CN119824944B - Prefabricated micropile foundations and construction methods for power transmission lines - Google Patents

Prefabricated micropile foundations and construction methods for power transmission lines

Info

Publication number
CN119824944B
CN119824944B CN202510251219.7A CN202510251219A CN119824944B CN 119824944 B CN119824944 B CN 119824944B CN 202510251219 A CN202510251219 A CN 202510251219A CN 119824944 B CN119824944 B CN 119824944B
Authority
CN
China
Prior art keywords
bearing platform
pile
connecting steel
steel cylinder
edge bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202510251219.7A
Other languages
Chinese (zh)
Other versions
CN119824944A (en
Inventor
徐志军
郭兆翔
韩杨
张晓曼
赵帅
李明阳
马媛媛
郭慧杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN202510251219.7A priority Critical patent/CN119824944B/en
Publication of CN119824944A publication Critical patent/CN119824944A/en
Application granted granted Critical
Publication of CN119824944B publication Critical patent/CN119824944B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本申请的实施例涉及微型桩基础工程技术领域,具体涉及输电线路装配式微型桩基础与施工方法。该输电线路装配式微型桩基础的一具体实施方式包括:中间承台、第一边缘承台、第二边缘承台、预应力筋、锚具组件、锚垫组件、第一微型桩、第二微型桩、第三微型桩、第四微型桩、第一连接钢筒、第二连接钢筒、第三连接钢筒、第四连接钢筒、第一连接钢板、第二连接钢板、第三连接钢板和第四连接钢板,其中,中间承台与第一边缘承台通过预应力筋固定连接;中间承台与第二边缘承台通过预应力筋固定连接。该实施方式提高了装配式微型桩基础运输和安装的效率。

This application relates to the field of micropile foundation engineering technology, specifically to prefabricated micropile foundations for power transmission lines and their construction methods. One specific embodiment of this prefabricated micropile foundation for power transmission lines includes: an intermediate bearing platform, a first edge bearing platform, a second edge bearing platform, prestressed tendons, anchor assemblies, anchor pad assemblies, first micropile, second micropile, third micropile, fourth micropile, a first connecting steel cylinder, a second connecting steel cylinder, a third connecting steel cylinder, a fourth connecting steel cylinder, a first connecting steel plate, a second connecting steel plate, a third connecting steel plate, and a fourth connecting steel plate. The intermediate bearing platform and the first edge bearing platform are fixedly connected by prestressed tendons; the intermediate bearing platform and the second edge bearing platform are also fixedly connected by prestressed tendons. This embodiment improves the efficiency of transporting and installing prefabricated micropile foundations.

Description

Assembled miniature pile foundation of power transmission line and construction method
Technical Field
The embodiment of the application relates to the technical field of miniature pile foundation engineering, in particular to an assembled miniature pile foundation of a power transmission line and computer equipment.
Background
Cast-in-place pile foundations are a commonly used pile foundation form. The main technical characteristics include in-situ casting, multiple wet operations, concrete and steel bar materials, cast-in-situ connection, high ultimate bearing capacity and foundation rigidity. The novel assembled miniature pile foundation has obvious differences in the aspects of construction mode, materials, connection mode, load transmission, construction efficiency, adaptability, bearing performance, economy and the like, and particularly has obvious advantages in the aspects of fully mechanized construction and the design of prefabricated component sizes, so that the novel assembled miniature pile foundation is applied in complex environments.
However, in practice, it has been found that when a cast-in-place pile foundation and the above-mentioned assembled miniature pile foundation are used, the following technical problems often occur:
first, while fabricated foundations have been used, prefabricated parts are bulky and difficult to transport and install;
Secondly, the connection structure of the existing bearing platform and the pile is mostly biased to pre-buried bolts in concrete, site post-pouring and the like, wherein the pre-buried bolts have the problems of difficult positioning of the pre-buried bolts, easy deviation and the like, and the site post-pouring process is site wet operation, so that the construction period is short and the environment is protected;
Thirdly, the construction period of the cast-in-situ miniature pile foundation is long, and the field working procedures are complex (for example, in the whole construction process of the cast-in-situ pile foundation, additional reinforcement cage binding, concrete and reinforcement transportation, concrete pouring, concrete maintenance and the like are required);
fourthly, because the pile diameter of the miniature pile is small, the on-site construction quality control difficulty is high, and the construction environment and the level influence of operators are easy to influence, so that the pile forming quality is unstable;
Fifth, the site construction of the cast-in-situ pile foundation can generate a large amount of mud and other garbage, which causes pollution to the environment.
Disclosure of Invention
The summary of the application is provided to introduce a selection of concepts in a simplified form that are further described below in the detailed description. The summary of the application is not intended to identify key features or essential features of the claimed subject matter, nor is it intended to be used to limit the scope of the claimed subject matter.
Some embodiments of the present application provide a transmission line assembled micro pile foundation and a construction method to solve one or more of the technical problems mentioned in the background section above.
According to the first aspect, some embodiments of the application provide an assembled miniature pile foundation of a transmission line, which comprises a middle bearing platform, a first edge bearing platform, a second edge bearing platform, a prestress rib, an anchor assembly, an anchor pad assembly, a first miniature pile, a second miniature pile, a third miniature pile, a fourth miniature pile, a first connecting steel cylinder, a second connecting steel cylinder, a third connecting steel cylinder, a fourth connecting steel cylinder, a first connecting steel plate, a second connecting steel plate, a third connecting steel plate and a fourth connecting steel plate, wherein the middle bearing platform is fixedly connected with the first edge bearing platform through the prestress rib, the middle bearing platform is fixedly connected with the second edge bearing platform through the prestress rib, the prestress rib is fixedly connected with the first edge bearing platform through the anchor assembly and the anchor pad assembly, the prestress rib is fixedly connected with the second edge bearing platform through the anchor assembly and the anchor pad assembly, the first edge bearing platform is fixedly connected with the first miniature pile through the first connecting steel cylinder and the second connecting steel cylinder, the middle bearing platform is fixedly connected with the first edge bearing platform through the first connecting steel cylinder and the second steel cylinder, the middle bearing platform is fixedly connected with the second edge bearing platform through the first edge bearing platform and the second steel cylinder.
The middle bearing platform comprises a main column, a middle bearing platform prestressed pipeline, a first key groove and a second key groove, wherein connecting bolts are pre-embedded in the main column, the main column is fixedly connected with a pedal through the connecting bolts, the middle bearing platform prestressed pipeline is used for penetrating pipes of prestressed tendons, the first key groove is used for fixing a first edge bearing platform, and the second key groove is used for fixing a second edge bearing platform.
The first edge bearing platform comprises a first pile installation preformed hole, a second pile installation preformed hole, a first edge bearing platform prestressed pipeline and a first shear key, wherein the first pile installation preformed hole is used for installing a first micro pile, the diameter of the first pile installation preformed hole is larger than that of the first micro pile, a gap between the first pile installation preformed hole and the first micro pile is closely connected through grouting, the second pile installation preformed hole is used for installing a second micro pile, the diameter of the second pile installation preformed hole is larger than that of the second micro pile, the gap between the second pile installation preformed hole and the second micro pile is closely connected through grouting, the first edge bearing platform prestressed pipeline is used for penetrating pipes of prestressed ribs, and the first edge bearing platform is fixedly installed on a first key groove formed in the middle of the middle bearing platform through the first shear key.
The second edge bearing platform comprises a third pile installation preformed hole, a fourth pile installation preformed hole, a second edge bearing platform prestressed pipeline and a second shear key, wherein the third pile installation preformed hole is used for installing a third micro pile, the diameter of the third pile installation preformed hole is larger than that of the third micro pile, a gap between the third pile installation preformed hole and the third micro pile is closely connected through grouting, the fourth pile installation preformed hole is used for installing a fourth micro pile, the diameter of the fourth pile installation preformed hole is larger than that of the fourth micro pile, the gap between the fourth pile installation preformed hole and the fourth micro pile is closely connected through grouting, the second edge bearing platform prestressed pipeline is used for penetrating pipes of prestressed tendons, and the second edge bearing platform is fixedly installed on a second key groove formed in the middle of the middle bearing platform through the second shear key.
The first connecting steel cylinder comprises a first connecting steel cylinder upper flange plate, a first connecting steel cylinder lower flange plate, a first connecting steel cylinder web plate, a first bolt and a first anchoring steel bar, wherein the first connecting steel cylinder web plate is used for providing a first pile installation preformed hole, the first bolt is welded with the first connecting steel cylinder web plate on two sides, the first bolt is in plug welding connection with the first connecting steel cylinder upper flange plate, the first bolt is in plug welding connection with the first connecting steel cylinder lower flange plate, the first anchoring steel bar is used for embedding the first connecting steel cylinder in a first edge bearing platform, the first connecting steel cylinder upper flange plate is used for providing a flat construction platform when the first connecting steel plate is connected, and providing transverse rigidity and strength of the first connecting steel cylinder, and the first connecting steel cylinder lower flange plate is used for providing transverse rigidity and strength of the first connecting steel cylinder.
The first micro pile comprises a first micro pile embedded bolt and a first pile end, wherein the first micro pile is fixedly connected with the first connecting steel plate through the first micro pile embedded bolt comprising the first micro pile, the first pile end comprises a first pile head embedded bolt anchor bar and a bottom end, and the first micro pile embedded bolt is fixed in the first micro pile through the first pile head embedded bolt anchor bar comprising the first pile end.
In a second aspect, some embodiments of the application also provide a construction method for an assembled miniature pile foundation of a transmission line, the method comprising positioning a foundation construction position to obtain a positioning point, brushing a splicing surface of an intermediate bearing platform and a first edge bearing platform, brushing a splicing surface of the intermediate bearing platform and a second edge bearing platform, leveling a site of the construction site, thin-coating a grouting material on a surface of the leveled site, lifting the intermediate bearing platform, the first edge bearing platform and the second edge bearing platform to the positioning point by using a small-sized lifting pile machine in response to determining that the grouting material is not dry, enabling a first shear key comprised by the first edge bearing platform to reliably contact with a first key groove of the intermediate bearing platform, enabling a second shear key comprised by the second edge bearing platform to reliably contact with a second key groove of the intermediate bearing platform, penetrating a prestressed reinforcement from the first edge bearing platform, penetrating the prestressed reinforcement through the intermediate bearing platform and the second edge bearing platform and from the second edge bearing platform, installing the prestressed reinforcement in the miniature pile assembly through the first edge bearing platform and the miniature pile assembly.
The above embodiments of the present application have the advantage that the efficiency of transporting and installing the assembled type mini pile foundation can be improved by the assembled type mini pile foundation of the power transmission line according to some embodiments of the present application. In particular, the efficiency of the transportation and installation of the fabricated micro pile foundation is reduced because the fabricated foundation has been applied, but the prefabricated parts are bulky and difficult to transport and install. Based on the above, the transmission line assembled micro pile foundation according to some embodiments of the present application includes a middle bearing platform, a first edge bearing platform, a second edge bearing platform, a prestressed tendon, an anchor assembly, an anchor pad assembly, a first micro pile, a second micro pile, a third micro pile, a fourth micro pile, a first connection steel cylinder, a second connection steel cylinder, a third connection steel cylinder, a fourth connection steel cylinder, a first connection steel plate, a second connection steel plate, a third connection steel plate, and a fourth connection steel plate. Therefore, the assembled miniature pile foundation of the transmission line can adopt full mechanical connection without on-site wet operation, thereby obviously shortening the construction period and improving the construction efficiency. The prefabricated components are produced in factories, the quality control is more strict and reliable, the uncertainty of site construction is avoided, and the pile forming quality is ensured. The positions of the bolts and the pile holes of the prefabricated finished products are accurate, and the finished products are high in quality. The method does not need on-site wet operation, obviously reduces the pollution to the environment in the construction process, and is beneficial to the environmental protection requirement. The construction machine adopts a miniaturized design and a portable construction machine, improves the safety of construction, and is especially used in complex environmental conditions such as narrow spaces, slopes, mountainous areas and the like. The foundation member is miniaturized and is in block design, so that the transportation and the field installation are facilitated, and the development trend of the full-mechanized construction of the power transmission line engineering is adapted. The assembled miniature pile foundation has good bearing performance under vertical and horizontal load working conditions, a load transmission path is clear, stress distribution is reasonable, and the assembled miniature pile foundation has stronger adaptability and structural stability.
Drawings
The above and other features, advantages and aspects of embodiments of the present application will become more apparent by reference to the following detailed description when taken in conjunction with the accompanying drawings. The same or similar reference numbers will be used throughout the drawings to refer to the same or like elements. It should be understood that the figures are schematic and that elements and components are not necessarily drawn to scale.
Fig. 1 is a schematic diagram of some embodiments of a transmission line assembled miniature pile foundation according to the present application;
Fig. 2 is an elevation view of some embodiments of a transmission line assembled miniature pile foundation according to the present application;
fig. 3 is a side view of some embodiments of a transmission line assembled miniature pile foundation according to the present application;
FIG. 4 is a schematic view of the structure of the intermediate deck of some embodiments of the transmission line assembled micro pile foundation according to the present application;
FIG. 5 is an elevation view of the intermediate cap of some embodiments of a transmission line assembled micro pile foundation according to the present application;
FIG. 6 is a side view of an intermediate cap of some embodiments of a transmission line assembled micro pile foundation according to the present application;
FIG. 7 is a schematic view of the structure of a first edge cap of some embodiments of a transmission line assembled micro pile foundation according to the present application;
FIG. 8 is an elevation view of a first edge cap of some embodiments of a transmission line assembled micro pile foundation according to the present disclosure;
FIG. 9 is a side view of a first edge cap of some embodiments of a transmission line assembled micro pile foundation according to the present application;
Fig. 10 is a schematic structural view of a first connecting steel cylinder of some embodiments of a transmission line assembled miniature pile foundation according to the present application;
fig. 11 is a top view of a first connecting steel cylinder of some embodiments of a transmission line assembled miniature pile foundation according to the present application;
Fig. 12 is a cross-sectional view of a first connecting steel cylinder of some embodiments of a transmission line assembled miniature pile foundation according to the present application;
fig. 13 is a schematic structural view of a first micro pile of some embodiments of a transmission line assembled micro pile foundation according to the present application;
fig. 14 is a schematic structural view of a first micro pile pre-buried bolt anchor for a first micro pile according to some embodiments of the transmission line assembled micro pile foundation according to the present application;
fig. 15 is a schematic view of the structure of the bottom head of a first micro pile according to some embodiments of the transmission line assembled micro pile foundation of the present application;
fig. 16 is a flow chart of some embodiments of a construction method for a transmission line assembled micro pile foundation according to the present application.
In the figure, an intermediate bearing platform 1, a main column 1.1, an intermediate bearing platform prestressed pipeline 1.2, a first key groove 1.3, a second key groove 1.4, a first edge bearing platform 2, a first pile installation preformed hole 2.1, a first edge bearing platform prestressed pipeline 2.2, a first shear key 2.3, a first connecting steel cylinder 3, a first connecting steel cylinder upper flange plate 3.1, a first connecting steel cylinder lower flange plate 3.2, a first connecting steel cylinder web plate 3.3, a first bolt 3.4, a first anchoring steel bar 3.5, a first micro pile 4, a first micro pile embedded bolt 4.1, a first pile end 4.2, a first pre-embedded bolt anchor bar 4.1.1, a pointed end 4.2.1, a flat end 4.2.2, a cross-shaped end 4.2.3, a prestress bar 5, an anchor assembly 6, an anchor pad assembly 7, a first connecting steel plate 8, a second edge bearing platform 9, a second micro pile 10, a third micro pile 11, a fourth micro pile 12, a third micro pile 14, a fourth steel cylinder 17, a fourth connecting steel plate 17 and a fourth connecting steel cylinder 17.
Detailed Description
Embodiments of the present application will be described in more detail below with reference to the accompanying drawings. While certain embodiments of the application have been illustrated in the accompanying drawings, it is to be understood that the application may be embodied in various forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete. It should be understood that the drawings and embodiments of the application are for illustration purposes only and are not intended to limit the scope of the present application.
It should be noted that, for convenience of description, only the portions related to the present application are shown in the drawings. Embodiments of the application and features of the embodiments may be combined with each other without conflict.
It should be noted that the terms "first," "second," and the like herein are merely used for distinguishing between different devices, modules, or units and not for limiting the order or interdependence of the functions performed by such devices, modules, or units.
It should be noted that references to "one", "a plurality" and "a plurality" in this disclosure are intended to be illustrative rather than limiting, and those skilled in the art will appreciate that "one or more" is intended to be construed as "one or more" unless the context clearly indicates otherwise.
The names of messages or information interacted between the devices in the embodiments of the present application are for illustrative purposes only and are not intended to limit the scope of such messages or information.
The application will be described in detail below with reference to the drawings in connection with embodiments.
Fig. 1 shows a schematic structural view of some embodiments of a transmission line assembled miniature pile foundation according to the present application. As shown in fig. 1, the transmission line assembled miniature pile foundation comprises a middle bearing platform 1, a first edge bearing platform 2, a second edge bearing platform 9, a prestressed tendon 5, an anchor assembly 6, an anchor pad assembly 7, a first miniature pile 4, a second miniature pile 10, a third miniature pile 11, a fourth miniature pile 12, a first connecting steel cylinder 3, a second connecting steel cylinder 13, a third connecting steel cylinder 14, a fourth connecting steel cylinder 15, a first connecting steel plate 8, a second connecting steel plate 16, a third connecting steel plate 17 and a fourth connecting steel plate 18. Wherein, the middle bearing platform 1 and the first edge bearing platform 2 can be fixedly connected through the prestressed tendons 5.
In particular, the transmission line assembled micro pile foundation may be further described with reference to fig. 2 to 3. Fig. 2 illustrates an elevation view of some embodiments of a transmission line assembled miniature pile foundation according to the present application. Fig. 3 illustrates a side view of some embodiments of a transmission line assembled miniature pile foundation according to the present application. As shown in fig. 1-3, the middle bearing platform 1 and the second edge bearing platform 9 are fixedly connected through the prestressed tendons 5.
The prestress rib 5 and the first edge bearing platform 2 can be fixedly connected through the anchor assembly 6 and the anchor pad assembly 7.
The prestressing tendons 5 and the second edge bearing platform 2 can be fixedly connected through the anchor assembly 6 and the anchor pad assembly 7.
The first edge bearing platform 2 and the first micro pile 4 can be fixedly connected through the first connecting steel cylinder 3 and the first connecting steel plate 8.
The first edge bearing platform 2 and the second micro pile 10 can be fixedly connected through the second connecting steel cylinder 13 and the second connecting steel plate 16.
The second edge bearing platform 9 and the third micro pile 11 can be fixedly connected through the third connecting steel cylinder 14 and the third connecting steel plate 17;
The second edge bearing platform 9 and the fourth micro pile 12 may be fixedly connected through the fourth connecting steel cylinder 15 and the fourth connecting steel plate 18.
Therefore, the invention provides a novel assembled micro pile foundation, the foundation connection modes are all full-mechanical connection, the construction of the micro pile adopts a static pressure pile construction process, and no field wet operation is realized. The bearing platform is designed in a small-sized and equal-weight block manner, so that the bearing platform is convenient to transport and install on site. And the mechanical connection mode of the prestressed tendons and the bolts is adopted for splicing, so that the construction quality and efficiency are improved.
Alternatively, the intermediate deck 1 included in the transmission line-mounted mini-pile foundation may be further described with reference to fig. 4 to 6. Fig. 4 shows a schematic diagram of the structure of the intermediate cap 1 of some embodiments of the transmission line assembled micro pile foundation according to the present application. Fig. 5 shows an elevation view of the intermediate cap 1 of some embodiments of a transmission line assembled micro pile foundation according to the present application. Fig. 6 shows a side view of the intermediate cap 1 of some embodiments of a transmission line assembled micro pile foundation according to the present application. As shown in fig. 4-6, the middle bearing platform 1 may include a main column 1.1, a middle bearing platform prestressed pipe 1.2, a first key slot 1.3 and a second key slot 1.4, where a connecting bolt is pre-embedded in the main column 1.1. The main column 1.1 can be fixedly connected with the pedal through a connecting bolt. The intermediate cap prestressed pipe 1.2 can be used for the pipe penetration of the prestressed tendons 5. The first key slot 1.3 may be used to secure the first edge table 2. The second key way 1.4 can be used for fixing the second edge cap 9. Here, the connection bolt may be a bolt for connecting the step plate. The foot rest may be a foot rest for a scaffold for working aloft.
Alternatively, the first edge cap 2 included in the transmission line assembled micro pile foundation may be further described with reference to fig. 7 to 9. Fig. 7 shows a schematic structural view of a first edge cap 2 of some embodiments of a transmission line assembled miniature pile foundation according to the present application. Fig. 8 shows a front view of a first edge cap 2 of some embodiments of a transmission line assembled miniature pile foundation according to the present application. Fig. 9 shows a side view of a first edge cap 2 of some embodiments of a transmission line assembled miniature pile foundation according to the present application. As shown in fig. 7-9, the first edge cap 2 may include a first pile installation pre-hole 2.1, a second pile installation pre-hole 2.4, a first edge cap pre-stress pipe 2.2 and a first shear key 2.3, wherein the first pile installation pre-hole 2.1 may be used for installing a first micro pile 4. The diameter of the first pile installation preformed hole 2.1 can be larger than that of the first micro pile 4, and a gap between the first pile installation preformed hole 2.1 and the first micro pile 4 can be closely connected through grouting. The second pile installation pre-formed holes 2.4 may be used for installing the second micro pile 10. Wherein the diameter of the second pile mounting pre-formed holes 2..4 may be larger than the diameter of the second micro pile 10, and the gap between the second pile mounting pre-formed holes 2.4 and the second micro pile 10 may be closely connected by grouting. The first edge cap prestressed pipe 2.2 can be used for the pipe penetration of the prestressed tendons 5. The first edge table 2 may be fixedly mounted on a first key way 1.3 comprised by the intermediate table 1 by means of the first shear key 2.3.
Optionally, the second edge cap 9 may comprise a third pile installation pre-hole 9.1, a fourth pile installation pre-hole 9.4, a second edge cap pre-stress pipe 9.2 and a second shear key 9.3. Wherein the third pile installation pre-hole 9.1 may be used for installing a third micro pile 11. The diameter of the third pile installation preformed hole 9.1 may be larger than that of the third micro pile 11, and a gap between the third pile installation preformed hole 9.1 and the third micro pile 11 may be closely connected through grouting. The fourth pile installation pre-hole 9.4 may be used for installing a fourth micro pile 12. The diameter of the fourth pile installation preformed hole 9.4 may be larger than that of the fourth micro pile 12, and a gap between the fourth pile installation preformed hole 9.4 and the fourth micro pile 12 may be closely connected by grouting. The second edge cap prestressed pipe 9.2 can be used for the pipe penetration of the tendons 5. The second edge table 9 may be fixedly mounted on a second keyway 1.4 comprised by the intermediate table 1 by means of the second shear key 9.3. Here, reference may be made to the first edge table 2 in the above embodiment for the specific structure of the second edge table 9 and the technical effects thereof, which are not described herein.
Alternatively, the first connection steel cylinder 3 included in the transmission line assembled type mini pile foundation may be further described with reference to fig. 10 to 12. Fig. 10 shows a schematic structural view of a first connection steel cylinder 3 of some embodiments of a transmission line assembled miniature pile foundation according to the present application. Fig. 11 shows a top view of a first connection steel cylinder 3 of some embodiments of a transmission line assembled miniature pile foundation according to the present application. Fig. 12 shows a cross-sectional view of a first connection steel cylinder 3 of some embodiments of a transmission line assembled miniature pile foundation according to the present application. As shown in fig. 10-12, the first connecting steel cylinder 3 may include a first connecting steel cylinder upper flange plate 3.1, a first connecting steel cylinder lower flange plate 3.2, a first connecting steel cylinder web plate 3.3, a first bolt 3.4 and a first anchoring steel bar 3.5. Wherein the first connecting steel cylinder web 3.3 may be used to provide a first pile installation pre-hole 2.1. The first bolts 3.4 and the first connecting steel cylinder web 3.3 can be welded on both sides. The first bolts 3.4 and the upper flange plate 3.1 of the first connecting steel cylinder can be in plug welding connection. The first bolts 3.4 and the first connecting steel cylinder lower flange plate 3.2 can be in plug welding connection. The first anchor bars 3.5 may be used to pre-embed the first connecting steel cylinder 3 in the first edge cap 2. The first connecting steel cylinder upper flange plate 3.1 can be used for providing a flat construction platform when the first connecting steel plates 8 are connected and providing transverse rigidity and strength of the first connecting steel cylinder 3. The first connecting steel cylinder lower flange plate 3.2 may be used to provide lateral stiffness and strength of the first connecting steel cylinder 3.
Specifically, the specific structure of the second connecting steel cylinder 13 and the technical effects thereof may refer to the first connecting steel cylinder 3 in the above embodiment, the specific structure of the third connecting steel cylinder 14 and the technical effects thereof may refer to the first connecting steel cylinder 3 in the above embodiment, and the specific structure of the fourth connecting steel cylinder 15 and the technical effects thereof may refer to the first connecting steel cylinder 3 in the above embodiment, which will not be described herein.
Therefore, the connecting steel cylinder designed by the invention has the same height as the thickness of the bearing platform, and is simple in structure and easy to manufacture. Meanwhile, when the bearing platform is prefabricated, the bearing platform can serve as a template and can also serve as a stressed connecting piece of the bearing platform and the pile, and positioning is convenient.
Alternatively, the first micro pile 4 included in the transmission line assembled micro pile foundation may be further described with reference to fig. 13 to 15. Fig. 13 shows a schematic structural view of a first micro pile 4 according to some embodiments of the transmission line assembled micro pile foundation according to the present application.
Fig. 14 shows a schematic structural view of a first micro pile pre-buried bolt anchor 4.1.1 according to some embodiments of the transmission line assembled micro pile foundation according to the present application. Fig. 15 shows a schematic structural view of the bottom end of the first micro pile 4 according to some embodiments of the transmission line assembled micro pile foundation according to the present application. As shown in fig. 13-15, the first micro pile 4 may include a first micro pile pre-buried bolt 4.1 and a first pile tip 4.2. The first micro pile 4 may be fixedly connected with the first connection steel plate 8 through a first micro pile embedded bolt 4.1 included in the first micro pile 4. The first pile end 4.2 can comprise a first pile head embedded bolt anchor bar 4.1.1 and a bottom end. The first micro pile embedded bolt 4.1 is fixed in the first micro pile 4 through a first pile head embedded bolt anchor bar 4.1.1 included in the first pile head 4.2. Here, the bottom tip may be, but is not limited to, at least one of a pointed bottom tip 4.2.1, a flat bottom tip 4.2.2 or a cross-shaped tip 4.2.3.
Specifically, the pointed bottom end 4.2.1 can reduce the resistance of the micro pile in the pressed soil, and is mainly used for pressing the pile in hard soil or soil containing stones. The flat bottom end 4.2.2 is suitable for pile pressing in soft soil and medium-hardness soil. The cross-shaped end 4.2.3 can reduce pile pressing resistance and can also improve pile end bearing capacity.
Here, the specific structure of the second micro pile 10 and the technical effects thereof may refer to the first micro pile 4 in the above embodiment, the specific structure of the third micro pile 11 and the technical effects thereof may refer to the first micro pile 4 in the above embodiment, and the specific structure of the fourth micro pile 12 and the technical effects thereof may refer to the first micro pile 4 in the above embodiment, which will not be described herein.
The above embodiments of the present application have the advantage that the efficiency of transporting and installing the assembled type mini pile foundation can be improved by the assembled type mini pile foundation of the power transmission line according to some embodiments of the present application. In particular, the efficiency of the transportation and installation of the fabricated micro pile foundation is reduced because the fabricated foundation has been applied, but the prefabricated parts are bulky and difficult to transport and install. Based on the above, the transmission line assembled micro pile foundation according to some embodiments of the present application includes a middle bearing platform, a first edge bearing platform, a second edge bearing platform, a prestressed tendon, an anchor assembly, an anchor pad assembly, a first micro pile, a second micro pile, a third micro pile, a fourth micro pile, a first connection steel cylinder, a second connection steel cylinder, a third connection steel cylinder, a fourth connection steel cylinder, a first connection steel plate, a second connection steel plate, a third connection steel plate, and a fourth connection steel plate. Therefore, the assembled miniature pile foundation of the transmission line can adopt full mechanical connection without on-site wet operation, thereby obviously shortening the construction period and improving the construction efficiency. The prefabricated components are produced in factories, the quality control is more strict and reliable, the uncertainty of site construction is avoided, and the pile forming quality is ensured. The positions of the bolts and the pile holes of the prefabricated finished products are accurate, and the finished products are high in quality. The method does not need on-site wet operation, obviously reduces the pollution to the environment in the construction process, and is beneficial to the environmental protection requirement. The construction machine adopts a miniaturized design and a portable construction machine, improves the safety of construction, and is especially used in complex environmental conditions such as narrow spaces, slopes, mountainous areas and the like. The foundation member is miniaturized and is in block design, so that the transportation and the field installation are facilitated, and the development trend of the full-mechanized construction of the power transmission line engineering is adapted. The assembled miniature pile foundation has good bearing performance under vertical and horizontal load working conditions, a load transmission path is clear, stress distribution is reasonable, and the assembled miniature pile foundation has stronger adaptability and structural stability.
Fig. 16 illustrates a flow chart 1600 of some embodiments of a construction method for a transmission line assembled micro pile foundation according to the present application. As shown in fig. 16, the construction method for the transmission line assembled micro pile foundation is applied to some embodiments of the transmission line assembled micro pile foundation, and includes:
And 1601, positioning the foundation construction position to obtain a positioning point.
In some embodiments, an execution body of a construction method for an electric transmission line assembled miniature pile foundation can position a foundation construction position to obtain a positioning point. The foundation construction position can be positioned through a preset positioning method, and a positioning point is obtained.
As an example, the above-mentioned preset positioning method may be an engineering measurement positioning method.
In step 1602, the joint surfaces of the intermediate platform and the first edge platform are brushed.
In some embodiments, the executing body may brush the adhesive on the joint surface of the intermediate bearing platform and the first edge bearing platform. Wherein, glue can be brushed at the joint surface of the middle bearing platform and the first edge bearing platform.
And step 1603, brushing glue on the splicing surfaces of the middle bearing platform and the second edge bearing platform.
In some embodiments, the executing body may brush glue on the joint surface of the middle bearing platform and the second edge bearing platform. Wherein glue can be brushed at the joint surface of the middle bearing platform and the second edge bearing platform.
Step 1604, leveling the site of the construction site.
In some embodiments, the execution body may perform leveling treatment on a site of a construction site. Wherein, leveling equipment can be used for leveling the site of the construction site.
By way of example, the grading apparatus may be, but is not limited to, at least one of a bulldozer or a grader.
In step 1605, a layer of grouting material is applied to the surface of the field after the leveling treatment.
In some embodiments, the executing body may thin-coat a grouting material on the surface of the field after the leveling treatment. Wherein, a layer of grouting material can be coated on the surface of the field after the leveling treatment. Thus, the surface of the ground can be leveled and the bearing platform can be well contacted with the surface.
In step 1606, in response to determining that the grouting material is not dry, the intermediate cap, the first edge cap, and the second edge cap are lifted to the anchor point using the small-sized pile lifting machine such that the first shear key included in the first edge cap is in reliable contact with the first keyway of the intermediate cap and the second shear key included in the second edge cap is in reliable contact with the second keyway of the intermediate cap.
In some embodiments, the executing body may hoist the intermediate table, the first edge table, and the second edge table to the positioning points using a small-sized hoist in response to determining that the grouting material is not dry, so that a first shear key included in the first edge table is reliably contacted with a first key groove of the intermediate table, and a second shear key included in the second edge table is reliably contacted with a second key groove of the intermediate table. And in response to the determination that the grouting material is not dry, hoisting the middle bearing platform, the first edge bearing platform and the second edge bearing platform to positioning points by using a small pile hoist so that a first shear key included in the first edge bearing platform is reliably contacted with a first key groove of the middle bearing platform and a second shear key included in the second edge bearing platform is reliably contacted with a second key groove of the middle bearing platform.
Step 1607, penetrating the prestressed tendons into and through the middle bearing platform from the first edge bearing platform prestressed pipeline comprised by the first edge bearing platform and out from the second edge bearing platform prestressed pipeline comprised by the second edge bearing platform.
In some embodiments, the executing body may penetrate the tendon from a first edge cap prestressed pipe included in the first edge cap, through the intermediate cap, and out from a second edge cap prestressed pipe included in the second edge cap. The prestressed tendons can penetrate through a first edge bearing platform prestressed pipeline comprising the first edge bearing platform, penetrate through the middle bearing platform and penetrate out of a second edge bearing platform prestressed pipeline comprising the second edge bearing platform.
Optionally, the execution body may further penetrate the tendon from a second edge cap prestressed pipe included in the second edge cap, through the intermediate cap, and out from a first edge cap prestressed pipe included in the first edge cap.
And 1608, pre-stressing the pre-stressing tendons through a pre-stressing pump.
In some embodiments, the executing body may apply the prestressing force to the prestressing tendons through a prestressing pump. Wherein, can exert the prestressing force to the said prestressing tendons through the prestressing force pump.
Step 1609, anchoring the tendon by an anchor assembly and an anchor pad assembly.
In some embodiments, the execution body may anchor the tendon by an anchor assembly and an anchor pad assembly. Wherein, can anchor through ground tackle subassembly and anchor pad subassembly to prestressing tendons.
At step 1610, a first micro pile is installed in a first edge cap.
In some embodiments, the executing body may install a first micro pile in the first edge table. The first micro pile can adopt a single pile, two-section piles or three-section piles according to pile length, and the type of the first micro pile can be reinforced concrete piles or steel pipe piles.
In some optional implementations of some embodiments, the foregoing implementation body may install a first micro pile in the first edge cap, and the method may include the following steps:
And the first step is that the pile pressing frame is used for pressing the first micro pile in a first pile installation preformed hole formed in the first edge bearing platform. Wherein, the screw rod of the first edge bearing platform can be used for fixing the pile pressing frame so as to press the pile in the first pile installation preformed hole. In practice, the first micro pile can be directly subjected to static pile pressing by adopting a small pile pressing machine. The pile pressing method also comprises hammering pile sinking, and is not limited to static pressure pile sinking.
And secondly, in response to determining that the first micro pile meets a preset condition, detaching the pile pressing frame. The preset condition may be that the first micro pile is pressed to the target position.
As an example, the target position may be that the first micro pile is flush with the top of the first edge cap.
And thirdly, filling micro-expansion fine stone concrete in a first pile installation preformed hole formed in the first edge bearing platform.
And fourthly, fixedly connecting the first connecting steel plate with a first bolt included in the first connecting steel cylinder and a first micro pile embedded bolt included in the first micro pile respectively. The screw rod on the top surface of the first edge bearing platform can penetrate through the corresponding bolt hole on the first connecting steel plate to be connected with the nut, and the first connecting steel plate and the first micro pile embedded bolt in the first micro pile are connected and fixed through the nut, so that the connection and fixation of the micro pile and the bearing platform are realized.
At step 1611, a second micropile is installed in the first edge cap.
In some embodiments, the executing body may install a second micro pile in the first edge table. The specific implementation manner of installing the second micro pile in the first edge support platform and the technical effects thereof may refer to step 1610 in the above embodiment, which is not described herein again. The second micro pile can adopt a single pile, two-section piles or three-section piles according to the pile length, and the type of the second micro pile can be reinforced concrete piles or steel pipe piles.
At step 1612, a third micro pile is mounted in the second edge cap.
In some embodiments, the executing body may install a third micro pile in the second edge cap. The specific implementation manner of the third micro pile to be mounted in the second edge support platform and the technical effects thereof may refer to step 1610 in the above embodiment, which is not described herein again. The third miniature pile can adopt a single pile, two-section piles or three-section piles according to the pile length, and the miniature pile type of the third miniature pile can be reinforced concrete piles or steel pipe piles.
And 1613, installing the fourth micro pile in the second edge bearing platform.
In some embodiments, the executing body may install a fourth micro pile in the second edge cap. The specific implementation manner of installing the fourth micro pile in the second edge support platform and the technical effects thereof may refer to step 1610 in the above embodiment, which is not described herein again. The fourth miniature pile can adopt a single pile, two-section piles or three-section piles according to the pile length, and the miniature pile type of the fourth miniature pile can be reinforced concrete piles or steel pipe piles.
Therefore, the construction method and the construction process of the assembled miniature pile foundation can adopt full mechanical connection, field wet operation is avoided, the construction period is shortened, and the construction efficiency is improved.
The technical features of the above-described embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above-described embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the description.
Although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that the foregoing embodiments may be modified or equivalents may be substituted for some of the features thereof, and that the modifications or substitutions do not depart from the spirit and scope of the embodiments.

Claims (5)

1. The transmission line assembled micro pile foundation is characterized by comprising a middle bearing platform, a first edge bearing platform, a second edge bearing platform, a prestressed rib, an anchor assembly, an anchor pad assembly, a first micro pile, a second micro pile, a third micro pile, a fourth micro pile, a first connecting steel cylinder, a second connecting steel cylinder, a third connecting steel cylinder, a fourth connecting steel cylinder, a first connecting steel plate, a second connecting steel plate, a third connecting steel plate and a fourth connecting steel plate, wherein,
The middle bearing platform is fixedly connected with the first edge bearing platform through the prestressed tendons;
The middle bearing platform is fixedly connected with the second edge bearing platform through the prestressed tendons;
The prestress rib is fixedly connected with the first edge bearing platform through the anchor assembly and the anchor pad assembly;
The prestress rib is fixedly connected with the second edge bearing platform through the anchor assembly and the anchor pad assembly;
the first edge bearing platform is fixedly connected with the first micro pile through the first connecting steel cylinder and the first connecting steel plate;
the first edge bearing platform is fixedly connected with the second micro pile through the second connecting steel cylinder and the second connecting steel plate;
the second edge bearing platform is fixedly connected with the third micro pile through the third connecting steel cylinder and the third connecting steel plate;
the second edge bearing platform is fixedly connected with the fourth micro pile through the fourth connecting steel cylinder and the fourth connecting steel plate;
the first connecting steel cylinder comprises a first connecting steel cylinder upper flange plate, a first connecting steel cylinder lower flange plate, a first connecting steel cylinder web plate, a first bolt and a first anchoring steel bar, wherein the first connecting steel cylinder upper flange plate is arranged at the top of the first connecting steel cylinder web plate, and the first connecting steel cylinder lower flange plate is arranged at the bottom of the first connecting steel cylinder web plate;
The first connecting steel cylinder web plate is used for providing a first pile installation preformed hole;
the first bolt is welded with the side wall of the first connecting steel cylinder web in a double-sided manner;
the top of the first bolt penetrates out of the upper flange plate of the first connecting steel cylinder, and the first bolt is in plug welding connection with the upper flange plate of the first connecting steel cylinder;
the first bolt is in plug welding connection with the lower flange plate of the first connecting steel cylinder;
The first anchoring steel bars are arranged on the side wall of the web plate of the first connecting steel cylinder and are used for embedding the first connecting steel cylinder in the first edge bearing platform;
the upper flange plate of the first connecting steel cylinder is used for providing a flat construction platform when the first connecting steel plates are connected and providing transverse rigidity and strength of the first connecting steel cylinder;
the first connecting steel cylinder lower flange plate is used for providing transverse rigidity and strength of the first connecting steel cylinder.
2. The transmission line assembled micro pile foundation according to claim 1, wherein the intermediate cap comprises a main column, an intermediate cap prestressed pipe, a first key slot and a second key slot, wherein,
A connecting bolt is embedded in the main column;
The main column is fixedly connected with the pedal plate through a connecting bolt;
the middle bearing platform prestressed pipeline is used for penetrating pipes of the prestressed tendons;
the first key groove is used for fixing the first edge bearing platform;
the second key groove is used for fixing the second edge bearing platform.
3. The transmission line assembled micro pile foundation according to claim 2, wherein the first edge cap comprises a first pile-mounting preformed hole, a second pile-mounting preformed hole, a first edge cap pre-stress pipe and a first shear key, wherein,
The first pile installation preformed hole is used for installing a first micro pile, wherein the diameter of the first pile installation preformed hole is larger than that of the first micro pile, and a gap between the first pile installation preformed hole and the first micro pile is in tight connection through grouting;
the second pile installation preformed hole is used for installing a second micro pile, wherein the diameter of the second pile installation preformed hole is larger than that of the second micro pile, and a gap between the second pile installation preformed hole and the second micro pile is in tight connection through grouting;
the first edge bearing platform prestressed pipeline is used for penetrating a pipe of the prestressed tendon;
The first edge bearing platform is fixedly installed on a first key groove included in the middle bearing platform through the first shear key.
4. A construction method for an assembled miniature pile foundation of a power transmission line, which is applied to the assembled miniature pile foundation of the power transmission line according to any one of claims 1-3, and comprises the following steps:
Positioning the foundation construction position to obtain a positioning point;
brushing glue on the splicing surface of the middle bearing platform and the first edge bearing platform;
Brushing glue on the splicing surfaces of the middle bearing platform and the second edge bearing platform;
Leveling a site of a construction site;
Coating a layer of grouting material on the surface of the field after the leveling treatment;
In response to determining that grouting material is not dry, hoisting the middle bearing platform, the first edge bearing platform and the second edge bearing platform to positioning points by using a small pile hoist so that a first shear key included in the first edge bearing platform is reliably contacted with a first key groove of the middle bearing platform and a second shear key included in the second edge bearing platform is reliably contacted with a second key groove of the middle bearing platform;
penetrating a prestressed tendon from a first edge bearing platform prestressed pipeline comprising the first edge bearing platform, penetrating the prestressed tendon through the middle bearing platform and penetrating the prestressed tendon from a second edge bearing platform prestressed pipeline comprising the second edge bearing platform;
the prestress is applied to the prestress rib through a prestress pump;
The prestressed tendons are anchored through an anchor assembly and an anchor pad assembly;
installing a first micro pile in the first edge bearing platform;
Installing a second micro pile in the first edge bearing platform;
Installing a third micro pile in the second edge bearing platform;
And installing a fourth micro pile in the second edge bearing platform.
5. The construction method for an electric transmission line assembled micro pile foundation according to claim 4, wherein installing a first micro pile in the first edge cap comprises:
Pile pressing is carried out on the first miniature pile in a first pile installation preformed hole included in the first edge bearing platform through a pile pressing frame;
in response to determining that the first micro pile meets a preset condition, unloading the pile pressing frame;
filling micro-expansion fine stone concrete in a first pile installation preformed hole of the first edge bearing platform;
and the first connecting steel plate is fixedly connected with a first bolt included in the first connecting steel cylinder and a first micro pile embedded bolt included in the first micro pile respectively.
CN202510251219.7A 2025-03-04 2025-03-04 Prefabricated micropile foundations and construction methods for power transmission lines Active CN119824944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202510251219.7A CN119824944B (en) 2025-03-04 2025-03-04 Prefabricated micropile foundations and construction methods for power transmission lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202510251219.7A CN119824944B (en) 2025-03-04 2025-03-04 Prefabricated micropile foundations and construction methods for power transmission lines

Publications (2)

Publication Number Publication Date
CN119824944A CN119824944A (en) 2025-04-15
CN119824944B true CN119824944B (en) 2025-11-04

Family

ID=95296133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202510251219.7A Active CN119824944B (en) 2025-03-04 2025-03-04 Prefabricated micropile foundations and construction methods for power transmission lines

Country Status (1)

Country Link
CN (1) CN119824944B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209669909U (en) * 2019-02-25 2019-11-22 北京恒华伟业科技股份有限公司 A kind of assembled miniature screw thread post grouting pile basis
CN119287967A (en) * 2024-10-21 2025-01-10 国网河南省电力公司经济技术研究院 An assembled micro pile foundation for power transmission line engineering

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7533505B2 (en) * 2003-01-06 2009-05-19 Henderson Allan P Pile anchor foundation
KR100991341B1 (en) * 2008-05-14 2010-11-01 주식회사 중앙씨앤씨 Precast Foundation and Connection Structure of Pile and Precast Foundation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209669909U (en) * 2019-02-25 2019-11-22 北京恒华伟业科技股份有限公司 A kind of assembled miniature screw thread post grouting pile basis
CN119287967A (en) * 2024-10-21 2025-01-10 国网河南省电力公司经济技术研究院 An assembled micro pile foundation for power transmission line engineering

Also Published As

Publication number Publication date
CN119824944A (en) 2025-04-15

Similar Documents

Publication Publication Date Title
KR100899372B1 (en) Fixing method of new micropile head to existing concrete foundation structure and reinforcement method of foundation and column structure using the same
CN117758601B (en) Assembled pier without bearing platform for high-intensity areas and construction method
CN110777635A (en) Side arch rib construction method and side arch rib
CN114818062B (en) Soft soil foundation bridge pile foundation deviation rectifying method, device and storage medium
CN115030210A (en) Fabricated anti-settling beam slab foundation structure and construction method thereof
CN110206135B (en) A stone masonry house foundation reinforcement structure and method
JP2009167592A (en) Joining method of PC beam and steel beam
US20080181729A1 (en) Deep Foundation Construction Bracket and System
CN103233537A (en) Heavy-load superimposed overhead terrace and construction method
KR101919608B1 (en) Ground reinforcement method using jacked pile and grouting
CN119824944A (en) Assembled miniature pile foundation of power transmission line and construction method
CN119041473A (en) Assembled miniature pile foundation of transmission line of two upper and lower piecing together
CN119287967A (en) An assembled micro pile foundation for power transmission line engineering
CN217758906U (en) Assembled anti-settlement beam slab foundation structure
CN117947813A (en) A prestressed cantilever retaining wall structure and construction method thereof
CN215715241U (en) Novel post-tensioned prestressing rectangular cast-in-place pile
CN108797586A (en) A kind of construction method of anchor jacked pile
CN213805359U (en) Assembled frame prestressed anchorage cable supporting construction
CN211257110U (en) Synchronous lifting and deviation rectifying structure for existing sinking old building
RU85499U1 (en) STRENGTHENING STRENGTH PLATE BASE
CN217518279U (en) Prestressing force reinforced structure
JP4968676B2 (en) Pile foundation reinforcement method using increased piles
JP3407168B2 (en) Foundation of new building using existing pile foundation
CN113614313A (en) Foundation for a tower construction and method for establishing a foundation for a tower construction
CN223984113U (en) Connection node structure between steel-concrete composite column and foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant