CN201033790Y - Oxygen lance nozzle without welding - Google Patents

Oxygen lance nozzle without welding Download PDF

Info

Publication number
CN201033790Y
CN201033790Y CNU2007200118742U CN200720011874U CN201033790Y CN 201033790 Y CN201033790 Y CN 201033790Y CN U2007200118742 U CNU2007200118742 U CN U2007200118742U CN 200720011874 U CN200720011874 U CN 200720011874U CN 201033790 Y CN201033790 Y CN 201033790Y
Authority
CN
China
Prior art keywords
nozzle
oxygen lance
welding
copper
oxygen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200118742U
Other languages
Chinese (zh)
Inventor
刘志昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG DONGYE HANSEN METALLURGY EQUIPMENT CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200118742U priority Critical patent/CN201033790Y/en
Application granted granted Critical
Publication of CN201033790Y publication Critical patent/CN201033790Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Gas Burners (AREA)

Abstract

本实用新型涉及一种不用焊接的氧枪喷头,该氧枪喷头结构合理,不需离开炼钢车间即可更换喷头,由紫铜喷头、氧枪外层管、喷头内层接管、耐高温的密封圆环、O形橡胶圈组成,其特征是紫铜喷头与氧枪外层管通过螺纹进行连接,并通过耐高温的密封圆环进行密封;紫铜喷头与喷头内层接管通过螺纹进行连接,并通过O形橡胶圈进行密封。本实用新型的有益效果是:取消了紫铜喷头与外层接管和内层接管的焊接工序,节省了能源,降低了成本;更换氧枪喷头,不用切割和焊接,不用把氧枪运回检修车间,只在炼钢炉旁,即可进行喷头的更换。极大地简化了生产工序,缩短了换枪时间,降低了工人的劳动强度,提高了生产效率,增加了钢产量。

The utility model relates to an oxygen lance spray head without welding. The structure of the oxygen lance spray head is reasonable, and the spray head can be replaced without leaving the steelmaking workshop. It is composed of a ring and an O-shaped rubber ring. It is characterized in that the copper nozzle and the outer tube of the oxygen lance are connected by threads and sealed by a high-temperature-resistant sealing ring; the copper nozzle and the inner layer of the nozzle are connected by threads and passed through O-shaped rubber ring for sealing. The beneficial effects of the utility model are: canceling the welding process of the copper nozzle and the outer and inner layer nozzles, saving energy and reducing costs; replacing the nozzle of the oxygen lance without cutting and welding, and without transporting the oxygen lance back to the maintenance workshop , the nozzle can be replaced only next to the steelmaking furnace. It greatly simplifies the production process, shortens the time for changing guns, reduces the labor intensity of workers, improves production efficiency, and increases steel output.

Description

不用焊接的氧枪喷头 Oxygen lance nozzle without welding

技术领域technical field

本实用新型涉及转炉和电炉炼钢用的氧枪喷头。The utility model relates to an oxygen lance nozzle used in converter and electric furnace steelmaking.

背景技术Background technique

氧枪是氧气炼钢的关键设备,氧枪上的喷头是消耗件,其使用寿命,短的只有几十炉,长的可以达到几百炉,大多数的使用寿命是在200炉左右。氧枪喷头损坏了,就要进行更换。更换氧枪喷头,就是把旧的氧枪喷头从氧枪枪体上切割下来,然后再把新的喷头,焊接在氧枪枪体上。从炼钢氧枪诞生之日起,世界各国炼钢氧枪喷头的更换都是这样进行的。Oxygen lance is the key equipment for oxygen steelmaking. The nozzle on the oxygen lance is a consumable part. Its service life is as short as dozens of furnaces, and as long as hundreds of furnaces. Most of them have a service life of about 200 furnaces. If the nozzle of the oxygen lance is damaged, it must be replaced. To replace the oxygen lance nozzle, it is to cut the old oxygen lance nozzle from the oxygen lance body, and then weld the new nozzle on the oxygen lance body. From the day when the steelmaking oxygen lance was born, the replacement of the steelmaking oxygen lance nozzles in all countries in the world is carried out in this way.

图1是现有技术中氧枪与喷头的装配图。紫铜喷头1、喷头外层接管2、喷头内层接管4和3个“O”形橡胶密封圈5组成喷头备件,中层滑动管3、内层密封管6、外层管7、中层管8和内层管9,组成了氧枪枪体的下部分。Fig. 1 is an assembly diagram of an oxygen lance and a spray head in the prior art. Copper nozzle 1, nozzle outer layer connection 2, nozzle inner layer connection 4 and 3 "O" shaped rubber sealing rings 5 constitute the nozzle spare parts, middle sliding tube 3, inner sealing tube 6, outer tube 7, middle tube 8 and The inner tube 9 forms the lower part of the oxygen lance gun body.

由于紫铜与钢管的焊接属于异种金属焊接,焊接技术要求较高。紫铜喷头1与喷头外接管2和喷头内接管4进行焊接时,焊接要加热到800℃左右,然后进行氩弧焊。为了保证焊接质量,确保氧枪使用安全,紫铜喷头1与喷头外接管2和喷头内接管4之间的焊缝需要进行X光探伤检验。因此,喷头备件的焊接一定要在喷头备件生产厂进行,不能在炼钢厂的氧枪检修车间进行铜钢焊接。Since the welding of red copper and steel pipe belongs to the welding of dissimilar metals, the requirements for welding technology are relatively high. When the copper nozzle 1 is welded with the nozzle outer nozzle 2 and the nozzle inner nozzle 4, the welding should be heated to about 800°C, and then argon arc welding is performed. In order to ensure the welding quality and ensure the safe use of the oxygen lance, the welding seam between the copper nozzle 1, the nozzle outer nozzle 2 and the nozzle inner nozzle 4 needs to be inspected by X-ray flaw detection. Therefore, the welding of nozzle spare parts must be carried out in the nozzle spare parts production plant, and copper-steel welding cannot be performed in the oxygen lance maintenance workshop of the steelmaking plant.

喷头备件与氧枪枪体的装配过程是:将喷头备件插入氧枪枪体中,即将喷头内层接管4插入内层密封管6中,通过三个O形橡胶圈5进行密封;将喷头1中的中层管8插入中层滑动管3中,因这一层的管内、外都是水,紧密配合即可,不用密封;将喷头外层接管2与外层管7进行焊接,喷头备件与氧枪枪体的装配即完成。更换新喷头时,将喷头外层接管2与外层管7之间的焊缝切割开,即可将旧喷头备件取下来。The assembly process of the nozzle spare parts and the oxygen lance body is as follows: insert the nozzle spare parts into the oxygen lance body, that is, insert the nozzle inner layer connection tube 4 into the inner layer sealing pipe 6, and seal it with three O-shaped rubber rings 5; The middle layer tube 8 in the middle layer is inserted into the middle layer sliding tube 3, because the inside and outside of the tube of this layer are all water, it is enough to fit tightly without sealing; the outer layer connecting pipe 2 of the nozzle is welded with the outer layer tube 7, and the nozzle spare parts and the oxygen The assembly of the gun body is complete. When replacing a new shower head, the weld seam between the outer layer connecting pipe 2 and the outer layer pipe 7 of the shower head is cut, and the spare parts of the old shower head can be taken off.

氧枪喷头报废后,要将氧枪从转炉或电炉上取下来,水平放置在氧枪运送车上,运到氧枪检修车间,将旧喷头备件取下来,新喷头备件换上。因为喷头外层接管2与外层管7之间焊缝的切割,每次要切掉一少部分氧枪外层管7,喷头更换几次之后,外层管7就要加长一段。喷头换好之后,进行水压检验,检验合格的氧枪,再运回炼钢车间,吊挂在炼钢炉上。因此,氧枪喷头的更换要花费很多时间,特别是大转炉氧枪,二十多米长,从转炉上拆下,再装上,需要多人进行操作。After the oxygen lance nozzle is scrapped, the oxygen lance should be removed from the converter or electric furnace, placed horizontally on the oxygen lance transport vehicle, transported to the oxygen lance maintenance workshop, the old nozzle spare parts should be removed, and new nozzle spare parts should be replaced. Because of the cutting of the welding seam between the nozzle outer layer connection pipe 2 and the outer layer pipe 7, a small part of the oxygen lance outer layer pipe 7 will be cut off at every turn. After the nozzle is replaced several times, the outer layer pipe 7 will be lengthened. After the nozzles are replaced, the water pressure inspection is carried out, and the oxygen lances that pass the inspection are transported back to the steelmaking workshop and hung on the steelmaking furnace. Therefore, the replacement of the oxygen lance nozzle will take a lot of time, especially the large converter oxygen lance, which is more than 20 meters long, is removed from the converter and reinstalled, requiring many people to operate.

实用新型内容Utility model content

本实用新型的目的是针对现有技术的不足,提供一种不用焊接的氧枪喷头,该氧枪喷头结构合理,不需离开炼钢车间即可更换喷头。The purpose of the utility model is to provide an oxygen lance nozzle without welding, which has a reasonable structure and can be replaced without leaving the steelmaking workshop.

为实现上述目的,本实用新型通过以下技术方案实现:In order to achieve the above object, the utility model is realized through the following technical solutions:

不用焊接的氧枪喷头,由紫铜喷头、氧枪外层管、喷头内层接管、耐高温的密封圆环、O形橡胶圈组成,其特征在于:紫铜喷头与氧枪外层管通过螺纹进行连接,并通过耐高温的密封圆环进行密封;紫铜喷头与喷头内层接管通过螺纹进行连接,并通过O形橡胶圈进行密封。The oxygen lance nozzle without welding is composed of a copper nozzle, an oxygen lance outer tube, a nozzle inner tube, a high temperature resistant sealing ring, and an O-shaped rubber ring. It is characterized in that: the copper nozzle and the oxygen lance outer tube are connected through threads It is connected and sealed by a high-temperature-resistant sealing ring; the copper nozzle and the inner nozzle of the nozzle are connected by threads and sealed by an O-shaped rubber ring.

本实用新型的有益效果是:The beneficial effects of the utility model are:

1)取消了紫铜喷头与外层接管和内层接管的焊接工序,喷头备件中也不用再焊接外层接管3;节省了能源,降低了成本。1) The welding process between the copper nozzle and the outer layer nozzle and the inner layer nozzle is cancelled, and the outer layer nozzle 3 is not needed to be welded in the spare parts of the nozzle; energy is saved and the cost is reduced.

2)更换氧枪喷头,不用切割和焊接,不用把氧枪卸下来,不用把氧枪运回检修车间,只在炼钢炉旁,即可进行喷头的更换。极大地简化了生产工序,缩短了换枪时间,降低了工人的劳动强度,提高了生产效率,增加了钢产量。2) Replace the nozzle of the oxygen lance without cutting and welding, without removing the oxygen lance, and without transporting the oxygen lance back to the maintenance workshop. The nozzle can be replaced only next to the steelmaking furnace. It greatly simplifies the production process, shortens the time for changing guns, reduces the labor intensity of workers, improves production efficiency, and increases steel output.

附图说明Description of drawings

图1是现有技术中氧枪喷头的结构示意图;Fig. 1 is the structural representation of oxygen lance nozzle in the prior art;

图2是本实用新型的不用焊接的氧枪喷头的结构示意图。Fig. 2 is a schematic structural view of the oxygen lance nozzle without welding of the present invention.

图1、图2中:1、紫铜喷头 2、外接管 3、中层滑动管 4、喷头内层接管、5、O形橡胶圈 6、内层密封管 7、外层管 8、中层管 9、内层管 10、耐高温的密封圆环 11、O形橡胶圈In Fig. 1 and Fig. 2: 1. Copper nozzle 2. Outer pipe 3. Middle sliding pipe 4. Inner nozzle pipe 5. O-shaped rubber ring 6. Inner sealing pipe 7. Outer pipe 8. Middle pipe 9. Inner tube 10. High temperature resistant sealing ring 11. O-shaped rubber ring

具体实施方式Detailed ways

见图2,该喷头与氧枪枪体的装配过程是:将喷头备件插入氧枪枪体内,紫铜喷头1与喷头内层接管4通过螺纹进行连接,并通过O形橡胶圈11进行密封,喷头内层接管4与内层密封管6通过三个O形橡胶圈5进行密封,内层密封管6上部焊接有内层管9。喷头中层管8在中层滑动管3中滑动,在紫铜喷头1与外接管7之间采用螺纹连接,并且通过耐高温的密封圆环10进行密封。所述的耐高温的密封圆环10采用耐高温的弹性材料。As shown in Figure 2, the assembly process of the nozzle and the oxygen lance body is as follows: Insert the spare parts of the nozzle into the body of the oxygen lance, the copper nozzle 1 and the nozzle inner layer connecting pipe 4 are connected by threads, and are sealed by the O-shaped rubber ring 11, the nozzle The inner layer connecting pipe 4 and the inner layer sealing pipe 6 are sealed by three O-shaped rubber rings 5 , and an inner layer pipe 9 is welded on the top of the inner layer sealing pipe 6 . The middle layer pipe 8 of the nozzle slides in the middle layer sliding pipe 3, and the copper nozzle 1 and the outer connecting pipe 7 are connected by thread, and are sealed by a high temperature resistant sealing ring 10. The high temperature resistant sealing ring 10 is made of high temperature resistant elastic material.

Claims (2)

1. the oxygen lance blow head that need not weld, form by red copper shower nozzle (1), oxygen rifle outer tube (7), the adapter of shower nozzle internal layer (4), resistant to elevated temperatures sealed circular ring (10), O shape rubber ring (11), it is characterized in that: red copper shower nozzle (1) is connected by screw thread with oxygen rifle outer tube (7), and seals by resistant to elevated temperatures sealed circular ring (10); Red copper shower nozzle (1) is taken over (4) with the shower nozzle internal layer and is connected by screw thread, and seals by O shape rubber ring (11).
2. the oxygen lance blow head that need not weld according to claim 1 is characterized in that: described resistant to elevated temperatures sealed circular ring (10) adopts resistant to elevated temperatures resilient material.
CNU2007200118742U 2007-04-24 2007-04-24 Oxygen lance nozzle without welding Expired - Fee Related CN201033790Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200118742U CN201033790Y (en) 2007-04-24 2007-04-24 Oxygen lance nozzle without welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200118742U CN201033790Y (en) 2007-04-24 2007-04-24 Oxygen lance nozzle without welding

Publications (1)

Publication Number Publication Date
CN201033790Y true CN201033790Y (en) 2008-03-12

Family

ID=39194682

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200118742U Expired - Fee Related CN201033790Y (en) 2007-04-24 2007-04-24 Oxygen lance nozzle without welding

Country Status (1)

Country Link
CN (1) CN201033790Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821176A (en) * 2016-05-03 2016-08-03 中国钢研科技集团有限公司北京冶金工艺技术研究所 Inclined conical face multi-hole furnace door oxygen lance sprayer for electric furnace
CN116511867A (en) * 2023-06-14 2023-08-01 重庆钢铁股份有限公司 A method for replacing the spray head of RH top gun

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821176A (en) * 2016-05-03 2016-08-03 中国钢研科技集团有限公司北京冶金工艺技术研究所 Inclined conical face multi-hole furnace door oxygen lance sprayer for electric furnace
CN116511867A (en) * 2023-06-14 2023-08-01 重庆钢铁股份有限公司 A method for replacing the spray head of RH top gun

Similar Documents

Publication Publication Date Title
CN103672008A (en) Ball valve with all-welded valve bodies and welding method of ball valve
CN108723557A (en) A kind of welding method of cylinder
CN201394704Y (en) Argon-filling welding protective cover
CN102151963B (en) Welding gun for coupling active TIG welding of gas weld pool
CN215658355U (en) Argon protection device for titanium and titanium alloy pipeline GTAW welded argon arc welding gun
CN201033790Y (en) Oxygen lance nozzle without welding
CN101270401A (en) A pure oxygen non-blast furnace ironmaking final reduction furnace oxygen tuyere device
CN201077829Y (en) Coke drum bottom feeder
CN104073818B (en) Pressure-changing internal circulation pickling method for water-cooled pipeline of electron beam cold hearth furnace
CN105935832A (en) Titanium heat exchange tube welded argon shield device and using method thereof
CN102837100B (en) Flame brazing welding machine and pipe joint protection tool thereof
WO2021103880A1 (en) Repair structure for welding defect of high-alloy pipes
CN206163899U (en) Corrosion resistant lightning rod
CN203627875U (en) Ball valve with all-welded valve body
CN104400180A (en) Repair welding process of high alloy steel track shoe
CN202271106U (en) Novel titanium metal enclosed type continuous welding device
CN204486985U (en) Zirconium heat exchanger mouth of pipe automatic welding welding protection cover
CN212451291U (en) Coke oven bridge pipe wall damage point repairing device
CN203976601U (en) Porcelain platinum tank furnace bubbling device
CN203956353U (en) Zirconium pipe welding safety cover
CN104551354A (en) Protective anti-oxidation welding method of liner plate or air blowpipe
CN205111045U (en) Titanium material MIG welds safety cover
CN205470862U (en) Industrial boiler collection case hand hole device
CN206739896U (en) Novel oxidation-resistant, chute can be repaired
CN204053206U (en) A kind of carbon dioxide gas arc welding welding gun structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHENGYANG DONGYE HANSEN METALLURGICAL EQUIPMENT CO

Free format text: FORMER OWNER: LIU ZHICHANG

Effective date: 20100517

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 114000 SUITE 1105, HOUSE EAST, NO.15, WUYI ROAD, TIEDONG DISTRICT, ANSHAN CITY, LIAONING PROVINCE TO: 110168 NO.17, WENSU STREET, HUNNANXIN DISTRICT, SHENYANG CITY

TR01 Transfer of patent right

Effective date of registration: 20100517

Address after: 110168 Shenyang Hunnan wavesource Street No. 17

Patentee after: Shenyang Dongye Hansen Metallurgy Equipment Co., Ltd.

Address before: 114000 Anshan province Liaoning City Tiedong District 51 Road No. 15 East Building Room 1105

Patentee before: Liu Zhichang

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080312

Termination date: 20150424

EXPY Termination of patent right or utility model