CN119163235A - Building construction machine and construction method thereof - Google Patents
Building construction machine and construction method thereof Download PDFInfo
- Publication number
- CN119163235A CN119163235A CN202411589260.7A CN202411589260A CN119163235A CN 119163235 A CN119163235 A CN 119163235A CN 202411589260 A CN202411589260 A CN 202411589260A CN 119163235 A CN119163235 A CN 119163235A
- Authority
- CN
- China
- Prior art keywords
- frame body
- hanging frame
- jacking
- building machine
- core tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 73
- 238000009435 building construction Methods 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims description 42
- 239000010959 steel Substances 0.000 claims description 42
- 230000009194 climbing Effects 0.000 claims description 31
- 239000000725 suspension Substances 0.000 claims description 23
- 230000000712 assembly Effects 0.000 claims description 22
- 238000000429 assembly Methods 0.000 claims description 22
- 238000005507 spraying Methods 0.000 claims description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 17
- 239000007921 spray Substances 0.000 claims description 13
- 230000001360 synchronised effect Effects 0.000 claims description 13
- 230000001681 protective effect Effects 0.000 claims description 7
- 241000357293 Leptobrama muelleri Species 0.000 claims description 5
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 claims description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 6
- 238000009415 formwork Methods 0.000 description 6
- 239000010720 hydraulic oil Substances 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 3
- 235000017491 Bambusa tulda Nutrition 0.000 description 3
- 241001330002 Bambuseae Species 0.000 description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 3
- 239000011425 bamboo Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000004744 fabric Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000002390 adhesive tape Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/002—Workplatforms, railings; Arrangements for pouring concrete, attached to the form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/246—Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to the technical field of building engineering construction, and particularly discloses a building machine which comprises a lower hanging frame body, a jacking power system, a supporting system, an attaching system and a jacking platform system, wherein the lower hanging frame body comprises an outer hanging frame body and an inner hanging frame body, the attaching system is fixedly arranged on a core tube shear wall, the supporting system is connected with the attaching system, the outer hanging frame body and the inner hanging frame body are respectively arranged on two sides of the core tube shear wall, the outer hanging frame body and the inner hanging frame body are both connected with the supporting system, the jacking power system is connected with the attaching system and can drive the inner hanging frame body to move vertically, the jacking platform system is arranged above the core tube shear wall and is connected with the supporting system, and the outer hanging frame body and the inner hanging frame body are both connected with the jacking platform system. The invention also provides a construction method of the building machine. The invention can segment the construction area of each layer of structure, so that the construction operation of each stage is not affected, and the construction efficiency can be effectively improved.
Description
Technical Field
The invention relates to the technical field of building engineering construction, in particular to a building machine and a construction method thereof.
Background
At present, in super high-rise building structure construction, large-scale construction equipment of climbing formwork and climbing frame is generally adopted, and this type of equipment is core section of thick bamboo shear force wall (vertical structure) and core section of thick bamboo beam slab (horizontal structure) synchronous construction in the work progress, and the construction efficiency can't improve because of the later flowing water construction condition of frame horizontal structure and steel-pipe column.
Disclosure of Invention
The invention aims to solve the technical problem of improving the construction efficiency in the construction of super high-rise building structures.
In order to solve the technical problems, the invention provides a building machine for the construction of a core tube structure of a super high-rise building, which comprises a lower hanging frame body, a jacking power system, a supporting system, an attaching system and a top platform system, wherein the lower hanging frame body comprises an outer hanging frame body and an inner hanging frame body, the attaching system is fixedly arranged on a core tube shear wall, the supporting system is connected with the attaching system, the outer hanging frame body and the inner hanging frame body are respectively arranged on two sides of the core tube shear wall, the outer hanging frame body and the inner hanging frame body are both connected with the supporting system, the jacking power system is connected with the attaching system and can drive the inner hanging frame body to move vertically, and the top platform system is arranged above the core tube shear wall and is connected with the supporting system, and the outer hanging frame body and the inner hanging frame body are both connected with the top platform system.
Further preferably, the support system comprises a plurality of groups of guide rail assemblies, each group of guide rail assemblies is formed by splicing a jacking guide rail and a square pipe, the guide rail assemblies are vertically connected with the jacking platform system, the outer hanging frame body and the inner hanging frame body are respectively connected with the guide rail assemblies, and the guide rail assemblies are connected with the attachment system.
Further preferably, the attachment system comprises a plurality of embedded climbing cones and hanging shoes, the embedded climbing cones are vertically arranged on the core tube shear wall, the hanging shoes are connected with the embedded climbing cones, and each group of guide rail assemblies is connected with at least three hanging shoes.
Further preferably, the jacking power system comprises a jacking device, a climbing shoe and a hydraulic synchronous control device, wherein the jacking device is installed on the suspension shoe, the climbing shoe is installed on the jacking guide rail, the climbing shoe is connected with the jacking device, and the jacking device is controlled by the hydraulic synchronous control device.
Still preferably, the shear wall comprises a template system, wherein the template system is arranged at the top of the shear wall of the core tube, the template system comprises two oppositely arranged steel frame templates, two oppositely arranged double-spliced groove steel back ribs are arranged on one sides of the two steel frame templates, disc locks are connected between the oppositely arranged steel frame templates, the top platform system is provided with hanging rings, hanging hooks are arranged on the hanging rings, and the hanging hooks are connected with the steel frame templates through hanging ropes.
Further preferably, the top platform system comprises a frame structure formed by steel I-beams in the longitudinal direction and the transverse direction, steel grating plates are paved on the frame structure to form a top layer construction platform, protective nets are arranged at the peripheral edges of the frame structure, and protective rails and skirting boards are arranged on the frame structure located on the outer side of the shear wall of the core tube.
Further preferably, the top layer construction platform further comprises at least one spreader, wherein the spreader is mounted on the top layer construction platform.
Still preferably, the elevator system further comprises a goods elevator system, the goods elevator system can directly rise to the top layer construction platform from the first storey of the super high-rise building, the top layer construction platform is further provided with a plurality of wall attaching frame bodies extending to the lower hanging frame bodies, the wall attaching frame bodies are all connected with the goods elevator system, and the top layer construction platform is further provided with a triangular bracket which is connected with the goods elevator system.
Still preferably, the concrete curing system further comprises an intelligent spraying system, wherein the intelligent spraying system comprises an intelligent control system, a water supply system and a spraying pipeline, and the intelligent control system is used for controlling the water supply system to convey a water source to the spraying pipeline so as to be used for spraying and curing concrete.
In order to solve the technical problems, the invention also provides a construction method of the building machine, which is realized based on the building machine and comprises the following steps:
The core tube shear wall is provided with a pre-buried climbing cone;
assembling the lower hanging frame body, the supporting system and the top platform system;
the template system, the attachment system, the support system, the inner hanging frame body, the top platform system, the outer hanging frame body, the distributing machine and the intelligent spraying system are sequentially hoisted and installed;
The method comprises the steps of installing and debugging a jacking power system, wherein the debugging step of the jacking power system comprises the steps of carrying out film removing operation on a template system, removing the suspension boots at the lowest layer, controlling the jacking device to operate by the hydraulic synchronous control device, installing the suspension boots, closing the template system and moving the jacking device to the position of the upper layer of the attachment system.
Compared with the prior art, the building making machine and the construction method thereof have the beneficial effects that:
The building machine is applied to super high-rise building construction, and the construction area of each layer of structure can be segmented, so that the core tube wall column structure construction, the core tube beam plate structure construction and the flow construction operation of the outer frame and the steel pipe column structure are not affected, and the construction efficiency can be effectively improved.
Drawings
Fig. 1 is a schematic view of a building machine according to the present invention.
Fig. 2 is a schematic layout of the jacking power system of the present invention.
FIG. 3 is a layout of the track assembly and pre-buried climbing cone of the present invention.
Fig. 4 is a schematic structural view of the support system and the attachment system according to the present invention.
FIG. 5 is an assembly view of the lower hanger body and the core tube shear wall of the present invention.
Fig. 6 is a front view of the template system of the present invention.
Fig. 7 is a side view of the form system of the present invention.
FIG. 8 is a schematic view of the installation of the pylon according to the present invention.
Fig. 9 is a schematic view illustrating the installation of the inner hanger body according to the present invention.
Fig. 10 is a schematic installation view of the roof platform system of the present invention.
Fig. 11 is a schematic structural view of the intelligent spraying system according to the present invention.
Fig. 12 is a layout of the shower pipe and the shower header of the present invention.
Fig. 13 is an assembled top view of the spreader of the present invention.
Fig. 14 is an assembled side view of the spreader of the present invention.
Fig. 15 is a structural view of the man-machine lift system according to the present invention.
Fig. 16 is a schematic view of an arrangement of an elevator protection net according to the present invention.
In the figure:
10. a lower hanger body; 11, an externally hung frame body 12, an internally hung frame body;
20. jacking a power system; 21, climbing boots, 22, a jacking device, 23, a hydraulic synchronous control device, 24, a hydraulic oil pipe;
30. 31, a guide rail assembly;
40. Attachment system, 41, pre-buried climbing cone, 42, hanging boot
50. Top platform system, 51, frame structure, 52, steel grating;
60. the system comprises a template system, a steel frame template, a double-spliced groove steel back edge, a 63 and a disc lockset;
70. A cloth machine;
80. a man-cargo elevator system; 81 parts of an elevator body, 82 parts of an attached wall frame body, 83 parts of a triangular bracket, 84 parts of an elevator protection net;
90. an intelligent spraying system; 91, an intelligent control system, 92, a water supply system, 93, a spray pipeline, 94 and a spray header;
100. A core tube shear wall.
Detailed Description
The following describes in further detail the embodiments of the present invention with reference to the drawings and examples. The following examples are illustrative of the invention and are not intended to limit the scope of the invention.
In the description of the present invention, it should be understood that the terms "center," "longitudinal," "transverse," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," etc. are used herein for convenience in describing the invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have a particular orientation, be configured and operated in a particular orientation, and thus should not be construed as limiting the invention.
The terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In the description of the present invention, the meaning of "plurality" means at least two, for example, two, three, etc., unless specifically defined otherwise.
Furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "coupled," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected, mechanically connected, electrically connected, directly connected, or indirectly connected via an intervening medium, or may be in communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
In the present invention, unless expressly stated or limited otherwise, a first feature "up" or "down" a second feature may be the first and second features in direct contact, or the first and second features in indirect contact via an intervening medium. Moreover, a first feature being "above," "over" and "on" a second feature may be a first feature being directly above or obliquely above the second feature, or simply indicating that the first feature is level higher than the second feature. The first feature being "under", "below" and "beneath" the second feature may be the first feature being directly under or obliquely below the second feature, or simply indicating that the first feature is less level than the second feature.
It will be understood that when an element is referred to as being "fixed" or "disposed" on another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "upper," "lower," "left," "right," and the like are used herein for illustrative purposes only and are not meant to be the only embodiment.
Example 1
As shown in fig. 1 to 16, the present embodiment provides a building machine, which is applied to the core tube structure construction of a super high-rise building, and the purpose of the building machine is to segment the construction area of each layer of structure, so that the core tube wall column structure construction, the core tube beam slab structure construction, and the flow construction operation of the outer frame and the steel pipe column structure are not affected, thereby effectively improving the construction efficiency.
In a specific embodiment, the building machine comprises a lower hanger body 10, a jacking power system 20, a supporting system 30, an attaching system 40 and a top platform system 50, wherein the lower hanger body 10 comprises an outer hanger body 11 and an inner hanger body 12, the attaching system 40 is fixedly arranged on a core tube shear wall 100, the supporting system 30 is connected with the attaching system 40, the outer hanger body 11 and the inner hanger body 12 are respectively arranged on two sides of the core tube shear wall 100, the outer hanger body 11 and the inner hanger body 12 are connected with the supporting system 30, the jacking power system 20 is connected with the attaching system 40 and can drive the inner hanger body 12 to move vertically, the top platform system 50 is arranged above the core tube shear wall 100 and is connected with the supporting system 30, and the outer hanger body 11 and the inner hanger body 12 are connected with the top platform system 50.
In some embodiments, the whole building machine is preferably 24.5m wide and 35.5m long, the outer hanging frame 11 is 17m high, the inner hanging frame 12 is 20.575m high, the outer hanging frame 11 of the building machine is divided into 16 outer hanging frame bodies, the core barrel is divided into 17 inner hanging frame bodies, and the width of the frame body pavement plate is 900mm.
In some embodiments, the lower hanger body 10 of the building machine is mainly used as a reinforcing steel bar binding operation layer, an electromechanical pre-embedding and concrete pouring operation layer, a large formwork operation layer (which can perform the work of formwork reinforcement, mold closing, mold withdrawing and the like), a steel structure and tower crane connecting piece welding operation layer and can simultaneously perform the inner and outer wall repairing work.
In some embodiments, the support system 30 includes multiple sets of guide rail assemblies 31, each set of guide rail assemblies is formed by splicing a jacking guide rail and a square pipe, the guide rail assemblies 31 are vertically connected with the jacking platform system 50, the outer hanging frame 11 and the inner hanging frame 12 are respectively connected with the guide rail assemblies 31, and the guide rail assemblies 31 are connected with the attachment system 40, so that the support system 30 can stably support the building machine frame, and the overall building machine frame does not need to climb independently without the guide rail and the risk of falling.
In some preferred embodiments, the entire project is co-located 44 sets of track assemblies 31.
In other embodiments, the length of the jacking guide rail is 12m, the length of the square pipe is 8.5m, and the total length of the guide rail assembly formed after splicing is 20.5m.
In other embodiments, rail assemblies 31 are bolted to the top deck system 50 using high strength bolts of grade 8.8 and above.
In some embodiments, the attachment system 40 includes a plurality of pre-buried climbing cones 41 and suspension boots 42, the plurality of pre-buried climbing cones 41 are vertically disposed on the core tube shear wall 100, the suspension boots 42 are connected with the pre-buried climbing cones 41, and each set of guide rail assemblies 31 is connected with at least three suspension boots 42.
In some embodiments, three attachment points are provided for each set of rail assemblies 31, the three attachment points corresponding to three suspension shoes 42, so that in this example, 44 x 3 sets of attachment systems 40 are provided, the attachment systems 40 being located on the core tube shear wall and connected to the support system 30 of the building machine as a whole.
In some embodiments, the jacking power system 20 includes a jacking device 22, a climbing shoe 21 and a hydraulic synchronous control device 23, the jacking device 22 is mounted on the suspension shoe 42, the climbing shoe 21 is mounted on the jacking guide rail, the climbing shoe 21 is connected with the jacking device 22, and the jacking device 22 is controlled by the hydraulic synchronous control device 23.
Specifically, the jacking power system 20 further includes a hydraulic oil pipe 24, and the hydraulic oil pipe 24 is connected between the jacking device 22 and the hydraulic synchronization control device 23.
In this way, the whole building machine fixes the supporting system 30 through the hanging boots 42 of the attaching system 40, and the 44 sets of guide rail assemblies 31 are lifted up integrally through the lifting power system 20 and the attaching system 40 during lifting up so as to meet the lifting operation requirement of the building machine frame body.
In this embodiment, the suspension boots 42 integrate the functions of bearing, falling prevention and tilting prevention, and the working principle of the suspension system is that each guide rail assembly 31 is structurally attached on a building structure through the suspension boots 42, three layers of suspension boots 42 encircle the guide rail assembly 31 to prevent falling and tilting under a static condition, one layer of suspension boots 42 support the guide rail assembly 31, two layers of suspension boots 42 encircle the guide rail assembly 31 to prevent falling and tilting under a lifting condition, and one layer of suspension boots 42 support the guide rail assembly 31 to form a never falling frame body.
In other embodiments, to ensure that wall shrinkage does not affect the attachment system points, the building machine attachment points are located on the wall where the wall does not change within the core barrel. The attachment system is pre-buried on the core tube shear wall 100, and is fixed with the guide rail assembly 31 after construction is completed, so as to provide stable attachment points for the building machine.
In some embodiments, jacking power system 20 is mounted on a building machine negative one-storey steel frame platform. Each machine position is provided with a jacking device 22, the jacking device 22 is positioned on a second layer of the vertical three-layer wall-attached hanging boots 42, the cantilever height of the top structure can be reduced, and the climbing boots 21 are arranged on the jacking guide rails.
In some embodiments, the jacking device 22 is a hydraulic cylinder, and the purpose of jacking the frame body is achieved through repeated operation of the hydraulic cylinder.
In some embodiments, the output pressure of the hydraulic synchronous control device 23 is not lower than 30MPa, at least the 80-type oil cylinder 50 can be driven to operate synchronously, the hydraulic oil cylinder is in bidirectional action, the ejection pressure is not lower than 15t, and the hydraulic synchronous control device 23 is operated and provided with a remote control switch, so that the synchronization of the integral lifting of the frame body is ensured. Meanwhile, in order to meet the construction requirement that the project standard layer is 4.5m, the building machine climbs 4.5m each time.
In some embodiments, the building machine further includes a formwork system 60, the formwork system 60 is disposed at the top of the core tube shear wall 100, the formwork system 60 includes two steel frame templates 61 disposed oppositely, two opposite sides of the steel frame templates 61 are provided with opposite double-groove steel back ribs 62, and a disc lock 63 is connected between the opposite steel frame templates 61.
In some embodiments, the standard layer height of the project corresponding to the embodiment is 4.5 meters, and the refuge layer is 9 meters, so that the steel frame template 61 is integrally a large steel template with a height of 4.6 meters, and the double-spliced groove steel back ridge 62 is locked and reinforced by the disc lock 63.
In some embodiments, the top deck system 50 is provided with a lifting ring, and the lifting ring is provided with a lifting hook, and the lifting hook is connected with the steel frame template 61 through a lifting rope. Specifically, the steel frame template 61 is connected with the lifting hook under the building machine top platform system 50 by adopting a steel wire rope, the steel frame template 61 completes the mould withdrawing operation when the building machine climbs, and at the moment, the steel frame template 61 is fixed by depending on the lower hanging lifting hook of the top platform system 50 and climbs synchronously along with the whole building machine.
In other embodiments, because of small errors in climbing, the form system 60 also needs to be finely adjusted by using chain blocks, and an oily release agent is smeared inside the steel frame form 61 before concrete pouring to facilitate release.
In some embodiments, the lower hanger body 10 of the present embodiment includes an outer hanger body 11 and an inner hanger body 12. The external hanging frame body 11 is arranged in 6 layers according to construction requirements, the external hanging frame body 11 covers 3 layers of half (15.5 m) standard layers of the core tube structure, the external hanging frame body 11 is hung on a framework steel beam of the top platform system 50, the external hanging frame body 11 is positioned on the outer side of the core tube shear wall 100, the external hanging frame body 11 can be divided into 6 layers of construction platforms, the layer of the top platform system 50 is 0 layer, the next layer is an upper reinforcing steel bar binding layer, the next two layers are lower reinforcing steel bar binding layers and concrete pouring layers and can be simultaneously responsible for electromechanical embedding, the next three layers, the next four layers and the next five layers are large template working layers, constructors can perform template reinforcing, die assembling, die withdrawing and other works on the layers, and the next six layers are steel structures and tower crane connecting pieces are welded, outer wall repairing works can be simultaneously performed, and all layers of the construction platforms of the whole frame body cover the adjacent side protection systems.
In some embodiments, the inner hanging frame 12 is provided with 7 layers (the fire-fighting stair safety channel is partially and downwards hung with 2 layers of frame bodies) according to construction requirements, the inner hanging frame 12 is connected to the steel beam of the top platform system 50 in a hanging manner, the inner hanging frame 12 is positioned on the inner side of the core tube shear wall 100, and the inner side of the inner hanging frame 12 is connected with the jacking guide rail and the square pipe. The inner side of the inner hanging frame body 12 (the inner side of the frame body is close to the wall surface) is provided with a protective railing above the negative first layer, the negative second layer and the negative seventh layer, and three safety protective railings are arranged above the negative sixth layer. The large template layer (minus five layers) and the inner side of the bottommost layer are completely sealed by adopting a sealing turning plate and a structure, and the minus six layers are completely sealed by adopting the sealing turning plate and a structure beam only at the door opening, so that the object can be effectively prevented from falling to hurt people.
In some embodiments, the roof deck system 50 includes a frame structure 51 formed of steel i-beams in both the longitudinal and transverse directions, and steel lattice plates 52 are laid on the frame structure 51 to form a roof deck. The top construction platform is installed on the building machine support system 30 (including hydraulic jacking), and is connected with the attachment system 40 and the jacking power system 20 into a whole, and is fixed on the building structure through an attachment anchor point.
In some embodiments, the frame structure 51 is provided with a protection net at the peripheral edges, the height of the protection net is 1.5 meters, and the frame structure located outside the core tube shear wall 100 is provided with protection rails and skirting boards.
It should be noted that the top platform system 50 is configured to set a loading area and a non-loading area, and to set relevant functional areas, such as a tool room, a rest area, a toilet, etc.
In some embodiments, to facilitate construction, the building machine further comprises at least one spreader 70, the spreader 70 being mounted on the top construction platform.
In other embodiments, the building machine includes two spreaders 70, one having a radius of 17 meters and the other having a radius of 21 meters, to facilitate construction operations.
In some embodiments, the steel beam base of spreader 70 is fixed to the top construction platform, and the four support feet of spreader 70 fall above the attachment points. Four supporting legs are arranged on the top construction platform frame beam, and each supporting leg is provided with 4M 16 x 60 high-strength bolts. Two cloth machines are arranged for operation, and can completely cover all areas of the core tube, so that the concrete pouring requirement is met.
In some embodiments, the building machine further comprises an intelligent spraying system 90, wherein the intelligent spraying system 90 is located at the lower hanging frame body 10 of the building machine and is fixed on the protective railing of the lower hanging frame body 10 so as to facilitate maintenance of the concrete just poured.
In some embodiments, the intelligent spraying system 90 includes an intelligent control system 91, a water supply system 92, and a spraying pipe 93, wherein the intelligent control system 91 is configured to control the water supply system 92 to deliver water to the spraying pipe 93 for spraying maintenance of concrete. Specifically, water supply system 92 includes high-lift booster pump and main water pipe, intelligence spraying system 90 is equipped with high-lift booster pump in core section of thick bamboo lower floor, through the intelligent automatic control module that sprays of intelligent control system 91 integration, will spray the maintenance water and carry to the building machine top layer platform from the main water pipe of lower floor through water supply system 92, main water pipe installs at building machine top layer platform girder steel lower mouth, carry respectively to each spray pipe 93, spray pipe 93 installs on building machine inner frame five-layer platform protection railing, spray pipe 93 goes up spacing 1 meter about connection shower head 94, local special position can be adjusted, guarantee that every wall body can all be covered by shower head 94, carry out concrete spray maintenance.
In some embodiments, the building machine further comprises a goods elevator system 80, the goods elevator system 80 can directly rise to the top layer construction platform from the first floor of the super high-rise building, the goods elevator system 80 comprises an elevator body 81, the top layer construction platform is further provided with a plurality of wall-attached frame bodies 82 extending to the lower hanging frame body 10, the wall-attached frame bodies 81 are all connected with the elevator body 81, a triangular bracket 83 is further arranged on the top layer construction platform, and the triangular bracket 83 is connected with the goods elevator system 80.
In some embodiments, the elevator body 81 is an SC200/200ZB construction elevator, the size of which is 1570mm x 1200mm x 230mm, because the building frame body is higher, the wall attaching requirement of the construction elevator cannot be met, the building machine climbs frequently, the construction elevator cannot rise to the top platform after climbing, and the conventional wall attaching cannot meet the wall attaching specification requirement of the elevator, three movable wall attaching frame bodies 81 are arranged at the lower hanging frame body 10 and the top platform system 50 of the building machine, so that the building machine can be used after climbing is completed, and meanwhile, in order to ensure the sliding wall attaching force of the construction elevator, two auxiliary fixed triangular supports 83 are arranged behind the wall attaching frame bodies 81.
In some embodiments, the construction technology of the building machine is adopted, so that the core tube wall column and the core tube beam slab are constructed in a staggered manner, and therefore the steel bars of the core tube beam slab and the core tube wall column are pre-buried when the wall column is constructed, so that the climbing of the building machine is not affected, the steel bars of the slab are pre-buried when the core tube wall column is constructed, and the steel bars are sealed by adopting the PVC wire slots. And embedding the sleeve of the beam steel bar in the construction of the core wall column, and protecting the sleeve by using adhesive tape. And (3) chiseling pre-buried steel bars when the horizontal structure is constructed to the corresponding position, and extending the steel bars to the plate surface for lap joint or welding construction.
Example 2
The embodiment provides a building machine construction method, which is realized based on the building machine of the embodiment 1, and comprises the following steps:
S1, arranging pre-buried climbing cones on the core tube shear wall 100;
S2, assembling the lower hanging frame body 10, the supporting system 30 and the top platform system 50;
S3, sequentially hoisting and installing the template system 60, the attachment system 40, the support system 30, the inner hanging frame body 12, the top platform system 50, the outer hanging frame body 11, the distributor 70 and the intelligent spraying system 90;
S4, installing and debugging the jacking power system 20, wherein the debugging step of the jacking power system 20 comprises the steps of carrying out film removing operation on the template system 60, removing the suspension boots at the lowest layer, controlling the jacking device to operate by the hydraulic synchronous control device, installing the suspension boots, closing the template system 60, and moving the jacking device to the position of the upper layer of the attachment system 40.
The construction method of the building machine integral structure comprises the steps of constructing a wall column structure, constructing a core tube, an outer frame horizontal structure beam, a plate and stair reinforcing steel bars in a second step, constructing a third step, delaying the horizontal structure in the core tube by 3-5 layers, chiseling the embedded reinforcing steel bars when reaching a working surface, binding the embedded reinforcing steel bars, a sleeve and the horizontal structure beam, the plate and the stair, and constructing a fifth step, pouring beam, plate and stair concrete, and erecting a next layer of frame body.
In summary, the embodiment of the invention provides a building machine and a construction method thereof, which can segment the construction area of each layer of structure, so that the construction of a core tube wall column structure, the construction of a core tube beam plate structure and the flow construction operation of an outer frame and a steel pipe column structure are not affected, and the construction efficiency can be effectively improved.
The foregoing is merely a preferred embodiment of the present invention, and it should be noted that modifications and substitutions can be made by those skilled in the art without departing from the technical principles of the present invention, and these modifications and substitutions should also be considered as being within the scope of the present invention. While there has been shown and described what are at present considered to be fundamental principles, main features and advantages of the present invention, it will be apparent to those skilled in the art that the present invention is not limited to the details of the foregoing preferred embodiments, and that the examples should be considered as exemplary and not limiting, the scope of the present invention being defined by the appended claims rather than by the foregoing description, and it is therefore intended to include within the invention all changes which fall within the meaning and range of equivalency of the claims.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail herein, but rather is provided for the purpose of enabling those skilled in the art to make and use the embodiments described herein.
Claims (10)
1. The building machine is used for the construction of a super high-rise building core tube structure and is characterized by comprising a lower hanging frame body, a jacking power system, a supporting system, an attaching system and a jacking platform system, wherein the lower hanging frame body comprises an outer hanging frame body and an inner hanging frame body, the attaching system is fixedly arranged on a core tube shear wall, the supporting system is connected with the attaching system, the outer hanging frame body and the inner hanging frame body are respectively arranged on two sides of the core tube shear wall, the outer hanging frame body and the inner hanging frame body are connected with the supporting system, the jacking power system is connected with the attaching system and can drive the inner hanging frame body to move vertically, and the jacking platform system is arranged above the core tube shear wall and is connected with the supporting system, and the outer hanging frame body and the inner hanging frame body are connected with the jacking platform system.
2. The building machine according to claim 1, wherein the support system comprises a plurality of groups of guide rail assemblies, each group of guide rail assemblies is formed by splicing a jacking guide rail and a square pipe, the guide rail assemblies are vertically connected with the jacking platform system, the outer hanging frame body and the inner hanging frame body are respectively connected with the guide rail assemblies, and the guide rail assemblies are connected with the attachment system.
3. The building machine of claim 2, wherein the attachment system comprises a plurality of pre-buried climbing cones and a suspension shoe, the plurality of pre-buried climbing cones are vertically arranged on the core tube shear wall, the suspension shoe is connected with the pre-buried climbing cones, and each group of guide rail assemblies is connected with at least three suspension shoes.
4. A building machine according to claim 3, wherein the jacking power system comprises a jacking device, a climbing shoe and a hydraulic synchronous control device, the jacking device is mounted on the suspension shoe, the climbing shoe is mounted on the jacking guide rail, the climbing shoe is connected with the jacking device, and the jacking device is controlled by the hydraulic synchronous control device.
5. The building machine according to claim 1, further comprising a template system, wherein the template system is arranged at the top of the core tube shear wall and comprises two oppositely arranged steel frame templates, two opposite sides of the two steel frame templates are provided with opposite double-groove steel back edges, a disc lockset is connected between the opposite steel frame templates, the top platform system is provided with a hanging ring, the hanging ring is provided with a hanging hook, and the hanging hook is connected with the steel frame templates through hanging ropes.
6. The building machine according to claim 1, wherein the top platform system comprises a frame structure formed by longitudinal and transverse I-beams, steel grating plates are paved on the frame structure to form a top layer construction platform, protective nets are arranged at the peripheral edges of the frame structure, and protective rails and skirting boards are arranged on the frame structure located on the outer side of the core tube shear wall.
7. A building machine according to claim 6, further comprising at least one spreader mounted to the top construction platform.
8. The building machine according to claim 6, further comprising a goods elevator system, wherein the goods elevator system can directly ascend from a first floor of the super high-rise building to the top layer construction platform, the top layer construction platform is further provided with a plurality of wall-attached frame bodies extending to the lower hanging frame body, the wall-attached frame bodies are all connected with the goods elevator system, and the top layer construction platform is further provided with a triangular bracket connected with the goods elevator system.
9. The building machine of claim 1, further comprising an intelligent spray system, the intelligent spray system comprising an intelligent control system, a water supply system, and a spray pipe, the intelligent control system being configured to control the water supply system to deliver water to the spray pipe for spray curing of concrete.
10. A building machine construction method, realized on the basis of a building machine according to any one of claims 1-9, characterized in that it comprises the following steps:
The core tube shear wall is provided with a pre-buried climbing cone;
assembling the lower hanging frame body, the supporting system and the top platform system;
the template system, the attachment system, the support system, the inner hanging frame body, the top platform system, the outer hanging frame body, the distributing machine and the intelligent spraying system are sequentially hoisted and installed;
The method comprises the steps of installing and debugging a jacking power system, wherein the debugging step of the jacking power system comprises the steps of carrying out film removing operation on a template system, removing the suspension boots at the lowest layer, controlling the jacking device to operate by the hydraulic synchronous control device, installing the suspension boots, closing the template system and moving the jacking device to the position of the upper layer of the attachment system.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202411589260.7A CN119163235A (en) | 2024-11-08 | 2024-11-08 | Building construction machine and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202411589260.7A CN119163235A (en) | 2024-11-08 | 2024-11-08 | Building construction machine and construction method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN119163235A true CN119163235A (en) | 2024-12-20 |
Family
ID=93892738
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202411589260.7A Pending CN119163235A (en) | 2024-11-08 | 2024-11-08 | Building construction machine and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN119163235A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120684001A (en) * | 2025-07-23 | 2025-09-23 | 上海宝冶集团有限公司 | A multi-platform building machine for super high-rise core tube structure construction and a construction method thereof |
-
2024
- 2024-11-08 CN CN202411589260.7A patent/CN119163235A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120684001A (en) * | 2025-07-23 | 2025-09-23 | 上海宝冶集团有限公司 | A multi-platform building machine for super high-rise core tube structure construction and a construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2019409113B2 (en) | Building site device having a climbing formwork and an elevator system | |
| CN201217898Y (en) | Concrete prefabricated stairs | |
| CN103635643A (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
| US20030033772A1 (en) | Methods and apparatus for building tall vertical structures | |
| CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
| CN202090591U (en) | Lift type climbing formwork of building operations | |
| CN116181041B (en) | Building machine of multilayer quick construction | |
| CN106400951A (en) | Synchronous construction method for horizontal and vertical structures of super high-rise building | |
| PL190117B1 (en) | Modular set of components for construction of railway station platforms | |
| CN115538792B (en) | Building construction method and building construction structure by using residential building machine | |
| CN111926911B (en) | Construction method of super high-rise air corridor structure | |
| CN201962944U (en) | Hydraulic climbing formwork for building construction | |
| CN115559351B (en) | Reverse construction method for multi-layer basement of all-steel structure | |
| CN116335398A (en) | Multilayer rapid construction method | |
| CN113338537A (en) | Construction method of ultrahigh large-section concrete frame column | |
| CN109184190A (en) | It climbs and carries integrated beam type hydraulic climbing platform and its installation method | |
| CN109505309B (en) | A displacement system for pipe gallery segments and a pipe gallery installation method using the displacement system | |
| CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
| Li et al. | Study on construction technology of hydraulic climbing formwork for super high-rise building under aluminum formwork system | |
| CN211420881U (en) | Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam | |
| CN220705161U (en) | Concrete floor post-cast strip hanging walking template system | |
| CN113463900A (en) | Multifunctional slidable hanging rack for staircase and construction method thereof | |
| CN102092642B (en) | Cylinder mixed structure group tower auxiliary arm, jacking device and construction method thereof | |
| CN106121238A (en) | High-altitude concrete conveying device | |
| CN216662305U (en) | Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |