CN201059417Y - Section bar connecting piece capable of assembling rapidly - Google Patents
Section bar connecting piece capable of assembling rapidly Download PDFInfo
- Publication number
- CN201059417Y CN201059417Y CNU2007201118951U CN200720111895U CN201059417Y CN 201059417 Y CN201059417 Y CN 201059417Y CN U2007201118951 U CNU2007201118951 U CN U2007201118951U CN 200720111895 U CN200720111895 U CN 200720111895U CN 201059417 Y CN201059417 Y CN 201059417Y
- Authority
- CN
- China
- Prior art keywords
- bar
- link
- quick mounting
- mentioned
- raised line
- Prior art date
Links
- 230000000875 corresponding Effects 0.000 claims abstract description 11
- 238000003780 insertion Methods 0.000 claims abstract description 4
- 230000000452 restraining Effects 0.000 claims description 6
- 230000000295 complement Effects 0.000 claims description 2
- 238000010079 rubber tapping Methods 0.000 description 10
- 229910000838 Al alloys Inorganic materials 0.000 description 1
- 239000000956 alloys Substances 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000006073 displacement reactions Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000011521 glasses Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000000034 methods Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000007787 solids Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Abstract
Description
Technical field
The utility model relates to a kind of link, specifically refers to a kind ofly utilize it to make the link that is mounted to frame structure between the section bar.
Background technique
More frame, as the frame that forms between the column that adopted in the shower house and the crossbeam, the perhaps frame in the Door and window frame, the column and the crossbeam of the profile structure of making by aluminum alloy material constitute.When traditional shower house is installed, after glass sides edge and top edge embed the cross groove of longitudinal fluting, crossbeam of column respectively, between column and crossbeam, connect by self tapping screw again, be screwed onto in this mounting hole after promptly on an end face of crossbeam, designing the sidewall that has the mounting hole that enters for self tapping screw, self tapping screw to pass the section bar column.But because the middle part of section bar column generally is provided with the reinforcement dividing plate, make self tapping screw pass three-dimensional sidewall, must the operating space is provided for instrument and self tapping screw strengthening offering through hole on the dividing plate.Obviously, assemble such frame at the scene, also have certain degree of difficulty, general still more Consumer for the professional workforce.And such packaging efficiency is extremely low.Simultaneously because because of the depositing of equipped and machining error, also be difficult to guarantee the gap size between column and the crossbeam, thereby influenced the surface quality after the installation to a certain extent.
Summary of the invention
Technical problem to be solved in the utility model is the present situation at prior art, provides a kind of assembled on site section bar convenient, section bar link fast.
The utility model solves the problems of the technologies described above the technological scheme that is adopted: but the section bar link of this quick mounting is between first section bar and second section bar, it is characterized in that: this link includes first body and second body, described first body and second body are separately fixed on above-mentioned first section bar, second section bar, and inserting links into an integrated entity between the corresponding surface of described first body and second body.
As preferred version of the present utility model, can also be connected with between the corresponding surface of described first body and second body and prevent both from the bearing pin that the inserting direction breaks away from, make the connection after the inserting more firm like this.
Can realize that above-mentioned inserting is connected by dovetails and dovetail groove between the corresponding surface of described first body and second body; Certainly also can adopt the projection and the corresponding caulking groove of other shape to carry out, peg graft as the cooperation of T shape projection and T-slot, such scheme can realize that equally inserting is integral.
Consider that the location between first body and first section bar is convenient, quick, in the face of preferably being provided with raised line on the first body end face of described first section bar, be positioned at restraining groove on above-mentioned first section bar with embedding.And can also be provided with on the raised line surface and consistent grooves distributed of this raised line direction of insertion or fin, to be complementary with lip-deep corresponding fin of described restraining groove or groove, utilize coincideing of groove and fin like this, make between raised line and first section bar combine more reliable.In this scheme, raised line can be vertical distribution, and then fin and groove also correspondingly vertically distribute, and certainly, raised line also can arrange by other direction, if with first section bar on restraining groove match.Simultaneously, simultaneously, in order to attack solid connection between the two, have first mounting hole on described first body, self tapping screw is connected first body and first section bar by this mounting hole.
Equally, on the second body end face of described second section bar, also can be provided with projection, be arranged in inner chamber on above-mentioned second section bar with embedding.At second body is good to offer second mounting hole also, and self tapping screw passes this mounting hole and realizes the affixed of second body and second section bar.
As further improvement of the utility model, on the second body end face outer side edge of described second section bar, can also extend the outward flange that can cover appearance edge, the described second section bar end.The inward flange that blocks internal surface edge, the second section bar end is then extended at the same end face middle part of above-mentioned second body.
Compared with prior art, because the utility model can utilize two independently to link into an integrated entity by mutual inserting between first body and second body, therefore, can be in advance first body and second body be separately fixed on separately the section bar, and when assembling at the scene, as long as by simple inserting action, make two section bars form required structure, thereby accelerated assembling speed widely, make the operating efficiency height, need not professional workforce's operation again, connecting ordinary consumer can both conveniently implement, thereby more is subjected to liking of people.The bearing pin of setting up between two bodies simultaneously makes the inserting between two bodies connect reliable more, firm.Moreover, by means of second body inward flange and the outward flange, can eliminate second section bar because of processing, the surface quality defect that brings of assembly error, make the requirement that meets outling of truss between the section bar after the assembling more.
Description of drawings
Fig. 1 is the utility model embodiment's a schematic perspective view;
Fig. 2 is the schematic perspective view on Fig. 1 other direction;
Fig. 3 is the utility model embodiment's a perspective exploded view;
Fig. 4 is inserted into schematic perspective view behind first section bar for the raised line on first body among Fig. 1;
Fig. 5 is inserted into schematic perspective view behind second section bar for the projection on second body among Fig. 1;
Fig. 6 is the schematic perspective view after the utility model embodiment links into an integrated entity first section bar, second section bar.
Embodiment
Embodiment describes in further detail the utility model below in conjunction with accompanying drawing.
To shown in Figure 6, this link 1 is applied in the integral shower room, is positioned between first section bar 5 (being column) side and second section bar 6 (the being crossbeam) end face as Fig. 1, and the lateral longitudinal of first section bar 5 is provided with inner chamber 61 to being provided with restraining groove 51, the second section bars 6.Above-mentioned link 1 includes first body 2 and second body 3, and carrying out vertical inserting by dovetails and dovetail groove between the corresponding surface of first body 2 and second body 3 is connected, in the present embodiment, dovetail groove 21 is located on first body 2, dovetails 31 is located on second body 3, simultaneously, in order to prevent to break away from from the inserting direction between first body and second body, between two bodies, also be connected with bearing pin 4, just on perpendicular to two bodies on the inserting direction, have the first horizontal axis hole 22 and the second horizontal axis hole 32, bearing pin insert successively this second, behind the first horizontal axis hole, can prevent first effectively, second body break-off occurs from inserting direction superior displacement.Be for convenience detach simultaneously, be provided with block 41 at the afterbody of bearing pin, correspondingly the end face at second body has breach 33, utilizes breach and block, can easily bearing pin be extracted from horizontal axis hole.
In order to make above-mentioned first body, second physical efficiency be connected mutually with separately section bar easily and quickly,,, be positioned at the longitudinal spacing groove 51 of above-mentioned first section bar with embedding here being provided with raised line 23 in the face of on first body, 2 end faces of first section bar 5.See also Fig. 4, tightr for what both were cooperated, be provided with vertical fin 52 at this longitudinal spacing rooved face, then have the longitudinal fluting 24 that matches with above-mentioned fin on above-mentioned raised line 23 surfaces, after vertical raised line 23 is inserted into longitudinal spacing groove 51, by means of cooperating of vertical fin 52 and longitudinal fluting 24, make both connect more firmly.Simultaneously on first body 2, also have first mounting hole 25, be threaded mutually with first section bar so that self tapping screw passes these first mounting hole, 25 backs.
And on second body, 3 end faces of second section bar 6, also be provided with projection, be arranged in inner chamber 61 on above-mentioned second section bar with embedding, here, this projection is made of upper protruding block 34 that is scattered in the L type and is separated and lower protruding block 35, to be adapted to the demarcation strip 62 in the second section bar inner chamber.See also Fig. 5, simultaneously, on this second body, 3 end face outer side edge, also extend the outward flange 36 that can cover appearance edge, the second section bar end, the inward flange 37 that blocks internal surface edge, the second section bar end is then extended at the end face middle part of this second body, be inserted into the inner chamber of second section bar when above-mentioned projection after, inside and outside flange envelopes the end, medial and lateral of second section bar 6 respectively.In addition, with in like manner above-mentioned, on second body, also offer second mounting hole 38.So that self tapping screw passes these second mounting hole, 38 backs and is threaded mutually with second section bar 6, to increase the soundness that connects.
When the projection on the raised line on first body 2 23, second body 3 respectively inserting behind the inner chamber of the longitudinal spacing groove of first section bar, second section bar, and respectively first body and first section bar, second body and second section bar are tightened to one with self tapping screw.When assembled in situ, insert by vertical direction of arrow as shown in Figure 3 as long as dovetails is aimed at dovetail groove, and insert bearing pin like this, promptly obtain assembly structure as shown in Figure 6 by lateral arrows direction as shown in Figure 3.Therefore after adopting the link of said structure, can reach convenient, the quick and firm purpose of assembling.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201118951U CN201059417Y (en) | 2007-07-13 | 2007-07-13 | Section bar connecting piece capable of assembling rapidly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201118951U CN201059417Y (en) | 2007-07-13 | 2007-07-13 | Section bar connecting piece capable of assembling rapidly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201059417Y true CN201059417Y (en) | 2008-05-14 |
Family
ID=39407888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201118951U CN201059417Y (en) | 2007-07-13 | 2007-07-13 | Section bar connecting piece capable of assembling rapidly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201059417Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012071790A1 (en) * | 2010-11-30 | 2012-06-07 | 杭州康利达卫浴有限公司 | Connecting member for section bar, section bar and connecting structure of section bar |
CN103519728A (en) * | 2013-07-02 | 2014-01-22 | 宁波市沃特玛洁具有限公司 | Shower room easy to assemble and fast to install |
CN106049713A (en) * | 2016-04-22 | 2016-10-26 | 杭州康利达卫浴有限公司 | Quick profile mounting mechanism |
CN108601488A (en) * | 2015-12-16 | 2018-09-28 | 阿罗玻璃镜业有限公司 | Shower seals a head |
-
2007
- 2007-07-13 CN CNU2007201118951U patent/CN201059417Y/en not_active IP Right Cessation
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012071790A1 (en) * | 2010-11-30 | 2012-06-07 | 杭州康利达卫浴有限公司 | Connecting member for section bar, section bar and connecting structure of section bar |
EP2647774A1 (en) * | 2010-11-30 | 2013-10-09 | Hangzhou Clean Dell Sanitary Ware Co., Ltd | Connecting member for section bar, section bar and connecting structure of section bar |
EP2647774A4 (en) * | 2010-11-30 | 2014-12-24 | Hangzhou Clean Dell Sanitary Ware Co Ltd | Connecting member for section bar, section bar and connecting structure of section bar |
CN103519728A (en) * | 2013-07-02 | 2014-01-22 | 宁波市沃特玛洁具有限公司 | Shower room easy to assemble and fast to install |
CN103519728B (en) * | 2013-07-02 | 2017-04-05 | 宁波沃腾玛尔洁具有限公司 | Simple assembled Fast Installation formula shower house |
CN108601488A (en) * | 2015-12-16 | 2018-09-28 | 阿罗玻璃镜业有限公司 | Shower seals a head |
CN106049713A (en) * | 2016-04-22 | 2016-10-26 | 杭州康利达卫浴有限公司 | Quick profile mounting mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
USD513644S1 (en) | Headlight | |
USD557112S1 (en) | Mounting profile for the head rail of a covering for an architectural opening | |
US8955195B2 (en) | Clamping-sliding assembly for a single-track-suspension sliding door | |
KR101157086B1 (en) | Windows and doors prefabricated frame structure that have joint of 45 degrees | |
DE102015121193B4 (en) | Framework for a control cabinet arrangement | |
WO2005007566A3 (en) | Nanoporous carbide derived carbon with tunable pore size | |
EP1782942B8 (en) | Fast line maintenance repair method for composite structures | |
MY138541A (en) | A method producing a complex structure by assembling stressed structures | |
EP1118725A3 (en) | Structural member for building and method for forming a structure for building | |
KR200440844Y1 (en) | Curtain wall frame | |
WO2007002529A3 (en) | Multi-standard connection hub and method of manufacturing same | |
SI1772450T1 (en) | Method for producing 1,2-dihydropyridine-2-one compound | |
WO2006066014A3 (en) | Backplane design for display panels and processes for their manufacture | |
CN103573107B (en) | Control cabinet door frame and embedded frame type profile screen cabinet door | |
CN101165302A (en) | Device with a carriage for holding panels and a separation element | |
CN102418394A (en) | Connecting structure for photovoltaic glass curtain wall and photovoltaic glass | |
WO2006130652A3 (en) | Cavity well system | |
EP1564036A3 (en) | Multi-piece axle and suspension | |
CN202689269U (en) | Glass curtain wall suitable for exposed frame, hidden frame and half hidden frame | |
AU2003297643A1 (en) | Methods for improving secondary metabolite production in fungi | |
EP1795688A3 (en) | Glazing unit with transparent filler | |
CN101677697A (en) | shelf for showcase | |
ZA200705936B (en) | Process for preparing 2,3-disubstituted indoles | |
KR101286046B1 (en) | Inserting device for bearing of upper-bracket | |
RU2007130909A (en) | METHOD FOR PRODUCING 10, 11-DIHYDRO-10-HYDROXY-5H-DIBENZ / b, f / AZEPIN-5-CARBOXAMIDE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
CX01 | Expiry of patent term |
Granted publication date: 20080514 |
|
CX01 | Expiry of patent term |