CN201010496Y - Large-tonnage lifting device using through jack as power - Google Patents

Large-tonnage lifting device using through jack as power Download PDF

Info

Publication number
CN201010496Y
CN201010496Y CNU2007200838014U CN200720083801U CN201010496Y CN 201010496 Y CN201010496 Y CN 201010496Y CN U2007200838014 U CNU2007200838014 U CN U2007200838014U CN 200720083801 U CN200720083801 U CN 200720083801U CN 201010496 Y CN201010496 Y CN 201010496Y
Authority
CN
China
Prior art keywords
screw rod
jack
walking beam
main
force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200838014U
Other languages
Chinese (zh)
Inventor
李奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Dam group Limited by Share Ltd
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Water & Power Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Water & Power Engineering Group Co Ltd filed Critical China Gezhouba Water & Power Engineering Group Co Ltd
Priority to CNU2007200838014U priority Critical patent/CN201010496Y/en
Application granted granted Critical
Publication of CN201010496Y publication Critical patent/CN201010496Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A large tonnage hoist device utilizing cross-core hoisting jack as power belongs to the hoist equipment. The hoist device comprises a main girder, the main girder is connected with a frame, an upper walking beam and a lower walking beam are separately positioned on the upper side lower side of the main girder, the cross-core hoisting jack is connected with a main force-bearing screw rod, the main force-bearing screw rod is provided with a main force-bearing screw cap, a secondary force-bearing screw rod is provided with a secondary force-bearing screw cap, the main force-bearing screw rod and the secondary force-bearing screw rod are connected with the upper walking beam and the lower walking beam through the main girder, and the lower walking beam is connected with work pieces through a force transmission screw rod. The utility model utilizes the cross-core hoisting jack as the power, adopts the structure of coordination of the cross-core hoisting jack and the screw rod group, the hoisting work for large tonnage work pieces can be completed without the need to equip the pulley group and with small field limitation, thereby improving the hoisting height.

Description

The large-tonnage hoisting device that utilizes the feedthrough jack to be used as power
Technical field
The utility model relates to a kind of weight-lifting equipment, particularly a kind of large-tonnage hoisting device that utilizes the feedthrough jack to be used as power.
Background technology
Large-tonnage weight-lifting equipment commonly used has the supporting hoisting device of winch assembly pulley.This device keystone configuration is winch, assembly pulley and supporting system.Principle is to utilize the laborsaving principle of assembly pulley to improve the lifting tonnage.Lifting tonnage that this device improves is limited, generally can only reach 100 tons to 200 tons, and for satisfying the working space requirement of assembly pulley, the hoisting height that needs is bigger, is not suitable for hanging stenosis such as high conditional gate pier and carries out hoisting operation.
Summary of the invention
The purpose of this utility model is to provide a kind of lifting to surpass 200 tons, the large-tonnage hoisting device that utilizes the feedthrough jack to be used as power that hoisting height is big.
The purpose of this utility model is achieved in that a kind of large-tonnage hoisting device that utilizes the feedthrough jack to be used as power, comprise main bearing beam 1, main bearing beam 1 is connected with support 2, last walking beam 9 and following walking beam 12 lay respectively at main bearing beam 1 above and below, feedthrough jack 3 is connected with main stress screw rod 5, main stress screw rod 5 is provided with main stress nut 4, inferior stressed screw rod 6 is provided with time stressed nut 7, main stress screw rod 5 passes main bearing beam 1 with time stressed screw rod 6 and is connected with following walking beam 12 with last walking beam 9, and following walking beam 12 is connected with workpiece 13 by power transmission screw rod 8.Be provided with rolling bar 11 between last walking beam 9 and the main bearing beam 1.Main bearing beam 1 is provided with the equipment 10 that makes the workpiece parallel motion.The equipment 10 that makes the workpiece parallel motion can be bottle gouard moved by hands or winch or level jack.
The large-tonnage hoisting device that utilizes the feedthrough jack to be used as power provided by the utility model, the structure that adopts the feedthrough jack to cooperate with the screw rod faciation, do not need the lifting work that assembly pulley just can be finished the large-tonnage workpiece is set, be subjected to the place restriction little, improved hoisting height.
Description of drawings
Below in conjunction with drawings and Examples the utility model is done a step explanation.
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Rising principle of work of the present utility model is as follows:
With workpiece 13 clamp put in place after, 3 jackings of feedthrough jack, at this moment, inferior stressed screw rod of both sides 6 and time stressed nut 7 do not stress;
Because time stressed nut 7 does not stress, the artificial suitable position of time stressed nut 7 to of rotating;
Feedthrough jack 3 descends, and this moment, the inferior stressed screw rod 6 and the inferior stressed nut 7 of both sides were stressed, and main stress screw rod 5 and main stress nut 4 do not stress;
Rotate main stress nut 4 to one correct positions;
3 jackings of feedthrough jack can realize the another rising of taking turns.So circulation can rise to assigned position with workpiece 13.
The principle of work that the utility model descends is as follows:
When the stressed nut of time stressed screw rod 6 times 7 is stressed in both sides, rotate main stress nut 4, suppose that feedthrough jack stroke is 20cm away from feedthrough jack 3 plane of action 19cm.
With the very heavy jacking 19cm of feedthrough, this moment main stress nut 4 and jack 3 closed contacts, main stress screw rod 5, main stress nut 4, jack 3 is stressed, inferior stressed screw rod 6 and time stressed nut 7 do not stress.
Rotate time stressed nut 7, make it the 18cm that rises.
With jack 3 decline 18cm, this moment, time stressed nut 7 touched locking place of walking beam 9, and member is stuck.
Continue decline jack 30.5cm, this moment, main stress screw rod 5 main stress nuts 4 jacks 3 did not stress, and 6 stressed nuts 7 of inferior stressed screw rod bear total weight, promptly realize once circulation.
Can circulate according to last method next time.
The equipment 10 that makes the workpiece parallel motion can be bottle gouard moved by hands or winch or level jack, by the equipment 10 that makes the workpiece parallel motion can realize lifting or descend after the parallel motion of workpiece 13.
The purpose that rolling bar 11 is provided with is to reduce to go up friction force between walking beam 9 and the main bearing beam 1, is convenient to realize parallel motion.

Claims (4)

1. large-tonnage hoisting device that utilizes the feedthrough jack to be used as power, comprise main bearing beam (1), main bearing beam (1) is connected with support (2), it is characterized in that: go up walking beam (9) and following walking beam (12) and lay respectively at main bearing beam (1) above and below, feedthrough jack (3) is connected with main stress screw rod (5), main stress screw rod (5) is provided with main stress nut (4), inferior stressed screw rod (6) is provided with time stressed nut (7), main stress screw rod (5) passes main bearing beam (1) with time stressed screw rod (6) and is connected with following walking beam (12) with last walking beam (9), and following walking beam (12) is connected with workpiece (13) by power transmission screw rod (8).
2. the large-tonnage hoisting device that utilizes the feedthrough jack to be used as power according to claim 1 is characterized in that: go up between walking beam (9) and the main bearing beam (1) and be provided with rolling bar (11).
3. the large-tonnage hoisting device that utilizes the feedthrough jack to be used as power according to claim 1 and 2 is characterized in that: main bearing beam (1) is provided with the equipment (10) that makes the workpiece parallel motion.
4. the large-tonnage hoisting device that utilizes the feedthrough jack to be used as power according to claim 3 is characterized in that: the equipment (10) that makes the workpiece parallel motion can be bottle gouard moved by hands or winch or level jack.
CNU2007200838014U 2007-03-17 2007-03-17 Large-tonnage lifting device using through jack as power Expired - Fee Related CN201010496Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200838014U CN201010496Y (en) 2007-03-17 2007-03-17 Large-tonnage lifting device using through jack as power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200838014U CN201010496Y (en) 2007-03-17 2007-03-17 Large-tonnage lifting device using through jack as power

Publications (1)

Publication Number Publication Date
CN201010496Y true CN201010496Y (en) 2008-01-23

Family

ID=39045436

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200838014U Expired - Fee Related CN201010496Y (en) 2007-03-17 2007-03-17 Large-tonnage lifting device using through jack as power

Country Status (1)

Country Link
CN (1) CN201010496Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291248A (en) * 2014-09-03 2015-01-21 天奇自动化工程股份有限公司 Station conversion device
CN107311039A (en) * 2017-08-23 2017-11-03 中国十九冶集团有限公司 Method for hauling heavy equipment
CN111704041A (en) * 2020-07-16 2020-09-25 四川绵南高速公路开发有限公司 An integrated assembled gantry used for beam-slab lateral movement and lifting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291248A (en) * 2014-09-03 2015-01-21 天奇自动化工程股份有限公司 Station conversion device
CN107311039A (en) * 2017-08-23 2017-11-03 中国十九冶集团有限公司 Method for hauling heavy equipment
CN111704041A (en) * 2020-07-16 2020-09-25 四川绵南高速公路开发有限公司 An integrated assembled gantry used for beam-slab lateral movement and lifting

Similar Documents

Publication Publication Date Title
CN201351099Y (en) Oil cylinder direct ejection gantry automobile lifter
CN203143969U (en) Lifting fixed-column arm crane
CN204689527U (en) The lifting screw that a kind of rising or falling speed is fast
CN205500675U (en) Lifting device
CN203936615U (en) A kind of many height positioning mechanisms
CN201501762U (en) Wedge-shape guide rail device for lifting platform
CN201010496Y (en) Large-tonnage lifting device using through jack as power
CN202897887U (en) Rapid lifting device for on-load tap changer
CN204981004U (en) Push away ascending device of material
CN203127952U (en) Multi-stage elevator buffering device
CN106271807A (en) A kind of flange Workpiece tilting device
CN202829453U (en) Lift used for arch camber of motor-driven center pivot sprinkling machine
CN201797247U (en) Overhauling frame for valve body of circuit breaker mechanism
CN201458531U (en) Clamping-lifting device used for workpiece lifting
CN207108405U (en) Portable light-duty jacking apparatus
CN202880793U (en) Movable type single column type aerial work platform
CN204592722U (en) Roll mill moves integrally uses rise-fall type caster device
CN202492331U (en) Scissor lift with automotive ramp locking mechanism
CN202754757U (en) Novel lifting device structure
CN2761563Y (en) Special crane for extra-high, banding, autolifting type wind power generator
CN205928072U (en) Saw bit duplex position loading attachment
CN101863431B (en) Stepless mechanical lifting gear
CN202379682U (en) Lifting mechanism of forklift
CN204675565U (en) A kind of double-cylinder hydraulic elevator
CN202829424U (en) Indoor movable type hoisting tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA GEZHOUBA GROUP CO.

Free format text: FORMER OWNER: CHINA GEZHOUBA WATER CONSERVANCY AND HYDROELECTRIC ENGINEERING GROUP CO., LTD.

Effective date: 20080111

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080111

Address after: Hubei province Yichang City Qing Road No. 1, zip code: 443002

Patentee after: China Gezhouba Group Co., Ltd.

Address before: Hubei city of Yichang Province, a clear road, zip code: 443002

Patentee before: China Gezhouba Water & Power Engineering Group Co., Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090717

Address after: Hubei province Yichang City Qing Road No. 1, zip code: 443002

Co-patentee after: Gezhouba Group No.1 Engineering Co., Ltd.

Patentee after: China Gezhouba Dam group Limited by Share Ltd

Address before: Hubei province Yichang City Qing Road No. 1, zip code: 443002

Patentee before: China Gezhouba Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080123

Termination date: 20160317