CN119266728A - A drilling device for geological survey - Google Patents

A drilling device for geological survey Download PDF

Info

Publication number
CN119266728A
CN119266728A CN202411793140.9A CN202411793140A CN119266728A CN 119266728 A CN119266728 A CN 119266728A CN 202411793140 A CN202411793140 A CN 202411793140A CN 119266728 A CN119266728 A CN 119266728A
Authority
CN
China
Prior art keywords
correction
frame
fixedly mounted
mounting
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202411793140.9A
Other languages
Chinese (zh)
Other versions
CN119266728B (en
Inventor
万卜源
赵晓鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Wule Union Network Technology Co ltd
Original Assignee
Yantai Wule Union Network Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Wule Union Network Technology Co ltd filed Critical Yantai Wule Union Network Technology Co ltd
Priority to CN202411793140.9A priority Critical patent/CN119266728B/en
Publication of CN119266728A publication Critical patent/CN119266728A/en
Application granted granted Critical
Publication of CN119266728B publication Critical patent/CN119266728B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V9/00—Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B12/00—Accessories for drilling tools
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00—Supports for the drilling machine, e.g. derricks or masts
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/24—Guiding or centralising devices for drilling rods or pipes
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00—Special methods or apparatus for drilling
    • E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • G—PHYSICS
    • G08—SIGNALLING
    • G08B—SIGNALLING SYSTEMS, e.g. PERSONAL CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18—Status alarms
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30—Assessment of water resources

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)

Abstract

本发明涉及地质勘测技术领域,具体为一种地质勘测用钻孔装置,包括底座、井口板、动力装置、钻塔、主动钻杆和岩心管,所述井口板安装在底座的内部,所述动力装置安装在底座的上表面,所述钻塔固定安装在底座上,所述岩心管安装在主动钻杆底部,所述底座的侧边对称安装有第一连接件,所述第一连接件远离底座的一端固定安装有液压顶,所述第一连接件的上表面设置有第一校正组件,所述钻塔的正面设置有第二校正组件,该地质勘测用钻孔装置,通过警报件可以在主动钻杆发生弯曲时进行报警,配合纠偏组件能够及时的完成纠偏校正,能够保障后续的打孔精度,配合对中组件能够对纠偏校正进行检验,再一次保障纠偏校正的精度,进一步提高打孔精度。

The present invention relates to the technical field of geological survey, and specifically to a drilling device for geological survey, comprising a base, a wellhead plate, a power device, a drilling tower, an active drill rod and a core tube, wherein the wellhead plate is installed inside the base, the power device is installed on the upper surface of the base, the drilling tower is fixedly installed on the base, and the core tube is installed at the bottom of the active drill rod. A first connecting piece is symmetrically installed on the side of the base, a hydraulic jack is fixedly installed on the end of the first connecting piece away from the base, a first correction component is arranged on the upper surface of the first connecting piece, and a second correction component is arranged on the front of the drilling tower. The drilling device for geological survey can alarm when the active drill rod is bent through an alarm component, and can complete the correction in time in cooperation with the correction component, so as to ensure the subsequent drilling accuracy, and can check the correction in cooperation with the centering component, so as to ensure the accuracy of the correction again and further improve the drilling accuracy.

Description

Drilling device for geological survey
Technical Field
The invention relates to the technical field of geological survey, in particular to a drilling device for geological survey.
Background
Geological surveys, known from existing vocabulary entries, have the main purposes of finding mineral resources, assessing the risk of geological disasters, exploring the internal structure of the earth, etc. Currently, there are many methods and means for geological surveying, such as geological surveys, geological measurements, geological drilling, and the like.
For geological drilling, common equipment comprises a drilling device, wherein during the use process of the drilling device, the correction of a drilling machine in the drilling device is very important, particularly in deep hole construction, the drilling curvature is one of six final hole indexes of drilling, and generally no more than two degrees are specified, the correction of the drilling machine directly influences the drilling curvature, the drilling machine can perform drilling after correction so as to meet the requirement of drilling curvature, after the drilling machine is moved to a drilling position, the hole of a wellhead plate is aligned to a required drilling position, four hydraulic jacks are supported to the ground, and the drilling tower is erected and locked.
However, for many operators who drill holes, there is a wrong area when correcting the drill holes, namely, the correction base is selected when correcting the drill machine, but the active drill rod is actually required to be corrected, only the active drill rod is vertical to the ground, and the correction is completed, but the base is parallel to the ground, only preliminary correction can be calculated, because the vertical base of the vertical shaft of the drill machine is difficult to ensure, and if the drilling tower of some drill machines is not in line with the vertical shaft, the situation of unsmooth drilling can occur along with deepening of the drill holes, and then the drill rod is scratched and rubbed with the sleeve, so that the drilling operation is stopped.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a drilling device for geological survey, which solves the problems in the background art.
The drilling device for geological survey comprises a base, a wellhead plate, a power device, a drilling tower, a driving drill rod and a core barrel, wherein the wellhead plate is arranged in the base, the power device is arranged on the upper surface of the base, the drilling tower is fixedly arranged on the base, the core barrel is arranged at the bottom of the driving drill rod, first connecting pieces are symmetrically arranged on the side edges of the base, a hydraulic jack is fixedly arranged at one end, far away from the base, of each first connecting piece, a first correction component is arranged on the upper surface of each first connecting piece, a second correction component is arranged on the front face of the drilling tower, an alarm piece is arranged on each correction component, a centering component is arranged below each correction component, and a correction component is arranged on each centering component.
Optionally, the first correction component comprises a first correction piece, the first correction piece is installed on the upper surface of the first connecting piece, an installation groove is formed in the first correction piece, a bidirectional hydraulic rod is fixedly installed in the installation groove, a first installation piece is fixedly installed on an output shaft of the bidirectional hydraulic rod, a first driving rod is movably installed on the first installation piece far away from the wellhead plate, a second driving rod is movably installed at one end, far away from the first installation piece, of the first driving rod, the upper end of the second driving rod is installed on the first installation piece at the other side, and a second correction piece is movably installed at the bottom of the second driving rod;
The upper surface of the second correcting piece is fixedly provided with a vertical plate, the included angle between the vertical plate and the second correcting piece is ninety degrees, the vertical plate is positioned below the mounting groove, the width of the vertical plate is smaller than that of the mounting groove, one side of the vertical plate is fixedly provided with a pointer, the upper surface of the second correcting piece is fixedly connected with an elastic column, the other end of the elastic column is fixedly connected with the bottom of the first correcting piece, the included angle between the elastic column and the second correcting piece is ninety degrees, and the included angle between the elastic column and the first correcting piece is ninety degrees;
The side symmetry fixed mounting of second correction spare has the anti-sinking board, the upper surface of anti-sinking board is in same level with the upper surface of second correction spare, the thickness of anti-sinking board is the third of second correction spare thickness, the standing groove has been seted up to the inside of first correction spare, the lower surface of first correction spare is parallel with the upper surface of base.
Optionally, the second correction component comprises a mounting frame, the mounting frame is fixedly mounted on the front surface of the drilling tower, one end of the mounting frame is fixedly provided with a servo motor, an output shaft of the servo motor is fixedly provided with a bidirectional screw rod, the bidirectional screw rod is movably mounted on the inner side of the mounting frame, and screw sleeves are spirally connected to two sides of the outer surface of the bidirectional screw rod;
A second connecting piece is fixedly arranged on the threaded sleeve close to one side of the servo motor, a first mounting frame is fixedly arranged at one end, far away from the bidirectional screw rod, of the second connecting piece, a second mounting frame is fixedly arranged at one side, far away from the second connecting piece, of the first mounting frame, a first sliding piece is connected to the upper sides of the first mounting frame and the second mounting frame in a sliding mode, a first positioning bolt is connected to the inner side of the first sliding piece in a threaded mode, a second mounting piece is fixedly arranged at the bottom of the first sliding piece, and a level bar is movably arranged at the inner side of the second mounting piece;
The lower sides of the first installation frame and the second installation frame are both connected with a second sliding part in a sliding mode, and the side edges of the second sliding part are symmetrically connected with second positioning bolts in a threaded mode.
Optionally, the width of alert piece inner chamber is greater than the width of initiative drilling rod, alert piece is in the top of first slider, alert piece is fixed through the compaction of first slider with first positioning bolt nut.
Optionally, the centering component comprises a driving frame, the driving frame is fixedly arranged at the bottom of the screw sleeve, a bearing frame is fixedly arranged at the other end of the driving frame, a first adjusting arm is movably arranged in the bearing frame, a second adjusting arm is movably arranged in the middle of the lower surface of the first adjusting arm, a fixed frame is fixedly arranged at one ends of the first adjusting arm and the second adjusting arm, which are close to the wellhead plate, and a centering roller is movably arranged at the inner side of the fixed frame;
The upper surfaces of one ends, far away from the centering roller, of the first adjusting arm and the second adjusting arm are fixedly provided with studs, the outer surfaces of the studs are in threaded connection with nuts, the upper surface of the bearing frame is provided with a path groove, and the path groove is matched with the moving path of the studs when the first adjusting arm and the second adjusting arm are driven;
The nut is positioned above the path groove, and the width of the nut is larger than the width of the path groove.
Optionally, the deviation rectifying component comprises a central column, the central column is fixedly installed in the middle of the upper surface of the bearing frame, and a deviation rectifying piece is arranged on the outer surface of the central column.
Optionally, the center of the center column and the center of the round hole on the wellhead plate are positioned on the same straight line, and a rubber pad is arranged at the bottom of the bearing frame.
Optionally, the first mounting frame is arc-shaped, and a distance between the bottom of the level bar and the top of the second sliding piece is five to ten centimeters.
Optionally, the top fixed mounting of swivel nut has the stopper, the spout with stopper looks adaptation is seted up to the inboard of mounting bracket.
The invention provides a drilling device for geological survey, which has the following beneficial effects:
1. This drilling equipment for geological survey can provide visual regulation method to base and ground through first correction subassembly to designed standard correction scheme, can effectually improve preliminary correction's precision, utilize the design that the second correction piece is wide simultaneously can reduce the influence of subsidence to the correction, utilize the holistic gravity direction of anti-settling plate dispersion devices, can further reduce the influence of subsidence to the correction, and utilize mutually supporting not only can provide the standard for the correction between perpendicular board, pointer and the elastic column, can also constantly adjust with this as the standard when receiving the subsidence influence, improve the precision of calibration once more.
2. This drilling equipment for geological survey can make the initiative drilling rod perpendicular with ground through the second correction subassembly, further improves the correction effect for punching the precision higher, and make centering subassembly intervene, centering and direction the initiative drilling rod, again provide the guarantee for improving punching the precision, and centering subassembly can adapt to the not unidimensional initiative drilling rod in a flexible way, has improved the commonality of the device.
3. This drilling equipment for geological survey can report to the police when the initiative drilling rod takes place to bend through the alarm, and the cooperation is rectified the completion that the subassembly can be timely and is rectified the correction, can ensure subsequent punching precision, and the cooperation is centered the subassembly and can be checked rectifying the correction, again ensures rectifying the correction's precision, further improves punching precision.
Drawings
FIG. 1 is a schematic side view of the present invention;
FIG. 2 is a schematic view of a first calibration assembly according to the present invention;
FIG. 3 is a schematic view of a vertical plate of the present invention;
FIG. 4 is a schematic diagram of the position relationship between the second correction assembly and the driving drill rod according to the present invention;
FIG. 5 is a schematic view of a second correction assembly of the present invention;
FIG. 6 is a schematic view of a part of the alarm and the second correction assembly according to the present invention;
FIG. 7 is a schematic view showing a perspective view of the first slider, first positioning bolt and second mounting member of the present invention;
FIG. 8 is a schematic view of a centering assembly and a correction assembly of the present invention;
fig. 9 is a schematic view showing a partial specific structure of the centering assembly of the present invention.
In the figure, 1, a base, 11, a wellhead plate, 12, a power device, 13, a drilling tower, 14, a driving drill rod, 15, a core barrel, 16, a first connecting piece, 17, a hydraulic jack, 2, a first correcting piece, 21, a mounting groove, 22, a bidirectional hydraulic rod, 23, a first mounting piece, 24, a first driving rod, 25, a second driving rod, 26, a second correcting piece, 27, a vertical plate, 28, a pointer, 29, an elastic column, 210, an anti-sinking plate, 211, a placing groove, 3, a mounting rack, 31, a servo motor, 32, a bidirectional screw rod, 33, a screw sleeve, 34, a limiting block, 35, a second connecting piece, 36, a first mounting frame, 37, a second mounting frame, 38, a first sliding piece, 39, a first positioning bolt, 310, a second mounting piece, 311, a level gauge, 312, a second sliding piece, 313, a second sliding piece, a second bolt, 4, an alarm piece, 5, a driving frame, 51, a carrying frame, 52, a first adjusting arm, 53, a second adjusting frame, 54, a centering frame, 55, a fixing roller, a bolt, a screw sleeve, a 34, a limiting block, a 35, a second connecting piece, a correction bolt, a center bolt, 61, a stud, a bolt, and a guide rail.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Example 1:
Referring to fig. 1 to 3, the invention provides a technical scheme that a drilling device for geological survey comprises a base 1, a wellhead plate 11, a power device 12, a drilling tower 13, an active drilling rod 14 and a core barrel 15, wherein the wellhead plate 11 is arranged in the base 1, the power device 12 is arranged on the upper surface of the base 1, the drilling tower 13 is fixedly arranged on the base 1, the core barrel 15 is arranged at the bottom of the active drilling rod 14, first connecting pieces 16 are symmetrically arranged on the side edges of the base 1, a hydraulic jack 17 is fixedly arranged at one end of the first connecting pieces 16 far away from the base 1, a first correction component is arranged on the upper surface of the first connecting pieces 16, a second correction component is arranged on the front surface of the drilling tower 13, an alarm piece 4 is arranged on the correction component, a centering component is arranged below the correction component, and a correction component is arranged on the centering component;
The first correction component comprises a first correction piece 2, the first correction piece 2 is arranged on the upper surface of a first connecting piece 16, a mounting groove 21 is formed in the first correction piece 2, a bidirectional hydraulic rod 22 is fixedly arranged in the mounting groove 21, a first mounting piece 23 is fixedly arranged on an output shaft of the bidirectional hydraulic rod 22, a first driving rod 24 is movably arranged on the first mounting piece 23 far away from a wellhead plate 11, a second driving rod 25 is movably arranged at one end of the first driving rod 24 far away from the first mounting piece 23, the upper end of the second driving rod 25 is arranged on the first mounting piece 23 at the other side, and a second correction piece 26 is movably arranged at the bottom of the second driving rod 25;
The upper surface of the second correcting piece 26 is fixedly provided with a vertical plate 27, an included angle between the vertical plate 27 and the second correcting piece 26 is ninety degrees, the vertical plate 27 is positioned below the mounting groove 21, the width of the vertical plate 27 is smaller than that of the mounting groove 21, one side of the vertical plate 27 is fixedly provided with a pointer 28, the upper surface of the second correcting piece 26 is fixedly connected with an elastic column 29, the other end of the elastic column 29 is fixedly connected with the bottom of the first correcting piece 2, the included angle between the elastic column 29 and the second correcting piece 26 is ninety degrees, and the included angle between the elastic column 29 and the first correcting piece 2 is ninety degrees;
The side symmetry fixed mounting of second correction piece 26 has the anti-sinking board 210, and the upper surface of anti-sinking board 210 is in same level with the upper surface of second correction piece 26, and the thickness of anti-sinking board 210 is the third of second correction piece 26 thickness, and standing groove 211 has been seted up to the inside of first correction piece 2, and the lower surface of first correction piece 2 is parallel with the upper surface of base 1.
When the drilling machine moves to a drilling position, the holes of the wellhead plate 11 are aligned to the required drilling position, then four hydraulic jacks 17 are supported to the ground, the drilling tower 13 is vertically locked, and then preliminary correction is carried out, wherein the correction mode is that the base 1 is parallel to the ground, most staff judges through naked eyes, although the gap is not large, the drilling machine is not accurate enough, even when holes are drilled in places easy to subside, because the positions of the drilling tower 13 and the driving drilling rod 14 are influenced, the gravity center of the drilling machine is not in the middle, and the correction precision is influenced under the action of subsidence along with long-time stay of the drilling machine;
In the invention, the preliminary correction firstly needs to start the bidirectional hydraulic rod 22 to drive the first mounting piece 23, so that the first mounting piece 23 drives the first driving rod 24 and the second driving rod 25, the first driving rod 24 and the second driving rod 25 are utilized to drive the second correcting piece 26 to move downwards, so that the second correcting piece 26 contacts with the ground and is attached to the ground, and if the base 1 and the ground are not flat, the first correcting piece 2 and the second correcting piece 26 which are kept horizontal with the base 1 are not parallel;
At this time, the elastic column 29 is observed, the elastic column 29 is inclined due to the fact that the first correcting piece 2 is not parallel to the second correcting piece 26, at this time, the pointer 28 points to the center position of the diameter of the elastic column 29 by adjusting the base 1, meanwhile, whether the second correcting piece 26 is vertical to the elastic column 29 or not or whether the elastic column 29 is vertical to the first correcting piece 2 or not can be observed, if so, the preliminary correction is finished, and at this time, the base 1 is parallel to the ground, so that the accurate preliminary correction is realized;
In addition, the second correcting piece 26 is a wide plate, the tension between the second correcting piece 26 and the ground can be increased by utilizing the large-area contact of the second correcting piece 26 and the ground, and the influence of sedimentation can be reduced by matching with the support of the hydraulic jack 17, so that the influence of the sedimentation on the correction precision after preliminary correction is reduced;
When sedimentation occurs, the gravity of the whole device can be dispersed from the two sides of the second correcting piece 26 through the anti-sedimentation plate 210, so that the sedimentation amplitude is further reduced, the influence of sedimentation on the correction precision is reduced again, meanwhile, when sedimentation occurs, the sedimentation amplitude can be found more accurately than naked eyes through cooperation among the vertical plate 27, the pointer 28 and the elastic column 29, and timely correction is performed again through observing the inclination angle of the elastic column 29;
The first correcting element 2 can be used as a reference object for correction, the placing groove 211 arranged on the first correcting element can be used for placing a drill rod, and the first correcting element has a limiting effect, so that the first correcting element is safer under the condition of no limiting structure compared with the condition that the first correcting element is directly placed on the first connecting element 16.
Example 2:
Referring to fig. 4 to 7, the second correction component comprises a mounting frame 3, the mounting frame 3 is fixedly mounted on the front surface of a drilling tower 13, a servo motor 31 is fixedly mounted at one end of the mounting frame 3, a bidirectional screw rod 32 is fixedly mounted on an output shaft of the servo motor 31, the bidirectional screw rod 32 is movably mounted on the inner side of the mounting frame 3, screw sleeves 33 are spirally connected to two sides of the outer surface of the bidirectional screw rod 32, limiting blocks 34 are fixedly mounted on the top of the screw sleeves 33, and sliding grooves matched with the limiting blocks 34 are formed in the inner side of the mounting frame 3;
a second connecting piece 35 is fixedly arranged on the threaded sleeve 33 close to one side of the servo motor 31, a first mounting frame 36 is fixedly arranged at one end, far away from the bidirectional screw rod 32, of the second connecting piece 35, a second mounting frame 37 is fixedly arranged at one side, far away from the second connecting piece 35, of the first mounting frame 36, a first sliding piece 38 is slidably connected to the upper sides of the first mounting frame 36 and the second mounting frame 37, a first positioning bolt 39 is connected to the inner threads of the first sliding piece 38, a second mounting piece 310 is fixedly arranged at the bottom of the first sliding piece 38, and a level bar 311 is movably arranged at the inner side of the second mounting piece 310;
The lower sides of the first mounting frame 36 and the second mounting frame 37 are both in sliding connection with a second sliding piece 312, the side edges of the second sliding piece 312 are symmetrically in threaded connection with a second positioning bolt 313, the shape of the first mounting frame 36 is arc-shaped, and the distance between the bottom of the level bar 311 and the top of the second sliding piece 312 is five to ten centimeters.
Because it is difficult to ensure that the vertical shaft of the drilling machine is vertical to the base, the tower and the vertical shaft of some drilling machines are not on the same line, so that the situation of unsmooth tripping occurs along with deepening of drilling holes, and the drill rod scrapes the sleeve, so that the drilling operation is stopped;
At this time, the servo motor 31 needs to be started to drive the bidirectional screw rod 32 to rotate, the bidirectional screw rod 32 is used for driving the screw sleeve 33, when the screw sleeve 33 moves, the first mounting frame 36 moves along with the bidirectional screw rod, so that the two leveling bars 311 are close to the driving drill rod 14 and are positioned on two asymmetric sides of the driving drill rod 14, at this time, the leveling bars 311 need to be adjusted, so that air bubbles in the transverse direction of the leveling bars 311 are centered, and because the interval between the bottom of the leveling bars 311 and the top of the second sliding piece 312 is five to ten centimeters, the leveling bars 311 cannot be interfered by the second sliding piece 312 when being adjusted to rotate;
Then two second positioning bolts 313 need to be screwed down to fix the level 311, then the inclination angles of the driving drill rod 14 and the level 311 are observed, and the driving drill rod 14 is adjusted, so that the two asymmetric sides of the driving drill rod 14 are parallel to the level 311, and the driving drill rod 14 is vertical to the ground, and at the moment, the holes of Kong Caishi ninety degrees are drilled, so that the correction precision can be further improved.
Example 3:
referring to fig. 4 to 6, the width of the inner cavity of the alarm 4 is larger than the width of the driving drill rod 14, the alarm 4 is located above the first sliding member 38, and the alarm 4 is fixed by pressing the first sliding member 38 against the nut of the first positioning bolt 39.
On the basis of embodiment 2, when the correction of the active drill pipe 14 is completed, the first slider 38 mounted on the first mounting frame 36 or the second mounting frame 37 is required to be slid so that the first slider 38 is at the center position of the width of the body of the active drill pipe 14, at this time, the alarm 4 is set outside the active drill pipe 14 and the opening of the alarm 4 is directed toward the wellhead plate 11, and finally the first positioning bolt 39 is screwed so that the bottom of the first positioning bolt 39 is in close contact with the first mounting frame 36 or the second mounting frame 37, so that the nut of the first positioning bolt 39 is in close contact with the alarm 4, and the fixation of the first slider 38 and the fixation of the alarm 4 are completed;
So, when because subside how big influence or complicated geological formation influence, when leading to base 1 crooked, the rotation diameter of base 1 grow this moment can contact with alarm 4 when the rotation diameter of initiative drilling rod 14 grow, and the sound is reported to the police, in time reminds the staff to stop drilling then to the rectifying of initiative drilling rod 14, avoid initiative drilling rod 14 to continue crooked and cause the sleeve pipe to take place to cut and scratch the phenomenon.
Example 4:
Referring to fig. 1, 8 and 9, the centering assembly includes a driving frame 5, the driving frame 5 is fixedly mounted at the bottom of the threaded sleeve 33, a bearing frame 51 is fixedly mounted at the other end of the driving frame 5, a first adjusting arm 52 is movably mounted inside the bearing frame 51, a second adjusting arm 53 is movably mounted in the middle of the lower surface of the first adjusting arm 52, a fixed frame 54 is fixedly mounted at one ends of the first adjusting arm 52 and the second adjusting arm 53, which are close to the wellhead plate 11, and a centering roller 55 is movably mounted at the inner side of the fixed frame 54;
The upper surfaces of one ends, far away from the centering roller 55, of the first adjusting arm 52 and the second adjusting arm 53 are fixedly provided with studs 56, the outer surfaces of the studs 56 are in threaded connection with nuts 57, the upper surface of the bearing frame 51 is provided with a path groove 58, and the path groove 58 is matched with the moving path of the studs 56 when the first adjusting arm 52 and the second adjusting arm 53 are driven;
The nut 57 is located above the path groove 58, and the width of the nut 57 is greater than the width of the path groove 58.
On the basis of embodiment 2, when the screw sleeve 33 moves, the driving frame 5 is also driven to move, so that the driving frame 5 drives the bearing frame 51 to move, and the bearing frame 51 drives the fixing frame 54 to move, so that the centering roller 55 is involved in the operation of the active drill rod 14, centering and guiding of the active drill rod 14 are realized, and the stability of the active drill rod 14 during the operation is improved;
In addition, when the driving drill rods 14 with different sizes are encountered, the distance between the centering rollers 55 can be adjusted by driving the first adjusting arm 52 and the second adjusting arm 53, and then the nuts 57 are screwed down, so that the nuts 57 are in close contact with the bearing frame 51, the centering rollers 55 are fixed, the driving drill rods 14 with different sizes are matched, and the universality of the device is improved;
And the centering roller 55 rotates when contacting with the driving drill rod 14, compared with the sliding friction between the traditional guiding device and the driving drill rod 14, the rolling friction between the centering roller 55 and the driving drill rod 14 reduces the friction force born by the driving drill rod 14, reduces the abrasion born by the driving drill rod 14, and does not hinder the rotation of the driving drill rod 14;
Example 5:
Referring to fig. 1 and 8, the deviation rectifying assembly includes a central column 6, the central column 6 is fixedly installed in the middle of the upper surface of the bearing frame 51, and a deviation rectifying member 61 is provided on the outer surface of the central column 6;
the center of the center column 6 and the center of the round hole on the wellhead plate 11 are positioned on the same straight line, and a rubber pad is arranged at the bottom of the bearing frame 51.
In order to correct and guide correct operation, but in actual operation, the correct operation of staff cannot be guaranteed, errors occur in the operation process, or sedimentation effect is serious, geological strata complexity is too great, so that the bending amplitude of the driving drill rod 14 is large and the speed is high in the advancing process, and when a sleeve is scratched, correction is needed at the moment to be carried out again;
The depth of the hole reaches a certain degree, so that the correction reference object before the hole is opened is deactivated, the core barrel 15 is lifted from the deep hole, the deviation correcting piece 61 is placed on the outer side of the center column 6, the core barrel 15 is allowed to freely droop, the core barrel 15 is stopped by interference blocking of the deviation correcting piece 61 after the core barrel 15 sags, the base 1 is adjusted to enable the core barrel 15 to be aligned with the sleeve, deviation correction is completed, and the drill-down is smoother at the moment;
The deviation correcting operation at this time adjusts the base 1, but the situation of borehole bending does not occur, and the problem of borehole bending does not need to be worried about because only the core barrel 15 for borehole bending is controlled with the deepening of the borehole;
By arranging the rubber pad at the bottom of the bearing frame 51, impact generated when the falling of the core barrel 15 is blocked by the deviation rectifying piece 61 can be buffered, the bearing frame 51 is prevented from being deformed due to extrusion, and the bearing frame 51 can be manufactured by using hard materials such as refined steel and the like during production;
In addition, after the correction is performed on the driving drill stem 14 by using the core barrel 15, the four centering rollers 55 can be simultaneously moved and approached by driving the first adjusting arm 52 and the second adjusting arm 53, when the core barrel 15 is positioned in the middle of the four centering rollers 55, the correction is completed, and if the core barrel 15 is not positioned in the middle, the correction is required to be adjusted again, so that the correction accuracy can be further improved by using the centering rollers 55, and the correction assembly is verified.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1.一种地质勘测用钻孔装置,包括底座(1)、井口板(11)、动力装置(12)、钻塔(13)、主动钻杆(14)和岩心管(15),所述井口板(11)安装在底座(1)的内部,所述动力装置(12)安装在底座(1)的上表面,所述钻塔(13)固定安装在底座(1)上,所述岩心管(15)安装在主动钻杆(14)底部,其特征在于:所述底座(1)的侧边对称安装有第一连接件(16),所述第一连接件(16)远离底座(1)的一端固定安装有液压顶(17),所述第一连接件(16)的上表面设置有第一校正组件,所述钻塔(13)的正面设置有第二校正组件,所述校正组件上设置有警报件(4),所述校正组件下方设置有对中组件,所述对中组件上设置有纠偏组件。1. A drilling device for geological survey, comprising a base (1), a wellhead plate (11), a power device (12), a drilling tower (13), an active drill rod (14) and a core tube (15), wherein the wellhead plate (11) is mounted inside the base (1), the power device (12) is mounted on the upper surface of the base (1), the drilling tower (13) is fixedly mounted on the base (1), and the core tube (15) is mounted on the bottom of the active drill rod (14), characterized in that: a first connecting member (16) is symmetrically mounted on the side of the base (1), a hydraulic jack (17) is fixedly mounted on one end of the first connecting member (16) away from the base (1), a first correction component is arranged on the upper surface of the first connecting member (16), a second correction component is arranged on the front of the drilling tower (13), an alarm component (4) is arranged on the correction component, a centering component is arranged below the correction component, and a deviation correction component is arranged on the centering component. 2.根据权利要求1所述的一种地质勘测用钻孔装置,其特征在于:所述第一校正组件包括第一校正件(2),所述第一校正件(2)安装在第一连接件(16)的上表面,所述第一校正件(2)的内部开设有安装槽(21),所述安装槽(21)中固定安装有双向液压杆(22),所述双向液压杆(22)的输出轴上固定安装有第一安装件(23),远离所述井口板(11)的第一安装件(23)上活动安装有第一驱动杆(24),所述第一驱动杆(24)远离第一安装件(23)的一端活动安装有第二驱动杆(25),所述第二驱动杆(25)的上端安装在另一侧第一安装件(23)上,所述第二驱动杆(25)底部活动安装有第二校正件(26);2. A drilling device for geological survey according to claim 1, characterized in that: the first correction component comprises a first correction part (2), the first correction part (2) is mounted on the upper surface of the first connecting part (16), a mounting groove (21) is provided inside the first correction part (2), a bidirectional hydraulic rod (22) is fixedly mounted in the mounting groove (21), a first mounting part (23) is fixedly mounted on the output shaft of the bidirectional hydraulic rod (22), a first driving rod (24) is movably mounted on the first mounting part (23) away from the wellhead plate (11), a second driving rod (25) is movably mounted on one end of the first driving rod (24) away from the first mounting part (23), an upper end of the second driving rod (25) is mounted on the first mounting part (23) on the other side, and a second correction part (26) is movably mounted on the bottom of the second driving rod (25); 所述第二校正件(26)的上表面固定安装有垂直板(27),所述垂直板(27)与第二校正件(26)之间的夹角为九十度,所述垂直板(27)处于安装槽(21)的下方,所述垂直板(27)的宽度小于安装槽(21)的宽度,所述垂直板(27)的一侧固定安装有指针(28),所述第二校正件(26)的上表面固定连接有弹力柱(29),所述弹力柱(29)的另一端固定连接在第一校正件(2)的底部,所述弹力柱(29)与第二校正件(26)之间的夹角为九十度,所述弹力柱(29)与第一校正件(2)之间的夹角为九十度;A vertical plate (27) is fixedly mounted on the upper surface of the second correction member (26), the included angle between the vertical plate (27) and the second correction member (26) is ninety degrees, the vertical plate (27) is located below the mounting groove (21), the width of the vertical plate (27) is smaller than the width of the mounting groove (21), a pointer (28) is fixedly mounted on one side of the vertical plate (27), an elastic column (29) is fixedly connected to the upper surface of the second correction member (26), the other end of the elastic column (29) is fixedly connected to the bottom of the first correction member (2), the included angle between the elastic column (29) and the second correction member (26) is ninety degrees, and the included angle between the elastic column (29) and the first correction member (2) is ninety degrees; 所述第二校正件(26)的侧边对称固定安装有防沉板(210),所述防沉板(210)的上表面与第二校正件(26)的上表面处于同一水平,所述防沉板(210)的厚度为第二校正件(26)厚度的三分之一,所述第一校正件(2)的内部开设有放置槽(211),所述第一校正件(2)的下表面与底座(1)的上表面平行。An anti-sinking plate (210) is symmetrically fixedly mounted on the side of the second correction piece (26); the upper surface of the anti-sinking plate (210) is at the same level as the upper surface of the second correction piece (26); the thickness of the anti-sinking plate (210) is one third of the thickness of the second correction piece (26); a placement groove (211) is provided inside the first correction piece (2); and the lower surface of the first correction piece (2) is parallel to the upper surface of the base (1). 3.根据权利要求2所述的一种地质勘测用钻孔装置,其特征在于:所述第二校正组件包括安装架(3),所述安装架(3)固定安装在钻塔(13)的正面,所述安装架(3)的一端固定安装有伺服电机(31),所述伺服电机(31)的输出轴上固定安装有双向丝杠(32),所述双向丝杠(32)活动安装在安装架(3)的内侧,所述双向丝杠(32)外表面的两侧均螺旋连接有螺套(33);3. A drilling device for geological survey according to claim 2, characterized in that: the second correction component comprises a mounting frame (3), the mounting frame (3) is fixedly mounted on the front of the drilling tower (13), a servo motor (31) is fixedly mounted on one end of the mounting frame (3), a bidirectional lead screw (32) is fixedly mounted on the output shaft of the servo motor (31), the bidirectional lead screw (32) is movably mounted on the inner side of the mounting frame (3), and both sides of the outer surface of the bidirectional lead screw (32) are spirally connected with screw sleeves (33); 靠近所述伺服电机(31)一侧的螺套(33)上固定安装有第二连接件(35),所述第二连接件(35)远离双向丝杠(32)的一端固定安装有第一安装框(36),所述第一安装框(36)远离第二连接件(35)的一边固定安装有第二安装框(37),所述第一安装框(36)与第二安装框(37)的上侧均滑动连接有第一滑动件(38),所述第一滑动件(38)的内部螺纹连接有第一定位螺栓(39),所述第一滑动件(38)的底部固定安装有第二安装件(310),所述第二安装件(310)的内侧活动安装有水平尺(311);A second connecting member (35) is fixedly mounted on the screw sleeve (33) at one side close to the servo motor (31); a first mounting frame (36) is fixedly mounted on one end of the second connecting member (35) away from the bidirectional lead screw (32); a second mounting frame (37) is fixedly mounted on one side of the first mounting frame (36) away from the second connecting member (35); a first sliding member (38) is slidably connected to the upper sides of the first mounting frame (36) and the second mounting frame (37); a first positioning bolt (39) is connected to the internal thread of the first sliding member (38); a second mounting member (310) is fixedly mounted on the bottom of the first sliding member (38); and a level ruler (311) is movably mounted on the inner side of the second mounting member (310); 所述第一安装框(36)与第二安装框(37)的下侧均滑动连接有第二滑动件(312),所述第二滑动件(312)的侧边对称螺纹连接有第二定位螺栓(313)。The lower sides of the first installation frame (36) and the second installation frame (37) are both slidably connected with a second sliding member (312), and the side edges of the second sliding member (312) are symmetrically threadedly connected with a second positioning bolt (313). 4.根据权利要求3所述的一种地质勘测用钻孔装置,其特征在于:所述警报件(4)内腔的宽度大于主动钻杆(14)的宽度,所述警报件(4)处于第一滑动件(38)的上方,所述警报件(4)通过第一滑动件(38)与第一定位螺栓(39)螺帽的压紧进行固定。4. A drilling device for geological survey according to claim 3, characterized in that: the width of the inner cavity of the alarm member (4) is greater than the width of the active drill rod (14), the alarm member (4) is located above the first sliding member (38), and the alarm member (4) is fixed by pressing the first sliding member (38) and the nut of the first positioning bolt (39). 5.根据权利要求4所述的一种地质勘测用钻孔装置,其特征在于:所述对中组件包括驱动架(5),所述驱动架(5)固定安装在螺套(33)的底部,所述驱动架(5)的另一端固定安装有承载框(51),所述承载框(51)的内部活动安装有第一调节臂(52),所述第一调节臂(52)下表面的中部活动安装有第二调节臂(53),所述第一调节臂(52)与第二调节臂(53)靠近井口板(11)的一端均固定安装有固定框(54),所述固定框(54)的内侧活动安装有对中辊(55);5. A drilling device for geological survey according to claim 4, characterized in that: the centering component comprises a driving frame (5), the driving frame (5) is fixedly mounted on the bottom of the screw sleeve (33), a bearing frame (51) is fixedly mounted on the other end of the driving frame (5), a first adjusting arm (52) is movably mounted inside the bearing frame (51), a second adjusting arm (53) is movably mounted in the middle of the lower surface of the first adjusting arm (52), a fixing frame (54) is fixedly mounted on one end of the first adjusting arm (52) and the second adjusting arm (53) close to the wellhead plate (11), and a centering roller (55) is movably mounted on the inner side of the fixing frame (54); 所述第一调节臂(52)与第二调节臂(53)远离对中辊(55)一端的上表面均固定安装有螺柱(56),所述螺柱(56)的外表面螺纹连接有螺母(57),所述承载框(51)的上表面开设有路径槽(58),所述路径槽(58)与驱动第一调节臂(52)和第二调节臂(53)时,螺柱(56)的移动路径相适配;A stud (56) is fixedly mounted on the upper surface of the first adjusting arm (52) and the second adjusting arm (53) at one end away from the centering roller (55); a nut (57) is threadedly connected to the outer surface of the stud (56); a path groove (58) is provided on the upper surface of the bearing frame (51); the path groove (58) is adapted to the movement path of the stud (56) when the first adjusting arm (52) and the second adjusting arm (53) are driven; 所述螺母(57)处于路径槽(58)的上方,所述螺母(57)的宽度大于路径槽(58)的宽度。The nut (57) is located above the path groove (58), and the width of the nut (57) is greater than the width of the path groove (58). 6.根据权利要求5所述的一种地质勘测用钻孔装置,其特征在于:所述纠偏组件包括中心柱(6),所述中心柱(6)固定安装在承载框(51)上表面的中部,所述中心柱(6)的外表面设置有纠偏件(61)。6. A drilling device for geological survey according to claim 5, characterized in that: the correction component comprises a center column (6), the center column (6) is fixedly installed in the middle of the upper surface of the supporting frame (51), and the outer surface of the center column (6) is provided with a correction member (61). 7.根据权利要求6所述的一种地质勘测用钻孔装置,其特征在于:所述中心柱(6)的圆心与井口板(11)上圆孔的圆心处于同一条直线上,所述承载框(51)的底部设置有橡胶垫。7. A drilling device for geological survey according to claim 6, characterized in that the center of the center column (6) and the center of the circular hole on the wellhead plate (11) are on the same straight line, and a rubber pad is provided at the bottom of the supporting frame (51). 8.根据权利要求7所述的一种地质勘测用钻孔装置,其特征在于:所述第一安装框(36)的形状为弧形,所述水平尺(311)的底部与第二滑动件(312)顶部之间的间距为五到十厘米。8. A drilling device for geological survey according to claim 7, characterized in that: the first mounting frame (36) is in an arc shape, and the distance between the bottom of the level (311) and the top of the second sliding member (312) is five to ten centimeters. 9.根据权利要求8所述的一种地质勘测用钻孔装置,其特征在于:所述螺套(33)的顶部固定安装有限位块(34),所述安装架(3)的内侧开设有与限位块(34)相适配的滑槽。9. A drilling device for geological survey according to claim 8, characterized in that a limit block (34) is fixedly installed on the top of the screw sleeve (33), and a sliding groove matched with the limit block (34) is opened on the inner side of the mounting frame (3).
CN202411793140.9A 2024-12-09 2024-12-09 Drilling device for geological survey Active CN119266728B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411793140.9A CN119266728B (en) 2024-12-09 2024-12-09 Drilling device for geological survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411793140.9A CN119266728B (en) 2024-12-09 2024-12-09 Drilling device for geological survey

Publications (2)

Publication Number Publication Date
CN119266728A true CN119266728A (en) 2025-01-07
CN119266728B CN119266728B (en) 2025-03-14

Family

ID=94115021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411793140.9A Active CN119266728B (en) 2024-12-09 2024-12-09 Drilling device for geological survey

Country Status (1)

Country Link
CN (1) CN119266728B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2852352A1 (en) * 2003-07-10 2004-09-17 Cie Du Sol Drilling machine comprises device for correcting verticality
CN210638765U (en) * 2019-08-27 2020-05-29 魏晓云 Crude oil storage tank surplus detection device
CN111350464A (en) * 2018-12-20 2020-06-30 河南泉涌科技有限公司 A drilling device for geological survey with anti-migration function
CN114319332A (en) * 2021-12-03 2022-04-12 湖北华朔建设工程有限公司 High-pressure jet grouting pile device for reinforcing foundation and construction process
CN117823075A (en) * 2024-01-15 2024-04-05 大连明强塑料机械有限公司 Packing sealing device of oil pumping unit
CN221761852U (en) * 2024-01-29 2024-09-24 石家庄千山煤矿机械制造有限公司 A hole deflection prevention device for drilling rig
CN118911613A (en) * 2024-10-11 2024-11-08 内蒙古工业大学 Engineering geological investigation high-efficiency drilling machine
CN119041851A (en) * 2024-08-14 2024-11-29 中冶武勘工程技术有限公司 Directional deviation preventing device for geological drilling and drilling method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2852352A1 (en) * 2003-07-10 2004-09-17 Cie Du Sol Drilling machine comprises device for correcting verticality
CN111350464A (en) * 2018-12-20 2020-06-30 河南泉涌科技有限公司 A drilling device for geological survey with anti-migration function
CN210638765U (en) * 2019-08-27 2020-05-29 魏晓云 Crude oil storage tank surplus detection device
CN114319332A (en) * 2021-12-03 2022-04-12 湖北华朔建设工程有限公司 High-pressure jet grouting pile device for reinforcing foundation and construction process
CN117823075A (en) * 2024-01-15 2024-04-05 大连明强塑料机械有限公司 Packing sealing device of oil pumping unit
CN221761852U (en) * 2024-01-29 2024-09-24 石家庄千山煤矿机械制造有限公司 A hole deflection prevention device for drilling rig
CN119041851A (en) * 2024-08-14 2024-11-29 中冶武勘工程技术有限公司 Directional deviation preventing device for geological drilling and drilling method thereof
CN118911613A (en) * 2024-10-11 2024-11-08 内蒙古工业大学 Engineering geological investigation high-efficiency drilling machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
沈朝旭;: "地质勘探中钻孔弯曲原因及预防措施", 现代商贸工业, no. 19, 1 October 2013 (2013-10-01) *

Also Published As

Publication number Publication date
CN119266728B (en) 2025-03-14

Similar Documents

Publication Publication Date Title
CN112064633B (en) A pile foundation center positioning bracket
CN110644931A (en) Deviation-preventing drilling device for engineering investigation and using method
CN103770099A (en) Intersecting line marking tool
CN119266728B (en) Drilling device for geological survey
CN204195391U (en) A kind of Installing machine tool extensible guide precision calibrator
CN211740199U (en) Wall straightness detection device that hangs down for building engineering
CN114248352B (en) Hanging self-walking type guardrail drilling device and drilling positioning method
CN219841910U (en) Ground flatness detection device
CN219319368U (en) Coal seam thickness measuring device
CN219607980U (en) Auxiliary device for railway platform limit measurement
CN118049227A (en) A geotechnical exploration drilling equipment with depth monitoring function
CN215632960U (en) Aligning device of roadway heading machine
CN217267696U (en) Pile foundation construction detection device
CN214424488U (en) A borehole deflection measurement and control device for freezing method construction
CN114136199B (en) High-precision ballast track carrier cable height measurement method
CN215639316U (en) Device for aligning tunnel boring machine
CN210486903U (en) Vertical measuring device for building construction
CN214893169U (en) Geological disaster deep displacement monitoring device
CN208072218U (en) Accurate Installation Device of Turning and Climbing Formwork for Bridge High Pier
CN221645869U (en) Foundation pit settlement monitoring device
CN220445509U (en) Track alignment appurtenance and alignment structure take one's place
CN113669056B (en) Alignment device of tunnel boring machine
CN219589566U (en) High-precision test equipment suitable for automatic mold production line
CN220729262U (en) Laser receiving device for laser vertical leveler
CN215764343U (en) Theodolite for forestry surveying

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
OL01 Intention to license declared
OL01 Intention to license declared