CN119021099A - An integrated upward movable mold frame - Google Patents

An integrated upward movable mold frame Download PDF

Info

Publication number
CN119021099A
CN119021099A CN202411081899.4A CN202411081899A CN119021099A CN 119021099 A CN119021099 A CN 119021099A CN 202411081899 A CN202411081899 A CN 202411081899A CN 119021099 A CN119021099 A CN 119021099A
Authority
CN
China
Prior art keywords
leg
support leg
beams
auxiliary
landing leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202411081899.4A
Other languages
Chinese (zh)
Inventor
张光明
李继伟
郝永刚
王艳芳
唐坤元
苏六帅
杜小刚
刘波
杨代静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Hanjiang Heavy Industry Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Hanjiang Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Hanjiang Heavy Industry Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN202411081899.4A priority Critical patent/CN119021099A/en
Publication of CN119021099A publication Critical patent/CN119021099A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供了一种一体式上行式移动模架,包括主梁总成、支腿总成、外模吊挂总成和电气总成,外模吊挂总成上安装有外模板,外模吊挂总成吊挂于主挑梁下方,后导梁上吊挂安装有用于绑扎钢筋笼整体的挂篮胎架总成,后导梁和主梁的两内侧均设置有吊装轨道,吊装轨道上安装有两个起重小车,两个起重小车通过吊具将钢筋笼整体吊装入模。使绑扎钢筋与混凝土桥梁浇注、养生、张拉工序同时进行,施工效率高、工期短。

The present invention provides an integrated upward movable formwork, including a main beam assembly, a leg assembly, an outer formwork hanging assembly and an electrical assembly, an outer formwork hanging assembly is installed on the outer formwork hanging assembly, the outer formwork hanging assembly is hung below the main cantilever beam, a basket frame assembly for tying the entire steel cage is hung on the rear guide beam, and hoisting tracks are provided on both inner sides of the rear guide beam and the main beam, two lifting trolleys are installed on the lifting tracks, and the two lifting trolleys hoist the entire steel cage into the mold through a hoisting device. The steel bar tying and the concrete bridge pouring, curing and tensioning processes are carried out simultaneously, with high construction efficiency and short construction period.

Description

Integral type goes up formula movable mould frame
Technical Field
The invention relates to the technical field of uplink movable die frames, in particular to an integrated uplink movable die frame.
Background
The bridge is used as an important component of the high-speed railway, and the bridge accounts for more than 50 percent. How to quickly manufacture and frame the beams is the key for ensuring the construction period. The movable formwork bridge fabrication machine is a construction machine with a template, and utilizes a bearing platform or pier column as a support to perform on-site pouring on a bridge. The upper movable formwork is not limited by the clearance under the bridge during construction, and is widely used in bridge construction at present.
At present, the reinforcement cages of the uplink movable formwork are all bound in a beam field in advance and then transported to a bridge construction site, and along with the construction of high-speed rails, the construction of the beam field becomes more difficult along with the tappet of the high-speed rails towards mountain areas; and the construction project that the number of the beam manufacturing is less than 150 holes is poor in beam field construction economy. In addition, the in-situ cast-in-situ construction of the bridge with the hole by the existing movable formwork bridge fabrication machine has the advantages of sequential expansion of several construction procedures, long waiting time of different kinds of work, insufficient labor force utilization, long construction period, low work efficiency and high construction cost. And the steel bars are bound in the formwork cavity on site, so that the quality control is difficult. Therefore, the invention has important significance in improving the construction efficiency.
Disclosure of Invention
The invention provides an integrated up-type movable formwork, wherein a basket hanging jig frame is arranged below a rear guide beam of the movable formwork to carry out integral binding of a reinforcement cage, and a lifting trolley and a lifting appliance are arranged to carry out integral mould entering of the reinforcement cage, so that binding reinforcement and concrete bridge pouring, curing and tensioning procedures are carried out simultaneously, the construction efficiency is high, the construction period is short, and the basket hanging jig frame can move through holes along with the whole movable formwork.
The technical scheme adopted for achieving the purposes of the invention is as follows:
The integrated ascending movable formwork at least comprises a girder assembly, a supporting leg assembly, an outer mold hanging assembly and an electric assembly, wherein the supporting leg assembly is installed at the bottom of the girder assembly and is supported on a bridge and a bridge pier, the girder assembly comprises a girder and a rear guide beam, a plurality of groups of main cantilever beams are symmetrically connected to the two outer sides of the girder, an outer mold is installed on the outer mold hanging assembly, the outer mold hanging assembly is hung below the main cantilever beams, so that the outer mold is hung below the girder, a basket hanging jig assembly for binding a reinforcement cage is hung on the rear guide beam, the basket hanging jig assembly comprises a basket hanging jig, a plurality of groups of jig hanging and fixing support assemblies, the structure of the basket hanging jig is matched with that of a bridge box girder, the basket hanging jig comprises an inner mold jig, a bottom mold and side mold jigs symmetrically connected to the two sides of the bottom mold, and the inner mold jig is fixedly connected to the bottom mold; the basket hanging jig frame is hung below the rear guide beam through a jig frame hanger, the height of the jig frame hanger is adjustable, and the height of the basket hanging jig frame is adjusted; the cradle jig frame is supported on the bridge girder surface through the fixed supporting component; and lifting rails are arranged on the two inner sides of the rear guide beam and the main beam, two lifting trolleys are mounted on the lifting rails and run along the lifting rails, and the whole reinforcement cage is lifted to the outer mold hanging assembly from the lower part of the rear guide beam through a lifting appliance.
The fixed support assembly comprises a plurality of spiral column feet distributed on two sides of the bottom of the hanging basket jig frame, the top of each spiral column foot is locked and fixed with the hanging basket jig frame through bolts, and the bottom of each spiral column foot is arranged to be a triangular support base structure.
The two outer sides of the rear guide beam are symmetrically connected with a plurality of groups of auxiliary cantilever beams, the number of groups of the jig frame hangers is the same as that of the groups of the auxiliary cantilever beams, each group of the jig frame hangers comprises two jig frame hangers connected to one group of auxiliary cantilever beams, each jig frame hanger comprises a jig frame hanger rod and an inclined strut, the upper ends of each group of two jig frame hanger rods are hinged to the corresponding auxiliary cantilever beams, the lower ends of each group of two jig frame hanger rods are fixedly connected with two side die jig frames of the hanging basket jig frame respectively, the two ends of each inclined strut are hinged to the corresponding auxiliary cantilever beams and the corresponding jig frame hanger rod respectively, the jig frame hanger rods and the inclined strut are made of telescopic oil cylinders, and the jig frame hanger rods and the inclined strut are telescopic to adjust the height of the hanging basket jig frame.
The lifting appliance comprises a lifting frame and hangers which are connected below the lifting frame in a distributed manner, the hangers are integrally connected with the reinforcement cage, and the two trolley cranes are respectively connected to two ends of the top of the lifting frame; the hoisting frame comprises connecting longitudinal beams, connecting beams, cross beams, cantilever beams and pilot beams, wherein two groups of connecting longitudinal beams and connecting beams are respectively arranged, the two groups of connecting beams are respectively connected to the front end and the rear end of the two groups of connecting longitudinal beams, the connecting beams are connected with a trolley, the cross beams are connected to the two groups of connecting longitudinal beams in a distributed manner, the two groups of pilot beams are arranged on the two groups of connecting longitudinal beams, the two groups of pilot beams are connected to the outer sides of the two groups of connecting longitudinal beams through the cantilever beams, a plurality of groups of cantilever beams are distributed between the pilot beams and the connecting longitudinal beams, the cantilever beams are fixedly connected with the pilot beams, and the cantilever beams are hinged with the connecting longitudinal beams and are connected with cotter pins.
Two electric hoists capable of moving longitudinally and transversely are mounted on the rear guide beam, and the electric hoists are located behind the two hoisting trolleys to assist binding of the reinforcement cage.
The support leg assembly comprises a front support leg, an auxiliary support leg, a middle support leg and a rear support leg, and the four support legs are sequentially arranged at the front end of the main beam, the middle part of the main beam, the rear end of the main beam and the rear end of the rear guide beam;
The front landing leg comprises a front landing leg running mechanism, a front landing leg upper cross beam, a front landing leg upright post, a front landing leg jacking cylinder, a front landing leg lower cross beam, a front landing leg traversing cylinder, a front landing leg traversing beam and a front landing leg fixing cross beam which are connected in sequence, wherein the front landing leg running mechanism is connected with a front landing leg running track and a front landing leg change wheel track which are arranged on the main beam assembly, and the front landing leg running mechanism is driven by a speed reducer; the front support leg upright post comprises a front support leg upper upright post and a front support leg lower upright post, and the front support leg upper upright post is connected with the front support leg lower upright post through a pin shaft and a cotter pin; the front support leg jacking oil cylinder penetrates through the front support leg lower cross beam and is fixedly connected with the front support leg lower cross beam, and two ends of the front support leg jacking oil cylinder are respectively and fixedly connected with the front support leg upright post and the front support leg transverse beam; the front leg transverse beam is connected to the front leg fixing cross beam in a sliding manner, two ends of the front leg transverse oil cylinder are respectively connected with the front leg transverse beam and the front leg fixing cross beam, the front leg transverse oil cylinder stretches out and draws back to drive the front leg transverse beam to transversely move along the front leg fixing cross beam, and the front leg fixing cross beam is detachably anchored on the bridge pier through a front leg anchor rod; a supporting beam is longitudinally connected to the upper cross beam of the front supporting leg in an extending manner, and a front supporting leg inclined strut oil cylinder is connected between the supporting beam and the upright post of the front supporting leg;
The auxiliary landing leg comprises an auxiliary landing leg hinged support, an auxiliary landing leg upright post, an auxiliary landing leg jacking cylinder, an auxiliary landing leg cushion block and an auxiliary landing leg rotating cylinder, wherein the auxiliary landing leg upright post is connected below the main beam through the auxiliary landing leg hinged support, the auxiliary landing leg jacking cylinder is connected to the bottom of the auxiliary landing leg upright post, and the auxiliary landing leg cushion block is connected to the bottom of the auxiliary landing leg jacking cylinder through a fine adjustment screw; two ends of the auxiliary leg rotating cylinder are connected to the main beam and the auxiliary leg upright post through an upper hinged support and a lower hinged support respectively, and the auxiliary leg rotating cylinder stretches and contracts to drive the auxiliary leg to rotate around the main beam;
The middle support leg is integrally in an O-shaped structure, and comprises C-shaped support leg upright posts, middle support leg jacking cylinders, middle support leg lower cross beams, middle support leg running mechanisms, middle support leg running rails, middle support leg traversing cylinders, middle support leg backing plates and supporting upright posts which are symmetrically connected to two sides of a main beam, wherein the tops of the C-shaped support leg upright posts are fixedly connected with the main beam, the middle support leg lower cross beams are connected to the bottoms of the two C-shaped support leg upright posts, the middle support leg running rails are arranged on bridge beam surfaces, and the middle support leg running mechanisms are arranged at the bottoms of the middle support leg lower cross beams and are arranged on the middle support leg running rails and driven by a speed reducer; the middle support leg jacking cylinders are connected with two bottom parts of the lower cross beam and control the lifting of the middle support legs, so that the middle support leg running mechanism is controlled to be installed or separated from the middle support leg running track; the middle support leg base plate is arranged on the bridge girder surface, the middle support leg traversing oil cylinder is connected between the middle support leg lower cross beam and the middle support leg base plate, and when the middle support leg travelling mechanism is arranged and separated from the middle support leg travelling rail, the middle support leg traversing oil cylinder stretches to drive the middle support leg to transversely move; the top of the supporting upright post is rotatably hinged to the bottom of the main beam, and the bottom of the supporting upright post is detachably connected with the lower cross beam of the middle supporting leg;
The rear landing leg comprises a rear landing leg upright post, a rear landing leg jacking cylinder, a rear landing leg lower cross beam, a rear landing leg running mechanism and a rear landing leg running track which are sequentially connected, wherein the rear landing leg upright post is fixedly connected to two sides of the rear guide beam, the rear landing leg running track is erected on a bridge girder surface, the rear landing leg running mechanism is installed on the rear landing leg running track, and the middle landing leg running mechanism is driven to run along the rear landing leg running track.
And the front supporting leg and the middle supporting leg are provided with tensioning auxiliary tools.
The outer die hanging assembly comprises a plurality of groups of C-shaped hanging parts distributed on the main beam, wherein the number of the groups of C-shaped hanging parts corresponds to that of the main cantilever beams, each group of C-shaped hanging parts comprises two C-shaped hanging parts, and the two C-shaped hanging parts are respectively arranged on the main cantilever beams through a hydraulic transverse moving mechanism and are opened and closed relatively; the outer templates are formed by splicing a left outer template and a right outer template, the left outer template and the right outer template are respectively connected to all left C-shaped hangers and right C-shaped hangers through template supporting oil cylinders, the C-shaped hangers are opened and closed to drive the left outer template and the right outer template to be opened and closed, the C-shaped hangers are closed in a die closing pouring state, the bottoms of each group of two C-shaped hangers are connected into a whole through connecting bolts, and the left outer template and the right outer template are connected into a whole; after the whole reinforcing cage is put into the mould, C-shaped hanging suspenders are detachably connected between the main cantilever beam and the bottom of the C-shaped hanger, and the C-shaped hanging suspenders are penetrating cylinder type stretching suspenders.
Attached vibrators are distributed on two side surfaces of the outer template; an electric push-pull awning is arranged above the main beam and the rear guide beam; two concrete hydraulic distributing machines are fixedly connected to the main beam; the upper moving die frame further comprises a spraying maintenance assembly, the spraying maintenance assembly comprises a formed box girder spraying maintenance system and a cast-in-situ girder surface spraying maintenance system, the formed box girder spraying maintenance system comprises a spray header A distributed in a box girder hole, a spray header B distributed on a girder surface and a spray header C positioned at the outer side and the lower side of the box girder, wherein the spray header C is connected to the lower side of a jig frame hanger through a spray frame hanger rod and a spray frame, the bottom of each group of jig frame hanger is connected with a spray frame hanger rod, the bottom of the spray frame hanger rod is connected with a spray frame, the spray frame is positioned at the outer side and the lower side of a bridge girder, and the spray headers C are distributed on the spray frame, so that the formed bridge girder is sprayed and maintained; the cast-in-situ beam surface spray curing system comprises spray heads D distributed on two sides of the top of the outer template, wherein the spray heads A, the spray heads B, the spray heads C and the spray heads D are all connected with water pipes, and the water pipes are connected with a water pump and a water tank, so that the cast-in-situ beam surface is sprayed and cured.
The front end of the main beam is connected with a front guide beam, and the main beam assembly adopts a double-longitudinal beam structure; the main cantilever beam is of a truss structure with a right trapezoid cross section, and the main cantilever beam is fixed with the outer side face of the main beam in an abutting mode.
Compared with the prior art, the technical scheme provided by the invention has the following advantages:
(1) The integral up-going movable formwork provided by the invention has the advantages that the hanging basket jig frame is arranged below the rear guide beam of the movable formwork to carry out integral binding of the steel reinforcement cage, and the lifting trolley and the lifting appliance are arranged to carry out integral mould entering of the steel reinforcement cage, so that the procedures of binding steel reinforcement, assembling an inner formwork and the like and casting, curing and tensioning of the concrete bridge are carried out simultaneously, the single-hole construction period of the formwork is 11-12 days on the premise of guaranteeing the curing period of the concrete, the construction time of each hole is shortened by about 5 days, the construction efficiency of the movable formwork is improved by more than 25%, the construction period of the beam manufacturing is shortened, and the construction efficiency is high; and the basket clamping fixture can move along with the whole movable die frame through holes, so that the beam manufacturing construction equipment integrating the whole binding and cast-in-situ of the reinforcing steel bars is realized for the first time.
(2) The front support leg running mechanism adopts the form of an upper carrier roller, the front support leg running mechanism and the middle support leg running mechanism both adopt a speed reducer driving carrier roller structure, the rear support leg is provided with a rear support leg running track, the middle support leg running drives the rear support leg to run, the construction period requirement of rapid beam making is met, each support leg can be automatically installed through Kong Jiuwei, the investment of auxiliary equipment is reduced, and the labor intensity is reduced; the front supporting leg upright post stretches and contracts through the front supporting leg jacking oil cylinder, so that the height of the whole machine can be reduced (lifted), and the equipment is convenient to span the beam; the auxiliary supporting leg adopts hydraulic rotation, so that the whole reinforcement cage is convenient to pass through the die; the front support leg and the middle support leg can transversely move through the oil cylinder, so that the die carrier can conveniently pass through a small plane curve; the C-shaped hanging device is opened and closed in opposite translation through the hydraulic transverse moving oil cylinder, and the operation is simple; the lifting, the transverse movement and the opening and closing of the C-shaped hanging of the whole machine are controlled by hydraulic pressure, so that the operation is stable, safe and reliable.
(3) The front support leg and the middle support leg are provided with the tensioning auxiliary tool, the front support leg is also provided with the auxiliary hoisting tool for transporting the inner die, in addition, the C-shaped hanging suspender is a through oil cylinder type tensioning suspender, so that the posture of the whole die bed can be quickly adjusted and installed, and the labor intensity of the movable die frame is greatly reduced; the beam manufacturing quality of the movable mould frame can reach the effect of a precast beam factory by being integrated into a spray maintenance assembly, a concrete hydraulic spreader, an attached vibrator, an electric push-pull canopy and the like.
Drawings
FIG. 1 is a side view of an integrated ascending mobile form in accordance with the present invention;
FIG. 2 is a top view of an integrated ascending mobile form in accordance with the present invention;
FIG. 3 is a side view of the front leg of the present invention;
FIG. 4 is a front view of the front leg of the present invention;
FIG. 5 is a front view of the front leg in the final riding position of the present invention
FIG. 6 is a side view of the auxiliary leg of the present invention lowered and retracted;
FIG. 7 is a front view of the auxiliary leg of the present invention when lowered;
FIG. 8 is a side view of a middle leg of the present invention;
FIG. 9 is a front view of a middle leg of the present invention;
FIG. 10 is a side view of the rear leg of the present invention;
FIG. 11 is a front view of the rear leg of the present invention;
FIG. 12 is a side view of an outer mold suspension assembly of the present invention;
FIG. 13 is a front view of an external mold suspension assembly in an open mold via condition in accordance with the present invention;
FIG. 14 is a front view of the exterior mold suspension assembly in a closed casting condition in accordance with the present invention;
FIG. 15 is a side view of the cradle head assembly of the present invention;
FIG. 16 is a front view of the cradle head assembly of the present invention;
Fig. 17 is a side view of the entire lifting cage of the lifting trolley and the lifting appliance in the invention;
Fig. 18 is a front view of the entire lifting cage of the lifting trolley and the lifting appliance of the present invention;
fig. 19 is a top view of the whole lifting cage of the lifting trolley and the lifting appliance in the invention;
Fig. 20 is a front view of the whole lifting cage of the lifting trolley and the lifting appliance in the through hole working condition;
FIG. 21 is a side view of the electric block of the present invention;
FIG. 22 is a front view of the electric block of the present invention;
FIG. 23 is a schematic view of the structure of the electric push-pull canopy of the present invention in a contracted state;
FIG. 24 is a schematic view of the structure of the electric push-pull canopy of the present invention in an extended state;
FIG. 25 is a schematic view of an arrangement of an electric push-pull canopy in the present invention;
FIG. 26 is a schematic view of the arrangement of a spray header A and a spray header B in a spray maintenance assembly according to the present invention, wherein (a) is a side view, (B) is a front view, and (c) is a top view;
FIG. 27 is a schematic view showing the arrangement of a shower head C in the shower maintenance assembly of the present invention, (b) being a front view;
FIG. 28 is a schematic view of the arrangement of a shower head D in the shower maintenance assembly of the present invention, wherein (a) is a side view, (b) is a front view, and (c) is a top view;
FIG. 29 is a schematic view of a construction of an integrated ascending mobile form according to the present invention;
FIG. 30 is a second schematic construction diagram of an integrated ascending mobile form in accordance with the present invention;
FIG. 31 is a third schematic construction view of an integrated ascending mobile form according to the present invention;
FIG. 32 is a construction diagram of an integrated ascending mobile form according to the present invention;
FIG. 33 is a schematic view of the present invention illustrating the construction of the inner form;
fig. 34 is a construction schematic diagram of an integrated upward moving mold frame according to the present invention;
FIG. 35 is a construction schematic diagram of an integrated ascending movable formwork in the present invention;
FIG. 36 is a construction schematic seventh of an integrated ascending mobile form according to the present invention;
FIG. 37 is a schematic construction view of an integrated ascending mobile form according to the present invention;
Fig. 38 is a construction schematic diagram of an integrated upward moving mold frame according to the present invention;
FIG. 39 is a schematic construction view of an integrated ascending mobile form according to the present invention;
FIG. 40 is a construction schematic diagram eleven of an integrated ascending mobile form in accordance with the present invention;
FIG. 41 is a schematic view showing construction of an integrated ascending movable formwork in the present invention;
FIG. 42 is a construction schematic diagram thirteen of an integrated upward moving mold frame in the present invention;
FIG. 43 is a schematic view of an integrated upward moving mold frame for turning around and two-way cast-in-situ beam construction in the present invention;
In the figure: 100-bridge, 1001-steel pouring box girder, 200-bridge pier, 2001-0# pier, 2002-1# pier, 300-outer template, 3001-left outer template, 3002-right outer template, 400-inner template, 500-reinforcement cage, 5001-reinforcement cage bottom plate and side plate, 5002-reinforcement cage top plate and 600-end die;
The device comprises a 1-main beam assembly, 11-front guide beams, 12-main beams, 13-rear guide beams, 14-main cantilever beams, 15-auxiliary cantilever beams, 16-front support leg running rails, 17-front support leg change wheel rails and 18-hoisting rails;
21-front support legs, 211-front support leg running mechanisms, 212-front support leg upper cross beams, 213-front support leg upright posts, 2131-front support leg upper upright posts, 2132-front support leg lower upright posts, 2133-cotter pins, 214-front support leg jacking cylinders, 215-front support leg lower cross beams, 216-front support leg traversing cylinders, 217-front support leg traversing beams, 218-front support leg fixing cross beams and 219-front support leg diagonal bracing cylinders;
22-auxiliary support legs, 221-auxiliary support leg hinged supports, 222-auxiliary support leg upright posts, 223-auxiliary support leg jacking cylinders, 224-auxiliary support leg cushion blocks, 225-auxiliary support leg rotating cylinders, 226-upper hinged supports, 227-lower hinged supports and 228-fine tuning screws;
23-middle support legs, 231-C-shaped support leg upright posts, 232-middle support leg jacking cylinders, 233-middle support leg lower cross beams, 234-middle support leg running mechanisms, 235-middle support leg running tracks, 236-middle support leg traversing cylinders, 237-middle support leg backing plates and 238-support upright posts;
24-rear support legs, 241-rear support leg upright posts, 242-rear support leg jacking cylinders, 243-rear support leg lower cross beams, 244-rear support leg running mechanisms and 245-rear support leg running tracks;
3-outer mold hanging assembly, 31-C type hanging, 32-C type hanging rod and 33-template supporting cylinder;
The device comprises a 4-basket hanging jig frame assembly, a 41-basket hanging jig frame, a 411-bottom template, a 412-side template jig frame, a 413-inner template jig frame, a 42-jig frame hanger, a 421-jig frame hanger rod, a 422-diagonal brace, a 43-spiral column foot and a 44-ladder platform;
51-lifting trolleys, 52-lifting appliances, 521-hanging, 522-connecting longitudinal beams, 523-connecting transverse beams, 524-transverse beams, 525-cantilever transverse beams, 526-longitudinal beams, 53-locking suspenders and 54-auxiliary lifting tools;
6-electric hoist, 61-track cross beam, 62-cross beam running wheel set;
71-attached vibrator, 72-electric push-pull canopy, 721-end beam motor, 722-wind-resistant column and 73-concrete hydraulic spreader;
8-spraying maintenance assemblies, 81-spraying heads A, 82-spraying heads B, 83-spraying heads C, 84-spraying frame hanging rods, 85-spraying frames, 86-spraying heads D, 87-water pipes, 88-water pumps and 89-water tanks;
9-stretching auxiliary tool.
Detailed Description
The invention will now be described in more detail with reference to the drawings and examples.
The structure of the integrated uplink movable formwork is shown in fig. 1, and comprises a main beam assembly 1, a supporting leg assembly, an outer die hanging assembly 3, a basket hanging jig frame assembly 4, a trolley 51, an electric hoist 6, an electric assembly, a hydraulic assembly and other auxiliary facilities.
In this embodiment, the main beam assembly adopts a three-span structure, including the front guide beam 11, the main beam 12 and the rear guide beam 13 which are sequentially connected, as shown in fig. 1 and 2, the reserved area for installing the basket assembly for binding the reinforcement cage in the rear is satisfied, and the advantages of Kong Kuaijie and good anti-forward-tilting safety are also satisfied. The girder assembly adopts a double-girder structure, and has good transverse stability and strong wind resistance. Two outsides of girder symmetry are connected with multiunit main cantilever beam 14, and main cantilever beam is provided with five groups in this embodiment, and main cantilever beam is right trapezoid's truss structure in cross-section, and main cantilever beam is fixed with the lateral surface of girder in close proximity, see fig. 13, and main cantilever beam is used for the suspension of outer mould suspension assembly. Two outsides of back nose girder symmetry are connected with the vice nose girder 15 of multiunit, and vice nose girder is provided with six groups in this embodiment, and vice nose girder is right triangle-shaped's in cross-section truss structure, and a right angle face of vice nose girder is fixed with the lateral surface subsides of back nose girder, see fig. 16, and vice nose girder is used for hanging of hanging basket bed-jig assembly. In this embodiment, front leg running rails 16 are disposed on two sides of bottoms of two stringers of the front guide beam and the main beam, front leg change wheel rails 17 are disposed on bottoms of two outer sides of two stringers of the front guide beam and the main beam, and hoisting rails 18 for running the trolley are disposed on two inner sides of the main beam and the rear guide beam (i.e., inner sides of two stringers). The rear guide beam is of a truss structure, the self weight of the structure is light, and the supporting force on the bridge deck is reduced.
Further, in this embodiment, the main beam and the outer die hanging assembly are designed symmetrically in the transverse direction, and only the front guide beam, the rear guide beam and the supporting leg parts are needed to be exchanged, so that turning and bidirectional construction can be realized quickly, as shown in fig. 43, the equipment transition difficulty is reduced, and the equipment transition cost is reduced.
The leg assembly is installed at the bottom of the girder assembly and supported on the bridge 100 and the bridge pier 200 so that the whole girder assembly is placed above the bridge deck, and the leg assembly comprises a front leg 21, an auxiliary leg 22, a middle leg 23 and a rear leg 24, which are sequentially installed at the front end, the middle part, the rear end and the rear end of the girder.
The front leg structure is shown in fig. 3 and 4, and the front leg includes a front leg running mechanism 211, a front leg upper beam 212, a front leg upright 213, a front leg jack-up cylinder 214, a front leg lower beam 215, a front leg traversing cylinder 216, a front leg traversing beam 217, and a front leg fixing beam 218. The front landing leg running mechanism comprises a front supporting wheel group, a rear supporting wheel group, a hanging wheel group and a horizontal wheel group, the front landing leg running mechanism is driven by a speed reducer, the front landing leg running mechanism is connected with a front landing leg running rail and a front landing leg hanging wheel rail which are arranged on the main beam assembly, and the speed reducer is used for driving the front landing leg running mechanism, so that the movable die frame integrally moves forwards, and during the via hole operation, the beam body which is stretched and drawn is not subjected to heavy load of the bridge fabrication machine, and the construction period requirement of rapid beam making is met. The upper carrier roller assembly is fixed in the top of preceding landing leg entablature, and preceding landing leg stand is fixed in the bottom of preceding landing leg entablature, preceding landing leg stand includes preceding landing leg upper column 2131 and preceding landing leg lower column 2132, and preceding landing leg upper column and preceding landing leg lower column pass through round pin axle and cotter pin 2133 to be connected, and preceding landing leg is when striding the station at last, can dismantle preceding landing leg lower column, reduces the height of preceding landing leg, is applicable to and strides the condition of erectting not, as shown in fig. 5. The front support leg jacking oil cylinder penetrates through the front support leg lower cross beam and is fixedly connected with the front support leg lower cross beam, two ends of the front support leg jacking oil cylinder are respectively fixedly connected with the front support leg upright post and the front support leg transverse beam, and the front support leg jacking oil cylinder stretches and contracts to adjust the height of the front support leg. The front support leg transverse beam is connected to the front support leg fixing cross beam in a sliding mode, two ends of the front support leg transverse oil cylinder are connected with the front support leg transverse beam and the front support leg fixing cross beam respectively, the front support leg transverse oil cylinder stretches out and draws back to drive the front support leg transverse beam to transversely move along the front support leg fixing cross beam, and the front support leg fixing cross beam is detachably anchored to the bridge pier through the front support leg anchor rod. The front support leg is inverted triangle to prevent overturning, a support beam is connected to the upper cross beam of the front support leg along the longitudinal extension, and a front support leg diagonal bracing cylinder 219 is connected between the support beam and the upright post of the front support leg.
The auxiliary leg is structured as shown in fig. 6 and 7, and comprises an auxiliary leg hinge support 221, an auxiliary leg upright post 222, an auxiliary leg jacking cylinder 223, an auxiliary leg cushion block 224 and an auxiliary leg rotating cylinder 225, wherein the auxiliary leg upright post is connected below the main beam through the auxiliary leg hinge support, the auxiliary leg jacking cylinder is connected to the bottom of the auxiliary leg upright post, and the auxiliary leg cushion block is connected to the bottom of the auxiliary leg jacking cylinder through a fine adjustment screw 228. The two ends of the auxiliary leg rotating cylinder are respectively connected to the main beam and the auxiliary leg upright post through an upper hinged support 226 and a lower hinged support 227, and the auxiliary leg rotating cylinder stretches and contracts to drive the auxiliary leg to rotate around the main beam. During the via hole process, the auxiliary supporting leg jacking oil cylinder and the auxiliary supporting leg rotating oil cylinder are controlled to extend, so that the auxiliary supporting leg is supported on the bridge girder surface; during the casting process, the whole reinforcement cage needs to be put into a mould, at the moment, the auxiliary supporting leg jacking oil cylinder is controlled to shrink, and then the auxiliary supporting leg rotating oil cylinder is controlled to shrink, so that the auxiliary supporting leg is overturned and retracted to the bottom of the main beam.
The structure of the middle support leg is shown in fig. 8 and 9, the whole middle support leg is of an O-shaped structure, the whole reinforcement cage is convenient to pass through a die, the middle support leg comprises C-shaped support leg upright posts 231, middle support leg jacking cylinders 232, middle support leg lower cross beams 233, middle support leg running mechanisms 234, middle support leg running rails 235, middle support leg traversing cylinders 236, middle support leg backing plates 237 and supporting upright posts 238 which are symmetrically connected to two sides of a main beam, the C-shaped support leg upright posts are formed by connecting a plurality of sections of upright posts through pin shafts and cotter pins, the height is adjustable, the top of the C-shaped support leg upright posts is fixedly connected with the main beam, the middle support leg lower cross beams are connected to the bottoms of the two C-shaped support leg upright posts, the middle support leg running rails are arranged on the bridge beam surface, the middle support leg running mechanisms are arranged at the bottoms of the middle support leg lower cross beams and are arranged on the middle support leg running rails, and the middle support leg running mechanisms are riding wheel sets, and the middle support leg running mechanisms are driven by a speed reducer to move along the middle support leg running rails. The middle support leg jacking cylinders are connected with two bottom parts of the lower cross beam and control the lifting of the middle support legs, so that the middle support leg running mechanism is controlled to be installed or separated from the middle support leg running track; the middle support leg base plate is arranged on the bridge girder surface, the middle support leg traversing oil cylinder is connected between the middle support leg lower cross beam and the middle support leg base plate, and when the middle support leg travelling mechanism is arranged and separated from the middle support leg travelling rail, the middle support leg traversing oil cylinder stretches out and draws back to drive the middle support leg to transversely move. The top of the support column is rotatably hinged to the bottom of the main beam, and the bottom of the support column is detachably connected with the lower cross beam of the middle support leg (in fig. 9, the connection of the support column and the C-shaped support leg column is removed, and the support column is turned to the bottom of the main beam). When the whole reinforcement cage needs to pass through the die, the support upright posts are turned to the bottom of the main beam, so that a space is reserved for the reinforcement cage. When concrete is poured, the support upright posts are turned and supported between the main beams and the lower cross beams of the middle support legs, and the middle support leg jacking oil cylinders stretch out and draw back, so that the middle support legs are supported on the bridge. The tilting mechanism of the support column can refer to the auxiliary leg in particular. The front and middle support legs of the movable mould frame can move transversely through the oil cylinder, so that the movable mould frame can conveniently pass through a small plane curve.
The structure of back landing leg is as shown in fig. 10 and 11, including back landing leg stand 241, back landing leg jack-up hydro-cylinder 242, back landing leg lower beam 243, back landing leg running gear 244 and back landing leg running rail 245 that connect gradually, back landing leg stand fixed connection is in the both sides of back guide beam, and back landing leg running rail erects on the bridge girder face, and back landing leg running gear installs on back landing leg running rail, and is different with preceding landing leg and well landing leg, and back landing leg running gear does not have driving power, and when well landing leg running, drives back landing leg running gear and walks along back landing leg running rail. Specifically, the rear leg running rail is made of I-shaped steel. The landing leg assemblies are matched with each other, so that embedded parts do not need to be additionally arranged on the beam body and the pier body in the construction and via hole process of the movable formwork. Each supporting leg is safely and automatically dumped without auxiliary equipment, and has the capability of safely crossing a river. Each supporting leg floats through hydraulic pressure, and when guaranteeing that three supporting legs support, every supporting leg can all stably support with the roof beam face.
The structure of the outer mold hanging assembly is shown in fig. 12-14, and comprises a plurality of groups of C-shaped hanging members 31 distributed on the main beams, wherein the number of the C-shaped hanging members corresponds to that of the main cantilever beams, in the embodiment, the number of the C-shaped hanging members is five, each group of C-shaped hanging members comprises two C-shaped hanging members, and the two C-shaped hanging members are respectively arranged on the main cantilever beams through a hydraulic transverse moving mechanism and are opened and closed relatively. The hydraulic traversing mechanism is a conventional means in the art and will not be described in detail herein. In the embodiment, the outer template 300 is connected to a C-shaped hanger through a supporting component, the outer template is formed by splicing a left outer template 3001 and a right outer template 3002, the left outer template and the right outer template are respectively connected to all left C-shaped hangers and right C-shaped hangers through a template supporting oil cylinder 33, and the C-shaped hangers are opened and closed to drive the left outer template and the right outer template to be opened and closed; the template support oil cylinders are distributed on the outer template, the side face and the bottom, wherein the template support oil cylinders on the side face of the outer template are hinged with the outer template and the C-shaped hanger, and after the left outer template and the right outer template are assembled, the postures of the left outer template and the right outer template and the elevation position of the beam are adjusted through the template support oil cylinders so as to form an accurate outer template space. Under the mould closing pouring state, the C-shaped hanging is folded, the bottoms of each group of two C-shaped hanging are connected into a whole through the connecting bolts, the left outer formwork and the right outer formwork are connected into a whole, after the whole reinforcing cage is put into the mould, the C-shaped hanging rods 32 are detachably connected between the main cantilever beam and the bottoms of the C-shaped hanging at the moment, concrete loads are transferred to the main beam, and the C-shaped hanging rods are penetrating cylinder type stretching hanging rods, so that the gesture of installing the inner formwork can be quickly adjusted. And in the state of the die opening through holes, the connection between each group of two C-shaped hangers is released, the connection between the left outer die plate and the right outer die plate is released, and the C-shaped hanger rods are removed, so that the influence on the whole die entering of the reinforcement cage is avoided.
The structure of the hanging basket jig frame assembly is shown in fig. 15 and 16, and the hanging basket jig frame assembly is hung and installed on the auxiliary cantilever beam and used for binding the whole reinforcement cage, and the whole reinforcement cage comprises a reinforcement cage 500, an inner template 400, an end mold and a prestressed reinforcement pipeline. The basket hanging jig assembly comprises a basket hanging jig 41, a plurality of groups of jig hangers 42 and a fixed support assembly, wherein the structure of the basket hanging jig is matched with that of a section of bridge box girder, the basket hanging jig comprises an inner die jig 413, a bottom template 411 and side die jigs 412 which are symmetrically connected to two sides of the bottom template, the side die jigs are made of trusses, the inner die jig is fixedly connected to the bottom template, specifically, the inner die jig is connected to the bottom template through a supporting beam, the bottom of the supporting beam is fixedly connected with the bottom die jig, the top of the supporting beam is connected with a longitudinal slideway, an inner die jig roller is arranged at the bottom of the inner die jig, and the inner die jig roller is mounted on the longitudinal slideway so as to facilitate push-pull positioning and mounting of the inner die jig. The basket hanging jig frame is hung below the rear guide beam through the jig frame, and is supported on the bridge beam surface through the fixed supporting component; the group number of the jig frame hanging is the same as the group number of the auxiliary cantilever beams, each group of the jig frame hanging comprises two jig frame hanging parts connected to a group of the auxiliary cantilever beams, each jig frame hanging part comprises a jig frame hanging rod 421 and an inclined strut 422, the upper ends of each group of the two jig frame hanging rods are hinged to the auxiliary cantilever beams, the lower ends of each group of the two jig frame hanging rods are respectively fixedly connected with two side mould jig frames of the hanging basket jig frame, the two ends of the inclined strut are respectively hinged to the auxiliary cantilever beams and the jig frame hanging rods, the jig frame hanging rods and the inclined strut are made of telescopic cylinders, and the jig frame hanging rods and the inclined strut are telescopic to adjust the height of the hanging basket jig frame. The fixed support assembly includes a plurality of spiral column feet 43 that distribute in hanging basket bed-jig bottom both sides, the top of spiral column foot is all fixed through bolt locking with hanging basket bed-jig, and the bottom of spiral column foot sets up to triangle support base structure. When the whole reinforcement cage is bound, the jig suspender and the diagonal brace are stretched, so that the spiral column feet are supported on the bridge girder surface, and then reinforcement is bound; when the hole is used, the jig frame suspender and the diagonal brace rod are telescopic, so that the spiral column feet are separated from the bridge girder surface, and the whole basket-hanging jig frame assembly moves along with the girder assembly. The basket clamping fixture is connected with a ladder platform 44 for workers binding the steel bars to enter the basket clamping fixture.
The two lifting trolleys are arranged on the lifting rails of the main beam assembly, the structure of the lifting trolleys is shown in fig. 17-19, the two lifting trolleys run along the lifting rails, and the whole reinforcement cage is lifted to the outer die hanging assembly from the lower part of the rear guide beam through the lifting appliance 52. The lifting appliance comprises a lifting frame and hanging parts 521 which are connected below the lifting frame in a distributed manner, the hanging parts are integrally connected with the reinforcement cage, and the two lifting trolleys are respectively connected to the two ends of the top of the lifting frame. Specifically, the hoisting frame is including connecting longeron 522, connecting crossbeam 523, cross beam 524, cantilever beam 525 and pilot beam 526, connect longeron and connecting crossbeam all to be provided with two sets of, and two sets of connecting crossbeams are connected respectively in the front and back ends of two sets of connecting longerons, connect the crossbeam and are connected with the travelling crane, and the cross beam distributes and connects on two sets of connecting longerons, and the pilot beam is provided with two sets of, and two sets of pilot beams are connected in the outside of two sets of connecting longerons through the cantilever beam, and the cantilever beam distributes between pilot beam and connecting longeron, cantilever beam and pilot beam fixed connection, cantilever beam articulates and is connected with the cotter with connecting longeron. In order to avoid the C-shaped hanging boom, the cantilever beam and the pilot beam can be turned over to the upper part of the hanging frame (turning over 100 degrees) for avoiding, as shown in fig. 20.
In order to facilitate the overall binding of the reinforcement cage, two electric hoists 6 capable of moving longitudinally and transversely are arranged on the rear guide beam, as shown in fig. 21 and 22. And the electric hoist is located the rear of lifting trolley, and electric hoist's specification is 5t, and electric hoist is got the material and is transported to the basket assembly of hanging inside in a vertical and horizontal direction in a flexible way, supplementary steel reinforcement cage's ligature. Specifically, the electric hoist is mounted on the rear guide beam through a rail beam 61 and a beam traveling wheel set 62, the beam traveling wheel set is fixed on the rail beam, the beam traveling wheel set is slidably connected on the rear guide beam and longitudinally moves along the rear guide beam, and the electric hoist is mounted on the rail beam and transversely moves along the rail beam.
In this embodiment, attached vibrators 71 are distributed on two sides of the outer formwork, see fig. 1 and 13, and vibration force is transmitted to the concrete through the outer formwork, so that the overall forming quality of the concrete is better.
The electric push-pull canopy 72 is arranged above the main beam and the rear guide beam, can shade sun, shade rain and fold to prevent floating, prevent external weather from affecting the pouring of concrete and binding of a reinforcement cage, realize all-weather construction, improve the overall working efficiency of the bridge fabrication machine and ensure the requirement of the total construction period. Each electric push-pull canopy is 36m long when being unfolded, 6-7 m long after being contracted and closed, the structure schematic diagrams of the electric push-pull canopy are shown in fig. 23 and 24, the electric push-pull canopy is driven to be unfolded and contracted by an end beam motor 721, and the fixed end of the electric push-pull canopy is also provided with an anti-wind column 722. The H-shaped steel on the main beam is reversely buckled and installed to prevent overturning, and when strong wind and typhoon are early warned, the electric push-pull canopy is bolted with a bolting point arranged on the main beam. In this embodiment, an electric push-pull canopy is respectively disposed at the rear end of the rear guide beam, the rear end of the main beam, and the main beam near the front end, and the arrangement schematic diagram of the electric push-pull canopy is shown in fig. 25.
Two concrete hydraulic spreader 73 are fixedly connected to the main beam, after the whole reinforcing cage is put into the mould, concrete pouring is carried out through the two concrete hydraulic spreader, and the concrete hydraulic spreader is arranged at the front end and the rear end of the main beam, so that the rapid material distributing construction requirement of the whole pouring area is met.
The up-going movable mold frame in this embodiment further includes a spray curing assembly 8, which includes a formed box girder spray curing system and a cast-in-situ girder surface spray curing system, and the formed box girder spray curing system includes a spray header a81 distributed in the box girder hole, a spray header B82 distributed on the girder surface, and a spray header C83 located outside and below the box girder, as shown in fig. 26 and 27. The spray heads C are connected to the lower part of the jig frame hanger through spray frame hanging rods 84 and spray frames 85, specifically, the bottom of each group of jig frame hanger is connected with a spray frame hanging rod, the bottom of the spray frame hanging rod is connected with a spray frame, the spray frames are positioned on the outer side and the lower side of the bridge box girder, and the spray frames are distributed with the spray heads C, so that the formed bridge box girder is sprayed and maintained; the cast-in-situ beam surface spray curing system comprises spray heads D86 distributed on two sides of the top of the outer template, as shown in fig. 28, the spray heads A, B, C and D are all connected with a water pipe 87, and the water pipe is connected with a water pump 88 and a water tank 89, so that the cast-in-situ beam surface is sprayed and cured.
In this embodiment, the front leg and the middle leg are provided with an auxiliary tensioning tool 9, see fig. 1 and 3. When the concrete strength of the beam body reaches 80% of the design value, the inner template is loosened, and the end mould is removed and then is initially stretched. And after the strength and the elastic modulus of the beam body concrete reach the design values, carrying out final stretching when the age is not less than 7 days.
The construction method of the integrated uplink movable formwork provided by the invention comprises the following steps: (1) The integral type ascending movable mould frame complete machine passes Kong Jiuwei on the bridge, and the complete machine initial state is prepared, as shown in figure 29;
After the via hole is in place, the front supporting leg is supported on the front end of the main beam and the No. 0 pier 2001, the auxiliary supporting leg is rotated and retracted, the middle supporting leg is supported on the rear end of the main beam and the front end beam surface of the box girder 1001 which is just poured, the rear supporting leg is supported on the rear end of the rear guide girder and the beam surface of the box girder which is just poured, and the C-shaped hanging hangs the outer template at the position of the box girder which is to be poured;
After the whole machine via hole is in place, the beam body spray curing is carried out on the freshly poured box beam through a formed box beam spray curing system in the embodiment, and the spray curing is carried out on the box Liang Kongna, the beam surface and the outer side and the lower side of the box beam, as shown in fig. 29.
The initial state in this embodiment is: c-shaped hanging and the outer template are in a die closing connection state, polishing of the outer template and smearing of a release agent are carried out, and the whole reinforcement cage is put into a die;
when the whole machine is in place for the first time, binding the whole reinforcement cage;
(2) Synchronously carrying out pouring construction below the main beam and reinforcement cage binding construction below the rear guide beam, as shown in figures 30-34;
the pouring construction steps are as follows: (2.11) putting on a C-shaped hanging boom, and adjusting the elevation of the whole mold bed, wherein the elevation is shown in figure 30;
(2.12) working a concrete hydraulic spreader to perform concrete pouring, and simultaneously starting a vibrating assembly to assist in vibrating, wherein the figure 30 is shown; specifically, when concrete is poured, longitudinal segmentation oblique (horizontal) layered pouring construction is adopted, and after the concrete is poured, the bridge deck is subjected to dust collection and leveling;
(2.13) after the initial setting of the concrete, carrying out beam surface spray curing, wherein in the embodiment, spray curing is carried out through spray heads D distributed on two sides of the top of the outer template in a cast-in-situ beam surface spray curing system, as shown in fig. 30;
simultaneously, after the concrete pouring is completed, the locking of the lifting appliance and the rear guide beam is released, the two lifting trolleys and the lifting appliance move to the main beam, and the lifting appliance and the main beam are locked by the locking lifting rod, as shown in fig. 31;
(2.14) when the strength of the beam body concrete reaches 80% of the design value, loosening the inner template, and performing initial tensioning after removing the end template;
(2.15) detaching the inner die, releasing the connection between the lifting trolley and the lifting appliance, and transporting the inner die plate and the end die to a reinforcement cage binding area through an auxiliary lifting tool 54 arranged at the positions of the lifting trolley and the front supporting legs, wherein the inner die plate and the end die are shown in fig. 32 and 33; after the transportation is completed, connecting the lifting trolley with the lifting appliance, and unlocking the lifting appliance from the main girder, as shown in fig. 34; meanwhile, when the strength and the elastic modulus of the beam body concrete reach the design values, the final stretching is carried out in the age of not less than 7 days, as shown in fig. 35;
(2.16) after the final stretching is finished, releasing the longitudinal, vertical and transverse constraint of the outer template, wherein the release of the constraint is carried out under the condition that the wind power is not more than 6 levels;
The binding construction steps of the reinforcement cage are as follows: (2.21) the two trolleys and the sling are moved to the rear guide beam, and the sling is locked with the rear guide beam by locking the hanger rod 53, see fig. 30;
(2.22) adjusting the hanging basket jig frame assembly to enable the spiral column feet at the bottom of the hanging basket jig frame assembly to be supported on the beam surface of the poured bridge, wherein the drawing is shown in fig. 30;
(2.23) a material transporting vehicle (not shown in the figure) transports materials required by the whole reinforcement cage to the rear of the rear guide beam, and the electric hoist at the rear of the rear guide beam is used for assisting in unloading, as shown in figure 30;
(2.24) binding a reinforcement cage bottom plate and a side plate 5001 on the basket clamping fixture, see fig. 31; in step (2.15), the inner template and the end mould are transported to a reinforcement cage binding area, the inner template, a binding reinforcement cage top plate 5002 and an end mould 600 are installed, see fig. 32 and 34; installing prestressed reinforcement pipes when binding the bottom plate, the side plates and the top plate of the reinforcement cage, and completing the binding and the installation of the whole reinforcement cage, wherein the binding and the installation of the whole reinforcement cage are assisted by an electric hoist, as shown in fig. 35;
and (3) after the whole reinforcement cage is bound, if the casting construction below the main beam is not completed, synchronously carrying out the construction of the step (3.1).
(3) Demolding the whole machine and preparing a via hole state, as shown in fig. 36 and 37;
(3.1) the lifting trolley and the lifting appliance move to a steel reinforcement cage binding area, the lifting appliance is integrally connected with the steel reinforcement cage, the lifting trolley lifts the whole steel reinforcement cage to enable the whole steel reinforcement cage to be separated from the hanging basket jig frame assembly by 15cm, the lifting appliance and the rear guide beam are locked through the locking hanging rod, the hanging basket jig frame assembly is adjusted, and the supporting rod at the bottom of the hanging basket jig frame assembly is separated from the bridge girder surface by 45cm, as shown in fig. 36;
(3.2) simultaneously unloading the lifting cylinders of the front supporting leg, the middle supporting leg and the rear supporting leg, so that the whole machine descends by 15cm and is demolded, and the drawing is shown in fig. 37;
(3.3) removing the C-shaped hanging boom, removing the center joint connection of the outer template and the C-shaped hanging, and opening the C-shaped hanging and the outer template, as shown in figure 37;
(3.4) checking that the running mechanisms and the supporting states of the front supporting leg, the middle supporting leg and the rear supporting leg are good, and preparing the via holes;
(4) The whole machine passes Kong Jiuwei as shown in fig. 38 to 40;
(4.1) starting a middle support leg running mechanism, wherein the whole machine moves forwards until the auxiliary support leg is positioned above the front end beam surface of the box beam just poured, as shown in fig. 38, at the moment, the front support leg is anchored on the No. 0 pier through a front support leg anchor rod, the whole machine is supported by the front support leg, the middle support leg and the rear support leg, and after the middle support leg running mechanism starts forwards, the main beam moves along the front support leg running mechanism;
(4.2) the auxiliary support leg is rotated to be supported on the beam surface, the auxiliary support leg supports the stress, in the embodiment, the jacking cylinders of the auxiliary support leg, the middle support leg and the rear support leg are jacked up by 40cm to enable the front support leg to be emptied, and at the moment, the front support leg anchor rod is removed to enable the front support leg to be separated from the 0# pier, and the auxiliary support leg, the middle support leg and the rear support leg support the whole machine;
(4.3) forward leg travel to 1# pier 2002 in place by front leg travel mechanism, front leg support force, auxiliary leg rotation retraction, see fig. 39, at which point the front leg is anchored to 1# pier;
(4.4) starting a middle supporting leg running mechanism, enabling the whole machine to move forward until the front end of the main beam is positioned at the front supporting leg, synchronously working jacking cylinders of the front supporting leg, the middle supporting leg and the rear supporting leg, jacking the whole machine for 15cm to be in place, and finishing the whole machine through Kong Jiuwei, wherein the figure 40 is shown;
In the embodiment, when the 32m beam construction is performed, the whole machine moves forward by 21.35m in the step (4.1), and the whole machine moves forward by 11.35m in the step (4.4). The movable mould frame in the embodiment is also suitable for construction of 24m standard beams and 30m and 27.2m nonstandard beams.
(5) After the whole machine via hole is in place, carrying out beam body spray maintenance on the box girder which is just poured, and corresponding to the step (1); the C-shaped hanger and the outer template are assembled, and the outer template and a center seam on the C-shaped hanger are connected, as shown in FIG. 41;
And the locking of the lifting appliance and the rear guide beam is released, and the lifting trolley lifts the steel reinforcement cage into the die integrally, so that the whole machine is adjusted to an initial state, and the next construction cycle is started as shown in fig. 42.
When the whole machine passes through the continuous beam, the front supporting leg is only required to be converted into a non-crossing supporting state, and then the C-shaped hanging part is opened to a certain width for locking, so that the whole machine can smoothly pass through the continuous beam together with the template.
The integral up-going movable formwork provided by the invention is characterized in that the integral up-going movable formwork is formed by carrying out integral pre-binding on a reinforcement cage rack assembly, then realizing integral mold entering through a reinforcement cage integral hoisting assembly, realizing synchronous carrying out of reinforcement binding on a rear guide beam, inner mold assembling, prestressed reinforcement pipeline mounting procedures and concrete pouring, spray curing and tensioning procedures on a main beam, wherein the integral up-going movable formwork is divided into a front working surface and a rear working surface, the front part is a cast-in-place beam pouring area of the formwork, the rear part is a reinforcement binding area, and the parallel working surfaces of reinforcement binding and cast-in-place beam construction are realized. On the premise of ensuring the concrete life, the single-hole construction period of the die carrier is 11-12 days, and the beam manufacturing period is shortened.

Claims (10)

1. The utility model provides an integral type up-line movable mould frame, includes girder assembly, landing leg assembly, external mold and hangs assembly and electrical assembly at least, the landing leg assembly is installed in the bottom of girder assembly to support on bridge and pier, the girder assembly includes girder and back nose girder, and the two outsides symmetry of girder is connected with multiunit main nose girder, installs the external mold on the external mold and hangs the assembly, and the external mold is hung the assembly and is hung in main nose girder below to hang the external mold in the below of girder, its characterized in that:
The rear guide beam is hung and provided with a basket hanging jig frame assembly for binding the whole reinforcement cage, the basket hanging jig frame assembly comprises a basket hanging jig frame and a plurality of groups of jig frame hanging and fixing support assemblies, the structure of the basket hanging jig frame is adapted to that of a section of bridge box beam, the basket hanging jig frame comprises an inner die jig frame, a bottom die plate and side die jig frames symmetrically connected to two sides of the bottom die plate, and the inner die jig frame is fixedly connected to the bottom die plate; the basket hanging jig frame is hung below the rear guide beam through a jig frame hanger, the height of the jig frame hanger is adjustable, and the height of the basket hanging jig frame is adjusted; the cradle jig frame is supported on the bridge girder surface through the fixed supporting component; and lifting rails are arranged on the two inner sides of the rear guide beam and the main beam, two lifting trolleys are mounted on the lifting rails and run along the lifting rails, and the whole reinforcement cage is lifted to the outer mold hanging assembly from the lower part of the rear guide beam through a lifting appliance.
2. The integrated ascending mobile form of claim 1, wherein: the fixed support assembly comprises a plurality of spiral column feet distributed on two sides of the bottom of the hanging basket jig frame, the top of each spiral column foot is locked and fixed with the hanging basket jig frame through bolts, and the bottom of each spiral column foot is arranged to be a triangular support base structure.
3. The integrated ascending mobile form of claim 1, wherein: the two outer sides of the rear guide beam are symmetrically connected with a plurality of groups of auxiliary cantilever beams, the number of groups of the jig frame hangers is the same as that of the groups of the auxiliary cantilever beams, each group of the jig frame hangers comprises two jig frame hangers connected to one group of auxiliary cantilever beams, each jig frame hanger comprises a jig frame hanger rod and an inclined strut, the upper ends of each group of two jig frame hanger rods are hinged to the corresponding auxiliary cantilever beams, the lower ends of each group of two jig frame hanger rods are fixedly connected with two side die jig frames of the hanging basket jig frame respectively, the two ends of each inclined strut are hinged to the corresponding auxiliary cantilever beams and the corresponding jig frame hanger rod respectively, the jig frame hanger rods and the inclined strut are made of telescopic oil cylinders, and the jig frame hanger rods and the inclined strut are telescopic to adjust the height of the hanging basket jig frame.
4. The integrated ascending mobile form of claim 1, wherein: the lifting appliance comprises a lifting frame and hangers which are connected below the lifting frame in a distributed manner, the hangers are integrally connected with the reinforcement cage, and the two trolley cranes are respectively connected to two ends of the top of the lifting frame; the hoisting frame comprises connecting longitudinal beams, connecting beams, cross beams, cantilever beams and pilot beams, wherein two groups of connecting longitudinal beams and connecting beams are respectively arranged, the two groups of connecting beams are respectively connected to the front end and the rear end of the two groups of connecting longitudinal beams, the connecting beams are connected with a trolley, the cross beams are connected to the two groups of connecting longitudinal beams in a distributed manner, the two groups of pilot beams are arranged on the two groups of connecting longitudinal beams, the two groups of pilot beams are connected to the outer sides of the two groups of connecting longitudinal beams through the cantilever beams, a plurality of groups of cantilever beams are distributed between the pilot beams and the connecting longitudinal beams, the cantilever beams are fixedly connected with the pilot beams, and the cantilever beams are hinged with the connecting longitudinal beams and are connected with cotter pins.
5. The integrated ascending mobile form of claim 1, wherein: two electric hoists capable of moving longitudinally and transversely are mounted on the rear guide beam, and the electric hoists are located behind the two hoisting trolleys to assist binding of the reinforcement cage.
6. The integrated ascending mobile form of claim 1, wherein: the support leg assembly comprises a front support leg, an auxiliary support leg, a middle support leg and a rear support leg, and the four support legs are sequentially arranged at the front end of the main beam, the middle part of the main beam, the rear end of the main beam and the rear end of the rear guide beam;
The front landing leg comprises a front landing leg running mechanism, a front landing leg upper cross beam, a front landing leg upright post, a front landing leg jacking cylinder, a front landing leg lower cross beam, a front landing leg traversing cylinder, a front landing leg traversing beam and a front landing leg fixing cross beam which are connected in sequence, wherein the front landing leg running mechanism is connected with a front landing leg running track and a front landing leg change wheel track which are arranged on the main beam assembly, and the front landing leg running mechanism is driven by a speed reducer; the front support leg upright post comprises a front support leg upper upright post and a front support leg lower upright post, and the front support leg upper upright post is connected with the front support leg lower upright post through a pin shaft and a cotter pin; the front support leg jacking oil cylinder penetrates through the front support leg lower cross beam and is fixedly connected with the front support leg lower cross beam, and two ends of the front support leg jacking oil cylinder are respectively and fixedly connected with the front support leg upright post and the front support leg transverse beam; the front leg transverse beam is connected to the front leg fixing cross beam in a sliding manner, two ends of the front leg transverse oil cylinder are respectively connected with the front leg transverse beam and the front leg fixing cross beam, the front leg transverse oil cylinder stretches out and draws back to drive the front leg transverse beam to transversely move along the front leg fixing cross beam, and the front leg fixing cross beam is detachably anchored on the bridge pier through a front leg anchor rod; a supporting beam is longitudinally connected to the upper cross beam of the front supporting leg in an extending manner, and a front supporting leg inclined strut oil cylinder is connected between the supporting beam and the upright post of the front supporting leg;
The auxiliary landing leg comprises an auxiliary landing leg hinged support, an auxiliary landing leg upright post, an auxiliary landing leg jacking cylinder, an auxiliary landing leg cushion block and an auxiliary landing leg rotating cylinder, wherein the auxiliary landing leg upright post is connected below the main beam through the auxiliary landing leg hinged support, the auxiliary landing leg jacking cylinder is connected to the bottom of the auxiliary landing leg upright post, and the auxiliary landing leg cushion block is connected to the bottom of the auxiliary landing leg jacking cylinder through a fine adjustment screw; two ends of the auxiliary leg rotating cylinder are connected to the main beam and the auxiliary leg upright post through an upper hinged support and a lower hinged support respectively, and the auxiliary leg rotating cylinder stretches and contracts to drive the auxiliary leg to rotate around the main beam;
The middle support leg is integrally in an O-shaped structure, and comprises C-shaped support leg upright posts, middle support leg jacking cylinders, middle support leg lower cross beams, middle support leg running mechanisms, middle support leg running rails, middle support leg traversing cylinders, middle support leg backing plates and supporting upright posts which are symmetrically connected to two sides of a main beam, wherein the tops of the C-shaped support leg upright posts are fixedly connected with the main beam, the middle support leg lower cross beams are connected to the bottoms of the two C-shaped support leg upright posts, the middle support leg running rails are arranged on bridge beam surfaces, and the middle support leg running mechanisms are arranged at the bottoms of the middle support leg lower cross beams and are arranged on the middle support leg running rails and driven by a speed reducer; the middle support leg jacking cylinders are connected with two bottom parts of the lower cross beam and control the lifting of the middle support legs, so that the middle support leg running mechanism is controlled to be installed or separated from the middle support leg running track; the middle support leg base plate is arranged on the bridge girder surface, the middle support leg traversing oil cylinder is connected between the middle support leg lower cross beam and the middle support leg base plate, and when the middle support leg travelling mechanism is arranged and separated from the middle support leg travelling rail, the middle support leg traversing oil cylinder stretches to drive the middle support leg to transversely move; the top of the supporting upright post is rotatably hinged to the bottom of the main beam, and the bottom of the supporting upright post is detachably connected with the lower cross beam of the middle supporting leg;
The rear landing leg comprises a rear landing leg upright post, a rear landing leg jacking cylinder, a rear landing leg lower cross beam, a rear landing leg running mechanism and a rear landing leg running track which are sequentially connected, wherein the rear landing leg upright post is fixedly connected to two sides of the rear guide beam, the rear landing leg running track is erected on a bridge girder surface, the rear landing leg running mechanism is installed on the rear landing leg running track, and the middle landing leg running mechanism is driven to run along the rear landing leg running track.
7. The integrated ascending mobile form of claim 6, wherein: and the front supporting leg and the middle supporting leg are provided with tensioning auxiliary tools.
8. The integrated ascending mobile form of claim 1, wherein: the outer die hanging assembly comprises a plurality of groups of C-shaped hanging parts distributed on the main beam, wherein the number of the groups of C-shaped hanging parts corresponds to that of the main cantilever beams, each group of C-shaped hanging parts comprises two C-shaped hanging parts, and the two C-shaped hanging parts are respectively arranged on the main cantilever beams through a hydraulic transverse moving mechanism and are opened and closed relatively; the outer templates are formed by splicing a left outer template and a right outer template, the left outer template and the right outer template are respectively connected to all left C-shaped hangers and right C-shaped hangers through template supporting oil cylinders, the C-shaped hangers are opened and closed to drive the left outer template and the right outer template to be opened and closed, the C-shaped hangers are closed in a die closing pouring state, the bottoms of each group of two C-shaped hangers are connected into a whole through connecting bolts, and the left outer template and the right outer template are connected into a whole; after the whole reinforcing cage is put into the mould, C-shaped hanging suspenders are detachably connected between the main cantilever beam and the bottom of the C-shaped hanger, and the C-shaped hanging suspenders are penetrating cylinder type stretching suspenders.
9. The integrated ascending mobile form of claim 1, wherein: attached vibrators are distributed on two side surfaces of the outer template; an electric push-pull awning is arranged above the main beam and the rear guide beam; two concrete hydraulic distributing machines are fixedly connected to the main beam; the upper moving die frame further comprises a spraying maintenance assembly, the spraying maintenance assembly comprises a formed box girder spraying maintenance system and a cast-in-situ girder surface spraying maintenance system, the formed box girder spraying maintenance system comprises a spray header A distributed in a box girder hole, a spray header B distributed on a girder surface and a spray header C positioned at the outer side and the lower side of the box girder, wherein the spray header C is connected to the lower side of a jig frame hanger through a spray frame hanger rod and a spray frame, the bottom of each group of jig frame hanger is connected with a spray frame hanger rod, the bottom of the spray frame hanger rod is connected with a spray frame, the spray frame is positioned at the outer side and the lower side of a bridge girder, and the spray headers C are distributed on the spray frame, so that the formed bridge girder is sprayed and maintained; the cast-in-situ beam surface spray curing system comprises spray heads D distributed on two sides of the top of the outer template, wherein the spray heads A, the spray heads B, the spray heads C and the spray heads D are all connected with water pipes, and the water pipes are connected with a water pump and a water tank, so that the cast-in-situ beam surface is sprayed and cured.
10. The integrated ascending mobile form of claim 1, wherein: the front end of the main beam
The front guide beam is connected, and the main beam assembly adopts a double-longitudinal beam structure; the main cantilever beam is a truss structure with a right trapezoid cross section,
The main cantilever beam is fixed with the outer side surface of the main beam in an abutting manner.
CN202411081899.4A 2024-08-08 2024-08-08 An integrated upward movable mold frame Pending CN119021099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411081899.4A CN119021099A (en) 2024-08-08 2024-08-08 An integrated upward movable mold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411081899.4A CN119021099A (en) 2024-08-08 2024-08-08 An integrated upward movable mold frame

Publications (1)

Publication Number Publication Date
CN119021099A true CN119021099A (en) 2024-11-26

Family

ID=93539923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411081899.4A Pending CN119021099A (en) 2024-08-08 2024-08-08 An integrated upward movable mold frame

Country Status (1)

Country Link
CN (1) CN119021099A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119195009A (en) * 2024-11-27 2024-12-27 中铁北京工程局集团有限公司 An upward self-propelled mobile formwork for bridge construction and a bidirectional construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119195009A (en) * 2024-11-27 2024-12-27 中铁北京工程局集团有限公司 An upward self-propelled mobile formwork for bridge construction and a bidirectional construction method

Similar Documents

Publication Publication Date Title
CN108442255B (en) Movable formwork bridge fabrication machine and construction method for cast-in-situ bridge fabrication
CN107059640B (en) Bridge girder erection machine for prefabricated segmental beam span-by-span construction and construction method thereof
CN111594221A (en) Tunnel secondary lining full-section integrated construction trolley and secondary lining method using same
CN218712236U (en) External mold device applied to continuous beam construction
CN109024291A (en) A kind of integration Bridge Erector and its working method
CN104695335B (en) Upstroke movable framework steel bar overall binding lifting construction engineering method and constructing device
CN115787487B (en) Construction method of continuous beam variable cross-section bridge fabrication machine
CN212335790U (en) Large cantilever bent cap construction trolley
CN112160246B (en) Method for installing composite beam
CN115613478B (en) Continuous beam cantilever pouring method
CN116537076B (en) A large-tonnage two-span self-supporting mobile formwork and its construction method
CN110130937B (en) Tunnel construction trolley
CN209408814U (en) A kind of PC track beam form system
CN114108446A (en) High-speed railway stay cable bridge structure and construction method
CN111733872B (en) Pipe gallery construction method
CN119021100A (en) A construction method for an integrated upward movable formwork
CN115094836B (en) Grooving machine and grooving method
CN119021098A (en) A construction method for a split upward movable formwork
CN115125856A (en) Multifunctional bridge fabrication machine
CN114657884B (en) Construction method of descending movable formwork for bridge abutment assembly and sectional propulsion
CN209260561U (en) A kind of integration Bridge Erector
CN115897417A (en) A formwork construction method and device in the process of cantilever pouring continuous beams
CN204401473U (en) Upstroke movable framework steel bar overall binding lifting construction device
CN118933885A (en) A single-track railway tunnel secondary lining construction trolley and construction method thereof
CN115351884B (en) Synchronous positioning device and method for inner and outer templates of U-shaped aqueduct

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination