CN201180561Y - Double-control dustproof atomizer - Google Patents

Double-control dustproof atomizer Download PDF

Info

Publication number
CN201180561Y
CN201180561Y CNU2007200653130U CN200720065313U CN201180561Y CN 201180561 Y CN201180561 Y CN 201180561Y CN U2007200653130 U CNU2007200653130 U CN U2007200653130U CN 200720065313 U CN200720065313 U CN 200720065313U CN 201180561 Y CN201180561 Y CN 201180561Y
Authority
CN
China
Prior art keywords
double
way
spray nozzle
way valve
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200653130U
Other languages
Chinese (zh)
Inventor
江忠
Original Assignee
江忠
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 江忠 filed Critical 江忠
Priority to CNU2007200653130U priority Critical patent/CN201180561Y/en
Application granted granted Critical
Publication of CN201180561Y publication Critical patent/CN201180561Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a double-control dustproof spraying device, which is suitable for a mine laneway and an engineering tunnel and can open and close sprays at both ends of a spray nozzle. The double-control dustproof spraying device is formed by continuously mounting a water inlet pipe, a three-way valve I, a double-way water pipe, a three-way valve II, a water outlet pipe, the spray nozzle in sequence; the spray nozzle is mounted above the position between the three-way valve I and the three-way valve II in a rewinding manner via the water outlet pipe. Because the three-way valves is a two-channel water valve with one channel opening and the other channel closing at the same time, a worker can open and close the spray at either end of the spray nozzle at any moment; therefore, the spraying device not only facilitates the passage of the worker and the transportation of moisture-proof material, but also has no effect on dust prevention, and is favorable for safe production.

Description

Two controls atomization mechanism that prevents dust
Technical field
The utility model relates to a kind of mine laneway and engineering tunnel dustproof piping installation, especially can solve the problem that all can open, close dustproof spraying in nozzle ends.
Background technology
At present, the dustproof spraying of mine laneway and engineering tunnel is known all to be the single valve atomization mechanism, in case when using, the people who does not establish water valve one side will be drenched by whole body during through the nozzle below, both influenced healthy, influence safety in production again; The people who establishes water valve one side then can helplessly turn off dustproof spraying (in order to avoid drenching clothes) during through the nozzle below, and allows whole tunnel (engineering tunnel) mine dust fly upward, and makes too many workman breathe turbid bad air for a long time and suffers from occupational disease; Mine coal dust excessive concentration also causes coal-dust explosion easily.
Summary of the invention
In order to solve the dustproof spraying of existing single tube single valve can open, close spraying only with an end deficiency, the utility model provides a kind of two control dustproof atomization mechanism, this utility model can not only be dustproof for mine laneway and engineering tunnel, and the workman can open, close spraying at any time at any end of nozzle.Be convenient to the current transportation that reaches moistureproof material (cement, explosive etc.) of personnel, help safety in production.
The technical scheme that its technical problem that solves the utility model adopts is: it is the installation that is linked in sequence by water inlet pipe, three way cock I, two-way water pipe, three way cock II, outlet pipe, nozzle, nozzle unrolls through outlet pipe and is installed in top between three way cock I and the three way cock II, because three way cock is a kind of one the tunnel to open and simultaneously just close the two-way water valve on another road, thereby can reach the purpose that can both open, close spraying in nozzle ends.
The beneficial effects of the utility model are that no matter the workman can open at any time, close spraying at any end of nozzle, the transportation and the personnel that help moistureproof material are current.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Fig. 1 is the dustproof atomization mechanism schematic diagrames of two controls.
Fig. 2 is a three way cock sectional structural map schematic diagram.
1. water inlet pipes among the figure, 2. three way cock I, 3. two-way water pipe, 4. three way cock II, 5. outlet pipe, 6. nozzle.
The specific embodiment
In Fig. 1, the installation that is linked in sequence of water inlet pipe (1), three way cock I (2), two-way water pipe (3), three way cock II (4), outlet pipe (5), nozzle (6), nozzle (6) unrolls through outlet pipe (5) and is installed in top between three way cock I (2) and the three way cock II (4), operation for the benefit of, three way cock I and three way cock II are separated by several meters, and concrete length is decided on mine laneway or the distinguished and admirable size of engineering tunnel.Decide on the wind direction and the distinguished and admirable size of mine laneway or engineering tunnel the installation site of nozzle.

Claims (1)

1, a kind of mine laneway and dustproof atomization mechanism of the two controls of engineering tunnel dustproof of relating to, it is by the installation that is linked in sequence of water inlet pipe, three way cock I, two-way water pipe, three way cock II, outlet pipe, nozzle, it is characterized in that: nozzle unrolls through outlet pipe and is installed in top between three way cock I and the three way cock II.
CNU2007200653130U 2007-12-02 2007-12-02 Double-control dustproof atomizer Expired - Fee Related CN201180561Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200653130U CN201180561Y (en) 2007-12-02 2007-12-02 Double-control dustproof atomizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200653130U CN201180561Y (en) 2007-12-02 2007-12-02 Double-control dustproof atomizer

Publications (1)

Publication Number Publication Date
CN201180561Y true CN201180561Y (en) 2009-01-14

Family

ID=40250062

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200653130U Expired - Fee Related CN201180561Y (en) 2007-12-02 2007-12-02 Double-control dustproof atomizer

Country Status (1)

Country Link
CN (1) CN201180561Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587955A (en) * 2011-01-13 2012-07-18 淮南矿业(集团)有限责任公司 Tunnel dust suppression system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587955A (en) * 2011-01-13 2012-07-18 淮南矿业(集团)有限责任公司 Tunnel dust suppression system

Similar Documents

Publication Publication Date Title
WO2001039222A3 (en) Emergency gas and electricity shutoff apparatus and control system
CN104061012B (en) Air water smoke device for reducing dust and application process thereof in a kind of mining restriction space
CN105381563A (en) Building fire extinguishing system
CN204490916U (en) A kind of casting house atomization spray dust removal device
CN203921696U (en) A kind of external floating top tank sealingly secure ensures system
CN201180561Y (en) Double-control dustproof atomizer
CN204419234U (en) Mine development end tunnel high-concentration hydrogen sulfide spraying treatment system
CN201502395U (en) Mine centralized control timing air-flow purifying drenching installation
CN207760875U (en) A kind of drainage system of pipe gallery
CN205299081U (en) Recovery system of gas gathering station unloading natural gas
CN200993026Y (en) Coal mine underground explosion-suppression water trough level fully-automatic supply device
CN204200263U (en) A kind of mining running auto spraying purification water curtain device
CN207829942U (en) A kind of coal mine double-direction control purification water curtain device
CN203925567U (en) Mining gas control high pressure micropore dust falling system
CN201915988U (en) Spray device for mine shaft
CN202708157U (en) Mine essence safety type electric ball valve
CN201747396U (en) Coal mine underground pneumatic air-door locking control device
CN205100297U (en) Fire control pressure boost steady voltage equipment
CN202970761U (en) Under well bilateral control dustproof water curtain device
CN205796825U (en) A kind of portable multi-function dust controlling device
CN209586421U (en) A kind of dust detection automatic control purification water curtain
CN205782019U (en) Two-way storied building pressure regulator
CN202381114U (en) Mining pneumatically controlled spray and dust reduction device
CN205806793U (en) Spiral case discharging valve
CN208274854U (en) A kind of automatic fire extinguisher of mist extractor flue

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090114

Termination date: 20121202