CN118793256B - Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top - Google Patents

Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top Download PDF

Info

Publication number
CN118793256B
CN118793256B CN202411281254.5A CN202411281254A CN118793256B CN 118793256 B CN118793256 B CN 118793256B CN 202411281254 A CN202411281254 A CN 202411281254A CN 118793256 B CN118793256 B CN 118793256B
Authority
CN
China
Prior art keywords
lifting
frame
vertical
scaffold
attached lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202411281254.5A
Other languages
Chinese (zh)
Other versions
CN118793256A (en
Inventor
赵树森
鲁忠军
郭振海
杨华川
易国权
李长波
邓磊
陈朋
黄孝玲
廖超
黄栋
张会芬
田明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 3 Construction Engineering Co Ltd
Original Assignee
Beijing No 3 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 3 Construction Engineering Co Ltd filed Critical Beijing No 3 Construction Engineering Co Ltd
Priority to CN202411281254.5A priority Critical patent/CN118793256B/en
Publication of CN118793256A publication Critical patent/CN118793256A/en
Application granted granted Critical
Publication of CN118793256B publication Critical patent/CN118793256B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The application discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, which comprises an attached lifting scaffold and an operation protection platform which is installed at the top end of the attached lifting scaffold in a lifting manner, wherein the attached lifting scaffold comprises upright rods which are respectively arranged in an inner row and an outer row, the operation protection platform comprises a lifting frame which is respectively in sliding fit with the two rows of upright rods, a pavement plate paved on the lifting frame, an upright frame installed on the lifting frame and a steel mesh window installed between two adjacent straddling frames and positioned at the outer side of the upright frame, and the lifting frame is temporarily installed and fixed with the upright rods through bolts. The application is suitable for the condition that the climbing frame is used for protecting the building structure with the changeable layer height, the height of the climbing frame can be freely adjusted, the work of erecting and dismantling the climbing frame body in the climbing frame construction with more frequent layer height change is reduced, the safety risk of high-altitude erection or dismantling is avoided, the labor intensity of manpower is reduced, and the construction period is saved.

Description

Full-rigid attached lifting scaffold with lifting operation protection platform at top
Technical Field
The invention relates to the technical field of scaffolds, in particular to an all-rigid attached lifting scaffold with a lifting operation protection platform at the top.
Background
The all-steel attached lifting scaffold is a high-rise building construction scaffold which consists of a vertical main frame, a horizontal supporting frame, a frame body framework, an attached device lifting mechanism, a synchronous lifting control system and the like. The vertical main frame of the scaffold is of a planar frame structure and comprises guide rails, outer vertical rods, a main frame rigid support, a bottom cross bar and the like, the horizontal supporting truss comprises web members, frame vertical rods, scaffold plates, rigid supports, bottom cross bars and the like, the vertical main frame is arranged at the bottom of the frame, and the frame framework comprises frame vertical rods, scaffold plates, rigid supports, protective nets and the like. The protection net is connected with the vertical rod outside the frame body through a connecting piece. The components are connected through bolts.
The lifting mechanism of the scaffold consists of an electric hoist, a lifting support, an upper lifting block, a lower lifting block, an auxiliary upright rod and the like. The electric hoist is hung at the upper lifting block between the vertical main frame and the auxiliary vertical rod, and the steel wire rope is connected with the wall-attached lifting support through the guide pulley of the lower lifting block. The wall attaching lifting support and the wall attaching support are fixed on a building structure by double screws.
The swing block type anti-falling device of the scaffold consists of an anti-falling swing block, a trigger block, a reset spring and a middle 30mm anti-falling pin shaft. When the frame body rises, the trigger block swings under the drive of the guide rail anti-falling toothed plate and resets under the action of the spring, when the frame body descends, the trigger block drives the anti-falling swing block to swing, the anti-falling swing block resets under the action of dead weight and the reset spring, and when the frame body falls, the reset speed of the anti-falling swing block is lower than the falling speed of the frame body, and the anti-falling toothed plate is propped up to realize the anti-falling function.
The height of the frame body is designed according to the height of a building layer, and the protection requirement of 4-5 layers can be met. However, along with the diversification of the functions of high-rise buildings, the main structure layer height is frequently changed, the problem of insufficient protection height of the frame body possibly occurs when the local layer height is higher than the design standard layer height, the frame body needs to be erected or dismantled at high altitude when the layer height is increased or reduced, the safety risk is high, the working strength is high, and the construction period is longer.
Disclosure of Invention
The invention provides an all-rigid attached lifting scaffold with a lifting operation protection platform at the top.
In order to solve the technical problems, the invention adopts the following technical scheme:
The invention relates to an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, which is characterized by comprising an attached lifting scaffold and an operation protection platform which is installed at the top end of the attached lifting scaffold in a lifting manner;
the attached lifting scaffold comprises upright rods respectively positioned in an inner row and an outer row;
The operation protection platform comprises a lifting frame, a pavement plate, a vertical frame and a steel mesh window, wherein the lifting frame is respectively in sliding fit with two rows of vertical rods, the pavement plate is paved on the lifting frame, the vertical frame is installed on the lifting frame, the steel mesh window is installed between two adjacent vertical frames and is positioned on the outer side of the vertical frame, and the lifting frame is temporarily installed and fixed with the vertical rods through bolts.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, which comprises a chute, a bracket, guide wheels, a winch, lifting steel wire ropes and a speed reducing motor, wherein the chute is fixedly arranged at one side opposite to the upper parts of two rows of upright posts, and the bracket is respectively arranged at two sides of the upright posts and connected with the upright posts through bolts;
the two brackets are fixedly provided with connecting plates at one side opposite to each other, the connecting plates are positioned at the outer sides of the sliding grooves, the guide wheels are arranged between the two connecting plates, and the guide wheels are positioned in the sliding grooves;
The two brackets are arranged on one side which is away from each other, a winch is rotatably arranged below the brackets between the two lugs, two lifting steel wire ropes are wound on the winch, one lifting steel wire rope is wound on the winch in the forward direction, the other lifting steel wire rope is wound on the winch in the reverse direction, and the end part of the lifting steel wire rope extending out of the winch bypasses the guide wheel and is connected with the upper end of the chute;
