CN1546776A - Arrangement of steam conveying pipe of steam iron and operation method thereof - Google Patents
Arrangement of steam conveying pipe of steam iron and operation method thereof Download PDFInfo
- Publication number
- CN1546776A CN1546776A CNA2003101241026A CN200310124102A CN1546776A CN 1546776 A CN1546776 A CN 1546776A CN A2003101241026 A CNA2003101241026 A CN A2003101241026A CN 200310124102 A CN200310124102 A CN 200310124102A CN 1546776 A CN1546776 A CN 1546776A
- Authority
- CN
- China
- Prior art keywords
- steam
- flow control
- iron
- control valve
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Air Transport Of Granular Materials (AREA)
- Pipeline Systems (AREA)
Abstract
The invention is a method for steam transmitting channels layout in steam iron. Each channel is set with one or more water filter which parts the channel into two ore more segments, each segment is paralleled with two ore more steam iron, the steam inlet valve is in front of the steam outlet valve, there sets a steam flow control valve between the two valves, a drainage controller is set on the steam inlet valve, and which is connected to the steam iron through steam soft pipe. The running method is: when starting, the steam flow control valve is set at the one-quarter position, when in use; it adjusts the flow control valve according to the needed steam quantity.
Description
Affiliated technical field
The present invention relates to steam iron delivery of steam technical field in the clothes manufacturing enterprise, refer in particular to a kind of steam iron steam conveying pipe and arrange and operation method.
Background technology
Desire to make steam to obtain dry the use, the insulation of depending merely on pipeline obviously not enough.Steam locomotive use vapour, it is to take from the boiler to be divided into tubule again behind the vapour of upper strata, utilizes the high temperature of chimney with steam drying by chimney again.And iron does not just possess this condition.So, prolong the steam iron of having used decades, an also inreal difficult problem that solves it with the vapour water outlet.So, at first having occurred electric heater abroad and added the practice of within the iron its condensed water being dried, but done the expense height like this, the service life of iron is short.Go out water problems in order to solve with vapour, clothes manufacturing enterprise couples together admission pipeline and drainage pipeline at present, and the centre adds drain valve to reduce the waste (referring to Fig. 1) of tail vapour.But effect is not very good.Because steam is when mobile, condensed water mixes under the promotion of pressure with steam and advances.Referring to Fig. 1, it can only be purified the steam of B section, and with what vapour was taken from the A section bigger moisture content is just arranged.Be subjected to the influence of pipeline peripheral air still more, cooling is all being carried out at any time.Especially pipeline is long between large car, cools off even more serious.
Summary of the invention
In order to overcome the above-mentioned defective that prior art exists, the object of the present invention is to provide a kind of steam iron steam conveying pipe to arrange and operation method, it is effective with the vapour problem that it solves steam iron.
For achieving the above object, the solution that the present invention takes is: a kind of steam iron steam conveying pipe method for arranging, article one, more than one water filter is set in the gas pipeline is divided into gas pipeline more than two sections, every section gas pipeline is parallel with and is no less than two steam irons, the used inlet valve of each steam iron is positioned at before the gas outlet valve, the steam flow control valve is installed in the middle of each inlet valve and the gas outlet valve, and steam trap is installed on the inlet valve, is connected with steam iron by steam hose again.
A kind of steam iron steam conveying pipe operation method of Bu Zhiing is as follows according to the method described above: when bringing into operation, the steam flow control valve is located at out 1/4 position, in the use, according to the size adjustment steam flow control valve of back steam iron steam consumption.
The present invention adopts one-pipe operation way.When bringing into operation, the steam flow control valve is located at out 1/4 position, is subjected to 3/4 obstacle and just advances to steam trap when steam is come in.Because the container diameter of steam trap is tens times of the delivering vapor pipe diameter, the discharge area diameter is again the hundreds of times of steam hose diameter, just obtained the static relatively of long period so entered the steam of steam trap, the vapour light-water is heavy, and the condensed water natural subsidence is got back to gas pipeline and pushed water filter to from steam flow control valve 1/4 opening part.So the used steam of steam iron is just relatively drier.
One-pipe operation way mainly is a flow velocity of having accelerated steam.If last steam iron in use, it just can accelerate the flow velocity of each steam iron of front, this just overcome twin flue operation (prior art) the steam that forms be detained and the condensed water that produces, just the time spent all gets and at first discharges a burst of condensed water or tail vapour is often emitted existing significant wastage phenomenon in back intermittently to have avoided the common steam iron.In addition, the present invention also has flexibility: as a certain steam iron water outlet, can recover normal several seconds as long as this steam flow control valve closed.Its principle is: the steam off flow control valve, block the flow of gas pipeline, and by preceding and pressure that come all rushes at this steam iron, promptly condensed water is pressed to the back segment pipe.
Condensed water is not only just regained in the effect of water filter, and because its container diameter greater than gas pipeline diameter hundred times, therefore all plays continual and steady effect to the flow of steam and the use of pressure.
Description of drawings
Fig. 1 is that the prior art twin flue is arranged schematic diagram.
Fig. 2 is that present embodiment is arranged schematic diagram.
Among the figure: 1, gas pipeline, 2, inlet valve, 3, drain valve, 4, drainpipe, 5, steam iron, 6, steam hose, 7, gas outlet valve, 8, steam trap, 9, the steam flow control valve, 10, water filter.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing thereof the present invention is remake description.
Referring to Fig. 2, a kind of steam iron steam conveying pipe method for arranging, article one, more than one water filter 10 is set in the gas pipeline 1 is divided into gas pipeline 1 more than two sections, every section gas pipeline 1 is parallel with and is no less than two steam irons 5, each steam iron 5 used inlet valve 2 is positioned at before the gas outlet valve 7, each inlet valve 2 and the gas outlet valve 7 middle steam flow control valves 9 of installing, steam trap 8 is installed on the inlet valve 2, is connected with steam iron 5 by steam hose 6 again.
A kind of steam iron steam conveying pipe operation method of Bu Zhiing is as follows according to the method described above: when bringing into operation, steam flow control valve 9 is located at out 1/4 position, in the use, according to the size adjustment steam flow control valve 9 of back steam iron 5 steam consumptions.
A kind of steam iron steam conveying pipe operation method of Bu Zhiing also can followingly be realized according to the method described above: when bringing into operation, all steam flow control valves 9 all often are in to be opened, in the use, carry out discontinuous control steam flow control valve 9 by electronic controller, regulate by electronic controller, determine to end and length blanking time.As steam flow control valve 9, No. two steam flow control valves 9, No. three steam flow control valves 9 ... all often be in and open, when electronic controller begins power supply a steam flow control valve 9 is closed, blocked pipeline flow, at this moment the steam that the front is come is at once to 5 superchargings of perming of a steam, in wherein condensed water is arranged backward segment pipe from steam hose 6 rapidly.Disconnect behind the five seconds, No. one steam flow control valve 9 recovers normally open.No. two steam flow control valves 9 start after two seconds, and condensed water is released rapidly equally; No. two steam flow control valves 9 are disconnected behind the five seconds, and steam flow control valve 9 recovers normally open; No. three steam flow control valves 9 start after two seconds ... so analogize, every work five seconds is at interval until last, and accent begins after being separated by three minutes, so circulation.What this had guaranteed every steam iron 5 uses the vapour drying, does not influence the bulk flow of steam again.
Claims (3)
1, a kind of steam iron steam conveying pipe method for arranging, it is characterized in that: more than one water filter (10) is set in the gas pipeline (1) is divided into gas pipeline (1) more than two sections, every section gas pipeline (1) is parallel with and is no less than two steam irons (5), the used inlet valve (2) of each steam iron (5) is positioned at gas outlet valve (7) before, each inlet valve (2) and the middle steam flow control valve (9) of installing of gas outlet valve (7), steam trap (8) is installed on the inlet valve (2), is connected with steam iron (5) by steam hose (6) again.
2, a kind of steam iron steam conveying pipe operation method of arranging according to the described method of claim 1, it is characterized in that: when bringing into operation, steam flow control valve (9) is located at out 1/4 position, in the use, according to the size adjustment steam flow control valve (9) of back steam iron (5) steam consumption.
3, a kind of steam iron steam conveying pipe operation method of arranging according to the described method of claim 1, it is characterized in that: when bringing into operation, all steam flow control valves (9) all often are in to be opened, in the use, carry out discontinuous control steam flow control valve (9) by electronic controller, regulate by electronic controller, determine to end and length blanking time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200310124102 CN1253626C (en) | 2003-12-13 | 2003-12-13 | Arrangement of steam conveying pipe of steam iron and operation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200310124102 CN1253626C (en) | 2003-12-13 | 2003-12-13 | Arrangement of steam conveying pipe of steam iron and operation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1546776A true CN1546776A (en) | 2004-11-17 |
CN1253626C CN1253626C (en) | 2006-04-26 |
Family
ID=34338953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200310124102 Expired - Fee Related CN1253626C (en) | 2003-12-13 | 2003-12-13 | Arrangement of steam conveying pipe of steam iron and operation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1253626C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100458001C (en) * | 2006-01-04 | 2009-02-04 | 陈光焕 | Steam-vapour three-purpose pipe distributing method of iron |
CN102154807A (en) * | 2010-12-03 | 2011-08-17 | 陈光焕 | Series-parallel connection arrangement method of steam pipelines of irons |
CN102154808A (en) * | 2010-12-03 | 2011-08-17 | 陈光焕 | Steam iron-dewatering-filtration arrangement method |
-
2003
- 2003-12-13 CN CN 200310124102 patent/CN1253626C/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100458001C (en) * | 2006-01-04 | 2009-02-04 | 陈光焕 | Steam-vapour three-purpose pipe distributing method of iron |
CN102154807A (en) * | 2010-12-03 | 2011-08-17 | 陈光焕 | Series-parallel connection arrangement method of steam pipelines of irons |
CN102154808A (en) * | 2010-12-03 | 2011-08-17 | 陈光焕 | Steam iron-dewatering-filtration arrangement method |
Also Published As
Publication number | Publication date |
---|---|
CN1253626C (en) | 2006-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201251371Y (en) | Flue gas pre-cooling system with highly-effective water and energy conservation | |
CN104482742A (en) | Fuel drying device used for direct combustion biomass power station | |
CN108468575B (en) | System for changing extraction condensing unit into back pressure unit based on injection heat pump and operation method thereof | |
CN1253626C (en) | Arrangement of steam conveying pipe of steam iron and operation method thereof | |
CN204513372U (en) | Coal feeder for circular fluidized bed boiler | |
CN201779676U (en) | Seal air system of desulfurized flue gas damper | |
CN103638784B (en) | A kind of external heated type wet flue gas dehumanization method and dehumidification system | |
CN105387446A (en) | Bypass grading coal economizer system with active exhaust gas temperature control function | |
CN201666717U (en) | Strip steel drying device | |
CN210356549U (en) | Intelligent integrated ash conveying air compression system | |
CN208184799U (en) | Extraction and condensing unit based on jet heat pump changes back pressure unit system | |
CN100458001C (en) | Steam-vapour three-purpose pipe distributing method of iron | |
CN201801760U (en) | Steam conveying pipeline for steam iron | |
CN202393251U (en) | Flue gas waste heat recovery system for big flue of sintering machine | |
CN101598495B (en) | Recovery device for condensed water | |
CN103994459B (en) | A kind of flue gas processing equipment | |
CN113803039A (en) | Oil field carbon emission-free high-temperature high-pressure multi-element miscible flooding intelligent system | |
CN203927882U (en) | Warm economizer system in one | |
CN207730083U (en) | A kind of low-level (stack-gas) economizer cleaning system | |
CN202032849U (en) | Powdery material dryer | |
CN106338060B (en) | The water supply system of Combined Cycle Heat Recovery Boiler | |
CN102230038B (en) | Slag granulation steam recovering device | |
CN202470795U (en) | Sintering flue gas waste heat recovery and utilization plant and sintering apparatus with same | |
CN205957148U (en) | Combined cycle exhaust -heat boiler's water supply system | |
CN109985499A (en) | A kind of desulfurization oxidized input air intelligent Matching method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |