CN118929432A - Arch beam type lifting equipment and installation method and use method thereof - Google Patents

Arch beam type lifting equipment and installation method and use method thereof Download PDF

Info

Publication number
CN118929432A
CN118929432A CN202411088222.3A CN202411088222A CN118929432A CN 118929432 A CN118929432 A CN 118929432A CN 202411088222 A CN202411088222 A CN 202411088222A CN 118929432 A CN118929432 A CN 118929432A
Authority
CN
China
Prior art keywords
arch
belt conveyor
trolley
type lifting
arched girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202411088222.3A
Other languages
Chinese (zh)
Inventor
谭志国
高鹏
万志鸿
王爱国
苗永光
肖鑫明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges Construction Engineering Co Ltd
Original Assignee
China Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges Construction Engineering Co Ltd filed Critical China Three Gorges Construction Engineering Co Ltd
Priority to CN202411088222.3A priority Critical patent/CN118929432A/en
Publication of CN118929432A publication Critical patent/CN118929432A/en
Pending legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C6/00—Girders, or track-supporting structures, specially adapted for cranes
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00—Cranes
    • B66C2700/01—General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
    • B66C2700/012—Trolleys or runways

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种拱梁型起重设备及其安装方法和使用方法,包括第一轨道、拱架、起重小车以及混凝土输送系统,第一轨道用于安装到峡谷两侧的基础平台上,两个拱架的两端下侧分别安装有行走车架,两侧的行走车架分别用于安装到两侧的第一轨道上,两个拱架上安装有多个起重小车,基础平台下方的廊道内安装有混凝土输送系统。每台拱梁型起重设备上的多台起重小车既可以分别单独进行吊装作业也可以联合作业,满足了在大坝、混凝土水利设施、大体积建筑物等建造中浇筑仓位多、起重量大的吊装要求,并且通过多个起重小车吊挂混凝土输送系统,使搅拌楼生产的混凝土能够直接通过混凝土输送系统输送至施工区的浇筑仓位,提高了施工区的浇筑效率,提高了工程的进度。

An arch-beam type lifting equipment and its installation method and use method include a first track, an arch frame, a lifting trolley and a concrete conveying system. The first track is used to be installed on the foundation platforms on both sides of the canyon. Traveling frames are respectively installed on the lower sides of the two ends of the two arch frames. The traveling frames on both sides are respectively used to be installed on the first tracks on both sides. Multiple lifting trolleys are installed on the two arch frames. The concrete conveying system is installed in the corridor under the foundation platform. The multiple lifting trolleys on each arch-beam type lifting equipment can be used for lifting operations separately or in combination, which meets the lifting requirements of multiple casting positions and large lifting weights in the construction of dams, concrete water conservancy facilities, large-volume buildings, etc., and the concrete conveying system is suspended by multiple lifting trolleys, so that the concrete produced by the mixing plant can be directly transported to the casting positions in the construction area through the concrete conveying system, which improves the casting efficiency in the construction area and improves the progress of the project.

Description

Arched girder type lifting equipment and installation method and use method thereof
Technical Field
The invention relates to the technical field of hydropower station construction equipment, in particular to arched girder type lifting equipment, and an installation method and a use method thereof.
Background
Hydropower stations are arranged in the deep mountain canyons, the concrete pouring quantity of the hydropower station dam is quite large, the pouring speed of concrete directly determines the production time of the hydropower station, and millions of direct benefits can be brought in each early production day. The pouring means of the large-volume concrete is generally a cable crane or a tower crane arranged on a warehouse, and is limited by the hanging weight, and the discontinuous pouring of one tank of concrete is poured for one working cycle, so that the lifting and pouring efficiency is low, and the progress of engineering is directly influenced.
Disclosure of Invention
The invention aims to solve the technical problems that: the problems existing in the background technology are solved, and the arch beam type lifting equipment is provided and is used for solving the problems of lower concrete pouring and lifting efficiency of a hydropower station dam.
Another technical problem to be solved by the invention is: an installation method of arched girder type lifting equipment is provided, which is used for solving the problem of installing arched girder type lifting equipment.
A further technical problem to be solved by the present invention is: the application method of the arched girder type lifting equipment is provided, and is used for solving the problem of using the arched girder type lifting equipment.
In order to solve the technical problems, the invention adopts the following technical scheme: the utility model provides an arched girder type lifting device, includes first track, bow member, lifting trolley and concrete conveying system, first track is used for installing on the basic platform of canyon both sides, and walking frame is installed respectively to the both ends downside of two bow members, and the walking frame of both sides is used for installing respectively on the first track of both sides, installs a plurality of lifting trolley on two bow members, concrete conveying system one end is connected with basic platform, and the other end hangs to the canyon through the hoist system of lifting trolley and extends.
And a truss structure is arranged on the lower side of the arch frame.
The travelling frame comprises a machine base, roller wheels and a first motor, wherein the roller wheels are rotatably arranged on the lower side of the machine base through a central shaft, the first motor is arranged on the machine base, and an output shaft of the first motor is connected with the central shaft of one of the roller wheels for transmission; the two arches are arranged on the machine base.
Two ends of each arch frame are provided with a walking frame, and two walking frames positioned on the same side are connected into a whole.
The trolley comprises a walking seat, a box body and a hoisting system, wherein the walking seats are respectively arranged at two sides of the box body, the walking seats at two sides are respectively arranged at the upper sides of the two arches, the hoisting system is arranged in the box body, and a lifting hook of the hoisting system extends downwards from between the two arches; at least two travelling wheels are arranged on the lower side of the travelling seat, the travelling wheels roll on the upper side of the arch frame to travel, a rack is arranged on the arch frame, a support is arranged on the outer side of the travelling seat, a second motor is arranged on the support, a first gear is arranged on an output shaft of the second motor, and the first gear is meshed with the rack for transmission.
The arch frame is provided with a second track, and the travelling wheels roll and walk on the second track.
And the arch centering is also provided with a trolley line, the walking seat or the bracket is provided with a hub, the hub is elastically contacted with the trolley line to conduct electricity, and the hub is used for supplying power to the hoisting system and the second motor.
The electric control cabinet is further arranged in the box body, the electric control cabinet is electrically connected with the hub, the winch system and the second motor are electrically connected with the electric control cabinet, the remote control unit is arranged in the electric control cabinet, and the winch system and the second motor are started and stopped through remote control.
The concrete conveying system comprises a telescopic belt conveyor and a plurality of transfer belt conveyors, wherein the feeding ends of the telescopic belt conveyors are connected with a foundation platform, and the connection between the discharging ends of the telescopic belt conveyors and the feeding ends of the transfer belt conveyors and between the discharging ends of the transfer belt conveyors above and the feeding ends of the transfer belt conveyors below are horizontally rotated and vertically swung through an adjusting mechanism; the transfer belt conveyor is hung to extend towards the canyon through a hoisting system of the lifting trolley.
The adjusting mechanism comprises a connecting part, a first hinge part and a second hinge part, wherein the connecting part is arranged at the discharging ends of the telescopic belt conveyor and the transfer belt conveyor, the upper end of the first hinge part is rotatably arranged at the lower side of the connecting part through a bearing, the second hinge part is arranged at the upper side of the feeding end of the transfer belt conveyor, and the first hinge part is hinged with the second hinge part.
The adjusting mechanism further comprises a third motor, the third motor is arranged at the discharging end of the telescopic belt conveyor and the transfer belt conveyor, a second gear is arranged on an output shaft of the third motor, a gear ring is fixedly arranged on the first hinge part and is rotationally connected with the connecting part, and the second gear is meshed with the gear ring for transmission.
The first hinge part is provided with a gear ring, and the second gear is meshed with the gear ring for transmission.
The telescopic belt conveyor is arranged on the amplitude varying oil cylinder which is arranged on the basic platform.
A gallery is arranged in the foundation platform, and the concrete conveying system passes through the gallery.
Still include installing the system, installing the system includes upset hydro-cylinder and draw gear, be provided with first buttress on the basic platform, first track is installed on first buttress, the bow member is articulated through the articulated seat of third articulated portion with first buttress side in the position that is close to the tip, the bow member tip is articulated through the one end of fourth articulated portion with upset hydro-cylinder, the other end of upset hydro-cylinder passes behind the first buttress and articulates with basic platform, draw gear one end is articulated to be installed on the basic platform of arch member one side of keeping away from, the other end articulates the upside at the bow member.
And a first connecting rod and a second connecting rod are fixedly connected between the two arches at the position of the end part, the first connecting rod is hinged with the overturning oil cylinder, and the second connecting rod is hinged with the traction device.
The arch centering is composed of two half-frames, the foundation platforms on the two sides are respectively provided with a mounting system, the mounting systems on the two sides respectively drive the half-frames of the arch centering, and the arch centering is welded or connected through bolts after being folded.
And the foundation platform is also provided with a second buttress and a third buttress for supporting the arch frame.
The traction device is a hydraulic cylinder or a steel wire traction machine.
The method for installing the arched girder type lifting equipment is used for installing the arched girder type lifting equipment and comprises the following steps of;
S1, preparation before installation: the method comprises the steps that an installation area is arranged on a foundation platform, a first buttress is arranged on the foundation platform, and a first track is installed on the first buttress;
S2, assembling an arch frame: in the installation area of the foundation platform, two arches are assembled into an arch combination body through a first connecting rod and a second connecting rod, a third hinging part is hinged with a hinging seat through a plug-in bolt, a fourth hinging part is hinged with a turnover oil cylinder through a plug-in bolt, and a traction device is hinged with the arch combination body through a plug-in bolt;
S3, arch centering lifting: the overturning oil cylinder is driven to extend through the hydraulic system, the overturning oil cylinder pushes the arch frame assembly to overturn clockwise, and when the arch frame assembly rotates to the limit of the overturning oil cylinder, the arch frame assembly also overturns beyond the vertical state;
S4, arch centering pulling and releasing: starting a traction device to tension the arch frame assembly, taking out a pin shaft at the joint of the fourth hinging part and the overturning oil cylinder, then lowering the arch frame assembly by the traction device until the other end of the arch frame assembly falls on a first track on a foundation platform at the other side, and then releasing the connection between the traction device and the arch frame assembly and the connection between the third hinging part and the hinging seat;
S5, mounting a lifting trolley: hoisting the trolley onto the arch frame by using a crane for installation, debugging the trolley, running the trolley to a position on the arch frame, which does not interfere with the installation of other trolley, then installing the next trolley until the plurality of trolley are all installed, and then performing arch frame walking, trolley walking and integral control debugging, and then putting the trolley into use.
The use method of the arched girder type lifting equipment adopts the arched girder type lifting equipment and comprises the following steps of;
s1, extending a feeding end of a telescopic belt conveyor to a mixing plant, or communicating the mixing plant with the feeding end of the telescopic belt conveyor through the belt conveyor, so that concrete produced by the mixing plant is directly conveyed to the telescopic belt conveyor;
s2, installing a plurality of transfer belt conveyors at the discharging end of the telescopic belt conveyors through an adjusting mechanism according to the construction requirements of the dam, wherein the discharging end of the transfer belt conveyors is hooked and hung on a hoisting system of a lifting trolley;
S3, conveying the concrete conveyed from the mixing plant to the transfer belt conveyor through the telescopic belt conveyor, and conveying the concrete to an operation area of the dam, wherein when the position of the operation area changes in the width direction of the canyon, the number of the transfer belt conveyors is increased or decreased through the telescopic belt conveyor so as to meet the change of the position of the operation area; when the position of the working area changes in the upstream and downstream directions of the canyon, the arch frame moves on the first track through the travelling frame, and meanwhile, the angle of the transfer belt conveyor is adjusted through the adjusting mechanism so as to meet the change of the position of the working area; when the position of the working area is changed in the height direction of the canyon, the height of the transfer belt conveyor is adjusted through the winding system so as to meet the change of the position of the working area.
The invention has the following beneficial effects:
1. Compared with cable machines and door tower machines which are frequently used at present, the cable machines and door tower machines adopt the arched girder form, the bearing capacity and the lifting capacity of the lifting machine are greatly increased, a plurality of lifting trolleys on each arched girder type lifting device can be used for lifting operation independently, trolleys on the same or different arched girder type lifting devices can be combined for lifting operation of corresponding double trolleys or multiple trolleys, the lifting requirements of a large number of pouring positions and large lifting weight in dam construction are met, the operation requirements of a construction area can be well met, and the cable machines are particularly applicable to large and complex construction areas. And the concrete conveying system is hung by the plurality of lifting trolleys, so that the concrete produced by the stirring building can be directly conveyed to the casting bin of the dam through the concrete conveying system, the casting efficiency of the dam body is improved, and the progress of engineering is improved. The feeding belt conveyor is hung through the lifting hook system, so that concrete in a mixing plant to a pouring area can be poured continuously, and meanwhile, the lifting hook can perform various conventional lifting operations.
2. This patent has well solved the problem that current equipment of pouring inefficiency, through the lighter structural weight of equipment such as compared current cable machine, gate tower machine, has realized bigger lifting capacity, richer function, but the effect that many machines used with the rail to effectively improved and pour efficiency, produced considerable economy and social.
3. For the difficult problem of arch beam span large-span pouring area installation, the installation of arch centering is realized through the installing system to this patent, has very good innovation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic diagram of a front view structure of the present invention.
Fig. 2 is a schematic perspective view of the present invention.
Fig. 3 is a schematic top view of the present invention.
Fig. 4 is a schematic structural view of the walking frame of the present invention mounted on the first track.
Fig. 5 is a schematic structural view of the connection of the arch frame and the running frame of the present invention.
Fig. 6 is a schematic diagram of the construction of the inventive trolley and arch mounting.
Fig. 7 is a schematic perspective view of a trolley according to the present invention.
Fig. 8 is a schematic top view of the lifting trolley of the present invention.
Fig. 9 is a schematic structural view of an adjusting mechanism of the present invention.
Fig. 10 is a schematic view showing a state that an arch is positioned in an installation area when the arch is installed.
Fig. 11 is a schematic view of an arch of the present invention in a vertical position when installed.
Fig. 12 is a schematic view of the arch of the present invention when installed over a canyon.
FIG. 13 is a schematic view of the mounting system of the present invention.
Fig. 14 is a schematic view of a first buttress construction according to the present invention.
Fig. 15 is a schematic view of a second buttress structure and a third buttress structure according to the present invention.
In the figure:
A base platform 100, a first buttress 101, a first track 102, a hinge base 103 and a gallery 110;
Arch 200, truss structure 201, third hinge 202, fourth hinge 203, second rail 204, trolley line 205, first connecting rod 206, rack 207, second connecting rod 208, walking frame 210, frame 211, roller wheel 212, first motor 213;
the lifting trolley 300, a walking seat 310, walking wheels 311, a bracket 312, a second motor 313, a first gear 314, a hub 315, a box 320, a hoisting system 330, a lifting hook 331 and an electric control cabinet 340;
a concrete conveying system 400, a telescopic belt conveyor 410, a transit belt conveyor 420 and an amplitude variable oil cylinder 430;
mounting system 500, inversion cylinder 501, traction device 502, second buttress 503, third buttress 504;
The device comprises an adjusting mechanism 600, a third motor 601, a second gear 602, a connecting part 603, a gear ring 604, a first hinge part 605 and a second hinge part 606;
Canyon 700, dam 701.
Detailed Description
The following description of the embodiments of the present invention will be made apparent and fully in view of the accompanying drawings, in which some, but not all embodiments of the invention are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
In addition, the technical features of the different embodiments of the present invention described below may be combined with each other as long as they do not collide with each other.
Embodiment one:
Referring to fig. 1 to 9, an arched girder type lifting apparatus includes a first rail 102, arches 200, lifting trolleys 300, and a concrete delivery system 400, wherein the first rail 102 is used for being mounted on a base platform 100 at two sides of a canyon 700, walking frames 210 are respectively mounted at two lower sides of two arches 200, the walking frames 210 at two sides are respectively used for being mounted on the first rail 102 at two sides, a plurality of lifting trolleys 300 are mounted on the two arches 200, one end of the concrete delivery system 400 is connected with the base platform 100, and the other end of the concrete delivery system is hung to the canyon 700 through a winding system 330 of the lifting trolleys 300.
Compared with cable machines and door tower machines which are frequently used at present, the cable machines and door tower machines adopt the arched girder form, the bearing capacity and the lifting capacity of the lifting machine are greatly increased, a plurality of lifting trolleys 300 on each arched girder type lifting device can be used for lifting operation independently, trolleys on the same or different arched girder type lifting devices can be combined for lifting operation of corresponding double trolleys or multiple trolleys, the lifting requirements of more casting positions and large lifting weight in construction of dams, concrete water conservancy facilities, large-volume buildings and the like are met, the operation requirements of construction areas can be well met, and the cable machines and door tower machines are particularly suitable for large and complex construction areas. And the concrete conveying system 400 is hung by the plurality of lifting trolleys 300, so that the concrete produced by the stirring building can be directly conveyed to the casting space of the dam through the concrete conveying system 400, the casting efficiency of the dam body is improved, and the progress of engineering is improved.
Referring to fig. 1, the underside of the arch 200 is provided with truss structures 201 by which the structural strength of the arch 200 is enhanced. The truss structure 201 includes transverse bars connecting the ends of the underside of the arch 200 and longitudinal bars connecting the arch 200 to the transverse bars. Of course, diagonal braces may be further provided between the arches 200 and the transverse bars. The transverse brace and the vertical brace are arranged below the arch frame, so that the position of the rack is not interfered, and the staggered arrangement is carried out, so that the strength of the arch frame is further supplemented. The arch frame, the transverse support and the vertical support are all assembled into a whole by adopting a plurality of sections and are connected by adopting a welding or local flange bolt mode, so that the interference with the parts such as the track, the rack and the like is avoided.
Referring to fig. 4 and 5, the travelling carriage 210 includes a base 211, roller wheels 212 and a first motor 213, the roller wheels 212 are rotatably mounted on the lower side of the base 211 through a central shaft, the first motor 213 is mounted on the base 211, and an output shaft of the first motor 213 is connected with the central shaft of one of the roller wheels 212 for transmission; the arch 200 is mounted on a stand 211. With the above configuration, the arch 200 is moved by the travelling frame 210 to travel on the first rail 102.
In one embodiment, the running gear frame 210 may be one, and the two arches 200 are mounted on the same running gear frame 210. In another embodiment, referring to fig. 5, one traveling frame 210 is installed at both ends of each arch 200, and two traveling frames 210 located at the same side are connected as a unit. Specifically, the opposite sides of the two traveling frames 210 may be provided with flange plates, and the two traveling frames 210 are connected through flange plates by bolts, or a structure welded into a whole through a connecting rod as shown in fig. 5 may be adopted. With the above structure, the two arches 200 are positioned and supported.
In practice, the running carriage 210 may be welded to the underside of the arch 200, or may be bolted to the underside of the arch 200 as shown in fig. 5.
Referring to fig. 6 and 7, the trolley 300 includes a traveling block 310, a case 320, and a hoist system 330, the traveling blocks 310 are respectively installed at both sides of the case 320, the traveling blocks 310 at both sides are respectively at upper sides of the two arches 200, the hoist system 330 is installed in the case 320, and a hook 331 of the hoist system 330 extends downward from between the two arches 200; at least two travelling wheels 311 are arranged on the lower side of the travelling seat 310, the travelling wheels 311 roll and travel on the upper side of the arch 200, a rack 207 is arranged on the lower side of the arch 200, a bracket 312 is arranged on the outer side of the travelling seat 310, a second motor 313 is arranged on the bracket 312, a first gear 314 is arranged on an output shaft of the second motor 313, and the first gear 314 is meshed with the rack 207 for transmission. The first gear 314 engages with the rack 207 on the underside of the arch 200, so that the travelling base 310 is restrained to travel on the arch 200.
Further, the arch 200 is provided with a second track 204, and the travelling wheels 311 roll on the second track 204. The arrangement of the second rail 204 not only can improve the structural strength of the arch 200, but also can prevent the travelling wheel 311 from travelling to cause abrasion of the arch 200, and can further ensure that the travelling wheel 311 travels along the longitudinal axis of the arch 200 to avoid deviation faults.
When the second rail 204 is not disposed on the arch 200, the travelling wheel 311 is a cambered wheel that is matched with the arch 200.
Referring to fig. 5 and 6, a trolley line 205 is further installed on the arch 200, an insulating plate is padded between the trolley line 205 and the arch 200, the arch 200 is ensured to be uncharged, a hub 315 is installed on the walking seat 310 or the support 312, a spring is arranged in the hub 315 support, the hub 315 is ensured to be always elastically kept in contact with the trolley line 205 to be conductive under various influences such as vibration, shaking and bouncing in the operation of the device, and the hub 315 is used for supplying power to the hoisting system 330 and the second motor 313. By the above structure, the power supply of the winding system 330 and the second motor 313 is realized. In use, trolley line 205 is laid on arch 200 and connected to a power source, and hub 315 slides along trolley line 205 and is electrically conductive.
Further, an electric control cabinet 340 is further installed in the box 320, the electric control cabinet 340 is electrically connected with the hub 315, the winding system 330 and the second motor 313 are electrically connected with the electric control cabinet 340, a remote control unit is arranged in the electric control cabinet 340, and the winding system 330 and the second motor 313 are started and stopped through remote control. By the above structure, remote control of the hoisting trolley 300 and the hoisting system 330 is realized. The remote control unit is a prior art, for example, a QA600 industrial crane wireless controller is adopted, and the controller comprises a controller host and a remote controller.
Referring to fig. 1, the concrete conveying system 400 includes a telescopic belt conveyor 410 and a plurality of transfer belt conveyors 420, wherein a feeding end of the telescopic belt conveyor 410 is connected with the base platform 100, and a discharging end of the telescopic belt conveyor 410 is connected with a feeding end of the transfer belt conveyor 420, and a discharging end of the transfer belt conveyor 420 above and a feeding end of the transfer belt conveyor 420 below are horizontally rotated and vertically swung through an adjusting mechanism 600; the transfer belt 420 is suspended by the hoist system 330 of the trolley 300 to extend toward the canyon 700. Through the structure, the transfer belt conveyor 420 and the transfer belt conveyor 420, and the telescopic belt conveyor 410 and the transfer belt conveyor 420 can horizontally rotate and longitudinally swing through the adjusting mechanism 600, so that concrete is conveyed to different pouring spaces on the dam 701.
Specifically, referring to fig. 9, the adjusting mechanism 600 includes a connecting portion 603, a first hinge portion 605 and a second hinge portion 606, the connecting portion 603 is disposed at a discharging end of the telescopic belt conveyor 410 and the transfer belt conveyor 420, an upper end of the first hinge portion 605 is rotatably mounted at a lower side of the connecting portion 603 through a bearing, the second hinge portion 606 is mounted at an upper side of a charging end of the transfer belt conveyor 420, and the first hinge portion 605 is hinged with the second hinge portion 606.
Further, the adjusting mechanism 600 further includes a third motor 601, the third motor 601 is mounted at the discharging end of the telescopic belt conveyor 410 and the transfer belt conveyor 420, a second gear 602 is mounted on an output shaft of the third motor 601, a gear ring 604 is disposed on the first hinge portion 605, a bearing is disposed in the gear ring 604, the gear ring 604 is rotatably connected with the connecting portion 603 through the bearing, the first hinge portion 605 is fixedly mounted at the lower side of the gear ring 604, and the second gear 602 is meshed with the gear ring 604 for transmission. By arranging the third motor 601, the horizontal angle of each transfer belt conveyor 420 can be actively adjusted, and the transfer belt conveyors 420 with the adjusted angles can keep fixed positions under the action of the third motor 601. Specifically, the third motor 601 has a structure in which a motor and a speed reducer are integrated.
Referring to fig. 1, the telescopic belt conveyor 410 is mounted on a first mounting on a luffing cylinder 430, the luffing cylinder 430 is mounted on the base platform 100, and the height of the telescopic belt conveyor 410 can be adjusted as required.
Referring to fig. 1 and 2, a gallery 110 is provided in the base platform 100, and a telescopic belt conveyor 410 is installed in the gallery 110 so that the concrete delivery system 400 does not interfere with the movement of the arch 200.
Referring to fig. 1, the arched girder type lifting apparatus further includes a mounting system 500, by which the installation of the arch 200 is achieved. Specifically, the installation system 500 includes a turnover cylinder 501 and a traction device 502, the foundation platform 100 is provided with a first buttress 101, the buttresses 101 are in a concrete or steel structure form connected on the ground through a foundation, the lower part of each arch is reliably connected with the upper part of the walking frame 210 through a flange or a welding mode, the first track 102 is installed on the first buttress 101, the arch 200 is hinged with a hinging seat 103 on the side of the first buttress 101 at a position close to the end through a third hinging part 202, the end of the arch 200 is hinged with one end of the turnover cylinder 501 through a fourth hinging part 203, the other end of the turnover cylinder 501 passes through the first buttress 101 and then is hinged with the foundation platform 100, one end of the traction device 502 is hinged on the foundation platform 100 on one side far away from the arch 200, and the other end is hinged on the upper side of the arch 200, see fig. 12. The two arches 200 of the arched girder type lifting device may be provided with a mounting system 500, respectively, so that the individual mounting of the two arches 200 is achieved. When the two arches 200 are independently installed, two traveling frames 210 are required to be installed at two ends of the two arches 200, and after the arches 200 are installed in place, the two traveling frames 210 at each side are connected into an integrated structure.
The upper part of the arch centering is connected with a steel strand, a strand cylinder and a wire cylinder through a hinge point, the end part of the steel strand is provided with an end anchor which is rotationally connected with the hinge point through a pin shaft, the steel strand is driven by the strand cylinder, the arch centering is driven to overturn in steps by the overturning cylinder, the wire cylinder is used for storing the steel strand from an installation position to a working position, and the strand cylinder drives the steel strand to stretch and retract so as to further drive the arch centering to overturn.
In one of the solutions, see fig. 2 and 11, a first connecting rod 206 and a second connecting rod 208 are fixedly connected between the two arches 200 at the end portions, the first connecting rod 206 is hinged with the overturning cylinder 501, the second connecting rod 208 extends upwards to form a hinged plate, and the hinged plate is hinged with the traction device 502. With the above structure, the two arches 200 can be installed in place by providing one set of the installation system 500.
Embodiment two:
The difference between this embodiment and the first embodiment is that if the width of the canyon is large, the width of the casting area of the dam 701 is large, the length and weight of the arch 200 are large, and referring to fig. 1, two half-width arches 200 can be respectively arranged on the foundation platforms 100 on the left and right sides of the canyon 700 according to the above structure, and after the two half-width arches 200 are installed in place by the installation systems 500 on both sides, the two half-width arches are connected by bolts or welding at the butt joint positions by personnel.
Specifically, the arch frame 200 is formed by two half-frames, the base platforms 100 on two sides are respectively provided with a mounting system 500, the mounting systems 500 on two sides respectively drive one half-frame of the arch frame 200, and the arch frame 200 is welded or bolted after being folded.
Further, referring to fig. 1, 10 and 15, a second abutment 503 and a third abutment 504 for supporting arch 200 are also mounted to base platform 100. Second buttress 503 and third buttress 504 are used to support arch 200 to facilitate the flipping of arch 200.
Specifically, the traction device 502 is a hydraulic cylinder or a wire tractor.
Embodiment III:
Referring to fig. 10-13, a method of installing an arched girder type lifting apparatus for installing an arched girder type lifting apparatus, the method of installing comprising the steps of;
S1, preparation before installation: an installation area is arranged on a foundation platform 100, a first buttress 101 is arranged on the foundation platform 100, and a first track 102 is installed on the first buttress 101;
S2, assembling an arch frame: in the installation area of the foundation platform 100, two arches 200 are assembled into an arch frame assembly through a first connecting rod 206, a third hinging part 202 is hinged with a hinging seat 103 through a plug-in bolt, a fourth hinging part 203 is hinged with a turnover oil cylinder 501 through a plug-in bolt, and a traction device 502 is hinged with the arch frame assembly through a plug-in bolt;
S3, arch centering lifting: the overturning oil cylinder 501 is driven to extend through the hydraulic system, the overturning oil cylinder 501 pushes the arch frame assembly to overturn clockwise, and when the arch frame assembly rotates to the extreme limit of the overturning oil cylinder 501, the arch frame assembly also overturns beyond the vertical state;
S4, arch centering pulling and releasing: starting a traction device 502 to tension an arch frame assembly, enabling the traction device 502 to bear force, taking out a pin shaft at the joint of a fourth hinging part 203 and a turnover oil cylinder 501, then lowering the arch frame assembly by the traction device 502 until the other end of the arch frame assembly falls on a first track 102 on a base platform 100 on the other side or two arch frame assemblies are reliably connected after being aligned in the air, and finally, releasing the connection between the traction device 502 and the arch frame assembly and the connection between a third hinging part 202 and a hinging seat 103;
S5, mounting a lifting trolley 300: lifting the lifting trolley 300 onto the arch frame by using a crane for installation, after the lifting trolley 300 is debugged and operated to a position on the arch frame, which does not interfere with the installation of the rest lifting trolley 300, installing the next lifting trolley 300 until the lifting trolleys 300 are all installed, and then carrying out the walking of the arch frame 200, the walking of the lifting trolleys 300 and the whole control and debugging, and then putting the lifting trolley into use.
By the above method, the installation of the arch 200 is achieved.
Specific:
The first step: prepared before installation. Setting an installation area at a proper position of the foundation platform 100, designing and installing a corresponding first support pier 101, a second support pier 503 and a third support pier 504 according to stress requirements, installing a first track 102 on the first support pier 101, positioning and installing a travelling frame 210 according to the position of an arch frame, and supporting to ensure that the travelling frame is in a vertical state; the saddles are mounted on second buttress 503 and third buttress 504.
And a second step of: and assembling the arch frame. The arches 200 are assembled together in pairs on the second buttress 503 and the third buttress 504 section by section and left and right, and the installation direction section by section is from the first buttress 101 to the third buttress 504, and the installation is in an up-down turnover mode, namely, the installation direction is 180 degrees up-down turnover with the installation direction of the arches in place. Hinge points at the end parts of the arch frame head sections are respectively and rotatably connected with hinge seats 103 arranged on the first buttresses 101 through pin shafts. And then, the subsequent arch centering sections are installed in a flange bolt connection mode, and accessories such as the first rail 102, the truss structure 201, the rack 207, the trolley wire 205 and the like attached to each arch centering section are required to be installed before each arch centering section is installed, so that the subsequent installation is avoided. And (5) carrying out integral adjustment after the arch frame is continuously installed.
And a third step of: and (5) jacking the arch frame. The rotating cylinder 501 is connected through a rotating shaft, and the steel stranded wires extending out of the traction device 502 and the hinge points of the end anchors and the upper parts of the arches are connected through pin shafts in a rotating way, so that the left arch and the right arch which are paired in principle need to be connected with the steel stranded wires. The mode of synchronously lifting and pulling the left arch frame and the right arch frame in pairs is preferably selected, so that the stability in the process can be ensured. The arch frame jacking stage firstly stretches out the overturning oil cylinder 501, along with the continuous stretching out of a piston rod of the overturning oil cylinder 501 and the rotation of the whole overturning oil cylinder 501 around a hinge point on a platform, the arch frame is pushed to rotate around a rotating shaft, when the arch frame rotates to the limit position of the overturning oil cylinder, the arch frame is overturned beyond a vertical state, the whole body is rotated to be positioned above a pouring area from the upper side of the platform, and then the arch frame jacking stage is converted into a pulling and releasing stage.
Fourth step: the arch is pulled and put. Firstly, the traction device 502 is started to slightly pull back the steel strand with the arch, and after the steel strand is stressed and tensioned, the overturning oil cylinder 501 slightly loosens, so that the connection between the overturning oil cylinder 501 and the hinge point at the tail end of the arch is conveniently released. The traction device 502 further puts the steel strands to continue to rotate and lower the arch centering around the rotating shaft until the other end of the arch centering falls on the travelling frame 210 on the first buttress 101 at the other end of the pouring area, at this time, the travelling frames 210 which are installed in advance on the first rails 102 at the left and right sides of the pouring area are positioned below the arch centering, and the travelling frames 210 are finely adjusted to be connected with arch centering bolts or welding. The pin shaft connection of the traction device 502 and the hinge point on the arch is released, and the traction device 502 is started to retract the steel strand. If the width of the pouring area is large, the length and the weight of the steel arch frame are large, the mode that the left and right shore platforms of the pouring area are respectively assembled, lifted and pulled to put the half-width steel arch frames can be adopted, the two half-width steel arch frames are folded in the air, and then the people are connected by bolts or welding at the butt joint positions.
Fifth step: accessories and carts are installed. Hoisting the trolley 300 onto the arch frame by a small crane, locking, debugging, running the trolley to a position on the arch frame which does not interfere with installation, installing the second trolley 300 until the plurality of trolley frames are installed and debugged, and debugging such as arch frame walking, integral control and the like, so that the trolley can be put into use. And after the installed arched girder type crane leaves the installation position in a manner of moving the cart, the next arched girder type crane is installed according to the steps.
Embodiment four:
The use method of the arched girder type lifting equipment adopts the arched girder type lifting equipment and comprises the following steps of;
S1, extending the feeding end of the telescopic belt conveyor 410 to a mixing plant, or communicating the mixing plant with the feeding end of the telescopic belt conveyor 410 through the belt conveyor, so that concrete produced by the mixing plant is directly conveyed to the telescopic belt conveyor 410;
S2, installing a plurality of transfer belt conveyors 420 at the discharging end of the telescopic belt conveyor 410 through an adjusting mechanism 600 according to the construction requirements of the dam 701, wherein the discharging end of the transfer belt conveyor 420 is hooked and hung on a hoisting system 330 of the crane trolley 300;
S3, concrete conveyed from the mixing plant passes through the telescopic belt conveyor 410 and is conveyed to the transit belt conveyor 420, so that the concrete is conveyed to an operation area of the dam 701, and when the position of the operation area changes in the width direction of the canyon 700, the position of the operation area is changed by the telescopic belt conveyor 410 or the quantity of the transit belt conveyors 420 is increased or decreased; when the job site location changes in the upstream and downstream directions of the canyon 700, the arch 200 is moved on the first track 102 by the travelling carriage 210 while the angle of the transfer belt conveyor 420 is adjusted by the adjustment mechanism 600 to meet the change in the job site location; when the work area position is changed in the height direction of the canyon 700, the height of the transfer belt 420 is adjusted by the winding system 330 to satisfy the change in the work area position.
By the above method, the concrete produced by the mixing plant is directly conveyed to the casting space of the dam 701 by the concrete conveying system 400.
According to the data calculated for the span and the stress capacity of the arch frame, a plurality of lifting trolleys 300 can be arranged to simultaneously and respectively hoist and cast different positions in the casting area on the arch frame 200, or to perform combined hoisting operation in a multi-hook hoisting mode, so as to obtain larger hoisting weight and realize more hoisting functions.
Advantages of this patent
And (one) the lifting capacity is high. Compared with the cable machine and the door tower machine which are frequently used at present, the cable machine and the door tower machine adopt the arched girder form, so that the bearing capacity and the lifting capacity of the lifting machine are greatly increased, and the construction efficiency is effectively improved.
And (II) hoisting modes are various. The plurality of cranes on each arched girder type crane can be used for hoisting operation independently, and the trolleys on the same or different cranes can be combined for hoisting operation of corresponding double trolleys or multiple trolleys, so that the abundant and various hoisting requirements of multi-point storage space, large hoisting capacity and the like are met, the operation requirement of a construction area can be well met, and the crane is particularly suitable for large and complex construction areas.
And thirdly, the design is simple and the innovation is very strong. The arched girder type crane is simple and ingenious in design, strong in innovation and very ingenious and practical, and has a large working range of a single device and very high popularization value because the movable cart is arranged.
And (IV) the installation method is novel. For the problem of the installation of the arched girder crossing the large-span pouring area, the problem is well solved by adopting a simple overturning cylinder and a stranded wire cylinder only through an innovative method, and the arched girder pouring device has very good innovation.
The above embodiments are only preferred embodiments of the present invention, and should not be construed as limiting the present invention, and the scope of the present invention should be defined by the claims, including the equivalents of the technical features in the claims. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor it is intended that all embodiments be exhaustive, i.e. equivalent modifications within the scope of the invention.

Claims (20)

1. Arched girder type lifting equipment is characterized in that: including first track (102), bow member (200), trolley (300) and concrete conveying system (400), first track (102) are used for installing basic platform (100) in canyon (700) both sides, and walking frame (210) are installed respectively to both ends downside of two bow members (200), and walking frame (210) in both sides are used for installing respectively on first track (102) in both sides, install a plurality of trolley (300) on two bow members (200), concrete conveying system (400) one end is connected with basic platform (100), and the other end is hung to canyon (700) through hoist system (330) of trolley (300).
2. An arched girder type lifting apparatus as claimed in claim 1, wherein: the lower side of the arch (200) is provided with a truss structure (201).
3. An arched girder type lifting apparatus as claimed in claim 1, wherein: the travelling frame (210) comprises a base (211), roller wheels (212) and a first motor (213), wherein the roller wheels (212) are rotatably arranged on the lower side of the base (211) through a central shaft, the first motor (213) is arranged on the base (211), and an output shaft of the first motor (213) is connected and driven with the central shaft of one of the roller wheels (212); two arches (200) are mounted on the foundation (211).
4. An arched girder type lifting apparatus as claimed in claim 3, wherein: two ends of each arch frame (200) are provided with a walking frame (210), and two walking frames (210) positioned on the same side are connected into a whole.
5. An arched girder type lifting apparatus as claimed in claim 1, wherein: the trolley (300) comprises a traveling seat (310), a box body (320) and a hoisting system (330), wherein the traveling seat (310) is respectively arranged at two sides of the box body (320), the traveling seats (310) at two sides are respectively arranged at the upper sides of the two arches (200), the hoisting system (330) is arranged in the box body (320), and a lifting hook (331) of the hoisting system (330) extends downwards from between the two arches (200); at least two travelling wheels (311) are arranged on the lower side of the travelling seat (310), the travelling wheels (311) roll on the upper side of the arch frame (200) to travel, a rack (207) is arranged on the arch frame (200), a support (312) is arranged on the outer side of the travelling seat (310), a second motor (313) is arranged on the support (312), a first gear (314) is arranged on the output shaft of the second motor (313), and the first gear (314) is in meshed transmission with the rack (207).
6. An arched girder type lifting apparatus as claimed in claim 5, wherein: the arch (200) is provided with a second track (204), and the travelling wheels (311) roll on the second track (204).
7. An arched girder type lifting apparatus as claimed in claim 5, wherein: and the arch frame (200) is also provided with a trolley line (205), the walking seat (310) or the bracket (312) is provided with a hub (315), the hub (315) is elastically contacted with the trolley line (205) to conduct electricity, and the hub (315) is used for supplying power to the hoisting system (330) and the second motor (313).
8. An arched girder type lifting apparatus as claimed in claim 7, wherein: still install automatically controlled cabinet (340) in box (320), automatically controlled cabinet (340) and concentrator (315) electric connection, hoist system (330) and second motor (313) and automatically controlled cabinet (340) electric connection have remote control unit in automatically controlled cabinet (340), hoist system (330) and second motor (313) are opened through remote control and are stopped.
9. An arched girder type lifting apparatus as claimed in claim 1, wherein: the concrete conveying system (400) comprises a telescopic belt conveyor (410) and a plurality of transfer belt conveyors (420), wherein the feeding end of the telescopic belt conveyor (410) is connected with a foundation platform (100), and the feeding end of the telescopic belt conveyor (410) is connected with the feeding end of the transfer belt conveyor (420) and the feeding end of the transfer belt conveyor (420) above and the feeding end of the transfer belt conveyor (420) below are horizontally rotated and vertically swung through an adjusting mechanism (600); the transfer belt conveyor (420) is suspended by a hoist system (330) of the trolley (300) and extends toward the canyon (700).
10. An arched girder type lifting apparatus as claimed in claim 9, wherein: adjustment mechanism (600) are including connecting portion (603), first articulated portion (605) and second articulated portion (606), connecting portion (603) set up at the unloading end of flexible belt feeder (410) and well commentaries on classics belt feeder (420), and first articulated portion (605) upper end is installed in the downside of connecting portion (603) through the bearing rotation, and second articulated portion (606) are installed in the material loading end upside of well commentaries on classics belt feeder (420), and first articulated portion (605) are articulated with second articulated portion (606).
11. An arched girder type lifting apparatus as claimed in claim 10, wherein: the adjusting mechanism (600) further comprises a third motor (601), the third motor (601) is arranged at the discharging end of the telescopic belt conveyor (410) and the middle-rotating belt conveyor (420), a second gear (602) is arranged on an output shaft of the third motor (601), a gear ring (604) is fixedly arranged on the first hinge part (605), the gear ring (604) is rotationally connected with the connecting part (603), and the second gear (602) is meshed with the gear ring (604).
12. An arched girder type lifting apparatus as claimed in claim 9, wherein: the telescopic belt conveyor (410) is arranged on a first amplitude variation oil cylinder (430), and the amplitude variation oil cylinder (430) is arranged on the basic platform (100).
13. An arched girder type lifting apparatus according to any of claims 1, 9-12, wherein: a gallery (110) is arranged in the foundation platform (100), and a concrete conveying system (400) penetrates through the gallery (110).
14. An arched girder type lifting apparatus as claimed in claim 1, wherein: still include installing the system (500), installing the system (500) including upset hydro-cylinder (501) and draw gear (502), be provided with first buttress (101) on basis platform (100), first track (102) are installed on first buttress (101), articulated seat (103) of bow member (200) and first buttress (101) side are passed through third articulated portion (202) in the position that is close to the tip, bow member (200) tip is articulated through fourth articulated portion (203) and the one end of upset hydro-cylinder (501), the other end of upset hydro-cylinder (501) passes behind first buttress (101) articulated with basis platform (100), draw gear (502) one end articulated install on basis platform (100) of keeping away from bow member (200) one side, the other end articulates the upside in bow member (200).
15. An arched girder type lifting apparatus as claimed in claim 14, wherein: a first connecting rod (206) and a second connecting rod (208) are fixedly connected between the two arches at the position of the end part, the first connecting rod (206) is hinged with the overturning oil cylinder (501), and the second connecting rod (208) is hinged with the traction device (502).
16. An arched girder type lifting apparatus as claimed in claim 14 or 15, wherein: the arch centering (200) is composed of two half-frames, the base platforms (100) on two sides are respectively provided with a mounting system (500), the mounting systems (500) on two sides respectively drive one half-frame of the arch centering (200), and the arch centering (200) is welded or connected through bolts after being folded.
17. An arched girder type lifting apparatus as claimed in claim 14 or 15, wherein: the foundation platform (100) is also provided with a second buttress (503) and a third buttress (504) for supporting the arch (200).
18. An arched girder type lifting apparatus as claimed in claim 14, wherein: the traction device (502) is a hydraulic cylinder or a steel wire traction machine.
19. An installation method of arched girder type lifting equipment is characterized in that: an installation for an arched girder type lifting device as recited in claim 15, the installation method comprising the steps of;
S1, preparation before installation: an installation area is arranged on a foundation platform (100), a first buttress (101) is arranged on the foundation platform (100), and a first track (102) is installed on the first buttress (101);
S2, assembling an arch frame: in an installation area of the foundation platform (100), two arches (200) are assembled into an arch frame assembly through a first connecting rod (206) and a second connecting rod (208), a third hinging part (202) is hinged with a hinging seat (103) through a plug-in bolt, a fourth hinging part (203) is hinged with a turnover oil cylinder (501) through a plug-in bolt, and a traction device (502) is hinged with the arch frame assembly through a plug-in bolt;
S3, arch centering lifting: the overturning oil cylinder (501) is driven to extend through the hydraulic system, the overturning oil cylinder (501) pushes the arch frame assembly to overturn clockwise, and when the arch frame assembly rotates to the limit position of the overturning oil cylinder (501), the arch frame assembly overturns beyond the vertical state;
S4, arch centering pulling and releasing: starting a traction device (502) to tension an arch frame assembly, taking out a pin shaft at the joint of a fourth hinging part (203) and a turnover oil cylinder (501), then lowering the arch frame assembly by the traction device (502) until the other end of the arch frame assembly falls on a first track (102) on a foundation platform (100) at the other side, and then releasing the connection between the traction device (502) and the arch frame assembly and the connection between a third hinging part (202) and a hinging seat (103);
S5, mounting a lifting trolley (300): hoisting the trolley (300) to the arch by using a crane, installing the trolley, debugging the trolley, running the trolley to a position on the arch without interfering with the installation of the rest trolley (300), installing the next trolley (300) until the plurality of trolleys (300) are all installed, and then running the arch (200), running the trolley (300) and integrally controlling and debugging the trolley, wherein the trolley can be put into use.
20. The application method of the arched girder type lifting equipment is characterized by comprising the following steps of: an arched girder type lifting device as claimed in claim 13, and the use method comprises the following steps;
s1, extending a feeding end of a telescopic belt conveyor (410) to a mixing plant, or communicating the mixing plant with the feeding end of the telescopic belt conveyor (410) through the belt conveyor, so that concrete produced by the mixing plant is directly conveyed to the telescopic belt conveyor (410);
S2, installing a plurality of transfer belt conveyors (420) at the discharging end of the telescopic belt conveyor (410) through an adjusting mechanism (600) according to construction requirements of a dam (701), wherein the discharging end of the transfer belt conveyor (420) is hooked on a hoisting system (330) of a lifting trolley (300);
S3, conveying the concrete conveyed from the mixing plant to a transit belt conveyor (420) through a telescopic belt conveyor (410), and conveying the concrete to an operation area of a dam (701), wherein when the position of the operation area changes in the width direction of the canyon (700), the number of the transit belt conveyors (420) is increased or decreased through the telescopic belt conveyor (410) so as to meet the change of the position of the operation area; when the position of the working area changes in the upstream and downstream directions of the canyon (700), the arch (200) is moved on the first track (102) by the travelling carriage (210), and the angle of the transfer belt conveyor (420) is adjusted by the adjusting mechanism (600) so as to meet the change of the position of the working area; when the position of the working area changes in the height direction of the canyon (700), the height of the transfer belt conveyor (420) is adjusted by the winch system (330) so as to meet the change of the position of the working area.
CN202411088222.3A 2024-08-09 2024-08-09 Arch beam type lifting equipment and installation method and use method thereof Pending CN118929432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411088222.3A CN118929432A (en) 2024-08-09 2024-08-09 Arch beam type lifting equipment and installation method and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411088222.3A CN118929432A (en) 2024-08-09 2024-08-09 Arch beam type lifting equipment and installation method and use method thereof

Publications (1)

Publication Number Publication Date
CN118929432A true CN118929432A (en) 2024-11-12

Family

ID=93351949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411088222.3A Pending CN118929432A (en) 2024-08-09 2024-08-09 Arch beam type lifting equipment and installation method and use method thereof

Country Status (1)

Country Link
CN (1) CN118929432A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119218872A (en) * 2024-12-02 2024-12-31 成都市棠德家具有限公司 A hoisting device and hoisting transportation line for plate spraying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119218872A (en) * 2024-12-02 2024-12-31 成都市棠德家具有限公司 A hoisting device and hoisting transportation line for plate spraying
CN119218872B (en) * 2024-12-02 2025-03-11 成都市棠德家具有限公司 Lifting appliance for spraying plates and lifting transportation line

Similar Documents

Publication Publication Date Title
CN218708558U (en) Device for hoisting reinforcement cage in cantilever casting segment construction
CN107059640B (en) Bridge girder erection machine for prefabricated segmental beam span-by-span construction and construction method thereof
CN102367651B (en) U-shaped concrete beam bridge girder erection machine
CN110642152A (en) Large-span bulk cargo conveying system
CN108149589B (en) Large span tunnel box girder bridge erecting machine
CN106087990B (en) Movable reinforcement cage installs equipment
CN109371849A (en) Negative bending moment tensioning device and trolley
CN207904782U (en) Large span crosses tunnel box beam bridge formation machine
CN202658902U (en) Hoisting and distributing dual-purpose concrete placing machine
CN203878478U (en) A bridge girder erection machine with a single arm box girder
CN209428963U (en) Hogging moment tensioning equipment and trolley
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN206015665U (en) Movable reinforcement cage installs equipment
CN205526360U (en) Prefab conveyer
CN220976396U (en) Lower arm transfer device for pulling plate
CN209652772U (en) Box girder bridge cantilever construction main truss cradle system
CN103924523B (en) A kind of single armed box beam bridge formation machine
CN219009769U (en) Tower crane
CN215828211U (en) Horizontal hoisting device for construction
CN205369054U (en) Suspension bridge stiffening beam erects construction structures
CN111661768B (en) Method and system for hoisting multiple peripheral components of prefabricated building
CN203878477U (en) Hanger of single-arm box girder bridging machine
CN203890889U (en) Supporting leg of single-arm box girder bridge erecting machine
CN222961005U (en) Arch beam type lifting equipment
CN102733393A (en) Self-elevating type concrete belt conveyor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination