CN201187039Y - Self-balance loading temporary anchoring device between main beam and platform - Google Patents

Self-balance loading temporary anchoring device between main beam and platform Download PDF

Info

Publication number
CN201187039Y
CN201187039Y CNU2008200666671U CN200820066667U CN201187039Y CN 201187039 Y CN201187039 Y CN 201187039Y CN U2008200666671 U CNU2008200666671 U CN U2008200666671U CN 200820066667 U CN200820066667 U CN 200820066667U CN 201187039 Y CN201187039 Y CN 201187039Y
Authority
CN
China
Prior art keywords
cushion cap
self
anchoring
girder
balancing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200666671U
Other languages
Chinese (zh)
Inventor
李宗平
曲洪春
李鉴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CNU2008200666671U priority Critical patent/CN201187039Y/en
Application granted granted Critical
Publication of CN201187039Y publication Critical patent/CN201187039Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a self-balancing load temporary anchor device between a girder and a bearing platform. The self-balancing load temporary anchor device comprises an anchor pile connected between a beam and the bearing platform; a prestressing rod is arranged inside and/or outside the anchor pile; one end of the prestressing rod is connected with the bearing platform; and the other end of the prestressing rod is connected with the beam. The self-balancing load temporary anchor device makes use of the characteristics of prestressing rods, in particular of finish milled reinforced bars, such as high strength and small deformation, to resist the repeated load during the construction of suspended splicing of girders, and makes use of pretension to eliminate the plastic deformation and partial elastic deformation of anchor piles, which solves the problem of large deformation of a support caused by large pull and compression load during the construction of suspended splicing of steel box girders. The device is simple in structure; and the construction cost is low.

Description

Self-balancing loads the anchoring temporarily device between girder and the cushion cap
Technical field
The utility model belongs to the two rope face steel box girder bridge beam construction technologies of double tower, is specifically related to realize between a kind of beam section and the cushion cap device of anchoring.
Background technology
The girder of the two rope face steel box girder bridge beams of double tower adopts separate type steel case beam, connect with gooseneck between up-downgoing two width of cloth, wherein lower king-post strut is " people " the font structure, in, upper king-post strut is single pillar structure, solely post part king-post passes from the middle neutral of steel case beam up-downgoing two width of cloth, extends to the cat head peak always.Mutual alignment between the existence of single pillar structure and the tower beam, decision No. zero piece beam section can only be anchored on the falsework, falsework is taken root in the cushion cap end face, the distance of cushion cap end face and cradle top surface reaches 56m, the powerful tension and compression load that produces in the steel case beam cantilever work progress causes deformation of timbering very big, the anchorage style and the device that adopt between existing cushion cap and the beam section can't satisfy the requirement of steel case beam cantilever construction precision.
Summary of the invention
The purpose of this utility model is to provide self-balancing loading anchoring temporarily device between a kind of girder and the cushion cap, to address the above problem.
The technical solution of the utility model is: self-balancing loads the anchoring temporarily device between girder and the cushion cap, it comprises the anchoring pile that is connected between beam section and the cushion cap, described anchoring pile is interior and/or be provided with the prestressing force bar outward, and an end of prestressing force bar connects cushion cap, and the other end of prestressing force bar connects crossbeam.
The utility model utilizes the prestressing force bar particularly to utilize smart indented bars intensity height, the little characteristic of distortion of pricking, resist the effect of reloading in the girder cantilever work progress, utilize pretension to eliminate distortion of anchoring pile retrospective and part elastic deformation, well solved the powerful tension and compression load that produces in the steel case beam cantilever work progress and caused the very big problem of deformation of timbering.Described apparatus structure is simple, and construction cost is low.
Description of drawings
Self-balancing loads the temporary anchoring structure schematic diagram between Fig. 1 girder and the cushion cap.
A place enlarged drawing among Fig. 2 Fig. 1.
D-D cross-sectional schematic among Fig. 3 Fig. 2.
B place enlarged drawing among Fig. 4 Fig. 1.
E-E cross-sectional schematic among Fig. 5 Fig. 3.
The specific embodiment
As shown in Figure 1, connect anchoring pile 2 on the cushion cap 1, anchoring pile 2 upper ends connect crossbeam 3.Present embodiment anchoring pile 2 adopts steel pipe pile.Connect flat multi pack between the anchoring pile 2 and put 4.It is 4 identical with existing structure that flat multi pack is put, and no longer this type of states its structure.Be provided with prestressing force bar 5 in the anchoring pile 2, an end of prestressing force bar 5 is connected with cushion cap 1, and the other end is connected with crossbeam 3.Prestressing force bar 5 adopts finish rolling deformed bar in the present embodiment.
The syndeton of cushion cap 1 and finish rolling deformed bar 5 as shown in Figure 4, finish rolling deformed bar 5 lower ends connect anchor slab 6, are provided with stiffener 7 around the anchor slab 6.Anchor slab 6, stiffener 7 and finish rolling deformed bar 5 bottoms are in advance in cushion cap 1.Connect backing plate 8 on the cushion cap 1, backing plate 8 is fixed on the cushion cap 1 by screw thread and reinforcing bar 9.Finish rolling deformed bar 5 passes backing plate 8 and is connected on the cushion cap 1 by ground tackle 10.Ground tackle 10 can be nut.Anchoring pile 2 is connected with backing plate 8, can adopt welding.Finish rolling deformed bar 5 is located in the anchoring pile 2 (Fig. 5) along circumference in the present embodiment.Establish on anchoring pile 2 sidewalls and strengthen gusset 10 and backing plate 8 welding.
The syndeton of crossbeam 3 and finish rolling deformed bar 5 as shown in Figure 2, connect anchor slab 11 on the crossbeam 3, finish rolling deformed bar 5 passes crossbeam 3 and applies pre-applied force with anchor slab 11 by ground tackle 12 make it to be connected with crossbeam 3 (offer the hole on the anchor slab 11, finish rolling deformed bar 5 passes) from the hole, and ground tackle 12 adopts nuts.Connect spreading steel pipe pile 13 on the anchor slab 11, finish rolling deformed bar 5 is located at spreading steel pipe pile 13 (Fig. 3) along circumference, and spreading steel pipe pile 13 covers concrete mortar 14, will be applied with prestressed finish rolling deformed bar 5 and ground tackle 12 in advance in concrete mortar 14.The spreading steel pipe pile 13 outer reinforcing rib plates 15 that are provided with weld with anchor slab 11.
During bearing platform construction, prestressing force bar finish rolling deformed bar 5 and anchor slab 6 are connected by nut, after anchor slab 6 covers stiffener 7, carry out prefabricatedly, backing plate 8 is passed the finish rolling deformed bar that exposes 5 and connect, utilize screw thread and reinforcing bar 9 that backing plate 8 is connected on the cushion cap again with ground tackle 10 nuts; With steel pipe pile 2 and backing plate 8 welding; Smart indented bars and the anchoring pile pricked of spreading is after the anchoring pile spreading puts in place; With essence prick indented bars 5 pass crossbeam 3 and on anchor slab 11, cover concrete mortar 14 after applying prestressing force by ground tackle 12 nuts, finish construction.
Prestressing force applies operating principle: its principle derives from hooke theorem, promptly
p = E . A L · Δl , P is a payload values; E is a modulus of elasticity; A is a section area; L is a rod member length; Δ L is a deformation values; If A1 is the prestressed reinforcement section area; A2 is the steel tube section area; E is the steel modulus of elasticity; L is anchoring strut length (prestressed reinforcement and steel pipe is approximate isometric); Δ L1 is the prestressed reinforcement elongation; Δ L2 is the steel pipe decrement; P0 is initial pre-axial force;
Then to prestressed reinforcement: p 0 = E . A 1 L · Δl 1 (P0 is a pulling force);
To steel pipe pile: p 0 = E . A 2 L · Δl 2 (P0 is a pressure)
By last two formulas as can be known, when not considering the direction of power, can get A1 Δ L1=A2 Δ L2 (1)
If Δ L is subjected to the external force P (deformation values behind the p<=p0) for the anchoring column;
Then P = E . A 1 L ( ΔL 1 ± ΔL ) - E . A 2 L ( ΔL 2 μΔL ) (as P during for upwards pulling force, the presstressed reinforcing steel total elongation increases, the front bracket gets+number, steel pipe elongation total elongation reduces, get-number, otherwise when P when being downward pressure then), promptly PL E = A 1 ΔL 1 ± A 1 ΔL - A 2 ΔL 2 ± A 2 ΔL - - - ( 2 )
With (1) formula substitution (2) formula, ΔL = PL E ( A 1 + A 2 ) Promptly by prestressing force bar and the common vertical anchoring system of forming of steel pipe pile, under pre-responsive to axial force, not only eliminated the initial deformation of structure, and no matter anchoring steel pipe system is under the situation that is subjected to pulling force or pressure, presstressed reinforcing steel and steel pipe post by automatic synchronization distortion carry out internal force heavily distribute to make distortion all less than With Realize that self-balancing loads anchor between beam section and the cushion cap.

Claims (10)

1, self-balancing loads the anchoring temporarily device between a kind of girder and the cushion cap, it comprises the anchoring pile that is connected between beam section and the cushion cap, it is characterized in that described anchoring pile is interior and/or be provided with the prestressing force bar outward, an end of prestressing force bar connects cushion cap, and the other end of prestressing force bar connects crossbeam.
2, according to claim 1 between girder and the cushion cap self-balancing load the anchoring temporarily device, it is characterized in that the prestressing force bar with the syndeton of cushion cap is: prestressing force bar one end is connected anchor slab and backing plate at interval, and in cushion cap, backing plate is connected with cushion cap anchor slab in advance.
3, load the anchoring temporarily device as self-balancing between girder as described in the claim 2 and the cushion cap, it is characterized in that anchoring pile is connected with backing plate.
4, according to claim 1 between girder and the cushion cap self-balancing load the anchoring temporarily device, the spy is characterized in that the prestressing force bar with the structure of crossbeam is: the prestressing force bar passes crossbeam and is applied pre-applied force and be connected crossbeam by anchoring piece.
5, load the anchoring temporarily device as self-balancing between girder as described in the claim 4 and the cushion cap, the spy is characterized in that crossbeam connects anchor slab, and the prestressing force bar passes crossbeam and anchor slab is connected with anchoring piece.
6, load the anchoring temporarily device as self-balancing between girder as described in claim 4 or 5 and the cushion cap, the spy is characterized in that anchoring piece is in advance in concrete mortar.
7, as claimed in claim 1 or 2 between girder and the cushion cap self-balancing load the anchoring temporarily device, the spy it is characterized in that anchor slab in the cushion cap around be shaped on stiffener in advance.
8, load the anchoring temporarily device as self-balancing between girder as described in claim 1 or 2 or 4 or 5 and the cushion cap, the spy is characterized in that the prestressing force bar is connected to form by reinforcing bar.
9, load the anchoring temporarily device as self-balancing between arbitrary girder as described in the claim 1~5 and the cushion cap, the spy is characterized in that anchoring pile top and/or bottom are provided with the reinforcement gusset.
10, according to claim 1 between girder and the cushion cap self-balancing load the anchoring temporarily device, the spy is characterized in that flat multi pack is put connection between the anchoring pile.
CNU2008200666671U 2008-04-25 2008-04-25 Self-balance loading temporary anchoring device between main beam and platform Expired - Lifetime CN201187039Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200666671U CN201187039Y (en) 2008-04-25 2008-04-25 Self-balance loading temporary anchoring device between main beam and platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200666671U CN201187039Y (en) 2008-04-25 2008-04-25 Self-balance loading temporary anchoring device between main beam and platform

Publications (1)

Publication Number Publication Date
CN201187039Y true CN201187039Y (en) 2009-01-28

Family

ID=40310057

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200666671U Expired - Lifetime CN201187039Y (en) 2008-04-25 2008-04-25 Self-balance loading temporary anchoring device between main beam and platform

Country Status (1)

Country Link
CN (1) CN201187039Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132460A (en) * 2011-11-28 2013-06-05 上海市基础工程有限公司 Concrete filled steel tubular temporary consolidation system of cast-in-cantilever beam
CN103215894A (en) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 Mobile temporary prestress tension anchor block
CN103410102A (en) * 2013-08-29 2013-11-27 浙江省宏途交通建设有限公司 H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN103437300A (en) * 2013-07-11 2013-12-11 中铁大桥局股份有限公司 Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132460A (en) * 2011-11-28 2013-06-05 上海市基础工程有限公司 Concrete filled steel tubular temporary consolidation system of cast-in-cantilever beam
CN103215894A (en) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 Mobile temporary prestress tension anchor block
CN103215894B (en) * 2013-04-26 2015-10-28 中铁第一勘察设计院集团有限公司 Portable interim prestressed stretch-draw anchor block
CN103437300A (en) * 2013-07-11 2013-12-11 中铁大桥局股份有限公司 Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN103410102A (en) * 2013-08-29 2013-11-27 浙江省宏途交通建设有限公司 H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN110361275A (en) A kind of shear wall shock test device and its application method
CN101260651A (en) Method and device for accomplishing self-balancing load and anchoring temporarily between main beam and platform
CN102051858B (en) Jack loading triangular truss hanging basket and load test construction method thereof
CN201187039Y (en) Self-balance loading temporary anchoring device between main beam and platform
CN106894326A (en) The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder
CN203923924U (en) No. 0 section bracket prepressing device
CN109680619A (en) A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions
CN205012666U (en) High altitude steel construction vestibule integrally lift up support structure
CN105544398A (en) Horizontal force self-balancing type splayed heavy type upper air support system and installation method thereof
CN201310102Y (en) Static load test conversion beam
CN201406635Y (en) Self-balancing load anchor device between girder section and bearing platform
CN201695337U (en) Straight-line segment bracket of side pier of grouting continuous beam
CN206607506U (en) A kind of through type adds the capping construction support of passive stress trapezoid block
CN207133129U (en) A kind of bridge static loading test pre-stressed steel pipe concrete self-balancing type static test bed
CN201865330U (en) Device used for constructing cantilever scaffold bottom platform
CN211735075U (en) Bent cap reinforcing bar stretch-draw platform
CN105298203A (en) Anti-fatigue pre-stress steel pipe column structure
CN207551767U (en) By the use of precast main beam as the bridge construction hanging device of primary structure member
CN201502037U (en) Separation-type hydraulic anchoring devices with multiple anchor rods
CN210976696U (en) Reinforced structure of concrete roof beam
CN101200876A (en) Erection of second hole large-span steel girder by rear anchorage cable method
CN212223643U (en) Single-column pier tension-compression combined anti-overturning structure
CN212533734U (en) Cable buckle integrated tower
CN214576115U (en) Assembled antidetonation steel pipe concrete toughness post

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: CCCC SHEC Fourth Engineering Co., Ltd.

Assignor: China Communications 2nd Navigational Bureau

Contract record no.: 2010420000184

Denomination of utility model: Self-balance loading temporary anchoring device between main beam and platform

Granted publication date: 20090128

License type: Exclusive License

Record date: 20101115

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090128