CN1869336A - Road crossing - Google Patents

Road crossing Download PDF

Info

Publication number
CN1869336A
CN1869336A CN 200510071096 CN200510071096A CN1869336A CN 1869336 A CN1869336 A CN 1869336A CN 200510071096 CN200510071096 CN 200510071096 CN 200510071096 A CN200510071096 A CN 200510071096A CN 1869336 A CN1869336 A CN 1869336A
Authority
CN
China
Prior art keywords
bridge
passage
road crossing
walkway
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510071096
Other languages
Chinese (zh)
Inventor
贾连海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200510071096 priority Critical patent/CN1869336A/en
Publication of CN1869336A publication Critical patent/CN1869336A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention relates to a ring crossing bridge that includes main bridge and walkway. The main bridge includes 12 arc walkways, and the walkway has four same direct movement dome bridge. The invention integrates the vehicle walkway and left turn and right turn walkway to the same bridge and drastically solves the man and vehicle separating problem. It has high passing efficiency.

Description

Road crossing
Technical field:
The present invention relates to road infall bridge.It specifically is a kind of road crossing
Background technology:
Bridge generally has level bridge at all times, arch bridge, and overpass bridge, and mostly be the mixed row of people's car, traffic efficiency is low; The light people of bridge loaded vehicle who has, pedestrian must climb up and bore down, or the walking of detouring, and suffer untold misery; The bridge that has is heavily kept straight on and is gently turned, and various current intersections turn to problem, all place bridge to handle outward, causes ground dough figurine car to mix, and current difficulty increases; The bridge construction that also has is huge, and passage and outlet are complicated, not only take up an area of too much, and run wrong road easily.
Summary of the invention:
The purpose of this invention is to provide a kind of modern design, the 26S Proteasome Structure and Function uniqueness, people's car separates fully.Not only unobstructed but also safe new bridge.For a change the crossing block up and the pedestrian climbs overline bridge, make one's way into the tunnel too much, forbid that the vehicle too much phenomenon of turning left creates favorable conditions.
Concrete technical scheme is: this road crossing; Constitute by main bridge and passage bridge two parts; Described main bridge refers to by 12 different directions arc row of channels, and height is straggly, intersects in length and breadth, and shuttle is worn the annular bridge that braiding constitutes;
Described passage bridge refers to be four domatic bridges of identical craspedodrome of one with main bridge linking;
Described people's car separates fully, refer to that pedestrian's (comprising bicycle) ground under bridge is current, and motor vehicle travels on bridge, and is separately noiseless mutually up and down;
The unique distinction of this road crossing is: the craspedodrome passage and the left and right sides turning channel of each different directions vehicle all combine in a bridge, and the contradiction that various current intersections turn to all places to handle in the bridge to be dissolved, and thoroughly solves people's car separation problem from integral body; Great advantage is to accomplish that people-oriented, attaches most importance to car, develops simultaneously on the bridge under the bridge, and unobstructed and safety makes the best of both worlds the traffic efficiency height.The pedestrian is at ground running, and road is smooth, extends in all direction, and need not climb up and bore down, and time saving and energy saving, vehicle travels on bridge, respectively goes into Qi Dao, takes advantage of a situation to advance, and need not worry to run wrong road, shuttles back and forth up and down; Powerful and unconstrained style, unblocked.
Description of drawings:
Fig. 1 is main bridge vertical view
Fig. 2 is a passage bridge vertical view
Fig. 3 is the a-a sectional view of Fig. 1
Fig. 4 is this bridge pier location alignment view (also being the pedestrian way line chart)
The specific embodiment:
Referring to Fig. 1-Fig. 4
It is one that this road crossing is connected with four identical passage bridges by main bridge;
12 arc row of channels of main bridge, height is straggly, and intersection and shuttle are worn braiding looping bridge in length and breadth;
A1.A2.A3.A4 is respectively four craspedodrome passages of different directions among Fig. 1; B1.B2.B3.
B4 is respectively four left-hand bend passages of different directions; And take advantage of a situation respectively and A2.A3.A4A1 merges into one; C1.C2.C3.C4 is respectively four right-hand bend passages of different directions.
Fig. 2, passage bridge upper end is connected with main bridge, and the lower end is communicated with highway, and the passage bridge is made up of up bridge and downward bridge, wherein up bridge is separated into A again, B, three passages of C are respectively the left side of keeping straight on, the right-hand bend passage, D, E are that down going channel (divide afterwards earlier and close, be convenient to bus and pull in) F1.F2 is two reserved passageway holes (pedestrian is led to the bus-stop under the bridge).
Fig. 3, the passage of this bridge be by upslope face road, the domatic road of plane road and declivity, and three kinds of highway sections are formed; A1 downslope highway section, cross from A2 plane road below and cross (and the like), H1 is two highway section infall, drop height up and down, be the specified altitude that vehicle safety passes through, H2 is right-hand bend channel plane highway section, and the height between the pedestrian road surface (generally being not less than 3 meters is advisable) under the bridge.
Between each passage of this road crossing, all establish isolated column, be separated from each other, take their own roads.
Fig. 4, T are this bridge bridge piers, are the garden column, and main bridge pier location is arranged in the concentric circles that diameter does not wait, and vacant lot makes up annular walkway between circle and circle; K is the well-regulated isolation strip that connects into varying length between the part bridge pier, isolation strip (greenbelt) i.e., is joined together with the circular passage between circle and the circle in vacant lot, two ends, isolation strip again, makes up the radiation walkway, leads to from all directions.
This bridge is omited attachment point up and down beautify, greening just can become the crossing human landscape, so claim Landscape Bridge again.
This road crossing also can be implemented in underground according to geographical situation and needs.

Claims (3)

1. a road crossing comprises main bridge and passage bridge two parts, it is characterized in that described main bridge is straggly by 12 arc row of channels height, and intersection and shuttle are worn the annular bridge that braiding constitutes in length and breadth; The passage bridge is to be connected with main bridge to be the domatic bridge of craspedodrome of one.
2. road crossing according to claim 1, its unique distinction is: the vehicle craspedodrome passage and the left and right sides turning channel of each different directions all combine in a bridge, various current intersection contradictions all place to handle in the bridge to be dissolved, and thoroughly solves the problem that people's car separates from integral body;
3. the described road crossing of claim 1 can also be implemented in underground according to geographical situation and needs.
CN 200510071096 2005-05-25 2005-05-25 Road crossing Pending CN1869336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510071096 CN1869336A (en) 2005-05-25 2005-05-25 Road crossing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510071096 CN1869336A (en) 2005-05-25 2005-05-25 Road crossing

Publications (1)

Publication Number Publication Date
CN1869336A true CN1869336A (en) 2006-11-29

Family

ID=37443106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510071096 Pending CN1869336A (en) 2005-05-25 2005-05-25 Road crossing

Country Status (1)

Country Link
CN (1) CN1869336A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949119A (en) * 2009-10-29 2011-01-19 廖大中 Rotary traffic tunnel with four link-ring inner-edge slope tunnels
CN101736663B (en) * 2009-12-11 2011-05-18 电子科技大学 Traffic diverging system for roundabout
CN102286906A (en) * 2011-07-13 2011-12-21 深圳大学 Non-interweaved ring flyover
CN101636538B (en) * 2007-02-22 2012-09-26 科帕尼·拜尔凯什 Traffic distribution structure for facilitating the prevention of traffic congestion on roads joining highway junctions
CN104294722A (en) * 2014-09-23 2015-01-21 吴小平 Design scheme of round double-ring plane cross road intersection
CN104328721A (en) * 2014-09-23 2015-02-04 吴小平 Design plan of quadrangle double ring plane cross-shaped intersection
CN105862530A (en) * 2016-04-13 2016-08-17 管中林 Cross road single-deck overpass

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101636538B (en) * 2007-02-22 2012-09-26 科帕尼·拜尔凯什 Traffic distribution structure for facilitating the prevention of traffic congestion on roads joining highway junctions
CN101949119A (en) * 2009-10-29 2011-01-19 廖大中 Rotary traffic tunnel with four link-ring inner-edge slope tunnels
CN101949121A (en) * 2009-10-29 2011-01-19 廖大中 Annular overpass with four connected ring inner edge slope bridges
CN101736663B (en) * 2009-12-11 2011-05-18 电子科技大学 Traffic diverging system for roundabout
CN102286906A (en) * 2011-07-13 2011-12-21 深圳大学 Non-interweaved ring flyover
CN102286906B (en) * 2011-07-13 2013-06-12 深圳大学 Non-interweaved ring flyover
CN104294722A (en) * 2014-09-23 2015-01-21 吴小平 Design scheme of round double-ring plane cross road intersection
CN104328721A (en) * 2014-09-23 2015-02-04 吴小平 Design plan of quadrangle double ring plane cross-shaped intersection
CN105862530A (en) * 2016-04-13 2016-08-17 管中林 Cross road single-deck overpass

Similar Documents

Publication Publication Date Title
CN1869336A (en) Road crossing
CN102817295A (en) Stereoscopic crossroad parking multi-station through linkage hinge type pendulum flyover
CN101316965A (en) Traffic control intersection
CA2571975C (en) Road junction
CN106320119A (en) Rotating disc type flyover
CN2797426Y (en) Ring stacked 3-D steel structure interchange overpass
CN101338542A (en) Full-green traffic by-pass system on road crossing
CN1916281A (en) Underground system for dividing flow of vehicles and foot passengers at crossroad
CN102979019A (en) Pedestrian and vehicle barrier-free combined flyover at arterial road and branch road intersection
CN201099829Y (en) Human vehicle shunting facilities
CN107988866B (en) Simple overpass
CN1149318C (en) Interchange road
CN102900000B (en) Comprehensive complete straight-through direct left-hand rotation right lateral viaduct
CN102234966B (en) The composite bridge of four independence " fore-telling " the shaped forked bridges turned left and keep straight on unimpeded
WO2021036902A1 (en) Interchange overpass bridge
CN102121221A (en) Flyover with five bridges
CN2806549Y (en) Single-layer separated-bridge type flyover
CN103526661A (en) Triple path single-layer all-round overpass bridge
CN203890822U (en) Continuous interchange T-shaped overpass
CN112376341A (en) Underground rotary type full-intercommunication crossroad and T-shaped crossroad
CN201317903Y (en) Lane tunnel bridge at crossing
CN103306177A (en) Semi-interchange double-layer intersection
CN108797248B (en) All-road-condition double-layer cross bridge shaped like Chinese character' mi
CN202107957U (en) Combination tunnel of two right turning and straight going "Y"-shaped bifurcation tunnels
CN202705839U (en) Crossroads overpass

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 100842, 53, Fuxing Road, Beijing, building 22, No. 2, gate 4, Haidian District

Applicant after: Jia Lianhai

Address before: 100842, 7, 54, 1, 22, Fuxing Road, Beijing, Haidian District

Applicant before: Jia Lianhai

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20061129