CN120486697A - Cantilever hanging scaffold for special-shaped outer elevation reconstruction construction and construction method - Google Patents

Cantilever hanging scaffold for special-shaped outer elevation reconstruction construction and construction method

Info

Publication number
CN120486697A
CN120486697A CN202510476479.4A CN202510476479A CN120486697A CN 120486697 A CN120486697 A CN 120486697A CN 202510476479 A CN202510476479 A CN 202510476479A CN 120486697 A CN120486697 A CN 120486697A
Authority
CN
China
Prior art keywords
frame
hanging
scaffold
building
overhanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202510476479.4A
Other languages
Chinese (zh)
Other versions
CN120486697B (en
Inventor
刘文杰
麻柱
赵文明
冯琳
高鹏
韩存金
刘苓苓
齐蕾
赵宏达
刘勃
邵泽建
杨元春
张琳沂
王玉基
孙楠楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing International Construction Group Co ltd
Original Assignee
Beijing International Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing International Construction Group Co ltd filed Critical Beijing International Construction Group Co ltd
Priority to CN202510476479.4A priority Critical patent/CN120486697B/en
Publication of CN120486697A publication Critical patent/CN120486697A/en
Application granted granted Critical
Publication of CN120486697B publication Critical patent/CN120486697B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an overhanging hanging scaffold for reconstruction construction of a special-shaped outer elevation and a construction method, wherein the overhanging hanging scaffold comprises an overhanging steel beam frame, a hanging steel frame and a scaffold structure, the outer part of the overhanging steel beam frame is overhanging out of a building, the hanging steel frame is arranged on the outer part of the outer elevation of the building along with the shape, a construction space is reserved between the hanging steel frame and the outer elevation of the building, the scaffold structure is erected in the construction space, the inner side of the scaffold structure is erected between layers of the construction structure, and the outer side of the scaffold structure is connected with the hanging steel frame. The cantilever steel girder frame is used as the installation foundation of the hanging steel frame to realize the cantilever hanging of the hanging steel frame, and the hanging steel frame is used as the erection foundation of the scaffold, so that the scaffold is erected at any height of the building, the defect of building a full scaffold from the ground is avoided, meanwhile, the damage of the wall connecting piece to the outer facade of the building when the outer scaffold is erected is avoided, the erection of a construction platform is realized, and meanwhile, the protection of the outer facade of the building is also met.

Description

Cantilever hanging scaffold for special-shaped outer elevation reconstruction construction and construction method
Technical Field
The invention relates to the technical field of building reconstruction construction, in particular to a cantilever hanging scaffold for special-shaped outer elevation reconstruction construction and a construction method.
Background
At present, more old buildings are required to be modified to be more suitable for the existing commercial mode, and when the old buildings are modified, the main structure of the building is generally reserved, and the interior decoration and the outer facade are modified. Construction can be realized by utilizing building structural layers in interior decoration, and scaffold is needed to be erected to form a construction platform in modification of the outer elevation. The conventional scaffold used for the facade reconstruction construction is a full-hall scaffold, and the scaffold needs to be erected upwards from the ground no matter the whole facade is reconstructed or only middle and high floors are reconstructed, but the construction mode has the defects of long construction period and large occupied space, and the scaffold erected from the bottom has great influence on the surrounding environment of the building and has interference on material transportation and transfer. The invention provides a cantilever hanging scaffold for reconstruction construction of special-shaped outer vertical surfaces and a construction method for solving the problems.
Disclosure of Invention
The invention provides an overhanging hanging scaffold for special-shaped facade reconstruction construction and a construction method thereof, wherein a hanging steel frame is used as a building foundation of the scaffold to build the scaffold, so that the building of the scaffold above a middle layer of a building is realized as a construction platform.
The technical scheme adopted by the invention for solving the technical problems is as follows:
The utility model provides a construction is reformed transform with encorbelmenting and hang scaffold frame, includes the girder framework of encorbelmenting, hangs steelframe and scaffold structure, the girder framework of encorbelmenting is established at the building top, and its outside encorbelments and stretches out the building outside, hang the steelframe along with shape setting in the outside of building outer facade to with the building outer facade between reserve there be construction space, hang the steelframe and hang on the girder framework of encorbelmenting, scaffold structure sets up in construction space, and the inboard is set up between the building structure layer, and its outside is connected on hanging the steelframe.
Further, the hanging steel frame comprises hanging frames, the top ends of the hanging frames are connected to the cantilever steel beam frames, the hanging frames comprise hanging frame units, the hanging frame units are arranged up and down correspondingly and continuously to form hanging frames, and the hanging frame units are arranged corresponding to building structure layers.
Further, the hanging frame unit comprises a follow-shaped keel and connecting hanging rods, wherein the follow-shaped keel is horizontally arranged and positioned outside the building structural layer, the connecting hanging rods are vertically arranged on the follow-shaped keel at intervals, and the follow-shaped keel is connected with the cantilever steel beam frame and the adjacent follow-shaped keel.
Further, the hanging steel frame further comprises a drawknot frame, the bottom end of the drawknot frame is connected with the foundation surface, the top end of the drawknot frame is connected with the bottom end of the hanging frame, the drawknot frame comprises a drawknot rod and a connecting suspender, the drawknot rod comprises a lower drawknot rod, and the lower drawknot rod is arranged on the ground and is connected with the hanging frame through the connecting suspender.
Further, the tie rod further comprises an upper tie rod, the upper tie rod is connected with the bottom end of the hanging rack through a connecting hanging rod, and the lower tie rod is connected with the upper tie rod through the connecting hanging rod.
Further, stabilizer bars are arranged at two ends of the conformal keels and are connected to the building structural layer.
Further, the scaffold structure comprises a bottom frame and a protective frame, wherein the outer side of the bottom frame is arranged on the hanging frame, the inner side of the bottom frame is arranged on the building structural layer, and the protective frame is arranged in the hanging frame.
Further, the cantilever steel beam frame comprises a steel frame and a ring beam, the steel frame comprises a cross beam and a longitudinal beam, the cross beam and the longitudinal beam are arranged in a staggered mode, the outside of the cross beam extends out of a building, and the ring beam is arranged at the outer end of the cross beam to integrally connect the outer end of the cross beam.
Further, the conformal keel and the connecting boom are connected by bolts.
A construction method of cantilever hanging scaffold for reconstruction construction of special-shaped outer elevation comprises the following steps:
s1, mounting and constructing an overhanging steel beam frame on the top of a building;
S2, prefabricating the components of the hanging steel frame, and transferring the prefabricated components and the components of the scaffold structure to a construction site;
S3, installing a hanging steel frame, constructing according to the sequence of installing the hanging frame units layer by layer from top to bottom, installing a connecting suspender firstly, then integrally hanging the butted shape-following keels and butting the shape-following keels with the connecting suspender, connecting the end parts of the shape-following keels with a building main body through stabilizing rods, and then installing the hanging frame units of the next layer;
S4, after the hanging frame is installed, fixing a lower drawknot rod of the drawknot frame on a foundation surface, and connecting the drawknot frame with the hanging frame by using a connecting suspender to drawknot the hanging frame, so that the state of the hanging frame is stable;
S5, setting up a scaffold structure in a construction space between the hanging steel frame and the outer vertical surface of the building, and setting up the scaffold structure layer by layer in a mode from bottom to top, wherein materials are transported and constructed from the inside of the building during setting up.
S6, after the scaffold structure is erected, carrying out reconstruction construction on the outer vertical surface of the building;
S7, after construction is completed, removing the scaffold structure layer by layer from top to bottom;
S8, after the scaffold structure is dismantled, the hanging steel frame is dismantled, the connection between the lower tie rod and the hanging frame is dismantled first, and then the hanging frame units are dismantled layer by layer from bottom to top until the hanging steel frame is completely dismantled.
The invention has the following beneficial effects:
The cantilever steel girder frame is used as the installation foundation of the hanging steel frame to realize the cantilever hanging of the hanging steel frame, and then the hanging steel frame is used as the erection foundation of the scaffold, so that the scaffold is erected at any height of the building, the defect that a full scaffold is erected from the ground is avoided, meanwhile, the damage of the wall connecting piece to the outer vertical surface of the building when the outer scaffold is erected is avoided, the erection of a construction platform is realized, and meanwhile, the protection of the outer vertical surface of the building is also met.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present invention;
fig. 2 is a schematic view of a hanging state of a hanging steel bar according to the present invention;
FIG. 3 is a schematic diagram showing the connection state of the hanging steel frame and the cantilever steel beam frame;
FIG. 4 is a schematic diagram showing the connection state of the hanging rack and the cantilever steel girder frame;
FIG. 5 is a schematic diagram showing the connection state of the hanger and the drawknot rack according to the present invention;
FIG. 6 is a schematic view of a hanger according to the present invention.
The steel beam cantilever type steel frame comprises the following components of a steel beam frame body 1, a steel frame body 11, a steel frame body 12, a ring beam 2, a hanging steel frame body 21, a hanging frame body 211, a conformal keel body 212, a connecting suspender 213, a stabilizer bar 22, a drawknot frame 221 and a drawknot bar.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it should be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate describing the present invention and simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention.
As shown in fig. 1, when building facades are constructed, two conventional scaffolds are used, one is a full scaffold, the whole building facade is directly erected upwards from the bottom, the other is an outer scaffold, the scaffold is erected on the building facade through a wall connecting piece, and the scaffold can be erected upwards from the middle of the building. However, both scaffolds need to be connected with wall parts to keep stable structure, the wall parts can damage the outer facade of the building, and when the outer facade of the building is transformed, the decoration of the outer facade cannot be damaged by the wall parts, so that the scaffold which does not depend on the wall parts and cannot influence the ground is needed to be used as a construction platform. According to the overhanging hanging scaffold for the special-shaped outer elevation reconstruction construction, the overhanging steel beam frame 1 is used as a mounting foundation to realize overhanging hanging of the hanging steel frame 2, the hanging steel frame 2 is hung outside a building, and the scaffold is erected based on the hanging steel frame 2, so that the scaffold can be erected at any layer of the building, and further reconstruction construction of the top of a high-rise building and an upper-rise building can be solved. Compared with the traditional overhanging scaffold, the overhanging scaffold has the characteristics of no damage to the outer facade of the building, good overall structure stability and high safety, is also suitable for building types with inconsistent upper and lower dimensions, can be applied to building structures of special-shaped outer facades, and has the advantages of wide application and good applicability.
As shown in fig. 1 and 2, the overhanging hanging scaffold for the reconstruction construction of the special-shaped outer vertical surface comprises an overhanging steel beam frame 1, a hanging steel frame 2 and a scaffold structure 3, wherein the overhanging steel beam frame 1 is arranged at the top of a building, the outer part of the overhanging steel beam frame overhangs the outside of the building and serves as a hanging foundation of the hanging steel frame 2 below the overhanging steel frame, the hanging steel frame 2 is vertically hung outside the outer vertical surface of the building, the hanging steel frame 2 is similar in shape to the outer vertical surface of the building, a construction space with uniform width is further formed with the outer vertical surface of the building to serve as a erection space of the scaffold structure 3, the top of the hanging steel frame 2 is connected to the overhanging structure of the overhanging steel beam frame 1, the scaffold structure 3 is erected in the construction space, the inner side of the scaffold structure 3 is erected between the layers of the building, and the outer side of the scaffold structure 3 is connected to the hanging steel frame 2.
As shown in fig. 4, in the first embodiment of the present invention, the hanging steel frame 2 is only provided with hanging frames 21, the top ends of the hanging frames 21 are connected to the overhanging steel beam frame 1 and are located below the overhanging steel beam frame 1, the hanging frames 21 are formed by vertically connecting hanging frame units which are vertically corresponding and continuously arranged, the hanging frame units are correspondingly arranged with building structural layers, each layer is provided with a group of hanging frame units, and each layer is arranged from top to bottom to the bottommost layer of the building floor to be constructed. Because the hanging steel frame 2 is only provided with the hanging frame 21, the hanging frame 21 is in a hanging mode, the structure of the hanging frame is unstable and easy to shake, and the load carried by the operation in the construction process also causes structural instability, so that the stabilizer bars 213 are arranged on two sides of the hanging frame unit in order to ensure the structural stability of the hanging frame 21, the stabilizer bars 213 are fixedly arranged at two ends of the shape-following keels 211, the stabilizer bars 213 are connected with a building structure, and then the drawknot which is stable for the hanging frame unit is fixed on the building structure, so that the holding state of the hanging frame unit is stable, the shaking of the hanging frame unit in the construction process is avoided, and the holding state of the hanging frame 21 is stable and the structure is safe.
As shown in fig. 6, further, the hanger unit includes a conformal keel 211 and a connecting hanger bar 212, the conformal keel 211 is horizontally arranged and correspondingly arranged outside the building structure layer, the inner side of the scaffold structure 3 is erected on the floor board between the building structure layers, the outer side of the scaffold structure is erected on the conformal keel 211, so that the scaffold structure 3 is horizontally erected, the connecting hanger bars 212 are vertically arranged on the conformal keel 211 at intervals, hanging of the conformal keel 211 is realized, and the connecting hanger bar 212 is used for connecting the conformal keel 211 with the overhanging steel beam frame 1 and connecting the conformal keel 211 of the adjacent hanger unit.
As shown in fig. 3, 4 and 5, in order to further increase stability of the hanging steel frame 2, the embodiment of the invention avoids the middle part of the hanging steel frame 2 from outwards shifting due to load in construction or influence of external load, and avoids potential safety hazards in the construction process. Therefore, the bottom of the hanging rack 21 is provided with the drawknot rack 22, and the hanging steel frame 2 is drawed by the drawknot rack 22, so that the hanging steel frame 2 is in an up-down tensioning state, the middle part of the hanging steel frame 2 is prevented from outwards shifting or deforming and shifting, and the construction safety is further ensured. The bottom and the basic face of drawknot frame 22 are connected, and its top is connected with the bottom of hanging frame 21, drawknot frame 22 includes drawknot pole 221 and connects jib 212, drawknot pole 221 includes lower drawknot pole, lower drawknot pole sets up subaerial to be connected with hanging frame 21 through connecting jib 212, lower drawknot pole is connected the back through connecting jib 212 with hanging frame 21, avoids its middle part to take place deformation or outwards squint through taut hanging frame 21 for hanging frame 21 is invariable and always be in under the steady state with the distance of building facade, and then guarantees the stability of scaffold structure 3 of setting up on hanging frame 21.
As shown in fig. 5, further, the tie bar 221 further includes an upper tie bar connected to the bottom end of the hanger 21 through the connecting boom 212, and a lower tie bar connected to the upper tie bar through the connecting boom 212.
According to the concrete structure of the tie frame 22 arranged on the building layer height or the building structure, when the layer height of the bottom layer is higher, two tie rods of an upper tie rod and a lower tie rod are arranged together to strengthen the structural stability, wherein the upper tie rod plays a role of strengthening the stability of the tie frame 22 by shortening the length of the connecting suspender 212 in the tie frame 22 so as to promote the stability of the tie, when the layer height of the bottom layer is lower, the length of the connecting suspender 212 in the tie frame 22 is also shorter, the tie requirement can be met by only arranging the lower tie rod, and the integral structure has enough stability at the moment by connecting the connecting suspender 212 with the hanging frame unit at the lowest side.
The drawknot frame 22 can not only promote the stability of the hanging frame 21, but also can not influence the passing of personnel and materials below. Compared with the traditional full-hall scaffold, the drawknot frame 22 only plays a drawknot role, but does not play a supporting role, so that the frame structure with larger space is adopted, and the drawknot role is realized, and meanwhile, the lower personnel and material transportation cannot be influenced. In addition, since the tie frame 22 only needs to provide tension, the tie frame can be arranged on the ground, and can also be arranged on a roof, a terrace or a hall of a bottom building, so that the requirement of tie is met.
Further, as shown in fig. 6, stabilizer bars 213 are provided at both ends of the compliant keel 211, and the stabilizer bars 213 are connected to the building structure layer. The stabilizer bar 213 is detachably connected with the building structure layer, and is convenient to detach after construction, and the stabilizer bar is connected with the building structure by adopting a wall connecting piece or a wall connecting bolt according to specific conditions.
Further, the scaffold structure 3 comprises a bottom frame and a protective frame, the bottom frame is horizontally arranged, the outside of the bottom frame is erected on the hanging frame 21, the inside of the bottom frame is erected on a building structure layer to serve as a building foundation of a construction platform, and the protective frame is erected in the hanging frame 21 to play a role in protection.
Further, the cantilever steel beam frame 1 comprises a steel frame 11 and a ring beam 12, the steel frame 11 comprises cross beams and longitudinal beams, the cross beams and the longitudinal beams are arranged in a staggered mode to form the steel frame 11 arranged at the top of the building, the outer parts of the cross beams extend out of the building, the ring beam 12 is arranged at the outer ends of the cross beams and is connected with all the cross beams to integrally connect the outer ends of the cross beams, and the hanging steel frame 2 is connected to the outer ends of the cross beams and is connected to the ring beam 12 at a curved surface. Because hang steelframe 2 is through connecting jib 212 lug connection on the outer end of crossbeam, in the work progress, can have the uneven condition of load distribution, when load passes through connecting jib 212 and conveys on the crossbeam, different loads can lead to there being certain difference in height between the outer end of different crossbeams, and connect the length unanimous of jib 212, therefore if there is the difference in height of crossbeam, can lead to hanging steelframe 2 in the condition that the stress concentration appears, even lead to overall structure to take place to warp, and then lead to hanging steelframe 2's overall stability not enough, there is certain potential safety hazard. In order to ensure that the structure of the hanging steel frame 2 cannot deform due to the height difference of the cross beams above the hanging steel frame, the ring beams 12 are arranged at the outer ends of the cross beams, so that all the cross beams are connected into a whole, further, the height difference among the cross beams is not ensured, the integral structure of the hanging steel frame 2 cannot be influenced, the structural safety is improved, meanwhile, due to the special-shaped structure of the outer vertical surface of a building, the cross beams cannot extend out of the curved surface, and the ring beams 12 are used as hanging points, so that hanging connection at special points is realized.
Further, the conformal keels 211 and the connecting suspenders 212 are connected through bolts, so that the assembly and disassembly are convenient, and the device can be reused, and the cost is reduced.
Preferably, the following-shaped keels 211 are provided with mounting seats, and the connecting suspenders 212 are connected with the mounting seats through bolts to realize detachable connection.
A construction method of cantilever hanging scaffold for reconstruction construction of special-shaped outer elevation comprises the following steps:
s1, mounting and constructing the cantilever steel beam frame 1 on the top of a building;
S2, prefabricating the components of the hanging steel frame 2, and transferring the prefabricated components and the components of the scaffold structure 3 to a construction site;
S3, installing the hanging steel frame 2, constructing according to the sequence of installing the hanging frame units layer by layer from top to bottom, firstly installing the connecting suspenders 212 when installing the hanging frame units of each layer, then integrally hoisting the butted shape-following keels 211 and butting the shape-following keels with the connecting suspenders 212, connecting the end parts of the shape-following keels 211 with a building main body through the stabilizing rods 213, and then installing the hanging frame units of the next layer;
S4, after the hanging frame 21 is installed, fixing a lower drawknot rod of the drawknot frame 22 on a foundation surface, and then connecting the drawknot frame 22 with the hanging frame 21 by using a connecting suspender 212 to drawknot the hanging frame 21, so that the state of the hanging frame 21 is ensured to be stable;
S5, setting up the scaffold structure 3 in a construction space between the hanging steel frame 2 and the outer vertical face of the building, and setting up the scaffold structure layer by layer in a mode from bottom to top, wherein materials are transported and constructed from the inside of the building when setting up the scaffold structure.
S6, after the scaffold structure 3 is erected, carrying out reconstruction construction of the outer facade of the building;
S7, after construction is completed, removing the scaffold structure 3 layer by layer from top to bottom;
s8, after the scaffold structure 3 is dismantled, the hanging steel frame 2 is dismantled, the connection between the lower tie rod and the hanging frame 21 is firstly dismantled, and then the hanging frame units are dismantled layer by layer from bottom to top until the hanging steel frame 2 is completely dismantled.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.

Claims (10)

1. The overhanging hanging scaffold for the special-shaped outer elevation reconstruction construction is characterized by comprising an overhanging steel beam frame (1), a hanging steel frame (2) and a scaffold structure (3), wherein the overhanging steel beam frame (1) is arranged at the top of a building, the outer part of the overhanging steel beam frame overhangs the outside of the building, the hanging steel frame (2) is arranged at the outside of the outer elevation of the building along with the shape, a construction space is reserved between the hanging steel frame (2) and the outer elevation of the building, the hanging steel frame (2) is hung on the overhanging steel beam frame (1), the scaffold structure (3) is erected in the construction space, the inner side of the scaffold structure is erected between the building structure layers, and the outer side of the scaffold structure is connected with the hanging steel frame (2).
2. The overhanging scaffold for the reconstruction of the special-shaped outer vertical surface of claim 1 is characterized in that the hanging steel frame (2) comprises hanging frames (21), the top ends of the hanging frames (21) are connected to the overhanging steel beam frame (1), the hanging frames (21) comprise hanging frame units, the hanging frame units are vertically and continuously arranged to form the hanging frames (21), and the hanging frame units are arranged corresponding to building structure layers.
3. The overhanging scaffold for the reconstruction of the special-shaped outer vertical surface, as set forth in claim 2, characterized in that the hanging scaffold unit comprises a conformal keel (211) and a connecting suspender (212), wherein the conformal keel (211) is horizontally arranged and positioned outside the building structural layer, and the connecting suspender (212) is vertically arranged on the conformal keel (211) at intervals and is connected with the conformal keel (211) and the overhanging steel beam frame (1) and is connected with the adjacent conformal keel (211).
4. The overhanging scaffold for the reconstruction of the special-shaped facade of claim 2, wherein the hanging steel frame (2) further comprises a drawknot frame (22), the bottom end of the drawknot frame (22) is connected with a foundation surface, the top end of the drawknot frame is connected with the bottom end of the hanging frame (21), the drawknot frame (22) comprises a drawknot rod (221) and a connecting suspender (212), the drawknot rod (221) comprises a lower drawknot rod, and the lower drawknot rod is arranged on the ground and is connected with the hanging frame (21) through the connecting suspender (212).
5. The overhanging scaffold for the reconstruction of the special-shaped facade of claim 4, wherein the tie rod (221) further comprises an upper tie rod, the upper tie rod is connected with the bottom end of the hanging frame (21) through a connecting suspender (212), and the lower tie rod is connected with the upper tie rod through the connecting suspender (212).
6. The overhanging scaffold for the reconstruction of the special-shaped outer vertical surface according to claim 3, wherein stabilizer bars (213) are arranged at two ends of the conformal keels (211), and the stabilizer bars (213) are connected to a building structural layer.
7. The overhanging scaffold for the reconstruction of the special-shaped outer vertical surface of claim 1, wherein the scaffold structure (3) comprises a bottom frame and a protective frame, the outer side of the bottom frame is arranged on the hanging frame (21), the inner side of the bottom frame is arranged on a building structure layer, and the protective frame is arranged in the hanging frame (21).
8. The overhanging hanging scaffold for the special-shaped outer elevation reconstruction construction of claim 1 is characterized in that the overhanging steel beam frame (1) comprises a steel frame (11) and a ring beam (12), the steel frame (11) comprises cross beams and longitudinal beams, the cross beams and the longitudinal beams are arranged in a staggered mode, the outer parts of the cross beams extend out of a building, and the ring beam (12) is arranged at the outer end of the cross beam and connects the outer ends of the cross beam into a whole.
9. The overhanging scaffold for the reconstruction of the special-shaped outer vertical surface according to claim 3, which is characterized in that the conformal keel (211) is connected with the connecting suspender (212) through bolts.
10. The construction method of the overhanging hanging scaffold for the reconstruction construction of the special-shaped outer vertical surface is characterized by comprising the following steps of:
s1, performing installation construction of an overhanging steel beam frame (1) on the top of a building;
s2, prefabricating the components of the hanging steel frame (2), and transferring the prefabricated components and the components of the scaffold structure (3) to a construction site;
s3, installing a hanging steel frame (2), constructing according to the sequence of installing the hanging frame units layer by layer from top to bottom, installing a connecting suspender (212), integrally hoisting the butted shape-following keels (211) and butting the shape-following keels with the connecting suspender (212), connecting the end parts of the shape-following keels (211) with a building main body through stabilizing rods (213), and installing the hanging frame units of the next layer;
S4, after the hanging frame (21) is installed, fixing a lower drawknot rod of the drawknot frame (22) on a foundation surface, and then connecting the drawknot frame (22) with the hanging frame (21) by using a connecting suspender (212), so as to drawknot the hanging frame (21) and ensure the stable state of the hanging frame (21);
S5, erecting a scaffold structure (3) in a construction space between the hanging steel frame (2) and the outer vertical surface of the building, and erecting the scaffold structure layer by layer in a bottom-up mode, wherein during erection, material transfer and construction are carried out from the inside of the building;
s6, after the scaffold structure (3) is erected, carrying out reconstruction construction of the outer facade of the building;
s7, after construction is completed, removing the scaffold structure (3) layer by layer from top to bottom;
s8, after the scaffold structure (3) is dismantled, the hanging steel frame (2) is dismantled, the connection between the lower tie rod and the hanging frame (21) is dismantled firstly, and then the hanging frame units are dismantled layer by layer from bottom to top until the hanging steel frame (2) is completely dismantled.
CN202510476479.4A 2025-04-16 2025-04-16 A cantilevered scaffolding and construction method for irregular facade renovation. Active CN120486697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202510476479.4A CN120486697B (en) 2025-04-16 2025-04-16 A cantilevered scaffolding and construction method for irregular facade renovation.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202510476479.4A CN120486697B (en) 2025-04-16 2025-04-16 A cantilevered scaffolding and construction method for irregular facade renovation.

Publications (2)

Publication Number Publication Date
CN120486697A true CN120486697A (en) 2025-08-15
CN120486697B CN120486697B (en) 2025-12-02

Family

ID=96662694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202510476479.4A Active CN120486697B (en) 2025-04-16 2025-04-16 A cantilevered scaffolding and construction method for irregular facade renovation.

Country Status (1)

Country Link
CN (1) CN120486697B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202767488U (en) * 2012-07-23 2013-03-06 青岛东亚建筑装饰有限公司 Steel pipe fastener hanging type handling frame
CN113550550A (en) * 2021-06-30 2021-10-26 重庆建工第三建设有限责任公司 Overhanging unit type scaffold convenient to assemble and disassemble
CN115126233A (en) * 2022-08-02 2022-09-30 广东中联建建筑工程有限公司 Construction method for using cantilever beam plate high formwork with complex outer vertical surface as outer wall scaffold
CN115126212A (en) * 2022-06-30 2022-09-30 歌山建设集团有限公司 Lifting type dismantling device for inner wall of overhanging outer frame and dismantling construction method
CN115680257A (en) * 2022-11-16 2023-02-03 中建八局第一建设有限公司 A large-span cantilevered scaffolding foundation and its construction method without returning to the roof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202767488U (en) * 2012-07-23 2013-03-06 青岛东亚建筑装饰有限公司 Steel pipe fastener hanging type handling frame
CN113550550A (en) * 2021-06-30 2021-10-26 重庆建工第三建设有限责任公司 Overhanging unit type scaffold convenient to assemble and disassemble
CN115126212A (en) * 2022-06-30 2022-09-30 歌山建设集团有限公司 Lifting type dismantling device for inner wall of overhanging outer frame and dismantling construction method
CN115126233A (en) * 2022-08-02 2022-09-30 广东中联建建筑工程有限公司 Construction method for using cantilever beam plate high formwork with complex outer vertical surface as outer wall scaffold
CN115680257A (en) * 2022-11-16 2023-02-03 中建八局第一建设有限公司 A large-span cantilevered scaffolding foundation and its construction method without returning to the roof

Also Published As

Publication number Publication date
CN120486697B (en) 2025-12-02

Similar Documents

Publication Publication Date Title
CN214996139U (en) Safe operation platform for overhead large-span steel reinforced concrete beam suspension formwork construction
CN215803108U (en) Attached beam type hanging basket
CN112609578B (en) Method for mounting steel truss girder at top section of bridge pier of cable-stayed bridge
CN209924434U (en) High-altitude overhanging formwork support frame body
JP2022035152A (en) Slide construction method for rigid-frame structure
CN111794119A (en) Temporary support system and hoisting method for basket type steel box tied arch
CN209780193U (en) Suspension type scaffold
JPH11181725A (en) Construction method of horizontal beam of concrete main tower
CN217810527U (en) Asynchronous hanging basket hoisting system with corrugated steel web self-bearing function
CN113373810A (en) Side span support structure of continuous T-structure viaduct with upper span of existing line
CN115787996A (en) Overhung construction method and overhung frame for super-high building
CN115538678B (en) Construction method for small side surface platform of large-angle overhanging view platform
CN116497945B (en) Roofing steel truss accumulated lifting reaction frame and construction method
CN206581577U (en) Using housing construction builder's jack
CN211569908U (en) Annular rail hoisting system for curtain wall plates
CN120486697B (en) A cantilevered scaffolding and construction method for irregular facade renovation.
CN119083577B (en) Truss layer of super high-rise reinforced concrete structure and construction method
CN117418671B (en) Cable-stayed large-span overhanging steel platform system and construction method
CN113846543A (en) A door-rigid type coal conveying trestle bridge corridor overall structure and installation method thereof
CN113718654A (en) Installation structure for ropeless beam section of bridge tower area
CN113846792A (en) Workshop steel structure roof, hoisting device and hoisting method thereof
CN218668435U (en) Span structure string supporting platform
CN115182482B (en) Construction method of prefabricated hollow wall body without outer frame matching
CN107035037B (en) Tower top curtain wall frame and mounting method thereof
CN216276800U (en) Assembly type building external hanging rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20260513

Granted publication date: 20251202