CN1670322A - 大跨度大纵深空间钢结构的矩阵式顶推安装法 - Google Patents

大跨度大纵深空间钢结构的矩阵式顶推安装法 Download PDF

Info

Publication number
CN1670322A
CN1670322A CNA2004100170437A CN200410017043A CN1670322A CN 1670322 A CN1670322 A CN 1670322A CN A2004100170437 A CNA2004100170437 A CN A2004100170437A CN 200410017043 A CN200410017043 A CN 200410017043A CN 1670322 A CN1670322 A CN 1670322A
Authority
CN
China
Prior art keywords
column
steel structure
pushing tow
slideway
moulding bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2004100170437A
Other languages
English (en)
Other versions
CN100427690C (zh
Inventor
吴欣之
王云飞
朱伟新
陈晓明
许勇
袁鼎
应建华
倪洪革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CNB2004100170437A priority Critical patent/CN100427690C/zh
Publication of CN1670322A publication Critical patent/CN1670322A/zh
Application granted granted Critical
Publication of CN100427690C publication Critical patent/CN100427690C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种大跨度大纵深空间钢结构的矩阵式顶推安装法,其特征在于:在空间钢结构安装位置的一个跨端上设置平拼胎架和立拼胎架,在空间钢结构纵向的立柱位置上布置滑道,在平拼胎架上拼装主桁架,将主桁架吊至立拼胎架进行主桁架和立柱的拼装,后将主桁架及立柱沿滑道由顶推装置顶推平移一个柱距,在跨端处再拼装下一榀主桁架及立柱,安装两榀间的次桁架和檩条,将连接成一体的两榀主桁架及立柱沿滑道由顶推装置顶推平移一个柱距,重复上述过程至拼装完成,最后将整体钢结构沿滑道顶推就位校正固定。本发明的优点是能在施工现场及设备受到特定限制的条件下,能避免结构振动和变形,用累积平移矩阵式顶推的方法安装大跨度大纵深空间钢结构。

Description

大跨度大纵深空间钢结构的矩阵式顶推安装法
技术领域
本发明涉及一种大跨度大纵深空间钢结构的矩阵式顶推安装法。
背景技术
目前特大型的整体钢结构建筑得到广泛的应用,现有的一些大空间的钢结构一般为在现场进行部件起吊,高空安装,逐步完成整体的结构安装,但是遇到施工场地的各种条件的限制,无法在施工现场按照需要进行安装胎架及起重机的布设,尤其是起重机的最大起重量及起重力矩的限制,对于大跨度的大体量空间钢结构的安装存在有一些难以解决的问题,如安装位于高空,其结构的本身刚度小,且结构的多自由度以及安装过程中的结构稳定性。
发明内容
本发明的目的是解决现有技术中受现场施工条件限制的大跨度大体量空间钢结构安装中所存在的问题,提供一种能在受的限制的施工场地完成大跨度大纵深空间钢结构的矩阵式顶推安装法。本发明设计大跨度大纵深空间钢结构的矩阵式顶推安装法,其特征在于:在空间钢结构安装位置的一个跨端上设置平拼胎架和立拼胎架,在空间钢结构纵向的立柱位置上布置滑道,在平拼胎架上拼装主桁架,用起重机将主桁架吊至立拼胎架进行主桁架和立柱的拼装,立柱底部有减摩块,将主桁架及立柱沿滑道由顶推装置顶推平移一个柱距,在跨端所设置的平拼胎架和立拼胎架处再拼装下一榀主桁架及立柱,安装两榀间的次桁架和檩条,将连接成一体的两榀主桁架及立柱沿滑道由顶推装置顶推平移一个柱距,重复上述安装过程至最后一榀主桁架与已成一体的钢结构连接成一整体空间钢结构,最后将整体钢结构沿滑道顶推就位校正固定。所述的顶推装置为在每一榀的主桁架下的立柱底部有一液压千斤顶,液压千斤顶后有一反力架,形成整体钢结构下的顶推矩阵。所述的减摩块为在立柱底部固定垫置嵌入滑道的减摩块。所有的顶推液压千斤顶上安装有位移传感器和压力传感器。所述的所有的顶推液压千斤顶由计算机集群控制。所述顶推平移由若干个顶推行程构成,每一顶推行程为伸缸顶推,缩缸、反力架移位。本发明的优点是能在施工现场及设备受到特定限制的条件下,能避免结构振动、减少结构变形,用累积平移、矩阵式顶推的方法安装大跨度大纵深空间钢结构。
附图说明
图1为本发明的施工现场平面图,
图2为本发明的施工现场平面图的施工示意图,
图3为本发明的立柱滑块与滑道结构示意图,
图4顶推装置与立柱、滑道结构示意图,
图5为整体钢结构示意图,
下面结合实施例对本发明作详细说明,
具体实施方式
图1、2、3、4、5中在空间钢结构安装位置的一个跨端上设置平拼胎架1和立拼胎架2,在空间钢结构纵向的立柱位置上布置滑道3,在平拼胎架1上拼装第一主桁架4,用起重机5将第一主桁架4吊至立拼胎架2进行第一主桁架4和立柱6的拼装,在立柱6底部装上减摩块7,同时在立柱6底部安装顶推装置(液压千斤顶10)及反力架8,反力架8插入到支撑位9上,从而形成了钢结构顶推矩阵。将第一主桁架4与立柱6成一体的结构沿滑道3由顶推装置顶推平移一个柱距,然后在跨端所设置的平拼胎架1和立拼胎架2处再拼装第二榀主桁架4及立柱6以及安装第二榀主桁架4下立柱6的减摩块7和顶推装置,安装两榀间的次桁架11和檩条12,将第一和第二榀主桁架连接成一体,沿滑道3由顶推装置顶推平移一个柱距,重复上述安装过程至最后一榀主桁架4与已成一体的钢结构连接成一整体空间钢结构,最后将整体钢结构沿滑道3顶推就位校正固定。所述的减摩块7为在立柱6底部固定垫置嵌入滑道3的减摩块7。所有的顶推液压千斤顶10上安装有位移传感器和压力传感器。所有的顶推液压千斤顶10由计算机集群控制,所述顶推平移由若干个顶推行程构成,每一顶推行程为伸缸顶推,缩缸、反力架移位,在滑道两侧设置有若干个反力架8支撑位9,具体间距由每一顶推行程的距离确定。在顶推过程中,控制用计算机由上位机控制全部的顶推装置,具体每一顶推装置则有下位机予以控制,下位机接受上位机控制,顶推中下位机接收位移传感器和压力传感器的数据,由计算得出具体的整体空间结构的应力分布情况,按照需要将顶推装置分布在相关的立柱下,形成整体空间结构下的顶推矩阵,解决了现有技术中的钢索牵引或单线横布顶推的安装法所带来的整体空间结构在整体移位时的变形问题,避免了用钢索柔性连接造成在牵引移动中的脉动现象,能有效克服或大大降低在移动中的整体空间结构发生结构振动。尤其是能够在一狭小的施工场地完成大跨度大纵深空间钢结构的安装。

Claims (6)

1、大跨度大纵深空间钢结构的矩阵式顶推安装法,其特征在于:在空间钢结构安装位置的一个跨端上设置平拼胎架和立拼胎架,在空间钢结构纵向的立柱位置上布置滑道,在平拼胎架上拼装主桁架,用起重机将主桁架吊至立拼胎架进行主桁架和立柱的拼装,立柱底部有减摩块,将主桁架及立柱沿滑道由顶推装置顶推平移一个柱距,在跨端所设置的平拼胎架和立拼胎架处再拼装下一榀主桁架及立柱,安装两榀间的次桁架和檩条,将连接成一体的两榀主桁架及立柱沿滑道由顶推装置顶推平移一个柱距,重复上述安装过程至最后一榀主桁架与已成一体的钢结构连接成一整体空间钢结构,最后将整体钢结构沿滑道顶推就位校正固定。
2、按权利要求1所述的大跨度大纵深空间钢结构的矩阵式顶推安装法,其特征在于:所述的顶推装置为在每一榀的主桁架下的立柱底部设有液压千斤顶,液压千斤顶后有反力架,形成整体钢结构下的顶推矩阵。
3、按权利要求2所述的顶推装置,其特征在于:所有的顶推液压千斤顶上安装有位移传感器和压力传感器。
4、按权利要求2或3所述的顶推装置,其特征在于:所有的顶推液压千斤顶由计算机集群控制。
5、按权利要求1所述的大跨度大纵深空间钢结构的矩阵式顶推安装法,其特征在于:所述的减摩块为在立柱底部固定垫置嵌入滑道的减摩块。
6、按权利要求1所述的大跨度大纵深空间钢结构的矩阵式顶推安装法,其特征在于:所述顶推平移由若干个顶推行程构成,每一顶推行程为伸缸顶推,缩缸、反力架移位。
CNB2004100170437A 2004-03-18 2004-03-18 大跨度大纵深空间钢结构的矩阵式顶推安装法 Expired - Fee Related CN100427690C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100170437A CN100427690C (zh) 2004-03-18 2004-03-18 大跨度大纵深空间钢结构的矩阵式顶推安装法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100170437A CN100427690C (zh) 2004-03-18 2004-03-18 大跨度大纵深空间钢结构的矩阵式顶推安装法

Publications (2)

Publication Number Publication Date
CN1670322A true CN1670322A (zh) 2005-09-21
CN100427690C CN100427690C (zh) 2008-10-22

Family

ID=35041737

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100170437A Expired - Fee Related CN100427690C (zh) 2004-03-18 2004-03-18 大跨度大纵深空间钢结构的矩阵式顶推安装法

Country Status (1)

Country Link
CN (1) CN100427690C (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718115B (zh) * 2009-11-20 2011-06-22 山东宏跃网架钢结构有限公司 大跨度柱面网壳安装方法
CN102220811A (zh) * 2011-04-18 2011-10-19 武船重型工程有限公司 一种特大跨径钢管桁架拱立拼装方法
CN102776840A (zh) * 2012-08-02 2012-11-14 中铁二十三局集团有限公司 桁架梁异位拼装就位方法
CN103774556A (zh) * 2014-01-14 2014-05-07 中建三局集团有限公司 一种轻型拼装胎架与顶推支点分离式顶推平台一体式装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2576035B2 (ja) * 1993-05-14 1997-01-29 三菱重工業株式会社 鉄鋼構造物建設用ゾーンモジュール工法
DE10034324A1 (de) * 2000-07-12 2002-01-24 Rudolf Smolny Montagesysteme UNIVERSAL und SPEZIAL

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718115B (zh) * 2009-11-20 2011-06-22 山东宏跃网架钢结构有限公司 大跨度柱面网壳安装方法
CN102220811A (zh) * 2011-04-18 2011-10-19 武船重型工程有限公司 一种特大跨径钢管桁架拱立拼装方法
CN102220811B (zh) * 2011-04-18 2012-09-05 武船重型工程股份有限公司 一种特大跨径钢管桁架拱立拼装方法
CN102776840A (zh) * 2012-08-02 2012-11-14 中铁二十三局集团有限公司 桁架梁异位拼装就位方法
CN102776840B (zh) * 2012-08-02 2015-03-11 中铁二十三局集团有限公司 用于弯曲桥梁的桁架梁异位拼装就位方法
CN103774556A (zh) * 2014-01-14 2014-05-07 中建三局集团有限公司 一种轻型拼装胎架与顶推支点分离式顶推平台一体式装置

Also Published As

Publication number Publication date
CN100427690C (zh) 2008-10-22

Similar Documents

Publication Publication Date Title
CN101200959B (zh) 钢屋架多点顶推累积滑移施工方法
CN100572713C (zh) 大跨度双向张弦桁架带索累计滑移施工方法
CN208815424U (zh) 一种桥梁下行式挂篮
CN201367728Y (zh) 用于钢筋混凝土水塔支筒施工中的无井架液压滑模装置
CN203878979U (zh) 螺栓对拉式轨道滑动模板
CN101633483B (zh) 一种钢结构网架整体提升装置
CN101387129B (zh) 采光顶钢架安装方法
CN114197634B (zh) 一种高层连体大型钢结构安装监测系统的施工方法
CN1670322A (zh) 大跨度大纵深空间钢结构的矩阵式顶推安装法
CN1141479C (zh) 在不停产条件下厂房抬梁抽柱的方法
CN106150525A (zh) 一种岩锚梁施工台车及其施工方法
CN105858501A (zh) 具有基础托换装置的附着自身塔吊及其施工方法
CN107934859A (zh) 一种钢结构建筑倒装提升的半自动化施工方法及装置
CN1933925A (zh) 将机组插进生产线中的插入方法
CN212358039U (zh) 一种超高悬浇梁0#块支架的反力预压系统
CN201873949U (zh) 桥梁预应力张拉台车
CN114135001B (zh) 一种超高层拉索结构建造方法
CN101858165A (zh) 塔桅结构分段套装、穿心抽出式整体安装技术
CN204941570U (zh) 轨行式液压水沟电缆槽台车模板系统
CN213418468U (zh) 建高楼支撑托吊模架浇灌混凝土的装置
CN1935622B (zh) 用于具有核心筒的超高层建筑施工的自升式附壁吊
CN101774516A (zh) 更换耙式吊车桥架的顶升装置及施工方法
CN200967239Y (zh) 箱梁全自动液压内模
CN118997455B (zh) 一种模架平台机位交替支撑及动力转换的施工方法
CN216342204U (zh) 一种适用于不同断面尺寸的可调节式隧道模板台车

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHANGHAI CITY MACHINERY CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200072, Shanghai, 200 old Shanghai Road

Patentee after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 200072, Shanghai, 200 old Shanghai Road

Patentee before: Shanghai Mechanized Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081022

Termination date: 20190318