CN1721636A - Prestressed steel-concrete compound beam and manufacturing method thereof - Google Patents

Prestressed steel-concrete compound beam and manufacturing method thereof Download PDF

Info

Publication number
CN1721636A
CN1721636A CN 200410028132 CN200410028132A CN1721636A CN 1721636 A CN1721636 A CN 1721636A CN 200410028132 CN200410028132 CN 200410028132 CN 200410028132 A CN200410028132 A CN 200410028132A CN 1721636 A CN1721636 A CN 1721636A
Authority
CN
China
Prior art keywords
steel
girder
girder steel
beam according
compound beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410028132
Other languages
Chinese (zh)
Inventor
李勇
陈善军
郭帅
熊正元
方秦汉
Original Assignee
李勇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李勇 filed Critical 李勇
Priority to CN 200410028132 priority Critical patent/CN1721636A/en
Publication of CN1721636A publication Critical patent/CN1721636A/en
Pending legal-status Critical Current

Links

Images

Abstract

This invention discloses one pre-strain steel and concrete compound cylinder rack and its process method, which comprises the following steps: first connecting two pieces of steel beams by connection screw; then running the temporary rack to make the end of beam generate strain force; then drilling concrete layer to form compound section through shearing force key and steel beam after solidifying; then removing the temporary rack and there is still stain force over.

Description

Manual prestress steel-concrete combination beam and manufacture method thereof
Technical field the present invention relates to a kind of prestress steel-concrete combination simply supported beam and manufacture method thereof, more particularly, relates to a kind of need not the steel bundle and can obtaining prestressed steel-concrete combination simply supported beam of bridge, building structure that be particularly suitable for.
Background technology in the prior art, the relevant report of existing prestress steel-concrete combination beam, ZL94248089.9 disclosed " interconnection system concrete blinding compound beam " is the square-section, some holes are arranged on it, the beam head is provided with monaural and ears, also have connecting pin, alignment pin and location to insert yesterday etc., its structure is comparatively complicated, the construction trouble.Of the present invention can the conversion by system saved prestressed strand and ground tackle, obtains prestressing force, increases economic efficiency.
Summary of the invention the objective of the invention is to utilize steel-concrete combination beam in structure-forming process, cross section geometric characteristic and cross section internal force are all in the feature that constantly changes, structure is carried out the system conversion, need not prestressed strand, can obtain prestressing force, thereby adjust the structural internal force state, form this principle of compound beam that meets requirement of strength, design a kind of prestress steel-concrete combination beam of simple in structure, easy construction.
In order to achieve the above object, the invention provides following technical scheme: design a kind of prestress steel-concrete combination beam of adjusting internal force, comprise two identical and girder steels that will splice each other (1) of length, girder steel (1) has vertical pillar (2) respectively away from the two ends of splice ends, on girder steel (1), has layer of concrete (3), have several equally distributed shear connectors (4) on the extending direction of girder steel (1) end face, two girder steels (1) are linked to be an integral body by high-strength bolt (5) and back pouring concrete layer (3).
The present invention is in work progress, earlier two girder steels (1) frame is gone up contraposition at pillar (2) and prop (6), adopt high-strength bolt (5) to connect or welding, below match line, support with center prop (6), at girder steel (1) the end face shear connector (4) of burn-oning, at girder steel (1) top-pour layer of concrete (3), after layer of concrete (3) fully condenses, take out center prop (6) and get final product then.
The present invention's technical scheme preferably is: girder steel (1) is steel I-beam or box steel beam.The upper limb concrete bears compressive stress, and the lower edge girder steel bears tensile stress, gives full play to mechanical properties of materials.
The present invention's technical scheme preferably can be: shear connector (4) is T steel weldering nail, and the weldering nail is with girder steel (1) and is welded to connect, and the weldering nail also can adopt reinforcing bar or channel-section steel to replace.
Compared with prior art, the present invention utilizes steel-concrete combination beam in structure-forming process, cross section geometric characteristic and cross section internal force are all in the feature that constantly changes, structure is carried out the system conversion, need not prestressed strand, can obtain prestressing force, thereby adjust the structural internal force state, formation meets this principle of compound beam of requirement of strength, design a kind of prestress steel-concrete combination beam of simple in structure, easy construction, advantages such as that designed compound beam has is simple in structure, easy construction are with a wide range of applications in building trade especially bridge construction.
Be description of drawings of the present invention below the description of drawings:
Fig. 1 is a contour structures schematic diagram of the present invention;
Fig. 2 is a construction status architecture schematic diagram of the present invention;
Fig. 3 is the cross-sectional structure schematic diagram of i iron compound beam;
Fig. 4 is the cross-sectional structure schematic diagram of box-shaped steel combination beam;
Fig. 5 is the cross-sectional structure schematic diagram of opening box-shaped steel combination beam.
Among Fig. 1~Fig. 5, the 1st, girder steel, the 2nd, pillar, the 3rd, layer of concrete, the 4th, shear connector, the 5th, high-strength bolt, the 6th, center prop.
By specific embodiment the present invention is carried out more detailed description below the specific embodiment:
With reference to Fig. 1,3 and 4, prestress steel-concrete combination simply supported beam, two identical and girder steels (1) that splice each other of length, girder steel (1) has vertical pillar (2) respectively away from the two ends of splice ends, on girder steel (1), has layer of concrete (3), have several equally distributed steel fasteners (4) on the extending direction of girder steel (1) end face, high-strength bolt (5) and back pouring concrete layer (3) are linked to be an integral body with two girder steels (1), Figure 3 shows that steel I-beam, Figure 4 shows that box steel beam, steel fastener (4) is T steel weldering nail, and the weldering nail is with girder steel (1) and is welded to connect.
With reference to Fig. 2, in the construction, below match line, support with center prop (6).

Claims (9)

1, a kind of pre-stress steel-concrete combination simply supported beam and manufacture method thereof.Comprise two identical and girder steels (1) that splice each other of length, girder steel (1) has vertical pillar (2) respectively away from the two ends of splice ends, and girder steel (1) splice ends has vertical prop (6) and is rigidly connected by high-strength bolt (5).It is characterized in that: have several equally distributed shear connectors (4) and back pouring concrete layer (3) on the extending direction of girder steel (1) end face, by high-strength bolt (5) two girder steels (1) are linked to be integral body, are linked to be integral body with back pouring concrete layer (3) with girder steel (1) by shear connector (4).
2, compound beam according to claim 1 is characterized in that: girder steel (1) is two or three and connects, more than one of splice ends, and several girder steels (1) length can be inequality.
3, compound beam according to claim 1 is characterized in that: girder steel (1) is an i beam.
4, compound beam according to claim 1 is characterized in that: girder steel (1) is a box-girder.
5, compound beam according to claim 1 is characterized in that: girder steel (1) splice ends can be welding.
6, compound beam according to claim 1 is characterized in that: girder steel (1) splice ends can be to be rigidly connected by the bolt weldering combination that high-strength bolt (5) and welding form jointly.
7, compound beam according to claim 1 is characterized in that: girder steel (1) can be common steel-concrete composite beam.
8, compound beam according to claim 1 is characterized in that: girder steel (1) can be the box steel beam that has applied external prestressing or prestressing with bond.
9, compound beam according to claim 1 is characterized in that: shear connector (4) is T steel weldering nail, reinforcing bar or channel-section steel, and shear connector (4) is with girder steel (1) and is welded to connect.
CN 200410028132 2004-07-13 2004-07-13 Prestressed steel-concrete compound beam and manufacturing method thereof Pending CN1721636A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410028132 CN1721636A (en) 2004-07-13 2004-07-13 Prestressed steel-concrete compound beam and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410028132 CN1721636A (en) 2004-07-13 2004-07-13 Prestressed steel-concrete compound beam and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN1721636A true CN1721636A (en) 2006-01-18

Family

ID=35912211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410028132 Pending CN1721636A (en) 2004-07-13 2004-07-13 Prestressed steel-concrete compound beam and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN1721636A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798794A (en) * 2010-03-29 2010-08-11 广东省公路勘察规划设计院有限公司 Composite box girder bridge erected in advance by using corrugated steel web steel girders and construction method thereof
CN101032830B (en) * 2006-03-08 2011-03-30 上海市基础工程公司 Technique of producing steel-concrete connecting beam
CN102912728A (en) * 2012-10-18 2013-02-06 中交第二航务工程局有限公司 Method for filling non-tight-contact parts of steel-concrete composite beams through rear grouting and filling structure
CN105064196A (en) * 2015-07-29 2015-11-18 广西交通科学研究院 Prefabricated and assembled fish-belly I-shaped prestressed steel-concrete composite simple supported girder bridge and construction method thereof
WO2018196376A1 (en) * 2017-07-24 2018-11-01 崔冰 Dry connection prefabricated assembly steel-concrete composite beam

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101032830B (en) * 2006-03-08 2011-03-30 上海市基础工程公司 Technique of producing steel-concrete connecting beam
CN101798794A (en) * 2010-03-29 2010-08-11 广东省公路勘察规划设计院有限公司 Composite box girder bridge erected in advance by using corrugated steel web steel girders and construction method thereof
CN101798794B (en) * 2010-03-29 2012-07-25 广东省公路勘察规划设计院股份有限公司 Composite box girder bridge erected in advance by using corrugated steel web steel girders and construction method thereof
CN102912728A (en) * 2012-10-18 2013-02-06 中交第二航务工程局有限公司 Method for filling non-tight-contact parts of steel-concrete composite beams through rear grouting and filling structure
CN102912728B (en) * 2012-10-18 2014-10-01 中交第二航务工程局有限公司 Method for filling non-tight-contact parts of steel-concrete composite beams through rear grouting and filling structure
CN105064196A (en) * 2015-07-29 2015-11-18 广西交通科学研究院 Prefabricated and assembled fish-belly I-shaped prestressed steel-concrete composite simple supported girder bridge and construction method thereof
WO2018196376A1 (en) * 2017-07-24 2018-11-01 崔冰 Dry connection prefabricated assembly steel-concrete composite beam
US11105084B1 (en) 2017-07-24 2021-08-31 Bing Cui Dry connection prefabricated assembly steel-concrete composite beam

Similar Documents

Publication Publication Date Title
US6915615B2 (en) Prestressed composite truss girder and construction method of the same
CN102758499B (en) Precast prestressed steel girder with post-seismic restorable function
CN100432348C (en) Prestress mixed beam with concrete plate and corrugate steel web beam
CN201411822Y (en) Novel pre-tensioned steel-concrete composite beam
CN102691257A (en) Continuous box girder made of corrugated steel web pre-tensioned prestressed concrete and construction method
CN1884700A (en) Bamboo bridge
CN1300421C (en) Prestress combined beam, continuous prestress combined beam structure and producing connection method
CN110528778B (en) Novel tensile shear steel-concrete composite beam structure and manufacturing process thereof
CN2527608Y (en) Prestressed large span solid web steel girder structure system
KR101200563B1 (en) A Steel Composite Bridge Having Steel Plates Connected by Using Concrete Cross Beams and Its Constructing Method
CN2661809Y (en) nternal force adjustable prestressed steel-concrete combination beam
CN1721636A (en) Prestressed steel-concrete compound beam and manufacturing method thereof
CN211200025U (en) Shaped steel and concrete combined bridge
CN1560369A (en) Connecting method for rigid joint of steel girdle and concrete bridge pier
CN101962975A (en) Novel prestressed steel pipe-concrete composite beam
CN201474083U (en) Novel steel-concrete combined panel node
CN2536686Y (en) Floor template combined components
CN211114417U (en) Novel steel-concrete composite beam structure of tensile shear
CN108517759B (en) Cable tower beam connecting system in corrugated steel web composite beam form and construction method
CN202610695U (en) Corrugated steel web type pre-tensioned prestressed concrete I-type beam
CN109736200A (en) A kind of steel-UHPC thin plate combined structure system of steel plate support-cluster skew nailing quick assembling
CN1710222A (en) Method for reinforcing space concrete beam column node by sticking fiber cloth
CN213951909U (en) Tubular connecting piece suitable for steel-concrete composite structure
CN1730827A (en) Profiled steel sheet steel-concrete combined bridge
CN202990196U (en) Partially prestressed prefabricated thin plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication