CN119038412A - Door machine mounting and dismounting system and mounting and dismounting method thereof - Google Patents

Door machine mounting and dismounting system and mounting and dismounting method thereof Download PDF

Info

Publication number
CN119038412A
CN119038412A CN202411249637.4A CN202411249637A CN119038412A CN 119038412 A CN119038412 A CN 119038412A CN 202411249637 A CN202411249637 A CN 202411249637A CN 119038412 A CN119038412 A CN 119038412A
Authority
CN
China
Prior art keywords
jacking
lifting
installation
main beam
wheel seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202411249637.4A
Other languages
Chinese (zh)
Inventor
谭志国
高鹏
宫照光
王爱国
周建兵
龚磊
王宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges Construction Engineering Co Ltd
Original Assignee
China Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges Construction Engineering Co Ltd filed Critical China Three Gorges Construction Engineering Co Ltd
Priority to CN202411249637.4A priority Critical patent/CN119038412A/en
Publication of CN119038412A publication Critical patent/CN119038412A/en
Priority to PCT/CN2025/129835 priority patent/WO2026052151A1/en
Pending legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00—Base supporting structures with legs
    • B66C5/02—Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C7/00—Runways, tracks or trackways for trolleys or cranes
    • B66C7/08—Constructional features of runway rails or rail mountings
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/08—Runners; Runner bearings
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00—Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/10—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
    • B66F7/16—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by one or more hydraulic or pneumatic jacks
    • B66F7/18—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by one or more hydraulic or pneumatic jacks by a single central jack
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00—Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/28—Constructional details, e.g. end stops, pivoting supporting members, sliding runners adjustable to load dimensions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Jib Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The gantry crane installing and dismantling system comprises a gantry crane, wherein the gantry crane comprises a lifting girder, a walking wheel seat and supporting legs, the supporting legs are connected and supported between the lifting girder and the walking wheel seat, the walking wheel seat is used for moving on a track, bottom beams are respectively installed at the bottoms of two ends of the lifting girder, the supporting legs are respectively arranged at two sides of two ends of the lifting girder, the walking wheel seat is respectively arranged at two sides of two ends of the lifting girder, two ends of each supporting leg are respectively hinged with the walking wheel seat and the bottom beams at the same side, a gear is installed at one side of the walking wheel seat, racks are installed on the tracks at two sides at positions corresponding to the walking wheel seat, the gears and the racks are meshed and driven, and the gantry crane installing and dismantling system further comprises jacking systems, wherein the two jacking systems are respectively used for being arranged below two ends of the lifting girder. By adopting the structure to install the door machine, the quick and efficient, economical and safe installation or disassembly can be realized without the help of external large-scale hoisting equipment by only assisting with simple tools and structures.

Description

Door machine mounting and dismounting system and mounting and dismounting method thereof
Technical Field
The invention relates to the technical field of gantry cranes, in particular to a gantry crane assembly and disassembly system and an assembly and disassembly method thereof.
Background
The portal crane, for short, portal crane, is a kind of lifting equipment running on ground track. The installation and the disassembly of the door machine are carried out by adopting a method of hoisting the large hoisting equipment one by one, and after the installation of the metal structural part is completed, the installation of the functional equipment is carried out at high altitude, so that the efficiency of the mode is low, the danger is high, and the economical efficiency is poor.
For example, CN114261901A, publication No. 2022.04.01 discloses a method for installing a portal crane, which comprises the steps of arranging a connecting section at the installation position of a rigid leg below a main beam, enabling the height of the inner side of the connecting section to be lower than a first set value of the height of the outer side, rotating the outer side of the rigid leg to be connected with the outer side of the connecting section, lifting the main beam, adjusting the rigid leg to be approximately vertical to the main beam, temporarily fixing the rigid leg and the connecting section, installing a rigid leg cart, a flexible leg and a flexible leg cart, pulling the main beam, enabling the rigid leg to reach a first set offset, and welding the connecting section and the rigid leg. The crane has the advantages that the problem that the construction efficiency is low due to the fact that the rigid supporting legs are difficult to install when the large-tonnage crane is installed in the prior art, and the problem that the construction efficiency is low due to the fact that the rigid supporting legs are reinstalled is solved, and the crane has the defects that large-scale lifting equipment is needed to lift a main beam to the high altitude, and the risk is high.
Disclosure of Invention
In order to solve the technical problems at present, the main purpose of the invention is to provide a door machine installing and detaching system and an installing and detaching method thereof, which can realize the rapid, efficient, economical and safe installation and detaching effect without the help of external large-scale hoisting equipment and only with the help of simple tools and structures.
The technical scheme adopted by the invention is as follows:
The gantry crane installing and detaching system comprises a gantry crane, wherein the gantry crane comprises a lifting girder, a walking wheel seat and supporting legs, the supporting legs are connected and supported between the lifting girder and the walking wheel seat, the walking wheel seat is used for moving on a track, bottom beams are respectively installed at the bottoms of two ends of the lifting girder, the supporting legs are respectively arranged at two sides of two ends of the lifting girder, the walking wheel seat is respectively arranged at two sides of two ends of the lifting girder, each side of the supporting legs is respectively hinged with the walking wheel seat and the bottom beams at the same side, a gear is installed at one side of the walking wheel seat and driven by a speed reducing motor on the walking wheel seat, racks are installed on the tracks at positions corresponding to the walking wheel seats, the gears are meshed with the racks for transmission, and the gantry crane installing and detaching system further comprises two jacking systems which are respectively arranged below the two ends of the lifting girder and are used for eliminating dead points between the bottom beams and the supporting legs and assisting in jacking the lifting girder.
The two ends of the bottom beam are respectively provided with a first hinge support, the upper ends of the supporting legs are respectively provided with a second hinge support at one side far away from the lifting main beam, and the first hinge support and the second hinge support are hinged through a pin shaft.
The lower side of the bottom beam is fixedly connected with a first flange at the position corresponding to the supporting leg, the upper end of the supporting leg is fixedly connected with a second flange, and after the supporting leg is installed in place, the first flange and the second flange are connected through bolts.
The lower end of the supporting leg is fixedly connected with a third hinged support, the top of the walking wheel seat is fixedly connected with a fourth hinged support, and the third hinged support and the fourth hinged support are hinged through a pin shaft.
Bolt holes are formed in the side face of the rail and the rack, and the rack is mounted on the side face of the rail through bolts.
The travelling wheel seat comprises a frame, roller wheels and a gear motor, at least two roller wheels are arranged in the frame, the gear motor is arranged on the frame, a central shaft of one roller wheel is fixedly connected with a wheel body of the roller wheel, the central shaft is rotationally connected with the frame through a bearing seat, an output shaft of the gear motor is in transmission connection with one end of the central shaft of the roller wheel, and the other end of the central shaft extends out of the frame and is provided with the gear.
The jacking system comprises a jacking oil cylinder and a hydraulic station, wherein the hydraulic station is connected with the jacking oil cylinder through a pipeline and drives the jacking oil cylinder to stretch out and draw back through the hydraulic station.
The jacking system further comprises a jacking cylinder car, and the jacking cylinder and the hydraulic station are respectively arranged on the jacking cylinder car.
The bottom of the top cylinder car is also provided with a supporting oil cylinder, a piston rod of the supporting oil cylinder extends downwards, and the end part of the piston rod is provided with a supporting plate.
The bottom beam underside is at the position of contacting with the jacking system, or is provided with a jacking block at the top of the jacking system.
The gantry crane comprises a crane main beam, a rail, two cross beams, two supporting legs and a gantry crane, wherein the two cross beams are arranged between the two supporting legs at two ends of the crane main beam respectively, and the cross beams are used for being placed on the rail when the gantry crane is installed so as to support the supporting legs and the crane main beam above the supporting legs.
The mounting and dismounting method of the door machine mounting and dismounting system comprises the following steps:
S1, installing a track foundation and a track on the ground, and installing a rack at a proper position on the side surface of the track according to the length dimension of the supporting leg;
s2, respectively mounting four travelling wheel seats on the positions of the corresponding racks on the rails at two sides by using lifting equipment;
S3, temporarily placing the two cross beams on the track, wherein the cross beam on each side is positioned between the two travelling wheel seats;
s4, the supporting leg is horizontally arranged, one end of the supporting leg is hinged with the walking wheel seat through a pin shaft, and the other end of the supporting leg is placed on the cross beam;
s5, hoisting the main crane beam to the supporting legs by using a hoisting device, and hinging two ends of the bottom beam with the top ends of the supporting legs on two sides respectively;
s6, installing devices and equipment in a machine room, an outer frame of the machine room, a roof and a lightning rod on the lifting girder, and installing functional components of the gantry crane in a state of approaching the ground, and installing and debugging power supply and control circuits inside the gantry crane;
S7, jacking operation, namely respectively placing at least two jacking systems on the ground below two ends of the lifting girder, wherein the jacking systems at the two ends of the lifting girder synchronously jack up, stably jack up the lifting girder, and finishing the jacking stage after the lifting stage is up to a certain height;
S8, climbing operation, namely after the lifting operation is carried out to lift the lifting girder to a certain height, entering a climbing operation stage, driving a gear and a rack to be meshed and driven by a gear motor, driving a traveling wheel seat on each side of the track to continuously and synchronously run in opposite directions, further lifting the lifting girder by pushing the lower ends of the supporting legs, stopping the lifting girder after the two supporting legs are folded to a final installation angle, and connecting and fixing the legs and the bottom girder by contacting the upper ends of the supporting legs with the bottom girder;
S9, lifting the cross beam placed on the track to the installation height through a manual hoist or hoisting equipment, and connecting and fixing the two ends of the cross beam with the supporting legs on the two sides respectively;
s10, detaching the gear and the rack to finish installation;
when the door machine needs to be disassembled, the operations S2-S9 are reversed.
The invention has the following beneficial effects:
1. the invention discloses a crane lifting device, which is characterized in that on the basis of the existing crane and a track, the upper part of a crane landing leg and the lower part of a bottom beam are correspondingly arranged in a matched flange connection mode, hinge points are matched on the outer side of the crane landing leg and are connected through a pin shaft, the connection part of the lower end of the crane landing leg and a travelling wheel is adjusted to be in a hinge point and pin shaft connection mode so as to facilitate the swinging angle of the landing leg in the installation process, a gear is arranged on the outer side of a crane travelling wheel seat, a rack is arranged on the side surface of the track, a lifting girder is driven to climb through meshing of the rack, and a lifting system is further arranged, and is used for eliminating dead points between the bottom beam and the landing leg and assisting in lifting the lifting girder. By adopting the structure to install or disassemble the door machine, the door machine can be installed or disassembled quickly, efficiently, economically and safely without the help of external large-scale hoisting equipment and only by assisting with simple tools and structures.
2. The invention also comprises a cross beam which is used for being placed on a track when the gantry crane is installed so as to support the supporting legs and the lifting girder above the supporting legs, and the cross beam is connected between the two supporting legs after the lifting girder climbs in place so as to improve the stability of the gantry crane, thus the temporary supporting beam is also omitted, and the rapid installation is realized while the gantry crane has multiple purposes.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic view of the state of the invention before the jacking operation.
Fig. 2 is an enlarged schematic view of the structure at a in fig. 1.
Fig. 3 is a schematic structural diagram of the jacking system of the present invention.
Fig. 4 is a schematic view of the structure of the present invention after installation.
In the figure:
A main lifting beam 100, a bottom beam 110, a first hinge support 111, a first flange 112, a top block 120 and bolts 130;
the travelling wheel seat 200, the frame 201, the fourth hinged support 202, the roller way wheel 203 and the gear 210;
a leg 300, a second hinge base 301, a third hinge base 302, a second flange 303;
A cross beam 400;
Track 500, rack 510;
jacking system 700, jacking cylinder 710, hydraulic station 720, jacking trolley 730, supporting cylinder 740, and supporting plate 741.
Detailed Description
The following description of the embodiments of the present invention will be made apparent and fully in view of the accompanying drawings, in which some, but not all embodiments of the invention are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, unless explicitly stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected, mechanically connected, electrically connected, directly connected, indirectly connected via an intervening medium, or in communication between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art according to the specific circumstances.
In addition, the technical features of the different embodiments of the present invention described below may be combined with each other as long as they do not collide with each other.
Embodiment one:
Referring to fig. 1 to 4, a door machine installing and detaching system comprises a door machine, wherein the door machine comprises a lifting girder 100, a walking wheel seat 200 and a supporting leg 300, the supporting leg 300 is connected and supported between the lifting girder 100 and the walking wheel seat 200, the walking wheel seat 200 is used for moving on a track 500, bottom beams 110 are respectively installed at the bottoms of two ends of the lifting girder 100, the supporting legs 300 are respectively arranged at two sides of two ends of the lifting girder 100, the walking wheel seat 200 is respectively arranged at two sides of two ends of the lifting girder 100, two ends of each supporting leg 300 are respectively hinged with the walking wheel seat 200 and the bottom beams 110 on the same side, a gear 210 is installed at one side of the walking wheel seat 200, the gear 210 is driven by a speed reducing motor on the walking wheel seat 200, racks 510 are installed on rails 500 on two sides at positions corresponding to the walking wheel seat 200, the gears 210 are in meshed transmission with the racks 510, and a jacking system 700 is respectively used for being arranged below two ends of the lifting girder 100, and the jacking system 700 is used for eliminating dead spots between the bottom beams 110 and the supporting legs 300 and assisting in lifting the lifting girder 100.
By providing the bottom beam 110 at the underside of the main girder 100, it is facilitated to hinge with the leg 300 by the bottom beam 110, both ends of the bottom beam 110 protruding out of the main girder 100 in fig. 1. The bottom beam 110 may be a rod, a plate, or a metal structure. After the lifting main beam 100 is lifted to a certain height by the two lifting systems 700, the lifting main beam 100 is further lifted by meshing and driving the gear 210 on the travelling wheel seat 200 with the rack 51 on the track 500, and when the tops of the supporting legs 300 and the bottom beams 110 are close to each other, the lifting main beam can be welded or connected with the bottom beams 110 through bolts, so that the installation of the gantry crane is completed.
By adopting the structure to install or disassemble the door machine, the quick and efficient, economical and safe installation or disassembly can be realized without the help of external large-scale hoisting equipment by only assisting with simple tools and structures.
Referring to fig. 1 and 2, specifically, the bottom beam 110 is provided at both ends thereof with a first hinge support 111, the leg 300 is provided at an upper end thereof with a second hinge support 301 at a side remote from the main girder 100, and the first hinge support 111 and the second hinge support 301 are hinged by a pin.
Referring to fig. 1 and 3, a first flange 112 is fixedly connected to the lower side of the bottom beam 110 at a position corresponding to the support leg 300, a second flange 303 is fixedly connected to the upper end of the support leg 300, and after the support leg 300 is installed in place, the first flange 112 and the second flange 303 are connected through bolts. When the top of the leg 300 is closed to the bottom beam 110, the first flange 112 and the second flange 303 are coupled by bolts, thereby rapidly coupling the leg 300 to the bottom beam 110.
Referring to fig. 1 and 2, specifically, the lower end of the leg 300 is fixedly connected with a third hinge support 302, the top of the traveling wheel seat 200 is fixedly connected with a fourth hinge support 202, and the third hinge support 302 and the fourth hinge support 202 are hinged through a pin.
To facilitate the mounting and dismounting of the rack 510, bolt holes are provided in the rack 510, threaded holes are provided in the sides of the rail 500, and the rack 510 is mounted on the sides of the rail 500 by bolts. When installed, the rack 510 is meshed with the gear 210 with its tooth slot facing upwards. Of course, in order to improve the stability of the installation of the rack 510, a support block for supporting the rack 510 is also installed under the rack 510 at the rail 500.
In one embodiment, referring to fig. 2, the running wheel seat 200 includes a frame 201, roller wheels 203 and a gear motor, not shown in the gear motor, at least two roller wheels 203 are installed in the frame 201, the gear motor is installed on the frame 201, a central shaft of one roller wheel 203 is fixedly connected with a wheel body thereof, the central shaft is rotatably connected with the frame 201 through a bearing seat, an output shaft of the gear motor is in transmission connection with one end of the central shaft of the roller wheel 203, and the other end of the central shaft extends out of the frame 201 and is provided with a gear 210. One of the roller wheels 203 and the gear 210 is driven to rotate by a gear motor, so that the traveling wheel seat 200 stably travels on the track 500.
Of course, the gear 21 may be driven by a gear motor separately installed at the wheel mount 200.
Referring to fig. 3, the jacking system 700 includes a jacking cylinder 710 and a hydraulic station 720, wherein the hydraulic station 720 is connected with the jacking cylinder 710 through a pipeline, and the jacking cylinder 710 is driven to extend and retract by the hydraulic station 720. By the extension of the jacking cylinder 710, dead points between the bottom beam 110 and the leg 300 are eliminated, and the jacking of the heavy main beam 100 is assisted. The jacking system 700 may employ a multi-stage ram. The number of the jacking cylinders 710 on each side may be one or more.
Further, the jacking system 700 further includes a jacking cylinder car 730, and the jacking cylinder 710 and the hydraulic station 720 are respectively mounted on the jacking cylinder car 730. By providing the top cart 730, the lift cylinders 710 and the hydraulic stations 720 are facilitated to be moved.
Further, a supporting cylinder 740 is also installed at the bottom of the top cylinder vehicle 730, a piston rod of the supporting cylinder 740 extends downwards, and a supporting plate 741 is installed at the end of the piston rod. In use, the piston rod of support cylinder 740 is extended and brace 741 contacts the ground. The overhead cart 730 is made more stable. Specifically, support cylinders 740 are respectively installed at four corners and the middle of the bottom of the top cylinder vehicle 730, and the support cylinders 740 are centrally controlled by the hydraulic station 720 so as to realize precise synchronous telescoping.
Further, in order to improve the stability of the jacking cylinder 710 in jacking, referring to fig. 1 and 3, the lower side of the bottom beam 110 is provided with a jacking block 120 at a position contacting the jacking system 700 or at the top of the jacking system 700. Specifically, the bottom beam 110 is provided with a top block 120 at a position contacting with a piston rod of the jacking cylinder 710 or at a top of the piston rod of the jacking cylinder 710 at a lower side.
Referring to fig. 1 and 3, the girder 400 is further comprised of at least two girders 400, and the two girders 400 are respectively installed between the two legs 300 at both ends of the girder 100. The beam 400 is accurately placed on the rail 500 after being calculated and positioned during the installation of the gantry crane to support the supporting legs 300 and the lifting girder 100 above the supporting legs 300, and the beam 400 is connected between the two supporting legs 300 after the lifting girder 100 climbs in place to improve the stability of the gantry crane. The cross beam 400 may be welded to the leg 300 or bolted via a flange structure.
Embodiment two:
referring to fig. 1 and 4, an installing and detaching method of a door machine installing and detaching system is adopted, and the door machine installing method comprises the following steps:
S1, installing a track foundation and a track 500 on the ground, and installing the rack 510 at a proper position on the side surface of the track 500 after calculation according to the length dimension of the supporting leg 300.
S2, the four traveling wheel seats 200 are firstly respectively installed on the positions of the corresponding racks 510 on the two side rails 500 by using lifting equipment.
S3, after the two cross beams 400 are precisely calculated and positioned, the cross beams 400 on each side are temporarily placed on the track 500, and the cross beams 400 on each side are positioned between the two traveling wheel seats 200.
S4, the supporting leg 300 is horizontally arranged, one end of the supporting leg 300 is hinged with the walking wheel seat 200 through a pin shaft, the other end of the supporting leg is placed on the cross beam 400, and the supporting leg is supported up through sleepers and the like so as to meet the installation angle and the installation height.
S5, hoisting the main crane beam 100 to the supporting legs 300 by using a hoisting device, and hinging the two ends of the bottom beam 110 with the top ends of the supporting legs 300 on the two sides respectively.
S6, installing devices and equipment in a machine room on the lifting main beam 100, and installing functional components of the gantry crane in a state of approaching the ground as well as an external frame, a roof and a lightning rod of the machine room, and installing and debugging power supply and control circuits in the gantry crane.
And S7, jacking operation, namely respectively placing at least two jacking systems 700 on the ground below two ends of the lifting girder 100 during the jacking operation, synchronously jacking the lifting girder 100 by the jacking systems 700 at the two ends of the lifting girder 100, and finishing the jacking stage after the lifting is up to a certain height, wherein in the jacking process, the gear 210 and the rack 510 are meshed for transmission, so that the two travelling wheel seats 200 at each side synchronously move towards each other.
S8, climbing operation, namely after the lifting operation is carried out to lift the lifting girder 100 to a certain height, the lifting operation enters a climbing operation stage, the gear motor is driven by the gear 210 to be meshed with the rack 510 for transmission, the running wheel seat 200 on each side of the track 500 is driven to continue to synchronously run in opposite directions, synchronous measurement is carried out in the lifting process, so that the lifting girder 100 is synchronously and stably lifted step by step, the lifting girder 100 is further lifted by pushing the lower ends of the supporting legs 300, the lifting girder is stopped after the two supporting legs 300 are folded to a final installation angle, and at the moment, the upper ends of the supporting legs 300 are contacted with the bottom girder 110 to connect and fix the legs 300 with the bottom girder 110.
And S9, vertically lifting the cross beam 400 placed on the track 500 to the installation height through a hand hoist or hoisting equipment, and connecting and fixing two ends of the cross beam 400 with the supporting legs 300 on two sides respectively.
And S10, detaching the gear 210 and the rack 510 to finish the installation.
When the door machine needs to be disassembled, the operations S2-S9 are reversed.
Embodiment III:
Specifically, the door machine installation process is as follows:
The track foundation and the track 500 are installed on the ground, and then the racks 510 are installed to the sides of the track 500 according to the size of the leg 300 after calculation and accurate measurement, and are reliably installed and fixed by bolts. And then the size and the position are measured, the walking wheel seat 200 is firstly installed on the track 500 at the corresponding position by using small-sized lifting equipment, then the supporting leg 300 is connected with the walking wheel seat 200 by adopting a horizontal installation mode through a pin shaft, the other end of the supporting leg 300 is supported on a beam 400 which is arranged at the proper position of the track in advance and is temporarily supported, the proper installation height and angle are met, the lifting girder 100 is hoisted by using the small-sized lifting equipment, devices and equipment in a machine room and facilities such as a roof and a lightning rod are further installed on the lifting girder 100 through hinge points and hinge points connected with the upper end of the supporting leg 300, and the whole gantry crane is installed in a low-frame state.
And (3) mounting and debugging the power supply and control circuit in the door machine, ensuring that all mechanisms are adjusted in place, and starting subsequent climbing operation by electrically debugging to meet the operation requirement.
The subsequent operation is divided into two stages of jacking operation and climbing operation. If the climbing mode is adopted, the climbing device has large self weight and small horizontal angle in the initial climbing stage, so the horizontal component force required by climbing is quite large, the requirements on the power and the structural strength of the climbing device are quite high, the economy and the feasibility are poor, and the climbing combined mode is the optimal mode. During jacking operation, a plurality of jacking systems 700 are stopped below jacking blocks 120 corresponding to bottom beams 110 on the ground outside a gantry crane track, at least two jacking cylinders are symmetrically arranged in general, a supporting cylinder 740 of the jacking system 700 is driven to act, a supporting plate 741 is connected to the end part of a piston rod of the supporting cylinder 740, the piston rod of the supporting cylinder 740 extends out, and the supporting plate 741 is reliably supported on the ground for leveling. The jacking cylinders 710 are driven to extend out of the piston rods to prop against the jacking blocks 120, the jacking cylinders 710 synchronously act, the lifting main girder 100 is lifted stably and integrally, the jacking stage is finished after the lifting stage is lifted to a certain height, the jacking height is determined through calculation, the follow-up climbing operation process can be ensured to be stressed within a design range, the overload problem does not occur, and the gears 210 and the motor can push the supporting legs 300 to continuously finish the climbing operation.
The climbing process is that a gear motor on the travelling wheel seat 200 drives a gear 210 to rotate, the gear 210 is meshed with a rack 510, two travelling wheel seats 200 on two sides of a track synchronously move in opposite directions, in the process, the supporting legs 300 are further lifted gradually and approach gradually, when the two supporting legs 300 are folded to a final installation angle, the two supporting legs 300 are stopped, at the moment, a second flange 303 on the upper part of the supporting legs 300 is exactly aligned with a first flange 112 on the bottom of the bottom beam 110, reliable connection of flange surfaces is ensured through bolts 130, and then a cross beam 400 which is placed at a position corresponding to the track 500 in advance is lifted up through a hoist or small lifting equipment mode and then is connected with a connecting surface on the inner side of the supporting legs through bolts, so that all installation and debugging work is completed.
The installation mode has the advantages that large hoisting equipment is not needed, equipment debugging is completed when the gantry crane is in a low-elevation stage, if a debugging process is problematic, accessories are convenient to replace in time, maintenance and replacement are convenient, safety and efficiency are high in the climbing process, and the rack 510, the pin shaft, the gear 210 and the lifting system 700 can be repeatedly used in other equipment, so that the economy is very excellent.
The installation device and the method not only can be used for installing or dismantling the door machine described in the patent, but also can be widely used for various large-scale equipment, large-scale steel members or structures with hinged support legs, and the principle and the steps are similar to those described in the patent, but all belong to the protection scope of the patent.
It is apparent that the above examples are given by way of illustration only and are not limiting of the embodiments. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. While still being apparent from variations or modifications that may be made by those skilled in the art are within the scope of the invention.

Claims (12)

1.一种门机安拆系统,包括门机,所述门机包括起重主梁(100)、行走轮座(200)以及支腿(300),支腿(300)连接支撑在起重主梁(100)与行走轮座(200)之间,行走轮座(200)用于在轨道(500)上移动,其特征在于:所述起重主梁(100)的两端底部分别安装有底梁(110),起重主梁(100)两端的两侧分别设置有支腿(300),起重主梁(100)两端的两侧还分别设有行走轮座(200),每侧所述支腿(300)的两端分别与同侧的行走轮座(200)以及底梁(110)铰接,所述行走轮座(200)的一侧安装有齿轮(210),齿轮(210)通过行走轮座(200)上的减速电机带动,两侧的轨道(500)上在对应行走轮座(200)的位置安装有齿条(510),齿轮(210)与齿条(510)啮合传动;还包括顶升系统(700),两个所述顶升系统(700)分别用于布置到起重主梁(100)的两端下方,顶升系统(700)用于消除所述底梁(110)与支腿(300)之间的死点,并辅助顶升所述起重主梁(100)。1. A gantry crane installation and disassembly system, comprising a gantry crane, the gantry crane comprising a lifting main beam (100), a running wheel seat (200) and a support leg (300), the support leg (300) being connected and supported between the lifting main beam (100) and the running wheel seat (200), the running wheel seat (200) being used to move on a track (500), characterized in that: bottom beams (110) are respectively installed at the bottom of both ends of the lifting main beam (100), the two sides of both ends of the lifting main beam (100) are respectively provided with support legs (300), the two sides of both ends of the lifting main beam (100) are also respectively provided with a running wheel seat (200), and the two ends of the support leg (300) on each side are respectively connected to the running wheel seat (2 00) and a bottom beam (110), a gear (210) is installed on one side of the traveling wheel seat (200), the gear (210) is driven by a reduction motor on the traveling wheel seat (200), racks (510) are installed on the tracks (500) on both sides at positions corresponding to the traveling wheel seats (200), the gears (210) and the racks (510) are meshed for transmission; and a jacking system (700) is also included, the two jacking systems (700) are respectively arranged below the two ends of the lifting main beam (100), the jacking systems (700) are used to eliminate the dead point between the bottom beam (110) and the support legs (300), and to assist in jacking up the lifting main beam (100). 2.根据权利要求1所述的一种门机安拆系统,其特征在于,所述底梁(110)的两端分别设置有第一铰座(111),支腿(300)上端并在远离起重主梁(100)的一侧设置有第二铰座(301),第一铰座(111)和第二铰座(301)通过销轴铰接。2. A door crane installation and disassembly system according to claim 1, characterized in that first hinge seats (111) are respectively provided at both ends of the bottom beam (110), a second hinge seat (301) is provided at the upper end of the support leg (300) and on the side away from the lifting main beam (100), and the first hinge seat (111) and the second hinge seat (301) are hinged by a pin shaft. 3.根据权利要求1或2所述的一种门机安拆系统,其特征在于,所述底梁(110)下侧在对应支腿(300)的位置固接有第一法兰(112),支腿(300)上端固接有第二法兰(303),在所述支腿(300)安装到位后,第一法兰(112)和第二法兰(303)通过螺栓连接。3. A door crane installation and disassembly system according to claim 1 or 2, characterized in that a first flange (112) is fixedly connected to the lower side of the bottom beam (110) at a position corresponding to the support leg (300), and a second flange (303) is fixedly connected to the upper end of the support leg (300); after the support leg (300) is installed in place, the first flange (112) and the second flange (303) are connected by bolts. 4.根据权利要求1所述的一种门机安拆系统,其特征在于,所述支腿(300)的下端固接有第三铰座(302),行走轮座(200)的顶部固接有第四铰座(202),第三铰座(302)和第四铰座(202)通过销轴铰接。4. A door machine installation and disassembly system according to claim 1, characterized in that the lower end of the support leg (300) is fixedly connected to a third hinge seat (302), the top of the walking wheel seat (200) is fixedly connected to a fourth hinge seat (202), and the third hinge seat (302) and the fourth hinge seat (202) are hinged by a pin shaft. 5.根据权利要求1所述的一种门机安拆系统,其特征在于,所述轨道(500)的侧面和齿条(510)上设置有螺栓孔,齿条(510)通过螺栓安装在轨道(500)的侧面。5. A door machine installation and disassembly system according to claim 1, characterized in that bolt holes are provided on the side of the track (500) and the rack (510), and the rack (510) is installed on the side of the track (500) by bolts. 6.根据权利要求1所述的一种门机安拆系统,其特征在于,所述行走轮座(200)包括机架(201)、辊道轮(203)以及减速电机,机架(201)内安装有至少两个辊道轮(203),减速电机安装在机架(201)上,其中一个辊道轮(203)的中心轴与其轮体固定连接,并且中心轴通过轴承座与机架(201)转动连接,减速电机的输出轴与这个辊道轮(203)的中心轴一端传动连接,中心轴的另一端伸出机架(201)并安装有所述齿轮(210)。6. A door crane installation and disassembly system according to claim 1, characterized in that the walking wheel seat (200) includes a frame (201), a roller wheel (203) and a reduction motor, at least two roller wheels (203) are installed in the frame (201), the reduction motor is installed on the frame (201), the central axis of one of the roller wheels (203) is fixedly connected to its wheel body, and the central axis is rotatably connected to the frame (201) through a bearing seat, the output shaft of the reduction motor is transmission-connected to one end of the central axis of the roller wheel (203), and the other end of the central axis extends out of the frame (201) and is installed with the gear (210). 7.根据权利要求1所述的一种门机安拆系统,其特征在于,所述顶升系统(700)包括顶升油缸(710)和液压站(720),液压站(720)通过管道与顶升油缸(710)连接,通过液压站(720)驱动顶升油缸(710)伸缩运行。7. A door crane installation and disassembly system according to claim 1, characterized in that the jacking system (700) comprises a jacking cylinder (710) and a hydraulic station (720), the hydraulic station (720) is connected to the jacking cylinder (710) through a pipeline, and the jacking cylinder (710) is driven to extend and retract through the hydraulic station (720). 8.根据权利要求7所述的一种门机安拆系统,其特征在于,所述顶升系统(700)还包括顶缸车(730),顶升油缸(710)和液压站(720)分别安装在顶缸车(730)上。8. A door crane installation and disassembly system according to claim 7, characterized in that the jacking system (700) further comprises a jacking cylinder vehicle (730), and the jacking cylinder (710) and the hydraulic station (720) are respectively installed on the jacking cylinder vehicle (730). 9.根据权利要求8所述的一种门机安拆系统,其特征在于,所述顶缸车(730)的底部还安装有支撑油缸(740),支撑油缸(740)的活塞杆向下伸出,活塞杆的端部安装有撑板(741)。9. A door crane installation and disassembly system according to claim 8, characterized in that a supporting cylinder (740) is also installed at the bottom of the cylinder-lifting vehicle (730), the piston rod of the supporting cylinder (740) extends downward, and a support plate (741) is installed at the end of the piston rod. 10.根据权利要求1或7所述的一种门机安拆系统,其特征在于,所述底梁(110)下侧在与顶升系统(700)接触的位置,或者是在顶升系统(700)的顶部安装有顶块(120)。10. A door crane installation and disassembly system according to claim 1 or 7, characterized in that a top block (120) is installed at a position where the lower side of the bottom beam (110) contacts the jacking system (700), or at the top of the jacking system (700). 11.根据权利要求1所述的一种门机安拆系统,其特征在于,还包括横梁(400),所述横梁(400)具有两根,两根所述横梁(400)用于分别安装到所述起重主梁(100)两端的两个支腿(300)之间;其中,横梁(400)在门机安装时,用于放置到轨道(500)上,以支撑所述支腿(300)和支腿(300)上方的起重主梁(100)。11. A gantry crane installation and disassembly system according to claim 1, characterized in that it also includes a crossbeam (400), wherein there are two crossbeams (400), and the two crossbeams (400) are used to be respectively installed between the two legs (300) at both ends of the lifting main beam (100); wherein, when the gantry crane is installed, the crossbeam (400) is used to be placed on the track (500) to support the legs (300) and the lifting main beam (100) above the legs (300). 12.采用权利要求11所述的一种门机安拆系统的安拆方法,其特征在于,门机的安装方法包括以下步骤:12. The installation method of the door machine installation system according to claim 11, characterized in that the door machine installation method comprises the following steps: S1、在地面上安装轨道基础和轨道(500),再根据支腿(300)的长度尺寸,将齿条(510)安装到轨道(500)的侧面合适位置;S1. Install the track foundation and the track (500) on the ground, and then install the rack (510) to a suitable position on the side of the track (500) according to the length of the support leg (300); S2、用起重设备将四个行走轮座(200)先分别安装到两侧所述轨道(500)上对应齿条(510)的位置;S2, using a lifting device to install the four traveling wheel seats (200) respectively to the positions corresponding to the racks (510) on the tracks (500) on both sides; S3、将两根横梁(400)临时放置到轨道(500)上,每侧的横梁(400)位于两个行走轮座(200)之间;S3, temporarily placing two crossbeams (400) on the track (500), with the crossbeam (400) on each side being located between two traveling wheel seats (200); S4、支腿(300)采用卧装方式,支腿(300)一端通过销轴与行走轮座(200)铰接,另一端放置在横梁(400)上;S4, the outrigger (300) is horizontally mounted, one end of the outrigger (300) is hinged to the travel wheel seat (200) via a pin, and the other end is placed on the crossbeam (400); S5、用起重设备将所述起重主梁(100)吊装到支腿(300)上,并将底梁(110)的两端分别与两侧的支腿(300)顶端铰接;S5, using a lifting device to hoist the lifting main beam (100) onto the supporting legs (300), and hinge the two ends of the bottom beam (110) to the top ends of the supporting legs (300) on both sides respectively; S6、在起重主梁(100)上安装机房内的装置和设备,以及机房的外部框架、屋顶、避雷针,门机的功能部件在靠近地面状态下完成安装,并进行门机内部供电和控制线路的安装和调试;S6. Install the devices and equipment in the machine room, as well as the external frame, roof, and lightning rod of the machine room on the lifting main beam (100). Complete the installation of the functional components of the gantry crane close to the ground, and install and debug the power supply and control circuits inside the gantry crane. S7、顶升作业;顶升作业时,将至少两台顶升系统(700)分别放置在起重主梁(100)两端下方的地面上,起重主梁(100)两端的顶升系统(700)同步顶升动作,平稳地将起重主梁(100)顶起,当顶起到一定高度后顶升阶段结束;在顶升过程中,齿轮(210)与齿条(510)啮合传动,使每侧的两个所述行走轮座(200)同步相向移动;S7, jacking operation; during the jacking operation, at least two jacking systems (700) are placed on the ground below the two ends of the lifting main beam (100), and the jacking systems (700) at the two ends of the lifting main beam (100) are synchronously lifted to smoothly lift the lifting main beam (100). When the lifting is lifted to a certain height, the jacking stage ends; during the jacking process, the gear (210) and the rack (510) are meshed and transmitted, so that the two walking wheel seats (200) on each side move synchronously towards each other; S8、爬升作业;通过顶升作业将起重主梁(100)顶升到一定高度后,进入到爬升作业阶段,减速电机驱动齿轮(210)与齿条(510)啮合传动,带动每侧轨道(500)上的行走轮座(200)继续同步相向运行,通过推动支腿(300)的下端,进一步使起重主梁(100)抬升,当两个支腿(300)合拢至最终的安装角度后停止,此时支腿(300)上端与底梁(110)接触,将腿(300)与底梁(110)连接固定;S8, climbing operation; after the lifting main beam (100) is lifted to a certain height through the lifting operation, the climbing operation phase is entered, the reduction motor drives the gear (210) to mesh with the rack (510) to drive the walking wheel seat (200) on each side track (500) to continue to run synchronously in the opposite direction, and further lifts the lifting main beam (100) by pushing the lower end of the support leg (300). When the two support legs (300) are closed to the final installation angle, they stop, and at this time, the upper end of the support leg (300) contacts the bottom beam (110), and the leg (300) is connected and fixed to the bottom beam (110); S9、通过手动葫芦或起重设备将放置在轨道(500)上的横梁(400)提升至安装高度,将横梁(400)的两端分别与两侧的支腿(300)连接固定;S9, lifting the crossbeam (400) placed on the track (500) to the installation height by means of a manual hoist or a lifting device, and connecting and fixing the two ends of the crossbeam (400) to the supporting legs (300) on both sides respectively; S10、拆除齿轮(210)和齿条(510),完成安装;S10, removing the gear (210) and the rack (510) to complete the installation; 其中,当门机需要拆卸时,反向操作S2-S9。When the door machine needs to be disassembled, operate S2-S9 in reverse.
CN202411249637.4A 2024-09-06 2024-09-06 Door machine mounting and dismounting system and mounting and dismounting method thereof Pending CN119038412A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202411249637.4A CN119038412A (en) 2024-09-06 2024-09-06 Door machine mounting and dismounting system and mounting and dismounting method thereof
PCT/CN2025/129835 WO2026052151A1 (en) 2024-09-06 2025-10-24 Gantry crane mounting and dismounting system and mounting and dismounting method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411249637.4A CN119038412A (en) 2024-09-06 2024-09-06 Door machine mounting and dismounting system and mounting and dismounting method thereof

Publications (1)

Publication Number Publication Date
CN119038412A true CN119038412A (en) 2024-11-29

Family

ID=93584837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411249637.4A Pending CN119038412A (en) 2024-09-06 2024-09-06 Door machine mounting and dismounting system and mounting and dismounting method thereof

Country Status (2)

Country Link
CN (1) CN119038412A (en)
WO (1) WO2026052151A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2026052151A1 (en) * 2024-09-06 2026-03-12 中国三峡建工(集团)有限公司 Gantry crane mounting and dismounting system and mounting and dismounting method therefor

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE889357C (en) * 1943-01-17 1953-09-10 Bauma Fa Dismountable gantry crane
CN101249927A (en) * 2007-08-30 2008-08-27 中铁大桥局集团第一工程有限公司 Mounting and dismounting method for gantry crane
CN216038290U (en) * 2021-10-21 2022-03-15 中交二航局第二工程有限公司 Gantry crane capable of being integrally and automatically installed and dismantled
CN118343625A (en) * 2024-05-18 2024-07-16 郑州科润机电工程有限公司 Installation method suitable for large-span high-lift truss type gantry crane
CN119038412A (en) * 2024-09-06 2024-11-29 中国三峡建工(集团)有限公司 Door machine mounting and dismounting system and mounting and dismounting method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2026052151A1 (en) * 2024-09-06 2026-03-12 中国三峡建工(集团)有限公司 Gantry crane mounting and dismounting system and mounting and dismounting method therefor

Also Published As

Publication number Publication date
WO2026052151A1 (en) 2026-03-12

Similar Documents

Publication Publication Date Title
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN102953343A (en) Descending bracket self-mobile model framework bridge fabrication machine
CN111675112B (en) A height-adjustable bridge pier hoisting machine, construction method and overpass method
CN115613478B (en) Continuous beam cantilever pouring method
CN118653508B (en) Using method of adjustable trolley mould frame system
CN110158460A (en) Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam
WO2026052151A1 (en) Gantry crane mounting and dismounting system and mounting and dismounting method therefor
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN111335182A (en) Portable single-rail bridge girder erection machine and steel column and steel girder installation method in bridge erecting process
CN115897417B (en) A formwork construction method and device in cantilever casting continuous beam process
CN121573586A (en) Gantry cranes for railway loading and unloading and their construction methods
CN110804958B (en) A method for changing the frame of a whole-hole beam
CN118343625A (en) Installation method suitable for large-span high-lift truss type gantry crane
CN111502293A (en) Method and system for hoisting single peripheral component of assembly type building
CN110777681A (en) Whole hole roof beam trades a equipment
CN212387581U (en) Safe supporting device for disassembling crane
CN212532065U (en) Gantry crane capable of being used in different height difference places
CN211256698U (en) Novel bridge girder erection machine
CN110792038B (en) A self-propelled hanging formwork tool and method for high-altitude cast-in-place beams of tied arch bridges
CN114575255B (en) U-turn device of bridge girder erection machine and use method thereof
CN119021099A (en) An integrated upward movable mold frame
CN119021100A (en) A construction method for an integrated upward movable formwork
CN216277928U (en) Tunnel steel lining mounting system
CN215208144U (en) Erection equipment
CN117587855A (en) Tunnel variable section external mold lining trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination