Prior art keywords
steel
tunnel
steel band
anchor
anchor bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200774233U
Other languages
Chinese (zh)
Inventor
代天开
武丕炯
赵康宏
赵俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Coking Coal Group Co Ltd
Original Assignee
Shanxi Coking Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Coking Coal Group Co Ltd filed Critical Shanxi Coking Coal Group Co Ltd
Priority to CNU2008200774233U priority Critical patent/CN201218105Y/en
Application granted granted Critical
Publication of CN201218105Y publication Critical patent/CN201218105Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a mining device, in particular to a component for shoring the tunnelling under a mine well. The utility model solves the problems that the prior coal-mine tunnel shoring which adopts pure anchor bolts for shoring has poor canopy-guard effect, and the two sides can easily shift so that the canopy-guard effect and the security of the tunnel are influenced. The component comprises a reinforcing mesh which is laid on the roof of the tunnel, top steel bands and top anchor bolts, and side anchor bolts arranged on the two sides of the tunnel. The utility model is characterized in that a top anchor cable is additionally arranged on each top steel band, the top anchor bolts are arranged on the two midmost rows of the top steel bands, top anchor bolts on adjacent top steel bands are staggered and are basically arranged in a Z-shaped array, and the top steel bands are made of channel steel; the component also comprises a reinforcing mesh and side steel bands, which are additionally arranged at two sides of the working face of the tunnel, and at least one side anchor cable is additionally arranged on a side steel band which is spaced at a certain distance. The utility model has simple structure, convenient production, and wide application range, more importantly can enhance the shoring effect and the security degree of the tunnel, can ensure the tunneling speed, and has a certain popularization value.

Description

Mine laneway driving support unit
Technical field
The utility model relates to mining device, is specially a kind of mine laneway driving support unit.
Background technology
The colliery tunnel support technology is the key technology in the coal mining, keep adjoining rock stability, control roadway deformation and destruction are the necessary conditions that realizes mine safety, High-efficient Production, and along with mine develops both in depth and in breadth, the roadway support problem shows more and more outstandingly.Roof timbering for roadway workface mainly adopts full bolt support at present, and the defective of existence is that anchor rod anchored length is less, and body of rod Fracture Force is less, shock resistance is poor, and supporting is not good, in addition, employed steel band strength and stiffness are little, tear easily and break, and protect the top weak effect; And, also adopt full bolt support for helping supporting in two of tunnel, and and lack wire lath and steel band, be easy to cause two to help displacement, cause roof timbering to lose efficacy or weaken.In a word, above-mentioned phenomenon has had a strong impact on roadway support effect and safe coefficient.
Summary of the invention
The problem that the utility model influences roadway support effect and safe coefficient in order to solve existing colliery tunnel support and to adopt full bolt support to exist to protect top weak effect, two to help to be easy to be subjected to displacement provides a kind of mine laneway driving support unit.
The utility model is to adopt following technical scheme to realize: mine laneway driving support unit, comprise spaced apart top anchor pole on the steel mesh reinforcement that is laid on the back, top steel band and the every steel band, also comprise the group's anchor pole that is arranged on the both sides, tunnel, innovative point of the present utility model is to set up the top anchor cable on the every top steel band, the top anchor pole is positioned at middle two rows of top steel band, top anchor pole on the steel band of adjacent top is staggered to be arranged, and is " Z " font generally and arranges, and described top steel band is a channel-section steel.In the prerequisite that guarantees supporting effect, in order further to reduce cost, the quantity of top anchor pole is one on the every steel band described in the utility model.
In order further to strengthen the supporting that tunnel two is helped, prevent that two help displacement to cause roof timbering to lose efficacy, the utility model also comprises steel mesh reinforcement and the group's steel band of setting up in work plane both sides, tunnel, on group's steel band of certain distance, set up at least one group's anchor cable, the quantity of the group's anchor cable on every group's steel band described in the utility model is one, described group steel band can be channel-section steel, also can be the steel band of original structure.
Compared with prior art, adopt structure design of the present utility model to have the following advantages:
1, on the structure of existing bolt support, increases the quantity of anchor cable, can increase anchorage depth greatly, guarantee that anchored end enters stable rock stratum;
2, increase steel mesh reinforcement, anchor cable member, strengthen two and help supporting, the principle of reinforcing when adopting back and two to help strengthens supporting effect greatly;
3, utilize channel-section steel as the top steel band, not only recyclable recycling, and changed the present situation of original steel band strength deficiency;
In a word, support unit described in the utility model, simple in structure, easy to make, applied widely, the more important thing is and can strengthen roadway support effect and safe coefficient, guarantee tunnelling speed, have certain popularization value,
Description of drawings
Fig. 1 is the supporting and protection structure schematic diagram to back described in the utility model
Fig. 2 is the supporting and protection structure schematic diagram that tunnel two is helped described in the utility model
Among the figure: steel band 8-group of anchor pole 5-top anchor cable 6-steel mesh reinforcement 7-group of 1-steel mesh reinforcement 2-top steel band 3-top anchor pole 4-group anchor cable
The specific embodiment
Mine laneway driving support unit, as Fig. 1, shown in 2, comprise the steel mesh reinforcement 1 that is laid on the back, spaced apart top anchor pole 3 on top steel band 2 and the every steel band, between array pitch be 900 * 900mm, the top specification is φ 20 * 2400mm screw-thread steel resin anchor, also comprise the group's anchor pole 4 that is arranged on the both sides, tunnel, between array pitch be 900 * 900mm, specification is φ 18 * 2000mm screw-thread steel resin anchor, set up top anchor cable 5 on the every top steel band 2, top anchor cable specification is φ 17.8 * 5200mm steel strand, top anchor pole 3 is positioned at middle two rows of top steel band, top anchor pole on the steel band of adjacent top is staggered to be arranged, and is " Z " font generally and arranges, and described top steel band 2 is the 12# channel-section steel.As shown in Figure 3, also comprise steel mesh reinforcement 6 and the group's steel band 7 set up in work plane both sides, tunnel, set up group's anchor cable 8 on group's steel band of certain distance, group's anchor cable specification is φ 17.8 * 3500mm steel strand.

Claims (2)

1, a kind of mine laneway driving support unit, comprise spaced apart top anchor pole (3) on the steel mesh reinforcement (1) that is laid on the back, top steel band (2) and the every steel band, also comprise the group's anchor pole (4) that is arranged on the both sides, tunnel, it is characterized in that setting up on the every top steel band (2) top anchor cable (5), top anchor pole (3) is positioned at middle two rows of top steel band, top anchor pole (3) on the steel band of adjacent top is staggered to be arranged, and is " Z " font generally and arranges, and described top steel band (2) is a channel-section steel.
2, mine laneway driving support unit according to claim 1 is characterized in that also comprising steel mesh reinforcement (6) and the group's steel band (7) set up in work plane both sides, tunnel, sets up at least one group's anchor cable (8) on group's steel band of certain distance.
CNU2008200774233U 2008-05-28 2008-05-28 Mine tunnel digging support component Expired - Fee Related CN201218105Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200774233U CN201218105Y (en) 2008-05-28 2008-05-28 Mine tunnel digging support component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200774233U CN201218105Y (en) 2008-05-28 2008-05-28 Mine tunnel digging support component

Publications (1)

Publication Number Publication Date
CN201218105Y true CN201218105Y (en) 2009-04-08

Family

ID=40540942

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200774233U Expired - Fee Related CN201218105Y (en) 2008-05-28 2008-05-28 Mine tunnel digging support component

Country Status (1)

Country Link
CN (1) CN201218105Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101915112A (en) * 2010-08-02 2010-12-15 中国矿业大学(北京) Strong-side and strong-corner coal entry anchor rod support method
CN102425437A (en) * 2011-11-21 2012-04-25 大同煤矿集团有限责任公司 Crossheading roadway supporting method for carboniferous system coal bed exploitation
CN103362519A (en) * 2013-01-31 2013-10-23 中国矿业大学(北京) Safe and quick coal roadway tunneling method
CN103470289A (en) * 2013-09-25 2013-12-25 大同煤矿集团有限责任公司 Contiguous coal seam mining support method
CN103742177A (en) * 2013-12-30 2014-04-23 北京科技大学 High mine pressure roadway support design method
CN108518234A (en) * 2018-03-27 2018-09-11 中国矿业大学(北京) A kind of wrong title formula anchor cable method for arranging of extra-large cross-section open-off cut Roof Control
CN109184762A (en) * 2018-11-07 2019-01-11 辽宁工程技术大学 Press method to a kind of modified country rock protecting against shock of anchor pole for super high seam
CN110284913A (en) * 2019-07-19 2019-09-27 山东科技大学 A kind of interior drawing anchor cable structure of the lane large span Qie Dingcheng top plate
CN111379580A (en) * 2020-03-18 2020-07-07 中铁十六局集团第三工程有限公司 Tunnel primary support protection construction method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101915112A (en) * 2010-08-02 2010-12-15 中国矿业大学(北京) Strong-side and strong-corner coal entry anchor rod support method
CN101915112B (en) * 2010-08-02 2012-05-23 中国矿业大学(北京) Strong-side and strong-corner coal entry anchor rod support method
CN102425437A (en) * 2011-11-21 2012-04-25 大同煤矿集团有限责任公司 Crossheading roadway supporting method for carboniferous system coal bed exploitation
CN103362519A (en) * 2013-01-31 2013-10-23 中国矿业大学(北京) Safe and quick coal roadway tunneling method
CN103362519B (en) * 2013-01-31 2015-06-03 中国矿业大学(北京) Safe and quick coal roadway tunneling method
CN103470289A (en) * 2013-09-25 2013-12-25 大同煤矿集团有限责任公司 Contiguous coal seam mining support method
CN103742177A (en) * 2013-12-30 2014-04-23 北京科技大学 High mine pressure roadway support design method
CN103742177B (en) * 2013-12-30 2016-03-02 北京科技大学 A kind of strong ore deposit pressure roadway support design method
CN108518234A (en) * 2018-03-27 2018-09-11 中国矿业大学(北京) A kind of wrong title formula anchor cable method for arranging of extra-large cross-section open-off cut Roof Control
CN109184762A (en) * 2018-11-07 2019-01-11 辽宁工程技术大学 Press method to a kind of modified country rock protecting against shock of anchor pole for super high seam
CN110284913A (en) * 2019-07-19 2019-09-27 山东科技大学 A kind of interior drawing anchor cable structure of the lane large span Qie Dingcheng top plate
CN110284913B (en) * 2019-07-19 2021-09-10 山东科技大学 Inner-pulling anchor cable structure of large-span roof-cutting roadway-forming roof
CN111379580A (en) * 2020-03-18 2020-07-07 中铁十六局集团第三工程有限公司 Tunnel primary support protection construction method

Similar Documents

Publication Publication Date Title
CN201218105Y (en) Mine tunnel digging support component
CN106894833B (en) Gob side entry driving unbalanced support structure and construction method under the unstable overlying strata in deep
CN101761338B (en) Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed
CN103233751B (en) Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN103216244B (en) Roadway soft and weak top plate anchoring beam-arch combined structure support system and support method
CN102182483A (en) Semi-rigid abnormal beam anchor cable truss roadway supporting system
CN102278140A (en) Gob-side entry retaining method for solid filling coal mining building gangue wall
CN102296976A (en) Asymmetrical bolt-net-cable combined supporting method for special-shaped recovery tunnel of large inclination angle coal bed
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
CN201288586Y (en) Structure for preventing slipping of filled wall body along spatially keeping lane
CN104047613A (en) Method for anchoring coal mine tunnel bottom plate
CN109973126A (en) The double release constant resistance supporting surrounding rock stability control methods of fender gob side entry driving
CN1966937A (en) Once supporting method for reinforced anchor rod in deep tunnel
CN102900449B (en) Support method for underground goaf roof of coal mine
CN211666747U (en) Coal mine underground crossheading roadway tunneling composite supporting device
CN106050282A (en) Anchoring structure and reinforcing method of narrow coal pillar of gob-side entry retaining
CN101737078B (en) Structure and method for preventing filled wall bodies of gob-side retained entries from sliding
CN205743941U (en) A kind of colliery tunnel support plate
CN201972707U (en) Reinforced concrete gob-side isolation wall of sandwich anchor
CN101082281A (en) Method for controlling deformation of surrounding rocks of gallery influenced by overhead mining
CN202467857U (en) Mining shoring device for axial bottom syncline under coal mine
CN201314241Y (en) Built-in three-dimensional strengthening rib-strengthened filled wall structure for roadway retained for next sublevel
CN103244158A (en) Strengthening structure for integrated bolting with bar and wire mesh
CN103742177B (en) A kind of strong ore deposit pressure roadway support design method
CN202064979U (en) Semi-rigidity heterotypical girder anchor cable truss support system in roadway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090408

Termination date: 20130528