CN201148601Y - Waveform girder guard rail improved structure - Google Patents

Waveform girder guard rail improved structure Download PDF

Info

Publication number
CN201148601Y
CN201148601Y CNU2008200000798U CN200820000079U CN201148601Y CN 201148601 Y CN201148601 Y CN 201148601Y CN U2008200000798 U CNU2008200000798 U CN U2008200000798U CN 200820000079 U CN200820000079 U CN 200820000079U CN 201148601 Y CN201148601 Y CN 201148601Y
Authority
CN
China
Prior art keywords
upright column
protection plate
column
guardrail
internal
Prior art date
Application number
CNU2008200000798U
Other languages
Chinese (zh)
Inventor
李志锋
张颖
邓冲
邰永刚
白书锋
汤文杰
贾日学
Original Assignee
广东广韶高速公路有限公司路面扩建工程管理处
北京中路安交通科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 广东广韶高速公路有限公司路面扩建工程管理处, 北京中路安交通科技有限公司 filed Critical 广东广韶高速公路有限公司路面扩建工程管理处
Priority to CNU2008200000798U priority Critical patent/CN201148601Y/en
Application granted granted Critical
Publication of CN201148601Y publication Critical patent/CN201148601Y/en

Links

Abstract

The utility model discloses an improved corrugated guardrail structure, which comprises an upright column, a protection plate, a prevention component and a connecting component. Wherein, the upright column comprises an internal upright column and an external upright column which are mutually covered; the protection plate comprises an internal protection plate and an external protection plate which are mutually buckled. The internal protection plate and the external protection plate are connected with the external upright column through the prevention component and the connecting component. The protection plate comprises an internal protection plate and an external protection plate which are mutually buckled and the internal layer and the external layer are jointed to form an 8 shape. The internal upright column can be the original upright column before the improvement on the road. Due to the protection plate with mutually buckled internal protection plate and external protection plate and the upright column with mutually covered internal upright column and external upright column, the old protection plate combination can be utilized to achieve higher protection requirement. At the same time, the originally arranged upright column can be used as the internal upright column so as to increase the intensity of the upright column, thus not only fully utilizing the original guardrail facilities but also greatly increasing the protection capacity of the guardrail.

Description

The corrugated beam barrier reconstruction structure

Technical field

The utility model relates to a kind of highway barrier reconstruction structure form, and particularly a kind of corrugated beam barrier forms of modification is used for improving as security protection facility on the highway measure of protective capacities.

Background technology

Etesian traffic accident is all in rapid increase, and especially highway accident more very.Wherein because the accident of Vehicular impact guardrails of both sides of highway accounts for the significant proportion of annual accident.Expressway speed is fast, in case vehicle is out of hand, be easy to take place serious accident, though all be provided with guardrail on the highway at present, can play certain protective action, but the protective capacities of guardrail is lower, Vehicular impact is behind guardrail, seriously cause occupant's injures and deaths after gently then clashing into guardrail, heavy then vehicle passes guardrail, or pour the subtend track or directly pour hazardous location such as trackside gutter, casualty rate and economic loss are bigger, so the high guardrail of exploitation protective capacities has become the society need of traffic safety facilities research.

Simultaneously, along with China's rapid economy development, the speedway career development is rapid, continuous growth along with the operation amount, serious damage, phenomenon such as aging have appearred in many express highway pavements, press for to carry out cover and handle, simultaneously, because the growth of the traffic volume, the part speedway need be widened processing.No matter be cover or widen etc., utilizing again of original safety device become new research topic, if lay guardrail again, then expense is higher, and original material is caused very big waste.

If study a kind of guardrail form, can have suitable protective capacities, can make full use of the former guardrail of haveing been friends in the past again, can have outward appearance preferably again simultaneously, then can reduce safety device significantly cost is set.

The utility model content

The purpose of this utility model provides a kind of corrugated beam barrier reconstruction structure, and this guardrail can make full use of old guardrail, and cost is lower, and the protection energy of 93kJ can be provided simultaneously, satisfies degree of protection A and the Am level requirement of former China to corrugated beam barrier.

For realizing above-mentioned target, the utility model adopts following technical scheme: guardrail of the present utility model comprises column and guardrail board, deters member and connecting elements; Its central post comprises sheathed internal layer column and outer column, and guardrail board comprises inboard guardrail board and the outside guardrail board that make-up is provided with; Inside and outside side rail plate is connected with outer column by deterring member and connecting elements.

Above-mentioned described guardrail board comprises inboard guardrail board and the outside guardrail board that make-up is provided with, and divides inside and outside two-layer butt joint to constitute the figure of eight.

Described internal layer column can be the original column before transformation on the highway, can certainly use and newly beat column.

The described member that deters can be carriage, obstruction block or their combinations.

Used guardrail board can be corrugated sheet or three ripple plates.

Guardrail of the present utility model, because the guardrail board and the sheathed column of ectonexine that have adopted inside and outside double-deck make-up to be provided with, thereby the combination that can utilize old guardrail board reaches higher requirement of shelter, can utilize the column of original setting to improve the intensity of column as the internal layer column simultaneously.Not only can make full use of original guardrail facility, improve the guardrail protective capacities simultaneously greatly.When vehicle collision behind guardrail, the inside and outside two-layer guardrail board of guardrail can both play protective action, can effectively protect collision energy at 93kJ with interior vehicle.The utility model structure design is simple, rationally, construct simple and easy, with low cost, good looking appearance, reality is a kind of economy, guard bar structure form attractive in appearance.

Description of drawings

Fig. 1 is the section structure schematic diagram of a kind of embodiment of the utility model.

The specific embodiment

Now the utility model is described in further detail in conjunction with the accompanying drawings.

Embodiment 1:

As shown in Figure 1, guardrail of the present utility model by guardrail board, column, deter member and connecting elements is formed.Wherein guardrail board is formed by outside corrugated sheet 1 and the 3 make-up settings of outside corrugated sheet, forms the structure of one " 8 " font.Column is that wherein internal layer column 6 can directly use original fence upright by outer column 5 and internal layer column 6 sheathed forming.Connecting elements is then used bolt for connecting, and deters member and uses carrier structure.The intermediate recess position that make-up is arranged to the guardrail board of " 8 " font is provided with connecting bolt 2, by this connecting bolt 2 with deter carriage 4 and be connected, deter carriage 4 and be fixed together with outer column 5.Outer column 5 then links together by connecting bolt 7 and internal layer column 6, and the lower end of outer column 5 is embedded in the layer of concrete 8, and layer of concrete 8 can be along the horizontal concrete belt of guardrail.

Certainly connecting elements can also be other connected mode, deters member and also can be the obstruction block structure or other deters structure.

And guardrail board make-up forms when adopting three ripple plates can not be " 8 " font structure, but the similar structures of alternative many rings.

Internal layer column 6 can adopt column existing or newly-increased on the highway, and the column spacing is 4m, and guardrail board then can directly use the old guardrail board or the new and old guardrail board of no gross distortion, corrosion etc. to be used in combination.The protection energy of this guardrail can reach 93kJ.

Claims (5)

1. a corrugated beam barrier reconstruction structure is characterized in that: comprise column and guardrail board, deter member and connecting elements; Its central post comprises sheathed internal layer column and outer column, and guardrail board comprises inboard guardrail board and the outside guardrail board that make-up is provided with; Inside and outside side rail plate is connected with outer column by deterring member and connecting elements.
2. corrugated beam barrier reconstruction structure according to claim 1 is characterized in that: described guardrail board comprises inboard guardrail board and the outside guardrail board that make-up is provided with, and divides inside and outside two-layer butt joint to constitute the figure of eight.
3. corrugated beam barrier reconstruction structure according to claim 1 is characterized in that: described internal layer column is the original column before transformation on the highway.
4. corrugated beam barrier reconstruction structure according to claim 1 is characterized in that: the described member that deters is the one kind of of carriage or obstruction block and their combinations.
5. corrugated beam barrier reconstruction structure according to claim 1 is characterized in that: used guardrail board is the wherein a kind of of double wave plate, three ripple plates.
CNU2008200000798U 2008-01-07 2008-01-07 Waveform girder guard rail improved structure CN201148601Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200000798U CN201148601Y (en) 2008-01-07 2008-01-07 Waveform girder guard rail improved structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200000798U CN201148601Y (en) 2008-01-07 2008-01-07 Waveform girder guard rail improved structure

Publications (1)

Publication Number Publication Date
CN201148601Y true CN201148601Y (en) 2008-11-12

Family

ID=40116367

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200000798U CN201148601Y (en) 2008-01-07 2008-01-07 Waveform girder guard rail improved structure

Country Status (1)

Country Link
CN (1) CN201148601Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979051A (en) * 2012-08-30 2013-03-20 北京中通路科技有限公司 Double-layer single-wave beam steel guardrail
CN106638385A (en) * 2016-09-21 2017-05-10 东莞市联洲知识产权运营管理有限公司 Reinforced road guard railing
CN108643089A (en) * 2018-07-02 2018-10-12 唐虎 A kind of reconstruction structure of highway trackside corrugated beam barrier

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979051A (en) * 2012-08-30 2013-03-20 北京中通路科技有限公司 Double-layer single-wave beam steel guardrail
CN102979051B (en) * 2012-08-30 2016-06-22 中交路安(北京)科技有限公司 A kind of double-layer single-wave beam steel guardrail
CN106638385A (en) * 2016-09-21 2017-05-10 东莞市联洲知识产权运营管理有限公司 Reinforced road guard railing
CN106638385B (en) * 2016-09-21 2018-12-04 绍兴柯桥定基转移印花有限公司 A kind of road guard-rail of reinforcement type
CN108643089A (en) * 2018-07-02 2018-10-12 唐虎 A kind of reconstruction structure of highway trackside corrugated beam barrier

Similar Documents

Publication Publication Date Title
US7220077B2 (en) Traffic noise barrier system
CN202671990U (en) Bay type wire mesh emergency lane
CN103437255B (en) A kind of mountain area arterial highway " T "-intersection Design of Traffic Safety method
CN102979051B (en) A kind of double-layer single-wave beam steel guardrail
CN201109902Y (en) Traffic insulation fence for highroad
CN201310078Y (en) Express way abacus-type collision-preventing movable rail
CN205975423U (en) Elasticity highway guardrail
CN205223914U (en) Anti -collision guardrail
CN106223228A (en) Intelligent safe height-limiting frame
CN207073089U (en) A kind of highway guard rail with height buffer performance
CN202658555U (en) Mobile combined type strip opening movable guardrail
CN207419326U (en) A kind of tunnel intelligent drum-type crash barrier
CN202090310U (en) Reinforced and reformed structure of W-shaped beam guardrail
CN204238149U (en) Flexible protection movable isolation guardrail
CN203346833U (en) Bridge pier anti-collision guardrail with automatic alarm function
CN2680723Y (en) L type concrete guard-rail
CN203514232U (en) Sound absorption slow-collision type road guardrail
CN203475336U (en) Light environment-friendly sound absorbing and insulating barrier
CN201372416Y (en) Guardrail fixing structure
CN202913379U (en) Expressway buffering anti-collision guardrail
CN204959656U (en) Prevent leap -type road guardrail
CN204125872U (en) A kind of highway barrier bracing means
CN206902585U (en) A kind of deceleration strip with shock-absorbing function
CN204023459U (en) A kind of elastic anti-collision guardrail
CN204849649U (en) Guardrail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: The road extension project management Guangdong Guangshao freeway limited

Document name: Notification of Termination of Patent Right

EXPY Termination of patent right or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081112

Termination date: 20150107