CN120990330A - A structure of an attached climbing scaffold - Google Patents
A structure of an attached climbing scaffoldInfo
- Publication number
- CN120990330A CN120990330A CN202511231025.7A CN202511231025A CN120990330A CN 120990330 A CN120990330 A CN 120990330A CN 202511231025 A CN202511231025 A CN 202511231025A CN 120990330 A CN120990330 A CN 120990330A
- Authority
- CN
- China
- Prior art keywords
- wall
- attached
- supporting
- supporting beam
- climbing scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/20—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
- E04G3/325—Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention relates to the technical field of scaffolds, in particular to a structure of an attached climbing scaffold, which comprises a wall attaching support, an anti-tilting device and a main frame, wherein the wall attaching support is fixedly arranged on an outer wall of a building, the anti-tilting device comprises a fixed plate, limiting wheels, side plates and positioning wheels, the fixed plate is fixedly arranged on the wall attaching support, the limiting wheels are rotatably arranged on the fixed plate, three limiting wheels are distributed in an isosceles triangle shape, and the side plates are fixedly arranged on the fixed plate.
Description
Technical Field
The invention relates to the technical field of scaffolds, in particular to a structure of an attached climbing scaffold.
Background
In the construction process of modern high-rise and super high-rise buildings, the outer scaffold system is a key facility for guaranteeing the safety of high-rise operation, supporting constructors and materials and providing an operation platform, the traditional floor type scaffold has the advantages of huge material usage, long erection and disassembly period and high labor cost along with the increase of the building height, and has larger safety risks and occupation problems on ground construction sites, so that the requirements of high-efficiency, safe and green modern construction are difficult to meet.
In order to solve the above problems, an attached lifting scaffold (commonly called a "climbing scaffold") has been developed and widely used in the field of construction, and the type of scaffold can realize the vertical lifting of the whole or the fragments along the main structure of the building by attaching a frame structure to the main structure of the building (such as an outer wall, a side beam, etc.) and providing a power lifting device (such as an electric hoist), thereby climbing upwards along with the rising of a construction floor or lowering and dismantling after the completion of the construction.
The main components of the existing attached climbing scaffold comprise a wall attaching support, an anti-tilting device, a lifting hanging seat and the like, and the wall attaching support and the lifting hanging seat are generally two parts and are mutually independent, so that the space utilization rate is low, the stability is required to be improved, and the reliability of the anti-tilting device and the anti-tilting stability of the whole structure still need to be optimized.
Despite the significant advances made in the art, some challenges remain in practical applications:
in view of the above, the present invention has been made in view of the above problems, and an object of the present invention is to provide an attachable climbing scaffold structure that solves the problems and improves the practical value.
Disclosure of Invention
The present invention is directed to a structure of an attached climbing scaffold, which solves the above-mentioned problems and disadvantages of the prior art.
In order to achieve the above purpose, the invention provides a structure of an attached climbing scaffold, which is achieved by the following specific technical means:
The structure of the attached climbing scaffold comprises a wall attaching support, an anti-tilting device and a main frame, wherein the wall attaching support is fixedly arranged on an outer wall of a building;
The anti-tilting device comprises a fixed plate, limit wheels, side plates and positioning wheels, wherein the fixed plate is fixedly arranged on a wall-attached support, the limit wheels are rotatably arranged on the fixed plate, three limit wheels are arranged and distributed in an isosceles triangle shape, the side plates are fixedly arranged on the fixed plate, and the side plates are vertically arranged with the fixed plate;
The main frame comprises a cross rod and guide rails, wherein the guide rails are fixedly arranged at two ends of the cross rod, a chute is arranged on the guide rails, three limiting wheels are respectively propped against the inner wall of the chute and the guide rails, the side plates and the positioning wheels are positioned in the chute, and the positioning wheels are propped against the inner wall of the chute.
As a further optimization of the technical scheme, the structure of the attached climbing scaffold is characterized in that two anti-tilting devices are arranged on the wall-attached support, and the two anti-tilting devices are symmetrically arranged about the central line of the wall-attached support.
As a further optimization of the technical scheme, the three limit wheels of the attached climbing scaffold structure are positioned in the sliding groove, and the other limit wheel is positioned on the outer side of the guide rail.
According to the structure of the attached climbing scaffold, the attached wall support comprises a base, a supporting beam, supporting beams, a mounting plate and a cross beam, wherein the base is abutted against an outer wall of a building, the supporting beams are fixedly arranged on the base and are perpendicular to the base, two ends of the supporting beams are fixedly connected with the supporting beams and the base respectively, the mounting plate is fixedly arranged at one end, far away from the base, of the supporting beams, the fixing plate is detachably and fixedly connected with the mounting plate, and two ends of the cross beam are fixedly connected with the supporting beams.
As a further optimization of the technical scheme, the structure of the attached climbing scaffold further comprises a fixing device, wherein the fixing device comprises an upper fixing beam and a lower fixing beam, the upper fixing beam and the lower fixing beam are arranged on the wall-attached support, the upper fixing beam abuts against the supporting beam, the lower fixing beam abuts against the supporting beam, and two ends of the upper fixing beam and the lower fixing beam are fixed on an outer wall of a building through wall penetrating bolts.
As a further optimization of the technical scheme, the structure of the attached climbing scaffold further comprises a lifting hanging seat, wherein the lifting hanging seat comprises a mounting seat, supporting beams and connecting beams, the mounting seat is arranged at two ends of a base, two ends of the mounting seat are fixed on an outer wall of a building through wall penetrating bolts, the supporting beams are fixedly arranged on the mounting seat and are abutted against an upper fixing beam and a lower fixing beam, and two ends of the connecting beams are respectively inserted into the supporting beams of the mounting seat at two ends of the base and are fixedly connected with the connecting beams.
As a further optimization of the technical scheme, the structure of the attached climbing scaffold is characterized in that two supporting beams are arranged on the mounting seat, one supporting beam is arranged above the supporting beam and is abutted against the supporting beam, and the other supporting beam is abutted against the supporting beam.
As a further optimization of the technical scheme, the lifting hanging seat of the attached climbing scaffold also comprises a hanging frame and a hanging rod, wherein the hanging frame is fixedly arranged on the supporting beam, the hanging rod is arranged on the hanging frame, and two ends of the hanging rod are fixedly connected with the hanging frame.
As a further optimization of the technical scheme, the structure of the attached climbing scaffold further comprises an unloading device, wherein the unloading device is rotatably arranged on the cross beam, and the top end of the unloading device can be propped against the cross beam.
As a further optimization of the technical scheme, the structure of the attached climbing scaffold further comprises a falling prevention device, wherein the falling prevention device is rotatably arranged on the cross beam and can be clamped with the cross beam.
Due to the application of the technical scheme, compared with the prior art, the invention has the following advantages:
1. According to the invention, the three limiting wheels and the positioning wheels are arranged on the fixing plate, and the three limiting wheels are used for clamping the guide rail, so that the stability of the main frame during lifting is improved, the main frame is prevented from tilting, the positioning wheels play a role in supporting and positioning the main frame, and the stability of the main frame during lifting is prevented from being influenced by loosening of the main frame.
2. According to the invention, the lifting hanging seat is arranged on the outer side of the wall-attached support, the two supporting beams and the supporting beams of the wall-attached support are abutted Liang Gazhu, the firmness of the wall-attached support is improved through the lifting hanging seat, the stability of the lifting hanging seat can be improved through the wall-attached support, the firmness and the stability of the integral structure are further improved, the split structure of the lifting hanging seat is fixedly connected through the connecting beam, and the lifting hanging seat is convenient to install and detach and operate.
3. The hanging frame is fixedly arranged on the supporting beam, and the hanging rod is arranged on the hanging frame, so that the installation firmness and stability of the hanging frame are improved, and the bearing capacity of the hanging rod is improved.
4. The invention improves the structure of the attached climbing scaffold, has the advantages of reasonable structural design, improves the firmness of the wall-attached support by lifting the hanging seat, and can improve the stability of the lifting hanging seat at the same time, so that the firmness and stability of the whole structure are improved, and the attached climbing scaffold is convenient to install and disassemble and convenient to operate, thereby effectively solving the problems and defects in the prior art and equipment.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this specification, illustrate embodiments of the application and together with the description serve to explain the application. In the drawings:
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic view of the structure of the wall-attached support of the present invention;
FIG. 4 is a schematic view of an explosion structure at a wall mount of the present invention;
FIG. 5 is a schematic view of the structure of the fixing device of the present invention
FIG. 6 is a schematic view of an exploded view of the fastening device of the present invention;
FIG. 7 is a schematic view of the structure of the anti-tilting device of the present invention;
FIG. 8 is a schematic view of the structure of the lifting hanging seat of the present invention;
fig. 9 is a schematic view of an explosion structure at the lifting hanging seat of the invention.
In the figure, 1, a wall-attached support; 11, a base, 12, a supporting beam, 13, a supporting beam, 14, a mounting plate, 15, a cross beam, 2, an anti-tilting device, 21, a fixed plate, 22, a limiting wheel, 23, a side plate, 24, a positioning wheel, 3, a main frame, 31, a cross rod, 32, a guide rail, 301, a chute, 4, a fixing device, 41, an upper fixing beam, 42, a lower fixing beam, 5, a lifting hanging seat, 51, a mounting seat, 52, an abutting beam, 53, a connecting beam, 54, a hanging frame, 55, a hanging rod, 6, an unloading device, 7 and an anti-falling device.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1 to 9, the present invention provides a specific technical embodiment of a structure of an attached climbing scaffold:
The structure of the attached climbing scaffold comprises a wall attaching support 1, an anti-tilting device 2, a main frame 3, a fixing device 4, a lifting hanging seat 5, an unloading device 6 and an anti-falling device 7.
The wall-attached support 1 is used for supporting the main frame 3 and guiding the main frame 3, the wall-attached support 1 comprises a base 11, a supporting beam 12, supporting beams 13, mounting plates 14 and cross beams 15, the base 11 abuts against an outer wall of a building, the supporting beams 12 are fixedly arranged on the base 11 and are perpendicular to the base 11, two ends of each supporting beam 13 are fixedly connected with the supporting beams 12 and the base 11 respectively and are used for supporting the supporting beams 12 and improving the bearing capacity of the supporting beams 12, the mounting plates 14 are fixedly arranged at one end, far away from the base 11, of each supporting beam 12 and are used for fixing the anti-tilting device 2, two ends of each cross beam 15 are fixedly connected with the supporting beams 12 and are used for reinforcing the wall-attached support 1, and meanwhile the unloading device 6 and the anti-falling device 7 are conveniently installed and fixed.
The anti-tilting device 2 is used for preventing the main frame 3 from tilting and improving stability when the main frame 3 is lifted, two anti-tilting devices 2 are arranged on the wall-attached support 1, the two anti-tilting devices 2 are symmetrically arranged around the central line of the wall-attached support 1, the main frame 3 is clamped through the two anti-tilting devices 2, the anti-tilting effect is good, the anti-tilting device 2 comprises a fixed plate 21, a limiting wheel 22, a side plate 23 and a positioning wheel 24, the fixed plate 21 is fixedly arranged on the wall-attached support 1, the fixed plate 21 is detachably and fixedly connected with the mounting plate 14, the limiting wheel 22 is rotatably arranged on the fixed plate 21, three limiting wheels 22 are distributed in an isosceles triangle shape, the side plate 23 is fixedly arranged on the fixed plate 21, the side plate 23 is perpendicular to the fixed plate 21, and the positioning wheel 24 is rotatably arranged on the side plate 23.
The main frame 3 is used for installing a scaffold body, the main frame 3 comprises a cross bar 31 and guide rails 32, the guide rails 32 are fixedly arranged at two ends of the cross bar 31, the guide rails 32 are in sliding connection with the limiting wheels 22 and the positioning wheels 24, the guide rails 32 are provided with sliding grooves 301, two of the three limiting wheels 22 are located in the sliding grooves 301 and abutted against the inner walls of the sliding grooves 301, the other limiting wheel 22 is located on the outer side of the guide rails 32 and abutted against the guide rails 32, the three limiting wheels 22 clamp the guide rails 32, stability of the main frame 3 in lifting is improved, the main frame 3 is prevented from being inclined, the side plates 23 and the positioning wheels 24 are located in the sliding grooves 301, the positioning wheels 24 are abutted against the inner walls of the sliding grooves 301, the positioning wheels 24 play a supporting and positioning role on the main frame 3, and stability of the main frame 3 in lifting is prevented from being loosened.
The fixing device 4 is used for fixing the wall-attached support 1, the fixing device 4 comprises an upper fixing beam 41 and a lower fixing beam 42, the upper fixing beam 41 and the lower fixing beam 42 are arranged on the wall-attached support 1, the upper fixing beam 41 abuts against the supporting beam 12, the lower fixing beam 42 abuts against the supporting beam 13, the supporting beam 12 and the supporting beam 13 are supported by the upper fixing beam 41 and the lower fixing beam 42, fixing firmness and stability are improved, and two ends of the upper fixing beam 41 and the lower fixing beam 42 are fixed on an outer wall of a building through wall penetrating bolts to clamp the base 11, so that falling is prevented.
The lifting hanging seat 5 is used for hanging an electric hoist, the lifting hanging seat 5 comprises mounting seats 51, supporting beams 52 and connecting beams 53, the mounting seats 51 are arranged at two ends of a base 11, two ends of each mounting seat 51 are fixed on an outer wall of a building through wall penetrating bolts, the supporting beams 52 are fixedly arranged on the mounting seats 51, two supporting beams 52 are arranged on the mounting seats 51, one supporting beam 52 is arranged above the supporting beams 12 and abuts against the supporting beams 13, the other supporting beam 52 abuts against the supporting beams 13, the supporting beams 12 and the supporting beams 13 of the wall attaching support 1 are clamped through the two supporting beams 52, the firmness of the wall attaching support 1 is improved, the stability of the lifting hanging seat 5 is improved, the firmness and the stability of the whole structure are improved, two ends of the connecting beams 53 are respectively inserted into the supporting beams 52 of the mounting seats 51 at two ends of the base 11, the connecting beams 53 are fixedly connected with the supporting beams 52, and the split structure is fixedly connected through the connecting beams 53, and is convenient to install and detach.
The lifting hanging seat 5 further comprises a hanging frame 54 and a hanging rod 55, the hanging frame 54 is fixedly arranged on the supporting beam 52, the hanging rod 55 is arranged on the hanging frame 54, two ends of the hanging rod 55 are fixedly connected with the hanging frame 54, and accordingly installation firmness and stability of the hanging frame 54 are improved, and bearing capacity of the hanging rod 55 is improved.
The unloading device 6 is used for supporting the main frame 3, the unloading device 6 is rotatably arranged on the cross beam 15, the top end of the unloading device 6 can be propped against the cross beam 31, and the unloading device 6 plays a role in supporting the cross beam 31 when propping against the cross beam 31.
The anti-falling device 7 is used for preventing the main frame 3 from accidentally sliding down, the anti-falling device 7 is rotatably arranged on the cross beam 15, the anti-falling device 7 can be clamped with the cross rod 31, and when the main frame 3 descends, the cross rod 31 can be blocked by the anti-falling device 7 to prevent the main frame 3 from continuously descending.
Working principle:
The scaffold frame body is assembled and fixed on the main frame 3, then the wall attaching support 1 is installed on the outer wall of the building, the wall attaching support 1 is fixed through the fixing device 4, the anti-tilting device 2 is installed on the wall attaching support 1, the main frame 3 is connected with the anti-tilting device 2, lifting hanging seats 5 are installed at two ends of the wall attaching support 1, the installation seats 51 at two ends are connected into a whole through connecting beams 53, hanging frames 54 are fixed during connection, an electric hoist is hung on hanging rods 55, hooks at the bottoms of the electric hoist are hooked on the scaffold frame body, the electric hoist is started, the main frame 3 is pulled upwards, the main frame 3 slides upwards along the anti-tilting device 2, and after the electric hoist is moved to a proper height, the unloading device 6 is propped against the cross bars 31, so that the main frame 3 is supported, and the main frame 3 is prevented from falling off.
