CN1545255A - A method for centralized management of relay resources - Google Patents

A method for centralized management of relay resources Download PDF

Info

Publication number
CN1545255A
CN1545255A CNA2003101152041A CN200310115204A CN1545255A CN 1545255 A CN1545255 A CN 1545255A CN A2003101152041 A CNA2003101152041 A CN A2003101152041A CN 200310115204 A CN200310115204 A CN 200310115204A CN 1545255 A CN1545255 A CN 1545255A
Authority
CN
China
Prior art keywords
resource
module
service processing
processing module
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2003101152041A
Other languages
Chinese (zh)
Inventor
戴江宁
黄建军
季彩虹
景华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNA2003101152041A priority Critical patent/CN1545255A/en
Publication of CN1545255A publication Critical patent/CN1545255A/en
Pending legal-status Critical Current

Links

Abstract

The invention is a relay resources centralized managing method, used for managing relay resources in an exchange system, managing all the relay resources by an only resources managing module in the system, a service processing module applies and distributes the relay resources to the resources managing module, which assures the relay resources to be accurately released by judging the mark of the service processing module occupying resources. It provides a reliable management mechanism of distributing and releasing relay resources, enhances the reliability of a relay resources management system and stability of an exchange system and assures transplantation of program by using logic module mark.

Description

A kind of centralized management method of relay resource
Technical field
The present invention relates to the method for managing resource in a kind of communication field switching system, relate in particular to and have the continue relay resource centralized management of switch device of function of traffic resource and speech channel.
Background technology
Along with telephone subscriber's rapid increase, exchanger capacity is also increasing, in the design of switch, the mode of multimode becomes the main flow of switch design gradually, in the design of multimode, and the management of resource, the particularly management of relaying traffic resource seems extremely important.A kind of main method for designing is: will leave in the resource set on certain module (resource module), resource is applied for, inquires about, discharged to business to resource module.This way to manage realizes simple, and the module extensibility is good, realizes the load sharing that traffic resource uses easily, but during this mode specific implementation, not can solve resource and discharged by the business of this resource of unoccupied, causes the problem of existing speech channel aborted.Prior art is No. the 96117990.2nd, Chinese patent application for example, this scheme takies resource and applies for whether the permanent program ID of the processor of release is same by checking application, solve this problem, but because this this method judges is relevant with hardware and the permanent program ID of the operating system processor of being correlated with, and the portability of program is brought certain problem.
Summary of the invention
The present invention seeks to solve the speech channel aborted problem that prior art exists, it is simple to provide a kind of resource management to realize, resource management efficient height, the resources centralized management method that program portability is good.
Core of the present invention is: all relay resource of a switching system are transferred to unique in a system resource management module manage, exchange system business is handled required relay resource and is distributed to this resource management module application by Service Processing Module, and the module id that resource management module takies the Service Processing Module of resource according to judgement guarantees the correct release of relay resource.
The centralized management method of relay resource of the present invention may further comprise the steps:
Resource management module with the resource number centralized stores of relay resource all in the switching system in the relay resource allocation table;
When Service Processing Module needs the relaying traffic resource, send the application that distributes the relay resource numbering to resource management module;
Resource management module is selected available relay resource from the relaying resource allocation table, with the module id of the Service Processing Module of this relay resource of application corresponding to distributes relay resource number preservation, make this relay resource can not be, and the relay resource numbering of being distributed can be fed back to this Service Processing Module by sub-distribution again;
When the Service Processing Module application discharges shared relay resource, whether module id and the relay resource that is required to discharge that the Service Processing Module of this application is initiated in the resource management module inspection numbered pairing module id consistent, if unanimity then allow to discharge, otherwise refusal this time discharges application.
Adopt the method for resources centralized management of the present invention, compared with prior art, the relay resource administrative mechanism of reliable distribution and release is provided, improve the reliability of relay resource management system, the stability of switching system, and used logic module to identify the portability that this method has guaranteed program.
Description of drawings
Fig. 1 is a logic module schematic diagram of the present invention;
Fig. 2 is a flow chart of the present invention.
Embodiment
Please refer to Fig. 1, the present invention relates to lower module:
Resource management module is the main realization module of the inventive method, is responsible for the realization of switching system resource management, comprises resource allocation, recovery, condition managing etc.Be provided with resource allocation table in the resource management module, the module id of the Service Processing Module of relay resource is numbered and taken to the relay resource that is used for the memory transactions system.
Service Processing Module comprises the related service processing module that will use relay resource, and as TUP, ISUP, BSSAP etc., they mainly are to use the resource management function that resource management module provides in the present invention.Each Service Processing Module all has a module id unique in switching system separately, this module id is in logic a module id when Business Processing, represented actual Service Processing Module, switching system uses module id to distinguish the actual different individuality of Service Processing Module, module id is by the unified numbering of the principle that guarantees its uniqueness in switching system, place processor when coding rule and program running and concrete process ID are irrelevant, have guaranteed the portability of program.
Among Fig. 1, resource management module is finished the function of relay resource centralized management, and Service Processing Module then is application and the user who uses relay resource.Deposited all relaying traffic resources of switching system in the resource allocation table of the resource management module among Fig. 1, and each relay resource has been distributed unique resource number.Service Processing Module has n, each Service Processing Module all has a module id unique in switching system separately, this module id can be added numbering by the sign of Service Processing Module type and form, the sign difference of wherein different Service Processing Module types, numbering can be when the Service Processing Module initialization, specify a current number unique in the Service Processing Module of same type by system dynamics, for example a kind of Service Processing Module type is M among Fig. 1, then when all Service Processing Modules behind system initialization, module id is M1, M2 ..., Mn.
Please in the lump with reference to figure 2, when Service Processing Module M2 needs the relaying traffic resource, distribute relay resource to the resource management module application, resource management module is selected available relay resource R2 according to certain system of selection in resource allocation table (system of selection can determine to realize whether the use of traffic resource is the load sharing mode, such as the selected number of times of noting each resource when the Resources allocation, when distributing new resources, need just in available resources, pick out the resource of choosing least number of times, it is dispensed), resource management module will apply for that the Service Processing Module sign M2 of this resource deposits in the resource allocation table corresponding to resource number R2, make relay resource R2 be returned the relay resource R2 of distribution for its use to Service Processing Module at last by sub-distribution again.
Service Processing Module M2 discharges relay resource R2 to the resource management module application, the resource processing module is according to the preservation record of resource allocation table, judge corresponding to the module id M2 of resource number R2 consistent with the module id M2 of the Service Processing Module of application release relay resource R2, then allow to discharge, module id M2 with resource number R2 correspondence in resource allocation table empties, and resource R2 can be assigned with once more.
If Service Processing Module M1 discharges relay resource R2 to the resource management module application, the resource processing module is according to the preservation record of resource allocation table, it is inconsistent with the module id M1 of the Service Processing Module of application release relay resource R2 to judge the module id M2 that deposits corresponding to resource number R2, then refusal discharges, and returns the result that refusal discharges to module M1.This method has prevented that effectively resource is by the generation of the situation of the Service Processing Module of this resource of unoccupied release.

Claims (5)

1, a kind of centralized management method of relay resource, the relay resource that is used for managing switching system may further comprise the steps:
Step 1: resource management module with the resource number centralized stores of relay resource all in the switching system in the relay resource allocation table;
Step 2: when Service Processing Module needs the relaying traffic resource, send the application that distributes the relay resource numbering to resource management module;
Step 3: resource management module is selected available relay resource from the relaying resource allocation table, with the module id of the Service Processing Module of this relay resource of application corresponding to distributes relay resource number preservation, make this relay resource can not be, and the relay resource numbering of being distributed can be fed back to this Service Processing Module by sub-distribution again;
Step 4: when the Service Processing Module application discharges shared relay resource, whether module id and the relay resource that is required to discharge that the Service Processing Module of this application is initiated in the resource management module inspection numbered pairing module id consistent, if unanimity then allow to discharge, otherwise refusal this time discharges application.
2, the centralized management method of relay resource as claimed in claim 1 is characterized in that: the resource number of described relay resource is that resource management module is unique logical identifier that each relay resource is distributed in this switching system.
3, the centralized management method of relay resource as claimed in claim 1 is characterized in that: the module id of described Service Processing Module is that this switching system is unique logical identifier that each Service Processing Module wherein distributes.
4, the centralized management method of relay resource as claimed in claim 3, it is characterized in that: the module id of described Service Processing Module adds numbering by the type identification of Service Processing Module and forms, the type identification difference of different kinds of business processing module, numbering is when the Service Processing Module initialization, dynamically specifies a current number unique in the Service Processing Module of same type by switching system.
5, the centralized management method of relay resource as claimed in claim 1, it is characterized in that: when resource management module allows Service Processing Module to discharge shared relay resource, module id with this Service Processing Module in resource allocation table empties, and this relay resource can be assigned with once more.
CNA2003101152041A 2003-11-21 2003-11-21 A method for centralized management of relay resources Pending CN1545255A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2003101152041A CN1545255A (en) 2003-11-21 2003-11-21 A method for centralized management of relay resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2003101152041A CN1545255A (en) 2003-11-21 2003-11-21 A method for centralized management of relay resources

Publications (1)

Publication Number Publication Date
CN1545255A true CN1545255A (en) 2004-11-10

Family

ID=34337279

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2003101152041A Pending CN1545255A (en) 2003-11-21 2003-11-21 A method for centralized management of relay resources

Country Status (1)

Country Link
CN (1) CN1545255A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008124985A1 (en) * 2007-04-13 2008-10-23 Zte Corporation A method for terminating connection to wireless relay station
CN101287268B (en) * 2007-04-13 2012-05-09 中兴通讯股份有限公司 Method for updating connection relation of wireless relay station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008124985A1 (en) * 2007-04-13 2008-10-23 Zte Corporation A method for terminating connection to wireless relay station
CN101287268B (en) * 2007-04-13 2012-05-09 中兴通讯股份有限公司 Method for updating connection relation of wireless relay station

Similar Documents

Publication Publication Date Title
US5570410A (en) Dynamic resource allocation process for a service control point in an advanced intelligent network system
CN1081865C (en) Overload prevention in a telecommunications network node
CN111506404A (en) Kubernetes-based shared GPU (graphics processing Unit) scheduling method
CN104468407A (en) Method and device for performing service platform resource elastic allocation
CN110515704A (en) Resource regulating method and device based on Kubernetes system
US20030158883A1 (en) Message processing
CN104038439A (en) Message flow control method and system
CN100461683C (en) Universal business system and device, network access system and business processing method
CN106385330A (en) Network function virtualization composer realization method and device
CN100464541C (en) Method and system for realizing time-division multiplexing bearing resource share
CN1545255A (en) A method for centralized management of relay resources
CN102025534A (en) Single-plate resource allocation method and device thereof
CN106878128A (en) A kind of collocation method and device of identifier receiving filter
CN100388745C (en) A method and system for distributed management of relay resources
CN1082307C (en) Method for calling distribution in communication network
CN1946120B (en) Method and system for realizing telephone list association
CN101969582A (en) Link bundle label distribution system and method
CN101494844A (en) Method and apparatus for processing fees limit
CN1384651A (en) Multiple-signalling point and multiple-protocal method
CN100373863C (en) Method and system for managing intelligent external equipment in intelligent network
CN100502448C (en) System and method for realizing cross-sectional charge and pay
US6337847B1 (en) Method and architectural model for handling a pool of hardware resources
CN102811154A (en) Resource acquisition method and network server system
US7779098B1 (en) Methods for identifying and recovering stranded and access-no-revenue network circuits
CN1332531C (en) A method for dynamically adjusting system service performance on service management point

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication