CN1499015A - 一种全立体化城市道路系统及采用该系统的交通方法 - Google Patents

一种全立体化城市道路系统及采用该系统的交通方法 Download PDF

Info

Publication number
CN1499015A
CN1499015A CNA031264646A CN03126464A CN1499015A CN 1499015 A CN1499015 A CN 1499015A CN A031264646 A CNA031264646 A CN A031264646A CN 03126464 A CN03126464 A CN 03126464A CN 1499015 A CN1499015 A CN 1499015A
Authority
CN
China
Prior art keywords
road
street
sidewalk
full
motorway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031264646A
Other languages
English (en)
Other versions
CN1249302C (zh
Inventor
董国良
张桂淑
张亦周
董学义
董学健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to CNB031264646A priority Critical patent/CN1249302C/zh
Application filed by Individual filed Critical Individual
Priority to US10/573,614 priority patent/US20070189851A1/en
Priority to AU2003280539A priority patent/AU2003280539A1/en
Priority to JP2005509129A priority patent/JP2007506876A/ja
Priority to KR1020067006046A priority patent/KR20060088117A/ko
Priority to PCT/CN2003/000892 priority patent/WO2005031069A1/zh
Priority to EP03769156A priority patent/EP1676959A4/en
Publication of CN1499015A publication Critical patent/CN1499015A/zh
Application granted granted Critical
Publication of CN1249302C publication Critical patent/CN1249302C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/04Road crossings on different levels; Interconnections between roads on different levels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/123Traffic control systems for road vehicles indicating the position of vehicles, e.g. scheduled vehicles; Managing passenger vehicles circulating according to a fixed timetable, e.g. buses, trains, trams

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Road Paving Structures (AREA)

Abstract

本发明涉及一种全立体化城市道路系统及采用该系统的交通方法,其中所述道路系统基本为棋盘式的两层道路网,包括机动车道和人行道,一层为地面机动车道,机动车道的上方适当的高度上对应或两侧设置一层人行道,两侧设置的人行道之间设置横向通道,或将支路的部分路口上的人行道设置为环形通道或架空广场,在两个快速路的交叉路口之间设置掉头道或在分离式立交桥下设置掉头道;在每两条平行的快速路之间设置一条用于作为快速路的匝道和通向支路的通道。该系统将人、车完全分离,大量节约了道路占地面积,实现了快速路交叉路口的全部立交化,在整个城市中形成纵横交错的快速路交通系统,并彻底解决了渠化问题。

Description

一种全立体化城市道路系统及采用该系统的交通方法
技术领域
本发明涉及一种城市道路系统及采用该系统的交通方法,特别是一种节约土地的全立体化城市道路系统及采用该系统的交通方法。属于城市道路建筑领域。
背景技术
随着人们生活水平的日益提高,汽车已经成为越来越重要的交通工具,然而日益增长的汽车数量给城市交通带来了严重的堵塞问题。目前的交通系统主要由快速路、主干路、支干路、支路(小区路)构成,为了缓解交通堵塞,主要是通过设立互通式立交桥、增加环形快速路、增设匝道,这些方式会大量占用土地,对于一些大城市其交通道路的土地占用面积已经接近国家的规定,随着汽车家庭化的发展,仅仅在现有的交通模式上所作的改进无法满足汽车数量日益增长所带来的严重的交通问题。
专利号93119501.2,公开了一种城市立体交通系统,该发明阐明了一种现代化城市道路系统:所有道路形成网格状系统,最好是正交,也可是非正交,将市区分成许多块,或许多小区、厂区,所有形成网格的道路全部是单行道,同顺向单行道设计的基本原则是正行道间是一条反行道,交替安排,交叉向单行道相互间的设计原则是某一方向的单行道由单层立交桥全部架起,形成高一层的立交系统,或跨越部分架起,形成波浪起伏状,所有道路全部封闭,人行道、人力车、自行车、畜力车可在单行道侧另开通行道(并可同高架道并行,以跨越地面一层单行道,也可下挖一层),可在高架单行道下或小区道路上通行,铁道或有轨电车原则上与地面一层的同方向的单行道同向,并紧靠在一起(留出安全部隔,或以小区和人行道分开),相互交叉的单行道间,以半弧形立交引桥相联,用于车辆转向,汇流及分流,单行道上一般设三个行车道,一个是左转行车道,中间一个超车道,一个是右转行车道,城市立体交通系统的道路上,一般不设信号,且全时间畅通,公交车停车站设在封闭围栏侧,围栏开人行口,以供上下车,公交车停在车站前增加的停车道上。
该技术方案能够节约大量用于立交桥、信号系统及占地面积等的资金,它主要是由单行原理,和单行环绕跨越、转向原理设计而成,其存在的问题是到达指定目标多需要绕行,浪费时间和能源,出行极不方便,且难以区分道路、占地多。
专利号98107272.0一种畅通式路口交通设施,围绕岗区设一隔离带,隔离带沿不同道路方向均开有机动车进口、出口,隔离带以内为机动车直行或左转弯时绕行道。隔离带以外为右转弯时的机动车道、人行道。自行车、人直行或左转弯时通过地道桥上层或下层绕行道绕行。本发明简易经济,减少了机动车、自行车过路口时的相互交叉。
专利号97115611.5公开了一种缓解交通阻塞的方法,以路口的中心为圆心形成内圆盘和外圆,平时车辆可绕内圆盘行驶,当饱和分界线内的车辆呈饱和状时,线外的车辆则绕外圆行驶,使车辆按圆周的形式来改变行驶方向,减少了交通阻塞,加快了交通流量。
专利号98117567.8公开了一种用于城市或集中居住区或高速公路的建筑与交通系统设计方案,该种建筑与交通系统是将建筑物的顶部连接在一起并构成公路,并在建筑物地下构建地下公路和地铁将其连接在一起,上述两类公路可同时与地面公路网或地铁网相通。这样就将建筑物与公路结合成为一体。另外,还可以在建筑物的顶部侧面设置了高架列车通道。该发明与现有建筑格局相比具有可充分地利用地上和地下的空间,节省土地资源,其缺点是:造价高、可操作性差、无法调和城市景观的需要。
发明内容
本发明的目的在于提供一种全立体化城市道路系统,该系统采用较少的占地面积,使机动车与人及非机动车完全分离,提高道路的利用率,彻底解决城市道路堵车、停车难和交通区划问题。
本发明的另一目的在于提供采用上述系统的交通方法,该方法在城市道路交通中取消交通指挥灯,使城市现有交通道路分类中的快速路和主干路全部改变为快速路,能够实现车辆的快速、高效运行。
为了实现上述目的,本发明采用的技术方案为:一种全立体化城市道路系统,基本为棋盘式的道路网,包括机动车道和非机动车道,其特征在于所述交通系统为两层结构,一层为地面机动车道,另一层为机动车道两侧上层的人行道(非机动车道),两侧的人行道(非机动车道)之间设置横向通道,或将支路的部分路口上的人行道设置为环形通道或架空广场。
其中机动车道包括快速路和支干道,快速路在交叉路口设分离式立交,快速路的立交桥用支干路完成匝道的功能。
快速路上可在两个交叉口之间设置掉头道。也可以在分离式立交桥下设置掉头道。
在每两条平行的快速路之间设置一条支干道,用于作为快速路的匝道和通向支路(小区路)的通道。
道路两旁的建筑物一层为架空层,建筑物架空层可用于停车、绿化以及与行车有关的设施建设,也可用于在紧急情况下车辆绕行。
城市建筑物的一层也可以全部为架空层,用于停车、绿化以及改善城市通风,缓解城市的热岛现象。
在城市的边界处和市内的部分地段会出现丁字路口,可在丁字路口附近设有掉头路,用以解决左转弯的问题;或者,也可设专用匝道解决左转弯的问题;或者,在快速路的丁字路口交替设立左转弯的分离式立交;或者,将丁字路口设在支干路上,避免快速路上出现丁字路口,该支干路单行,以完成快速路匝道的功能。
本发明还涉及采用上述立体化城市道路系统的交通方法,其中机动车道包括快速路和支干道,快速路在交叉路口设分离式立交桥,快速路为直行或沿行驶方向向通行一侧转弯,用支干路完成匝道的功能。这样在快速路道口不设信号灯,人车分离,通行速度大大提高。这样虽然在某些路段需要绕行,但由于整体道路的畅通,将大大缩短行车时间。
上述快速路为直行或沿行驶方向向通行一侧转弯,是指对于对于规定为左侧通行的国家或地区,沿行驶方向只能够左转弯;而规定为右侧通行的国家或地区,沿行驶方向只能够右转弯。
支干路与支干路的交叉口可以只允许右转弯或按常规方式管理。
由于采用上述技术方案,将主干道全部改为快速路,增加快速路的密度,且取消传统的匝道,用支干路完成匝道的功能,同时取消向道路通行一侧的对侧转弯,在快速路上不再出现互通式立交桥。这样设计的结果,将人、车完全分离,一方面大量节约了道路占地面积,另一方面又实现了快速路交叉路口的全部立交化,在整个城市中形成纵横交错的快速路交通系统,并彻底解决了渠化问题。
下面结合附图和具体实施方式详细描述本发明。
附图说明
图1是本发明城市道路系统机动车道的平面示意图
图2是本发明城市道路系统机动车和人行道(非机动车道)的示意图
图3是本发明城市道路系统人行道(非机动车道)的平面示意图
图4是本发明城市道路系统机动车道上掉头道的平面示意图
图5是本发明城市道路系统机动车道中边界处和市内的部分地段的丁字路口的平面示意图。
图6快速路的丁字路口交替设立左转弯的分离式立交桥示意图。
参见图1-2,本发明的全立体化城市道路系统,所述道路系统基本为棋盘式的两层道路网,包括机动车道1和人行道2,人行道兼具非机动车道的作用,所述交通系统为上、下两层结构,第一层的机动车道1设置在城市的地面上,机动车道的上方适当的高度上对应设置一层人行道2,人行道层与机动车道层完全对应,或仅仅在机动车道1的两侧的上部分别设置适当宽度的人行道层3、4,还可以在同一城市的交通系统中同时分别设置两种结构。当在机动车道1的两侧的上部分别设置人行道层3、4时,两侧的人行道3、4之间设置横向通道5(如图3)。人行道层3或4的至少一侧设置有护栏14。在支路的部分路口上的人行道设置环形通道或架空广场。
机动车道1包括快速路6和支干道7,一条支干道7设置在每两条快速路6之间,用于作为快速路6的匝道和通向支路(小区路,图中未示)的通道。
在快速路6与快速路6的交叉路口8处设分离式立交桥9,机动车道1用支干路7完成立交桥匝道的功能。支干路7与快速路6间距优选为L/2,以减少占地。支干路兼做快速路的匝道。
参见图4,快速路上可在两个或两个以上交叉路口之间设置至少一个掉头道10。掉头道10的数量也可以根据交叉路口之间的道路长度以及实际需要设置多个,以减少绕行距离。另外在交叉路口8处设置的分离式立交桥9处,也可以在立交桥9的下面设置掉头道(图中未示)。
道路两旁的建筑物一层为架空层11,在地面和一层楼板12之间形成架空层11,建筑物架空层11可用于停车、绿化以及与行车有关的设施建设,也可用于在紧急情况下车辆绕行。当人行道层3或4临近建筑物时,人行道层3或4直接与架空层11上部的楼板12相连,即方便了行人出行,又节约了一侧的护栏。
城市的建筑物的一层也可以全部为架空层,用于停车、绿化以及改善城市通风,缓解城市的热岛现象。
在城市的边界处和市内的部分地段,如轨道、河流等处会出现丁字路口,在丁字路口附近设有掉头道91(图5),用以解决左转弯的问题;或者,也可设专用匝道解决左转弯的问题;或者,在快速路的丁字路口交替设立左转弯的分离式立交桥15(参见图6);或者,将丁字路口设在支干路上,避免快速路上出现丁字路口,该支干路单行,以完成快速路匝道的功能(参见图1上部)。
上述立体化城市道路系统的交通方法为:参见图1、4,如果机动车从A点出发欲到达B点,由于所有的快速路6不设置左转弯,机动车可以在快速路6的交叉路口81,也就是E点右转,经快速路6的EL线,在交叉路口16(L处)右转至支干道7,至快速路6与支干道7的交叉路口17(N处),在交叉路口17右转弯,沿快速路6直行至快速路6的交叉路口83(0)再右转弯,最后直行到达B点,整个路线表示为A-C-D-E-L-M-N-O-P-B。采用这种路线,支干道7上的L-M-N起匝道的作用。或者按照A-C-D-M-N-0-B的路线到达B点,其他可行的路线包括但不限手A-C-D-E-F-K-L-E-P-B,A-C-D-E-F-G-H-I-J-Q-B等。这时,支干道7上的相应部分起匝道的作用。按照图4所示,机动车也可以利用快速路6的F-G之间设置的掉头道10掉头,行驶到E和P处分别右转弯,再直行至B点。在快速路上无须设置交通调度灯,车辆的行驶速度大大提高。
如果机动车从A点出发欲到达B点对面的Z点,择除上述行驶路线外,只须在图4所示的X处设置的掉头道10掉头,或在Y处立交桥9下设置的掉头道掉头,再直行到达Z点。其他城市道路之间的任何两点,都可以参照上述方法行驶。
对于左侧通行的国家,只需要将右转弯改为全部左传弯即可。
采用上述交通系统,在城市组团式规划的前提下,同时解决了堵车、停车难和交通的渠化问题,能够缩短出行时间,交通质量可以做到不受城市规模膨胀的影响。采用立体化而非立交化设计的结果,节约了道路占地。初步估计,采用本专利的系统及方法,在现有道路占地面积的前提下,可以使城市的汽车容量增加3-4倍,到达同样距离的出行时间缩短1倍,城市每辆汽车容量的道路投资减少1倍,交通管理运行费用降低到常规的1/3。
本发明的系统及方法,可以用于新城市的建设,也可以用作老城市道路改造的目标模式。在老城市改造中,可以毗邻老区按照本专利建设新区,并逐步减少老城区的交通量,再依据建筑物的更新速度,对老区道路进行逐步改造。

Claims (9)

1.一种全立体化城市道路系统,基本为棋盘式的道路网,包括机动车道和非机动车道,其特征在于所述交通系统为两层结构,一层为地面机动车道,机动车道的上方适当的高度上对应设置一层人行道,人行道层与机动车道层完全对应,或仅仅在机动车道上部分别两侧设置适当宽度的人行道层,或分别设置两种结构,两侧设置的人行道(非机动车道)之间设置横向通道。
2.根据权利要求1所述的全立体化城市道路系统,其特征在于机动车道包括快速路和支干道,在快速路的交叉路口设分离式立交桥,立交桥用支干路完成匝道的功能。
3.根据权利要求1所述的全立体化城市道路系统,其特征在于或将支路的部分路口上的人行道设置为环形通道或架空广场。
4.根据权利要求1所述的全立体化城市道路系统,其特征在于人行道亦为非机动车道。
5.根据权利要求1所述的全立体化城市道路系统,其特征在于在两个或两个以上快速路的交叉路口之间设置至少一个掉头道或在分离式立交桥下设置掉头道;优选在快速路的两个交叉口之间设置一个掉头道。
6.根据权利要求2所述的全立体化城市道路系统,其特征在于在每两条平行的快速路之间设置一条用于作为快速路的匝道和通向支路(小区路)的通道。
7.根据权利要求1-6所述的全立体化城市道路系统,其特征在于道路两旁的建筑物一层为用于停车、绿化以及与行车有关的设施建设,也可用于在紧急情况下车辆绕行的架空层;人行道层直接与其相邻的架空层上部的楼板相连。
8.根据权利要求1-6所述的全立体化城市道路系统,其特征在于在城市的边界处和市内的部分地段的丁字路口附近设有掉头路;或者,设解决左转弯问题的专用匝道;或者,在快速路的丁字路口交替设立左转弯的分离式立交桥;或者,将丁字路口设在单行的支干路上。
9.采用根据权利要求1-8所述的全立体化城市道路系统的交通方法,其中机动车道包括快速路和支干道,快速路在交叉路口设分离式立交桥,快速路为直行或沿行驶方向向通行一侧转弯,用支干路完成匝道的功能。
CNB031264646A 2003-09-28 2003-09-28 一种全立体化城市道路系统及采用该系统的交通方法 Expired - Lifetime CN1249302C (zh)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CNB031264646A CN1249302C (zh) 2003-09-28 2003-09-28 一种全立体化城市道路系统及采用该系统的交通方法
AU2003280539A AU2003280539A1 (en) 2003-09-28 2003-10-24 A full interchange urban road system and the traffic method of using it
JP2005509129A JP2007506876A (ja) 2003-09-28 2003-10-24 一種の完全立体化の都市道路システム及び当該システムを採用する交通様式
KR1020067006046A KR20060088117A (ko) 2003-09-28 2003-10-24 일종의 전부 입체화한 도시도로시스템 및 그 시스템을도입한 교통방법
US10/573,614 US20070189851A1 (en) 2003-09-28 2003-10-24 Full interchange urban road system and the traffic method of using it
PCT/CN2003/000892 WO2005031069A1 (fr) 2003-09-28 2003-10-24 Systeme routier urbain d'echangeur complet et sa methode d'utilisation par le trafic
EP03769156A EP1676959A4 (en) 2003-09-28 2003-10-24 URBAN ROAD SYSTEM WITH COMPLETE MOTORWAY CROSS AND ALL-ROAD TRANSPORT SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031264646A CN1249302C (zh) 2003-09-28 2003-09-28 一种全立体化城市道路系统及采用该系统的交通方法

Publications (2)

Publication Number Publication Date
CN1499015A true CN1499015A (zh) 2004-05-26
CN1249302C CN1249302C (zh) 2006-04-05

Family

ID=34239664

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031264646A Expired - Lifetime CN1249302C (zh) 2003-09-28 2003-09-28 一种全立体化城市道路系统及采用该系统的交通方法

Country Status (7)

Country Link
US (1) US20070189851A1 (zh)
EP (1) EP1676959A4 (zh)
JP (1) JP2007506876A (zh)
KR (1) KR20060088117A (zh)
CN (1) CN1249302C (zh)
AU (1) AU2003280539A1 (zh)
WO (1) WO2005031069A1 (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007025416A1 (fr) * 2005-08-31 2007-03-08 Guoliang Dong Unité de structure de réseau routier urbain sans feux tricolores
CN1304715C (zh) * 2005-08-31 2007-03-14 董国良 全围合封闭但机动车可自由穿行的城市街区结构
WO2007028307A1 (fr) * 2005-09-09 2007-03-15 Guo Liang Dong Système routier urbain sans lieu conflictuel
CN100415994C (zh) * 2006-09-11 2008-09-03 董国良 一种少停顿、零换乘、乘车方便的快速公交系统
CN1834354B (zh) * 2006-07-11 2010-04-14 董国良 一种空间有序化的节地节能畅通宁静生态城市系统
CN1834352B (zh) * 2006-07-11 2010-05-12 董国良 一种人车全面分离的城市系统
WO2011150740A1 (zh) * 2010-06-02 2011-12-08 Xiong Jianping 一种无干扰城市道路交通网络设施
CN102592028A (zh) * 2012-02-24 2012-07-18 天津市市政工程设计研究院 车道边横向通道设置位置及数量优化方法
CN104099842A (zh) * 2014-07-18 2014-10-15 王建友 一种纵向横向车辆互相绕开叉开的公路网
CN104099839A (zh) * 2014-07-20 2014-10-15 王建友 一种路桥网
CN105672071A (zh) * 2016-02-06 2016-06-15 沈钟德 田字形道路
CN106638193A (zh) * 2015-10-28 2017-05-10 赵士星 模块化城市
CN108763775A (zh) * 2018-05-30 2018-11-06 东南大学 一种基于限制因素对高速公路进行立体改扩建的定线方法及其系统

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1398637B1 (it) 2010-02-25 2013-03-08 Rotondo Metodo e sistema per la mobilita' delle persone in un contesto urbano ed extra urbano.
CN102535284A (zh) * 2011-01-04 2012-07-04 缪龙琯 城市主干道畅通技术方案
CN102121219A (zh) * 2011-04-18 2011-07-13 贾建军 一种解决交叉路口人及车辆单行道通行和停车的新设计
CN103177590B (zh) * 2013-03-07 2015-04-01 王俊昌 道路平面交叉口制动警示信号灯及其控制方法
MX2016001210A (es) 2013-08-02 2016-08-17 Meroz Gilead Sistema de intercambio de anillo espiral de carretera.
CN103680159B (zh) * 2013-12-10 2016-01-13 重庆交通大学 道路交叉口多虚拟信号线性联动控制系统及其控制方法
CN104153265B (zh) * 2014-08-08 2016-03-02 王建友 一种城市路桥网
CN104750938A (zh) * 2015-04-09 2015-07-01 广东省城乡规划设计研究院 一种基于gis的城市通风廊道识别方法及系统
CN109024117B (zh) * 2015-10-29 2020-09-29 金传华 交通运输网系统
WO2017203326A1 (en) * 2016-05-25 2017-11-30 Arun Kumar Pedestrian subway
CN115354538A (zh) * 2017-08-10 2022-11-18 刘基农 承压路面与行驶引导路面功能重合的太阳能公路系统
CN109322222A (zh) * 2018-07-03 2019-02-12 刘启明 一种星光射线式城市多用河道路网模式
CN110453553A (zh) * 2018-07-28 2019-11-15 郑昊 一种休闲、购物、旅游的高速公路服务区
CN108729317A (zh) * 2018-09-06 2018-11-02 北京时代新锋尚科技发展有限责任公司 一种主干线、次干线路网
CN108951331A (zh) * 2018-09-06 2018-12-07 北京时代新锋尚科技发展有限责任公司 一种无红绿灯道路
CN114387778B (zh) * 2020-10-22 2023-08-15 济南市公安局交通警察支队 一种城市快速路拥堵原因分析的方法

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3272096A (en) * 1966-09-13 Roadway structure and method of making same
US1543080A (en) * 1924-08-25 1925-06-23 John F Goode Street-traffic system
US1628935A (en) * 1925-08-03 1927-05-17 Daniel L Turner Superhighway
US1748309A (en) * 1928-01-30 1930-02-25 James M Rose Elevated railroad
FR665780A (fr) * 1928-03-24 1929-09-23 Système d'aménagement des artères et des immeubles urbains pour faciliter la circulation
US3386351A (en) * 1963-09-14 1968-06-04 Hara Shusaku System of grade separation and also underroad parking
US3385180A (en) * 1966-03-01 1968-05-28 Ti Group Services Ltd Construction of roads and associated surfaces
US3406616A (en) * 1966-04-14 1968-10-22 Mclean Edwin Lee Bridge and traffic system
US3405612A (en) * 1966-11-25 1968-10-15 John H. Pearson Method and apparatus for handling urban shopper traffic
DE2321264A1 (de) * 1972-05-03 1973-11-22 Km Insinoeoeritoimisto Oy Km I Rohrfoermiges konstruktionselement
JPS53133942A (en) * 1972-07-16 1978-11-22 Shiyuusaku Hara Stereoscopic crossing device for ttshaped road
JPH04336102A (ja) * 1991-05-14 1992-11-24 Masuji Oi 歩道と車道を上下に分離した交差点構造
DE9309821U1 (de) * 1993-07-01 1994-02-03 Frank, Günther, 81667 München Aufgestockter Wohnbaugrund auf Gemeindewohnstraßen hochgestellter Gehweg mit darunterliegendem Auto-Parkraum
US5807020A (en) * 1996-09-17 1998-09-15 Chen; Chien-Yuan Traffic guide constructions at road intersections to provide smooth traffic flows and methods of traffic control thereof
US5846020A (en) * 1997-06-26 1998-12-08 Mckeown; Kevin Pre-fabricated multi-level roadway structure
CN1195122C (zh) * 1998-08-25 2005-03-30 秦国光 建筑与交通系统
JP3742792B2 (ja) * 2000-06-07 2006-02-08 リー,スー,ヘン 多層道路システム
CN1179093C (zh) * 2000-09-08 2004-12-08 王英旭 带停车场分行式立体公路
US6470633B2 (en) * 2000-12-13 2002-10-29 Robert Harrison Showen Circular subdivisions
JP2003082604A (ja) * 2001-09-10 2003-03-19 Sumitomo Heavy Ind Ltd 自転車専用道路
CN1378017A (zh) * 2002-05-22 2002-11-06 郑学信 一种新型城市公路立交桥
JP4541154B2 (ja) * 2002-12-13 2010-09-08 ガスタフソン、トーマス、エフ. 多目的歩行者本位立体駐車場
CN101155963B (zh) * 2005-02-11 2010-12-01 托马斯·F·加斯塔夫逊 社区联运运输系统
WO2008017279A1 (de) * 2006-08-07 2008-02-14 G. Tröster E. K. Verkehrseinrichtung
US7347642B1 (en) * 2007-01-18 2008-03-25 Robert Harrison Showen Circular subdivisions parking/biking lane, elimination of storm drains, and walkable community development provisions

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007025416A1 (fr) * 2005-08-31 2007-03-08 Guoliang Dong Unité de structure de réseau routier urbain sans feux tricolores
CN1304715C (zh) * 2005-08-31 2007-03-14 董国良 全围合封闭但机动车可自由穿行的城市街区结构
CN100415993C (zh) * 2005-08-31 2008-09-03 董国良 一种取消信号灯的城市道路网结构单元
WO2007028307A1 (fr) * 2005-09-09 2007-03-15 Guo Liang Dong Système routier urbain sans lieu conflictuel
CN1834354B (zh) * 2006-07-11 2010-04-14 董国良 一种空间有序化的节地节能畅通宁静生态城市系统
CN1834352B (zh) * 2006-07-11 2010-05-12 董国良 一种人车全面分离的城市系统
CN100415994C (zh) * 2006-09-11 2008-09-03 董国良 一种少停顿、零换乘、乘车方便的快速公交系统
WO2011150740A1 (zh) * 2010-06-02 2011-12-08 Xiong Jianping 一种无干扰城市道路交通网络设施
CN102592028A (zh) * 2012-02-24 2012-07-18 天津市市政工程设计研究院 车道边横向通道设置位置及数量优化方法
CN104099842A (zh) * 2014-07-18 2014-10-15 王建友 一种纵向横向车辆互相绕开叉开的公路网
CN104099839A (zh) * 2014-07-20 2014-10-15 王建友 一种路桥网
CN104099839B (zh) * 2014-07-20 2017-02-15 王建友 一种路桥网
CN106638193A (zh) * 2015-10-28 2017-05-10 赵士星 模块化城市
CN105672071A (zh) * 2016-02-06 2016-06-15 沈钟德 田字形道路
CN108763775A (zh) * 2018-05-30 2018-11-06 东南大学 一种基于限制因素对高速公路进行立体改扩建的定线方法及其系统
CN108763775B (zh) * 2018-05-30 2022-03-18 东南大学 一种基于限制因素对高速公路进行立体改扩建的定线方法及其系统

Also Published As

Publication number Publication date
WO2005031069A1 (fr) 2005-04-07
CN1249302C (zh) 2006-04-05
EP1676959A1 (en) 2006-07-05
EP1676959A4 (en) 2007-09-26
US20070189851A1 (en) 2007-08-16
AU2003280539A1 (en) 2005-04-14
KR20060088117A (ko) 2006-08-03
JP2007506876A (ja) 2007-03-22

Similar Documents

Publication Publication Date Title
CN1249302C (zh) 一种全立体化城市道路系统及采用该系统的交通方法
CN1834354B (zh) 一种空间有序化的节地节能畅通宁静生态城市系统
CN100351468C (zh) 全立体化城市道路系统及采用该系统的交通方法
CN202194041U (zh) 立交桥
CN102322005A (zh) 立交桥
CN102268852A (zh) 一种城市道路交通系统的两相位实施方法
CN102747661A (zh) 基于城市道路中的扭转式立交桥的结构及其用途
CN105951545A (zh) 井田式无红绿灯无立交桥全程单向行驶的道路交通系统
CN201080585Y (zh) 应用在十字路口的单向直通立交桥
CN1286335A (zh) 城市交叉路口交通分流桥
CN209602887U (zh) 一种无红灯十字路口立交桥
CN207672350U (zh) 一种城市干道集约型立交桥
CN201056663Y (zh) 全功能无障碍三层立交桥
CN102900000B (zh) 全方位全直通直接左转右行立交桥
CN1105084A (zh) 4/4(4/3)车道地上双层无交叉立交桥
CN101487214A (zh) 城市十字路口人性化多功能立交桥
CN202055131U (zh) 一种市中心立交桥
CN2921083Y (zh) 全互通高速单层立交桥
CN101358441A (zh) 一种无通行障碍的立体交通道路
CN101298749B (zh) 绕跨法互通立交桥的绕跨方法
CN1089390C (zh) 两层式立体交叉桥
CN203639771U (zh) 全封闭全立交快速公交道路系统
CN1335430A (zh) 十字形双层无交叉立交桥
CN202194042U (zh) 应用变道方式的交通路口
CN201459557U (zh) 一种全互通式立体通行桥

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20060405