CN201040692Y - Double flat arm base pole - Google Patents

Double flat arm base pole Download PDF

Info

Publication number
CN201040692Y
CN201040692Y CNU2007200851131U CN200720085113U CN201040692Y CN 201040692 Y CN201040692 Y CN 201040692Y CN U2007200851131 U CNU2007200851131 U CN U2007200851131U CN 200720085113 U CN200720085113 U CN 200720085113U CN 201040692 Y CN201040692 Y CN 201040692Y
Authority
CN
China
Prior art keywords
pole
shaft
double flat
ground
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200851131U
Other languages
Chinese (zh)
Inventor
余秋安
张松华
彭浩
孙云
陈宏学
高文林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
State Grid Corp of China SGCC
Original Assignee
Hubei Electric Transmission & Transformation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Electric Transmission & Transformation Engineering Co filed Critical Hubei Electric Transmission & Transformation Engineering Co
Priority to CNU2007200851131U priority Critical patent/CN201040692Y/en
Application granted granted Critical
Publication of CN201040692Y publication Critical patent/CN201040692Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

双平臂座地抱杆,属于高塔组立用的起重装置。杆身2包括若干个依次叠加的标准节4,上下相邻的两个标准节4之间通过螺栓固定连接,杆身2的外部设有套接在标准节4外壁上的附墙框11,附墙框11经装配工柔性连接机构7与外部固定物6连接,在杆身2的基部外围设有液压顶升机构5。从地面引入标准节4,实现抱杆的自顶升。抱杆外围的软附墙与铁塔连接,拆装方便,调节幅度大,双平臂可向上折叠收拢后与杆身2一起整体自降。底座与基础上的地脚螺栓相连,可重复使用;整机安全性高,操作简便,拆装方便,施工工效高,特别适于大高度铁塔如大跨越铁塔或特高压铁塔的组立施工,也可用于高层建筑物的起重施工作业。

Figure 200720085113

The ground holding pole with double flat arms belongs to the lifting device for erecting high towers. The shaft 2 includes several standard sections 4 stacked in sequence, and the two adjacent standard sections 4 are fixedly connected by bolts. The outside of the shaft 2 is provided with a wall frame 11 which is sleeved on the outer wall of the standard section 4. The attached wall frame 11 is connected with the external fixture 6 through the assembler's flexible connection mechanism 7 , and a hydraulic jacking mechanism 5 is provided on the periphery of the base of the shaft 2 . Introduce the standard section 4 from the ground to realize the self-jacking of the pole. The soft attached wall on the periphery of the pole is connected to the iron tower, which is easy to disassemble and assemble, and has a large adjustment range. The base is connected with the anchor bolts on the foundation and can be reused; the whole machine has high safety, easy operation, convenient disassembly and assembly, and high construction efficiency. It is especially suitable for the assembly construction of large-height iron towers such as large-span iron towers or UHV iron towers. It can also be used for lifting construction operations of high-rise buildings.

Figure 200720085113

Description

Two flat arm seats ground pole
Technical field
The utility model relates to the pole that group such as the crossing tower, extra high voltage line iron tower of a kind of hoisting device, particularly power engineering needs immediately, especially relates to a kind of structure improved two flat arm seat ground pole.
Background technology
The domestic lifting device that send the power transformation industry to be used to organize upright high tower mainly divides three kinds: inner suspension rocking arm pole, seat ground rocking arm pole and tower crane.Above instrument, in the construction of the upright high tower of group, all such and such restricted of ubiquity all can not be called desirable high tower special use lifting device.
Summary of the invention
The utility model mainly is the technical matters that solves the danger etc. of existing in prior technology pole aloft work; A kind of two flat arm seat ground pole with low aloft work risk is provided.
It is to solve existing in prior technology because the pole arm is removed inconvenience and jack-up system complexity that the utility model also has a purpose, operation inconvenience, the technical matters of inefficiency etc.; It is easy to provide a kind of pole head to remove, and jacking is convenient, the two flat arm seat ground pole that work efficiency is high.
It is to solve comparatively complexity of existing in prior technology structure that the utility model has a purpose again, and the pole attached wall is installed difficulty, and the problem that cost is high provides a kind of attached wall simple in structure, two flat arm seat ground pole easy for installation.
Above-mentioned technical matters of the present utility model is mainly solved by following technical proposals: two flat arm seats ground pole, comprise the shaft that is fixed on the base, top at shaft is provided with arm, described shaft comprises the standard knot that several superpose successively, be bolted to connection between two neighbouring standard knots, the outside of shaft is provided with the attached wall frame that is socketed on the standard knot outer wall, the attached wall frame is connected with the external stability thing through flexible linking device, be useful on the hydraulic lifting mechanism of the standard knot of packing in the base portion outer periphery of shaft, shaft also comprises an arm seat that is fixed on top, described arm seat is trapezoidal, be hinged with two arms in the bottom of arm seat symmetry, arm and shaft are perpendicular, are the level of state, and are provided with the arm drag-line between arm middle part and arm seat top.
The utility model adopts hydraulic lifting mechanism to substitute the assembly pulley lifting body of traditional pole, adopted hydraulic lifting mechanism has been placed ground, introduce standard knot from ground, from the scheme of bottom jacking pole, thereby reduce aloft work, reduced construction risk, improved the efficient of pole from jacking, simultaneously, will link to each other between shaft and the external stability thing by attached wall frame and flexible linking device, the group that adopts this mode to make pole be adapted to large-scale high tower is especially stood.
At above-mentioned two flat arm seat ground pole, described hydraulic lifting mechanism comprises a jacking frame that is fixed on the base, be fixed with oil cylinder on the jacking frame, the expansion link of described oil cylinder is connected with lifting beam, and lifting beam is provided with can the solid movable latch of corresponding pin with standard knot.Cylinder action is steady synchronously, and simple to operate, the effect height.
At above-mentioned two flat arm seat ground pole, described flexible linking device comprises connecting strap, and an end of connecting strap links to each other with the attached wall frame, and the other end links to each other with the external stability thing.
At above-mentioned two flat arm seat ground pole, described connecting strap comprises crimping steel anchor steel strand, one end of steel strand links to each other with the attached wall frame by shackle one, and the other end links to each other with an end of double hook by shackle two, and the other end of double hook links to each other with the external stability thing with shackle four by shackle three.Effectively raise the installation efficiency of attached wall frame, reduced tooling cost.
At above-mentioned two flat arm seat ground pole, described standard knot periphery is provided with vertical slide rail, is provided with the pulley that can slide up and down along vertical slide rail in the described attached wall frame.
At above-mentioned two flat arm seat ground pole, arm is truss-like inverted triangle cross section.Be convenient to arm like this and can upwards fold gathering.
Two flat arm seat ground pole above-mentioned is provided with swing type mechanism between described arm seat and the shaft, and arm seat is fixed on the top of swing type mechanism, and the lower end of swing type mechanism is fixed on the shaft top.Arm can be rotated on shaft.
At above-mentioned two flat arm seat ground pole, described arm is provided with the dolly that can slide on arm, and dolly is provided with and supports the pulley that promotes lifting rope and suspension hook.
At above-mentioned two flat arm seat ground pole, an end that promotes lifting rope on the described dolly is fixed on the arm root, its other end through dolly from the top of arm around to arm seat and downwards the standard knot guide wheel on shaft forward the outside to from shaft inside, hang elevator and link to each other with being arranged on ground master again, be provided with operator's station near hanging elevator main.
At above-mentioned two flat arm seat ground pole, described base is fixed on the basis by holding-down bolt.Adopt the base of this mode can repeated usage, actv. have been saved construction cost.
Therefore, the utlity model has following advantage: 1. adopt hydraulic ram to substitute assembly pulley, realize pole from jacking.Hydraulic ram is steadily action synchronously, and is simple to operate, the effect height.Introduce standard knot from ground, reduced the aloft work risk, improved the efficient of pole simultaneously from jacking.2. use fabricated soft attached wall gauge member, install simply, the pole good stability, tooling cost is low, and the length adjustment scope is big, the recycling rate of waterused height; 2. two arms are balance mutually, operation simultaneously, and two suspension hooks are parallel motion alone, also can rise and fall alone.Two arms can upwards fold gathering.Pole head after the gathering can not be subjected to the flat mouthful of less restriction of size in iron tower top, can be whole together smoothly from falling with pole self.Exempt two arms in high-altitude disintegration decline trouble, solved the difficult problem that the pole head is removed, reduced the aloft work risk, also improved the work efficiency that pole is removed greatly; 3. pole need not " embedded foundation joint " by base used specially seat ground.Holding-down bolt pre-buried on pole base and the basis links to each other, and can reuse, and has saved construction cost; 4. operator's station and master winch are arranged in ground, and the driver has reduced the aloft work risk at the ground centralized operation, and maintenance is convenient.5. entire machine design is reasonable, and volume is little, and is safe, simple in structure, easy and simple to handle, and easy accessibility is particularly suited for the construction construction of big height electric power tower such as large crossing tower or extra-high voltage iron tower, also can be used for the lifting construction operation of high-rise.
Description of drawings
Accompanying drawing 1 is the front view of a kind of structure of the utility model;
Accompanying drawing 2 is scheme drawings that hydraulic lifting mechanism 5 introduces standard knot 4 among Fig. 1;
Accompanying drawing 3 is scheme drawings of flexible linking device 7 among Fig. 1;
Accompanying drawing 4 is the mounting structure scheme drawings on base 1 and basis 22 among Fig. 1;
Accompanying drawing 5 is the scheme drawings after two arms 3 in the utility model fold;
Accompanying drawing 6 is the scheme of installations of overlooking of standard knot 4 of the present utility model.
Among the figure, base 1, shaft 2, arm 3, standard knot 4, hydraulic lifting mechanism 5, external stability thing 6, flexible linking device 7, jacking frame 8, oil cylinder 9, lifting beam 10, attached wall frame 11, connecting strap 12, vertical slide rail 13, pulley 14, shackle 1, shackle 2 152, shackle 3 153, shackle 4 154, double hook 16, arm seat 17, arm drag-line 18, dolly 19, suspension hook 20, holding-down bolt 21, basis 22, standard knot guide wheel 23, swing type mechanism 24, lifting lifting rope 25, operator's station 26, main elevator 27, the steel strand 28 of hanging.
The specific embodiment
Below by embodiment and accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1:
As shown in Figure 1, two flat arm seats ground pole, comprise the shaft 2 that is fixed on the base 1, on shaft 2, be provided with two horizontal hanging arms 3, shaft 2 comprises several standard knots that superposes successively 4, connects with bolt between two neighbouring standard knots 4, and the outside of shaft 2 is provided with the attached wall frame 11 that is socketed on standard knot 4 outer walls, attached wall frame 11 is connected with external stability thing 6 through flexible linking device 7, is useful on the hydraulic lifting mechanism 5 of the standard knot 4 of packing in the base portion outer periphery of shaft 2.External stability thing 6 can be arranged near high building or the building the shaft, and for the electric power tower group was upright, external stability thing 6 just was arranged on the pole periphery and is organizing upright iron tower.Shaft 2 also comprises an arm seat 17 that is fixed on top, and arm seat 17 is trapezoidal, in the lower hinge of arm seat 17 arm 3 is arranged, and arm 3 is truss-like inverted triangle cross section.Two arms 3 of symmetric arrangement are perpendicular with shaft 2, are the level of state, and are provided with arm drag-line 18 between arm 3 middle parts and arm seat 17 tops.Arm 3 is provided with the dolly 19 that can slide on arm 3, dolly 19 is provided with and supports the pulley that promotes lifting rope 25 and suspension hook 20.An end that promotes lifting rope 25 is fixed on the arm seat 17, its other end through dolly 19 from the top of arm 3 around to arm seat 17 and downwards the standard knot guide wheel 23 on shaft 2 forward the outside to from shaft 2 inside, hang elevator 27 and link to each other with being arranged on ground master again, be provided with operator's station 26 near hanging elevator 27 main.Be provided with swing type mechanism 24 between arm seat 17 and the shaft 2, arm seat 17 is fixed on the top of swing type mechanism 24, and the lower end of swing type mechanism 24 is fixed on shaft 2 tops.Swing type mechanism 24 can adopt the standard swing type mechanism on the elevator machinery.
Hydraulic lifting mechanism 7 comprises a jacking frame 8 that is fixed on the base 1, and described base 1 is fixed on the basis 22 by holding-down bolt 21.Be fixed with oil cylinder 9 on jacking frame 8, the expansion link of oil cylinder 9 is connected with lifting beam 10, and can drive lifting beam 10 and move up and down, lifting beam 10 be provided with can with the solid movable latch of standard knot 4 corresponding pins.After penetrating movable latch in the pin-and-hole on lifting beam 10 and standard knot 4, oil cylinder 9 upward movements can drive shaft 2 whole upward movements.At this moment can below shaft 2, send into the new standard knot 4 of a joint, and its and shaft 2 are locked integral body, 2 of the shafts standard knot that upwards grown tall.After oil cylinder 9 is finished upward movement, manually withdraw from the movable latch that connects lifting beam 10 and standard knot 4, oil cylinder 9 can drive lifting beam 10 and return initial position.
Flexible linking device 7 comprises connecting strap 12, and an end of connecting strap 12 links to each other with attached wall frame 11, and the other end links to each other with external stability thing 6.Connecting strap 12 comprises crimping steel anchor steel strand 28, one end of steel strand 28 links to each other with attached wall frame 11 by shackle 1, the other end links to each other with an end of double hook 16 by shackle 2 152, and the other end of double hook 16 links to each other with external stability thing 6 with shackle 4 154 by shackle 3 153.Attached wall frame 11 is the corresponding dead front type frameworks of an internal dimensions and standard knot 4 oads.Standard knot 4 peripheries are provided with vertical slide rail 13, are provided with the pulley 14 that can slide up and down along vertical slide rail 13 in the attached wall frame 11.Make that forming between attached wall frame 11 and the standard knot 4 rolls is connected.
During assembling, at first fix base 1 with holding-down bolt 21 on the basis of accomplishing fluently 22, hydraulic lifting mechanism 5 is placed on the base 1, the hydraulic lifting mechanism 5 here comprises a jacking frame 8, and its upper end is mounted with an oil cylinder 9, and a lifting beam 10 is settled in oil cylinder 9 upper ends.As Fig. 2 and shown in Figure 8, by the guide rail of base 1 limit end standard knot 4 is sent in the jacking frame 8, finish the liter that standard knot 4 makes progress by oil cylinder 9 and lifting beam 10 flexible and push work.When pole after jacking reaches certain height, at this moment in order to make the pole stable operation, as shown in Figure 3, be connected to attached wall frame 11 in the outer race of pole.Attached wall frame 11 places standard knot 4 peripheries, and attached wall frame 11 links to each other with external stability thing 6 by connecting strap 12.In the upright process of the group of electric power tower, external stability thing 6 promptly is the iron tower that grows tall gradually along with the lifting operation of pole, and pole is arranged on the center of iron tower, and iron tower is trapped among the periphery of pole, iron tower is upright behind the close height at pole top, and pole is upwards jacking again just.Attached wall frame 11 is connected in one pole and iron tower by flexible linking device 7, all is connected with iron tower by flexible linking device 7 around the general attached wall frame 11, has kept the stable of pole self effectively.On the whole height of pole, the quantity of attached wall frame 11 is the amount doesn't matter, and this should decide according to the environment and the lifting condition at scene.Also can have double hook 16 on the connecting strap 12, more help regulating the length of connecting strap 12, and can be connected with several shackles with steel strand 28 between connecting strap 12 and attached wall frame 11 and the external stability thing 6, whole here attached wall frame 11 and flexible linking device 7 can be referred to as the soft attached wall of build-up type.Adopt this fabricated soft attached wall gauge member, install simply, effect is obvious, and tooling cost is low, and the length adjustment scope is big, the recycling rate of waterused height.From rising in the process of top, because attached wall frame 11 inside are provided with pulley 14, standard knot 4 can be slided up and down at pole in attached wall frame 11, therefore rise in the process of top certainly whole, the soft attached wall of build-up type is fixed.
During work, two arms 3 are symmetry mutually, balance mutually, and operation simultaneously is adapted to the symmetry characteristics of iron tower material weight and position, high efficiency.Be positioned at suspension hook 20 parallel motion alone on the arm 3, also can rise and fall alone.During the suspension hook luffing, can move by a dolly, so the level of suspension hook 20 and vertical coordinate can regulate separately, make the tower material easier to be in place.Be provided with a swing type mechanism 24 between arm seat 17 and the shaft 2.Whole like this arm seat 17 can be done ± 90 spinning movements of spending for axle by shaft 2, and the hoisting operation face of whole pole is bigger.
The operator's station 26 of present embodiment and master hang elevator 27 and all are arranged on ground.
During dismounting, as shown in Figure 5, be to be hinged between arm 3 and the arm seat 17, therefore two arms 3 can upwards be done the jackknife action of 0 to 90 degree scope respectively.At first arm drag-line 18 is changed into and promote lifting rope 25, then with the upwards folding gathering of two arms 3, the pole head that whole arm 3 after the gathering and arm seat 17 form is not subjected to the flat mouthful of less restriction of size in external stability thing top, can be whole together smoothly from falling with shaft, removed two arms separate in the high-altitude on the body construction the difficulty and the trouble, solve the difficult problem that the pole head is removed, reduced the aloft work risk, also improved the work efficiency that pole is removed.
According to the utility model scheme, the pole main technical details that the applicant designs trial-production sees the following form:
Project name Unit Design value Remarks
The nominal hoisting moment KN·M 1500
Maximum gravity torque is poor KN.M 750
Maximum rated hoisting capacity T 10
The maximum functional amplitude M 22
Minimum work range M 2.4
Rated load weight during amplitude peak T 6.8
Allow amplitude peak during the biggest lifting capacity M 15
Free height M 36.2
The arm maximum height M 220
Complete machine total mass (220M) T 120
Complete machine power KW 132
The applicant has carried out relevant closed test by national regulation to above-mentioned pole; Its technical performance has reached all design objective requirements fully.Prove that also the utility model pole performance is outstanding, safe and efficient.
Specific embodiment described herein only is that the utility model spirit is made casehistory.The utility model person of ordinary skill in the field can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present utility model or surmount the defined scope of appended claims.

Claims (10)

1.双平臂座地抱杆,包括固定在底座(1)上的杆身(2),在杆身(2)的上部设有吊臂(3),其特征在于,所述的杆身(2)包括若干个依次叠加的标准节(4),上下相邻的两个标准节(4)之间通过螺栓固定连接,杆身(2)的外部设有套接在标准节(4)外壁上的附墙框(11),附墙框(11)经柔性连接机构(7)与外部固定物(6)连接,在杆身(2)的基部外围设有用于装入标准节(4)的液压顶升机构(5),杆身(2)还包括一个固定在最顶部的臂座(17),所述的臂座(17)呈梯形,在臂座(17)的下部对称铰接有两根吊臂(3),吊臂(3)与杆身(2)相垂直,呈水平状态,在吊臂(3)中部和臂座(17)上部之间设有吊臂拉索(18)。1. The ground holding pole of the double flat arm base includes a shaft (2) fixed on the base (1), and a boom (3) is arranged on the upper part of the shaft (2). It is characterized in that the shaft (2) It includes several standard sections (4) superimposed in sequence, and the upper and lower adjacent two standard sections (4) are fixedly connected by bolts. Attached wall frame (11) on the outer wall, attached wall frame (11) is connected with external fixture (6) through flexible connection mechanism (7), is provided with for packing into standard section (4) ) of the hydraulic jacking mechanism (5), the shaft (2) also includes an arm seat (17) fixed on the top, the arm seat (17) is trapezoidal, symmetrically hinged at the bottom of the arm seat (17) Two booms (3) are arranged, and the boom (3) is perpendicular to the shaft (2) and is in a horizontal state, and a boom stay cable ( 18). 2.根据权利要求1所述的双平臂座地抱杆,其特征在于,所述的液压顶升机构(5)包括一个固定在底座(1)上的顶升框(8),在顶升框(8)上固定有油缸(9),所述的油缸(9)的伸缩杆与顶升梁(10)连接,顶升梁(10)上设置有可与标准节(4)对应销固的活动插销。2. The ground holding pole of the double flat arm seat according to claim 1, characterized in that, the hydraulic jacking mechanism (5) comprises a jacking frame (8) fixed on the base (1). An oil cylinder (9) is fixed on the lifting frame (8), and the telescoping rod of the oil cylinder (9) is connected with the jacking beam (10), and the jacking beam (10) is provided with a corresponding pin Solid active latch. 3.根据权利要求1所述的双平臂座地抱杆,其特征在于,所述的柔性连接机构(7)包括连接条(12),连接条(12)的一端与附墙框(11)相连,另一端与外部固定物(6)相连。3. The double flat arm base pole according to claim 1, characterized in that, the flexible connection mechanism (7) comprises a connecting strip (12), and one end of the connecting strip (12) is connected to the attached wall frame (11 ) is connected, and the other end is connected with the external fixture (6). 4.根据权利要求3所述的双平臂座地抱杆,其特征在于,所述的连接条(12)包括一根压接钢锚钢绞线(28),钢绞线(28)的一端通过卸扣一(151)与附墙框(11)相连,另一端通过卸扣二(152)与双钩(16)的一端相连,双钩(16)的另一端通过卸扣三(153)和卸扣四(154)与外部固定物(6)相连。4. The double flat arm seat ground holding pole according to claim 3, characterized in that, the connecting strip (12) comprises a crimped steel anchor steel strand (28), and the steel strand (28) One end links to each other with the attached wall frame (11) through shackle one (151), the other end links to each other with one end of the double hook (16) through the shackle two (152), and the other end of the double hook (16) passes through the shackle three (153) and Shackle four (154) links to each other with external fixture (6). 5.根据权利要求1所述的双平臂座地抱杆,其特征在于,所述的标准节(4)外围设有垂直滑轨(13),所述的附墙框(11)内设有可以沿垂直滑轨(13)上下滑动的滑轮(14)。5. The ground holding pole with double flat arms according to claim 1, characterized in that, vertical slide rails (13) are provided on the periphery of the standard section (4), and the wall-attached frame (11) is provided with There is a pulley (14) that can slide up and down along the vertical slide rail (13). 6.根据权利要求1所述的双平臂座地抱杆,其特征在于,吊臂(3)为桁架式倒三角截面。6. The ground pole with double flat arms according to claim 1, characterized in that the boom (3) is a truss-type inverted triangular section. 7.根据权利要求1或6所述的双平臂座地抱杆,其特征在于,所述的臂座(17)和杆身(2)之间设有回转机构(24),臂座(17)固定在回转机构(24)的上部,回转机构(24)的下端固定在杆身(2)顶部。7. The ground holding pole with double flat arm base according to claim 1 or 6, characterized in that, a turning mechanism (24) is provided between the described arm base (17) and the shaft (2), and the arm base ( 17) be fixed on the top of the slewing mechanism (24), and the lower end of the slewing mechanism (24) is fixed on the shaft (2) top. 8.根据权利要求`1或6所述的双平臂座地抱杆,其特征在于,所述的吊臂(3)上设有可以在吊臂(3)上滑动的小车(19),在小车(19)上设置有支撑提升吊绳(25)及吊钩(20)的滑轮。8. according to claim `1 or 6 described double flat arm seat ground holding bar, it is characterized in that, described boom (3) is provided with the dolly (19) that can slide on boom (3), The dolly (19) is provided with a pulley supporting a hoisting rope (25) and a suspension hook (20). 9.根据权利要求8所述的双平臂座地抱杆,其特征在于,所述的小车(19)上提升吊绳(25)的一端固定在吊臂(3)根部,其另一端经小车(19)从吊臂(3)的顶端绕向臂座(17)并向下经杆身(2)上的标准节导轮(23)从杆身(2)内部转到外部,再与设置在地面上的主吊卷扬(27)相连,在主吊卷扬(27)附近设置有操作台(26)。9. The double flat arm base pole according to claim 8, characterized in that one end of the hoisting rope (25) on the trolley (19) is fixed at the root of the boom (3), and the other end is Dolly (19) goes around to arm base (17) from the top of boom (3) and forwards to the outside from the inside of shaft (2) through the standard joint guide wheel (23) on the shaft (2) downwards, and then with The main suspension hoist (27) that is arranged on the ground is connected, and an operation platform (26) is arranged near the main suspension hoist (27). 10.根据权利要求1或2所述的双平臂座地抱杆,其特征在于,所述的底座(1)通过地脚螺栓(21)固定在基础(22)上。10. The ground pole with double flat arms according to claim 1 or 2, characterized in that, the base (1) is fixed on the foundation (22) by anchor bolts (21).
CNU2007200851131U 2007-06-06 2007-06-06 Double flat arm base pole Expired - Fee Related CN201040692Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200851131U CN201040692Y (en) 2007-06-06 2007-06-06 Double flat arm base pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200851131U CN201040692Y (en) 2007-06-06 2007-06-06 Double flat arm base pole

Publications (1)

Publication Number Publication Date
CN201040692Y true CN201040692Y (en) 2008-03-26

Family

ID=39252399

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200851131U Expired - Fee Related CN201040692Y (en) 2007-06-06 2007-06-06 Double flat arm base pole

Country Status (1)

Country Link
CN (1) CN201040692Y (en)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101830405A (en) * 2010-05-07 2010-09-15 湖北省输变电工程公司 Folding double-balanced suspension arm
CN102644403A (en) * 2011-06-24 2012-08-22 国家电网公司直流建设分公司 Holding pole with detachable standard knots
CN103434946A (en) * 2013-09-08 2013-12-11 东台市富康工程机械厂 Movable type tower crane
CN103832933A (en) * 2013-09-29 2014-06-04 国家电网公司 Group tower type crane with auxiliary boom
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device
CN104355239A (en) * 2014-11-09 2015-02-18 国网山东梁山县供电公司 Crane for electric tower
CN104495635A (en) * 2014-11-26 2015-04-08 国家电网公司 Hoisting apparatus for construction of 220 KV power transmission line cat-head type tower
CN105905815A (en) * 2014-07-18 2016-08-31 国家电网公司 Work method of seating-type self-balance holding pole
CN104555829B (en) * 2013-10-11 2017-03-29 卓越置业集团有限公司 Automatic transmission
CN107060480A (en) * 2017-06-15 2017-08-18 国网山东省电力公司烟台供电公司 A kind of electric pole sets up bar top material transfer device
CN107237543A (en) * 2017-06-15 2017-10-10 国网山东省电力公司烟台供电公司 A kind of electric pole sets up bar top material transfer device and locking mechanism one
CN111377364A (en) * 2020-03-13 2020-07-07 中国建筑股份有限公司 A ground jacking tower crane device and construction method
CN111622485A (en) * 2020-06-03 2020-09-04 中冶天工集团有限公司 A kind of chimney lining construction work platform and construction method thereof
CN111997430A (en) * 2020-08-10 2020-11-27 安徽送变电工程有限公司 High tower for line spanning in construction of UHV transmission line and its assembly method
CN112888652A (en) * 2018-09-13 2021-06-01 利勃海尔工厂比伯拉赫股份有限公司 Crane with a movable crane
CN113428787A (en) * 2021-07-19 2021-09-24 中铁大桥局第七工程有限公司 Wall attaching device of single-limb inclined steel tower crane and single-limb inclined steel tower crane system
CN113585860A (en) * 2021-09-02 2021-11-02 扬州国电通用电力机具制造有限公司 Device and method for mounting and dismounting double-arm holding pole
CN113716472A (en) * 2021-09-02 2021-11-30 扬州国电通用电力机具制造有限公司 Double-arm holding pole
CN114803893A (en) * 2022-04-18 2022-07-29 徐工集团工程机械股份有限公司建设机械分公司 Crane with a movable crane
CN114893056A (en) * 2022-06-24 2022-08-12 郑州科润机电工程有限公司 Double-flat-arm electric holding pole arm frame system capable of being folded into small-caliber
CN115818458A (en) * 2022-11-22 2023-03-21 大连益利亚工程机械有限公司 A standard section assembly and disassembly system and operating method
CN116290993A (en) * 2022-05-18 2023-06-23 国网山西送变电工程有限公司 Universal swing arm and flat arm
CN116513978A (en) * 2023-04-25 2023-08-01 常州润源电力建设有限公司 Floor rocker arm holding pole lifting device for electric power construction and use method thereof
CN117105114A (en) * 2023-07-25 2023-11-24 常州润源电力建设有限公司 Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation
CN117246919A (en) * 2023-10-31 2023-12-19 中国电力科学研究院有限公司 Self-folding device and method for rocker arm landing pole anti-rocker arm based on combined spring

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101830405B (en) * 2010-05-07 2013-10-09 湖北省送变电工程公司 Foldable double flat boom
CN101830405A (en) * 2010-05-07 2010-09-15 湖北省输变电工程公司 Folding double-balanced suspension arm
CN102644403B (en) * 2011-06-24 2015-03-18 国家电网公司直流建设分公司 Holding pole with detachable standard knots
CN102644403A (en) * 2011-06-24 2012-08-22 国家电网公司直流建设分公司 Holding pole with detachable standard knots
CN103434946A (en) * 2013-09-08 2013-12-11 东台市富康工程机械厂 Movable type tower crane
CN103832933A (en) * 2013-09-29 2014-06-04 国家电网公司 Group tower type crane with auxiliary boom
CN103832933B (en) * 2013-09-29 2015-11-25 国家电网公司 A kind of group tower tower crane with auxiliary
CN104555829B (en) * 2013-10-11 2017-03-29 卓越置业集团有限公司 Automatic transmission
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line
CN103924816B (en) * 2014-04-16 2015-11-25 山东送变电工程公司 A kind of mounting method of UHV transmission line wine glass-shaped steel tower
CN105905815A (en) * 2014-07-18 2016-08-31 国家电网公司 Work method of seating-type self-balance holding pole
CN104100124B (en) * 2014-07-23 2016-05-11 国家电网公司 A kind of holding pole base is connected and fixed device
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device
CN104355239A (en) * 2014-11-09 2015-02-18 国网山东梁山县供电公司 Crane for electric tower
CN104495635A (en) * 2014-11-26 2015-04-08 国家电网公司 Hoisting apparatus for construction of 220 KV power transmission line cat-head type tower
CN107060480A (en) * 2017-06-15 2017-08-18 国网山东省电力公司烟台供电公司 A kind of electric pole sets up bar top material transfer device
CN107237543A (en) * 2017-06-15 2017-10-10 国网山东省电力公司烟台供电公司 A kind of electric pole sets up bar top material transfer device and locking mechanism one
CN107237543B (en) * 2017-06-15 2019-04-02 国网山东省电力公司烟台供电公司 An electric pole erection pole top material transfer device and locking structure
CN112888652A (en) * 2018-09-13 2021-06-01 利勃海尔工厂比伯拉赫股份有限公司 Crane with a movable crane
US12012313B2 (en) 2018-09-13 2024-06-18 Liebherr-Werk Biberach Gmbh Crane
CN111377364A (en) * 2020-03-13 2020-07-07 中国建筑股份有限公司 A ground jacking tower crane device and construction method
CN111377364B (en) * 2020-03-13 2022-08-05 中国建筑股份有限公司 Construction method of ground jacking type tower crane device
CN111622485A (en) * 2020-06-03 2020-09-04 中冶天工集团有限公司 A kind of chimney lining construction work platform and construction method thereof
CN111997430A (en) * 2020-08-10 2020-11-27 安徽送变电工程有限公司 High tower for line spanning in construction of UHV transmission line and its assembly method
CN113428787A (en) * 2021-07-19 2021-09-24 中铁大桥局第七工程有限公司 Wall attaching device of single-limb inclined steel tower crane and single-limb inclined steel tower crane system
CN113716472B (en) * 2021-09-02 2023-12-22 扬州国电通用电力机具制造有限公司 Double-arm holding pole
CN113585860A (en) * 2021-09-02 2021-11-02 扬州国电通用电力机具制造有限公司 Device and method for mounting and dismounting double-arm holding pole
CN113716472A (en) * 2021-09-02 2021-11-30 扬州国电通用电力机具制造有限公司 Double-arm holding pole
CN114803893A (en) * 2022-04-18 2022-07-29 徐工集团工程机械股份有限公司建设机械分公司 Crane with a movable crane
CN116290993A (en) * 2022-05-18 2023-06-23 国网山西送变电工程有限公司 Universal swing arm and flat arm
CN114893056A (en) * 2022-06-24 2022-08-12 郑州科润机电工程有限公司 Double-flat-arm electric holding pole arm frame system capable of being folded into small-caliber
CN115818458A (en) * 2022-11-22 2023-03-21 大连益利亚工程机械有限公司 A standard section assembly and disassembly system and operating method
CN116513978A (en) * 2023-04-25 2023-08-01 常州润源电力建设有限公司 Floor rocker arm holding pole lifting device for electric power construction and use method thereof
CN116513978B (en) * 2023-04-25 2024-01-05 常州润源电力建设有限公司 Floor rocker arm holding pole lifting device for electric power construction and use method thereof
CN117105114A (en) * 2023-07-25 2023-11-24 常州润源电力建设有限公司 Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation
CN117105114B (en) * 2023-07-25 2024-04-09 常州润源电力建设有限公司 Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation
CN117246919A (en) * 2023-10-31 2023-12-19 中国电力科学研究院有限公司 Self-folding device and method for rocker arm landing pole anti-rocker arm based on combined spring

Similar Documents

Publication Publication Date Title
CN201040692Y (en) Double flat arm base pole
CN201901539U (en) Internal climbing type and external climbing type tower crane with luffing jib
CN201545635U (en) Holding rod with double flat arms
CN103848360B (en) A kind of group tower tower crane being provided with packaged type balance weight system
CN101580211B (en) Multifunctional combined type lifting framework for installing large scale electrical power unit
CN201176370Y (en) Electric generator stator combination sling
CN105110213A (en) Crane provided with counterweight balance mechanism adopting dead weight of hoisted object as well as crane transformation scheme
CN103832933B (en) A kind of group tower tower crane with auxiliary
CN202672832U (en) Rotatable seat double rocker arm and inner/outer stay wire suspension mixed derrick
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN203728443U (en) Combined tower crane with main and auxiliary boom structure
CN104803303B (en) A kind of single movable-arm floor mast with rock type counter-jib
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN103342296A (en) Adhering self-elevating-type tower crane for hoisting wind power equipment
CN203715054U (en) 3,000t combinable lifting balance beam
CN201793330U (en) Gantry hanger frame device
CN205276921U (en) Building site is with climbing device
CN220999012U (en) Self-retracting device for rocker arm grounding arm anti-rocker arm based on combined spring
CN2923644Y (en) Superhigh super-large high-tonnage walking derricktype lifting machine
CN114212702A (en) Attached-cylinder self-climbing crane
CN204569237U (en) A kind of oscillating type pole equilibrium arm
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN209024026U (en) A kind of reinforcing bar cage hoisting machine
CN201082850Y (en) Crawler crane main boom head
CN201458585U (en) Multifunctional combined hoisting frame for large electric equipment installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121126

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20121126

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Patentee after: State Grid Corporation of China

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080326

Termination date: 20160606