CN201038654Y - 停电跨越过线飞车 - Google Patents

停电跨越过线飞车 Download PDF

Info

Publication number
CN201038654Y
CN201038654Y CNU200720084106XU CN200720084106U CN201038654Y CN 201038654 Y CN201038654 Y CN 201038654Y CN U200720084106X U CNU200720084106X U CN U200720084106XU CN 200720084106 U CN200720084106 U CN 200720084106U CN 201038654 Y CN201038654 Y CN 201038654Y
Authority
CN
China
Prior art keywords
right pulley
utility
line
bar assembly
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720084106XU
Other languages
English (en)
Inventor
高久松
何雄军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIYAN POWER SUPPLY COMPANY OF HUBEI ELECTRIC POWER CORPORATION
Original Assignee
GAO JIUSONG HE XIONGJUN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GAO JIUSONG HE XIONGJUN filed Critical GAO JIUSONG HE XIONGJUN
Priority to CNU200720084106XU priority Critical patent/CN201038654Y/zh
Application granted granted Critical
Publication of CN201038654Y publication Critical patent/CN201038654Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型提供了一种停电跨越过线飞车,由左、右滑轮支架、两个滑轮、滚杆总成构成,两个滑轮分别安装在左、右滑轮支架上,在左、右滑轮支架的下端设有可拆卸连接的吊钩或吊环;滚杆总成构成连接在左、右滑轮支架之间。采用这样的停电跨越过线飞车后,可使施工跨越过线时,避免导线接触磨损,可在不损伤被跨电力线情况下,使施工展放线能顺利进行。而采用过线飞车后,跨越过线只需1个技工两个民工,不仅使施工速度加快,还大大节约了工费。

Description

停电跨越过线飞车
技术领域
本实用新型涉及一种电力线路施工中跨越过线装置,方便进行跨越架线。
背景技术
在电力线路施工中,常常遇到跨越各种障碍物的跨越架线施工。跨越最多的是各种电力线和通信线路,经常损伤电力线和通信线路,造成很大的弥经济损失,延误被跨越的送电时间或造成通信中断,为确保跨越施工的安全可靠,通常采用以下三种方法:1、搭设跨越架,封闭被跨越物:平原,跨越物15米以下;2、被跨越线路拆卸,将导线放到地面:平原,被跨越在可以放至地下;3、导线加保护保扩措施,直接展放线。在山区跨越施工中,通常采用第3种方法,线路停电,被跨越导线上套竹筒保护,进行跨越施工。存在的问题是;展放的牵引绳或导线在运动的过程中不在竹筒上时,两导线直接磨擦,相互损伤;展放的牵引绳或导线在竹筒上,竹筒转动对被跨越电力线、光纤有一定的磨损。
发明内容
为了保证在停电的电力线不搭设跨越架的情况下,不损伤被跨电力线情况下,施工展放线能顺利进行,本实用新型提出一种停电跨越过线飞车。
本实用新型采用的技术方案如下:停电跨越过线飞车,其特征在于:由左、右滑轮支架、两个滑轮、滚杆总成构成,两个滑轮分别安装在左、右滑轮支架上,在左、右滑轮支架的下端设有可拆卸连接的吊钩或吊环;滚杆总成构成连接在左、右滑轮支架之间。
使用时,把吊钩或吊环先拆卸,把跨越过线飞车通过滑轮支撑在被跨越线上,然后装上吊钩或吊环,用绳子拉住吊钩或吊环,保证飞车的平衡,把要展放的导线从滚杆总成上架过,通过移动飞车确定跨越位置,从而顺利完成跨越过线。
有益效果:跨越过线时,导线之间没有接触,避免了导线磨损。采用过线飞车后,跨越过线只需1个技工两个民工,施工速度快,节约施工费1500~1800元。
附图说明
图1是本实用新型的结构示意图。
图2是图1中的A向视图(局部)。
具体实施方式
如图1、2所示,停电跨越过线飞车,由左滑轮支架1、右滑轮支架6、两个滑轮2、滚杆总成构成,两个滑轮2分别安装在左滑轮支架1、右滑轮支架6上,在左、右滑轮支架的下端设有可拆卸连接的吊钩7;滚杆总成连接在左、右滑轮支架1、6之间。滚杆总成由三个滚杆4,左、右支架3、5组成,三个滚杆4连接在左、右支架之间,三个滚杆4呈“品”字形排列;滚杆总成通过左、右支架3、5与左、右滑轮支架连接。可拆卸连接的吊钩7设在左、右滑轮支架,可保证平衡,不易翻转。
图1中所示的吊钩7也可以用吊环替代,只要是能挂住绳子的结构就可以。

Claims (2)

1.停电跨越过线飞车,其特征在于:由左、右滑轮支架、两个滑轮、滚杆总成构成,两个滑轮分别安装在左、右滑轮支架上,在左、右滑轮支架的下端设有可拆卸连接的吊钩或吊环;滚杆总成构成连接在左、右滑轮支架之间。
2.根据权利要求1所述的停电跨越过线飞车,其特征在于:滚杆总成由三个滚杆,左、右支架组成,三个滚杆连接在左、右支架之间,三个滚杆呈“品”字形排列;滚杆总成通过左、右支架与左、右滑轮支架连接。
CNU200720084106XU 2007-04-04 2007-04-04 停电跨越过线飞车 Expired - Fee Related CN201038654Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720084106XU CN201038654Y (zh) 2007-04-04 2007-04-04 停电跨越过线飞车

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720084106XU CN201038654Y (zh) 2007-04-04 2007-04-04 停电跨越过线飞车

Publications (1)

Publication Number Publication Date
CN201038654Y true CN201038654Y (zh) 2008-03-19

Family

ID=39211178

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720084106XU Expired - Fee Related CN201038654Y (zh) 2007-04-04 2007-04-04 停电跨越过线飞车

Country Status (1)

Country Link
CN (1) CN201038654Y (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102361254A (zh) * 2011-06-20 2012-02-22 辽宁省电力有限公司本溪供电公司 展放导引绳的牵引装置
CN104934897A (zh) * 2015-06-12 2015-09-23 国家电网公司 输电线路放、撤线跨越飞车
CN106848932A (zh) * 2017-04-10 2017-06-13 国网辽宁省电力有限公司辽阳供电公司 一种绝缘跨越过线机
CN107404088A (zh) * 2016-10-10 2017-11-28 苏州高精特专信息科技有限公司 一种用于电力线路展放中的防磨损装置及电力线路敷设方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102361254A (zh) * 2011-06-20 2012-02-22 辽宁省电力有限公司本溪供电公司 展放导引绳的牵引装置
CN104934897A (zh) * 2015-06-12 2015-09-23 国家电网公司 输电线路放、撤线跨越飞车
CN107404088A (zh) * 2016-10-10 2017-11-28 苏州高精特专信息科技有限公司 一种用于电力线路展放中的防磨损装置及电力线路敷设方法
CN107404088B (zh) * 2016-10-10 2018-12-18 天津市浩源电力工程有限公司 一种用于电力线路展放中的防磨损装置及电力线路敷设方法
CN106848932A (zh) * 2017-04-10 2017-06-13 国网辽宁省电力有限公司辽阳供电公司 一种绝缘跨越过线机

Similar Documents

Publication Publication Date Title
CN201038654Y (zh) 停电跨越过线飞车
CN204823450U (zh) 一种基于钢丝绳牵引的采煤机电缆自动拖拽装置
CN103001146B (zh) 钢管杆作业平台的使用方法
CN203792500U (zh) 一种混凝土管桩生产线
CN203372984U (zh) 一种梁体滑轮翻身装置
CN103588092B (zh) 一种采用辅助装置更换钢丝绳的方法
CN101651307B (zh) 微张力高空悬浮展放导线方法及装置
CN202687795U (zh) 托架及小车组合缠绕设备
CN207834953U (zh) 电缆穿cse牵引系统
CN102344092B (zh) 单绳双吊点水平吊臂收放与折叠机构
CN101651306B (zh) “一牵三”张力放线用不对称牵引板和配套的放线滑车
CN201498965U (zh) 中包车的电缆保护装置
CN202717561U (zh) 一种吊篮用提升机
CN106532557B (zh) 跨越10kv线路施工平台工具装置
CN201817208U (zh) 一种简易吊装机
CN101966823A (zh) 一种承力索跨越架及其架设方法
CN204185775U (zh) 一种双线往复门架式大循环牵引系统
JP2005333789A (ja) ネット形設による吊金式移線工法
CN104210977B (zh) 模块化分布式卷扬机集成控制系统
CN203865920U (zh) 大吨位起重机起升机构钢丝绳缠绕结构
CN201490626U (zh) 一种“一牵三”张力放线用不对称牵引板
CN207218200U (zh) 一种用于实现电缆拖移的装置
CN202880699U (zh) 偏轨梁桥式起重机
CN204166176U (zh) 继电保护交换机屏柜光纤储线仓
CN112736763A (zh) 一种刚度可调节的弹性放线滑车装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HUBEI ELECTRIC POWER COMPANY,SHIYAN POWER COMPANY

Free format text: FORMER OWNER: GAO JIUSONG

Effective date: 20090515

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090515

Address after: No. 74, South Renmin Road, Hubei, Shiyan Province: 442000

Patentee after: SHIYAN POWER SUPPLY COMPANY OF HUBEI ELECTRIC POWER CORPORATION

Address before: No. 1, unit 17, No. 2 Station Road, Maojian District, Shiyan, Hubei 401, zip: 442000

Co-patentee before: He Xiongjun

Patentee before: Long pine

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080319

Termination date: 20100404