CN118881191A - Building curtain wall glass laying device and operation method thereof - Google Patents
Building curtain wall glass laying device and operation method thereof Download PDFInfo
- Publication number
- CN118881191A CN118881191A CN202411298894.7A CN202411298894A CN118881191A CN 118881191 A CN118881191 A CN 118881191A CN 202411298894 A CN202411298894 A CN 202411298894A CN 118881191 A CN118881191 A CN 118881191A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- glass
- plate
- glass curtain
- laying device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses a building curtain wall glass laying device and an operation method thereof, wherein the building curtain wall glass laying device comprises: comprises a mounting plate, a plurality of transverse frames are arranged on the front surface, an anti-falling component is arranged between the transverse frames and used for preventing the glass curtain wall from falling off; the anti-drop assembly comprises two cross bars positioned between the cross frames near the top and the bottom. The outer side of the cross rod is provided with a fixing ring, the two sides of the ring are provided with a belt frame, the outer side of the belt frame is provided with a cloth belt, one end of the cloth belt is penetrated with a jack at the inner side; the glass curtain wall also comprises a corner protection box which provides protection for four corners of the glass curtain wall. The long ropes can provide support for the corner protection boxes, the springs can provide tension for the corner protection boxes, and the corner protection boxes are fixed outdoors at four corners of the glass curtain wall; in addition, a balancing weight and a screw rod are also arranged, control module, etc. The operator can drive the air valve through the controller to change the flow of air, thereby changing the working state of the sucker. The angle bead box, the spring, the screw rod and the like can also be independently driven to move, so that the angle and the position of the glass curtain wall are changed.
Description
Technical Field
The invention relates to the technical field of building curtain wall glass paving devices, in particular to a building curtain wall glass paving device and an operation method thereof.
Background
The utility model provides a building curtain glass laying device is a device for removing building glass curtain, including hoisting device and hoist, general hoisting device is the hoist, and the hoist adsorbs for a plurality of sucking discs, and when hoisting device moved glass curtain through the hoist to the sky, glass curtain was rocked by external factor's influence easily, dropped even, has the reason that traditional device is not perfect enough, does not have the facility that can prevent glass curtain and drop, and glass curtain stability is low, has reduced the security, and a building curtain glass laying device and operating method thereof can provide convenience for the staff.
The defects of the existing building curtain wall glass laying device are that:
1. JP2008280708a discloses curtain wall suspension means, "i.e. when forming openings in the periphery of the building floor, curtain wall suspension means are also provided to suspend the curtain wall from the interior of the building to the exterior. The curtain wall 1 mounted on the periphery T1 of the T1 building 4 is hoisted from the inner side T2 of the T building to the outer side T3, and the upper end 1a side is lifted. The lifting structure 10 and the trolley 11 run on the suspension structure 10 and transport the curtain wall 1 at the top from the inside T2 of the building T to the outside T3. The suspension platform 13 is supported by the outer perimeter T1, the object T2 of the side T2 and the inner T2 is suspended on the opening 5, and the splash platform 14 extends from the outer perimeter portion T1 of the building T to the outer perimeter T3. The traditional device is not perfect enough, has no facility capable of preventing the glass curtain wall from falling off, is easy to fall off, and reduces the safety.
2. EP2063036A2 discloses a mounting device for glass sheets and panels for facade or ventilation and/or sun protection structures, "the present invention relates to a device for laying elements for forming glass curtain walls or ventilation and/or sun protection structures for buildings. It comprises a body with two vertical flanges (16, 116) which are connected in parallel and transversely, one side providing means for connecting it to a supporting mullion and the other side providing anchoring means (27,122,123) for the supporting element. The anchoring means may be in the form of vertical plates (27) to secure the glass plates or grooves or indentations to hold the panels in an inclined position. The traditional bag type dust collector is not perfect enough, has no facility for protecting four right angles of the glass curtain wall conveniently, and reduces the protection performance.
3. JP2008266891a discloses curtain wall installation method and apparatus, "challenge: the curtain wall installation method and the curtain wall installation equipment can reduce the constraint of a crane and improve the operability of curtain wall installation work. The curtain wall of the present invention is installed by installing the rebound guide 20 on the frame 2 at the upper portion of the building in such a manner that one end side is fixed to the frame and the other end side horizontally extends to the outside of the building. After the suspension support, the storage rack 50 is lifted to the upper portion of the building by the crane 83, the storage rack 50 is placed on the cart 30, and the cart 30 slides toward the inside of the building. The traditional device is not perfect enough, is not convenient for balancing facilities of the glass curtain wall position, and improves the stability.
4. CN217808238U discloses a glass curtain wall lifting appliance, "comprising a supporting frame, the top of support frame is provided with the connecting seat, the inner wall of connecting seat is fixed to be equipped with the hoist and mount pole, the top of hoist and mount pole is provided with the lug, the bottom of support frame is provided with three link, the both sides of link bottom all are provided with the sucking disc, the holding tank has all been seted up to the both sides of link, the inner wall sliding connection of holding tank has the connecting rod, one side fixedly connected with anticollision protection pad of connecting rod, the utility model through the anticollision protection pad that sets up, movable column, dead lever, four corners of glass in the in-process of hoist and mount are protected, then the staff can rise the movable column to make two dead levers remove and be close to each other, and the dead lever then has driven connecting rod 7 and removed simultaneously at the in-process of removal, thereby makes anticollision protection pad press close to glass's corner, thereby makes glass avoid taking place the damage because of the collision in the in-process of lifting. The traditional device is not perfect enough, is inconvenient for the facility for containing the anti-drop assembly, and improves the occupied space of the device.
Disclosure of Invention
The invention aims to provide a building curtain wall glass laying device and an operation method thereof, which are used for solving the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: the building curtain wall glass laying device comprises a mounting plate, wherein a plurality of transverse frames are arranged on the front surface of the mounting plate, and anti-falling assemblies are arranged between the transverse frames and used for preventing glass curtain walls from falling off;
The utility model discloses a take-off assembly, including the anticreep subassembly, and two horizontal poles are located respectively between two crossbearers that are close to the top and two crossbearers that are close to the bottom, two solid fixed rings are installed in the outside of horizontal pole, the area frame is installed to the both sides of solid fixed ring, the strap is installed in the outside of area frame, and the one end winding of strap is in the outside round of area frame, a plurality of jacks have been seted up in the inside run through of strap, the thin pole is installed to one side of strap, and the thin pole runs through the inboard that is located one of them jack, and the ball is installed to the one end of thin pole, and the ball is located the front of strap, the U board is installed to the one end of strap.
Preferably, the back of crossbearer installs the sucking disc, and two reinforcing plates are installed in the front of mounting panel, installs the support between two liang of reinforcing plates, and two lugs are installed at the top of support, and the pneumatic valve is installed to the inboard of support, and the back-mounted of pneumatic valve has a plurality of trachea, and tracheal other end is connected with the back of sucking disc respectively, and the protection component is installed in the front of crossbearer, protection component is used for protecting four angles of glass curtain wall.
Preferably, a control module is arranged on the inner side of the bracket, and the control module is used for air inlet and air outlet of the air valve;
The control module comprises a controller arranged on the inner side of the bracket, the controller is positioned at the top of the air valve, and the inside of the controller is used for installing electric elements required by the operation of the air valve;
When a worker operates the controller, the controller can transmit corresponding control signals to the air valve through the electric element under the support of the support, so that the air valve is electrified to perform corresponding operation.
Preferably, the outside of the horizontal pole near the top is equipped with two expansion rings, two long area are installed in the outside of expansion ring, and the elastic band is installed to the one end in long area, and the elastic band is close to the both ends of bottom and is installed two other long area, and the pothook is installed to the one end in this long area, and the pothook is located the outside near the horizontal pole of bottom, and the arc post has been placed in the outside in four long area, and the N board is installed to one side of arc post cambered surface, and the N board is located the outside in long area, and the link is installed to one side of arc post, and L board is installed to one side in arc post plane.
Preferably, the inner side of the U-shaped plate is provided with a rubber plate, and the rubber plate is used for providing protection for the glass curtain wall.
Preferably, the protection component comprises two groups of fixed plates, each group of fixed plates is provided with two fixed plates, four fixed plates are respectively located at the front sides of two crossbeams close to the top and two crossbeams close to the bottom, limiting plates are respectively installed at the front sides of two crossbeams close to the top and two crossbeams close to the bottom, a first spring is installed at one side of the fixed plates, a circular plate is installed at one end of the first spring, a long rope is installed at one side of the circular plate far away from the first spring, the long rope penetrates through the inside of the limiting plates, one ends of the two long ropes close to the top and the two long ropes close to the bottom are respectively connected with two sides of the two U plates, an angle protection box is placed at the back side of the long rope, a sponge cushion is installed at the inner side of the angle protection box, a thick column is installed at the front side of the angle protection box, the thick column is located at the top of the long rope, a cover plate is jointly installed at one end of the thick column and the thin column is located at the front side of the long rope.
Preferably, the top of horizontal pole near the bottom is provided with balanced subassembly, and balanced subassembly is used for increasing stability, balanced subassembly includes the spout, and the spout is seted up at the top of horizontal pole, install the square pole between two crossbearers near the bottom, the through-hole has been seted up in the inside run-through of square pole, the screw rod has been placed in the inboard run-through of through-hole, the thread bush is installed to the outside screw thread of screw rod, and the thread bush is located the top of square pole, the pillar is installed to the bottom of screw rod, the slider is installed to the bottom of pillar, and the slider is located the inboard of spout, the strengthening rib is installed in the front of pillar, the pipe is installed in the front of pillar, and the pipe is connected with the top of strengthening rib, the inboard of pipe runs through and has been placed the lead screw, the bolt is installed in the top run-through of pipe, and the one end of bolt runs through the top of installing at the lead screw, the balancing weight is installed to the outside screw thread of lead screw, the baffle is installed in the front of lead screw, the baffle is used for preventing that the balancing weight from breaking away from the outside of lead screw.
Preferably, the bottom and the top of mounting panel are provided with the subassembly of accomodating, accomodate the subassembly and be used for fixed U board, accomodate the subassembly and including spring two, and spring two installs at the top and the bottom of mounting panel, and the ring is installed to the one end that the mounting panel was kept away from to spring two, and two sleeve pipes are installed in the outside of ring, and tensile stay cord is installed in the telescopic outside, and the stay cord runs through the inside of installing at the horizontal pole, and spacing ball is installed to the one end of stay cord, and spacing ball is located one side that the mounting panel was kept away from to the horizontal pole, and two short ropes are installed to the bottom of spacing ball, and the couple is installed to the one end of short rope, and two hook holes have been run through respectively to the front and the back of U board, and the hook hole is used for providing the space of running through for the couple.
Preferably, the operation method of the building curtain wall glass laying device is as follows:
s1, firstly, a worker needs to penetrate a hook of an external lifting device through the inner side of a lifting lug, the lifting lug is fixed on the outer side of the hook, the lifting device drives a building curtain wall glass laying device to move to the periphery of an external glass curtain wall through the hook, one side of the building curtain wall glass laying device with a sucker faces towards the glass curtain wall, the building curtain wall glass laying device is moved to enable the sucker to be attached to the glass curtain wall, the worker presses the building curtain wall glass laying device towards the glass curtain wall, the sucker is tightly attached to the glass curtain wall, the worker controls an air valve to enter air through an operation control module, the air valve sucks air between the sucker and the glass curtain wall through an air pipe, and the sucker tightly adsorbs the glass curtain wall;
S2, then, a worker grabs one end of a cloth belt wound on the outer side of the belt frame, so that one end of the cloth belt moves in a direction away from the jack, one end of the cloth belt drives the ball to move back through the thin rod, one end of the cloth belt drives the thin rod and the ball to move out of the inner side of the jack, fixation of the cloth belt is relieved, then, the worker grabs two U plates to move in a direction away from the mounting plate, the groove parts of the two U plates with rubber plates are aligned with the top and the bottom of the glass curtain wall respectively, the two U plates are clamped on the outer side of the glass curtain wall, one end of the cloth belt is grabbed again to wind on the outer side of the belt frame, the ball and the thin rod are penetrated and placed on the inner side of the proper jack, and the cloth belt is in a straight state;
s3, a worker grabs the angle bead box to move in a direction away from the mounting plate, so that the angle bead box moves in a direction away from the U plate along the long rope under the action of external force, one end, connected with the U plate, of the long rope is fixed, the part, away from the U plate, of the long rope moves relatively in the direction away from the U plate under the action of the angle bead box, one end, away from the U plate, of the long rope drives the circular plate to move in a direction away from the first spring, the circular plate drives the first spring to stretch, the distance between the circular plate and the limiting plate is the maximum stretching distance of the first spring, the limiting plate is used for preventing the first spring from damaging due to the fact that the first spring stretches excessively, the worker moves the angle bead box to a position exceeding one corner of the glass curtain wall, a groove with a sponge pad of the angle bead box is aligned with one corner of the glass curtain wall, the angle bead box is sleeved at one corner of the glass curtain wall, at the moment, the first spring is still in a stretching state, the first long rope and the thick column pulls the angle bead box in the direction of the mounting plate, and the angle bead box is fixed by the resisting action with the glass curtain wall, so that the angle bead box is protected at right angles to the glass curtain wall;
S4, lifting the building curtain wall glass paving device and the glass curtain wall upwards by a worker for a certain distance through the lifting device, wherein the building curtain wall glass paving device is inclined due to the fact that the glass curtain wall is adsorbed, the worker can grasp the threaded sleeve to rotate according to actual needs, the threaded sleeve rotates by taking the screw rod as the center of a circle under the action of external force, the threaded sleeve is detached by the action of the threads of the threaded rod, the worker grasps the threaded rod to move left and right, the threaded rod moves inside the through hole, the threaded rod drives the sliding block to move inside the sliding groove through the support column, the support column drives the screw rod and the balancing weight to move to a proper position through the circular tube, then grasps the balancing weight to rotate, the balancing weight moves to a proper position by taking the screw rod as the center of a circle under the action of external force, the balancing weight presses the building curtain wall glass paving device downwards by using self gravity, the balancing weight adjusts the building curtain wall glass paving device and the adsorbed glass curtain wall to a vertical state, and meanwhile the balancing weight increases the gravity of the building curtain wall glass paving device, the building curtain wall glass paving device is more stable when suspended in the air, the influence of external natural factors is reduced, and the stability is increased.
S5, finally, the building curtain wall glass laying device and the glass curtain wall are suspended in the air and moved to a designated working place, a worker dismantles the glass curtain wall to be assembled to a designated position, after the worker finishes using, the worker grabs a limiting ball close to the right side of the bottom to move away from the mounting plate, the limiting ball drives the pull rope to move, the pull rope drives the spring II to stretch under the action of external force, the limiting ball moves to the position close to the left side of the bottom, one of the hooks is grabbed to move, the worker penetrates through the inner side of one of the hook holes close to the front, then the other hook is grabbed, the worker penetrates through the inner side of the corresponding hook hole close to the back, then grabs the limiting ball close to the left side of the bottom to be operated in the same way, the two groups of hooks close to the bottom penetrate through the inner sides of the hook holes at opposite positions respectively, the worker loosens the limiting ball, the spring II in a stretched state contracts under the action of self elastic force, the spring II pulls the hooks through the pull rope, and the short rope, the hooks are in a straight state, and the U plate moves to the position close to the cross bar to be stored.
Preferably, in the step S4, the method further includes the following steps:
S41, a worker can rotate the bolt through an external spanner to detach the bolt, the fixation of the screw rod is relieved, then the worker grabs the screw rod to move to the front, the screw rod is removed from the inner side of the circular tube and detached, when the balancing weight is not needed to be used, the balancing weight can be detached, when the weight of the balancing weight is insufficient to balance, another or a plurality of balancing weights can be arranged on the outer side of the screw rod, and the screw rod is inserted into the inner side of the circular tube again to be arranged through the bolt.
Compared with the prior art, the invention has the beneficial effects that:
1. According to the invention, the anti-drop assembly is arranged, so that the glass curtain wall can be hooked when the glass curtain wall is suspended in the air and is separated from the sucker, and the anti-drop effect is realized by sleeving the U-shaped plate on the top and the bottom of the glass curtain wall, thereby preventing the glass curtain wall from dropping in the suspension process and improving the safety.
2. According to the invention, the corner protection box is arranged, the corner protection box can provide protection for four corners of the glass curtain wall, the long rope can provide support for the corner protection box, the first spring can provide tension for the corner protection box, the corner protection box is fixed on the outer sides of the four corners of the glass curtain wall, a worker grabs the corner protection box to move in the direction away from the mounting plate, so that the corner protection box moves along the long rope in the direction away from the U plate, one end of the long rope away from the U plate drives the circular plate to move in the direction away from the first spring, the circular plate drives the first spring to stretch, the corner protection box moves to a position exceeding one corner of the glass curtain wall, the groove with the sponge pad of the corner protection box is aligned with one corner of the glass curtain wall, the first spring is still in a stretched state, and the corner protection box is fixed by the resisting action with the glass curtain wall, so that the protection of the right angle of the glass curtain wall is realized.
3. According to the invention, the balancing weight is arranged, the screw rod can provide movable support for the balancing weight, the support column can provide stable support for the screw rod, when the position of the balancing weight needs to be adjusted, a worker needs to grasp the threaded sleeve to rotate, the threaded sleeve is detached by utilizing the threaded action of the screw rod, the worker grasps the screw rod to move left and right, the support column drives the screw rod and the balancing weight to move to a proper position through the round pipe, then grasps the balancing weight to rotate, the balancing weight is enabled to move around the screw rod as a circle center, the balancing weight is enabled to move to a proper position by utilizing the threaded action of the screw rod, the balancing weight is enabled to downwards press the building curtain wall glass paving device by utilizing the gravity of the balancing weight, the balancing weight is enabled to adjust the building curtain wall glass paving device and the adsorbed glass curtain wall to be in a vertical state, meanwhile, the balancing weight of the building curtain wall glass paving device is enabled to be more stable when the building curtain wall glass paving device is suspended in the air, the influence of external natural factors is reduced, and the stability is increased.
4. According to the invention, through installing the hooks, the U-shaped plate can provide an opening space for the hook holes, after the use of a worker is finished, the limiting ball near the right side of the bottom is grasped to move in the direction away from the mounting plate, so that the limiting ball drives the pull rope to move, the pull rope drives the second spring to stretch, the limiting ball moves to the position near the left side of the bottom, one of the hooks is grasped to move, the inner side of one hook hole near the front is grasped, the other hook is grasped and the corresponding inner side near the back hook hole is penetrated, the limiting ball near the left side of the bottom is grasped to perform the same operation, the two groups of hooks near the bottom respectively penetrate through the inner sides of the hook holes at opposite positions, the two groups of hooks are placed in a crossed mode, the worker releases the limiting ball, the second spring in a stretched state contracts under the action of the elasticity of the second spring, the second spring pulls the hooks through the pull rope, the limiting ball and the short rope to enable the pull rope to be in a straightened state, and the U-shaped plate to be moved to the position near the cross rod to be fixedly accommodated, and the occupied space is reduced.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present invention;
FIG. 2 is a schematic perspective view of a bracket according to the present invention;
FIG. 3 is a schematic perspective view of a cloth tape according to the present invention;
FIG. 4 is a schematic perspective view of a long rope according to the present invention;
FIG. 5 is a schematic cross-sectional view of the corner protector according to the present invention;
FIG. 6 is a schematic cross-sectional view of a balance assembly according to the present invention;
FIG. 7 is a schematic diagram of a pull cord according to the present invention;
FIG. 8 is a schematic view of a long belt structure of the present invention;
FIG. 9 is a schematic perspective view of an elastic band according to the present invention;
Fig. 10 is a flow chart of the present invention.
In the figure: 1. a mounting plate; 2. a cross frame; 3. a suction cup; 4. a reinforcing plate; 5. a bracket; 6. lifting lugs; 7. a controller; 8. an air valve; 9. an air pipe; 10. a cross bar; 11. a fixing ring; 12. a belt rack; 13. cloth belt; 14. a jack; 15. a thin rod; 16. a ball; 17. a U-shaped plate; 18. a rubber plate; 19. fixing plates; 20. a limiting plate; 21. a first spring; 22. a circular plate; 23. a long rope; 24. corner protection boxes; 25. a sponge cushion; 26. a thick column; 27. a thin column; 28. a cover plate; 29. a chute; 30. square rods; 31. a through hole; 32. a screw; 33. a thread sleeve; 34. a support post; 35. a slide block; 36. reinforcing ribs; 37. a round tube; 38. a screw rod; 39. a bolt; 40. balancing weight; 41. a baffle; 42. a second spring; 43. a circular ring; 44. a sleeve; 45. a pull rope; 46. a limit ball; 47. a short rope; 48. a hook; 49. a hook hole; 50. a movable ring; 51. a long belt; 52. an elastic band; 53. a clamping hook; 54. an arc column; 55. an N plate; 56. hanging rings; 57. l plate.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and are, for example, "connected," whether fixedly, detachably, or integrally; is a mechanical connection and also an electrical connection; is directly connected, also indirectly connected through an intermediate medium, and is the communication between the two components. The specific meaning of the above terms in the present invention is understood in detail by those of ordinary skill in the art.
Referring to fig. 1,2 and 8, an embodiment of the present invention provides: the utility model provides a building curtain wall glass laying device and operation method thereof, including mounting panel 1, a plurality of crossbearers 2 are installed in the front of mounting panel 1, the back-mounted of crossbearers 2 has sucking disc 3, mounting panel 1 can provide firm support for crossbearers 2, crossbearers 2 can provide firm support for sucking disc 3, two reinforcing plates 4 are installed in the front of mounting panel 1, install support 5 between two reinforcing plates 4, two lug 6 are installed at the top of support 5, support 5 can provide firm support for lug 6, the staff can lift building curtain wall glass laying device through lug 6, the pneumatic valve 8 is installed to the inboard of support 5, a plurality of trachea 9 are installed to the back of pneumatic valve 8, the other end of trachea 9 is connected with the back of sucking disc 3 respectively, pneumatic valve 8 can admit air and go out, tracheal 9 can provide the intercommunication passageway for pneumatic valve 8 and sucking disc 3, the staff is to inboard gas transmission and gassing of trachea 9 through pneumatic valve 8, make tracheal 9 to inboard gas transmission and gassing of sucking disc 3, make sucking disc 3 adsorb glass curtain wall and break away from.
Referring to fig. 1, 2, 3 and 8, an embodiment of the present invention is provided: the utility model provides a building curtain wall glass laying device and operation method thereof, including anticreep subassembly, anticreep subassembly is including two crossbars 10, and two crossbars 10 are located respectively between two crossbars 2 near the top and two crossbars 2 near the bottom, two solid fixed ring 11 are installed in the outside of crossbar 10, band frame 12 is installed to the both sides of guy fixed ring 11, band 13 is installed in the outside of band frame 12, and one end winding of strap 13 is in band frame 12 outside round, crossbars 2 can provide firm support for crossbar 10, crossbar 10 can provide firm support for solid fixed ring 11, band frame 12 can rotate, make things convenient for strap 13 to remove, a plurality of jacks 14 have been seted up in the inside run through of strap 13, thin pole 15 is installed to one side of strap 13, and thin pole 15 runs through the inboard that is located one of jacks 14, round ball 16 is installed to thin pole 15's one end, and round ball 16 is located the front of strap 13, jack 14 can provide the space of seting up for round ball 16 and thin pole 15, U board 17 is installed to one end of strap 13, U board 17 is installed to U board 17, U board 18 is installed for glass protection effect, rubber board 18 is provided for the curtain wall.
The staff grasps the strap 13 one end of winding in the area frame 12 outside, make strap 13 one end to keeping away from jack 14 direction removal, make this strap 13 one end drive ball 16 through thin pole 15 to the back removal, this strap 13 one end drive thin pole 15 and ball 16 shift out the inboard of jack 14, remove strap 13's fixation, then the staff grasps two U boards 17 and moves in the direction of keeping away from mounting panel 1, it places to aim at the top and the bottom of glass curtain wall respectively to have the recess part of two U boards 17 with rubber slab 18, make two U boards 17 joint in the outside of glass curtain wall, grasp strap 13's one end winding in the area frame 12 outside round again, run through ball 16 and thin pole 15 and place in suitable jack 14 inboard, make strap 13 be in the state of being in, strap 13 gives U board 17 the power to mounting panel 1 direction, make the firm dress cover of U board 17 in the top and bottom of glass curtain wall, the phenomenon that the realization prevents glass curtain wall from droing takes place.
Referring to fig. 1, 2, 8 and 9, an embodiment of the present invention is provided: the utility model provides a building curtain glass laying device and operation method thereof, including horizontal pole 10, the outside of horizontal pole 10 near the top is adorned and is overlapped two expansion ring 50, horizontal pole 10 can provide firm support for expansion ring 50, two long area 51 are installed to the outside of expansion ring 50, elastic band 52 is installed to one end of long area 51, elastic band 52 is installed near the both ends of bottom two other long area 51, hook 53 is installed to one end of this long area 51, and hook 53 is located the outside of horizontal pole 10 near the bottom, long area 51 can provide firm support for elastic band 52, long area 51 can provide firm support for hook 53, arc post 54 has been placed to the outside of four long areas 51, N board 55 is installed to one side of arc post 54 cambered surface, and N board 55 is located the outside of long area 51, link 56 is installed to one side of arc post 54 plane, L board 57 is installed to one side of arc post 54 plane, the friction of long area 51 and L board 57 can be reduced to the arc post 54.
The staff first grasps the pothook 53 to dismantle, make long area 51 and elastic band 52 pass from the top of glass curtain wall, make pothook 53, long area 51 and elastic band 52 remove the back of glass curtain wall, pass the pothook 53 and remove to the front of glass curtain wall from the bottom of glass curtain wall, hook the pothook 53 in the outside of horizontal pole 10 again, elastic band 52 stretches under the effect of external force at this moment, then the staff grasps two L boards 57 that are close to the top and remove, make L board 57 drive arc post 54 and N board 55 along the outside one side of long area 51 under the effect of external force, remove L board 57 to the top of glass curtain wall, make the inboard of L board 57 be located the top of glass curtain wall, at this moment, one side inner wall of L board 57 contacts with the top of glass curtain wall, the opposite side inner wall of L board 57 and the back of glass curtain wall, the same operation is with two L boards 57 that are close to the bottom of glass curtain wall, elastic band 52 extrudes four L boards 57 to the glass curtain wall direction under self elasticity effect, when glass curtain wall drops from 3, L board 57 is with glass sucker support under the effect of long area 51 and elastic band 52, prevent glass sucker drop.
Referring to fig. 1,2 and 8, an embodiment of the present invention provides: the building curtain wall glass laying device comprises a bracket 5, wherein a control module is arranged on the inner side of the bracket 5 and used for air inlet and air outlet of an air valve 8, the control module comprises a controller 7 arranged on the inner side of the bracket 5, the controller 7 is positioned at the top of the air valve 8, and the inside of the controller 7 is used for installing electrical elements required by the operation of the air valve 8;
when a worker operates the controller 7, the controller 7 transmits corresponding control signals to the air valve 8 through the electric element under the support of the support 5, so that the air valve 8 is electrified to perform corresponding operation.
Referring to fig. 1,2, 4,5 and 8, an embodiment of the present invention is provided: the utility model provides a building curtain wall glass laying device and operation method thereof, including the protection subassembly, the protection subassembly includes two sets of fixed plates 19, every group has two fixed plates 19, and four fixed plates 19 are located respectively and are close to the front of two crossbearers 2 of top and two crossbearers 2 of bottom, limit plate 20 is installed respectively to the front of two crossbearers 2 of top and two crossbearers 2 of bottom, crossbearers 2 can provide firm support for fixed plate 19 and limit plate 20, spring one 21 is installed to one side of fixed plate 19, the plectane 22 is installed to one end of spring one 21, the long rope 23 is installed to one side that the plectane 22 kept away from spring one 21, and long rope 23 runs through the inside of limit plate 20, two long ropes 23 of being close to the top and the one end of two long ropes 23 of being close to the bottom are connected with the both sides of two U-plates 17 respectively, angle bead box 24 has been placed to the back of long rope 23, angle bead box 24 can be provided for the rear of long rope 23, the cooperation of plectane 22 and limit plate 20 can prevent that spring one 21 from being broken, angle bead box 24's inboard cushion 24 installs 26, the thick rope 24 is installed to the long rope 23 and the front of 26 is located at the front of pillar 23, the thick pillar 23 is located at the front of pillar 28, the pillar 23 is located at the front of pillar 23, the pillar 23 is installed to the thick pillar 23.
The staff grasps angle bead box 24 and moves to the direction that keeps away from mounting panel 1, make angle bead box 24 follow long rope 23 to the direction that keeps away from U board 17 under the effect of external force, the one end that long rope 23 was connected with U board 17 is motionless, the part that long rope 23 kept away from U board 17 is moved to the direction of U board 17 under the effect of angle bead box 24 relatively, make the one end that long rope 23 kept away from U board 17 drive plectane 22 to the direction that keeps away from spring one 21 remove, make plectane 22 drive spring one 21 tensile, the distance of plectane 22 to limiting plate 20 is the biggest tensile distance of spring one 21, limiting plate 20 is used for preventing that spring one 21 is tensile overlength leads to damaging, the staff moves angle bead box 24 to the position that exceeds one corner of glass curtain, place angle bead box 24 has the recess of foam-rubber cushion 25 to the one corner of glass curtain wall, make angle bead box 24 dress cover in one corner of glass curtain wall, at this moment spring one 21 still is in tensile state, make spring one 21 draw angle bead box 24 to the direction of mounting panel through long rope 23 and thick post 26, make angle bead box 24 keep off the effect with glass curtain wall 24, thereby realize the protection of right angle to the fixed to glass curtain wall.
Referring to fig. 1,2, 6 and 8, an embodiment of the present invention is provided: a building curtain wall glass laying device and an operation method thereof, comprises a cross rod 10, wherein a balance component is arranged at the top of the cross rod 10 near the bottom, the balance component is used for increasing stability, the balance component comprises a sliding groove 29, the sliding groove 29 is arranged at the top of the cross rod 10, a square rod 30 is arranged between two cross frames 2 near the bottom, a through hole 31 is arranged in the square rod 30 in a penetrating way, a screw rod 32 is arranged in the inner side of the through hole 31 in a penetrating way, a thread sleeve 33 is arranged on the outer side thread of the screw rod 32, the thread sleeve 33 is arranged at the top of the square rod 30, a strut 34 is arranged at the bottom of the screw rod 32, a sliding block 35 is arranged at the bottom of the strut 34, the sliding block 35 is arranged at the inner side of the sliding groove 29, the horizontal pole 10 can provide the space of seting up for spout 29, the spout 29 can provide the activity space for slider 35, the cooperation of slider 35 and spout 29 can prevent pillar 34 skew predetermined track, strengthening rib 36 is installed in the front of pillar 34, pipe 37 is installed in the front of pillar 34, and pipe 37 is connected with the top of strengthening rib 36, the inboard of pipe 37 runs through and has placed lead screw 38, the bolt 39 is run through at the top of pipe 37, and the one end of bolt 39 runs through and installs at the top of lead screw 38, the balancing weight 40 is installed to the outside screw thread of lead screw 38, baffle 41 is installed in the front of lead screw 38, baffle 41 is used for preventing balancing weight 40 break away from the outside of lead screw 38.
The staff can rotate the bolt 39 through external spanner, dismantle the bolt 39, remove the fixation to lead screw 38, then the staff grasps lead screw 38 and moves to the front, remove the inboard that removes pipe 37 with lead screw 38, when need not use balancing weight 40, can dismantle it, when balancing weight 40 weight is insufficient balanced, can install another or several balancing weight 40 in the outside of lead screw 38, install the inboard that inserts pipe 37 again with lead screw 38 through bolt 39, the staff can also grasp the thread bush 33 rotation according to actual need, make the thread bush 33 regard as the centre of a circle with screw 32 under the effect of external force rotatory, make the thread bush 33 utilize with the screw effect of screw 32 dismantle, the staff grasps the screw 32 and moves about, make the screw 32 remove at the inboard of through-hole 31, make the screw 32 drive slider 35 at the inboard of spout 29 through pillar 34 drive lead screw 38 and balancing weight 40 through 37 and move to suitable position, afterwards grasp balancing weight 40 rotation, make balancing weight 40 use lead screw 38 as the rotation movement under the effect of external force, make balancing weight 40 remove suitable position with the centre of a circle, make the glass curtain wall 40 remove the balancing weight 40 under the effect of external force and take the centre of a circle to the centre of a circle, the glass curtain wall device is hung down to the glass curtain wall device is paved to the glass curtain wall device, the device is more stable, the glass curtain wall device is paved under the condition of the influence of the air curtain wall device is increased, the air-borne factors is more stable, and the device is more stable is paved, the device is used to the glass curtain wall device is paved down the air device is more has been paved.
Referring to fig. 1,2, 7 and 8, an embodiment of the present invention is provided: the utility model provides a building curtain wall glass laying device and operation method thereof, including horizontal pole 10, the bottom and the top of mounting panel 1 are provided with the storage subassembly, the storage subassembly is used for fixed U board 17, the storage subassembly is including second spring 42, and second spring 42 installs at the top and the bottom of mounting panel 1, ring 43 is installed to the one end that second spring 42 kept away from mounting panel 1, two sleeve pipes 44 are installed in the outside of ring 43, tensile stay cord 45 is installed in the outside of sleeve pipe 44, and stay cord 45 runs through the inside of installing at horizontal pole 10, spacing ball 46 is installed to the one end of stay cord 45, and spacing ball 46 is located one side that horizontal pole 10 kept away from mounting panel 1, two short ropes 47 are installed to the bottom of spacing ball 46, couple 48 is installed to the one end of short rope 47, two hook holes 49 have been run through respectively to the front and the back of U board 17, hook hole 49 is used for providing the space of running through for couple 48.
After the use of staff is finished, grasp the right limit ball 46 near the bottom and move to the direction away from the mounting plate 1, make limit ball 46 drive stay cord 45 move, make stay cord 45 drive spring two 42 under the effect of external force and stretch, move limit ball 46 to the position near the left hook hole 49 of bottom, grasp one of them couple 48 and move, make it pass near the inside of a hook hole 49 on the front, then grasp another couple 48, make it pass the inboard of the corresponding hook hole 49 near the back, grasp the limit ball 46 near the left side of bottom and do the same operation, make two sets of couples 48 near the bottom run through respectively in opposite hook hole 49, make two sets of couples 48 realize alternately placing, the staff unclamp limit ball 46, make spring two 42 in the tensile state shrink under self elasticity, spring two 42 pull couple 48 through stay cord 45, limit ball 46 and short rope 47, make stay cord 45 and short rope 47 be in the state of straightening, move U plate 17 to the position near horizontal pole 10 and take in fixedly.
Further, the operation method of the building curtain wall glass laying device is as follows:
S1, firstly, a worker needs to penetrate a hook of an external lifting device through the inner side of a lifting lug 6, the lifting lug 6 is fixed on the outer side of the hook, the lifting device drives a building curtain wall glass laying device to move around an external glass curtain wall through the hook, one side of the building curtain wall glass laying device with a sucker 3 faces towards a glass curtain wall, the building curtain wall glass laying device is moved to enable the sucker 3 to be attached to the glass curtain wall, the worker presses the building curtain wall glass laying device towards the glass curtain wall, the sucker 3 is tightly attached to the glass curtain wall, the worker controls an air valve 8 to enter air through operating a control module, the air valve 8 sucks air between the sucker 3 and the glass curtain wall through an air pipe 9, and the sucker 3 tightly adsorbs the glass curtain wall;
S2, then, a worker grabs one end of a cloth belt 13 wound on the outer side of the belt frame 12, so that one end of the cloth belt 13 moves in a direction away from the insertion hole 14, one end of the cloth belt 13 drives a ball 16 to move back through a thin rod 15, one end of the cloth belt 13 drives the thin rod 15 and the ball 16 to move out of the inner side of the insertion hole 14, fixation of the cloth belt 13 is released, then, the worker grabs two U plates 17 to move in a direction away from the mounting plate 1, groove parts of the two U plates 17 with rubber plates 18 are respectively aligned with the top and the bottom of the glass curtain wall, the two U plates 17 are clamped on the outer side of the glass curtain wall, one end of the cloth belt 13 is grabbed again, wound on the outer side of the belt frame 12 for one circle, and the ball 16 and the thin rod 15 are penetratingly placed on the inner side of a proper insertion hole 14, so that the cloth belt 13 is in a straight state;
s3, a worker grabs the corner protector box 24 to move in a direction away from the mounting plate 1, the corner protector box 24 moves along the long rope 23 in a direction away from the U plate 17 under the action of external force, one end, connected with the U plate 17, of the long rope 23 is fixed, the part, away from the U plate 17, of the long rope 23 moves relatively in the direction of the U plate 17 under the action of the corner protector box 24, one end, away from the U plate 17, of the long rope 23 drives the circular plate 22 to move in the direction away from the first spring 21, the circular plate 22 drives the first spring 21 to stretch, the distance between the circular plate 22 and the limiting plate 20 is the maximum stretching distance of the first spring 21, the limiting plate 20 is used for preventing the first spring 21 from being damaged due to excessively long stretching, the worker moves the corner protector box 24 to a position exceeding one corner of the glass curtain wall, the groove, with the sponge pad 25 is aligned with one corner of the glass curtain wall, the corner protector box 24 is sleeved at one corner of the glass curtain wall, at the moment, the first spring 21 is still in a stretching state, the first spring 23 and the thick column 26 pulls the corner protector box 24 in the direction away from the first spring 21, the direction of the first spring 21, the corner protector box 24 is stretched in the direction away from the direction of the first spring 21, the glass curtain wall is enabled to resist the glass curtain wall, and the right angle is fixed by the function of the corner protector box 24, and the right angle is realized;
S4, then, staff lifts the building curtain wall glass paving device and the glass curtain wall upwards for a certain distance through the lifting device, the building curtain wall glass paving device at this moment tilts due to the fact that the glass curtain wall is adsorbed, staff can grasp the threaded sleeve 33 to rotate according to actual needs, the threaded sleeve 33 rotates by taking the screw rod 32 as the center of a circle under the action of external force, the threaded sleeve 33 is detached by the action of threads of the screw rod 32, staff grasps the screw rod 32 to move left and right, the screw rod 32 moves inside the through hole 31, the screw rod 32 drives the sliding block 35 to move inside the sliding groove 29 through the supporting column 34, the supporting column 34 drives the screw rod 38 and the balancing weight 40 to move to a proper position through the round tube 37, then grasps the balancing weight 40 to rotate, the balancing weight 40 moves to a proper position by taking the screw rod 38 as the center of a circle under the action of external force, the balancing weight 40 utilizes self gravity to press the building curtain wall glass paving device downwards, the balancing weight 40 adjusts the building curtain wall glass paving device and the adsorbed glass curtain wall to a vertical state, and secondly, the balancing weight 40 increases the gravity of the building curtain wall glass paving device, so that the building curtain wall glass paving device is more stable in the air, the air is suspended, the natural stability is reduced, and the external factors are increased;
S5, finally, the building curtain wall glass laying device and the glass curtain wall are suspended in the air and moved to a designated working place, a worker dismantles the glass curtain wall to assemble the glass curtain wall to a designated position, after the worker finishes using the glass curtain wall, the limiting ball 46 near the right side of the bottom is grabbed to move in the direction away from the mounting plate 1, the limiting ball 46 drives the pull rope 45 to move, the pull rope 45 drives the spring II 42 to stretch under the action of external force, the limiting ball 46 moves to the position of the hook hole 49 near the left side of the bottom, one of the hooks 48 is grabbed to move, the other hook 48 is grabbed to pass through the inner side of the hook hole 49 near the front, then the other hook 48 is grabbed to pass through the inner side of the corresponding hook hole 49 near the back, then the limiting ball 46 near the bottom is grabbed to perform the same operation, the two groups of hooks 48 near the bottom are respectively penetrated through the inner sides of the opposite hook holes 49, the two groups of the hooks 48 are placed in a crossed mode, the worker loosens the limiting ball 46, the spring II 42 in the stretched state is contracted under the action of own elastic force, the pull rope II 42 pulls the pull rope 45, the limiting ball 46 and the hooks 47 are pulled by the short rope 47, the hooks 45 and the short rope 48 are in the state, and the state of the U17 is kept at the position near the position, and the cross bar 10 is kept close to the position, and is kept to the position, and in a state, and the state and is kept straight, and at a position, and near 10, and at a position, and near position.
Further, in step S4, the method further includes the steps of:
S41, a worker can rotate the bolt 39 through an external spanner to detach the bolt 39, the fixation of the screw rod 38 is released, then the worker grabs the screw rod 38 to move to the front, the screw rod 38 is removed from the inner side of the round tube 37, when the weight balancing block 40 is not needed, the worker can detach the screw rod 38, when the weight of the weight balancing block 40 is insufficient for balancing, another weight balancing block or weights 40 can be arranged on the outer side of the screw rod 38, and the screw rod 38 is reinserted into the inner side of the round tube 37 to be arranged through the bolt 39.
Working principle: before the device is used, whether the device has the problem of influencing the use or not is checked, when a worker needs to use the device, the building curtain wall glass laying device is moved to the position of the glass curtain wall through the lifting lug 6 by an external lifting device, the air valve 8 is started to enable the sucking disc 3 to suck the glass curtain wall, the two U plates 17 are respectively moved to the top and the bottom of the glass curtain wall, the four corner protection boxes 24 are sleeved at the four corners of the glass curtain wall, the glass curtain wall is lifted by one section of height, the rotary balancing weight 40 is moved to a proper position, the glass curtain wall is in a vertical state, the glass curtain wall is hung to a designated installation position through the lifting device for installation, after the use is finished, the hanging hook 48 penetrates through the hook hole 49, the left hanging hook 48 is hooked at the right hook hole 49, the right hanging hook 48 is hooked at the left hook hole 49, and the U plates 17 are stored.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference signs in the claims shall not be construed as limiting the claim concerned.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202411298894.7A CN118881191A (en) | 2024-09-18 | 2024-09-18 | Building curtain wall glass laying device and operation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202411298894.7A CN118881191A (en) | 2024-09-18 | 2024-09-18 | Building curtain wall glass laying device and operation method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN118881191A true CN118881191A (en) | 2024-11-01 |
Family
ID=93221276
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202411298894.7A Pending CN118881191A (en) | 2024-09-18 | 2024-09-18 | Building curtain wall glass laying device and operation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN118881191A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119914021A (en) * | 2025-03-17 | 2025-05-02 | 四川美多宝新材料科技有限公司 | Environmentally friendly curtain wall and installation method |
-
2024
- 2024-09-18 CN CN202411298894.7A patent/CN118881191A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119914021A (en) * | 2025-03-17 | 2025-05-02 | 四川美多宝新材料科技有限公司 | Environmentally friendly curtain wall and installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN116281590A (en) | Anti-swing device of single-beam crane and use method | |
| CN118881191A (en) | Building curtain wall glass laying device and operation method thereof | |
| CN206466914U (en) | Modular hanging device applied to the roof and ground of buildings | |
| CN118083762B (en) | Overhead hoist is used in solar photovoltaic board installation | |
| CN116374905B (en) | A stable electric safety manned hanging basket and its use method | |
| CN213234227U (en) | High-altitude hanging basket device | |
| JPH0673892A (en) | Fitting method for outer facing plate material of building and device therefor | |
| CN107165399B (en) | A high-altitude building exterior wall repair device | |
| JP5888603B2 (en) | Method of moving net suspension to indoor space and apparatus for moving net suspension to indoor space | |
| CN216235816U (en) | Glass curtain wall installation device | |
| CN116119530A (en) | Adjustable support of crane | |
| CN217350563U (en) | Material lifting equipment | |
| CN210759347U (en) | Mounting equipment | |
| CN213015465U (en) | Dry-hanging special vehicle | |
| JP5673134B2 (en) | Lifting device, shaking prevention jig and suspension jig | |
| CN222390956U (en) | A device for preventing curtain wall hanging basket from falling | |
| CN217296995U (en) | Cigarette rack lifting device | |
| CN211444796U (en) | Glass curtain wall mounting crane | |
| CN223088879U (en) | An anti-tilt hanging basket device for building curtain wall construction | |
| CN214456671U (en) | a suspension system | |
| CN221070652U (en) | High altitude screen hoisting structure | |
| CN220907006U (en) | A curtain wall hoisting device for building construction | |
| CN209778131U (en) | Automatic hoisting device of steel structure movable doorsill double-leaf protective airtight door | |
| CN220300140U (en) | Tuber pipe hoist device | |
| CN220642482U (en) | Bridge overhauls special hoist and mount frame |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information | ||
| CB02 | Change of applicant information |
Country or region after: China Address after: No. 588 Tianbao Road, Huashan District, Ma'anshan City, Anhui Province, China 243000 Applicant after: CHINA MCC17 GROUP Co.,Ltd. Address before: 243000 No.88 Yushan East Road, Huashan District, Ma'anshan City, Anhui Province Applicant before: CHINA MCC17 GROUP Co.,Ltd. Country or region before: China |