal rod and bears the single-phase bearing capacity, the force distance on the root of the rod is the largest. According to this condition, the wall thickness of the hoop designed according to this condition is 10mm, the height is 1.5 meters, and the distance between the section and the upper part is 1.5 meters. The distance of the lower part is 750mm, and the hoop is cast from angle steel, which is divided into two pieces and connected by bolts. The formula for calculating the inner diameter Φ of the upper and lower bottom surfaces of the hoop is as follows:
上部的内直径Φ1:Upper inner diameter Φ1:
下部的内直径Φ2:The inner diameter of the lower part Φ2:
其中:in:
h——电杆断面距杆根的距离,单位为mm.h——the distance from the section of the pole to the root of the pole, in mm.
注:10米杆埋深为1.6米,假设断面距地面1米,则h可为2600mm.。由上可知:抱箍上部内直径Φ1=278mm,下部内直径Φ2=298mm。Note: The burial depth of a 10-meter pole is 1.6 meters, assuming that the section is 1 meter above the ground, then h can be 2600mm. It can be seen from the above that the inner diameter of the upper part of the hoop is Φ 1 =278mm, and the inner diameter of the lower part is Φ 2 =298mm.
连接螺栓采用M16长度25mm。The connecting bolts are M16 with a length of 25mm.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200820037212 CN201236516Y (en) | 2008-06-27 | 2008-06-27 | Broken rod connection device for power distribution line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200820037212 CN201236516Y (en) | 2008-06-27 | 2008-06-27 | Broken rod connection device for power distribution line |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201236516Y true CN201236516Y (en) | 2009-05-13 |
Family
ID=40649256
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200820037212 Expired - Lifetime CN201236516Y (en) | 2008-06-27 | 2008-06-27 | Broken rod connection device for power distribution line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201236516Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102518334A (en) * | 2011-12-08 | 2012-06-27 | 河南省电力公司洛阳供电公司 | Method for reinforcing and protecting electric poles with cracks or fractures |
| CN104120910A (en) * | 2014-07-24 | 2014-10-29 | 国家电网公司 | Concrete pole breaking-preventing emergency repair protective cover |
| CN111827711A (en) * | 2020-07-28 | 2020-10-27 | 国网山东省电力公司寿光市供电公司 | A kind of emergency reinforcement device for broken pole of electric pole and using method |
| CN113982314A (en) * | 2021-12-10 | 2022-01-28 | 国网山东省电力公司临沂供电公司 | Quick prosthetic devices of disconnected pole |
| CN116905979A (en) * | 2023-06-06 | 2023-10-20 | 中国二十二冶集团有限公司 | Quick extraction method for broken rod of anchor rod drilling machine orifice |
-
2008
- 2008-06-27 CN CN 200820037212 patent/CN201236516Y/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102518334A (en) * | 2011-12-08 | 2012-06-27 | 河南省电力公司洛阳供电公司 | Method for reinforcing and protecting electric poles with cracks or fractures |
| CN104120910A (en) * | 2014-07-24 | 2014-10-29 | 国家电网公司 | Concrete pole breaking-preventing emergency repair protective cover |
| CN111827711A (en) * | 2020-07-28 | 2020-10-27 | 国网山东省电力公司寿光市供电公司 | A kind of emergency reinforcement device for broken pole of electric pole and using method |
| CN113982314A (en) * | 2021-12-10 | 2022-01-28 | 国网山东省电力公司临沂供电公司 | Quick prosthetic devices of disconnected pole |
| CN116905979A (en) * | 2023-06-06 | 2023-10-20 | 中国二十二冶集团有限公司 | Quick extraction method for broken rod of anchor rod drilling machine orifice |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201236516Y (en) | Broken rod connection device for power distribution line | |
| CN203799586U (en) | Signboard mounting support for power transmission line steel tube tower | |
| CN204012584U (en) | Circuit suspension clamp | |
| CN205839656U (en) | A kind of municipal administration bridge automatically clear up attending device | |
| CN209703383U (en) | A kind of temporary protection device of combined road reparation | |
| CN201627213U (en) | Detachable steel water stopping plate | |
| CN205532624U (en) | Ground system is synthesized in reinforced concrete pipe piece tunnel | |
| CN104900147A (en) | Hardware fitting special for rod number marking | |
| CN103696421B (en) | Earth anchor | |
| CN207082721U (en) | The connecting plate of regulator cubicle | |
| CN210230394U (en) | Rail guard paint spraying apparatus for municipal works | |
| CN204001927U (en) | The power transmission steel pipe tower cross-arm handle that strides | |
| CN204947419U (en) | A kind of novel device ground connection fixes anchor ear | |
| CN210074686U (en) | Swift cable protective sheath device | |
| CN109994255A (en) | A kind of insulating tube type busbar | |
| CN202797837U (en) | High voltage power transmission and transformation wire safe erection device | |
| CN206657040U (en) | A kind of ammeter box fixed mount | |
| CN211118215U (en) | Municipal works water supply and drainage pipe connecting device | |
| CN202607117U (en) | Elbow clamping track of automatic welding equipment of main pipeline of nuclear power plant | |
| CN105019547A (en) | Novel inspection well lid | |
| CN206422244U (en) | A kind of reinforcing attachment means for the aluminum tube bus that insulate | |
| CN201247925Y (en) | Safety hanging stair for maintaining cable terminal | |
| CN218972073U (en) | A municipal road water supply and drainage pipe connector | |
| CN207602838U (en) | A kind of general connector for stray electrical current flush type terminal | |
| CN202259759U (en) | Sectional grounding wire |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: JIANGSU ELECTRIC POWER COMPANY STATE ELECTRIC NET Effective date: 20130204 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20130204 Address after: 222000 No. 13 happy road, Sinpo District, Jiangsu, Lianyungang Patentee after: Lianyungang Power Supply Company of Jiangsu Electric Power Company Patentee after: Jiangsu Electric Power Company Patentee after: State Grid Corporation of China Address before: 222000 No. 13 happy road, Sinpo District, Jiangsu, Lianyungang Patentee before: Lianyungang Power Supply Company of Jiangsu Electric Power Company |
|
| CX01 | Expiry of patent term |
Granted publication date: 20090513 |
|
| CX01 | Expiry of patent term |