CN1958967A - Quick dewatering method of positive and negative pressure for drainage piles in rigid body - Google Patents

Quick dewatering method of positive and negative pressure for drainage piles in rigid body Download PDF

Info

Publication number
CN1958967A
CN1958967A CN 200610145889 CN200610145889A CN1958967A CN 1958967 A CN1958967 A CN 1958967A CN 200610145889 CN200610145889 CN 200610145889 CN 200610145889 A CN200610145889 A CN 200610145889A CN 1958967 A CN1958967 A CN 1958967A
Authority
CN
China
Prior art keywords
drainage
water
stake
positive
submersible pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610145889
Other languages
Chinese (zh)
Other versions
CN100570072C (en
Inventor
马鸿春
马骢
马卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HONGHAI TECH DEVELOPMENT Co Ltd TIANJIN
Original Assignee
HONGHAI TECH DEVELOPMENT Co Ltd TIANJIN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HONGHAI TECH DEVELOPMENT Co Ltd TIANJIN filed Critical HONGHAI TECH DEVELOPMENT Co Ltd TIANJIN
Priority to CNB2006101458898A priority Critical patent/CN100570072C/en
Publication of CN1958967A publication Critical patent/CN1958967A/en
Application granted granted Critical
Publication of CN100570072C publication Critical patent/CN100570072C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a drainage method of foundation pile, in particular, it relates to a positive and negative pressure quick drainage method of rigid body drainage pile. The invented principle is characterized by that when the positive pressure drainage efficiency is reduced, the negative pressure (namely evacuation) can be applied to the drainage channel in the pile interior, and can utilize water-filtering layer to increase hydraulic gradient of soil layer water penetration so as to accelerate water penetration and drainage.

Description

Quick dewatering method of positive and negative pressure for drainage piles in rigid body
Technical field
The present invention relates to a kind of water discharge method of foundation pile, particularly a kind of quick dewatering method of positive and negative pressure for drainage piles in rigid body.
Background technology
At present, about the draining of foundation pile, common method both domestic and external is: natural drainage or positive pressuring drainage method.That is the water that oozes out in the soil layer, directly overflow outside the stake or water seepage is extracted out by water pump.
After the water in the stake is drained, wait for that again next group water oozes out from soil layer.The speed of water seepage is quite slow, needs just to reach for a long time the water level that can require for suction, could be toward extracardiac pumping, this method draining not only slowly but also not thorough, cyclic suction several times after, it is very slow that water just oozes out.Reason is after the water in the soil layer flows out, to cause soil particle to sink, soil solidifying, and the transmission coefficient of soil has diminished.Than the water in the soil of distant place, because of path length, water need have a strong impact on construction quality, speed, investment for a long time if discharge is just very difficult apart from pile lining.Therefore, this technology is badly in need of improving.
Summary of the invention
Technology of the present invention is to utilize quick dewatering method of positive and negative pressure for drainage piles in rigid body to solve the slow technical problem of foundation pile drainage speed.
Feature of the present invention is a kind of quick dewatering method of positive and negative pressure for drainage piles in rigid body.
The present invention mainly is made up of rigid body drainage pile, seal cover, submersible pump, ejector, and wherein seal cover has air vent, and the submersible pump outlet pipe has valve.
Basic principle of the present invention
See that (Fig. 1) in the good rigid body drainage pile vertical drain that sinks, oozes out water level and stablize, and inserts submersible pump and draws water.The in-channel water position is consistent with groundwater table, and be an atmospheric pressure p this moment in the passage o, below the water level, be water pressure p wThe starting submersible pump draws water, and the very fast decline of water level reaches stable.After a while, infiltration is flowed out, and water level is gone up again.Repeat to draw water, very slow up to the water that oozes out, the water yield is very little again, and water level is difficult to go up and, and sees (Fig. 2).At this moment, interior still atmospheric pressure p of passage oThen, the drainage channel mouth is added top cover labyrinth, and install ejector, see (Fig. 3).Start ejector, occur negative pressure in the passage, up to-the 740mm mercury column.Because the drainage channel internal pressure sharply reduces, water level reduces again, makes the pressure of the interior anhydrous subregion of drainage channel be-the p state.And the pressure in the pile soil horizon does not become, and this just oozes out for the water in the soil layer.Increased pressure p.So current have been accelerated, flow has also strengthened, the water pressure p in the drainage channel wJust changed from small to big.Water is very fast full, and part water is extracted out by ejector and gone, and sees (Fig. 4).Because water has been expired in the drainage channel, water pressure has been recovered p again w, native internal water pressure gradient has diminished again, begins to influence oozing out of the interior water of soil again.In order to accelerate to discharge the water p in the drainage channel wSo, stop ejector, open air vent, open the valve of submersible pump, and start the submersible pump draining.Very fast, water drops to again at the bottom of the drainage channel, sees (Fig. 2).So, again air vent is closed, valve closing, the starting ejector applies negative pressure, causes the barometric gradient of water to increase, and strengthens the infiltration flow, and the water of drainage channel is very fast full again, sees (Fig. 4).Open the valve of submersible pump again, open air vent, start submersible pump and draw water, water level is very fast in the drainage channel has descended, and sees (Fig. 2).With this cycling, the pore water of soil layer is very fast to be taken away, and it is fixed to have realized that soil layer quickens.
Water discharge method of the present invention
1, when the rigid body drainage pile sink to underground after, underground water enters the drainage channel of stake just by the filtration beds of stake, and tends towards stability;
2, the drainage channel of submersible pump being put into stake draws water, when water seepage does not satisfy submersible pump and draws water condition, and stop pumping;
3, the drainage channel mouth is added seal cover, stretch out the submersible pump outlet pipe, close the outlet pipe valve, close the seal cover air vent, keep the drainage channel sealing state;
4, install ejector, and starting, to vacuumizing in the drainage channel, after well water rises, from ejector, discharge;
5, open seal cover, reset submersible pump and draw water.When drawing water, need not in-channel water and be full of, stable level just can draw water, and is principle soon with draining;
6, after water exhausts, close submersible pump outlet pipe valve, close air vent, start ejector and do again and vacuumize, accelerate the soil layer infiltration.When water level reaches when height of rationally drawing water, close ejector, reset submersible pump again;
7, above-mentioned steps recycles, fixed until stake week soil,, during engineering demands till.
Superiority of the present invention
1, owing to the water of having discharged stake Zhou Tuzhong is gentle, impels base soil rapidly solidified, improved native friction factor, so fundamentally improved the bearing capacity of friction pile;
2, use positive drainage by suction method, it is fast that the water in the basic soil, gas are discharged, thoroughly;
3, the fixed no Back Up in back of base soil;
4, save material, save the duration, save energy consumption, reduce investment outlay, free from environmental pollution;
5, the positive and negative pressure drainage principle is clear in the stake, and equipment is simple, and is easy to operate, and effect is obvious;
6, positive and negative pressure drainage system can forever keep in stake, can regularly irregularly continue draining, reduces the water content of stake Zhou Tuzhong.Therefore, Zhuan later stage bearing capacity is increasing year by year.
Description of drawings
(1) is each soil layer; (2) be ground; (3) be groundwater table; (4) be water level in the stake; (5) be the drainage layer; (6) be pile lining; (7) be the limbers; (8) be submersible pump; (9) be the submersible pump gutter; (10) be valve; (11) be seal cover; (12) be air vent; (13) be ejector; (14) be flow route; (15) be an internal drainage passage; p oBe atmospheric pressure, p wBe water pressure ,-p is a vacuum.
The specific embodiment
After the rigid body drainage pile sank in the soil, the water in each soil layer (1) just saw through drainage layer (5) along flow route (14), entered an internal drainage passage (15) and constantly rising through limbers (7), and through after a while, water level (4) is stable in the stake.At this moment, start submersible pump (8) draining, see (Fig. 1).
Submersible pump (8) started after a period of time, and water level (4) drops to drainage channel (15) bottom in the stake, sees (Fig. 2).At this moment, water infiltrates stake internal drainage passage (15) still in a manner described in each soil layer (1), starts submersible pump (8) draining again, in this way, and cycling.
Through after a burst of positive pressuring drainage, the water in each soil layer (1) just oozes out very slow, for quickening the top of infiltration at stake internal drainage passage (15), add a seal cover (11), and have air vent (12), ejector (13) and submersible pump gutter (9) are installed are seen (Fig. 3).
Starting ejector (13) vacuumizes stake internal drainage passage (15), and very fast vacuum reaches-the 740mm mercury column, near a negative atmospheric pressure.Increased seepage pressure this moment, the water source continually from each soil layer (1) fast through drainage layer (5) limbers (7), enter an internal drainage passage (15).Water level (4) beginning fast rise in the stake, and slow down gradually, be full of stake internal drainage passage (15) at last, by ejector (13) water is extracted out, see (Fig. 4).
At this moment, infiltration, draining all is in not good state, stops ejector (13) immediately, opens air vent (12), opens submersible pump valve (10), the draining of starting submersible pump (8).In this way, recycle, ooze out very for a short time until current, it is very long to wait to find time, and stops when confirming stake Zhou Tuyi engineering demands.

Claims (4)

1, quick dewatering method of positive and negative pressure for drainage piles in rigid body, it is positive pressuring drainage in stake, pore water in the soil layer oozes out when very slow, and stake internal drainage passage is implemented sealing, applies negative pressure, increase seepage pressure, the artificial soil layer of forcing seeps water fast, is reasonably opening into air vent opportunity, the method for the quick draining of starting malleation, and recycle, end when reaching designing requirement.
2, quick dewatering method of positive and negative pressure for drainage piles in rigid body according to claim 1, it is characterized in that: basic principle of the present invention is to carry out positive pressuring drainage after a period of time when rigid body drainage pile stake internal drainage passage, wait for when the infiltration time is oversize, stop positive pressuring drainage.Stake internal drainage passage from the stake top seal method that applies negative pressure (promptly vacuumizing), is increased the barometric gradient that seeps water in the soil layer, strengthen seepage velocity, stake internal drainage passage water level fast rise when helping positive pressuring drainage, is opened air vent, carry out positive pressuring drainage, the very fast decline of water level in the stake.When drawdown when submersible pump can't draw water, stop positive pressuring drainage, repeat above-mentioned steps again and carry out drainage by suction, move in circles, till engineering demands.
3, quick dewatering method of positive and negative pressure for drainage piles in rigid body according to claim 1, it is characterized in that: applying positive pressuring drainage equipment is submersible pump, applying drainage by suction equipment is ejector, the sealing equipment is a seal cover, and band air vent, the sealing position is a top or sidepiece, submersible pump drainage pipe band valve.
4, quick dewatering method of positive and negative pressure for drainage piles in rigid body according to claim 1 is characterized in that: water discharge method of the present invention
(1) when the rigid body drainage pile sink to underground after, the underground water just filtration beds by stake enters the drainage channel of stake, and tends towards stability;
(2) drainage channel of submersible pump being put into stake draws water, when water seepage does not satisfy submersible pump and draws water condition, and stop pumping;
(3) the drainage channel road junction is added seal cover, stretch out the submersible pump outlet pipe, close the outlet pipe valve, close the seal cover air vent, keep the drainage channel sealing state;
(4) install ejector, and starting, to vacuumizing in the drainage channel, after well water rises, from ejector, discharge;
(5) open the seal cover air vent, reset submersible pump and draw water.When drawing water, need not in-channel water and be full of, stable level just can be taken out, and is principle soon with draining;
(6) after water exhausts, close submersible pump outlet pipe valve, close air vent, start ejector and do again and vacuumize, accelerate the soil layer infiltration.When current reach when height of rationally drawing water, close ejector, reset submersible pump again;
(7) above-mentioned steps recycles, and fixed until stake week soil ends during engineering demands.
CNB2006101458898A 2006-11-22 2006-11-22 Quick dewatering method of positive and negative pressure for drainage piles in rigid body Expired - Fee Related CN100570072C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101458898A CN100570072C (en) 2006-11-22 2006-11-22 Quick dewatering method of positive and negative pressure for drainage piles in rigid body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101458898A CN100570072C (en) 2006-11-22 2006-11-22 Quick dewatering method of positive and negative pressure for drainage piles in rigid body

Publications (2)

Publication Number Publication Date
CN1958967A true CN1958967A (en) 2007-05-09
CN100570072C CN100570072C (en) 2009-12-16

Family

ID=38070809

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101458898A Expired - Fee Related CN100570072C (en) 2006-11-22 2006-11-22 Quick dewatering method of positive and negative pressure for drainage piles in rigid body

Country Status (1)

Country Link
CN (1) CN100570072C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061695A (en) * 2010-12-09 2011-05-18 广东省航盛建设集团有限公司 Treatment method of drainage pipe pile composite foundation
CN104018842A (en) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 Receiving structure and receiving method used when shield tunneling machine reaches tunneling end point
CN104711968A (en) * 2015-03-23 2015-06-17 程义吉 Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method
CN105317050A (en) * 2014-07-30 2016-02-10 天津鸿海科技开发有限责任公司 Reinforcing pile
CN106120701A (en) * 2016-08-23 2016-11-16 河海大学 Prepressing structure and method for Perioperative cardiac events blowing-filling sludge epeirogenetic
CN111676994A (en) * 2020-06-19 2020-09-18 深圳市亨泰建筑工程有限公司 Novel building pile foundation structure
CN113846626A (en) * 2021-10-09 2021-12-28 福建省大地管桩有限公司 Stable tip ground-grasping type concrete pipe pile
CN113914314A (en) * 2020-07-07 2022-01-11 宁波大学 Construction method of static drilling root-planting drainage pile

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061695A (en) * 2010-12-09 2011-05-18 广东省航盛建设集团有限公司 Treatment method of drainage pipe pile composite foundation
CN104018842A (en) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 Receiving structure and receiving method used when shield tunneling machine reaches tunneling end point
CN104018842B (en) * 2014-05-04 2016-11-02 广东水电二局股份有限公司 A kind of shield machine arrives reception structure and the method for reseptance thereof of driving terminal
CN105317050A (en) * 2014-07-30 2016-02-10 天津鸿海科技开发有限责任公司 Reinforcing pile
CN104711968A (en) * 2015-03-23 2015-06-17 程义吉 Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method
CN106120701A (en) * 2016-08-23 2016-11-16 河海大学 Prepressing structure and method for Perioperative cardiac events blowing-filling sludge epeirogenetic
CN106120701B (en) * 2016-08-23 2018-10-09 河海大学 Prepressing structure and method for Perioperative cardiac events blowing-filling sludge epeirogenetic
CN111676994A (en) * 2020-06-19 2020-09-18 深圳市亨泰建筑工程有限公司 Novel building pile foundation structure
CN113914314A (en) * 2020-07-07 2022-01-11 宁波大学 Construction method of static drilling root-planting drainage pile
CN113846626A (en) * 2021-10-09 2021-12-28 福建省大地管桩有限公司 Stable tip ground-grasping type concrete pipe pile

Also Published As

Publication number Publication date
CN100570072C (en) 2009-12-16

Similar Documents

Publication Publication Date Title
CN1958967A (en) Quick dewatering method of positive and negative pressure for drainage piles in rigid body
CN101851914B (en) Method for regulating and controlling ventilating transformation and quickly reinforcing dredger fill in vacuum
CN105649002A (en) Rapid treatment system and rapid treatment method for soft soil foundation
CN101787702A (en) Effective vacuum dewatering method
CN110397055B (en) Self-elevating water retaining wall embedded in box-type cofferdam
CN205012315U (en) Extrusion vacuum soft soil foundation treatment device
CN102733371A (en) Closed direct-sucking sectional vacuum preloading foundation treatment method
CN105442624A (en) Gas pumping-injecting interactive type foundation pit precipitation system and precipitation method thereof
CN109763479A (en) A kind of supercharged vacuum flexibility pipe well Yield rainfall relation system and its construction method
CN101230568B (en) U-shaped soft vacuum dredged silt rapid drainage method
JP5659566B2 (en) Pumping equipment, soft ground improvement method, ground excavation method, contaminated soil purification method, and condensate method
CN202007402U (en) Integrated light well plastic draining and precipitating well point pipe
CN112281883B (en) Precipitation system and operation method thereof
CN107794931B (en) Foundation pit supporting construction
CN218116404U (en) Vacuum preloading drainage system
CN201473943U (en) Soft foundation treatment device
CN112878308B (en) High-load ultralow-position precipitation vacuum preloading method
CN112252347B (en) Deep well dewatering device and operation method thereof
CN109972665B (en) Horizontal permeation-preventing structure with low permeation coefficient
CN205348204U (en) Light well point precipitation system
CN214423393U (en) Precipitation system
CN1837499A (en) Technique for quickly reinforcing soft soil foundation
CN111962540A (en) Automatic drainage box
CN112281884A (en) Well point dewatering device and operation method thereof
CN204343282U (en) Soft foundation is separated slip casting preloading quick separating dewatering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Ma Hongchun

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Xiaoyuan street 300457 Tianjin City Development Zone, No. 3 room 306

Patentee after: Honghai Tech Development Co., Ltd., Tianjin

Address before: 300452, Tanggu, Tianjin East sell oil village 65-404

Patentee before: Honghai Tech Development Co., Ltd., Tianjin

DD01 Delivery of document by public notice

Addressee: Honghai Tech Development Co., Ltd., Tianjin

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Honghai Tech Development Co., Ltd., Tianjin

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Honghai Tech Development Co., Ltd., Tianjin

Document name: Notification to Go Through Formalities Rectification of Restoration of Right

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091216

Termination date: 20171122

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Honghai Tech Development Co., Ltd., Tianjin

Document name: Notification of Decision on Request for Restoration of Right