The gear motor is arranged on the bracket and is in transmission connection with the winch.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, and further relates to an all-rigid attached lifting scaffold with a lifting operation protection platform.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, further, connecting pieces are respectively and fixedly arranged on the inner side and the outer side of a pavement plate on the top surface of a bracket, a vertical frame is arranged between the inner connecting piece and the outer connecting piece which are opposite, and the vertical frame is fixedly connected with the connecting pieces.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, and further relates to a door-shaped frame structure of a vertical frame.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, and further, sealing strips are arranged between vertical frames positioned at two sides of a bracket, and are connected with the vertical frames through bolts.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, further, a guide rail is arranged on one side of a vertical rod positioned in the inner row and deviating from an installation chute, guide grooves are respectively arranged on two opposite sides of the guide rail along the vertical direction, an anti-tilting guide claw is arranged on the vertical frame, a guide wheel is arranged on the anti-tilting guide claw, and the guide wheel is arranged in the guide groove in a rolling way.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, and further, connecting cross bars are respectively connected between two adjacent vertical rods in an inner row of a vertical frame.
The invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, and further, an overhanging part of a pavement plate is provided with an inclined strut, one end of the inclined strut is connected with the pavement plate, the other end of the inclined strut is connected with a connecting plate, and a transverse strut is connected between the inclined struts positioned at two sides of the pavement plate at the lower end of the inclined strut.
The full-rigid attached lifting scaffold with the lifting operation protection platform at the top is characterized in that an upper limit stop and a lower limit stop are arranged on upright posts positioned in an inner row, a limiter is fixedly arranged on the bracket, and the limiter is positioned between the upper limit stop and the lower limit stop and can be in interference fit with the upper limit stop or the lower limit stop when sliding to corresponding positions.
Compared with the prior art, the invention has the following beneficial effects:
The lifting operation protection platform is designed at the top of the attached lifting scaffold, is suitable for the conditions that building structures with changeable layer heights such as super high floors, apartments and refuge layers are protected by using the climbing frame, and the height of the lifting operation protection platform can be freely adjusted, so that the work of setting up and dismantling a climbing frame body in climbing frame construction with more frequent layer height changes is reduced, the safety risk of setting up or dismantling a high altitude is avoided, the labor intensity of workers is reduced, and the construction period is shortened.
The invention is further described below with reference to the accompanying drawings.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a side view of the mounting of the operation protection platform of the present invention;
FIG. 3 is a schematic diagram of the cooperation structure of the attached lifting scaffold and the operation protection platform;
FIG. 4 is a schematic view of a chute mounting structure according to the present invention;
FIG. 5 is a schematic view of a bracket mounting structure of the present invention;
FIG. 6 is a schematic view of the mounting structure of the deck of the present invention;
FIG. 7 is a schematic view of the mounting structure of the vertical frame of the present invention;
FIG. 8 is a schematic view of a mounting structure for a sealing strip according to the present invention;
FIG. 9 is a schematic view of the limit stop mounting structure of the present invention.
Reference numerals:
1. The lifting scaffold comprises an attached lifting scaffold, 1.1, a vertical rod, 1.2, a sliding chute, 1.3, a guide rail, 1.4, a guide groove, 1.5, a screw rod, 2, an operation protection platform, 2.1, a bracket, 2.2, a bolt, 2.3, a connecting plate, 2.4, a guide wheel, 2.5, an ear plate, 2.6, a winch, 2.7, a lifting steel wire rope, 3, a pavement plate, 4, an installation frame, 5, a gear motor, 6, a connecting piece, 7, a vertical frame, 8, a steel mesh window, 9, a sealing strip, 10, an anti-tilting guide claw, 10.1, a mounting vertical plate, 10.2, a mounting vertical plate, 10.3, a guide wheel, 11, a connecting cross bar, 12, a diagonal bracing, 13, a transverse bracing, 14, an upper limit stop, 15, a lower limit stop and 16, and a limiter.
Detailed Description
As shown in fig. 1-9, the invention discloses an all-rigid attached lifting scaffold with a lifting operation protection platform at the top, which comprises an attached lifting scaffold 1 and an operation protection platform 2 which is installed at the top end of the attached lifting scaffold 1 in a lifting manner, wherein the attached lifting scaffold 1 comprises two rows of upright posts 1.1.
The upper parts of the two rows of vertical rods 1.1 are respectively fixedly provided with a chute 1.2 at opposite sides, one side, away from the installation chute 1.2, of the vertical rods 1.1 positioned at the inner side is provided with a guide rail 1.3, two sides of the guide rail 1.3 are respectively provided with a guide groove 1.4 which is vertically arranged, the vertical rods 1.1 of the installation guide rail 1.3 are welded and fixed with the chute 1.2, the vertical rods 1.1 of the non-guide rail 1.3 are connected and fixed with the chute 1.2 through a screw rod 1.5, the chute 1.2 in the embodiment of the application is a U-shaped groove made of a steel plate by bending, the U-shaped groove is welded with a screw rod 1.5, and the screw rod 1.5 penetrates through the vertical rods 1.1 and is locked through nuts.
The operation protection platform 2 comprises a lifting frame, the lifting frame comprises brackets 2.1 which are respectively arranged on two sides of a vertical rod 1.1, the brackets 2.1 are fixedly connected with the vertical rod 1.1 through bolts 2.2, connecting plates 2.3 are respectively fixedly arranged on one sides of the two brackets 2.1 opposite to each other, the connecting plates 2.3 are positioned on the outer sides of sliding grooves 1.2, guide wheels 2.4 are arranged between the two connecting plates 2.3, and the guide wheels 2.4 are positioned in the sliding grooves 1.2.
The otic placode 2.5 is installed respectively to one side that two brackets 2.1 deviate from, rotates in bracket 2.1 below between two otic placodes 2.5 and installs capstan winch 2.6, twines two lift wire rope 2.7 on the capstan winch 2.6, and one lift wire rope 2.7 is positive with capstan winch 2.6 and is twined, and another lift wire rope 2.7 is reverse with capstan winch 2.6, through rotating capstan winch 2.6, can control the receive and releases of two lift wire ropes 2.7 simultaneously, and the tip of lift wire rope 2.7 is walked around leading wheel 2.4 and is connected fixedly with the upper end of spout 1.2.
The pavement plate 3 has been laid to the top surface of bracket 2.1, and mounting bracket 4 is installed in one of them bracket 2.1 outside, is fixed with gear motor 5 on the mounting bracket 4, and gear motor 5 is connected with capstan winch 2.6 transmission, drives capstan winch 2.6 through gear motor 5 and rotates, and capstan winch 2.6 control lifting wire rope 2.7 drives the crane and goes up and down.
The top surface of the bracket 2.1 is fixedly provided with connecting pieces 6 at the inner side and the outer side of the pavement plate 3 respectively, a vertical frame 7 is arranged between the two connecting pieces 6 which are opposite to each other inside and outside, the vertical frame 7 is connected with the connecting pieces 6 through bolts, the connecting pieces 6 are made of angle steel, the vertical frame 7 is of a door-shaped frame structure, a steel mesh window 8 is arranged between two adjacent straddling frames 7, the steel mesh window 8 is connected with the vertical frame 7 through bolts, sealing strips 9 are arranged between the vertical frames 7 positioned at the two sides of the bracket 2.1, and the sealing strips 9 are fixed on the vertical frame 7 together with the steel mesh window 8 through bolts.
The anti-tilting guide claw 10 is arranged on the vertical frame 7, the anti-tilting guide claw 10 comprises an installation vertical plate 10.1, the installation vertical plate 10.1 is arranged on the vertical frame 7 through bolts, an installation vertical plate 10.2 is fixed on the installation vertical plate 10.1, a guide wheel 10.3 is arranged on one side, facing the guide rail 1.3, of the installation vertical plate 10.2, and the guide wheel 10.3 is arranged in a vertical guide groove 1.4 on the side face of the guide rail 1.3 in a rolling mode.
Connecting cross bars 11 are respectively connected between two adjacent vertical rod pieces on the inner side of the vertical frame 7 so as to strengthen the rigidity of the inner row of the vertical frame 7 and can also be used as a protective measure of the lifting frame.
The cantilever part of the pavement plate 3 is provided with inclined struts 12, one end of each inclined strut 12 is connected with the pavement plate 3, the other end of each inclined strut 12 is connected with the connecting plate 2.3, and transverse struts 13 are connected between the inclined struts 12 on two sides of the pavement plate 3 at the lower ends of the inclined struts to strengthen the strength of the cantilever ends.
An upper limit stop 14 for controlling the lifting frame to rise to the upper limit and a lower limit stop 15 for controlling the lifting frame to fall to the lower limit are arranged on the upright rods 1.1 positioned in the inner row, a limiter 16 is fixedly arranged on the bracket 2.1, and the limiter 16 is positioned between the upper limit stop 14 and the lower limit stop 15.
The lifting operation protection platform 2 is designed at the top of the attached lifting scaffold 1, so that the lifting operation protection platform is suitable for the conditions that building structures with changeable layer heights such as super high floors, apartments and refuge layers are protected by using climbing frames, the height of the lifting operation protection platform can be freely adjusted through the lifting operation protection platform 2, the work of erecting and dismantling a climbing frame body in climbing frame construction with more frequent layer height changes is reduced, the safety risk of high-altitude erection or dismantling is avoided, the labor intensity of workers is reduced, and the construction period is shortened.
The above examples are only illustrative of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art to the technical solution of the present invention should fall within the scope of protection defined by the claims of the present invention without departing from the spirit of the present invention.

Claims (9)

1.顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:包括附着式升降脚手架(1)以及可升降安装在附着式升降脚手架(1)顶端的操作防护平台(2);1. A fully rigid attached lifting scaffold with a liftable operating protection platform on the top, characterized in that it comprises an attached lifting scaffold (1) and an operating protection platform (2) liftably mounted on the top of the attached lifting scaffold (1); 所述附着式升降脚手架(1)包括分别位于内排和外排的立杆(1.1);The attached lifting scaffold (1) comprises vertical poles (1.1) respectively located in an inner row and an outer row; 操作防护平台(2)包括分别与两排立杆(1.1)滑动配合的升降架、铺设在升降架上的走道板(3)、安装在升降架上的立框架(7)以及安装在相邻两跨立框架(7)之间且位于立框架(7)外侧的钢网窗(8),所述升降架通过插销(2.2)与立杆(1.1)临时安装固定;The operating protection platform (2) comprises a lifting frame respectively slidably matched with two rows of vertical poles (1.1), a walkway plate (3) laid on the lifting frame, a vertical frame (7) installed on the lifting frame, and a steel mesh window (8) installed between two adjacent span vertical frames (7) and located on the outside of the vertical frame (7), wherein the lifting frame is temporarily installed and fixed to the vertical poles (1.1) by means of a latch (2.2); 所述升降架包括滑槽(1.2)、托架(2.1)、导向轮(2.4)、绞盘(2.6)、升降钢丝绳(2.7)以及减速电机(5),所述滑槽(1.2)固定安装在两排立杆(1.1)上部相对的一侧,所述托架(2.1)分别设置在立杆(1.1)的两侧并通过插销(2.2)与立杆(1.1)连接;The lifting frame comprises a slide (1.2), a bracket (2.1), a guide wheel (2.4), a winch (2.6), a lifting wire rope (2.7) and a reduction motor (5); the slide (1.2) is fixedly mounted on one side opposite to the upper part of two rows of vertical poles (1.1); the bracket (2.1) is respectively arranged on both sides of the vertical poles (1.1) and connected to the vertical poles (1.1) through a latch (2.2); 两托架(2.1)相对的一侧分别固设有连接板(2.3),所述连接板(2.3)位于滑槽(1.2)的外侧,所述导向轮(2.4)安装在两块连接板(2.3)之间且导向轮(2.4)位于滑槽(1.2)内;A connecting plate (2.3) is fixedly provided on opposite sides of the two brackets (2.1), the connecting plate (2.3) is located outside the slide groove (1.2), the guide wheel (2.4) is installed between the two connecting plates (2.3) and the guide wheel (2.4) is located inside the slide groove (1.2); 两托架(2.1)相背离的一侧安装有耳板(2.5),两耳板(2.5)之间于托架(2.1)下方转动安装有绞盘(2.6),绞盘(2.6)上缠绕两根升降钢丝绳(2.7),其中一根升降钢丝绳(2.7)与绞盘(2.6)正向缠绕,另一根升降钢丝绳(2.7)与绞盘(2.6)反向缠绕,所述升降钢丝绳(2.7)伸出绞盘(2.6)的端部绕过导向轮(2.4)与滑槽(1.2)上端连接;An ear plate (2.5) is installed on the opposite side of the two brackets (2.1), and a winch (2.6) is rotatably installed between the two ear plates (2.5) below the bracket (2.1). Two lifting wire ropes (2.7) are wound around the winch (2.6), one of which is wound around the winch (2.6) in a positive direction, and the other is wound around the winch (2.6) in a reverse direction. The end of the lifting wire rope (2.7) extending out of the winch (2.6) passes around the guide wheel (2.4) and is connected to the upper end of the slide groove (1.2); 减速电机(5)安装在托架(2.1)上并与绞盘(2.6)传动连接。The reduction motor (5) is mounted on the bracket (2.1) and is drivingly connected to the winch (2.6). 2.根据权利要求1所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:其中一根托架(2.1)外侧安装有安装架(4),安装架(4)上固定安装有减速电机(5)。2. According to claim 1, the fully rigid attached lifting scaffolding with a lifting and lowering protective platform on the top is characterized in that: a mounting frame (4) is installed on the outside of one of the brackets (2.1), and a reduction motor (5) is fixedly installed on the mounting frame (4). 3.根据权利要求1所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:托架(2.1)的顶面于走道板(3)的内外两侧分别固设有连接件(6),内外相对的两根连接件(6)之间设有立框架(7),立框架(7)与连接件(6)连接固定。3. According to claim 1, the fully rigid attached lifting scaffolding with a lifting and lowering protective platform on the top is characterized in that: the top surface of the bracket (2.1) is fixedly provided with connecting pieces (6) on the inner and outer sides of the walkway board (3), and a vertical frame (7) is provided between the two connecting pieces (6) facing each other, and the vertical frame (7) is connected and fixed to the connecting pieces (6). 4.根据权利要求3所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:所述立框架(7)为门形框架结构。4. The fully rigid attached lifting scaffolding with a lifting and lowering protective platform on the top as described in claim 3 is characterized in that: the vertical frame (7) is a door-shaped frame structure. 5.根据权利要求1所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:位于托架(2.1)两侧的立框架(7)之间设有封口条(9),所述封口条(9)通过螺栓与立框架(7)连接。5. The fully rigid attached lifting scaffolding with a lifting and lowering protective platform on the top according to claim 1 is characterized in that a sealing strip (9) is provided between the vertical frames (7) located on both sides of the bracket (2.1), and the sealing strip (9) is connected to the vertical frames (7) by bolts. 6.根据权利要求1所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:位于所述内排的立杆(1.1)背离安装滑槽(1.2)的一侧安装有导轨(1.3),导轨(1.3)相对的两侧沿竖向分别设有导槽(1.4),所述立框架(7)上安装有防倾导向爪(10),所述防倾导向爪(10)上设有导轮(10.3),所述导轮(10.3)滚动设置在导槽(1.4)内。6. The fully rigid attached lifting scaffolding with a lifting and lowering protective platform on the top according to claim 1 is characterized in that: a guide rail (1.3) is installed on the side of the vertical pole (1.1) located in the inner row away from the installation slide groove (1.2), and guide grooves (1.4) are respectively provided on the opposite sides of the guide rail (1.3) in the vertical direction; an anti-tilt guide claw (10) is installed on the vertical frame (7), and a guide wheel (10.3) is provided on the anti-tilt guide claw (10), and the guide wheel (10.3) is rollingly set in the guide groove (1.4). 7.根据权利要求1所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:立框架(7)内排相邻两跨竖向杆件之间分别连接有连接横杆(11)。7. The fully rigid attached lifting scaffolding with a lifting and lowering protective platform on the top according to claim 1 is characterized in that connecting cross bars (11) are respectively connected between two adjacent vertical rods in the inner row of the vertical frame (7). 8.根据权利要求1所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:所述走道板(3)的悬挑部位设有斜撑(12),所述斜撑(12)一端与走道板(3)连接,另一端与连接板(2.3)连接,位于所述走道板(3)两侧的斜撑(12)之间于其下端连接有横撑(13)。8. According to claim 1, the fully rigid attached lifting scaffold with a lifting and lowering protective platform on the top is characterized in that: the cantilevered portion of the walkway board (3) is provided with an inclined brace (12), one end of the inclined brace (12) is connected to the walkway board (3), and the other end is connected to the connecting plate (2.3), and a horizontal brace (13) is connected at the lower end between the inclined braces (12) on both sides of the walkway board (3). 9.根据权利要求1所述的顶部有可升降操作防护平台的全刚型附着式升降脚手架,其特征在于:位于内排的立杆(1.1)上安装有上限位挡块(14)和下限位挡块(15),所述托架(2.1)上固设有限位器(16),所述限位器(16)位于上限位挡块(14)和下限位挡块(15)之间且能够在滑动至相应位置处与上限位挡块(14)或下限位挡块(15)发生抵触配合。9. The fully rigid attached lifting scaffolding with a lifting and lowering protective platform on the top according to claim 1 is characterized in that an upper limit stopper (14) and a lower limit stopper (15) are installed on the inner row of vertical poles (1.1), and a limiter (16) is fixed on the bracket (2.1), and the limiter (16) is located between the upper limit stopper (14) and the lower limit stopper (15) and can be slid to the corresponding position to interfere with the upper limit stopper (14) or the lower limit stopper (15).
CN202411281254.5A 2024-09-13 2024-09-13 Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top Active CN118793256B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411281254.5A CN118793256B (en) 2024-09-13 2024-09-13 Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411281254.5A CN118793256B (en) 2024-09-13 2024-09-13 Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top

Publications (2)

Publication Number Publication Date
CN118793256A CN118793256A (en) 2024-10-18
CN118793256B true CN118793256B (en) 2024-12-31

Family

ID=93023773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411281254.5A Active CN118793256B (en) 2024-09-13 2024-09-13 Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top

Country Status (1)

Country Link
CN (1) CN118793256B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204001656U (en) * 2014-08-25 2014-12-10 中国水利水电第十工程局有限公司 Attachment type raise scaffold
CN214942155U (en) * 2021-04-22 2021-11-30 齐河承泽照明金属涂装有限公司 Dish knot formula scaffold frame with moving platform
CN115045493A (en) * 2022-06-21 2022-09-13 江苏日凯建筑安装工程有限公司 An all-steel attached lifting scaffold

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2357068Y (en) * 1998-04-23 2000-01-05 河南省第四建筑工程公司 Lift-type external scaffold
JP4108076B2 (en) * 2004-11-19 2008-06-25 株式会社ヨシヒロ Construction method and dismantling method of scaffold for high-rise building
CN107476561A (en) * 2017-07-25 2017-12-15 北京建工建筑产业化投资建设发展有限公司 A kind of attachment type raise scaffold and its construction
CN214575548U (en) * 2021-02-03 2021-11-02 四川特辰明兴建筑机械安装工程有限公司 All-steel attached lifting scaffold
CN214423952U (en) * 2021-02-04 2021-10-19 湖北华震新材料有限公司 Structure and integrative attached lift protection platform of fitment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204001656U (en) * 2014-08-25 2014-12-10 中国水利水电第十工程局有限公司 Attachment type raise scaffold
CN214942155U (en) * 2021-04-22 2021-11-30 齐河承泽照明金属涂装有限公司 Dish knot formula scaffold frame with moving platform
CN115045493A (en) * 2022-06-21 2022-09-13 江苏日凯建筑安装工程有限公司 An all-steel attached lifting scaffold

Also Published As

Publication number Publication date
CN118793256A (en) 2024-10-18

Similar Documents

Publication Publication Date Title
CN215291318U (en) Mounting structure of attached lifting scaffold
CN212176541U (en) Light-duty high-efficient construction that can have enough to meet need makes building equipment
CN114753611A (en) Curtain wall construction platform
CN108487624A (en) Attachment type raise scaffold
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
JP3179045B2 (en) Wall construction method with work scaffold
CN212249184U (en) Electric creeping formwork device for building construction
CN118793256B (en) Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top
CN223061985U (en) Liftable operation protection platform
CN215167838U (en) Movable overhung suspension type operating platform
CN223061988U (en) Lifting device for be used for full rigid type inserted lift scaffold
CN210289078U (en) Light self-climbing type shielding frame system
CN219327296U (en) Attached lifting scaffold mounting structure
CN220667006U (en) A construction device for the simultaneous installation of steel structure elevator shafts and elevator equipment
CN219585686U (en) Safe telescopic channel for suspended tower crane driver
CN219060835U (en) Self-elevating lighting well operation platform device
CN117090408A (en) Attached lifting protection shed and installation and lifting method thereof
CN217924788U (en) High overhead position climbing frame climbing fixing auxiliary device
CN223061994U (en) Scaffold top protector
CN210767838U (en) Large-section inclined column template construction structure for constructional engineering
CN223317089U (en) A vertical self-climbing formwork and lifting structure support device for a bridge pier
CN114541728A (en) Lightweight and modular self-climbing external frame system for assembled structure
CN215760320U (en) Assembled facade integrated form lift platform structure outward
CN224105437U (en) A tower crane operator's access device that can be raised synchronously with the climbing scaffold.
CN111910905A (en) A vertical main frame of a lifting operation safety protection platform for high-rise building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant