CN1546776A - Arrangement of steam conveying pipe of steam iron and operation method thereof - Google Patents

Arrangement of steam conveying pipe of steam iron and operation method thereof Download PDF

Info

Publication number
CN1546776A
CN1546776A CNA2003101241026A CN200310124102A CN1546776A CN 1546776 A CN1546776 A CN 1546776A CN A2003101241026 A CNA2003101241026 A CN A2003101241026A CN 200310124102 A CN200310124102 A CN 200310124102A CN 1546776 A CN1546776 A CN 1546776A
Authority
CN
China
Prior art keywords
steam
flow control
iron
control valve
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2003101241026A
Other languages
Chinese (zh)
Other versions
CN1253626C (en
Inventor
陈光焕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200310124102 priority Critical patent/CN1253626C/en
Publication of CN1546776A publication Critical patent/CN1546776A/en
Application granted granted Critical
Publication of CN1253626C publication Critical patent/CN1253626C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Transport Of Granular Materials (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention is a method for steam transmitting channels layout in steam iron. Each channel is set with one or more water filter which parts the channel into two ore more segments, each segment is paralleled with two ore more steam iron, the steam inlet valve is in front of the steam outlet valve, there sets a steam flow control valve between the two valves, a drainage controller is set on the steam inlet valve, and which is connected to the steam iron through steam soft pipe. The running method is: when starting, the steam flow control valve is set at the one-quarter position, when in use; it adjusts the flow control valve according to the needed steam quantity.

Description

The steam iron steam conveying pipe is arranged and operation method
Affiliated technical field
The present invention relates to steam iron delivery of steam technical field in the clothes manufacturing enterprise, refer in particular to a kind of steam iron steam conveying pipe and arrange and operation method.
Background technology
Desire to make steam to obtain dry the use, the insulation of depending merely on pipeline obviously not enough.Steam locomotive use vapour, it is to take from the boiler to be divided into tubule again behind the vapour of upper strata, utilizes the high temperature of chimney with steam drying by chimney again.And iron does not just possess this condition.So, prolong the steam iron of having used decades, an also inreal difficult problem that solves it with the vapour water outlet.So, at first having occurred electric heater abroad and added the practice of within the iron its condensed water being dried, but done the expense height like this, the service life of iron is short.Go out water problems in order to solve with vapour, clothes manufacturing enterprise couples together admission pipeline and drainage pipeline at present, and the centre adds drain valve to reduce the waste (referring to Fig. 1) of tail vapour.But effect is not very good.Because steam is when mobile, condensed water mixes under the promotion of pressure with steam and advances.Referring to Fig. 1, it can only be purified the steam of B section, and with what vapour was taken from the A section bigger moisture content is just arranged.Be subjected to the influence of pipeline peripheral air still more, cooling is all being carried out at any time.Especially pipeline is long between large car, cools off even more serious.
Summary of the invention
In order to overcome the above-mentioned defective that prior art exists, the object of the present invention is to provide a kind of steam iron steam conveying pipe to arrange and operation method, it is effective with the vapour problem that it solves steam iron.
For achieving the above object, the solution that the present invention takes is: a kind of steam iron steam conveying pipe method for arranging, article one, more than one water filter is set in the gas pipeline is divided into gas pipeline more than two sections, every section gas pipeline is parallel with and is no less than two steam irons, the used inlet valve of each steam iron is positioned at before the gas outlet valve, the steam flow control valve is installed in the middle of each inlet valve and the gas outlet valve, and steam trap is installed on the inlet valve, is connected with steam iron by steam hose again.
A kind of steam iron steam conveying pipe operation method of Bu Zhiing is as follows according to the method described above: when bringing into operation, the steam flow control valve is located at out 1/4 position, in the use, according to the size adjustment steam flow control valve of back steam iron steam consumption.
The present invention adopts one-pipe operation way.When bringing into operation, the steam flow control valve is located at out 1/4 position, is subjected to 3/4 obstacle and just advances to steam trap when steam is come in.Because the container diameter of steam trap is tens times of the delivering vapor pipe diameter, the discharge area diameter is again the hundreds of times of steam hose diameter, just obtained the static relatively of long period so entered the steam of steam trap, the vapour light-water is heavy, and the condensed water natural subsidence is got back to gas pipeline and pushed water filter to from steam flow control valve 1/4 opening part.So the used steam of steam iron is just relatively drier.
One-pipe operation way mainly is a flow velocity of having accelerated steam.If last steam iron in use, it just can accelerate the flow velocity of each steam iron of front, this just overcome twin flue operation (prior art) the steam that forms be detained and the condensed water that produces, just the time spent all gets and at first discharges a burst of condensed water or tail vapour is often emitted existing significant wastage phenomenon in back intermittently to have avoided the common steam iron.In addition, the present invention also has flexibility: as a certain steam iron water outlet, can recover normal several seconds as long as this steam flow control valve closed.Its principle is: the steam off flow control valve, block the flow of gas pipeline, and by preceding and pressure that come all rushes at this steam iron, promptly condensed water is pressed to the back segment pipe.
Condensed water is not only just regained in the effect of water filter, and because its container diameter greater than gas pipeline diameter hundred times, therefore all plays continual and steady effect to the flow of steam and the use of pressure.
Description of drawings
Fig. 1 is that the prior art twin flue is arranged schematic diagram.
Fig. 2 is that present embodiment is arranged schematic diagram.
Among the figure: 1, gas pipeline, 2, inlet valve, 3, drain valve, 4, drainpipe, 5, steam iron, 6, steam hose, 7, gas outlet valve, 8, steam trap, 9, the steam flow control valve, 10, water filter.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing thereof the present invention is remake description.
Referring to Fig. 2, a kind of steam iron steam conveying pipe method for arranging, article one, more than one water filter 10 is set in the gas pipeline 1 is divided into gas pipeline 1 more than two sections, every section gas pipeline 1 is parallel with and is no less than two steam irons 5, each steam iron 5 used inlet valve 2 is positioned at before the gas outlet valve 7, each inlet valve 2 and the gas outlet valve 7 middle steam flow control valves 9 of installing, steam trap 8 is installed on the inlet valve 2, is connected with steam iron 5 by steam hose 6 again.
A kind of steam iron steam conveying pipe operation method of Bu Zhiing is as follows according to the method described above: when bringing into operation, steam flow control valve 9 is located at out 1/4 position, in the use, according to the size adjustment steam flow control valve 9 of back steam iron 5 steam consumptions.
A kind of steam iron steam conveying pipe operation method of Bu Zhiing also can followingly be realized according to the method described above: when bringing into operation, all steam flow control valves 9 all often are in to be opened, in the use, carry out discontinuous control steam flow control valve 9 by electronic controller, regulate by electronic controller, determine to end and length blanking time.As steam flow control valve 9, No. two steam flow control valves 9, No. three steam flow control valves 9 ... all often be in and open, when electronic controller begins power supply a steam flow control valve 9 is closed, blocked pipeline flow, at this moment the steam that the front is come is at once to 5 superchargings of perming of a steam, in wherein condensed water is arranged backward segment pipe from steam hose 6 rapidly.Disconnect behind the five seconds, No. one steam flow control valve 9 recovers normally open.No. two steam flow control valves 9 start after two seconds, and condensed water is released rapidly equally; No. two steam flow control valves 9 are disconnected behind the five seconds, and steam flow control valve 9 recovers normally open; No. three steam flow control valves 9 start after two seconds ... so analogize, every work five seconds is at interval until last, and accent begins after being separated by three minutes, so circulation.What this had guaranteed every steam iron 5 uses the vapour drying, does not influence the bulk flow of steam again.

Claims (3)

1, a kind of steam iron steam conveying pipe method for arranging, it is characterized in that: more than one water filter (10) is set in the gas pipeline (1) is divided into gas pipeline (1) more than two sections, every section gas pipeline (1) is parallel with and is no less than two steam irons (5), the used inlet valve (2) of each steam iron (5) is positioned at gas outlet valve (7) before, each inlet valve (2) and the middle steam flow control valve (9) of installing of gas outlet valve (7), steam trap (8) is installed on the inlet valve (2), is connected with steam iron (5) by steam hose (6) again.
2, a kind of steam iron steam conveying pipe operation method of arranging according to the described method of claim 1, it is characterized in that: when bringing into operation, steam flow control valve (9) is located at out 1/4 position, in the use, according to the size adjustment steam flow control valve (9) of back steam iron (5) steam consumption.
3, a kind of steam iron steam conveying pipe operation method of arranging according to the described method of claim 1, it is characterized in that: when bringing into operation, all steam flow control valves (9) all often are in to be opened, in the use, carry out discontinuous control steam flow control valve (9) by electronic controller, regulate by electronic controller, determine to end and length blanking time.
CN 200310124102 2003-12-13 2003-12-13 Arrangement of steam conveying pipe of steam iron and operation method thereof Expired - Fee Related CN1253626C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200310124102 CN1253626C (en) 2003-12-13 2003-12-13 Arrangement of steam conveying pipe of steam iron and operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200310124102 CN1253626C (en) 2003-12-13 2003-12-13 Arrangement of steam conveying pipe of steam iron and operation method thereof

Publications (2)

Publication Number Publication Date
CN1546776A true CN1546776A (en) 2004-11-17
CN1253626C CN1253626C (en) 2006-04-26

Family

ID=34338953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200310124102 Expired - Fee Related CN1253626C (en) 2003-12-13 2003-12-13 Arrangement of steam conveying pipe of steam iron and operation method thereof

Country Status (1)

Country Link
CN (1) CN1253626C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100458001C (en) * 2006-01-04 2009-02-04 陈光焕 Steam-vapour three-purpose pipe distributing method of iron
CN102154807A (en) * 2010-12-03 2011-08-17 陈光焕 Series-parallel connection arrangement method of steam pipelines of irons
CN102154808A (en) * 2010-12-03 2011-08-17 陈光焕 Steam iron-dewatering-filtration arrangement method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100458001C (en) * 2006-01-04 2009-02-04 陈光焕 Steam-vapour three-purpose pipe distributing method of iron
CN102154807A (en) * 2010-12-03 2011-08-17 陈光焕 Series-parallel connection arrangement method of steam pipelines of irons
CN102154808A (en) * 2010-12-03 2011-08-17 陈光焕 Steam iron-dewatering-filtration arrangement method

Also Published As

Publication number Publication date
CN1253626C (en) 2006-04-26

Similar Documents

Publication Publication Date Title
CN201251371Y (en) Flue gas pre-cooling system with highly-effective water and energy conservation
CN104482742A (en) Fuel drying device used for direct combustion biomass power station
CN108468575B (en) System for changing extraction condensing unit into back pressure unit based on injection heat pump and operation method thereof
CN1253626C (en) Arrangement of steam conveying pipe of steam iron and operation method thereof
CN204513372U (en) Coal feeder for circular fluidized bed boiler
CN201779676U (en) Seal air system of desulfurized flue gas damper
CN103638784B (en) A kind of external heated type wet flue gas dehumanization method and dehumidification system
CN105387446A (en) Bypass grading coal economizer system with active exhaust gas temperature control function
CN201666717U (en) Strip steel drying device
CN210356549U (en) Intelligent integrated ash conveying air compression system
CN208184799U (en) Extraction and condensing unit based on jet heat pump changes back pressure unit system
CN100458001C (en) Steam-vapour three-purpose pipe distributing method of iron
CN201801760U (en) Steam conveying pipeline for steam iron
CN202393251U (en) Flue gas waste heat recovery system for big flue of sintering machine
CN101598495B (en) Recovery device for condensed water
CN103994459B (en) A kind of flue gas processing equipment
CN113803039A (en) Oil field carbon emission-free high-temperature high-pressure multi-element miscible flooding intelligent system
CN203927882U (en) Warm economizer system in one
CN207730083U (en) A kind of low-level (stack-gas) economizer cleaning system
CN202032849U (en) Powdery material dryer
CN106338060B (en) The water supply system of Combined Cycle Heat Recovery Boiler
CN102230038B (en) Slag granulation steam recovering device
CN202470795U (en) Sintering flue gas waste heat recovery and utilization plant and sintering apparatus with same
CN205957148U (en) Combined cycle exhaust -heat boiler's water supply system
CN109985499A (en) A kind of desulfurization oxidized input air intelligent Matching method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee