CN1428213A - New process of gripper production for prestressed reinforcement - Google Patents
New process of gripper production for prestressed reinforcement Download PDFInfo
- Publication number
- CN1428213A CN1428213A CN 01138021 CN01138021A CN1428213A CN 1428213 A CN1428213 A CN 1428213A CN 01138021 CN01138021 CN 01138021 CN 01138021 A CN01138021 A CN 01138021A CN 1428213 A CN1428213 A CN 1428213A
- Authority
- CN
- China
- Prior art keywords
- raw material
- cone
- production
- gripper
- extruding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims abstract description 11
- 230000002787 reinforcement Effects 0.000 title claims description 12
- 239000000463 material Substances 0.000 claims abstract description 22
- 239000002994 raw material Substances 0.000 claims abstract description 22
- 238000007493 shaping process Methods 0.000 claims description 17
- 238000005516 engineering process Methods 0.000 claims description 15
- 230000000694 effects Effects 0.000 claims description 5
- 238000005520 cutting process Methods 0.000 abstract description 6
- 239000002699 waste material Substances 0.000 abstract description 4
- 238000000137 annealing Methods 0.000 abstract description 2
- 238000005553 drilling Methods 0.000 abstract 1
- 238000000641 cold extrusion Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000010438 heat treatment Methods 0.000 description 3
- 238000005098 hot rolling Methods 0.000 description 3
- 238000007514 turning Methods 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 229910000851 Alloy steel Inorganic materials 0.000 description 1
- 241001366041 Astronesthes gemmifer Species 0.000 description 1
- 206010011376 Crepitations Diseases 0.000 description 1
- REDXJYDRNCIFBQ-UHFFFAOYSA-N aluminium(3+) Chemical group [Al+3] REDXJYDRNCIFBQ-UHFFFAOYSA-N 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 229910001562 pearlite Inorganic materials 0.000 description 1
- 238000011056 performance test Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000005204 segregation Methods 0.000 description 1
- 210000001519 tissues Anatomy 0.000 description 1
Abstract
The present invention provides a method adopting cold-extruding forming process when the prestressed bar fixture is produced. It can fully utilize the material produced by drilling inner diameter and cutting external cone surface, can raise utilziation rate of material by about 23%, can use pressure machine to directly form instead of cutting process, and raise production efficiency by above 3 times. Said process includes the steps of spheriodizing and annealing raw material, extruding central bottom threaded hole and cutting bottom. It is characterized by that after having been spheriodized and annealed the raw material is undergone the process of extruding central bottom threaded hole, internal material is passed through side wall and back-flowed upwards to make raw material of central threaded bottom hole supplement to height, and the waste material of bottom and side wall can be cut, at the time of forming outer cone and inner cone.
Description
Technical field
The invention belongs to the cold processing technique field, specifically a kind of new technology of gripper production for prestressed reinforcement processing.
Background technology
At present the gripper production for prestressed reinforcement of China is that the center with structural alloy steel processing is that through hole saw shape tooth thread, an outside are the parts of cone, and the endoporus of the small end of cone part has one section outside tapering.Its product characteristics is: the hole, footpath, the end of male cone (strobilus masculinus) and precessing saw shape tooth thread needs concentric (axiality should below 0.05), the directly hole roughness requirement of the end of male cone (strobilus masculinus) and screw thread
More than, screwed hole does not allow the local material that lacks, and aperture error is in 0.05, in case cause the generation of saw shape screw thread agomphosis and tack tooth.Product material needs internal organizational structure even, fine and smooth, does not after heat treatment allow to occur crackle and snaggletooth.Its effect is bridge and builds when using the presstressed reinforcing steel anchoring that the steel wire after the stretch-draw, steel hinge line are fixed on the anchoring part by anchor slab with anchor clamps, and the saw shape screw thread in the anchor clamps is bitten steel wire or steel strand wires, so the precision of double thread and requirement of strength are very strict.Concrete specification requirement and test parameters should meet GB/T14370-2000.And the method that the present manufacturing firm of China generally adopts anchor clamps is with the big end size of bar turning to cone, car male cone (strobilus masculinus) and both ends of the surface again, and spermiation car surplus, slightly bore the center thread Pilot hole then, the aperture that gets out is less than the required thread Pilot hole size of reality, finish reaming thread Pilot hole with bottoming reamer again, is benchmark with the thread Pilot hole, big end size of finish turning cone or rounding cone and male cone (strobilus masculinus).Such processing method operation is various, the equipment dynamic waste is big, particularly adopt and finish ream the method machining screw bottom outlet in hole, because the swing of cutter and wearing and tearing cause pore size inconsistent easily, and feed velocity can not be fast, to prevent cutter band material, if raw material hardness is on the low side, it is more serious that cutter then is with material when finish reaming endoporus, and the endoporus roughness does not reach
Designing requirement.Because this product is cone, select for use round bar to add man-hour above the cone outside diameter, the raw material of conical section must all machine away, so processing capacity is very big during turning cone position, waste of raw materials (endoporus material and male cone (strobilus masculinus) material) is seriously.
In addition, at present domestic manufacturer directly purchases the production of hot rolling round bar from steel mill, and the subsequent heat treatment of product has been increased very big difficulty (delivery hardness deviation range is big when dispatching from the factory because of the hot rolling round bar, and the interior tissue segregation is big), and percent defective is very high.
Summary of the invention
The objective of the invention is to avoid above-mentioned weak point of the prior art and provide a kind of when producing the presstressed reinforcing steel anchor clamps, adopt the technology of cold-extrusion shaping.Anchor clamps bore the material that goes and male cone (strobilus masculinus) machines away to internal diameter and utilize fully, and the utilization rate of material is exceeded about 23%.Replace machining with the forcing press direct forming, production efficiency has improved more than 3 times.
Purpose of the present invention can reach by following measure:
A kind of new technology of gripper production for prestressed reinforcement processing, comprise the raw material spheroidizing, extruding center thread Pilot hole, cut the end, it is characterized in that the raw material after the spheroidizing pass through extruding center thread Pilot hole, internal material up instead flows through sidewall, the raw material of center thread Pilot hole are added on the height, the clout that equates with side thickness that the bottom is left is cut the end, when shaping outer cone and inner cone, the shaping plug is put into the blank material that squeezes good hole, in forming process, the raw material part of outer cone extends upward, and the side force of another part process tapering is included on the shaping plug its material tightly and forms inner cone.
The big end parts of outer cone forms upsetting squeeze through excess pressure, makes material under the state that extends nowhere, is included in tightly on the shaping plug, because the effect of upsetting squeeze is increased raw material internal structure state density.
The present invention has following advantage compared to existing technology:
One, production technology is simplified, and production efficiency improves
The present invention is by adopting cold-extrusion shaping processing gripper production for prestressed reinforcement new technology (now utilize the cutting of frock at the alternative lathe of forcing press production, technology is extruding center thread Pilot hole, cuts the end, shaping outer cone and inner conical surface), and production efficiency improves more than 3 times.Prior one side is by cold-extrusion shaping, and the roughness after the each several part extruding all surpasses
,, produce each spot size uniformity unanimity of product because of adopting the frock direct forming, and producing cost will be saved about 10%, because can continue after the rapid wear of frock is repaired again to use, and the cutting tool original cost is higher, blade rapid wear or damage back are difficult to repair produce scraps.
Two, improve the quality, reduce production costs
The present invention produces gripper production for prestressed reinforcement by adopting cold extrusion technology, and the raw material of original cutting tip are used the conservation of raw material about 22% of anchor clamps fully.Alloy structure, reduces the production cost of technology in addition in addition and does not count if annual turnover at 2,000,000 anchor clamps, aspect material cost, can be saved 380,000 yuan by 2.8 yuan/Kg of market price.Owing to be to adopt cold-extrusion technology production, so the hot rolling raw material of buying have preferentially been increased annealing process, make the inner net of raw material change globular pearlite into by plates, material inside organization structure is fine and close more after cold extrusion, make product quality qualification rate after the heat treatment more than 99.5%, and the product deflection is minimum, according to every performance test of GB/T14370-2000, qualification rate 100%.
Description of drawings
Fig. 1 is gripper production for prestressed reinforcement extruding screwed hole of centre mould schematic diagram.
Fig. 2 cuts the bottom die schematic diagram for gripper production for prestressed reinforcement.
Fig. 3 is gripper production for prestressed reinforcement shaping outer cone and inner cone mould schematic diagram.
The specific embodiment
The concrete production technology of the present invention is as follows:
1, extruding center thread Pilot hole: raw material are put into illustrated die 2, along with forcing press down, by punch 1 and the effect that plays core 3, extrusion blank.Because the blank cylindrical is contained to live by die 2 tightly, the material of endoporus is up instead flowed through sidewall, when forcing press was up, product was played core 3 and is withdrawed from die 2, made the product holder drive punch 1 through stripper 4, finished the work.
2, cut at the end: the product behind the crowded hole is inserted in the punch 5, by the stamping-out of punch 5 with die 6 gross weight of bottom, crowded hole is cut, the waste material of gross weight is upwards discharged, and the effect of product process stripper 7 makes the product holder drive punch 5, finishes this operation.
3, shaping outer cone and inner cone: product is inserted in the shaping plug 8, product and shaping plug 8 together are placed on the punch 9,,, raw material are extended upward by the tapering sidewall of die 10 by punch 9 and die 10 along with forcing press is downward.When forcing press was up, product withdrawed from product by dnockout rod 11, and the shaping plug is extruded by other facility, finishes this operation.
Claims (2)
1, a kind of new technology of gripper production for prestressed reinforcement processing, comprise the raw material spheroidizing, extruding center thread Pilot hole, cut the end, it is characterized in that the raw material after the spheroidizing pass through extruding center thread Pilot hole, internal material up instead flows through sidewall, the raw material of center thread Pilot hole are added on the height, the clout that equates with side thickness that the bottom is left is cut the end, when shaping outer cone and inner cone, the shaping plug is put into the blank material that squeezes good hole, in forming process, the raw material part of outer cone extends upward, and the side force of another part process tapering is included on the shaping plug its material tightly and forms inner cone.
2, the new technology of gripper production for prestressed reinforcement processing according to claim 1, the big end parts that it is characterized in that outer cone forms upsetting squeeze through excess pressure, make material under the state that extends nowhere, be included in tightly on the shaping plug, because the effect of upsetting squeeze is increased raw material internal structure state density.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB011380217A CN1180897C (en) | 2001-12-24 | 2001-12-24 | New process of gripper production for prestressed reinforcement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB011380217A CN1180897C (en) | 2001-12-24 | 2001-12-24 | New process of gripper production for prestressed reinforcement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1428213A true CN1428213A (en) | 2003-07-09 |
CN1180897C CN1180897C (en) | 2004-12-22 |
Family
ID=4674316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB011380217A Expired - Fee Related CN1180897C (en) | 2001-12-24 | 2001-12-24 | New process of gripper production for prestressed reinforcement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1180897C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100391689C (en) * | 2005-12-06 | 2008-06-04 | 张有龙 | Method for manufacturing prestress ground tackle clamping piece by hot extrusion |
CN100410000C (en) * | 2005-12-06 | 2008-08-13 | 张有龙 | Method for manufacturing ground tackle for finish rolling of screw-thread steel by heat expansion |
CN101332476B (en) * | 2008-08-01 | 2010-06-02 | 河南科技大学 | Precise extrusion molding method of thin wall long-pipe shaped parts bland and special mould |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2753075C1 (en) * | 2020-12-08 | 2021-08-11 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Тульский государственный университет" (ТулГУ) | Device for obtaining diamond-shaped riffles on outer and inner surfaces of cylindrical shell |
-
2001
- 2001-12-24 CN CNB011380217A patent/CN1180897C/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100391689C (en) * | 2005-12-06 | 2008-06-04 | 张有龙 | Method for manufacturing prestress ground tackle clamping piece by hot extrusion |
CN100410000C (en) * | 2005-12-06 | 2008-08-13 | 张有龙 | Method for manufacturing ground tackle for finish rolling of screw-thread steel by heat expansion |
CN101332476B (en) * | 2008-08-01 | 2010-06-02 | 河南科技大学 | Precise extrusion molding method of thin wall long-pipe shaped parts bland and special mould |
Also Published As
Publication number | Publication date |
---|---|
CN1180897C (en) | 2004-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100558501C (en) | The perforating process of carbon fiber composite material article | |
CN102556837B (en) | Lifting hook manufactured by adopting large-thickness fine-cutting technology and large-section friction welding method | |
CN104057271B (en) | A kind of preparation method of carbide alloy tool and mould | |
CN106140852A (en) | A kind of high-strength tenacity carefully brilliant light-alloy tubing prepare mould and preparation method thereof | |
CN101172325A (en) | Method for producing angle pin casing tube | |
CN201091881Y (en) | Automobile cooling pipe aluminum profile hot extrusion die | |
CN1180897C (en) | New process of gripper production for prestressed reinforcement | |
CN1117896A (en) | Forming technology for hollow sucker rod and mould thereof | |
CN100579710C (en) | Method for producing angle pin casing tube | |
CN201815555U (en) | Machining equipment for flat-head hexagon bolt of cold-extrusion forming vehicle | |
CN106424490A (en) | Cold-rolling thread forming cutter | |
CN100391689C (en) | Method for manufacturing prestress ground tackle clamping piece by hot extrusion | |
CN106984664A (en) | Aluminum alloy heat extrudes replaceable mold cores | |
CN103071693A (en) | Extrusion needle and extrusion method for large-specification thin-walled pipe or hollow profile | |
CN1686628A (en) | Cold extrusion shaping method of prestressed anchor jaw | |
CN100410000C (en) | Method for manufacturing ground tackle for finish rolling of screw-thread steel by heat expansion | |
CN105478502A (en) | Production process of non-annealed wire material for pulling rivet pull rod | |
CN206966803U (en) | Welded plate thread machining device | |
CN205110402U (en) | Circular tubular product lead alloy hot extrusion die | |
CN205519249U (en) | Be applied to tensile mould of production perforating bullet shell case | |
CN110293180A (en) | A kind of high-precision die cutting die processing technology | |
CN108161352A (en) | The production method of copper piece | |
CN2164930Y (en) | Straight-line wire-drawing dies | |
CN100333871C (en) | Process for manufacturing helicoid of plug type sealer for steel barrel | |
CN110814077B (en) | Quick-change forming die for preparing large-caliber magnesium alloy pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |