CN118970851A - A method for suppressing overvoltage of 10kV system in hydropower station based on ATP-EMTP simulation - Google Patents
A method for suppressing overvoltage of 10kV system in hydropower station based on ATP-EMTP simulation Download PDFInfo
- Publication number
- CN118970851A CN118970851A CN202410862914.2A CN202410862914A CN118970851A CN 118970851 A CN118970851 A CN 118970851A CN 202410862914 A CN202410862914 A CN 202410862914A CN 118970851 A CN118970851 A CN 118970851A
- Authority
- CN
- China
- Prior art keywords
- overvoltage
- voltage
- hydropower station
- simulation
- arrester
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H9/00—Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
- H02H9/04—Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess voltage
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/36—Circuit design at the analogue level
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0092—Details of emergency protective circuit arrangements concerning the data processing means, e.g. expert systems, neural networks
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/04—Power grid distribution networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Artificial Intelligence (AREA)
- Emergency Protection Circuit Devices (AREA)
Abstract
The invention discloses an over-voltage suppression method for a 10kV system of a simulated hydropower station based on ATP-EMTP, which relates to the technical field of overvoltage of hydropower station systems, and comprises the steps of constructing a hydropower station simulation model, analyzing the abnormal voltage increase condition possibly occurring during the operation of overvoltage, and evaluating the influence degree of the abnormal voltage increase condition on the stability of the hydropower station system; the protection scheme of the equipment under the condition of overvoltage operation is subjected to simulation analysis, so that different equipment protection strategies are determined; and optimizing the operation strategy of the hydropower station based on the simulation result, and obtaining the overvoltage suppression measures. The invention not only improves the stability and reliability of the system, but also optimizes the protection strategy and the operation scheme, and improves the economic benefit. Meanwhile, by combining with analysis of space-time distribution of ground surface potential, the fault diagnosis capability of the ground network is enhanced, scientific basis is provided for system design and transformation, and innovative development of the overvoltage suppression technology of the hydropower station is promoted. This systematic solution significantly improves the overall performance and safety level of the 10kV system of the hydropower station.
Description
Technical Field
The invention relates to the technical field of overvoltage of hydropower station systems, in particular to a 10kV system overvoltage suppression method based on ATP-EMTP simulation hydropower stations.
Background
The green house hydropower station adopts an expansion unit wiring mode of two machines and one transformer, the outlet voltage of a generator is 10.5kV, two sections of 10kV station power are respectively led to be connected from an expansion unit bus through a current limiting reactor, and a 150VCP-WRG50 type vacuum circuit breaker of Eton company is selected as the outlet circuit breaker of the generator. In order to reduce the steepness of overvoltage of the opening operation, a group of RC overvoltage protectors are respectively arranged on two sides of the circuit breaker, and the model is LCQ 10-0.2/100-1. The RC resistance-capacitance absorber is overheated and burnt to the open circuit fault of an outlet bus after being 08 in 2021 and 08 in 29.08 minutes and 33 seconds. Similar faults occur in other power plants and substations for many times, for 10kV of the outlet of a power plant unit, a design unit does not generally conduct quantitative analysis and calculation on the overvoltage level of operation, whether RC is selected to inhibit the overvoltage steepness of operation is completely experienced, the actual running conditions of a plurality of power plants of the same type are researched to find that the fault occurrence rate of partial power plants without RC resistance-capacitance absorbers due to overvoltage damage of a breaker is lower,
For these cases, it is necessary to install an RC resistive-capacitive absorber, and the choice of parameters thereof, and how to prevent the heat burning loss, is necessary to make qualitative and quantitative analysis demonstration. Aiming at the problems, according to the actual measurement parameters of the green house hydropower station, an ATP-EMPT power system electromagnetic transient state and power electronic digital simulation system is adopted to simulate electromagnetic and electromechanical transient state processes of a 10kV system of the power station, and the operation overvoltage level of the system under the condition that a breaker cannot be separated or combined is quantitatively analyzed.
Disclosure of Invention
The invention is provided in view of the problems existing in the existing 10kV system overvoltage suppression method of the simulated hydropower station based on the ATP-EMTP.
Therefore, the invention aims to solve the problem of how to prevent heating and burning loss by selecting RC to inhibit the operation overvoltage steepness or not for the 10kV power plant unit.
In order to solve the technical problems, the invention provides the following technical scheme:
In a first aspect, the embodiment of the invention provides an over-voltage suppression method for a 10kV system of a hydropower station based on ATP-EMTP simulation, which comprises the steps of constructing a hydropower station simulation model, analyzing the abnormal voltage increase condition possibly occurring during the operation of over-voltage, and evaluating the influence degree of the abnormal voltage increase condition on the stability of the hydropower station system; the protection scheme of the equipment under the condition of overvoltage operation is subjected to simulation analysis, so that different equipment protection strategies are determined; and optimizing the operation strategy of the hydropower station based on the simulation result, and obtaining the overvoltage suppression measures.
As a preferable scheme of the 10kV system overvoltage suppression method for the simulated hydropower station based on the ATP-EMTP, the invention comprises the following steps: the hydropower station simulation model is a 10kV side EMPT simulation model of a main transformer and comprises a 10kV vacuum circuit breaker simulation module, a main transformer simulation module, a cable simulation module, a lightning arrester simulation module and a resistance-capacitance absorber module; the 10kV vacuum circuit breaker simulation module is built in a MODLES module of ATP-EMTP and comprises four elements of arcing time, interception, insulation strength and high-frequency arc extinguishing capability of the vacuum circuit breaker; the main transformer simulation module simulates the magnetization characteristic of the transformer by adopting a three-phase symmetrical nonlinear inductance Type-96 model in the ATP-EMTP, wherein the Type-96 nonlinear inductance represents the relationship between exciting current and magnetic flux, and an idle load characteristic curve of the transformer is obtained through idle load and short circuit tests and is converted into a magnetization curve by using the ATP-EMTP; the cable simulation module constructs lightning arresters in ATP-EMTP by using type 92 elements, and comprises lightning arresters with higher than normal volt-ampere characteristic curves and lightning arresters with lower than normal volt-ampere characteristic curves.
As a preferable scheme of the 10kV system overvoltage suppression method for the simulated hydropower station based on the ATP-EMTP, the invention comprises the following steps: the operation overvoltage comprises switching off operation overvoltage, switching on operation overvoltage, transient recovery overvoltage and casting shear voltage device overvoltage; the switching-off operation overvoltage refers to a phenomenon that voltage is abnormally increased due to characteristics of electrical equipment and factors of an operation state of a power system when a breaker or a switch performs switching-off operation; the switching-on operation overvoltage comprises a planned switching-on operation and an automatic reclosing operation; the maximum overvoltage generated by the planned closing operation is p times, namely the ratio of the overvoltage amplitude to the steady-state power frequency voltage amplitude; the automatic reclosing operation is a closing operation performed by automatic device control after the tripping fault of the line occurs; the transient recovery overvoltage is generated by breaking the breaker to open and cut off the short-circuit current after the short circuit of the power system occurs, and generating an arc between contacts after the contacts of the breaker are separated, wherein the arc voltage is extinguished at the zero crossing moment, and the transient recovery voltage is generated on the contacts.
As a preferable scheme of the 10kV system overvoltage suppression method for the simulated hydropower station based on the ATP-EMTP, the invention comprises the following steps: the overvoltage of the casting shear voltage device is to cut off an empty load transformer, a reactor and an empty load motor, namely, cut off small inductive current; the no-load current cutting-off transformer is to cut off no-load current of the no-load transformer, the arc extinguishing capability of the circuit breaker is to forcedly extinguish the no-load current before zero crossing to cut off the no-load current, and a cut-off phenomenon is generated, so that under the action of power frequency voltage, the current i flowing through the no-load transformer is the current i L flowing through the exciting inductor; if the interruption occurs when no-load current i=i 0, and the power supply voltage is U 0, the energy stored in the inductor and the capacitor at the moment of interruption is:
Wherein, C represents the capacitance of the transformer, L represents the excitation inductance of the no-load transformer; electromagnetic oscillation occurs in an oscillation loop formed by L, C, all electromagnetic energy is changed into electric field energy at a certain moment, and the maximum voltage U max appears on the capacitor C at the moment, and the energy is obtained according to the law of conservation of energy:
if the energy stored on the capacitor is shut-off Then:
If the larger the value of the cutoff moment I 0 is, the larger the exciting inductance L of the no-load transformer is, the larger the magnetic field energy is; the smaller the capacitance, the higher the overvoltage that the same magnetic field energy is transferred to the capacitance.
As a preferable scheme of the 10kV system overvoltage suppression method for the simulated hydropower station based on the ATP-EMTP, the invention comprises the following steps: the suppression of overvoltage operation, in particular to the suppression of the split brake re-ignition overvoltage, is realized through a lightning arrester and a resistance-capacitance absorber; the voltage-current characteristic of the lightning arrester is different in influence degree on overvoltage, the lightning arrester is arranged on two sides of the circuit breaker, the amplitude of the switching-off overvoltage is limited by the nonlinearity of the lightning arrester and the insulation strength of a fracture during reburning, the switching-off overvoltage after the reburning is finished is limited by the nonlinearity of the lightning arrester only, and the lower the voltage-current characteristic curve is, the stronger the inhibiting effect is; considering the influence of the lightning arrester on the pre-breakdown overvoltage of the switch, compared with the re-ignition overvoltage of the switch, the suppression effect of the lightning arrester on the pre-breakdown of the switch is not obvious, particularly, the high volt-ampere characteristic lightning arrester is similar to the switch simulation, the suppression effect is still influenced by the volt-ampere characteristic and the installation position, the lower the volt-ampere characteristic curve is, the stronger the suppression effect is, and only the voltage at the corresponding installation position can be limited by a single lightning arrester; further considering the influence of the resistance-capacitance absorber on the split-gate re-ignition overvoltage, the resistance-capacitance absorber not only limits the amplitude of the overvoltage, but also reduces the oscillation frequency and the rising steepness, the capacitance value is positively correlated with the suppression effect but has a saturation effect, the installation position has the same influence, but the single resistance-capacitance absorber has better suppression effect than the single lightning arrester, the connection of the resistance-capacitance absorber changes the oscillation parameters of a high-frequency loop, and the resistance-capacitance absorber has excellent suppression effect on the re-ignition and pre-breakdown overvoltage; considering the influence of the resistance-capacitance absorber on the switch re-ignition overvoltage, compared with a lightning arrester, the resistance-capacitance absorber can limit the amplitude when facing the switch-on overvoltage with low amplitude, and can reduce the oscillation frequency and the rising steepness at the same time, and the influence rule of the capacitance value and the installation position on the inhibition effect is similar to that of the switch-on.
As a preferable scheme of the 10kV system overvoltage suppression method for the simulated hydropower station based on the ATP-EMTP, the invention comprises the following steps: the overvoltage suppression measures are realized by arranging protection equipment, and comprise a lightning arrester for limiting overvoltage to be equal in value and an RC resistance-capacitance absorption device for reducing and eliminating oscillation overvoltage; the lightning arrester adopts a zinc oxide lightning arrester, and an overvoltage value which can be born by insulation between a relative ground and a relative phase of a 10kV generator in operation is calculated by a motor withstand voltage level formula, and is expressed as follows:
Wherein U e is the rated voltage of the generator, and K is the impact coefficient; the zinc oxide arrester adopts star connection to protect the generator, when single-phase earth fault occurs, the sound relative earth voltage rises to the line voltage and allows operation mh, at this time, the maximum power frequency voltage U gm born by the zinc oxide arrester is calculated, in order to ensure the safe operation of the zinc oxide arrester, the nominal voltage U 1mA must be greater than U gm, the residual voltage U c on the zinc oxide arrester when nA flows in the zinc oxide arrester is calculated, the numerical values of U c and U s are compared, and the insulation protection condition between the zinc oxide arrester with a series gap and the relative earth of the high-voltage motor is obtained.
As a preferable scheme of the 10kV system overvoltage suppression method for the simulated hydropower station based on the ATP-EMTP, the invention comprises the following steps: when the resistance-capacitance absorber is not connected, C 0 and L 0 form an oscillating circuit after the switch is turned on, and as C 0 is small, the oscillating frequency is very high, the amplitude is also very high, and when the absorbers r1 and C1 are added, C 1>C0,C0 can be ignored, and the oscillating circuit is a r1 loop, a C1 loop and an L1 loop; frequency of oscillation in loopThe angular frequency ω is:
wherein, When (when)Without oscillatory damping waves whenWhen the voltage is in a critical state, R c is a critical resistance value; further, by simulation analysis, it is possible to obtain: in a power grid with a neutral point grounded through an arc suppression coil, a zinc oxide lightning arrester can only limit the amplitude of overvoltage and cannot change the frequency and the steepness, and has the defects that the zinc oxide lightning arrester can mainly protect relative ground insulation, and the interphase insulation can be protected, but the method is more complex and has higher price; the RC resistance-capacitance absorption device is an effective device for limiting the overvoltage of the vacuum switch operation, and not only can reduce the amplitude of incoming waves, but also can reduce the steepness of the incoming waves.
In a second aspect, an embodiment of the present invention provides an ATP-EMTP-based system for suppressing overvoltage in a 10kV system of a simulated hydropower station, including: the construction module is used for constructing a hydropower station simulation model, analyzing the voltage abnormal increase condition possibly occurring when the operation is over-voltage, and evaluating the influence degree of the voltage abnormal increase condition on the stability of the hydropower station system; the analysis module is used for determining different equipment protection strategies by performing simulation analysis on the protection scheme of the equipment under the condition of operation overvoltage; and the optimizing module is used for optimizing the operation strategy of the hydropower station based on the simulation result and obtaining overvoltage inhibition measures.
In a third aspect, embodiments of the present invention provide a computer apparatus comprising a memory and a processor, the memory storing a computer program, wherein: and the processor realizes any step of the method for suppressing the overvoltage of the 10kV system of the simulated hydropower station based on the ATP-EMTP when executing the computer program.
In a fourth aspect, embodiments of the present invention provide a computer-readable storage medium having a computer program stored thereon, wherein: and the computer program is executed by a processor to realize any step of the method for suppressing the overvoltage of the 10kV system of the simulated hydropower station based on the ATP-EMTP.
The method has the beneficial effects that by constructing an accurate hydropower station 10kV system simulation model and combining with ATP-EMTP software to carry out comprehensive overvoltage analysis, accurate prediction and effective suppression of various operation overvoltages are realized. The method not only improves the stability and reliability of the system and reduces the damage risk of equipment, but also optimizes the protection strategy and the operation scheme and improves the economic benefit. Meanwhile, by combining with analysis of space-time distribution of ground surface potential, the fault diagnosis capability of the ground network is enhanced, scientific basis is provided for system design and transformation, and innovative development of the overvoltage suppression technology of the hydropower station is promoted. This systematic solution significantly improves the overall performance and safety level of the 10kV system of the hydropower station.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for the description of the embodiments will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art. Wherein:
FIG. 1 is a schematic diagram of a three-phase simulation circuit;
FIG. 2 is a schematic diagram of a vacuum interrupter simulation module;
FIG. 3 is a diagram of a simulation module of the main transformer;
FIG. 4 is a graph of the volt-ampere characteristics of two types of arresters;
FIG. 5 is an electrical block diagram of a resistive-capacitive absorber;
FIG. 6 is a graph showing the result of the switching operation over voltage;
FIG. 7 is a graph showing the result of phase A switching operation over voltage;
FIG. 8 is a graph showing the overvoltage result of the phase B split operation;
FIG. 9 is a graph showing the result of the phase C opening operation over voltage;
fig. 10 is a diagram of an overvoltage simulation result of a planned closing operation;
FIG. 11 is a graph of the overvoltage simulation result of the reclosing operation;
FIG. 12 is a graph of simulated voltage results for a transient recovery process;
FIG. 13 is a graph of simulated current results for transient recovery process;
FIG. 14 is a graph of simulated voltage results for the low side of the main transformer;
FIG. 15 is a graph of simulated voltage results for the high side of the main transformer;
FIG. 16 is a graph of simulated voltage results for a split brake overvoltage without a lightning arrester installed;
FIG. 17 is a graph showing simulated voltage results of the break brake overvoltage during installation of the lightning arrester;
FIG. 18 is a graph of simulated voltage results for pre-breakdown overvoltage closing without a lightning arrester installed;
Fig. 19 is a graph of simulated voltage results of the closing pre-breakdown overvoltage when the lightning arrester is installed.
Detailed Description
So that the manner in which the above recited objects, features and advantages of the present invention can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to the embodiments, some of which are illustrated in the appended drawings. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments of the present invention without making any inventive effort, shall fall within the scope of the present invention.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, but the present invention may be practiced in other ways other than those described herein, and persons skilled in the art will readily appreciate that the present invention is not limited to the specific embodiments disclosed below.
Further, reference herein to "one embodiment" or "an embodiment" means that a particular feature, structure, or characteristic can be included in at least one implementation of the invention. The appearances of the phrase "in one embodiment" in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments.
Example 1
Referring to fig. 1 to 19, a first embodiment of the present invention provides an ATP-EMTP-based method for suppressing overvoltage in a 10kV system of a simulated hydropower station, including:
before describing embodiments of the present invention in detail, the background of the invention will be described first for clarity by:
The three-loop back line of 110kV at 03 minutes in 2021, 08 and 29 days 08 works normally; the I, II sections of the 110kV bus are normally connected; 1B and 2B are normal in operation, wherein the neutral point of the 1B is directly grounded, and the gap of the neutral point of the 2B is grounded; 10kV factory power I, II runs in sections. 4 units are operated, the 1F unit has the power of 22.2MW, the 2F unit has the power of 23MW, the 3F unit has the power of 22.2MW, the 4F unit has the power of 22MW, and the load is 90MW.
Starting at 8 points 03 for 33 seconds, the monitoring system reports that the PT insulation of the 10kV II section bus is reduced, the stator of the 3F generator is grounded, the stator of the 4F generator is grounded, the RCS-985S of the 4F generator protecting device is locked, the differential protection action of the 4F generator and the opening of a circuit breaker at the outlet of the generator are performed at 8 points 05 for 40 seconds, and the normal accident shutdown of the 8 points 07 for 4F generator set is realized.
Maintenance personnel go to site for disposal:
Checking the primary equipment: inspection shows that the front cabinet door of the 4LB high-voltage side isolation disconnecting link 943G switch cabinet of the 4F unit excitation transformer is washed away, and three dry-type overvoltage absorbers in the cabinet are damaged, wherein the resistance of the B-phase absorber is completely burnt out, and the resistance part metal wires of the A-phase absorber and the B-phase absorber are burnt out; the connecting wires of the phase B and the busbar have overheat phenomenon, and the connecting wires of the phase A and the phase C and the busbar fall off; other equipment has obvious carbon ash trace, and no obvious abnormality is found; the front and rear cabinet doors are slightly deformed. The model of the burnt overvoltage absorber is LGQ-0.2/100-1, and the manufacturer is Jinzhou brocade-containing special capacitor factory. The capacity check of the damaged absorber (measuring instrument: multimeter FULEK b+): phase a capacitance 0.203 μf; phase B capacitance 0.19 μf; phase C capacitance 0.205. Mu.F. Because the ABC three-phase resistor is burnt out, the resistance value cannot be measured.
Checking the secondary device: the protection screen of the generator of the 4F unit is checked on site, RCS-985RS, alarm signals and tripping signal lamps on the device are found to be on, and a protection action oscillogram is printed for analysis. From the analysis of the wave-recording diagram, when faults occur, the current of the machine end and the neutral point far exceeds rated values, the maximum value of the secondary current of the machine end reaches 100A, the maximum value of the secondary current of the neutral point reaches 10A, the maximum value of the secondary side of the differential current reaches about 110A, the secondary effective value of the differential current is 78A (differential starting value: 0.2Ie; differential speed setting value: 4Ie; ie=4.064A, current transformer transformation ratio 2500/5), the differential action of the generator ratio is caused, and the protection action is correct.
And cleaning the 4F excitation variable high-voltage switch cabinet, evacuating personnel, and handling the termination procedure of the electric work ticket. The operator shakes and measures that the excitation high-voltage side of the 4F unit is 10MΩ to ground, the insulation absorption ratio (R60/R15) =20/7 MΩ of the stator of the 4F unit, and the insulation of the rotor of the 4F unit is 3MΩ. And the insulation value of each device is qualified.
And (3) recovering the safety measures of the 4F unit by operating personnel at the time of 30 minutes, and recovering the unit for standby. And (3) starting the 4F unit to idle after 45 minutes, checking that each part is free of abnormality, and performing idle operation for one or more hours to check that the unit is free of abnormality.
And (3) carrying out zero-starting boosting on the 4F unit in the 15:00 field, slowly boosting to the rated voltage, and monitoring the normal operation of the generator, each switch cabinet and the secondary equipment beside the machine in the boosting process. Then, the excitation inversion de-excitation is normal.
And 15, 35, monitoring and sending a 4F unit 'pressure building' command, wherein the pressure building is normal.
And (5) carrying out grid connection on the 504F unit, carrying out load gradually until the current and voltage of the unit are 30MW, checking that the current and voltage of the unit and the protection sampling value are correct, and enabling the excitation device to work normally and enabling the unit to operate normally.
The main cause of the fault according to the above analysis is a short circuit caused by dielectric breakdown. The generating point is gradually aged at the B-phase resistor of the resistance-capacitance absorber of the circuit breaker generator side, the voltage drop on the resistor is increased, the heating of the resistor is increased, the local notch resistor of the resistor, particularly some metal wires, is easy to fire and burn out among notches when the current value is large, the insulating sleeve is gradually burnt out, in the process of burning out the resistor and the insulating sleeve, the phenomenon of discharging to the ground through the capacitor exists, when conductive particles and smoke in the cabinet reach a certain concentration, ABC three-phase short circuit is initiated, the resistor of A, C phases and the insulating sleeve are burnt out, and the connecting wire of the A, C phases and the busbar is knocked down by impact force (the connecting wire is intact), so that the equipment fault of the resistance-capacitance overvoltage absorber is caused.
S1, constructing a hydropower station simulation model, analyzing the voltage abnormal increase condition possibly occurring when the operation is over-voltage, and evaluating the influence degree of the voltage abnormal increase condition on the stability of the hydropower station system.
The green house hydropower station adopts 4 generator sets, the model number is SFWG, the rated capacity of each generator is 36.96MVA, and the rated voltage is 10.5kV. The generator set is a three-phase synchronous horizontal shaft bulb tubular hydraulic generator. The model of the main transformer is SF9-80000/110, the rated capacity is 80MVA, and the rated voltage is 110/10.5kV. Two sections of 10kV station service electricity are led to be connected with the expansion unit bus through the current limiting reactor, and a cable circuit is connected with the generator outlet and the current limiting reactor and between the current limiting reactor and station service electricity equipment. The 150VCP-WRG50 type vacuum circuit breaker 110kV side of the Eton company is selected as the generator outlet circuit breaker, and a single bus segment 4 return wire is adopted for conveying electric energy generated by the generator to a destination so as to meet the electricity demand. Based on field measured data, a 10kV side EMPT simulation model of a No. 1 main transformer (model SF 9-80000/110) of a Qingju 110kV hydropower station is shown in FIG. 1.
In the previous analysis, it was found that the circuit breaker is an important factor in the overvoltage generation when the no-load transformer is cut off. The amplitude of the overvoltage caused by cutting off the no-load transformer is approximately proportional to the cutoff value I0, the cutoff value is related to the performance of the circuit breaker, and the cutoff value I0 of each type of circuit breaker has great dispersion when the circuit breaker is opened. After the zero crossing of the current, the circuit breaker has two processes of insulation strength recovery and transient recovery voltage increase between the fractures. Arc "reburning" occurs when the transient recovery voltage exceeds the insulation recovery strength. The green house hydropower station adopts an Eton 150VCP-WRG50 0 type breaker, the model is provided with 3 basic characteristic parameters of cutoff value, medium dynamic insulation strength and high-frequency arc quenching capacity according to a Helmer vacuum breaker model, and the four factors of the arc burning time, cutoff, insulation strength and high-frequency arc quenching capacity of the vacuum breaker are considered according to a vacuum breaker model established in a MODLES module of ATP-EMTP according to specific conditions, and a vacuum breaker simulation module is shown in figure 2.
In fig. 2, T is a control switch, and its state is determined by the output TACS of the modem module. The MODEL module has 3 inputs and 3 outputs. The input is the voltages U1 and U2 on both sides of the circuit breaker and the current I flowing through the circuit breaker. The output quantity is a breaker state control signal TACS, a dielectric insulation strength DS between breaker contacts and a transient recovery voltage TRV. The MODEL module calculates the output quantity according to the current input quantity and a preset rule to control the state of the switch T in real time. In order to better simulate the switching and arc characteristics of the circuit breaker in a real environment, the simulation module is connected with the branches which are connected in series and comprise 10 omega resistors, 0.05uH inductor and 1nF capacitor at the two ends of the contact after referring to related documents.
As shown in fig. 3, the transformer model is constructed by considering firstly electromagnetic coupling between windings of corresponding turns ratio, secondly magnetization characteristics of the core, leakage reactance and winding resistance, and thirdly, capacitance between windings and winding to ground, etc. Since the transformer includes the winding and the core element, the electrical parameters, the excitation characteristics, and the like thereof change with the applied voltage waveform and the frequency change, and the transformer exhibits clear frequency characteristics. It is difficult to accurately build a transformer model in electromagnetic transient analysis. Firstly, the nonlinear characteristics and the frequency dependence of a transformer and a shunt reactor; secondly, the winding connection mode and the iron core structure of the transformer are various; and thirdly, many factors need to be considered in modeling, such as self inductance and mutual inductance of a coil, leakage magnetic flux, skin effect, proximity effect of the coil, core saturation, hysteresis, capacitance effect and the like. The transformer simulation is modeled in the buffer front overvoltage frequency domain taking into account the operating overvoltage caused by the breaker operation. The model of the main transformer of the green house hydropower station is SF9-80000/110, and the nameplate parameters are shown in the following table 1:
TABLE 1 Main Transformer nameplate parameter Table
| Capacity (kVA) | Rated voltage | Short circuit impedance | No-load loss | Load loss | Connection group |
| 80000 | 110/10.5 | Dyn11 |
In order to simulate the nonlinear characteristics of the high-frequency transformer iron core, a three-phase symmetrical nonlinear inductance Type-96 model in ATP-EMTP is adopted to simulate the magnetization characteristics of the transformer. The inductance Type-96 nonlinear inductor needs the relation between exciting current and magnetic flux, and the no-load characteristic curve of the transformer can be obtained through no-load and short circuit tests so as to be converted into a needed magnetization curve through ATP-EMTP.
The cable simulation module is constructed, the model of a three-core cable used for connecting a breaker and a main transformer on site is YJV22-10kV3 multiplied by 120, the length is about 150m, and the same parameters are used for a cable on the power supply side to be 12m. The inductance per unit length of the cable was about 0.4. Mu.H/m, the capacitance to ground was 22nF, and the sum was 183pF/m. In the transient state of the circuit breaker, the alternating current resistance of the cable should be considered, the unit length is 0.0033 omega/m, and the coupling capacitance between the cable phases is 70pF/m.
An arrester simulation module is constructed, and an arrester is essentially a kind of arrester connected in parallel near the protected equipment. When the voltage exceeds the discharge voltage of the lightning arrester, the lightning arrester is firstly discharged, the development of overvoltage is limited, and the equipment is protected from insulation breakdown. The zinc oxide arrester is widely applied to the overvoltage protection field of a power system due to the excellent nonlinear characteristic.
A rated voltage U r of a lightning arrester for a conventional power station in a 10kV system is 17kV. The reference voltage U 1mA under direct current 1mA is not lower than 24kV, and the lightning impulse residual voltage under 5kA nominal discharge current is not more than 45kV. In order to investigate the influence of the difference in volt-ampere characteristics on the inhibition effect, two types of arresters were additionally constructed in ATP-EMTP using type 92 elements, one having a higher than normal volt-ampere characteristic curve and one having a lower than normal volt-ampere characteristic curve. The voltammetric characteristic curves of the two lightning arresters are shown in fig. 4.
The operation overvoltage generated when the inductive load is switched has higher amplitude and is accompanied by very high oscillation frequency, so that the potential difference between adjacent turns of the inductive equipment is very large, and the inter-turn insulation is very easy to break, so that the amplitude of the overvoltage is reduced, and the oscillation frequency of the overvoltage is reduced. The electric structure of the resistance-capacitance absorber is relatively simple, and each phase is an equivalent series circuit of capacitance and resistance as shown in figure 5.
S2, determining different equipment protection strategies by performing simulation analysis on the protection scheme of the equipment under the condition of operation overvoltage.
The breaking operation overvoltage is a phenomenon in which voltage abnormality increases due to factors such as characteristics of electrical equipment and an operation state of a power system when a breaker or a switch performs a breaking operation. The overvoltage of the opening operation occurs frequently in the power system, and the overvoltage is spread over the whole line, and proper measures are taken to eliminate and limit the overvoltage, so that the overvoltage has great significance in reducing the insulation level of the power grid. Major factors affecting such operating overvoltages include: (1) the performance of a circuit breaker. The circuit breaker with good arc extinguishing performance can prevent or reduce the number of re-ignition times of the circuit, so that the maximum value of overvoltage is reduced; (2) When other bus occurs, the bus capacitance is increased, the residual charge is rapidly redistributed when the arc reburns, and the initial value of the voltage is changed to be closer to the steady-state value, so that the overvoltage is reduced; and (3) equipment such as an electromagnetic voltage transformer is arranged on the line side. Their presence will provide an additional release path for the residual charge on the line, reducing the residual voltage of the line and thus the re-ignition overvoltage.
The overvoltage of the opening operation takes the circuit where the power plant is located as an analysis object, and no overvoltage protection measures are added. Setting random single-time opening time to be 0.0239 for A phase, 0.0259 for B phase and 0.0269 for C phase, and setting the maximum amplitude of the overvoltage after opening to be 3.9p.u..
Line switching on in power systems is generally divided into two cases: the automatic reclosing device comprises a circuit voltage sensor, a switching-on control circuit, a switching-off control circuit, a switching-on control circuit and a switching-off control circuit. If the mutual influence caused by different three-phase switching-on and the capacitance effect of an idle long line are considered, the actually-occurring overvoltage amplitude is influenced by a series of factors, and the method mainly comprises the following steps: (1) The switching-on phase, the instantaneous value of the power supply voltage during switching-on depends on the phase theta thereof, and the difference of the phases directly influences the amplitude of the overvoltage; (2) The polarity and the magnitude of the residual voltage on the line are changed, and the influence of the amplitude of excessive voltage is larger. In the automatic reclosing process, the residual voltage of the line is reduced by 10-30% because the insulator has a certain leakage impedance resistance which is larger than the intermittent period of 0.5; (3) The line loss, the resistance on the line and the corona generated on the line can form energy loss when the overvoltage is high, so that the energy in the transition process is consumed, and the overvoltage is reduced.
The maximum overvoltage generated by the planned closing operation is 2.0 times (the ratio of the overvoltage amplitude to the steady-state power frequency voltage amplitude). Analysis of the equivalent circuit of the distribution parameters of the no-load long circuit of the closing switch shows that the fundamental component amplitude A1 can be larger than the steady component amplitude A, and in a certain case, the multiple of the overvoltage can be larger than 2. The maximum measured overvoltage is 1.9 to 1.96 times, typically 1.65 to 1.85 times, due to losses present in the loop. And the overvoltage of the planned closing and opening operation takes the line where the power plant is located as an analysis object, and no overvoltage protection measures are added.
According to the situation of the planned closing operation, there is no residual charge on the line, and the initial voltage U c (0) =0. If the automatic reclosing is performed, a certain residual charge and an initial voltage are arranged on the circuit, and the oscillation is more intense during reclosing. The automatic reclosing is a closing operation performed by automatic device control after a tripping fault occurs on a line. Assuming that the line residual voltage has fallen by 30% before reclosing the circuit breaker, the overvoltage during the transient state at reclosing is-Uph + -Uph- (1-0.3) x 1.4Uph = -2.98Uph, i.e. approximately 3 times, considering the most severe case, i.e. the supply voltage at reclosing is-Uph (phase voltage). In the actual process, the power supply voltage is not necessarily at a peak value during reclosing, and is not necessarily opposite to the polarity of the residual voltage of the circuit, and the overvoltage is lower.
After the electric power system is short-circuited, the breaker is opened to break the short-circuit current. After the contacts of the circuit breaker are separated, an arc is generated between the contacts. The arc voltage is extinguished at the moment of zero crossing, and a transient recovery voltage is generated on the contact. In the voltage recovery process, a transient recovery voltage utr (TRV) occurs between the arc gaps first. The instantaneous recovery voltage exists for a short time, from tens of microseconds to milliseconds. After the transient voltage disappears, the arc gap appears as a voltage determined by the power frequency power supply, which is called a power frequency recovery voltage upr. The main factors affecting the transient recovery voltage are: the amplitude of the power frequency recovery voltage, the sizes of inductance, capacitance and resistance in the line, the distribution condition of the inductance, capacitance and resistance, the length of the line, the arc characteristic when the line is disconnected and the like.
In the operation of the power system, the removal of the no-load transformer, the reactor, the no-load motor and the like are common operations in the power system. In normal operation, the empty load transformer, the reactor and the empty load motor represent an inductive load. Thus, the removal of the idling transformer, the reactor and the idling motor is to switch on and off a small inductive current, and a very high voltage may occur. The simulation takes the no-load transformer model as an analysis object, and the transient phenomenon at the moment after the action of the breaker is researched in a simulation way, so that the model of the hydroelectric generator is not considered in the model.
Fig. 14 and 15 are simulation waveforms of voltages on both sides of the transformer for suppressing overvoltage measures, the amplitude of overvoltage generated by cutting off the no-load transformer by the circuit breaker is large, and the amplitudes on both sides of high and low voltages reach 39.86kV (4.64 p.u.) and 246.53kV (2.39 p.u.), respectively. The overvoltage has a short duration and needs to be limited by the use of metal zinc oxide arresters and other devices.
The no-load transformer is cut off, the no-load current of the no-load transformer is cut off, the value of the no-load current is generally 0.2% -4% of the rated current of the transformer, the effective value is generally several to tens of amperes, the arc extinguishing capability of the circuit breaker forcedly extinguishes the arc to cut off the arc before the no-load current crosses zero, and a cut-off phenomenon is generated, so that the current i flowing through the no-load transformer is the current i L flowing through the exciting inductor under the action of the power frequency voltage;
If the interruption occurs when no-load current i=i 0, and the power supply voltage is U 0, the energy stored in the inductor and the capacitor at the moment of interruption is:
wherein, C represents the capacitance of the transformer, L represents the excitation inductance of the no-load transformer;
Electromagnetic oscillation occurs in an oscillation loop formed by L, C, all electromagnetic energy is changed into electric field energy at a certain moment, and the maximum voltage U max appears on the capacitor C at the moment, and the energy is obtained according to the law of conservation of energy:
if the energy stored on the capacitor is shut-off Then:
If the larger the value of the cutoff moment I 0 is, the larger the exciting inductance L of the no-load transformer is, the larger the magnetic field energy is; the smaller the capacitance, the higher the overvoltage that the same magnetic field energy is transferred to the capacitance. In general, although the value of I 0 is not large, the characteristic impedance value of the transformer is large, so that a high overvoltage can be generated. The actual process is much more complicated, and the performance of the circuit breaker, the parameters of the transformer, the neutral point grounding mode and the cable line segment connected with the transformer can all have an influence on cutting off the overvoltage of the no-load transformer. Based on the analysis, constructing the circuit breaker, the transformer, the cable and the like according to the actual parameters.
When a 10kV vacuum circuit breaker is subjected to opening operation, the overvoltage with extremely high amplitude frequency is often accompanied by interception re-burning, but the overvoltage with extremely high frequency amplitude can be generated, and proper measures are required to be found for suppression. The main current overvoltage suppression equipment mainly comprises a lightning arrester, a resistance-capacitance absorber and the like, and the principle of suppressing overvoltage is different. The section considers the voltage-current characteristics of the lightning arrester, the capacitance value of the resistance-capacitance absorber, the installation positions of two protection devices and the inhibition effect of a plurality of split brake re-ignition overvoltage.
The lightning arrester has the effects of breaking and re-burning overvoltage:
the installation positions of the lightning arresters are on the two sides of the circuit breakers a and b, and simulation results are recorded in table 2 and are compared. It can be seen that during the reburning period, the amplitude of the switching-off overvoltage is limited by the nonlinearity of the lightning arrester and the fracture insulation strength, and the switching-off overvoltage after the reburning is finished is limited by the nonlinearity of the lightning arrester only. The lower the volt-ampere characteristic curve is, the stronger the inhibition effect is.
Table 2 lightning rod installation position comparison result table
A single arrester can only limit overvoltage at a certain place, and in order to limit USR and UST simultaneously, two low volt-ampere characteristic arresters need to be additionally arranged at the positions a and b simultaneously. FIG. 17 shows simulated voltage waveforms with USR and UST amplitudes of 31.62kV (3.69 p.u.) and 28.37kV (3.31 p.u.), respectively, which are reduced by 51.5% and 45.9% compared to the case where no suppression measure is applied; although the surge arrester can limit the overvoltage amplitude well, the oscillation frequency and the rising steepness cannot be reduced.
In general, the arrester can limit the overvoltage amplitude, the lower the volt-ampere characteristic is, the better the inhibiting effect is, the influence exists on the installation position, the protection range is provided, the arrester with the low volt-ampere characteristic is required to be installed at the position a and the position b, the inhibiting effect is obvious when the arrester faces the switching-on reburning overvoltage with higher amplitude due to the nonlinear characteristic of the arrester, and the limitation is not obvious when the arrester faces the switching-on pre-breakdown overvoltage with lower amplitude.
Similar to the switching-off simulation, the installation position is changed, and simulation results of two types of lightning arresters for inhibiting switching-on overvoltage are shown in table 3:
table 3 simulation result table of arrester for inhibiting overvoltage of closing
The conclusion is as follows: compared with the switching-off heavy-duty overvoltage, the lightning arrester has the advantages that the inhibition effect on the pre-breakdown of the switching-off is not obvious, and particularly, the lightning arrester with high volt-ampere characteristics is provided. Similar to the switching simulation, the voltage-current characteristics and the installation position still affect the inhibition effect, and the lower the voltage-current characteristic curve is, the stronger the inhibition effect is, and the single lightning arrester can only limit the voltage of the corresponding installation position. In order to limit USR and UST simultaneously, two low volt-ampere characteristic lightning arresters are additionally arranged at the positions a and b simultaneously. FIG. 19 is a simulated voltage waveform with USR and UST amplitudes of 17.30kV (2.02 pu) and 15.36kV (1.79 pu), respectively, reduced by 10.1% and 7.2% compared to the case where no suppression measure was applied. After the pre-breakdown is finished, the USR waveform and the UST waveform have a high-frequency component overlapped on the power frequency, and the frequency is about 20kHz, because after the switching-on, the three-phase load side and the power supply side are both switched on, and the oscillation frequency is determined by the inductance and the capacitance of the load side and the power supply side at the same time.
The resistance-capacitance absorber not only can limit the overvoltage amplitude, but also can reduce the oscillation frequency and the rising steepness, the capacitance value and the inhibiting effect are positively correlated but have the saturation effect, and similar to a lightning arrester, the installation position also has the influence, but the single resistance-capacitance absorber has better inhibiting effect than the single lightning arrester. The connection of the resistance-capacitance absorber changes the oscillation parameters of the high-frequency loop, and has excellent inhibition effects on reburning and pre-breakdown overvoltage.
The results of the simulation of the rc absorbers installed at positions a and b are shown in table 4. In general, the resistance-capacitance absorber has good suppression effect on the amplitude of the split-gate reburning overvoltage, and the high-frequency oscillation loop is changed by the connection of the resistance-capacitance absorber, so that the time constant tau=RC of the high-frequency current can be increased, the zero-crossing moment of the current is prolonged, the contact opening distance is increased, the reburning probability is reduced, the development of the overvoltage is suppressed, and the amplitude of the overvoltage is limited. In longitudinal comparison, the capacitance directly affects the suppression effect of overvoltage, the capacitance positively correlates with the suppression effect and has a saturation effect, and because of process limitation, it is difficult to simultaneously satisfy a small volume and a large capacitance, a resistance-capacitance absorber of 0.10 mu F/100 omega is selected. Compared with the transverse direction, the installation position influences the inhibition effect, the USR is difficult to inhibit when a single resistance-capacitance absorber is installed at the a and b positions, and the USR and the UST are inhibited at the a and b positions at the same time, so that the inhibition effect is better.
TABLE 4 simulation results table for resistive-capacitive absorbers
Two 0.10 mu F/100 omega resistance-capacitance absorbers are additionally arranged at the position a and the position b, the amplitudes of USR and UST are respectively 32.74kV (3.82 p.u.) and 27.36kV (3.19 p.u.), and the inhibition effect is slightly stronger than that of a single resistance-capacitance absorber arranged at the position a and the position b. In addition, the resistive-capacitive absorber can not only reduce the oscillation frequency and the rising steepness by absorbing the capacitance, but also accelerate the oscillation damping by absorbing the resistivity, and the high-frequency component oscillation frequency of the USR is changed from 4.36kHz to 1.80 kHz.
The influence of the rc absorbers on the closing re-ignition overvoltage is similar to the switching off simulation, the installation position is changed, and the simulation results of the 3 types of rc absorbers for inhibiting the switching on overvoltage are shown in table 5:
TABLE 5 simulation results of resistance-capacitance absorber to suppress closing overvoltage
Compared with a lightning arrester, the resistance-capacitance absorber has excellent suppression effect on switching-on overvoltage with low amplitude, can limit the amplitude, and can reduce the oscillation frequency and the rising steepness. The influence rule of the capacitance value and the installation position on the inhibition effect is similar to that in the brake-separating simulation. Two 0.10 mu F/100 omega resistance-capacitance absorbers are added at the positions a and b, and the amplitudes of USR and UST are respectively 14.97kV (1.75 p.u.) and 12.01kV (1.40 p.u.), which are respectively reduced by 27.2% and 37.0% when no inhibition measures are added. Compared with a lightning arrester, the resistance-capacitance absorber not only can well limit the amplitude, but also can reduce the oscillation frequency and accelerate the attenuation, the oscillation frequency is reduced to 1.65 KHz from the original 3.74 KHz within 1ms after the first pre-breakdown, and the attenuation of the high-frequency oscillation component overlapped on the power frequency is very rapid after the pre-breakdown is finished.
When the voltage of the transformer is recovered after the transformer is unloaded and the external fault is removed, a large rush exciting current, commonly referred to as a magnetizing inrush current, may be generated. The nonlinearity of the transformer core is a cause of the generation of the magnetizing inrush current. The excitation surge current has the following characteristics: (1) Contains a large non-periodic component, so that the waveform deviates to one side of the time axis, and the waveform decays rapidly at the beginning moment; (2) Contains a large amount of higher harmonic components, mainly second harmonic, and for a three-phase transformer, the second harmonic component of one phase can exceed 60% of the fundamental component. (3) The initial waveforms have discontinuities with a break angle not less than 80 and even more than 120.
And S3, optimizing the operation strategy of the hydropower station based on the simulation result, and obtaining the overvoltage suppression measure.
The overvoltage endangers the safe operation of the electrical equipment, and the improvement of the contact material of the vacuum circuit breaker can only improve the probability of intercepting the overvoltage and has an effect of inhibiting the overvoltage. It is therefore necessary to provide dedicated protection devices. Currently, the following two protection devices are generally used: one is a lightning arrester for limiting overvoltage to the same value; the other is RC resistance-capacitance absorber for reducing and eliminating oscillation overvoltage.
Zinc oxide (ZnO) arrester:
The overvoltage value that can be borne by the insulation between the opposite phases and the ground of the 10kV generator in operation can be calculated by using a motor withstand voltage level formula:
Expressed as:
Wherein U e is the rated voltage of the generator; k is the impact coefficient, japanese 1.25, other 1.1-1.4, this analysis 1.15;
The generator U s for 10kV was 25.6kV (peak).
The neutral point of the 10kV system of the green house hydropower station is grounded through an arc suppression coil. When a single-phase earth fault occurs, the sound phase-to-earth voltage rises to the line voltage and is allowed to run for 2 hours. In this case, the maximum U gm of the power frequency voltage born by the zinc oxide arrester is 16.3kV. In order to ensure safe operation of the zinc oxide arrester, its nominal voltage U 1mA must be greater than U gm. The 10kV zinc oxide arrester is typically taken to have a U 1mA of 18.86kV, with U 1mA taken to be 11.3kV. When there is no series gap, the ratio of voltages U 100A to U 1mA at which it passes through 100A is about 1:4. the residual voltage U c on the zinc oxide arrester when it flows through 100A can be calculated. U c of the 10kV zinc oxide arrester is 26.4kV. Comparing the values of U c and U s, it can be seen that the two are almost equal, so it is very marginal to protect the insulation between the opposite grounds of the high voltage motor with a zinc oxide arrester without a series gap. The reliability is poor. If the zinc oxide lightning arrester with the series gap is adopted, U 100A generated by the zinc oxide lightning arrester with the voltage of 10kV is 21.5kV, U c<Us can better protect the insulation between the high-voltage motor and the ground.
The overvoltage applied to the phase-to-ground insulation is 2/3 of the overvoltage applied to the insulation between the opposite phases when the first open phase is open, and the former is only 1/2 of the latter when the second, three phase is open. For the connection mode shown in the star, when a gapless zinc oxide arrester is adopted, the insulation on the insulation between the opposite phases of the 10kV generator, U 1mA = 18.86kV, is 1.5U 1mA (28.3 kV); the voltage value exceeds or approaches the value of 10kV generator U s. If the residual voltage when the zinc oxide arrester flows through 100A is taken as the voltage on the insulation between the opposite phases, the voltage applied to the insulation between the opposite phases will be more than the generator U s. It follows that zinc oxide arresters without series gaps do not or substantially not protect the insulation between the opposing phases. If a zinc oxide lightning arrester with a series gap is adopted, 1.5U 1mA can be found to be 30kV. Again they all exceed the value of generator U s. Thus, these zinc oxide arresters also do not protect the insulation between the opposing phases.
And the zinc oxide lightning arrester three-phase four-star connection is adopted, so that the protection function of the zinc oxide lightning arrester three-phase four-star connection not only is relatively realized, but also is realized. The protector adopts a design scheme of series discharge gaps with respect to three protection units connected with a power grid, so that the protection residual voltage is lower, and the safety of electric equipment is improved. The protection unit is not connected with an anti-electric gap in series, so that the anti-electric gap is not influenced by parasitic capacitance and stray capacitance, and the stability of performance is ensured. The overvoltage protector has excellent and perfect performance, but has complex structure, high technical requirement and relatively high manufacturing cost.
When the resistance-capacitance absorber is not connected, C 0 and L 0 form an oscillating circuit after the switch ZK is opened, the oscillating frequency is very high and the amplitude is very high because C 0 is very small, and when the absorbers r1 and C1 are added, C 1>C0,C0 can be ignored, and the oscillating circuit is a loop of r1, C1 and L 1;
frequency of oscillation in loop The angular frequency ω is:
wherein, When (when)Without oscillatory damping waves whenWhen the voltage is in a critical state, R c is a critical resistance value;
the RC absorber is used for changing the working state of the circuit to enable the oscillating circuit to be changed into a non-oscillating circuit so as to inhibit the operation overvoltage of the circuit. To eliminate the oscillations of the circuit, the absorber C 1 must be large enough so that the oscillation frequency is at least close to the power frequency but not too large, otherwise wasteful. The protector R1 must also be large enough to be close to the value of R c and not too large, as that would result in energy waste and affect the function of the RC protector.
L 0 and C 0 in vacuum circuit breakers generally have a range that can be used with one or a few specifications of RC absorbers to enable most vacuum circuit breakers to operate at frequencies approaching 50HZ over-voltage oscillations. The amplitude of the voltage is reduced to about 2 times of the peak value of the power supply voltage, so that the safe operation of the circuit is ensured.
Further, by simulation analysis, it is possible to obtain: in a power grid with a neutral point grounded through an arc suppression coil, a zinc oxide lightning arrester can only limit the amplitude of overvoltage and cannot change the frequency and the steepness, and has the defects that the zinc oxide lightning arrester can mainly protect relative ground insulation, and the interphase insulation can be protected, but the method is more complex and has higher price;
The RC resistance-capacitance absorption device is an effective device for limiting the overvoltage of the vacuum switch operation, and not only can reduce the amplitude of incoming waves, but also can reduce the steepness of the incoming waves.
The test result of the double-path RC overvoltage protector shows that the operation overvoltage oscillation can be eliminated, and the reason is that r1 and C 1 mainly protect interphase overvoltage r1 and C 2 mainly protect overvoltage to ground.
When the RC protector is used, the capacitance current of the network is increased; when the grounded capacitor exceeds the allowable value in single-phase grounding, arc grounding overvoltage can be generated in the system, and the amplitude can be 3.5 times of phase voltage, and the duration is long. The selection of the rated voltage of the capacitor requires higher investment; the harmonic wave in the power system causes electric breakdown, heat generation, and the like of the RC device due to the influence of the harmonic wave on the capacitance, and the occurrence of an accident that the RC device explodes due to the harmonic wave action occurs.
In a power grid with a neutral point grounded through an arc suppression coil, the zinc oxide lightning arrester can only limit the amplitude of overvoltage and cannot change the frequency and the steepness, and has defects. The method mainly can protect the relative ground insulation, but the interphase insulation can be protected, and the method is more complex and has higher price.
Compared with zinc oxide arresters, RC devices are an effective device for limiting the overvoltage of vacuum switch operation. It can not only reduce the amplitude of incoming waves, but also reduce the steepness of incoming waves. But its installation space is large in size and expensive.
For the small and medium-sized hydroelectric generating set, an RC protector with good quality and a zinc oxide arrester are selected to be connected in parallel and are arranged at an inlet of a machine end as much as possible. The zinc oxide arrester can be arranged in the motor vacuum switch cabinet, and the RC protector is arranged at the main outgoing line of the motor.
In conclusion, the accurate prediction and effective suppression of various operation overvoltage are realized by constructing an accurate hydropower station 10kV system simulation model and carrying out comprehensive overvoltage analysis by combining ATP-EMTP software. The method not only improves the stability and reliability of the system and reduces the damage risk of equipment, but also optimizes the protection strategy and the operation scheme and improves the economic benefit. Meanwhile, by combining with analysis of space-time distribution of ground surface potential, the fault diagnosis capability of the ground network is enhanced, scientific basis is provided for system design and transformation, and innovative development of the overvoltage suppression technology of the hydropower station is promoted. This systematic solution significantly improves the overall performance and safety level of the 10kV system of the hydropower station.
Example 2
Referring to fig. 1, on the basis of the first embodiment, this embodiment further provides an ATP-EMTP-based system for suppressing overvoltage of 10kV system of a simulated hydropower station, including:
the construction module is used for constructing a hydropower station simulation model, analyzing the voltage abnormal increase condition possibly occurring when the operation is over-voltage, and evaluating the influence degree of the voltage abnormal increase condition on the stability of the hydropower station system;
The analysis module is used for determining different equipment protection strategies by performing simulation analysis on the protection scheme of the equipment under the condition of operation overvoltage;
And the optimizing module is used for optimizing the operation strategy of the hydropower station based on the simulation result and obtaining overvoltage inhibition measures.
The embodiment also provides computer equipment which is suitable for simulating the condition of the 10kV system overvoltage suppression method of the hydropower station based on ATP-EMTP, and comprises a memory and a processor; the memory is used for storing computer executable instructions, and the processor is used for executing the computer executable instructions to realize the 10kV system overvoltage suppression method of the simulated hydropower station based on the ATP-EMTP according to the embodiment.
The computer device may be a terminal comprising a processor, a memory, a communication interface, a display screen and input means connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The communication interface of the computer device is used for carrying out wired or wireless communication with an external terminal, and the wireless mode can be realized through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer equipment can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer equipment can be a touch layer covered on the display screen, can also be keys, a track ball or a touch pad arranged on the shell of the computer equipment, and can also be an external keyboard, a touch pad or a mouse and the like.
The present embodiment also provides a storage medium having stored thereon a computer program which, when executed by a processor, implements a method for implementing an ATP-EMTP based simulation hydropower station 10kV system overvoltage suppression as proposed in the above embodiment.
The storage medium according to the present embodiment belongs to the same inventive concept as the data storage method according to the above embodiment, and technical details not described in detail in the present embodiment can be seen in the above embodiment, and the present embodiment has the same advantageous effects as the above embodiment.
It should be noted that the above embodiments are only for illustrating the technical solution of the present invention and not for limiting the same, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solution of the present invention may be modified or substituted without departing from the spirit and scope of the technical solution of the present invention, which is intended to be covered in the scope of the claims of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410862914.2A CN118970851A (en) | 2024-06-28 | 2024-06-28 | A method for suppressing overvoltage of 10kV system in hydropower station based on ATP-EMTP simulation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410862914.2A CN118970851A (en) | 2024-06-28 | 2024-06-28 | A method for suppressing overvoltage of 10kV system in hydropower station based on ATP-EMTP simulation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN118970851A true CN118970851A (en) | 2024-11-15 |
Family
ID=93390216
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202410862914.2A Pending CN118970851A (en) | 2024-06-28 | 2024-06-28 | A method for suppressing overvoltage of 10kV system in hydropower station based on ATP-EMTP simulation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN118970851A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119695818A (en) * | 2024-11-21 | 2025-03-25 | 国网北京市电力公司 | Overvoltage suppression system, determination method and device of overvoltage suppression system |
| CN120012400A (en) * | 2025-01-17 | 2025-05-16 | 北京电力经济技术研究院有限公司 | A method, system, device and medium for simulating overvoltage of a shunt reactor |
-
2024
- 2024-06-28 CN CN202410862914.2A patent/CN118970851A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119695818A (en) * | 2024-11-21 | 2025-03-25 | 国网北京市电力公司 | Overvoltage suppression system, determination method and device of overvoltage suppression system |
| CN120012400A (en) * | 2025-01-17 | 2025-05-16 | 北京电力经济技术研究院有限公司 | A method, system, device and medium for simulating overvoltage of a shunt reactor |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Shipp et al. | Transformer failure due to circuit-breaker-induced switching transients | |
| CN102882201B (en) | Lightning protection method based on different grounding modes of neutral points of 10kV distribution network | |
| Geng et al. | Three-phase modeling of 40.5-kV vacuum circuit breaker switching off shunt reactors and overvoltage suppression measure analysis | |
| Mardegan et al. | The experience acquired sizing snubbers to mitigate switching transients in industrial power systems | |
| CN112769114A (en) | Method for selecting parameters of thyristor valve in controllable arrester | |
| Martinez‐Velasco et al. | Calculation of power system overvoltages | |
| Ang | Ferroresonance simulation studies of transmission systems | |
| Jesus et al. | Measurements and simulations in the analysis of transformer failures during vacuum circuit breaker switching and surge protector applications | |
| Abdelazim et al. | A case study of voltage transformer failures in a modern data center: Analysis, mitigation, and solution implementation | |
| Nagpal et al. | Sub-synchronous ferroresonance causes catastrophic failure of a line shunt reactor–a post mortem investigation | |
| CN217656418U (en) | Thunder and lightning incident releasing device | |
| CN202696141U (en) | Arc-extinction resonance-elimination device | |
| CN203504171U (en) | Protection circuit used for dry-type hollow electric reactor switching overvoltage protection | |
| Shipp et al. | Transformer failure due to circuit breaker induced switching transients appplicable to the cement industry | |
| Mitra et al. | Resonant behavior of EHV transformer windings under system originated oscillatory transient over voltages | |
| Onofri et al. | Fault Analysis of a Ladle Furnace Transformer caused by Switching Transient and Ferroresonance | |
| Thallam et al. | Design studies for the Mead-Phoenix 500 kV AC transmission project | |
| Kuzmin | Development of the intelligent single phase-to-ground-fault current compensation system for 6–35 kV networks | |
| Wang et al. | Fault Analysis and Countermeasure of Arc Suppression Coil in 66kV System | |
| CN220475278U (en) | GIS monitoring system without neutral point grounding | |
| Wang et al. | Optimization of Lightning Protection System for 10 kV Distribution Network Based on Yalmip Toolbox | |
| Boral | Study of transient over voltage for insulation coordination in 220kV gas insulated substation | |
| Hsiao et al. | Shunt reactor switching characteristics and maintenance planning in 161 kv system | |
| Hydro | Tertiary Shunt Reactor Grounding Impact on Collateral Damage to Autotransformer | |
| CN209046243U (en) | A kind of voltage transformer protection device of technological service |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |