CN1690976A - Automatic test system and method for mainboard - Google Patents

Automatic test system and method for mainboard Download PDF

Info

Publication number
CN1690976A
CN1690976A CN 200410027085 CN200410027085A CN1690976A CN 1690976 A CN1690976 A CN 1690976A CN 200410027085 CN200410027085 CN 200410027085 CN 200410027085 A CN200410027085 A CN 200410027085A CN 1690976 A CN1690976 A CN 1690976A
Authority
CN
China
Prior art keywords
test
testing
computer
server
mainboard
Prior art date
Application number
CN 200410027085
Other languages
Chinese (zh)
Inventor
蔡鸿远
肖仨
曾革新
Original Assignee
鸿富锦精密工业(深圳)有限公司
鸿海精密工业股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 鸿富锦精密工业(深圳)有限公司, 鸿海精密工业股份有限公司 filed Critical 鸿富锦精密工业(深圳)有限公司
Priority to CN 200410027085 priority Critical patent/CN1690976A/en
Publication of CN1690976A publication Critical patent/CN1690976A/en

Links

Abstract

This invention discloses an auto testing method for mainboard in computer, which comprises following steps, turn on the power, connect computer waiting for testing to server, download OS from server; select testing item to form a configuration file; download testing script and program for testing items; take error process; setup the downloaded testing script and program, playback the testing script and run the testing program; take error process for the testing; testing computer transmits the testing result to server. The invention solves the abnormity and errors during auto testing process, makes good use of local network function, lets the testing with more expansion; and can promote control the testing computer power with higher automation level.

Description

Mainboard automatization test system and method

[technical field]

The present invention relates to a kind of system and method for mainboard test, especially relate to a kind of mainboard automatization test system and method.

[background technology]

Mainboard is one of main building block of personal computer.It provides South Bridge chip group, north bridge chipset, bus, peripheral unit data transmission interface of keyholed back plate information transmission etc.The stability of mainboard, the compatibility between mainboard and operating system, other device of personal computer is the important determinative of mainboard quality.The manufacturer of mainboard must carry out the test of stability, compatibility and each performance parameters to mainboard before product export.Conventional method is that mainboard to be measured is installed in the test computer, carries out relevant test procedure to obtain test result via test computer, whether meets the foundation of performance requirement as this mainboard to be measured by this test result.Traditionally, when testing host, be installation testing program in each test computer separately, carry out each test procedure by these test computers of operator repetitive operation, obtain the test result of mainboard to be measured.

Yet, because employed test procedure is numerous during testing host, in test process, need the intervention of operator just can finish, and some to test time of required cost long.Therefore, traditional method of testing not only expends time in and manpower, also can interruptedly not carry out day and night fully, causes plenty of time and manpower to expend.This just requires a kind of test macro and method of robotization, to improve or to avoid above-mentioned defective.

The system and method that has occurred many automatic test mainboards on the market, as the 1431595A patent of China Intellectual Property Office in bulletin on July 23rd, 2003, its name is called " main board testing system of robotization and method ", it discloses a kind of system and method for automatic test mainboard, is installed on a mainboard to be measured in the computing machine in order to test.This method may further comprise the steps: the test event of selecting mainboard to be measured; Select a high-order operating system; Make computing machine to be measured online and from downloaded and selected high-order operating system is installed with a server under a disc operating system (DOS); The test procedure that computing machine to be measured is used from the selected test event of downloaded; Make computing machine installation testing program to be measured; Make computing machine to be measured online and carry out test procedure and test result is delivered to server stores with server under selected high-order operating system at computing machine.Though foregoing invention has realized the robotization of testing host to a certain extent, many mistakes that reach unusually appear in federation in test procedure and the test process yet download, and this invention does not provide and solves the way that these reach mistake unusually; Secondly, this invention does not make full use of the function of LAN, lacks extendibility, and the computer platform number that makes this invention to test is very limited; Moreover this invention can not provide the function of the power supply of Long-distance Control test computer, makes the automaticity of mainboard test make a discount.

[summary of the invention]

At the problem that prior art occurred, fundamental purpose of the present invention is, a kind of method of mainboard automatic test is provided.This method comprises the following steps: that at first testing server is opened the power supply of many test computers by the serial equipment webserver and power supervisor.When test computer after starting under the dos operating system, Windows XP operating system is downloaded and installed to test computer from testing server under dos operating system.After installing WindowsXP operating system, test computer sends a request message to testing server, and test procedure and the script file that is used for testing host downloaded in request.After testing server receives this request message, the prompting keeper sets the content of configuration file, and this configuration file sent to many test computers, wherein this configuration file comprises the hardware information of test computer, required test procedure, the storage path of test procedure, test required script file, testing sequence, processing after makeing mistakes in test duration and the test process, processing after wherein makeing mistakes in the test process comprises: restart the test computer of makeing mistakes and restart testing process, and close the test computer that this is made mistakes, thereby withdraw from testing process.Test computer receives this configuration file, downloads test procedure and script file by LAN from testing server according to the setting of this configuration file then.In downloading process, whether testing server is monitored each test computer in real time and is downloaded in the process of test procedure and make mistakes, as download overtime, network is obstructed or a certain test computer cuts out unintentionally etc.If mistake occurs in a certain test computer downloading process, this test computer sends error message to testing server.Testing server receives this error message, and by the database connection this error message is stored in the file server.Judge whether to proceed the testing process of this test computer of makeing mistakes then according to the setting of configuration file.Proceed test if this configuration file is set at, just restart the test computer of makeing mistakes, re-execute testing process then; Withdraw from testing process if this configuration file is set at, then this test computer of makeing mistakes unloads all test procedures of having downloaded, withdraws from operating system and powered-down then, thereby withdraws from testing process.If all test computers are not all made mistakes in downloading process, test computer sends to testing server and downloads successful message.Testing server receives after this prompting downloads successful message, sends to test computer and orders the mainboard to be measured that makes test computer begin to test to install in it.After test computer receives this order, according to the order that configuration file is set script and the test procedure of having downloaded is installed, and this script of playback is carried out this test procedure then.In test process, whether the control and measuring process mistake occurs in real time.If mistake appears in certain test computer in the test process, then carry out above-mentioned error handling processing flow process.If mistake does not all appear in each test computer in the test process, after current test procedure was finished, test computer sent test result to testing server by LAN.After testing server receives this test result, deposit this test result in file server by the database connection.Unload current test procedure then.Judge according to this configuration file whether all test procedures are finished.If also have test procedure not carry out, then continue to install the test procedure that next bar downloaded and carry out this test procedure, be finished up to all test procedures; If all test procedures are finished, test computer unload script file withdraws from operating system then and closes the power supply of test computer, thereby finishes testing process.

Another object of the present invention is to, a kind of system of mainboard automatic test is provided.This system comprises that a testing server, a file server, a database connect, many routers, many test computers, a serial equipment webserver, many power supervisors and a LAN.Testing server connects by a database and is connected with file server.Testing server and file server are connected with many test computers by LAN, and LAN is formed by being connected between many routers and the miscellaneous equipment.Each test computer is connected in a power supervisor, and power supervisor is connected in a serial equipment webserver, and the serial equipment server is connected in testing server by router, and circuit is with the power supply of control test computer by this.Testing server is used to control the power supply of test computer and the automatic test of mainboard, and this testing server stores many group test procedures.File server is in order to share the data processing work of testing server, especially when testing server connects many test computers, this document server stores has script file, and this script file is used for the operation of Simutation keyboard and mouse, and wherein this operation is used for the automatic test of control main board.Each test computer is equipped with a mainboard to be measured, this test computer from testing server Download Script file and test procedure with this mainboard to be measured of test.Testing server and file server are operated under the Windows 2000 Server operating systems, and many test computers are operated under the Windows XP operating system.In said system, testing server and file server and many mutual collaborative works of test computer are to carry out above-mentioned testing process.

Therefore, when the present invention possesses the automatic test main board function, also solved the unusual and mistake that occurs in the automatic test course; The present invention makes full use of the function of LAN, makes test have more extendibility; The present invention can also the Long-distance Control test computer power supply, automaticity is higher.

[description of drawings]

Fig. 1 is the system architecture diagram of plate automatic test of the present invention.

Fig. 2 is the high-level schematic functional block diagram of mainboard automatization test system of the present invention.

Fig. 3 is the process flow diagram of mainboard automated testing method of the present invention.

[embodiment]

As shown in Figure 1, be the system architecture diagram of mainboard automatic test of the present invention.This system comprises that a testing server 10, a file server 11, a database connect 12, many router ones 3, many test computers 14, a serial equipment webserver 16, many power supervisors 17 and a LAN 18.Testing server 10 connects 12 by a database and is connected with file server 11.Testing server 10 and file server 11 are connected with many test computers 14 by LAN 18, and LAN 18 is formed by being connected between many router ones 3 and the miscellaneous equipment.Each test computer 14 is connected in a power supervisor 17, and power supervisor 17 is connected in a serial equipment webserver 16, and serial equipment server 16 is connected in testing server 10 by router one 3, and circuit is with the power supply of control test computer 14 by this.Testing server 10 is used to control the power supply of test computer 14 and the automatic test of mainboard, and this testing server 10 stores many group test procedures.File server 11 is in order to share the data processing work of testing server 10, especially when testing server 10 connects many test computers 14; This document server 11 stores test result, error message and script file, and this script file is used for the operation of Simutation keyboard and mouse, and wherein this is operating as the automatic test of control main board.Each test computer 14 is equipped with a mainboard 15 to be measured, and this test computer 14 is downloaded test procedure with this mainboard 15 to be measured of test from testing server 10.Testing server 10 and file server 11 are operated under the Windows 2000 Server operating systems, and many test computers 14 are operated under the Windows XP operating system.In said system, testing server 10 and file server 11 and many test computer 14 mutual collaborative works are to carry out flow process as shown in Figure 3.

As shown in Figure 2, be the high-level schematic functional block diagram of mainboard automatization test system of the present invention.Testing server 10 comprises following modules: a testing setup module 100, be used to provide the user friendly interface setting following content, this content comprises the processing after makeing mistakes in the hardware information of test computer, required test procedure, the storage path of test procedure, test required script file, testing sequence, test duration and the test process; One communication module 101 is responsible for by communicating by letter between LAN 18 and many test computers 14, as sending and reception order, error message and test result etc.; One monitoring module 102 is used for the download of control and measuring program and whole test processs of test computer, and the error handling processing in the responsible downloading process; One database interface module 103 is used for test result is stored in file server 11 from testing server 10, and from file server 11 the hardware information data and the test result of read test computing machine 14, form report then and show; One logger module 104 is used for all test processs of control and measuring computing machine 14, receive and the record test process in error message and test result, and be stored in this testing server 10; One power supply control module 105 is used to control the power supply of test computer 14; And a script administration module 106, be used to read the required script file of control testing process.Test computer 14 comprises a communication module 140, is responsible for by communicating by letter between LAN 18 and the testing server 10, as sending and reception order, error message and test result etc.; One script operation module 141 is used for the monitoring script replayed section; One test control module 142 is used for after the script playback finishes control and measuring program implementation, and the error handling processing in the responsible test process; And a test result acquisition module 143, be used to obtain test result to send to testing server 10.

As shown in Figure 3, be the process flow diagram of mainboard automated testing method of the present invention.At first, testing server 10 is opened the power supply (step S20) of many test computers 14 by the serial equipment webserver 16 and power supervisor 17.When test computer 14 after starting under the dos operating system, Windows XP operating system (step S21) is downloaded and installed to test computer 14 from testing server 10 under dos operating system.After Windows XP operating system was installed, test computer 14 sent a request message to testing server 10, and test procedure and the script file (step S22) that is used for testing host downloaded in request.After testing server 10 receives this request message, the prompting keeper sets the content of configuration file, and this configuration file sent to many test computers 14, wherein this configuration file comprises the hardware information of test computer, required test procedure, the storage path of test procedure, test required script file, testing sequence, processing after makeing mistakes in test duration and the test process, processing after wherein makeing mistakes in the test process comprises: restart the test computer of makeing mistakes and return step S21 and restart testing process, and close this test computer of makeing mistakes 14 and withdraw from testing process (step S23).Test computer 14 receives this configuration file, downloads test procedure by LAN 18 from testing server 10 according to the setting of this configuration file then, and from file server 11 Download Script files (step S24).In downloading process, whether testing server 10 is monitored each test computer 14 in real time and is downloaded in the process of test procedures and make mistakes, as download overtime, network is obstructed or a certain test computer cuts out etc. (step S25) unintentionally.If mistake occurs in a certain test computer 14 downloading process, this test computer 14 sends error message to testing server 10 (step S35).Testing server 10 receives these error messages, and connects 12 by database this error message is stored in (step S36) in the file server 11.Judge whether to proceed the test (step S37) of this test computer of makeing mistakes then according to the setting of configuration file.Proceed test if this configuration file is set at, just restart the test computer of makeing mistakes, turn back to step S21 then and re-execute testing process (step S38); Withdraw from testing process if this configuration file is set at, then unload all test procedures (step S39) of having downloaded; Flow process goes to step S34 then, and the test computer unload script file that this is made mistakes withdraws from operating system and powered-down then, thereby withdraws from testing process.At step S25, if all test computers 14 are not all made mistakes in downloading process, test computer sends to testing server 10 and downloads successful message (step S26).Testing server 10 receives after this prompting downloads successful message, sends to test computer 14 and orders the mainboard to be measured 15 (step S27) that makes test computer 14 begin to test to install in it.After test computer 14 receives this order, according to the order that configuration file is set script and the test procedure of having downloaded is installed, and this script of playback is carried out this test procedure (step S28) then.In test process, whether the control and measuring process mistake (step S29) occurs in real time.If mistake appears in certain test computer in the test process, flow process goes to step S35, carries out each following flow process of this step S35 and this step S35.At step S29, if mistake does not all appear in each test computer 14 in the test process, after current test procedure was finished, test computer 14 sent test result to testing server 10 (step S30) by LAN 18.After testing server 10 receives this test result, connect 12 by database and deposit this test result in file server 11 (step S31).Unload current test procedure (step S32) then.Judge all test procedures whether be finished (step S33) according to this configuration file.If also have test procedure not carry out, then repeating step S28 is finished up to all test procedures to step S33; At step S33, if all test procedures are finished, test computer 14 unload script files withdraw from operating system then and close the power supply of test computer 14, thereby finish testing process (step S34).

Claims (12)

1. the system of a mainboard automatic test in order to test mainboard to be measured, is characterized in that, this system comprises:
One testing server is used to control the power supply of test computer and the automatic test of this mainboard to be measured, and this testing server stores many groups test procedure of configuration file correspondence;
One file server stores script file, and this script file is used for the operation of Simutation keyboard and mouse;
One database connects, in order to connect above-mentioned testing server and file server;
Many test computers, each test computer is equipped with a mainboard to be measured, test computer is from the required script file of this document downloaded, and from the required test procedure of this testing server download, this script of playback is carried out this test procedure then with this mainboard to be measured of test, and test result is sent to this testing server;
Many routers are in order to connect above-mentioned testing server and many test computers;
Wherein, testing server more includes a monitoring module, is used for the download of control and measuring program and whole test processs of test computer, and the error handling processing in the responsible downloading process; Test computer more includes a test control module, control and measuring program implementation, and the error handling processing in the responsible test process.
2. the system of mainboard automatic test as claimed in claim 1, it is characterized in that, wherein this system also comprises a serial equipment webserver and many power supervisors, testing server is connected by this serial equipment webserver and this many power supervisors and above-mentioned many test computers, in order to control the power supply of test computer.
3. the system of mainboard automatic test as claimed in claim 1 is characterized in that, wherein this system is by the quantity of the connection between the router with the expansion test computer.
4. the system of mainboard automatic test as claimed in claim 1 is characterized in that, wherein said file server is used to share the work load of testing server, makes testing server can control more test computer simultaneously.
5. the system of mainboard automatic test as claimed in claim 1, it is characterized in that wherein said configuration file comprises the processing after makeing mistakes in storage path, the test of the hardware information of test computer, required test procedure, test procedure required script file, testing sequence, test duration and the test process.
6. the method for a mainboard automatic test is installed on mainboard to be measured in many test computers in order to test, and test computer is connected in a testing server by a LAN, it is characterized in that, this method may further comprise the steps:
Make many test computers online and download and install a high-order operating system with a testing server under an operating system from this testing server;
Test computer is downloaded test procedure and is used for Simutation keyboard and the script file of mouse action to this testing server request;
Set configuration file and this configuration file is sent to many test computers at the testing server end;
Test procedure and script file are downloaded in setting according to configuration file;
Monitor downloading process in real time,, send error message and carry out error handling processing to testing server and according to the setting of configuration file if occur mistake in the downloading process;
If downloading process is not made mistakes, script and the test procedure downloaded are installed, and this script of playback is carried out this test procedure then;
The control and measuring process if occur mistake in the test process, sends error message and carries out error handling processing to testing server and according to the setting of configuration file in real time;
If test process is not made mistakes, test result is sent to testing server; And
Unload current test procedure.
7. the method for mainboard automatic test as claimed in claim 6, it is characterized in that, it also comprises a step: a serial equipment webserver and a power supervisor are provided, and open the power supply of many test computers by this serial equipment webserver and this power supervisor.
8. the method for mainboard automatic test as claimed in claim 6 is characterized in that, it also comprises a step: provide a file server, in order to store script file, test result and error message.
9. the method for mainboard automatic test as claimed in claim 6, it is characterized in that wherein said configuration file comprises following content: the processing after makeing mistakes in the storage path of the hardware information of test computer, required test procedure, test procedure, required script file, testing sequence, test duration and the test process of test.
10. the method for mainboard automatic test as claimed in claim 6, it is characterized in that, the error handling processing of wherein said downloading process comprises: restart the test computer of makeing mistakes and carry out testing process then again, and make the test computer of makeing mistakes unload the test procedure of having downloaded, withdraw from operating system and powered-down then, thereby withdraw from testing process.
11. the method for mainboard automatic test as claimed in claim 6, it is characterized in that, wherein the error handling processing of test process comprises: restart the test computer of makeing mistakes and carry out testing process then again, and make the test computer of makeing mistakes unload the test procedure of having downloaded, withdraw from operating system and powered-down then, thereby withdraw from testing process.
12. the method for mainboard automatic test as claimed in claim 6 is characterized in that, it also comprises a step: the script file in the unloading test computer, withdraw from operating system and powered-down then, thereby withdraw from testing process.
CN 200410027085 2004-04-24 2004-04-24 Automatic test system and method for mainboard CN1690976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410027085 CN1690976A (en) 2004-04-24 2004-04-24 Automatic test system and method for mainboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410027085 CN1690976A (en) 2004-04-24 2004-04-24 Automatic test system and method for mainboard

Publications (1)

Publication Number Publication Date
CN1690976A true CN1690976A (en) 2005-11-02

Family

ID=35346432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410027085 CN1690976A (en) 2004-04-24 2004-04-24 Automatic test system and method for mainboard

Country Status (1)

Country Link
CN (1) CN1690976A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100382042C (en) * 2005-11-17 2008-04-16 英业达股份有限公司 Method and system for automatically generating test script
CN100428703C (en) * 2006-08-24 2008-10-22 华为数字技术有限公司 Method and system for set testing of router
CN101052020B (en) * 2007-05-21 2010-06-09 中兴通讯股份有限公司 Monitor method and system for automatically measuring executing process
CN101782869A (en) * 2010-03-09 2010-07-21 南京航空航天大学 Method for testing function of panel based on Bash shell script
CN101442448B (en) * 2007-11-23 2011-02-02 鸿富锦精密工业(深圳)有限公司 Test system and method for knife blade server
CN102141951A (en) * 2010-11-25 2011-08-03 华为技术有限公司 Chip simulation system and method
CN102231128A (en) * 2011-07-06 2011-11-02 青岛海信信芯科技有限公司 Online debugging method and debugging host
CN102478623A (en) * 2010-11-22 2012-05-30 英业达股份有限公司 Testing method of a unit to be tested
CN102497293A (en) * 2011-12-08 2012-06-13 曙光信息产业(北京)有限公司 Hardware test analysis method of large-scale server
CN102541711A (en) * 2011-12-31 2012-07-04 曙光信息产业股份有限公司 Method for testing X86 architecture server mainboards
CN102789405A (en) * 2011-05-16 2012-11-21 鸿富锦精密工业(深圳)有限公司 Automated testing method and system for mainboard
CN102905034A (en) * 2011-07-29 2013-01-30 富泰华工业(深圳)有限公司 Electronic device testing system and electronic device testing method
CN102955723A (en) * 2011-08-19 2013-03-06 中国科学院微电子研究所 Automatic hardware testing method and automatic hardware testing system
CN103186444A (en) * 2013-04-15 2013-07-03 北京搜狐新时代信息技术有限公司 Performance testing method, platform and machine
CN103631702A (en) * 2012-08-20 2014-03-12 腾讯科技(深圳)有限公司 Automatic random key test method and device
CN103678751A (en) * 2012-09-25 2014-03-26 上海华虹集成电路有限责任公司 Processor chip simulation debugging system
CN104375907A (en) * 2013-08-13 2015-02-25 神讯电脑(昆山)有限公司 Laptop configuration auto-testing method
CN105843742A (en) * 2016-03-28 2016-08-10 乐视控股(北京)有限公司 Regression testing method and system
CN106370995A (en) * 2016-08-18 2017-02-01 中国电力科学研究院 Automatic device and method for writing programs into circuit boards in batches while conducting tests thereto at the same time
CN106526447A (en) * 2016-09-27 2017-03-22 曙光信息产业股份有限公司 Mainboard detection device and method
CN106649006A (en) * 2016-09-30 2017-05-10 广州视源电子科技股份有限公司 Method and system for automatic test of board start
CN108806761A (en) * 2018-06-04 2018-11-13 深圳忆联信息系统有限公司 A kind of SSD function test methods, system and computer storage media

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100382042C (en) * 2005-11-17 2008-04-16 英业达股份有限公司 Method and system for automatically generating test script
CN100428703C (en) * 2006-08-24 2008-10-22 华为数字技术有限公司 Method and system for set testing of router
CN101052020B (en) * 2007-05-21 2010-06-09 中兴通讯股份有限公司 Monitor method and system for automatically measuring executing process
CN101442448B (en) * 2007-11-23 2011-02-02 鸿富锦精密工业(深圳)有限公司 Test system and method for knife blade server
CN101782869B (en) * 2010-03-09 2013-10-02 南京航空航天大学 Method for testing function of panel based on Bash shell script
CN101782869A (en) * 2010-03-09 2010-07-21 南京航空航天大学 Method for testing function of panel based on Bash shell script
CN102478623B (en) * 2010-11-22 2013-10-16 英业达股份有限公司 Testing method of a unit to be tested
CN102478623A (en) * 2010-11-22 2012-05-30 英业达股份有限公司 Testing method of a unit to be tested
CN102141951A (en) * 2010-11-25 2011-08-03 华为技术有限公司 Chip simulation system and method
CN102141951B (en) * 2010-11-25 2013-10-02 华为技术有限公司 Chip simulation system and method
CN102789405A (en) * 2011-05-16 2012-11-21 鸿富锦精密工业(深圳)有限公司 Automated testing method and system for mainboard
CN102231128A (en) * 2011-07-06 2011-11-02 青岛海信信芯科技有限公司 Online debugging method and debugging host
CN102905034A (en) * 2011-07-29 2013-01-30 富泰华工业(深圳)有限公司 Electronic device testing system and electronic device testing method
CN102955723A (en) * 2011-08-19 2013-03-06 中国科学院微电子研究所 Automatic hardware testing method and automatic hardware testing system
CN102955723B (en) * 2011-08-19 2015-11-04 中国科学院微电子研究所 A kind of hardware automatic test approach and system
CN102497293A (en) * 2011-12-08 2012-06-13 曙光信息产业(北京)有限公司 Hardware test analysis method of large-scale server
CN102541711A (en) * 2011-12-31 2012-07-04 曙光信息产业股份有限公司 Method for testing X86 architecture server mainboards
CN102541711B (en) * 2011-12-31 2014-10-15 曙光信息产业股份有限公司 Method for testing X86 architecture server mainboards
CN103631702B (en) * 2012-08-20 2018-01-30 腾讯科技(深圳)有限公司 Automate random key test method and device
CN103631702A (en) * 2012-08-20 2014-03-12 腾讯科技(深圳)有限公司 Automatic random key test method and device
CN103678751A (en) * 2012-09-25 2014-03-26 上海华虹集成电路有限责任公司 Processor chip simulation debugging system
CN103678751B (en) * 2012-09-25 2018-04-27 上海华虹集成电路有限责任公司 Processor chips emulation debugging system
CN103186444A (en) * 2013-04-15 2013-07-03 北京搜狐新时代信息技术有限公司 Performance testing method, platform and machine
CN103186444B (en) * 2013-04-15 2016-07-06 北京搜狐新时代信息技术有限公司 A kind of performance test methods, test platform and test machine
CN104375907A (en) * 2013-08-13 2015-02-25 神讯电脑(昆山)有限公司 Laptop configuration auto-testing method
CN105843742A (en) * 2016-03-28 2016-08-10 乐视控股(北京)有限公司 Regression testing method and system
CN106370995A (en) * 2016-08-18 2017-02-01 中国电力科学研究院 Automatic device and method for writing programs into circuit boards in batches while conducting tests thereto at the same time
CN106526447A (en) * 2016-09-27 2017-03-22 曙光信息产业股份有限公司 Mainboard detection device and method
CN106649006A (en) * 2016-09-30 2017-05-10 广州视源电子科技股份有限公司 Method and system for automatic test of board start
CN108806761A (en) * 2018-06-04 2018-11-13 深圳忆联信息系统有限公司 A kind of SSD function test methods, system and computer storage media

Similar Documents

Publication Publication Date Title
CN103744422B (en) A kind of to the protective relaying device automatic test approach based on IEC61850 standard
US8280537B2 (en) Editing lifecycle and deployment of objects in an industrial automation environment
EP1203294B1 (en) Self-test electronic assembly and test system
CN100589587C (en) Automatic test system for handset single-plate and its method
KR100615974B1 (en) Substrate Processing System Managing Apparatus Information of Substrate Processing Apparatus
US6205579B1 (en) Method for providing remote software technical support
US6550021B1 (en) Internet-implemented method supporting component repair services
US6983037B2 (en) Method, system and computer program product for performing automated unbundled network element migration
CN104407971B (en) Method for automatically testing embedded software
US6985786B2 (en) Method for managing manufacturing data
US6598183B1 (en) Software tool for automated diagnosis and resolution of problems of voice, data and VoIP communications networks
CN102369713B (en) Automatic removing method and device of system configuration items
US8713146B2 (en) Change management automation tool
CN102420712B (en) Testing method and equipment
CN102495744B (en) Control software upgrading method of electronic control devices of electric automobile based on controller area network (CAN) bus
CN100445940C (en) Network technique for malfunction countermeasure
US20030046682A1 (en) System and method for the automatic installation and configuration of an operating system
CN102880532B (en) Test macro based on the technology of high in the clouds and method
US6178551B1 (en) Method of and system for installing a computer program
US20050225441A1 (en) System and method for monitoring management
US6453435B1 (en) Method and apparatus for automated testing of circuit boards
EP2076784B1 (en) Automated test and characterization data analysis methods and arrangement
CN101520657B (en) Methods and apparatus to bind properties in a process control system
CN103377061A (en) Firmware updating management system and method
CN103365262A (en) Apparatus and method for determining operation compatibility between field devices

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
WD01 Invention patent application deemed withdrawn after publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)