CN119195532A - A column migration structure capable of reinforcing crane beams - Google Patents

A column migration structure capable of reinforcing crane beams Download PDF

Info

Publication number
CN119195532A
CN119195532A CN202411707328.7A CN202411707328A CN119195532A CN 119195532 A CN119195532 A CN 119195532A CN 202411707328 A CN202411707328 A CN 202411707328A CN 119195532 A CN119195532 A CN 119195532A
Authority
CN
China
Prior art keywords
truss
plate
migration
target
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202411707328.7A
Other languages
Chinese (zh)
Other versions
CN119195532B (en
Inventor
杜赟
于仁健
孙作有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Hongwei Marine Engineering Co ltd
Original Assignee
Dalian Hongwei Marine Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Hongwei Marine Engineering Co ltd filed Critical Dalian Hongwei Marine Engineering Co ltd
Priority to CN202411707328.7A priority Critical patent/CN119195532B/en
Publication of CN119195532A publication Critical patent/CN119195532A/en
Application granted granted Critical
Publication of CN119195532B publication Critical patent/CN119195532B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/06—Separating, lifting, removing of buildings; Making a new sub-structure
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266—Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种可加固吊车梁的立柱迁移结构,涉及吊车部件技术领域。本发明包括混凝土硬化地面,所述混凝土硬化地面的顶部埋设有多个均匀分布的预埋承台板,所述混凝土硬化地面的顶部竖立有多个均匀分布的定点桁架立柱和一个目标桁架立柱,所述定点桁架立柱和所述目标桁架立柱分别设置在多个预埋承台板的顶部,多个所述定点桁架立柱和所述目标桁架立柱的顶端放置有同一个水平设置的吊车单梁。本发明提供的立柱迁移及吊车梁加固结构可以使吊车梁系统的桁架立柱可以快速、便捷、安全地进行迁移,同时利用工型钢架对失去桁架支撑后悬空的吊车梁一端进行加强,减小桁架迁移对吊车梁整体结构的影响,保证桁架迁移后,吊车梁仍具备足够的结构强度。

The present invention discloses a column migration structure capable of reinforcing a crane beam, and relates to the technical field of crane components. The present invention comprises a concrete hardened ground, a plurality of evenly distributed embedded cap plates are buried on the top of the concrete hardened ground, a plurality of evenly distributed fixed-point truss columns and a target truss column are erected on the top of the concrete hardened ground, the fixed-point truss columns and the target truss columns are respectively arranged on the top of a plurality of embedded cap plates, and a single crane beam arranged at the same level is placed on the top of the plurality of fixed-point truss columns and the target truss columns. The column migration and crane beam reinforcement structure provided by the present invention can enable the truss columns of the crane beam system to be migrated quickly, conveniently and safely, and at the same time, an I-shaped steel frame is used to strengthen one end of the crane beam suspended after losing the truss support, thereby reducing the influence of the truss migration on the overall structure of the crane beam, and ensuring that the crane beam still has sufficient structural strength after the truss migration.

Description

Can consolidate stand migration structure of crane beam
Technical Field
The invention relates to the technical field of crane components, in particular to a column migration structure capable of reinforcing a crane beam.
Background
A crane girder system is installed in many steel structure plants, crane girders are installed on plant columns of longitudinal walls on two sides of each steel structure plant, two ends of a crane track are installed on the crane girders, the crane girders are connected to a main steel structure of the plant through crane girder auxiliary system structures to be reinforced, the crane girder system is one of very important bearing structures of various industrial plants, and is generally designed into a simply supported structure, and the simply supported structure has the advantages of clear force transmission, simple structure, convenience in construction and the like and mainly comprises the crane girders, the crane tracks, the crane, truss upright posts, ground embedded parts and the like.
After the installation of the upright post and the crane beam is completed in a new factory workshop, the installation position of part of truss upright posts can influence the turning action of the large transportation vehicle when the transportation vehicle is used for transporting the large objects often in the process of being put into use, so that the truss upright posts need to be moved, and the positions of the upright posts are difficult to directly adjust on the premise that the installation of the upright posts and the crane beam is completed.
Disclosure of Invention
The invention aims to solve the problem that the position of an upright post is difficult to directly adjust after the upright post and a crane beam in a factory are installed at present.
The invention adopts the following technical scheme for realizing the purposes:
The utility model provides a can consolidate crane girder's stand migration structure, includes the concrete hardening ground, a plurality of evenly distributed's pre-buried bearing plate have been buried at the top of concrete hardening ground, a plurality of evenly distributed's fixed point truss stand and a target truss stand have been erect at the top of concrete hardening ground, fixed point truss stand with the target truss stand sets up respectively at the top of a plurality of pre-buried bearing plate, a plurality of fixed point truss stand with same horizontally arranged's crane monospar has been placed at the top of target truss stand, fixed point truss stand the both ends of target truss stand respectively with pre-buried bearing plate fixed mounting has a plurality of bolt fastener between the crane monospar, the migration hoist has been placed at the top of concrete hardening ground, the rolling has the traction steel strand wires on the migration hoist, the one end fixed mounting of traction steel strand wires draw the couple with be provided with between the target truss stand and drag the subassembly, drag the subassembly can make the target truss stand shifts under the condition that the bottom keeps stable in balance, the traction couple passes through the target truss stand and has placed the same horizontally arranged crane monospar with the top of pre-buried truss plate, the transition is located between pre-buried girder and the pre-buried girder has the transition plate migration of the concrete hardening board.
Further, the drawing assembly comprises a drawing plate arranged between the target truss upright and the drawing hook, a C-shaped telescopic drawing frame is fixedly arranged on one side of the drawing plate, which faces the target truss upright, the drawing plate and the C-shaped telescopic drawing frame are sleeved at the bottom end of the target truss upright together, a four-rope drawing structure is fixedly arranged on one side, which faces away from the target truss upright, of the drawing plate, a drawing ring is fixedly arranged on one end, far away from the drawing plate, of the four-rope drawing structure, and the drawing ring is mutually clamped with the drawing hook.
Further, two trapezoidal platform are arranged at one side of the bottom end of the target truss upright towards and away from the dragging plate, the dragging plate is located at the top of two trapezoidal platform, a C-shaped binding plate is fixedly installed at one side of each trapezoidal platform, the trapezoidal platform and the C-shaped binding plate at the same position are fixedly sleeved at the bottom end of the target truss upright together, and a plurality of uniformly distributed dragging rollers are rotatably installed at the bottom of each trapezoidal platform.
Further, a plurality of mutually spliced transition tracks are arranged at the top of the transition plate, and the transition tracks correspond to the four trapezoid platform positions.
Further, the U-shaped connecting frames are fixedly installed on two side faces, adjacent to the dragging plate, of the C-shaped telescopic dragging frame, and the bottom ends of the U-shaped connecting frames located at the same position are fixedly installed on one sides of the two trapezoid platforms.
Further, two stop nails are fixedly inserted into the top of the concrete hardening ground, the stop nails are positioned between the migration winch and the migration embedded plate, and the positions of the two stop nails correspond to the positions of the four trapezoid base stations respectively.
Further, a plurality of track positioning nails which are uniformly distributed are fixedly inserted into the top of the concrete hardening ground, and the plurality of track positioning nails are distributed on two sides of the transition plate and correspond to the positions of the plurality of transition tracks respectively.
Further, a temporary support steel frame is erected at the top of the concrete hardened ground, and is located at one side of the target truss upright, which faces away from the plurality of fixed-point truss uprights, and at the bottom of one end of the crane single beam.
The beneficial effects of the invention are as follows:
1. The upright column migration and crane beam reinforcement structure provided by the invention can enable truss upright columns of a crane beam system to be quickly, conveniently and safely migrated, and meanwhile, the I-shaped steel frame is utilized to strengthen one end of the suspended crane beam after the truss support is lost, so that the influence of truss migration on the whole structure of the crane beam is reduced, and the crane beam still has enough structural strength after truss migration;
2. According to the invention, by arranging the dragging assembly, when the migration winch drags the target truss upright post through the traction steel stranded wires and the traction hooks, the traction force can be shared at four corners of the dragging plate through the four-rope traction structure, and then the traction force acts on the bottom end of the target truss upright post through the C-shaped telescopic dragging frame, so that the stress area of the target truss upright post is increased, the position of the stress point of the target truss upright post is fixed, and the stable stress of the target truss upright post in the dragging process is ensured;
3. According to the invention, the trapezoid base stations are arranged on two sides of the bottom end of the target truss upright post to form a trapezoid structure, so that the grounding area of the bottom end of the target truss upright post is increased, the risk of rollover in the dragging process of the target truss upright post is greatly reduced, meanwhile, the friction force of the trapezoid base stations can be reduced by the dragging rollers at the bottom of the trapezoid base stations, and the influence of the installation of the trapezoid base stations on the smoothness of the dragging process is reduced;
4. According to the invention, by arranging the transition track, when the transition track is arranged and the target truss upright post is dragged by the migration winch, the trapezoidal platforms at two sides can travel in the transition track, so that the transition track has the functions of limiting and guiding the movement track of the target truss upright post, and the target truss upright post and the migration position are prevented from being deviated;
5. According to the invention, the U-shaped connecting frame is arranged, so that the dragging force of the C-shaped telescopic dragging frame to the target truss upright post can be shared on the bottom end of the target truss upright post and four trapezoidal ground stations at the same time, the integrity of the whole structure in the dragging process is improved, and the migration stability of the target truss upright post is further improved;
6. according to the invention, the stopping nails are arranged, so that after the target truss upright post is dragged to the top center of the migration embedded plate, the front ends of the two trapezoid base stations respectively contact with the two stopping nails, and further the target truss upright post cannot move continuously and stops at a preset migration position, thereby realizing automatic braking of the target truss upright post and avoiding position deviation caused by excessive migration of the target truss upright post;
7. according to the invention, the track positioning nails are arranged, so that after the transition plate or the transition track is placed, a plurality of track positioning nails can be nailed into the concrete hardening ground at two sides of the transition plate, the number of the track positioning nails is consistent with the position of the transition track, the track positioning nails can play a limiting role on the transition plate and the transition track, and the transition plate and the transition track are prevented from deviating from the positions of the transition plate, the transition track, the migration embedded plate and the embedded bearing plate;
8. according to the invention, the temporary support steel frame is clamped between the concrete hardening ground and the crane single beam by arranging the temporary support steel frame, so that the temporary support steel frame temporarily supports one suspended end of the crane single beam in the process of transferring the target truss upright post, and the temporary support steel frame is removed after the I-shaped steel frame is assembled, so that the internal structure of the crane single beam is ensured not to change beyond the expected range.
Drawings
FIG. 1 is a schematic view of a three-dimensional structure of a target truss column of the present invention prior to migration;
FIG. 2 is a schematic view of a perspective structure of the post-migration truss of the present invention;
FIG. 3 is a schematic view of the structure of FIG. 2A according to the present invention;
FIG. 4 is a schematic perspective view of the structure of the invention at B in FIG. 2;
FIG. 5 is a schematic diagram of a perspective structure of the target truss column and the transfer winch of the present invention;
FIG. 6 is a schematic view of a perspective structure of the target truss column and towing assembly of the present invention;
FIG. 7 is a schematic perspective view of a towing assembly of the present invention;
FIG. 8 is a schematic diagram of a three-dimensional structure of a transition rail, a transition plate and a rail positioning nail in the invention;
the concrete hardening ground is characterized by comprising the following components of 1, a concrete hardening ground, 2, a pre-buried bearing plate, 3, a fixed point truss column, 4, a target truss column, 5, a crane single beam, 6, a bolt fastener, 7, a migration winch, 8, a traction steel strand, 9, a traction hook, 10, a migration pre-buried plate, 11, a transition plate, 12, an I-shaped steel frame, 13, a traction plate, 14, a C-shaped telescopic traction frame, 15, a four-rope traction structure, 16, a traction ring, 17, a trapezoid platform, 18, a C-shaped binding plate, 19, a traction roller, 20, a transition track, 21, a U-shaped connecting frame, 22, a track positioning nail, 23, a termination nail and 24, and a temporary support steel frame.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention. The components of the embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the invention, as presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that like reference numerals and letters refer to like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures. Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
In describing embodiments of the present invention, it should be noted that the directions or positional relationships indicated by the terms "inner", "outer", "upper", etc. are directions or positional relationships based on those shown in the drawings, or those that are conventionally put in place when the inventive product is used, are merely for convenience of description and simplification of description, and are not indicative or implying that the apparatus or element in question must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the present invention.
As shown in figures 1 to 8, a column migration structure capable of reinforcing crane beams comprises a concrete hardening ground 1, wherein a plurality of embedded bearing plates 2 which are uniformly distributed are buried at the top of the concrete hardening ground 1, a plurality of fixed-point truss columns 3 and a target truss column 4 which are uniformly distributed are erected at the top of the concrete hardening ground 1, the fixed-point truss columns 3 and the target truss column 4 are respectively arranged at the tops of the embedded bearing plates 2, crane single beams 5 which are horizontally arranged are respectively arranged at the tops of the fixed-point truss columns 3 and the target truss column 4, and as shown in figure 3, two ends of the fixed-point truss columns 3 and the target truss column 4 are respectively connected with the embedded bearing plates 2, a plurality of bolt fasteners 6 are fixedly arranged between the crane single beams 5, as shown in figure 5, As shown in fig. 7, a migration winch 7 is placed on top of the concrete hardened ground 1, in this embodiment, depending on the actual situation of the construction site, the migration winch 7 may be replaced with a simpler traction device or tool such as a chain block, a traction steel strand 8 is wound on the migration winch 7, one end of the traction steel strand 8 is fixedly provided with a traction hook 9, a traction component is disposed between the traction hook 9 and the target truss column 4, the traction component can enable the target truss column 4 to migrate under the condition that the bottom end remains balanced and stable, the traction hook 9 is connected with the target truss column 4 through the traction component, a migration pre-buried plate 10 is buried at the top of the concrete hardened ground 1, the migration pre-buried plate 10 is located between the migration winch 7 and the target truss column 4, as shown in fig. 8, a transition plate 11 is located between the migration pre-buried plate 10 and the target truss column 4, and an inclined crane 12 is disposed between the target truss column 4 and the single beam 5 as shown in fig. 4; specifically, when the target truss column 4 is migrated, the final migration position of the target truss column 4 is selected, an embedded pit is dug at the migration position, a migration embedded plate 10 is embedded into the embedded pit for fixing, a new assembly hole is formed at the corresponding position at the bottom of a crane single beam 5, a transition plate 11 is placed between the migration embedded plate 10 and the original embedded bearing plate 2, and a hammer is utilized to strike the transition plate 11 to tightly clamp the transition plate 11 between the migration embedded plate 10 and the original embedded bearing plate 2, so that the transition plate 11 and the migration embedded plate 10 are eliminated, The method comprises the steps of pre-burying height difference between bearing plates 2, fixing a migration winch 7 on a concrete hardening ground 1, assembling a drawing assembly at the bottom end of a target truss upright 4, hanging a drawing hook 9 on the drawing assembly, detaching bolt fasteners 6 at the upper end and the lower end of the target truss upright 4, releasing the assembling relationship between the target truss upright 4, the pre-buried bearing plates 2 and a crane single beam 5, winding a traction steel strand 8 by the migration winch 7, drawing the target truss upright 4 through the drawing hook 9, enabling the target truss upright 4 to move on the pre-buried bearing plates 2, moving to a migration pre-buried plate 10 through a cab apron 11, and stopping the upper end and the lower end of the target truss upright 4 with the crane single beam 5 again by utilizing two groups of bolt fasteners 6, The migration pre-buried plate 10 is assembled and fixed, and an I-shaped steel frame 12 is fixedly installed between one side of the target truss upright 4 and one suspended end of the crane single beam 5 in a welding and screwing mode, so that the I-shaped steel frame 12 plays a role of a diagonal reinforcement structure, and finally the transition plate 11 and the migration winch 7 are removed to complete the migration of the target truss upright 4, so that the truss upright of the crane beam system can be quickly, conveniently and safely migrated, and meanwhile, the I-shaped steel frame 12 is utilized to reinforce one suspended crane beam end after the truss support is lost, the influence of truss migration on the whole structure of the crane beam is reduced, and the crane beam still has enough structural strength after the truss migration is ensured.
As shown in fig. 6, the dragging component comprises a dragging plate 13 arranged between the target truss upright 4 and the dragging hook 9, as shown in fig. 7, a C-shaped telescopic dragging frame 14 is fixedly arranged on one side of the dragging plate 13 facing the target truss upright 4, the dragging plate 13 and the C-shaped telescopic dragging frame 14 are jointly sheathed at the bottom end of the target truss upright 4, in this embodiment, the C-shaped telescopic dragging frame 14 is a C-shaped bidirectional telescopic steel frame, two telescopic ends of the C-shaped telescopic dragging frame 14 are mutually symmetrical, telescopic sliding grooves are formed in one ends, close to each other, of the two telescopic ends, of the two telescopic sliding grooves are internally and slidably provided with the same inner sliding plate, the dragging plate 13 and the C-shaped telescopic dragging frame 14 are fixedly sheathed on the bottom end of the target truss upright 4 through bolts, one side, away from the target truss upright 4, of the four-rope dragging structure 15 is fixedly provided with a dragging ring 16, and the dragging ring 16 is mutually clamped with the dragging hook 9, and the dragging plate 13 is fixedly arranged at one end, far from the dragging plate 16; specifically, when the C-shaped telescopic dragging frame 14 is arranged, the C-shaped telescopic dragging frame 14 is stretched firstly to ensure that the distance between the two ends of the opening of the C-shaped telescopic dragging frame is larger than the width of the target truss column 4, the C-shaped telescopic dragging frame 14 is sleeved on the target truss column 4, the C-shaped telescopic dragging frame 14 is contracted to be original, at the moment, the dragging plate 13 is screwed and fixed on the C-shaped telescopic dragging frame 14 through bolts, the dragging plate 13 and the C-shaped telescopic dragging frame 14 are locked and sleeved at the bottom end of the target truss column 4, then the traction hook 9 and the traction ring 16 are mutually clamped, and when the migration winch 7 drags the target truss column 4 through the traction steel stranded wires 8 and the traction hook 9, traction force can be shared at four corners of the dragging plate 13 through the four-rope traction structure 15, and the C-shaped telescopic dragging frame 14 acts on the bottom end of the target truss upright post 4, so that the stress area of the target truss upright post 4 is increased, the position of the stress point of the target truss upright post 4 is fixed, and the stability of the stress of the target truss upright post 4 in the dragging process is ensured.
As shown in FIG. 7, two trapezoid base plates 17 are arranged on one side, facing to and away from the dragging plate 13, of the bottom end of the target truss column 4, of each of the two trapezoid base plates 17, the dragging plate 13 is located at the top of each of the two trapezoid base plates 17, C-shaped binding plates 18 are fixedly mounted on one side of each of the trapezoid base plates 17, the trapezoid base plates 17 and the C-shaped binding plates 18 located at the same position are fixedly sleeved at the bottom end of the target truss column 4 together, a plurality of uniformly distributed dragging rollers 19 are rotatably mounted at the bottom of each of the trapezoid base plates 17, in the embodiment, four column-shaped truss columns 12 commonly used in the market are taken as an example, four column-dividing legs are arranged at the upper end and the lower end of each of the fixed point truss column 3 and each of the target truss column 4, the trapezoid base plates 17 and the C-shaped binding plates 18 are fixedly sleeved on the four column-dividing legs of the bottom end of the target truss column 4 through bolts, specifically, after the trapezoid base plates 13 are fixedly mounted, the four trapezoid base plates 17 and the C-shaped binding plates 18 are respectively mounted on the four column-dividing legs 4 through the bolts, the bottom end of the target truss column 4 is fixedly mounted, the side-dividing legs of the target truss column 4 is greatly reduced, and the side-rolling friction of the target truss column is reduced, and the side of the bottom of the target truss column is smoothly is lowered, and the side of the target truss is stretched by the bottom by the column-shaped.
As shown in fig. 8, a plurality of mutually spliced transition rails 20 are placed on the top of the transition plate 11, the plurality of transition rails 20 correspond to the positions of four trapezoid base plates 17, in this embodiment, the thickness of the transition plate 11 can be selected according to practical requirements, when the transition rails 20 are not used, the thickness of the transition plate 11 is the height of the embedded bearing plate 2 and the migration embedded plate 10 on the ground, if the transition rails 20 are used, the thickness of the bottom of the transition rails 20 plus the thickness of the transition plate 11 is the height of the embedded bearing plate 2 and the migration embedded plate 10 on the ground, specifically, by arranging the transition rails 20, if the transition rails 20 are required to be used, a thinner transition plate 11 can be selected, and a plurality of mutually spliced transition rails 20 are placed on the top of the transition plate 11, so that the overall length of the transition rails 20 is equal to the transition plate 11, and the overall thickness of the transition rails 20 is equal to the height of the embedded bearing plate 10 on the ground, and then the transition rails 20 are knocked by a skin, the transition rails 20 are removed, and the transition rails 10 are shifted to the height of the embedded bearing plate 10, and the truss frame 4 is prevented from shifting to the position of the truss frame 4 when the truss is shifted to the two sides, and the truss frame 4 is moved to the position of the truss is prevented.
As shown in FIG. 7, the U-shaped connecting frames 21 are fixedly installed on two adjacent side surfaces of the C-shaped telescopic dragging frame 14 and the dragging plate 13, the bottom ends of the U-shaped connecting frames 21 located at the same position are fixedly installed on one sides of the two trapezoid base plates 17, in this embodiment, the assembly holes are formed in two sides of the bottom of the U-shaped connecting frames 21, so that two bottom corners of the U-shaped connecting frames 21 are fastened with the trapezoid base plates 17 and the C-shaped binding plates 18 through the same bolts, specifically, by arranging the U-shaped connecting frames 21, when the trapezoid base plates 17 and the C-shaped binding plates 18 are assembled, the trapezoid base plates 17 and the C-shaped binding plates 18 are firstly sleeved on the split legs of the target truss column 4, the U-shaped connecting frames 21 on two sides of the C-shaped telescopic dragging frame 14 are located on one side of the trapezoid base plates 17, and the assembly holes in two corners of the bottom of the U-shaped connecting frames 21 correspond to the assembly holes in each other on the trapezoid base plates 17 and the C-shaped binding plates 18, and the telescopic dragging frame 14 is fastened through bolts directly, so that the whole truss column 4 can be moved in the whole process of the four-stage truss column 4, and the whole truss structure can be further improved, and the stability of the whole truss column 4 can be moved, and the whole truss structure can be moved, and the stability of the whole truss can be increased.
As shown in fig. 5, two stop nails 23 are fixedly inserted into the top of the concrete hardened ground 1, the stop nails 23 are positioned between the migration hoist 7 and the migration embedded plate 10, and the positions of the two stop nails 23 respectively correspond to the positions of the four trapezoidal base stations 17, specifically, by arranging the stop nails 23, the distance between the stop nails 23 and the migration embedded plate 10 is equal to the distance between the front ends of the trapezoidal base stations 17 and the embedded bearing plates 2, therefore, after the target truss upright 4 is dragged to the top center of the migration embedded plate 10, the front ends of the two trapezoidal base stations 17 respectively contact with the two stop nails 23, so that the target truss upright 4 cannot continue to move and stops at a preset migration position, and the automatic braking of the target truss upright 4 is realized, thereby avoiding the position deviation caused by excessive migration of the target truss upright 4.
As shown in fig. 8, a plurality of track positioning nails 22 which are uniformly distributed are fixedly inserted at the top of the concrete hardened ground 1, the plurality of track positioning nails 22 are distributed at two sides of the transition plate 11 and correspond to the positions of the plurality of transition tracks 20 respectively, specifically, the plurality of track positioning nails 22 can be nailed into the concrete hardened ground 1 at two sides of the transition plate 11 after the transition plate 11 or the transition tracks 20 are placed by arranging the track positioning nails 22, the number of the track positioning nails 22 is consistent with the positions of the transition tracks 20, so that the track positioning nails 22 can play a limiting role on the transition plate 11 and the transition tracks 20, and the position deviation among the transition plate 11, the transition tracks 20, the migration embedded plate 10 and the embedded bearing plate 2 is prevented.
The temporary support steel frames 24 are erected on the top of the concrete hardened ground 1 as shown in fig. 1 and 2, the temporary support steel frames 24 are positioned on one side of the target truss upright 4, which faces away from the plurality of fixed-point truss uprights 3, and are positioned at the bottom of one end of the crane single beam 5, specifically, the temporary support steel frames 24 with the length equal to the height of the crane single beam 5 from the ground can be selected before the target truss upright 4 is transferred, and pushed into the space between one end of the crane single beam 5 and the concrete hardened ground 1 to vertically stand, and then the temporary support steel frames 24 are clamped between the concrete hardened ground 1 and the crane single beam 5 by using a fur hammer to enable the temporary support steel frames 24 to temporarily support one suspended end of the crane single beam 5 in the transfer process of the target truss upright 4 until the temporary support steel frames 24 are removed after the assembly of the worker steel frames 12, so that the internal structure of the crane single beam 5 cannot be changed beyond the expected range.
To sum up: before migration: firstly, selecting the final migration position of a target truss upright post 4, digging an embedded pit at the migration position, embedding a migration embedded plate 10 into the embedded pit for fixing, opening a new assembly hole at the corresponding position of the bottom of a crane single beam 5, placing a transition plate 11 between the migration embedded plate 10 and an original embedded bearing plate 2, knocking the transition plate 11 by a hammer to tightly clamp the transition plate 11 between the migration embedded plate 10 and the original embedded bearing plate 2, eliminating the height difference between the transition plate 11 and the migration embedded plate 10 and between the transition plate 11 and the embedded bearing plate 2, fixing a migration winch 7 on a concrete hardening ground 1, sleeving a traction plate 13 and a C-shaped telescopic traction frame 14 at the bottom end of the target truss upright post 4 through bolts, mutually clamping a traction hook 9 and a traction ring 16, sleeving four groups of trapezoidal base stations 17 and C-shaped binding plates 18 on four column dividing legs of the target truss upright post 4, the U-shaped connecting frames 21 at two sides of the C-shaped telescopic dragging frame 14 are positioned at one side of the trapezoid base plate 17, meanwhile, the assembly holes at two corners at the bottom of the U-shaped connecting frames 21 correspond to the assembly holes on the trapezoid base plates 17 and the C-shaped binding plates 18 at two sides, bolts are directly screwed into the assembly holes for fastening, then a stop nail 23 is nailed into the concrete hardening ground 1 between the migration winch 7 and the migration embedded plate 10, the distance between the stop nail 23 and the migration embedded plate 10 is equal to the distance between the front end of the trapezoid base plate 17 and the embedded bearing plate 2, a temporary support steel frame 24 with the length equal to the ground clearance of the crane single beam 5 is selected, the temporary support steel frame 24 is pushed into the space between one end of the crane single beam 5 and the concrete hardening ground 1 to vertically stand, then the temporary support steel frame 24 is clamped between the concrete hardening ground 1 and the crane single beam 5 by using a hammer for knocking, finally, the bolt fasteners 6 at the upper end and the lower end of the target truss column 4 are dismantled, the assembly relation between the target truss upright post 4 and the pre-buried bearing plate 2 and the crane single beam 5 is relieved;
If the transition rail 20 is needed, a thinner transition plate 11 can be selected, a plurality of mutually spliced transition rails 20 are placed on the top of the transition plate 11, the overall length of the transition rails 20 is equal to that of the transition plate 11, the overall thickness of the transition rails 20 and the transition plate 11 is equal to that of the surface of the migration embedded plate 10, then the transition rails 20 are knocked by a hammer, the height difference between the transition rails 20 and the migration embedded plate 10 and the embedded bearing plate 2 is eliminated, when the migration winch 7 drags the target truss upright 4, the trapezoidal platforms 17 on two sides can travel in the transition rails 20, the transition rails 20 can limit and guide the moving track of the target truss upright 4, after the transition plate 11 or the transition rails 20 are placed, a plurality of rail positioning nails 22 can be nailed in the concrete hardened ground 1 on two sides of the transition plate 11, the number of the rail positioning nails 22 are consistent with the positions of the transition rails 20, and the rail positioning nails 22 can limit the transition plates 11 and the transition rails 20;
During migration, a traction steel strand 8 is wound by a migration winch 7, and then a target truss column 4 is dragged by a traction hook 9, so that the target truss column 4 moves on a pre-buried bearing plate 2 and moves to a migration pre-buried plate 10 through a cab apron 11, when the target truss column 4 is dragged to the top center of the migration pre-buried plate 10, the front ends of two trapezoid base stations 17 respectively contact two stop nails 23, and further the target truss column 4 cannot move continuously and stops at a preset migration position;
After the migration, the upper end and the lower end of the target truss upright post 4 are assembled and fixed with the crane single beam 5 and the migration embedded plate 10 again by utilizing two groups of bolt fasteners 6, an I-shaped steel frame 12 is fixedly installed between one side of the target truss upright post 4 and the suspended end of the crane single beam 5 in a welding, screwing and other modes, the I-shaped steel frame 12 plays a role of a diagonal reinforcement structure, and finally structural components such as the transition plate 11, the migration winch 7 and the like are removed to finish the migration of the target truss upright post 4.
The foregoing has shown and described the basic principles, principal features and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present invention, and various changes and modifications may be made therein without departing from the spirit and scope of the invention, which is defined by the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides a but stand migration structure of reinforcement crane roof beam, its characterized in that includes concrete hardening ground (1), the top of concrete hardening ground (1) buries a plurality of evenly distributed's pre-buried bearing plate (2), a plurality of evenly distributed's fixed point truss stand (3) and a target truss stand (4) are erect at the top of concrete hardening ground (1), fixed point truss stand (3) with target truss stand (4) set up respectively at the top of a plurality of pre-buried bearing plate (2), a plurality of fixed point truss stand (3) with crane monospar (5) that same level set up have been placed on the top of target truss stand (4), fixed point truss stand (3) the both ends of target truss stand (4) respectively with pre-buried bearing plate (2) crane monospar (5) between fixed mounting have a plurality of bolt fastener (6), the top of concrete hardening ground (1) has placed migration hoist (7), migration hoist (7) are last to have traction wire (8), traction wire (8) have the transportation hook (9) can make the balanced condition that the target truss (4) are carried out under the traction hook (9) the steady, the target truss is kept in the transportation condition, the traction hook (9) is connected with the target truss upright (4) through the traction assembly, a migration embedded plate (10) is buried at the top of the concrete hardening ground (1), the migration embedded plate (10) is located between the migration winch (7) and the target truss upright (4), a transition plate (11) is placed at the top of the concrete hardening ground (1), the transition plate (11) is located between the migration embedded plate (10) and the target truss upright (4), and an I-shaped steel frame (12) which is obliquely placed is arranged between the target truss upright (4) and the crane single beam (5).
2. The column migration structure capable of reinforcing a crane beam according to claim 1, wherein the drawing component comprises a drawing plate (13) arranged between the target truss column (4) and the drawing hook (9), a C-shaped telescopic drawing frame (14) is fixedly arranged on one side of the drawing plate (13) facing the target truss column (4), the drawing plate (13) and the C-shaped telescopic drawing frame (14) are jointly sleeved at the bottom end of the target truss column (4), a four-rope drawing structure (15) is fixedly arranged on one side of the drawing plate (13) facing away from the target truss column (4), a drawing ring (16) is fixedly arranged on one end, far away from the drawing plate (13), of the four-rope drawing structure (15), and the drawing ring (16) and the drawing hook (9) are clamped with each other.
3. The column migration structure capable of reinforcing a crane beam according to claim 2, wherein two trapezoid base stations (17) are arranged at one side, facing towards and away from the dragging plate (13), of the bottom end of the target truss column (4), the dragging plate (13) is located at the top of two trapezoid base stations (17), a C-shaped binding plate (18) is fixedly installed at one side of each trapezoid base station (17), the trapezoid base stations (17) and the C-shaped binding plate (18) located at the same place are fixedly sleeved at the bottom end of the target truss column (4), and a plurality of uniformly distributed dragging rollers (19) are rotatably installed at the bottom of each trapezoid base station (17).
4. A column transfer structure for a reinforced crane girder according to claim 3, characterized in that a plurality of mutually spliced transition tracks (20) are placed on top of the transition plate (11), a plurality of said transition tracks (20) corresponding to the positions of four said trapezoidal platforms (17).
5. A column transfer structure capable of reinforcing a crane beam according to claim 3, wherein the two sides of the C-shaped telescopic dragging frame (14) adjacent to the dragging plate (13) are fixedly provided with a U-shaped connecting frame (21), and the bottom ends of the U-shaped connecting frames (21) at the same place are fixedly provided at one sides of two trapezoid platforms (17).
6. A column transfer structure for a reinforced crane beam according to claim 3, wherein two stop nails (23) are fixedly inserted into the top of the concrete hardening ground (1), the stop nails (23) are located between the transfer hoist (7) and the transfer embedded plate (10), and the positions of the two stop nails (23) respectively correspond to the positions of the four trapezoid base stations (17).
7. The column migration structure capable of reinforcing a crane beam according to claim 4, wherein a plurality of track positioning nails (22) which are uniformly distributed are fixedly inserted at the top of the concrete hardening ground (1), and the plurality of track positioning nails (22) are distributed at two sides of the transition plate (11) and correspond to the positions of the plurality of transition tracks (20) respectively.
8. The column transfer structure capable of reinforcing a crane beam according to claim 1, wherein a temporary support steel frame (24) is erected on the top of the concrete hardening ground (1), and the temporary support steel frame (24) is located on one side of the target truss column (4) away from the plurality of fixed-point truss columns (3) and is located at the bottom of one end of the crane single beam (5).
CN202411707328.7A 2024-11-27 2024-11-27 Can consolidate stand migration structure of crane beam Active CN119195532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411707328.7A CN119195532B (en) 2024-11-27 2024-11-27 Can consolidate stand migration structure of crane beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411707328.7A CN119195532B (en) 2024-11-27 2024-11-27 Can consolidate stand migration structure of crane beam

Publications (2)

Publication Number Publication Date
CN119195532A true CN119195532A (en) 2024-12-27
CN119195532B CN119195532B (en) 2025-02-14

Family

ID=94076459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411707328.7A Active CN119195532B (en) 2024-11-27 2024-11-27 Can consolidate stand migration structure of crane beam

Country Status (1)

Country Link
CN (1) CN119195532B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100296723B1 (en) * 1994-02-14 2001-10-24 무로보시아키라 Construction method such as concrete house
CN103121625A (en) * 2011-11-21 2013-05-29 攀钢集团攀枝花钢钒有限公司 Method for high altitude disassembly of large-scale part
CN208534068U (en) * 2018-05-19 2019-02-22 中水电第十一工程局(郑州)有限公司 A traction-slip system for erecting prefabricated crane beams in a power plant
CN213390842U (en) * 2020-07-29 2021-06-08 安宜建设集团有限公司 Local bearing and supporting structure of steel truss
CN117052137A (en) * 2023-07-25 2023-11-14 上海宝冶集团有限公司 Large grid steel structure sliding installation device and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100296723B1 (en) * 1994-02-14 2001-10-24 무로보시아키라 Construction method such as concrete house
CN103121625A (en) * 2011-11-21 2013-05-29 攀钢集团攀枝花钢钒有限公司 Method for high altitude disassembly of large-scale part
CN208534068U (en) * 2018-05-19 2019-02-22 中水电第十一工程局(郑州)有限公司 A traction-slip system for erecting prefabricated crane beams in a power plant
CN213390842U (en) * 2020-07-29 2021-06-08 安宜建设集团有限公司 Local bearing and supporting structure of steel truss
CN117052137A (en) * 2023-07-25 2023-11-14 上海宝冶集团有限公司 Large grid steel structure sliding installation device and construction method thereof

Also Published As

Publication number Publication date
CN119195532B (en) 2025-02-14

Similar Documents

Publication Publication Date Title
JP3885584B2 (en) Construction method of composite truss bridge
CN115030046A (en) Hydraulic creeping formwork for hollow thin-wall pier and construction method thereof
CN103010949B (en) Method for traveling and operating portal crane on large-angle slope
CN110886233A (en) Construction method for connecting T-shaped beam with bridge
CN105019357B (en) The installation method of abnormity prefabricated bridge on a kind of arch bridge uncovered lattice girder steel
CN111794522A (en) Construction method of large-span high-altitude steel structure
CN112227206A (en) Process design and construction method for ground anchor to self-anchored beam
CN103030070B (en) A kind of can the transfer crane of traveling and operation on ramp
CN107227686A (en) A kind of tunnel-type anchorage pre-stress system locating support construction method
CN114575251B (en) Construction system and method of long-span steel truss arch bridge
CN110552294B (en) Reverse girder erection construction platform of bridge girder erection machine and construction method thereof
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN116853963B (en) A hoisting device and hoisting method for main beam of cable-stayed bridge
CN119195532B (en) Can consolidate stand migration structure of crane beam
CN210766417U (en) Pier-spanning lifting beam support device at side position of bridge
CN117144811A (en) Translation frame system of cast-in-situ box girder and construction method thereof
CN116411524A (en) Construction method of large multi-span self-propelled automatic formwork
CN108086168A (en) Ride cable-styled erection crane
CN113152166B (en) Straddle type monorail track beam sliding erection tool
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN110316662B (en) Installation and construction method of large-span portal crane
CN210140771U (en) Construction work platform hoisting frame of high mound of bridge
CN215801072U (en) Trackless walking hanging basket
CN117488647A (en) A kind of steel truss web rod composite beam suitable for the upper and lower floors of urban elevated highways and its construction method
CN210217757U (en) A super long lining trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant