CN1388292A - Bridge-road joint constructing method to prevent bump of vehicle at ends of bridge - Google Patents

Bridge-road joint constructing method to prevent bump of vehicle at ends of bridge Download PDF

Info

Publication number
CN1388292A
CN1388292A CN 01113650 CN01113650A CN1388292A CN 1388292 A CN1388292 A CN 1388292A CN 01113650 CN01113650 CN 01113650 CN 01113650 A CN01113650 A CN 01113650A CN 1388292 A CN1388292 A CN 1388292A
Authority
CN
China
Prior art keywords
bridge
junction
bridge circuit
circuit junction
solves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 01113650
Other languages
Chinese (zh)
Inventor
陈光和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01113650 priority Critical patent/CN1388292A/en
Publication of CN1388292A publication Critical patent/CN1388292A/en
Pending legal-status Critical Current

Links

Images

Abstract

The present invention is joint constructing method to prevent bump of vehicle at ends of bridge. The construction includes the steps of: densifying the refilled material in the bridge-road joint layer by layer; driving several friction piles in the transition area to form one bearing integral of soil and friction piles; setting waterproof material between the bridge and road surface layer; setting epoxy concrete or steel discs over the friction piles to form one integral to combine the friction piles and road surface in the combined area; and final road surface formation in the combining area.

Description

A kind of job practices that solves the bridge circuit junction of highway bridgehead vehicle jump disease
The present invention relates to the job practices of a kind of highway structure and maintenance, the job practices of particularly a kind of road bridge and highway junction.
At present, the job practices of road bridge and highway junction has two kinds usually, and a kind of is in their junction attachment strap to be set, and makes the stronger rigidity hardness of road bridge end carry out the transition to the less position of highway subgrade rigidity naturally by attachment strap.Another kind is to fill high-intensity building materials at the abutment back of road bridge, also makes the transition of rigidity nature.Though the former has avoided the weak link of the degree of compaction deficiency of bridge circuit junction, but As time goes on, the consolidation settlement of roadbed or because the variation of the traffic volume and traffic load can cause the deformation of the transition slab at bridge head generation longitudinal grade of junction, can make vehicle produce slight vibration during beginning, grow in intensity later on, abutment is produced impact, strengthened the inside separation trend of junction, the integral waterproofing performance is descended, occur the bumping at bridge-head disease then.Though the latter delays to some extent to the consolidation settlement of junction, but its long construction period, time-consuming, cost increases, and still can't change the trickle sedimentation of abutment self and the driving irregularity that brings impacts, be the difference of the own density of backfilling material and the seepage of water problem brought finally can cause the generation of bumping at bridge-head disease very soon.
In addition, for building up current highway bridge, if the jumping car disease of bridge circuit junction takes place, then be that surface material is adjusted road surface longitudinal gradient and absolute altitude or take measures (as by suitably replenishing roadbed material) improves the draining of abutment and roadbed junction by overlaying year by year, thereby improve the influence of bumping at bridge-head disease.This method construction is loaded down with trivial details, need suspend traffic and just can carry out, and need often to reinforce repeatedly, and is consuming time, and effect is still undesirable.
Purpose of the present invention is exactly in order to address the above problem, and proposes a kind of job practices that solves the bridge circuit junction of highway bridgehead vehicle jump disease.
Technical solution of the present invention:
A kind of job practices that solves the bridge circuit junction of highway bridgehead vehicle jump disease is characterized in that:
A, compacting is carried out in layering to the bridge of bridge circuit junction back of the body backfilling material;
B, squeeze into many friction piles in the transition region of bridge circuit junction, it is whole to make the junction soil body and friction pile constitute carrying;
C, between the abutment of end of the bridge and junction top course material, waterproofing materials is set;
D, epoxy concrete or steel disk are set, they are become one, so that each friction pile and effective combination of junction top course material at each friction pile top of squeezing into;
E, above-mentioned bridge circuit junction integral body is carried out pavement forming.
The inventive method integrates the advantage of attachment strap method and backfill high-strength material method, and overcome the defective that they exist separately, and its construction technology is simple, short construction period, and cost is low, and is effective.The inventive method has solved the problem of waterproof, the conversion of hard and soft property and the degree of compaction deficiency of bridge circuit junction, delayed subgrade settlement, pavement loading and driving load more are evenly distributed among the soil body of whole junction roadbed, effectively prevented the early stage generation of bumping at bridge-head disease, stabilized the impact that this disease is brought to the end of the bridge abutment, significantly reduce the highway maintenance workload, improved riding qualities.The inventive method is not only applicable to the new bridge construction, is equally applicable to the reconstruction and the maintenance of old bridge.
Description of drawings:
Fig. 1 is the structural representation that the inventive method is used for newly-built bridge construction.
Fig. 2 is the structural representation that the inventive method is used for establishing the old bridge construction of attachment strap.
Fig. 3 is the structural representation that the inventive method is used for not establishing the old bridge construction of attachment strap.
Concrete construction method step of the present invention is as follows:
1, compacting (being preferably compacting) is carried out in the bridge back of the body backfilling material layering of bridge circuit junction.
2, in the transition region of bridge circuit junction, squeeze into many friction piles, make the junction soil body and friction It is whole that stake consists of carrying. Each friction pile of preferably squeezing into evenly distributes, and its density and the degree of depth are according to bridge The specific design on road requires and decides.
3, at the abutment of end of the bridge and junction top course material (such as attachment strap or other pitch prill concrete Waterproof material (being preferably the flexible device of waterproof) is set layer).
4, at each friction pile top of squeezing into epoxy concrete or steel disk are set, they are become One is so that the effectively combination of each friction pile and junction top course material (comprising attachment strap).
5, above-mentioned bridge circuit junction integral body is carried out pavement forming.
The present invention is not only applicable to newly building bridge, also can be suitable for simultaneously the maintenance work of old bridge, and be described below by new bridge construction (not establishing transition slab at bridge head), old bridge maintenance (having established transition slab at bridge head) and old bridge reconstruction (can set up transition slab at bridge head) three kinds of situations:
Embodiment 1 (new bridge construction scheme):
As Fig. 1, to the appropriate draining of ground,, adopt the compaction in layers of powerful rammer to ground subsoil layer and basic unit earlier again by a certain amount of rendzinas of its optimum moisture content backfill, drill through two grey calculus layers with the special hammer rig, be the vibration of plum blossom or other shape simultaneously and squeeze into small-sized friction piling bar.FSS series (the lonely section in garden) bridge extension joint is set at the pallet place.
As long as handle ground well, set discharge structure transition slab at bridge head can be set.
Embodiment 2 (having established the old bridge maintenance of transition slab at bridge head):
As Fig. 2, in the transition region of bridge circuit junction, squeeze into the steel friction pile, high pour into cement mortar in right amount to the attachment strap middle part, make steel and pile lining welding in the attachment strap again, capping then, and with the epoxy concrete to reinforcing on every side, repave upper layer.
At the abutment place and abutment and attachment strap junction FSS series (garden arc section) bridge extension joint is set.
Embodiment 3 (not establishing the old bridge reconstruction of transition slab at bridge head):
As Fig. 3, excavation needs the abutment of processing to banket and makes the degree of depth to closing, ram the new backfilling material of compaction in layers with brute force, use again with industry hammer drill equipment and hole to platform to two ash knot platform layer or hardpan, squeeze into the steel friction pile, height is laid attachment strap and annex to setting up attachment strap bottom surface absolute altitude, at the abutment place and abutment and attachment strap junction FSS series (garden arc section) bridge extension joint is set.
Whether look subgrade settlement has stablized decision and whether has set up transition slab at bridge head.
Used brute force rams a kind of to be motive multipurpose facility by hydraulic crawler excavator or loader, can to produce nearly 10 tons vibration force that working sections is a rectangle, and abutment is handled no dead angle among the present invention.Used hammer drill equipment is the device that is installed additional a series of special tools by mobile or hydraulic power unit, can break hardpan and the task of squeezing into steel column by the on-the-spot brill of finishing under pulling equipment helps.Grouting procedure of the present invention can utilize existing homemade mud jacking device context to finish, and only in that transition slab at bridge head is set is intact, but roadbed uses when seriously forming depression.The FSS Series Bridge stretching device that the present invention is set is to utilize its superior water resistance and arc transition to depression and should unconspicuous feature and ad hoc, for the abutment that transition slab at bridge head is set, twice should be set for well.

Claims (4)

1, a kind of job practices that solves the bridge circuit junction of highway bridgehead vehicle jump disease is characterized in that:
A, compacting is carried out in layering to the bridge of bridge circuit junction back of the body backfilling material;
B, squeeze into many friction piles in the transition region of bridge circuit junction, it is whole to make the junction soil body and friction pile constitute carrying;
C, between the abutment of end of the bridge and junction top course material, waterproofing materials is set;
D, epoxy concrete or steel disk are set, they are become one, so that each friction pile and effective combination of junction top course material at each friction pile top of squeezing into;
E, above-mentioned bridge circuit junction integral body is carried out pavement forming.
2,, it is characterized in that described bridge back of the body backfilling material layering carrying out compacting to the bridge circuit junction selects the compacting operation for use by the described a kind of job practices that solves the bridge circuit junction of highway bridgehead vehicle jump disease of claim 1.
3, by the described a kind of job practices that solves the bridge circuit junction of highway bridgehead vehicle jump disease of claim 1, it is characterized in that the many friction piles of squeezing in the transition region of described bridge circuit junction should evenly distribute, its density and the degree of depth require to decide according to the specific design of bridge circuit.
4,, it is characterized in that the waterproofing materials that is provided with between the abutment of described end of the bridge and the junction top course material selects the waterproof stretching device for use by the described a kind of job practices that solves the bridge circuit junction of highway bridgehead vehicle jump disease of claim 1.
CN 01113650 2001-05-28 2001-05-28 Bridge-road joint constructing method to prevent bump of vehicle at ends of bridge Pending CN1388292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01113650 CN1388292A (en) 2001-05-28 2001-05-28 Bridge-road joint constructing method to prevent bump of vehicle at ends of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01113650 CN1388292A (en) 2001-05-28 2001-05-28 Bridge-road joint constructing method to prevent bump of vehicle at ends of bridge

Publications (1)

Publication Number Publication Date
CN1388292A true CN1388292A (en) 2003-01-01

Family

ID=4660363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01113650 Pending CN1388292A (en) 2001-05-28 2001-05-28 Bridge-road joint constructing method to prevent bump of vehicle at ends of bridge

Country Status (1)

Country Link
CN (1) CN1388292A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1298941C (en) * 2004-05-17 2007-02-07 长安大学 Road-bridge changeover portion subgrade settlement test platform
CN101974874A (en) * 2010-11-03 2011-02-16 中铁第四勘察设计院集团有限公司 Method for rolling transition section of rigid structure of rapid transit railway
CN102828453A (en) * 2012-09-17 2012-12-19 武卫国 Stamping reinforcement method of weak rolling area of roadbed and application thereof
CN102979021A (en) * 2012-11-21 2013-03-20 邢台路桥建设总公司 Construction method for treating vehicle jump at bridge head in highway
CN103290780A (en) * 2013-06-18 2013-09-11 浙江大学宁波理工学院 Road and bridge joint structure and method using structure for eliminating non-uniform settlement
CN104179105A (en) * 2014-08-27 2014-12-03 中国地质大学(武汉) Top-down rigid pile compound foundation construction method
CN104631271A (en) * 2015-01-26 2015-05-20 上海市政工程设计研究总院(集团)有限公司 Bridge grounding section structure for removing bump at bridge head
CN105178126A (en) * 2015-08-31 2015-12-23 中国矿业大学 Road-bridge transitional zone composite structure in permafrost region and construction method
CN105544334A (en) * 2015-12-21 2016-05-04 安徽省交通规划设计研究总院股份有限公司 Method for treating vehicle bump at bridge head of highway
CN106087628A (en) * 2016-07-27 2016-11-09 浙江大学城市学院 Without conical slope cast-in-place baffle plate foam concrete light road bank structure and construction method
CN109853381A (en) * 2019-01-31 2019-06-07 沈阳建筑大学 A kind of transition structure and its construction method preventing and treating bumping at bridge-head

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1298941C (en) * 2004-05-17 2007-02-07 长安大学 Road-bridge changeover portion subgrade settlement test platform
CN101974874A (en) * 2010-11-03 2011-02-16 中铁第四勘察设计院集团有限公司 Method for rolling transition section of rigid structure of rapid transit railway
CN102828453A (en) * 2012-09-17 2012-12-19 武卫国 Stamping reinforcement method of weak rolling area of roadbed and application thereof
CN102979021B (en) * 2012-11-21 2015-04-08 邢台路桥建设总公司 Construction method for treating vehicle jump at bridge head in highway
CN102979021A (en) * 2012-11-21 2013-03-20 邢台路桥建设总公司 Construction method for treating vehicle jump at bridge head in highway
CN103290780A (en) * 2013-06-18 2013-09-11 浙江大学宁波理工学院 Road and bridge joint structure and method using structure for eliminating non-uniform settlement
CN104179105B (en) * 2014-08-27 2017-06-13 中国地质大学(武汉) A kind of contrary sequence method rigid pile composite foundation construction method
CN104179105A (en) * 2014-08-27 2014-12-03 中国地质大学(武汉) Top-down rigid pile compound foundation construction method
CN104631271A (en) * 2015-01-26 2015-05-20 上海市政工程设计研究总院(集团)有限公司 Bridge grounding section structure for removing bump at bridge head
CN104631271B (en) * 2015-01-26 2016-08-24 上海市政工程设计研究总院(集团)有限公司 A kind of bridge ground section structure eliminating bumping at bridge-head
CN105178126A (en) * 2015-08-31 2015-12-23 中国矿业大学 Road-bridge transitional zone composite structure in permafrost region and construction method
CN105544334A (en) * 2015-12-21 2016-05-04 安徽省交通规划设计研究总院股份有限公司 Method for treating vehicle bump at bridge head of highway
CN105544334B (en) * 2015-12-21 2018-06-29 安徽省交通规划设计研究总院股份有限公司 One kind is used for vehicle jumping at bridge head of highway Treatment Methods
CN106087628A (en) * 2016-07-27 2016-11-09 浙江大学城市学院 Without conical slope cast-in-place baffle plate foam concrete light road bank structure and construction method
CN106087628B (en) * 2016-07-27 2018-01-09 浙江大学城市学院 Without the cast-in-place baffle plate foam concrete light road bank structure of conical slope and construction method
CN109853381A (en) * 2019-01-31 2019-06-07 沈阳建筑大学 A kind of transition structure and its construction method preventing and treating bumping at bridge-head
CN109853381B (en) * 2019-01-31 2024-03-05 沈阳建筑大学 Transitional structure for preventing bridge head from jumping and construction method thereof

Similar Documents

Publication Publication Date Title
EA027027B1 (en) Method for forming a retaining wall
CN102392447B (en) Given force variable stiffness discrete material pile ramming and expanding machine and application thereof
CN108301273A (en) The fore-telling shaped pile anchor structure and its construction method of guardrail reinforcing integrated with roadbed
CN1388292A (en) Bridge-road joint constructing method to prevent bump of vehicle at ends of bridge
CN1067453C (en) Supporting and protecting method for base pit, side slope, flat anchor and spray net
CN105672144B (en) A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method
CN1621626A (en) Construction method for concrete pile
CN1743561A (en) Column-hammer forced tamping substitution method
CN101240548A (en) Two-stage stack-type cantilevered L-shaped blank wall and construction method thereof
CN1167857C (en) Foundation pit side-wall flexible support method
CN1641114A (en) Method for constructing deep-large foundation pit over operating tunnel an ddeformation-preventing strucutre
CN114990955A (en) Municipal road structure in urban soft soil foundation zone and construction method thereof
CN1182301C (en) Technology for boring and prefabricating cast piles for foundation of building
CN1137314C (en) Construction method of concrete pile
CN1046014C (en) Construction method for soil bulkhead structure
HU225407B1 (en) Procedure for augmentation physical parameters and bearing capacity of ground and for diminution time of consolidation and expected consolidation settlement of thereof
CN207260082U (en) Active service refutes bank revetment and increases structure
CN210315650U (en) Anchor rod reinforced composite retaining wall
KR100472697B1 (en) The tamping method which uses the vibrating hammer and that system
CN210238174U (en) Old way transformation deep disease combined type micro pile reinforced structure
CN112211181A (en) Construction method for foundation bearing platform of elevator
CN1198992C (en) Reinforced earth retaining wall suitable for soft soil ground and its construction method
Gispert Prefabricated foundations for housing applied to room modules
CN112227344A (en) Soft foundation reinforcement construction method with good reinforcement effect
CN109972673A (en) Retaining wall reinforcement structure and the inclined active restorative procedure of retaining wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication