CN1800498A CNA2005100276741A CN200510027674A CN1800498A CN 1800498 A CN1800498 A CN 1800498A CN A2005100276741 A CNA2005100276741 A CN A2005100276741A CN 200510027674 A CN200510027674 A CN 200510027674A CN 1800498 A CN1800498 A CN 1800498A
Authority
CN
China
Prior art keywords
lifting
hole
origin
box beam
hoisting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2005100276741A
Other languages
Chinese (zh)
Other versions
CN100383341C (en
Inventor
查义强
崔革军
丁祥顺
汪铁钧
王少峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai No2 Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Municipal Engineering Co Ltd filed Critical Shanghai No2 Municipal Engineering Co Ltd
Priority to CNB2005100276741A priority Critical patent/CN100383341C/en
Publication of CN1800498A publication Critical patent/CN1800498A/en
Application granted granted Critical
Publication of CN100383341C publication Critical patent/CN100383341C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to a method for lifting large concrete box beam, belonging to the bridge construction technique, which is characterized in that it uses soft belt package and lifts it vertically to avoid the damage on the box beam caused by horizontal force of non-vertical lifting, while the box beam is 60 long and 1600t weight; the soft belt can select correct package point; it can utilize large marine floating crane to lift the lifting support without the design of lifting ship, to reduce the cost and shorten the period, therefore, it can be used in large bridge construction as marine bridge.

Description

A kind of hoisting method of large concrete boxes beam
Technical field: the invention belongs to technical field of bridge construction, exactly is a kind of method of lifting large concrete boxes beam.
Background technology: the effect of building traffic of bridge spanning the sea has the important strategic meaning, and China begins and will build many bridge spanning the seas successively from Donghai Bridge.In order to improve efficiency of construction and working security, reduce the offshore construction amount in the bridge spanning the sea building course as far as possible, therefore adopted mostly at prefabricated place precast unit, be transported to the offshore construction platform again and carry out the job practices that set up at the sea.And large scale prefabricated concrete box girder is as the important component in the bridge spanning the sea, and it is big to have a volume, self heavily waits characteristics, is the main difficult point in the work progress.
In order to set up being transported to offshore construction platform place at the prefabricated concrete box girder of precasting yard, must lift by crane the harbour of case beam, therefore just exist and play the box beam and adopt which kind of lifting to bring colligation and fixed case beam with which kind of structural establishment from precasting yard.
Mostly adopted special-purpose crane ship during existing bridge spanning the sea is built, the characteristics of this ship are that special setting up for the transportation of particular box beam built, and its hull has a fixing frame construction.The steel truss structure of upending frame for cooperating hull and case beam to make: the fixed case beam adopts the similar shoulder pole structural mat of a slice girder steel in case beam bottom, at four angle points of girder steel steel suspension rod suspension centre is set again, is fixed in by the steel suspension rod and plays the box beam on the upending frame.
Having used special-purpose crane ship, its suspension bracket and suspender belt mostly by the existing as can be known prefabricated large concrete boxes beam lifting of above introduction all is member with the supporting design of crane ship.Owing to crane ship is to make for box beam erection specially, its construction application scope is narrower and manufacturing cost is very high, and the cycle is also long.Therefore unit in charge of construction or follow traditional method and remove to make a special-purpose crane ship and its supporting member; The abandoning tradition way is sought new way.
It is long that my company has born more than 60 meter of Donghai Bridge, self weigh into more than 1600 ton non-navigation hole case beam prefabricated, set up task.Whether does my company also remove to make so special-purpose crane ship and its special-purpose assorted member?
Summary of the invention: the present invention provides and a kind ofly can lift by crane more than 60 meter long, more than 1600 ton the large concrete boxes beam that weighs certainly, and do not go specialized designs, make the suspension bracket of special-purpose crane ship and its supporting design and a kind of large concrete boxes beam hoisting method of suspender belt.
The technical scheme that the present invention takes:
According to vertical lifting requirement, determine prefabricated case beam lifting origin of force; According to origin of force, determine case back plate lead to the hole site, and construct through hole, the soft suspender belt that the high-strength polyester long filament that adopts safety factor to reach 5: 1 makes, the hanging belt color is orange international standard look, passes through hole, vertically bundlees the case beam, the suspender belt vertical direction is fixed on lifting sets a roof beam in place, and implements lifting upending frame by large-scale marine crane barge.
After implementing the present invention:
Owing to be to adopt soft suspender belt, pass case beam through hole easily, avoided the difficulty of cable wire hardness perforation and the damage that brings, adopt vertical lifting to avoid the lifting horizontal component that brings because of non-perpendicular lifting destructive power to case beam surface, and, improve antiwear property, and utilize technology maturation at suspension centre increase PES sheath, use the lifting of more large-scale marine crane barge enforcement to upending frame, save manufacturing and designing of special-purpose crane ship, provided cost savings, greatly shortened the cycle.
Description of drawings:
Fig. 1, soft suspender belt are fixed in case beam vertical section schematic diagram;
Fig. 2, upending frame play box beam schematic diagram;
Fig. 3, upending frame plan structure schematic diagram;
The specific embodiment: existing the invention will be further described in conjunction with the accompanying drawings, at first to prefabricated case beam 1, require to determine the lifting origin of force according to vertical lifting, according to origin of force, determine the position of case back plate through hole 4, and construct through hole 4, adopt safety factor to reach 5: 1 high strength, the soft suspender belt 2 that plyester filament yarn makes, hanging belt color are salmon pink international standard look, pass through hole 4, vertically be bundled in case beam 1, and with bottle gouard moved by hands 3, tighten up soft suspender belt 2, with soft suspender belt 2 hang the head hang on the hook of hydraulic jack 5, the upending frame that constitutes by hanger box beam 8 and suspension bracket truss 9, the case beam 1 of vertically slinging, large-scale marine crane barge is implemented lifting to case beam 1 easily by hanging structure 6.

Claims (1)

1, a kind of large concrete boxes beam hoisting method is characterized in that:
(1), determines prefabricated case beam (1) lifting origin of force according to vertical lifting requirement;
(2), determine case back plate lead to the hole site, and construct through hole (4) according to origin of force;
(3) soft suspender belt (2) the hanging belt color that makes of the high-strength polyester long filament that adopts safety factor to reach 5: 1 is a salmon pink international standard look, passes through hole (4), vertically bundlees case beam (1);
(4) vertical direction is fixed on and lifts by crane on the hydraulic jack (5) of setting a roof beam in place;
(5) large-scale marine crane barge is by the lifting of suspension hook (6) enforcement to upending frame.
CNB2005100276741A 2005-07-12 2005-07-12 A lifting method of large concrete box girder Expired - Fee Related CN100383341C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100276741A CN100383341C (en) 2005-07-12 2005-07-12 A lifting method of large concrete box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100276741A CN100383341C (en) 2005-07-12 2005-07-12 A lifting method of large concrete box girder

Publications (2)

Publication Number Publication Date
CN1800498A true CN1800498A (en) 2006-07-12
CN100383341C CN100383341C (en) 2008-04-23

Family

ID=36810683

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100276741A Expired - Fee Related CN100383341C (en) 2005-07-12 2005-07-12 A lifting method of large concrete box girder

Country Status (1)

Country Link
CN (1) CN100383341C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383375A (en) * 2011-08-10 2012-03-21 中国十九冶集团有限公司 Construction method for quickly mounting large steel bridge on urban main road
CN103174093A (en) * 2013-03-14 2013-06-26 中交二航局第四工程有限公司 Mounting device and mounting method of steel box girder in support zone

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19937729A1 (en) * 1999-08-10 2001-02-15 Lurgi Zimmer Ag High tenacity polyester threads and process for their manufacture
CN1216207C (en) * 2002-09-26 2005-08-24 上海市隧道工程轨道交通设计研究院 Cast-in-place Construction Method of Suspension Formwork for Bed Slab of Channel Beam Road
JP4040447B2 (en) * 2002-12-13 2008-01-30 オリエンタル白石株式会社 Wagen formwork device for strut box girder, strut support device, and method for constructing strut box girder
JP2004225275A (en) * 2003-01-20 2004-08-12 Taisei Corp Corrugated steel web box girder bridge erection device and corrugated steel web box girder bridge construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383375A (en) * 2011-08-10 2012-03-21 中国十九冶集团有限公司 Construction method for quickly mounting large steel bridge on urban main road
CN103174093A (en) * 2013-03-14 2013-06-26 中交二航局第四工程有限公司 Mounting device and mounting method of steel box girder in support zone

Also Published As

Publication number Publication date
CN100383341C (en) 2008-04-23

Similar Documents

Publication Publication Date Title
CN101476294B (en) Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower
CN101672102B (en) Steel structural overhead ceiling construction platform
CN108547223A (en) The hybrid beam bridge construction method of steel reinforced concrete overlapping
CN205387439U (en) Mast hoisting accessory
CN101684639A (en) Process method for construction of steel-structured suspension bridge and light type cable carrying crane specially used in same
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
CN204456109U (en) A kind of steel pipe pile lifting piling construction tackling system
CN208088097U (en) A kind of three-tower suspension bridge erection of main beam constructing structure
CN2615042Y (en) Special crane ship for transporting & erecting bridges on sea
CN114933247B (en) Intelligent construction equipment and its construction technology
CN112942069B (en) A heave mesh device for suppressing flutter of cross-sea bridges
CN201132941Y (en) Self floating lower carrying pole beam of moveable formwork
CN102926329B (en) Device dedicated for lifting steel box beam of small and medium-sized long-span suspension bridge and lifting method
HK1213532A1 (en) A specified lifting and piling barge for cellular arc cell construction
CN1800498A (en) Large scale concrete box girder hoisting method
CN202967862U (en) Lifting appliance for beam channel reinforcement cage
CN201762053U (en) Simple automatic hoisting rod
CN201907631U (en) Rudder blade hoisting device
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN109778720A (en) Bridge construction construction method based on cradle construction
CN210087319U (en) A large-section special-shaped shaft steel strand suspension intelligent hydraulic lifting sliding module
CN209367649U (en) A kind of superimposed sheet hanger
CN102234979B (en) Main pier steel sinking well for bridge and process for integrally hoisting and installing steel sinking well sections thereof
CN112850488A (en) Method for overturning steel pipe pile of fixed-boom crane ship
CN206070380U (en) A kind of device that can improve bottom concrete bearing capacity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING

Free format text: FORMER NAME: SHANGHAI NO.2 MUNICIPAL ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200065 No. 1565 traffic road, Shanghai

Patentee after: Shanghai Urban Construction Municipal Engineering (Group) Co.,Ltd.

Address before: 200065 No. 1565 traffic road, Shanghai

Patentee before: SHANGHAI NO. 2 MUNICIPAL ENGINEERING Co.,Ltd.

OL01 Intention to license declared
OL01 Intention to license declared
CI03 Correction of invention patent
CI03 Correction of invention patent

Correction item: Statement of Open License

Correct: Termination of Patent Open License Declaration

False: Patent Open License Declaration takes effect

Number: 17-02

Volume: 40

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080423