According to the structure of the attached climbing scaffold, the three limiting wheels and the positioning wheels are arranged on the fixing plate, the guide rail is clamped through the three limiting wheels, stability of the main frame during lifting is improved, the main frame is prevented from tilting, the positioning wheels play a role in supporting and positioning the main frame, the main frame is prevented from loosening to affect the stability during lifting, the lifting hanging seat is arranged on the outer side of the attached wall support, the supporting beams and the supporting beams of the attached wall support are used for lifting the hanging seat, the firmness of the attached wall support is improved through the lifting hanging seat, the stability of the attached wall support can be improved, the firmness and the stability of the whole structure are improved, the split structure of the lifting hanging seat is fixedly connected through the connecting beam, the installation and the detachment are facilitated, the hanging rod is fixedly arranged on the supporting beams, the installation firmness and the stability of the hanging rod are improved through the arrangement of the hanging frame, the improvement of the carrying capacity of the hanging rod is further improved, the structure of the attached wall support is reasonable in design, the stability of the attached wall support is improved through the lifting hanging seat, the stability of the attached wall support is improved, the attached wall support is convenient to install and the whole structure is not convenient to detach, and the structure is convenient to install, and the stability of the attached wall support is improved, and the structure is convenient to install and the structure is convenient to detach.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (10)
1. The structure of the attached climbing scaffold comprises a wall attaching support (1), an anti-tilting device (2) and a main frame (3), and is characterized in that the wall attaching support (1) is fixedly arranged on an outer wall of a building;
The anti-tilting device (2) comprises a fixed plate (21), limiting wheels (22), side plates (23) and positioning wheels (24), wherein the fixed plate (21) is fixedly arranged on a wall-attached support (1), the limiting wheels (22) are rotatably arranged on the fixed plate (21), three limiting wheels (22) are arranged, the three limiting wheels (22) are distributed in an isosceles triangle, the side plates (23) are fixedly arranged on the fixed plate (21), the side plates (23) are vertically arranged with the fixed plate (21), and the positioning wheels (24) are rotatably arranged on the side plates (23);
The main frame (3) comprises a cross rod (31) and guide rails (32), the guide rails (32) are fixedly arranged at two ends of the cross rod (31), sliding grooves (301) are formed in the guide rails (32), three limiting wheels (22) are respectively abutted against the inner walls of the sliding grooves (301) and the guide rails (32), the side plates (23) and the positioning wheels (22) are located in the sliding grooves (301), and the positioning wheels (22) are abutted against the inner walls of the sliding grooves (301).
2. The structure of an attached climbing scaffold according to claim 1, wherein the anti-tilting device (2) is arranged at two positions on the wall-attached support (1), and the two anti-tilting devices (2) are symmetrically arranged about the center line of the wall-attached support (1).
3. An attached climbing scaffold structure according to claim 1, characterized in that two of the three limit wheels (22) are located in the runner (301) and the other limit wheel (22) is located outside the guide rail (32).
4. The structure of the attached climbing scaffold according to claim 1, wherein the attached wall support (1) comprises a base (11), a supporting beam (12), a supporting beam (13), a mounting plate (14) and a cross beam (15), the base (11) is abutted against an outer wall of a building, the supporting beam (12) is fixedly arranged on the base (11) and is perpendicular to the base (11), two ends of the supporting beam (13) are fixedly connected with the supporting beam (12) and the base (11) respectively, the mounting plate (14) is fixedly arranged at one end, far away from the base (11), of the supporting beam (12), the fixing plate (21) is detachably and fixedly connected with the mounting plate (14), and two ends of the cross beam (15) are fixedly connected with the supporting beam (12).
5. The structure of an attached climbing scaffold according to claim 4, further comprising a fixing device (4), wherein the fixing device (4) comprises an upper fixing beam (41) and a lower fixing beam (42), the upper fixing beam (41) and the lower fixing beam (42) are arranged on the wall-attached support (1), the upper fixing beam (41) abuts against the supporting beam (12), the lower fixing beam (42) abuts against the supporting beam (13), and two ends of the upper fixing beam (41) and the lower fixing beam (42) are fixed on an outer wall of a building through wall penetrating bolts.
6. The structure of an attached climbing scaffold according to claim 5, further comprising a lifting hanging seat (5), wherein the lifting hanging seat (5) comprises a mounting seat (51), a supporting beam (52) and a connecting beam (53), the mounting seat (51) is arranged at two ends of the base (11), two ends of the mounting seat (51) are fixed on an outer wall of a building through wall penetrating bolts, the supporting beam (52) is fixedly arranged on the mounting seat (51), the supporting beam (52) is abutted against the upper fixing beam (41) and the lower fixing beam (42), two ends of the connecting beam (53) are respectively inserted into the supporting beams (52) of the mounting seat (51) at two ends of the base (11), and the connecting beam (53) is fixedly connected with the supporting beams (52).
7. The structure of an attached climbing scaffold according to claim 6, wherein two supporting beams (52) are arranged on the mounting seat (51), one supporting beam (52) is arranged above the supporting beam (12) and abuts against the supporting beam, and the other supporting beam (52) abuts against the supporting beam (13).
8. The structure of an attached climbing scaffold according to claim 6, wherein the lifting hanging seat (5) further comprises a hanging frame (54) and hanging rods (55), the hanging frame (54) is fixedly arranged on the supporting beam (52), the hanging rods (55) are arranged on the hanging frame (54), and two ends of the hanging rods (55) are fixedly connected with the hanging frame (54).
9. The structure of an attached climbing scaffold according to claim 1, further comprising an unloading device (6), wherein the unloading device (6) is rotatably arranged on the cross beam (15), and the top end of the unloading device (6) can prop against the cross beam (31).
10. The structure of an attached climbing scaffold according to claim 4, further comprising a fall preventing device (7), wherein the fall preventing device (7) is rotatably arranged on the cross beam (15), and the fall preventing device (7) can be clamped with the cross beam (31).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202511231025.7A CN120990330A (en) | 2025-08-30 | 2025-08-30 | A structure of an attached climbing scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202511231025.7A CN120990330A (en) | 2025-08-30 | 2025-08-30 | A structure of an attached climbing scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN120990330A true CN120990330A (en) | 2025-11-21 |
Family
ID=97685011
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202511231025.7A Pending CN120990330A (en) | 2025-08-30 | 2025-08-30 | A structure of an attached climbing scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN120990330A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121407714A (en) * | 2025-12-25 | 2026-01-27 | 湖南安华模板脚手架工程有限公司 | External wall scaffolding lifting guide rail mechanism, lifting method and positioning method of wall nails |
-
2025
- 2025-08-30 CN CN202511231025.7A patent/CN120990330A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121407714A (en) * | 2025-12-25 | 2026-01-27 | 湖南安华模板脚手架工程有限公司 | External wall scaffolding lifting guide rail mechanism, lifting method and positioning method of wall nails |
| CN121407714B (en) * | 2025-12-25 | 2026-03-31 | 湖南安华模板脚手架工程有限公司 | Lifting guide rail mechanism, lifting method and clamping wall nail positioning method for outer wall scaffold |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN212743427U (en) | Climbing type discharging platform | |
| CN113511583A (en) | A multifunctional and high-safety prefabricated building lifting fixture | |
| CN213626572U (en) | Tool type external cantilever operation platform | |
| CN219773544U (en) | Scaffolding for construction projects | |
| CN216240384U (en) | Operation platform assembly with ladder stand suitable for steel structure high altitude installation | |
| CN114876188A (en) | Early formwork dismantling device, early formwork dismantling system and construction method | |
| CN210482966U (en) | Multistage assembled lattice frame building structure | |
| CN220223314U (en) | Industrial factory steel structure lifting device | |
| CN219280494U (en) | Tower beam temporary consolidation supporting structure for bridge tower stability control | |
| CN218114720U (en) | Elevator pre-installation elevator car structure | |
| CN105152052A (en) | Glass curtain wall component lifting device and glass curtain wall component installing method | |
| CN114737816B (en) | Mast dismantling method for lifting high-altitude operation platform by adopting shoulder pole beam | |
| CN213774398U (en) | Elevator shaft operating platform | |
| CN211647242U (en) | Lifting scaffold unit | |
| CN217759993U (en) | Automatic creeping formwork system | |
| CN112502473B (en) | Supporting bearing capacity conversion device and method for dismantling large steel framework by using same | |
| CN222541968U (en) | A hanging basket bracket for super-high parapet wall or flower rack beam on roof | |
| CN210767838U (en) | Large-section inclined column template construction structure for constructional engineering | |
| CN220203353U (en) | A reversible stairwell operating platform | |
| CN113653439A (en) | Cat ladder, operation platform suitable for steel construction high altitude installation | |
| CN111997383A (en) | Construction is with platform of unloading | |
| CN220223339U (en) | Tower crane support structure for building hoisting machinery | |
| CN219281215U (en) | Scaffold with stable supporting structure | |
| CN221119145U (en) | Elevator well platform with prevent weighing down function | |
| CN220336411U (en) | Protection platform lifting point truss for building construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |