CN201125470Y - Post-installed beam curtain wall - Google Patents

Post-installed beam curtain wall Download PDF

Info

Publication number
CN201125470Y
CN201125470Y CNU2007200057560U CN200720005756U CN201125470Y CN 201125470 Y CN201125470 Y CN 201125470Y CN U2007200057560 U CNU2007200057560 U CN U2007200057560U CN 200720005756 U CN200720005756 U CN 200720005756U CN 201125470 Y CN201125470 Y CN 201125470Y
Authority
CN
China
Prior art keywords
curtain wall
cross beam
supporting plate
crossbeam
wall cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200057560U
Other languages
Chinese (zh)
Inventor
王广武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200057560U priority Critical patent/CN201125470Y/en
Application granted granted Critical
Publication of CN201125470Y publication Critical patent/CN201125470Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

An afterloading beam curtain wall comprises a standing curtain wall, a curtain wall beam, a fixed block of the curtain wall, a curtain wall splint, glass, glue, a connecting element and a sealing element. The curtain wall fixed block is fixed on either side of the standing curtain wall by bolts or screws, and an open slot and a beam splint card slot on the front of which a seal inlaying slot is positioned are arranged on the forepart of the curtain wall beam. The curtain wall splint is inserted into the beam splint card slot, and the curtain wall beam is placed by the front opening thereof on the curtain wall fixed block.

Description

后装横梁幕墙 Post-installed beam curtain wall

本实用新型涉及一种建筑幕墙。The utility model relates to a building curtain wall.

现有的建筑幕墙,幕墙横梁采用整体封闭结构,整体封闭结构存在的问题是:由于幕墙横梁固定块的阻挡,幕墙横梁不适宜采用先竖立挺后装横梁的工艺方法,给幕墙的安装和调整带来不便。The existing building curtain wall and the curtain wall beam adopt an integral closed structure. The problem of the overall closed structure is: due to the obstruction of the fixed block of the curtain wall beam, the curtain wall beam is not suitable for the process of erecting the beam first and then installing the beam, which is difficult for the installation and adjustment of the curtain wall. bring inconvenience.

现有的建筑幕墙的另一种结构是采用下开口结构,既在幕墙横梁下方设开口槽,幕墙横梁通过开口槽安装在幕墙横梁固定角铝上,然后,用封盖将开口槽封闭。该结构存在的问题是:封盖与幕墙横梁连接处存在连接缝隙,影响幕墙的外观。Another structure of the existing building curtain wall is to adopt the lower opening structure, that is, an opening slot is set under the curtain wall beam, and the curtain wall beam is installed on the fixed angle aluminum of the curtain wall beam through the opening slot, and then the opening slot is closed with a cover. The problem with this structure is that there is a connection gap between the cover and the beam of the curtain wall, which affects the appearance of the curtain wall.

本实用新型的目的是:通过改变幕墙横梁结构,提高幕墙的安装工艺性能和外观性能。The purpose of the utility model is: by changing the beam structure of the curtain wall, the performance of the installation process and the appearance of the curtain wall are improved.

本实用新型提出的后装横梁幕墙包括幕墙立挺,幕墙横梁,幕墙横梁固定块,幕墙横梁托板,玻璃,胶,连接件,密封件,幕墙立挺两侧是幕墙横梁固定块,幕墙横梁固定块用螺栓或螺钉固定在幕墙立挺上,幕墙横梁前部设开口槽和横梁托板卡槽,托板卡槽前部设密封条镶嵌槽,密封条镶嵌槽内装密封条,横梁托板插进横梁托板卡槽内,幕墙横梁通过前部开口放到幕墙横梁固定块上,将横梁托板移动到幕墙横梁固定块前方,幕墙横梁托板用螺钉分别固定在横梁固定块和幕墙横梁上。The post-mounted beam curtain wall proposed by the utility model includes curtain wall verticals, curtain wall beams, curtain wall beam fixing blocks, curtain wall beam support plates, glass, glue, connectors, seals, curtain wall vertical beams on both sides are curtain wall beam fixing blocks, curtain wall beams The fixing block is fixed on the curtain wall vertical with bolts or screws. The front part of the curtain wall beam is provided with an opening slot and a beam support plate slot. The front part of the support plate slot is provided with a sealing strip inlay groove. Insert it into the slot of the beam support plate, place the curtain wall beam on the curtain wall beam fixing block through the front opening, move the beam support plate to the front of the curtain wall beam fixing block, and fix the curtain wall beam support plate on the beam fixing block and curtain wall beam respectively with screws superior.

为提高幕墙的隔热性能,在幕墙横梁托板上设隔热型材。为提高幕墙的隔热性能和密封性能,在幕墙横梁托板上设带有密封条镶嵌槽的隔热型材。In order to improve the heat insulation performance of the curtain wall, heat insulation profiles are provided on the beam support plate of the curtain wall. In order to improve the thermal insulation performance and sealing performance of the curtain wall, a thermal insulation profile with a sealing strip inlay groove is provided on the curtain wall beam support plate.

为防止幕墙玻璃的破碎,幕墙横梁上下密封条镶嵌槽内装密封条,幕墙玻璃与密封条相接触。In order to prevent the breakage of the curtain wall glass, the upper and lower sealing strips of the curtain wall beams are inlaid with sealing strips, and the curtain wall glass is in contact with the sealing strips.

为防止幕墙横梁与幕墙横梁固定块金属间的摩擦产生噪音,在幕墙横梁与幕墙横梁固定块间放减振垫。In order to prevent the friction between the curtain wall beam and the metal of the curtain wall beam fixing block to generate noise, a vibration damping pad is placed between the curtain wall beam and the curtain wall beam fixing block.

在隐框幕墙中,幕墙中空玻璃隔条上设玻璃隔条固定板,螺钉穿过玻璃隔条固定板与幕墙横梁托板上的玻璃托板连接固定,相邻幕墙玻璃间的缝隙用胶粘接固定。在明框幕墙中,幕墙玻璃通过幕墙压座和压盖固定。In the hidden frame curtain wall, the glass spacer fixing plate is set on the hollow glass spacer of the curtain wall, and the screws pass through the glass spacer fixing plate to connect and fix the glass support plate on the curtain wall beam support plate, and the gap between the adjacent curtain wall glass is glued then fixed. In the exposed frame curtain wall, the curtain wall glass is fixed by the curtain wall press seat and gland.

本实用新型的优点是:1、横梁外表面无连接缝隙,外观美。2、幕墙加工安装工艺简单。3、幕墙横梁与横梁固定块整体接触,承受力大,安全性好。The utility model has the advantages: 1. There is no connection gap on the outer surface of the beam, and the appearance is beautiful. 2. The curtain wall processing and installation process is simple. 3. The beam of the curtain wall is in integral contact with the fixing block of the beam, which has a large bearing capacity and good safety.

下面结合说明书附图和实施例,对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment of description, the utility model is further described.

图1是具有本实用新型特征的幕墙横梁结构图。Fig. 1 is a structural diagram of a curtain wall beam with the characteristics of the utility model.

图2是具有本实用新型特征的横梁固定块结构图。Fig. 2 is a structural diagram of a beam fixing block with the characteristics of the present invention.

图3是具有本实用新型特征的幕墙横梁托板结构图。Fig. 3 is a structural view of the curtain wall beam supporting plate with the characteristics of the utility model.

图4是具有本实用新型特征的幕墙横梁、横梁固定块、幕墙横梁托板组装结构图。Fig. 4 is an assembly structure diagram of the curtain wall beam, the beam fixing block, and the curtain wall beam supporting plate with the characteristics of the utility model.

图5是具有本实用新型特征的幕墙立挺与横梁连接结构示意图。Fig. 5 is a schematic diagram of the connection structure between curtain wall uprights and beams with the characteristics of the utility model.

图6是具有本实用新型特征的幕墙立挺与隔热横梁连接结构图。Fig. 6 is a diagram of the connection structure of the vertical curtain wall and the heat-insulating beam with the characteristics of the utility model.

实施例1:Example 1:

一种幕墙后装横梁结构图如图1所示,图2是横梁固定块结构图,图3是幕墙横梁托板结构图,图4是幕墙横梁、横梁固定块、幕墙横梁托板组装结构图,图5是幕墙立挺与横梁连接结构示意图,其中:1是幕墙横梁,2是横梁加强筋,3是横梁托板卡槽,4是托板卡槽挡板,5是密封条镶嵌槽,6是横梁开口槽,7是横梁固定块,8是横梁固定块上固定卡台,9是固定块螺栓槽,10是固定块螺钉连接孔,11是横梁托板,12是横梁托板卡台,13是玻璃托板,14是螺钉,15是幕墙立挺,16是固定块连接螺杆,17是中空玻璃,18是中空玻璃固定板,19是中空玻璃固定螺钉,20是密封减振胶条,21是耐候胶。A structural diagram of a post-installed beam on a curtain wall is shown in Figure 1, Figure 2 is a structural diagram of a beam fixing block, Figure 3 is a structural diagram of a curtain wall beam supporting plate, and Figure 4 is an assembly structure diagram of a curtain wall beam, a beam fixing block, and a curtain wall beam supporting plate , Figure 5 is a schematic diagram of the connection structure between the curtain wall erecting and the beam, in which: 1 is the curtain wall beam, 2 is the reinforcement rib of the beam, 3 is the slot of the beam supporting plate, 4 is the baffle plate of the supporting plate slot, 5 is the inlay groove of the sealing strip, 6 is the opening slot of the beam, 7 is the fixing block of the beam, 8 is the fixing card platform on the fixing block of the beam, 9 is the bolt groove of the fixing block, 10 is the screw connection hole of the fixing block, 11 is the supporting plate of the beam, and 12 is the clamping platform of the supporting plate of the beam , 13 is the glass support plate, 14 is the screw, 15 is the vertical curtain wall, 16 is the connecting screw of the fixing block, 17 is the insulating glass, 18 is the fixing plate of the insulating glass, 19 is the fixing screw of the insulating glass, 20 is the sealing and damping rubber strip , 21 is weather-resistant glue.

组装过程如下:横梁固定块7用固定块连接螺杆16连接在幕墙立挺15上,如图5上部图所示,幕墙横梁1从后向前通过横梁开口槽6装在横梁固定块7上,幕墙横梁1向下移动,托板卡槽挡板4卡在横梁固定块上固定卡台8上,将幕墙横梁1固定,螺钉14将横梁固定块7与幕墙横梁1固定在一起,将予装在横梁托板卡槽3内的横梁托板11移到横梁固定块的前方。The assembly process is as follows: the beam fixing block 7 is connected to the curtain wall stand 15 with the fixing block connecting screw 16, as shown in the upper part of Figure 5, the curtain wall beam 1 is mounted on the beam fixing block 7 through the beam opening slot 6 from back to front, The curtain wall beam 1 moves downward, the supporting plate card groove baffle plate 4 is stuck on the beam fixing block and the fixing card platform 8 is fixed, and the curtain wall beam 1 is fixed, and the beam fixing block 7 and the curtain wall beam 1 are fixed together by screws 14. The crossbeam supporting plate 11 in the crossbeam supporting plate draw-in groove 3 moves to the place ahead of the crossbeam fixing block.

图5下部图显示组装后的结构图,中空玻璃17后部安放在密封减振胶条20上,中空玻璃17用中空玻璃固定板18和中空玻璃固定螺钉19固定在横梁托板11上,相邻中空玻璃间的缝隙用耐候胶21填充。The lower part of Fig. 5 shows the structure diagram after assembly. The rear part of the insulating glass 17 is placed on the sealing and damping rubber strip 20, and the insulating glass 17 is fixed on the beam supporting plate 11 with the insulating glass fixing plate 18 and the insulating glass fixing screw 19. The gap between the adjacent insulating glass is filled with weather-resistant adhesive 21.

实施例2:Example 2:

一种幕墙立挺与隔热横梁连接结构图如图6所示,其中:22是幕墙立挺,23是幕墙横梁,24是横梁固定块,25是固定块连接螺杆,26是螺钉,27是隔热横梁托板,28是隔热型材,29是中空玻璃,30是中空玻璃固定板,31是中空玻璃固定螺钉,32是密封减振胶条,33是耐候胶。A connection structure diagram of curtain wall uprights and heat insulation beams is shown in Figure 6, wherein: 22 is curtain wall uprights, 23 is curtain wall beams, 24 is beam fixing blocks, 25 is connecting screws for fixing blocks, 26 is screws, 27 is 28 is a heat-insulating profile, 29 is an insulating glass, 30 is a fixing plate of an insulating glass, 31 is a fixing screw of an insulating glass, 32 is a sealing and damping rubber strip, and 33 is a weather-resistant glue.

组装过程如下:横梁固定块24用固定块连接螺杆25连接在幕墙立挺22上,幕墙横梁23从后向前通过横梁开口槽装在横梁固定块24上,幕墙横梁23向下移动,托板卡槽挡板卡在横梁固定块上固定卡台上,将幕墙横梁23固定,螺钉26将横梁固定块24与幕墙横梁23固定在一起,将予装在横梁托板卡槽内的隔热横梁托板27和隔热型材28移到横梁固定块24的前方,中空玻璃29后部安放在密封减振胶条32上,中空玻璃29用中空玻璃固定板30和中空玻璃固定螺钉31固定在隔热横梁托板27和隔热型材28上,相邻中空玻璃间的缝隙用耐候胶33填充。The assembly process is as follows: the beam fixing block 24 is connected to the curtain wall upright 22 with the fixing block connecting screw 25, the curtain wall beam 23 is installed on the beam fixing block 24 through the opening slot of the beam from back to front, the curtain wall beam 23 moves downward, and the supporting plate The card groove baffle is clamped on the beam fixing block to fix the card platform, and the curtain wall beam 23 is fixed. The screw 26 fixes the beam fixing block 24 and the curtain wall beam 23 together. The supporting plate 27 and the heat-insulating profile 28 are moved to the front of the beam fixing block 24, the rear part of the insulating glass 29 is placed on the sealing and damping rubber strip 32, and the insulating glass 29 is fixed on the partition with the insulating glass fixing plate 30 and the insulating glass fixing screw 31. On the thermal beam supporting plate 27 and the heat insulating profile 28, the gap between adjacent insulating glass is filled with weather-resistant glue 33.

Claims (6)

1. dress crossbeam curtain wall comprises that curtain wall is very upright after one kind, curtain wall cross beam, the curtain wall cross beam fixed block, the curtain wall cross beam supporting plate, glass, glue, connector, seal is characterized in that: the upright very both sides of curtain wall are curtain wall cross beam fixed blocks, and the curtain wall cross beam fixed block stands at curtain wall with bolt or screw and very goes up, open slot and crossbeam supporting plate draw-in groove are established in the curtain wall cross beam front portion, the weather strip embedding groove is established in supporting plate draw-in groove front portion, and the crossbeam supporting plate injects in the crossbeam supporting plate draw-in groove, and curtain wall cross beam is put on the curtain wall cross beam fixed block by open front.
2. back as claimed in claim 1 dress crossbeam curtain wall is characterized in that: establish heat insulation section on the curtain wall cross beam supporting plate.
3. back as claimed in claim 1 dress crossbeam curtain wall is characterized in that: establish the heat insulation section that has the weather strip embedding groove on the curtain wall cross beam supporting plate.
4. back as claimed in claim 1 dress crossbeam curtain wall, it is characterized in that: the curtain wall cross beam supporting plate is separately fixed on crossbeam fixed block and the curtain wall cross beam with screw.
5. back as claimed in claim 1 dress crossbeam curtain wall is characterized in that: dress weather strip in the supporting plate draw-in groove front sealing bar embedding groove.
6. back as claimed in claim 1 dress crossbeam curtain wall is characterized in that: put cushion blocking between curtain wall cross beam and curtain wall cross beam fixed block.
CNU2007200057560U 2006-04-18 2007-02-16 Post-installed beam curtain wall Expired - Fee Related CN201125470Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200057560U CN201125470Y (en) 2006-04-18 2007-02-16 Post-installed beam curtain wall

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200610072279.XA CN101059005A (en) 2006-04-18 2006-04-18 Curtain wall
CN200610072279.X 2006-04-18
CNU2007200057560U CN201125470Y (en) 2006-04-18 2007-02-16 Post-installed beam curtain wall

Publications (1)

Publication Number Publication Date
CN201125470Y true CN201125470Y (en) 2008-10-01

Family

ID=38865287

Family Applications (2)

Application Number Title Priority Date Filing Date
CN200610072279.XA Pending CN101059005A (en) 2006-04-18 2006-04-18 Curtain wall
CNU2007200057560U Expired - Fee Related CN201125470Y (en) 2006-04-18 2007-02-16 Post-installed beam curtain wall

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN200610072279.XA Pending CN101059005A (en) 2006-04-18 2006-04-18 Curtain wall

Country Status (1)

Country Link
CN (2) CN101059005A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938901A (en) * 2017-12-28 2018-04-20 江苏龙升节能科技股份有限公司 Glass curtain wall beam structure
CN113417388A (en) * 2021-07-26 2021-09-21 山东东林铝业有限公司 Anti flexible curtain crossbeam connection structure
CN113431228A (en) * 2021-06-10 2021-09-24 深圳海外装饰工程有限公司 Novel no crossbeam broken line glass curtain wall structure

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967864A (en) * 2010-10-26 2011-02-09 苏州柯利达建筑装饰工程有限公司 Wedge-type connecting structure of pillar and crossbeam
CN102359214A (en) * 2011-10-27 2012-02-22 沈阳远大铝业工程有限公司 Hidden frame glass curtain wall with steel joist frame
CN102359215B (en) * 2011-10-27 2013-12-25 沈阳远大铝业工程有限公司 Exposed frame glass curtain wall with steel joist frame
CN104234276A (en) * 2013-06-18 2014-12-24 王广武 High polymer material profile, metal tube profile and aluminum alloy profile combined curtain wall and manufacturing method thereof
CN104044778A (en) * 2014-06-09 2014-09-17 苏州柏德纳科技有限公司 Milk filling machine support plate
DE102015100524A1 (en) * 2015-01-14 2016-07-14 SCHÜCO International KG Post and beam construction
CN105398463B (en) * 2015-11-24 2017-09-22 中车唐山机车车辆有限公司 Chair framework
CN107762021A (en) * 2017-10-27 2018-03-06 湖南省金为新材料科技有限公司 The curtain skeleton attachment structure of transom is filled afterwards

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938901A (en) * 2017-12-28 2018-04-20 江苏龙升节能科技股份有限公司 Glass curtain wall beam structure
CN113431228A (en) * 2021-06-10 2021-09-24 深圳海外装饰工程有限公司 Novel no crossbeam broken line glass curtain wall structure
CN113417388A (en) * 2021-07-26 2021-09-21 山东东林铝业有限公司 Anti flexible curtain crossbeam connection structure

Also Published As

Publication number Publication date
CN101059005A (en) 2007-10-24

Similar Documents

Publication Publication Date Title
CN201125470Y (en) Post-installed beam curtain wall
CN101215863B (en) Hollow glass curtain wall
CN210797986U (en) Stone material and glass curtain wall link up structure
CN201598936U (en) Door and window integral installation combination accessory frame profile
CN210858398U (en) Connecting structure of door and window and curtain wall
CN107119838B (en) Tower curtain wall floor fire prevention node structure
CN201148680Y (en) Hollow glass curtain wall
CN210622053U (en) Indoor side-mounted curtain wall system
CN113250352A (en) Stone curtain wall and glass curtain wall connecting structure
CN211341347U (en) Closed unit curtain wall system
CN103967250B (en) A kind of non-curtain wall pendant, non-curtain wall unit and exempt from the non-Curtain Wall of keel
CN207453213U (en) A kind of connection structure of curtain wall heat preservation rock plate
CN207073247U (en) Metope heat-insulating decorative composite board anchoring piece and metope heat-insulating decorative composite board mounting structure
CN213926959U (en) Quick installing the system of curtain plate
CN220080600U (en) Assembly integrated ultra-thin heat preservation stone material decorative board
CN211312924U (en) Wall system integrating stress supporting and heat insulation
KR101325925B1 (en) Frame for windows and doors
CN111236503A (en) Back cover of glass curtain wall
CN223446451U (en) A glass curtain wall system
CN216893033U (en) Special-shaped hollow heat-insulation curtain wall structure
CN215858468U (en) Fast-assembling type curtain backplate connection structure and heat preservation curtain system
CN222701298U (en) Energy-saving heat-preserving closing-up structure for bottom of curtain wall
CN211114281U (en) Double-layer heat-insulation aluminum alloy glass curtain wall
CN220666551U (en) Prefabricated heat preservation acoustic celotex board
CN221441977U (en) Wallboard pendant and wallboard adopting same for installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 065301 Hebei province Dachang Xiadian Town Oriental villa 12 Building 2 unit 502 room

Patentee after: Wang Guangwu

Address before: 101121 Beijing jiukeshu Tongzhou District Liyuan Town Road No. 120

Patentee before: Wang Guangwu

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081001

Termination date: 20130216