CN118790864A - A shoulder beam for hoisting a main beam component and a main beam component hoisting method - Google Patents
A shoulder beam for hoisting a main beam component and a main beam component hoisting method Download PDFInfo
- Publication number
- CN118790864A CN118790864A CN202411268573.2A CN202411268573A CN118790864A CN 118790864 A CN118790864 A CN 118790864A CN 202411268573 A CN202411268573 A CN 202411268573A CN 118790864 A CN118790864 A CN 118790864A
- Authority
- CN
- China
- Prior art keywords
- main beam
- hoisting
- support
- component
- shoulder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000005192 partition Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 abstract description 4
- 238000009434 installation Methods 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000006243 chemical reaction Methods 0.000 description 7
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 6
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 238000003466 welding Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000014509 gene expression Effects 0.000 description 2
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 210000005069 ears Anatomy 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C21/00—Cable cranes, i.e. comprising hoisting devices running on aerial cable-ways
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及桥梁工程技术领域,提供了一种用于吊装主梁构件的扁担梁及主梁构件吊装方法,其中用于吊装主梁构件的扁担梁包含横梁;旋转关节,旋转关节包含第一连接部和第二连接部,第一连接部能相对第二连接部旋转,第一连接部连接于横梁的中部,第二连接部用于和主梁构件连接;第一支撑,第一支撑连接于横梁的其中一端,第一支撑远离横梁的一端用于和主梁构件抵接;吊装结构,吊装结构连接于横梁的另一端,吊装结构用于和吊机连接。本发明能克服现有技术中,扁担梁为大型构件,拆装过程复杂困难,且容易与桥梁的中部结构发生干涉,导致主梁构件吊装效率低下的不足。
The present invention relates to the technical field of bridge engineering, and provides a shoulder pole beam for hoisting a main beam component and a main beam component hoisting method, wherein the shoulder pole beam for hoisting the main beam component comprises a cross beam; a rotating joint, the rotating joint comprises a first connecting part and a second connecting part, the first connecting part can rotate relative to the second connecting part, the first connecting part is connected to the middle part of the cross beam, and the second connecting part is used to connect with the main beam component; a first support, the first support is connected to one end of the cross beam, and the end of the first support away from the cross beam is used to abut the main beam component; a hoisting structure, the hoisting structure is connected to the other end of the cross beam, and the hoisting structure is used to connect with a crane. The present invention can overcome the shortcomings of the prior art that the shoulder pole beam is a large component, the disassembly and assembly process is complicated and difficult, and it is easy to interfere with the middle structure of the bridge, resulting in low hoisting efficiency of the main beam component.
Description
技术领域Technical Field
本发明涉及桥梁工程技术领域,特别涉及一种用于吊装主梁构件的扁担梁及主梁构件吊装方法。The invention relates to the technical field of bridge engineering, and in particular to a shoulder beam for hoisting a main beam component and a main beam component hoisting method.
背景技术Background Art
现有桥梁的主梁构件在进行安装时,往往使用缆索吊机对主梁构件进行吊装;缆索吊机根据其主索能否沿横桥向移动可分为可横移式的缆索吊机和固定式的缆索吊机;可横移式缆索吊机吊装无遮挡桥面钢梁时,可通过主索横移使得起重跑车位于主梁构件吊点正上方处,无需通过扁担梁装置直接进行起吊安装;但当吊装遮挡主梁构件时,起重跑车与主梁构件吊点之间因存在遮挡,无法直接起吊,需通过设置扁担梁装置转换起吊位置,即可起吊安装;固定式缆索吊机因无法横移,主梁构件吊装均需采用扁担梁装置转换,后起吊安装;桥面钢梁吊装均需通过缆索吊机左右幅起重跑车四钩同步起吊。When installing the main beam components of existing bridges, cable cranes are often used to lift the main beam components. Cable cranes can be divided into transversely movable cable cranes and fixed cable cranes according to whether their main cables can move along the transverse direction of the bridge. When the transversely movable cable crane lifts the steel beams on the bridge deck without obstruction, the main cables can be moved transversely so that the lifting carriage is located directly above the lifting point of the main beam component, and there is no need to directly lift and install it through a shoulder pole beam device. However, when lifting and obstructing the main beam component, direct lifting is impossible due to the obstruction between the lifting carriage and the lifting point of the main beam component, and the lifting position needs to be changed by setting a shoulder pole beam device for lifting and installation. Fixed cable cranes cannot move transversely, so the lifting of the main beam components needs to be converted by a shoulder pole beam device, and then lifted and installed. The lifting of the bridge deck steel beams needs to be lifted synchronously by the four hooks of the left and right lifting carriages of the cable crane.
由于扁担梁是为了转换起重跑车的起吊位置,因此扁担梁的形状和尺寸需要针对主梁构件的重量和形状、以及吊机的规格和左右移动幅度进行定制,通用性较差;且现有技术中的扁担梁往往是沿横桥向相对主梁构件通长设置的,即扁担梁沿横桥向横跨整个主梁构件,扁担梁沿横桥向的尺寸大于或等于主梁构件沿横桥向的尺寸,在作业空间有限,尤其是安装两边的跨中主梁构件时,其运输和拆装过程均极其繁杂,安装工期很长;且沿横桥向通长设置的扁担梁容易与桥梁或主梁构件的中部结构发生干涉,例如安装中承式拱桥跨中主梁构件时,吊杆会对扁担梁造成阻挡,需进行二次拆卸,从而会导致主梁构件的吊装效率进一步降低。Since the shoulder pole beam is used to change the lifting position of the lifting carriage, the shape and size of the shoulder pole beam need to be customized according to the weight and shape of the main beam component, as well as the specifications of the crane and the left and right movement range, and its versatility is poor; and the shoulder pole beam in the prior art is often arranged along the transverse bridge direction relative to the main beam component, that is, the shoulder pole beam spans the entire main beam component along the transverse bridge direction, and the size of the shoulder pole beam along the transverse bridge direction is greater than or equal to the size of the main beam component along the transverse bridge direction. When the working space is limited, especially when installing the mid-span main beam components on both sides, its transportation and disassembly process are extremely complicated and the installation period is very long; and the shoulder pole beam arranged along the transverse bridge direction is easy to interfere with the middle structure of the bridge or the main beam component. For example, when installing the mid-span main beam component of a mid-span arch bridge, the hanger will block the shoulder pole beam, requiring secondary disassembly, which will further reduce the lifting efficiency of the main beam component.
发明内容Summary of the invention
本发明的目的在于克服现有技术中,扁担梁为大型构件,拆装过程复杂困难,且容易与桥梁的中部结构发生干涉,导致主梁构件吊装效率低下的不足,提供一种用于吊装主梁构件的扁担梁及主梁构件吊装方法。The purpose of the present invention is to overcome the shortcomings of the prior art that the shoulder pole beam is a large component, the disassembly and assembly process is complicated and difficult, and it is easy to interfere with the middle structure of the bridge, resulting in low efficiency in lifting the main beam component, and to provide a shoulder pole beam for lifting the main beam component and a main beam component lifting method.
在第一方面,本发明提供一种用于吊装主梁构件的扁担梁,包含:In a first aspect, the present invention provides a shoulder beam for hoisting a main beam component, comprising:
横梁;beam;
旋转关节,旋转关节包含第一连接部和第二连接部,第一连接部能相对第二连接部旋转,第一连接部连接于横梁的中部,第二连接部用于和主梁构件连接;A rotary joint, the rotary joint comprises a first connection part and a second connection part, the first connection part can rotate relative to the second connection part, the first connection part is connected to the middle part of the cross beam, and the second connection part is used to connect to the main beam component;
第一支撑,第一支撑连接于横梁的其中一端,第一支撑远离横梁的一端用于和主梁构件抵接;A first support, the first support is connected to one end of the cross beam, and an end of the first support away from the cross beam is used to abut against the main beam component;
吊装结构,吊装结构连接于横梁的另一端,吊装结构用于和吊机连接。The hoisting structure is connected to the other end of the beam and is used to connect with the crane.
旋转关节的可动角度包含但不限于小于360°或大于等于360°的情况,只要能防止在第一连接部和第二连接部之间发生弯矩传递即可;旋转关节连接于横梁的中部,既可以是正好设置于横梁的中点处,也可以偏移横梁的中点。The movable angle of the rotary joint includes but is not limited to less than 360° or greater than or equal to 360°, as long as the bending moment transfer between the first connection part and the second connection part can be prevented; the rotary joint is connected to the middle part of the beam, and can be set exactly at the midpoint of the beam or offset from the midpoint of the beam.
第一支撑的具体形式包含但不限于块状、座状、柱状结构。The specific form of the first support includes but is not limited to a block-shaped, seat-shaped, or column-shaped structure.
吊装结构的具体形式包含但不限于吊耳、吊环、吊钩。The specific forms of the lifting structure include but are not limited to lifting ears, lifting rings, and lifting hooks.
当需要使用本方案的用于吊装主梁构件的扁担梁对主梁构件进行吊装时,将第二连接部连接于主梁构件上的预定位置(吊点),则横梁、旋转关节、第一支撑和吊装结构能在吊机与主梁构件之间形成杠杆;通过吊装结构施加向上的起吊力时,由于横梁中部设置有旋转关节,横梁具有第一支撑的一端会下降并与主梁构件抵接,从而也对横梁产生向上的支反力以平衡起吊力的弯矩;因此为了使横梁受力平衡,在旋转关节处会产生向下的支反力,其值等于起吊力与支撑的支反力之和,进而会对主梁构件产生等值的向上的反作用力,使得主梁构件能够向上升起。When it is necessary to use the shoulder pole beam of the present solution to lift the main beam component, the second connecting part is connected to the predetermined position (lifting point) on the main beam component, so that the crossbeam, the rotating joint, the first support and the lifting structure can form a lever between the crane and the main beam component; when the upward lifting force is applied by the lifting structure, since the middle part of the crossbeam is provided with a rotating joint, the end of the crossbeam with the first support will drop and abut against the main beam component, thereby also generating an upward support reaction force on the crossbeam to balance the bending moment of the lifting force; therefore, in order to balance the force on the crossbeam, a downward support reaction force will be generated at the rotating joint, and its value is equal to the sum of the lifting force and the support reaction force of the support, thereby generating an equal upward reaction force on the main beam component, so that the main beam component can rise upward.
由上可见,本方案通过杠杆原理实现了扁担梁在单个吊点处的受力平衡,而无需像现有方案一样,要使扁担梁沿横桥向通长设置以连接主梁构件两侧的吊点;在吊装主梁构件时,可以将多个本方案的用于吊装主梁构件的扁担梁分散布置在主梁构件两侧的各个吊点处,从而能够减少扁担梁的尺寸、避免扁担梁与主梁构件中部结构或桥梁中部结构发生干涉,进而能够减少扁担梁的尺寸和造价、提高扁担梁的运输效率、扁担梁的安装效率和主梁构件的吊装效率。As can be seen from the above, this scheme realizes the force balance of the shoulder pole beam at a single hanging point through the lever principle, without the need to set the shoulder pole beam along the transverse length of the bridge to connect the hanging points on both sides of the main beam component as in the existing scheme; when lifting the main beam component, multiple shoulder pole beams of this scheme for lifting the main beam component can be dispersedly arranged at various hanging points on both sides of the main beam component, thereby reducing the size of the shoulder pole beam and avoiding interference between the shoulder pole beam and the middle structure of the main beam component or the middle structure of the bridge, thereby reducing the size and cost of the shoulder pole beam and improving the transportation efficiency of the shoulder pole beam, the installation efficiency of the shoulder pole beam and the lifting efficiency of the main beam component.
优选地,横梁上还连接有第二支撑,第二支撑位于旋转关节背离第一支撑的一侧,第二支撑远离横梁的一端用于和主梁构件抵接。Preferably, a second support is also connected to the crossbeam, and the second support is located on a side of the rotary joint away from the first support, and an end of the second support away from the crossbeam is used for abutting against the main beam component.
第二支撑的具体形式包含但不限于块状、座状、柱状结构。The specific form of the second support includes but is not limited to a block-shaped, seat-shaped, or column-shaped structure.
在现场或车间对第一支撑进行组装时,本方案能利用第二支撑为横梁提供临时支撑,从而便于对齐第一支撑和横梁;而在现场或车间对旋转关节进行拆装时,本方案同样利用第一支撑和第二支撑为横梁提供支撑,使旋转关节处于不受力的状态,从而能更方便地对旋转关节中的销轴进行拆装。When the first support is assembled on site or in a workshop, the present solution can use the second support to provide temporary support for the crossbeam, thereby facilitating the alignment of the first support and the crossbeam; and when the rotary joint is disassembled and assembled on site or in a workshop, the present solution also uses the first support and the second support to provide support for the crossbeam, so that the rotary joint is in a stress-free state, thereby making it easier to disassemble and assemble the pin shaft in the rotary joint.
优选地,第二支撑包含至少两个分段,最靠近横梁的分段连接于横梁,最远离横梁的分段用于和主梁构件抵接,相邻两个分段之间角度可调。Preferably, the second support comprises at least two sections, the section closest to the crossbeam is connected to the crossbeam, the section farthest from the crossbeam is used to abut against the main beam component, and the angle between two adjacent sections is adjustable.
相邻两个分段之间角度可调可通过各种方式实现,包含但不限于铰接连接、合页连接、设置多个不同角度的安装孔位等。The angle between two adjacent segments can be adjusted in various ways, including but not limited to hinged connection, hinge connection, setting a plurality of installation holes at different angles, etc.
本方案使第二支撑包含多个分段,且相邻两个分段的角度可调,从而能够改变第二支撑的总长度,例如若分段数量为二,则当两个分段的夹角达到180°时,第二支撑的长度能够达到最大;当两个分段的夹角逐渐减小时,第二支撑的长度也会逐渐减少;因此本方案可以做到在需要第二支撑工作时,例如拆装第一支撑和旋转关节时,伸长第二支撑以抵接主梁构件;而在不需要第二支撑工作时,例如第一支撑和旋转关节均组装完成时,收起第二支撑以避免第二支撑发生损坏。According to the present solution, the second support includes a plurality of segments, and the angles of two adjacent segments are adjustable, so that the total length of the second support can be changed. For example, if the number of segments is two, when the angle between the two segments reaches 180°, the length of the second support can reach the maximum; when the angle between the two segments gradually decreases, the length of the second support will also gradually decrease; therefore, according to the present solution, when the second support is needed, such as when the first support and the rotating joint are disassembled, the second support can be extended to abut the main beam member; and when the second support is not needed, such as when the first support and the rotating joint are assembled, the second support can be retracted to avoid damage to the second support.
优选地,相邻两个分段之间还设置有锁定结构,锁定结构用于锁定相邻两个分段之间的角度。Preferably, a locking structure is provided between two adjacent segments, and the locking structure is used to lock the angle between the two adjacent segments.
锁定结构可以采用各种形式,例如在相邻两个分段上分别设置插孔,且两处插孔能在分段旋转到特定角度时对齐,向其中插入插销即可锁定两个分段的角度;在相邻两个分段上分别设置公扣和母扣,且公扣和母扣能在分段旋转到特定角度时相互扣紧,从而锁定两个分段的角度。The locking structure can take various forms, for example, respectively providing sockets on two adjacent segments, and the two sockets can be aligned when the segments are rotated to a specific angle, and inserting a pin therein can lock the angle of the two segments; respectively providing a male buckle and a female buckle on two adjacent segments, and the male buckle and the female buckle can be fastened to each other when the segments are rotated to a specific angle, thereby locking the angle of the two segments.
本方案能通过锁定分段之间的角度,从而锁定第二支撑的长度,避免在需要第二支撑时第二支撑发生意料外的收起,或在不需要第二支撑时第二支撑发生意料外的伸长。This solution can lock the length of the second support by locking the angle between the segments, thereby preventing the second support from being unexpectedly retracted when the second support is needed, or unexpectedly extended when the second support is not needed.
优选地,第一支撑沿横梁长度方向的位置可调,和/或,吊装结构沿横梁长度方向的位置可调。Preferably, the position of the first support along the length direction of the beam is adjustable, and/or the position of the lifting structure along the length direction of the beam is adjustable.
第一支撑沿横梁长度方向的位置可调可通过多种机构实现,例如在第一支撑和横梁之间设置滑轨、丝杆、拉索、行走轮、油缸等;吊装结构沿横梁长度方向的位置可调同样可通过多种机构实现,例如滑轨、丝杆、拉索、行走轮、油缸等。The adjustable position of the first support along the length direction of the beam can be achieved through a variety of mechanisms, for example, slide rails, screw rods, cables, travel wheels, cylinders, etc. are set between the first support and the beam; the adjustable position of the lifting structure along the length direction of the beam can also be achieved through a variety of mechanisms, for example, slide rails, screw rods, cables, travel wheels, cylinders, etc.
本方案能够调整第一支撑和旋转关节之间的距离,和/或,调整吊装结构和旋转关节之间的距离,一方面能够在主梁构件规格与吊机规格不匹配,导致主梁构件的吊点与吊机起吊位置存在偏移时,通过调整第一支撑和/或吊装结构的位置适应该偏移,从而无需针对不同的主梁构件和吊机规格设计单独的扁担梁,有利于实现扁担梁的标准化和通用化,降低扁担梁的使用成本。This solution can adjust the distance between the first support and the rotating joint, and/or adjust the distance between the lifting structure and the rotating joint. On the one hand, when the specifications of the main beam component do not match the specifications of the crane, resulting in an offset between the lifting point of the main beam component and the lifting position of the crane, the offset can be adapted by adjusting the position of the first support and/or the lifting structure, thereby eliminating the need to design separate shoulder pole beams for different main beam components and crane specifications, which is conducive to the standardization and generalization of shoulder pole beams and reducing the use cost of shoulder pole beams.
另一方面调整第一支撑和/或吊装结构的位置实际上也在调整他们在杠杆作用中的力臂,从而能够调节第一支撑处支反力和吊装结构处起吊力的大小,以适应不同尺寸规格和重量的主梁构件,以及不同尺寸规格的吊机,进一步提高本方案的通用性。On the other hand, adjusting the position of the first support and/or the lifting structure is actually adjusting their lever arms in the lever action, thereby being able to adjust the reaction force at the first support and the lifting force at the lifting structure to adapt to main beam components of different sizes and weights, as well as cranes of different sizes, further improving the versatility of this solution.
优选地,横梁上设置有至少两个安装结构,安装结构沿横梁的长度方向间隔分布,安装结构用于安装第一支撑或吊装结构。Preferably, at least two mounting structures are provided on the crossbeam, and the mounting structures are distributed at intervals along the length direction of the crossbeam, and the mounting structures are used to install the first support or lifting structure.
安装结构的具体形式包含但不限于用于连接螺纹连接件的通孔或螺纹孔、榫卯结构、锁扣、插销。The specific forms of the mounting structure include but are not limited to through holes or threaded holes for connecting threaded connectors, mortise and tenon structures, locks, and latches.
本方案沿横梁长度方向间隔设置多个安装结构,将第一支撑安装于不同位置的安装结构,即可实现第一支撑的位置调节;或将吊装结构安装于不同位置的安装结构,即可实现吊装结构的位置调节;相比于采用例如滑轨一样的活动机构,本方案能确保第一支撑或吊装结构与横梁之间连接的稳定性,避免在吊装主梁构件时发生意料外的滑动,从而引发吊装事故的情况。In this solution, multiple mounting structures are arranged at intervals along the length direction of the beam. The position of the first support can be adjusted by mounting the first support at mounting structures at different positions; or the position of the lifting structure can be adjusted by mounting the lifting structure at mounting structures at different positions. Compared with the use of movable mechanisms such as slide rails, this solution can ensure the stability of the connection between the first support or the lifting structure and the beam, avoiding unexpected sliding when lifting the main beam component, thereby causing lifting accidents.
优选地,第一支撑远离横梁的一端设置有胶垫。Preferably, a rubber pad is provided at one end of the first support away from the crossbeam.
本方案一方面能避免第一支撑抵接主梁构件时,直接与主梁构件发生接触,导致主梁构件表面发生磨损的情况;另一方面能提高第一支撑和主梁构件之间的摩擦系数,从而避免第一支撑发生滑移的情况。On the one hand, this solution can prevent the first support from directly contacting the main beam component when abutting against the main beam component, causing wear on the surface of the main beam component; on the other hand, it can increase the friction coefficient between the first support and the main beam component, thereby preventing the first support from slipping.
在第二方面,本发明提供一种主梁构件吊装方法,包含如下步骤:In a second aspect, the present invention provides a main beam component hoisting method, comprising the following steps:
S1、在主梁构件沿横桥向的两侧均安装至少两个本发明的一种用于吊装主梁构件的扁担梁,用于吊装主梁构件的扁担梁沿纵桥向间隔分布;S1. Install at least two shoulder pole beams for hoisting the main beam components of the present invention on both sides of the main beam component along the transverse direction of the bridge, and the shoulder pole beams for hoisting the main beam component are spaced apart along the longitudinal direction of the bridge;
S2、将吊机连接于吊装结构,提升主梁构件并移动至指定位置。S2. Connect the crane to the lifting structure, lift the main beam component and move it to the designated position.
本方案采用了本发明的一种用于吊装主梁构件的扁担梁对主梁构件进行吊装,用于吊装主梁构件的扁担梁可以分别设置于主梁构件沿横桥向的两侧,而无需像现有方案一样需要使用沿横桥向通长设置的扁担梁,因此能够避免扁担梁与主梁构件中部结构或桥梁中部结构发生干涉,进而能够提高扁担梁的安装效率和主梁构件的吊装效率。This scheme adopts a shoulder pole beam of the present invention for lifting the main beam component to lift the main beam component. The shoulder pole beam for lifting the main beam component can be respectively arranged on both sides of the main beam component along the transverse direction of the bridge, without the need to use a shoulder pole beam arranged along the transverse direction of the bridge as in the existing scheme. Therefore, it is possible to avoid interference between the shoulder pole beam and the middle structure of the main beam component or the middle structure of the bridge, thereby improving the installation efficiency of the shoulder pole beam and the lifting efficiency of the main beam component.
优选地,用于吊装主梁构件的扁担梁均设置于主梁构件具有横隔板的位置。Preferably, the shoulder beams used for hoisting the main beam components are all arranged at the positions where the main beam components have transverse partitions.
主梁构件具有横隔板处相比其余部位具有更高的强度和刚度,因此本方案将用于吊装主梁构件的扁担梁连接于主梁构件具有横隔板的位置,能够避免起吊力超限对主梁构件造成损伤或导致主梁构件变形。The main beam component has higher strength and rigidity at the part with the cross-part than other parts. Therefore, this scheme connects the shoulder beam used to lift the main beam component to the position of the main beam component with the cross-part, which can avoid damage to the main beam component or deformation of the main beam component caused by excessive lifting force.
优选地,吊机采用缆索吊机。Preferably, the crane is a cable crane.
本方案采用缆索吊机作为吊机,能适应跨度大、高度高的施工场合。This solution uses a cable crane as the crane, which can adapt to construction sites with large spans and high heights.
与现有技术相比,本发明的有益效果:Compared with the prior art, the present invention has the following beneficial effects:
1、 本发明提供一种用于吊装主梁构件的扁担梁,通过横梁、旋转关节、第一支撑和吊装结构在吊机与主梁构件之间形成杠杆,从而利用杠杆原理实现了扁担梁在单个吊点处的受力平衡,无需像现有方案一样需要使用沿横桥向通长设置的扁担梁,因此能够减少扁担梁的尺寸、避免扁担梁与主梁构件中部结构或桥梁中部结构发生干涉,进而能够减少扁担梁的尺寸和造价、提高扁担梁的运输效率、扁担梁的安装效率和主梁构件的吊装效率。1. The present invention provides a shoulder pole beam for hoisting a main beam component. A lever is formed between a crane and the main beam component by a cross beam, a rotating joint, a first support and a hoisting structure, thereby realizing force balance of the shoulder pole beam at a single hoisting point by utilizing the lever principle. Unlike the existing scheme, there is no need to use a shoulder pole beam arranged along the entire length of the transverse bridge. Therefore, the size of the shoulder pole beam can be reduced, and interference between the shoulder pole beam and the middle structure of the main beam component or the middle structure of the bridge can be avoided. This can reduce the size and cost of the shoulder pole beam, and improve the transportation efficiency of the shoulder pole beam, the installation efficiency of the shoulder pole beam and the hoisting efficiency of the main beam component.
2、 本发明的一种用于吊装主梁构件的扁担梁可进一步将第一支撑沿横梁长度方向的位置,以及吊装结构沿横梁长度方向的位置配置为可调节,从而能够在主梁构件规格与吊机规格不匹配时,通过调整第一支撑和吊装结构的位置适应吊点和起吊位置的偏移,同时也能对第一支撑处支反力和吊装结构处起吊力的大小,以适应不同尺寸规格和重量的主梁构件,以及不同尺寸规格的吊机,无需针对不同的主梁构件和吊机规格设计单独的扁担梁,有利于实现扁担梁的标准化和通用化,降低扁担梁的使用成本。2. A shoulder pole beam for hoisting main beam components of the present invention can further configure the position of the first support along the length direction of the beam and the position of the hoisting structure along the length direction of the beam to be adjustable, so that when the specifications of the main beam components do not match the specifications of the crane, the positions of the first support and the hoisting structure can be adjusted to adapt to the offset of the lifting point and the lifting position. At the same time, the reaction force at the first support and the lifting force at the hoisting structure can be adjusted to adapt to main beam components of different sizes and weights, as well as cranes of different sizes. There is no need to design separate shoulder pole beams for different main beam components and crane specifications, which is conducive to the standardization and generalization of shoulder pole beams and reduces the use cost of shoulder pole beams.
3、 本发明提供一种主梁构件吊装方法,通过使用本发明的一种用于吊装主梁构件的扁担梁对主梁构件进行吊装,能够避免扁担梁与主梁构件中部结构或桥梁中部结构发生干涉,从而能够提高扁担梁的安装效率和主梁构件的吊装效率。3. The present invention provides a method for hoisting a main beam component. By using a shoulder pole beam for hoisting a main beam component of the present invention to hoist the main beam component, interference between the shoulder pole beam and the middle structure of the main beam component or the middle structure of the bridge can be avoided, thereby improving the installation efficiency of the shoulder pole beam and the hoisting efficiency of the main beam component.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1是本发明的一种用于吊装主梁构件的扁担梁的侧视结构示意图;FIG1 is a schematic side view of a shoulder beam for hoisting a main beam member of the present invention;
图2是图1中Ⅰ-Ⅰ断面的剖视结构示意图;FIG2 is a schematic cross-sectional view of the structure of section Ⅰ-Ⅰ in FIG1;
图3是图1中Ⅱ-Ⅱ断面的剖视结构示意图;FIG3 is a schematic cross-sectional view of the structure of section II-II in FIG1;
图4是图1中Ⅲ-Ⅲ断面的剖视结构示意图;FIG4 is a schematic cross-sectional view of the structure of section III-III in FIG1;
图5是图1中Ⅳ-Ⅳ断面的剖视结构示意图;FIG5 is a schematic cross-sectional view of the structure of section IV-IV in FIG1;
图6是本发明的一种用于吊装主梁构件的扁担梁在第二支撑处的局部放大结构示意图一;FIG6 is a partial enlarged structural schematic diagram 1 of a shoulder pole beam for hoisting a main beam component at a second support of the present invention;
图7是本发明的一种用于吊装主梁构件的扁担梁在第二支撑处的局部放大结构示意图二;7 is a second partial enlarged structural schematic diagram of a shoulder pole beam for hoisting a main beam member at a second support of the present invention;
图8是本发明的一种用于吊装主梁构件的扁担梁连接于主梁构件状态的侧视结构示意图;8 is a side view of a structural schematic diagram of a state in which a shoulder beam for hoisting a main beam member of the present invention is connected to the main beam member;
图9是本发明的一种主梁构件吊装方法的工作示意图一;FIG9 is a working schematic diagram 1 of a main beam member hoisting method of the present invention;
图10是本发明的一种主梁构件吊装方法的工作示意图二;10 is a second working schematic diagram of a main beam member hoisting method of the present invention;
图11是本发明的一种主梁构件吊装方法的工作流程示意图;11 is a schematic diagram of the workflow of a main beam member hoisting method of the present invention;
图标:1-横梁;2-旋转关节;21-第一连接部;22-第二连接部;23-销轴;3-第一支撑;31-胶垫;4-吊装结构;41-安装卡板;5-第二支撑;51-分段;52-插销;6-主梁构件;61-横隔板;62-吊点;63-桥面板横梁;7-吊机;8-螺纹连接件;9-卡销。Icons: 1-crossbeam; 2-rotating joint; 21-first connection part; 22-second connection part; 23-pin shaft; 3-first support; 31-rubber pad; 4-lifting structure; 41-installation card plate; 5-second support; 51-section; 52-pin; 6-main beam member; 61-cross partition; 62-lifting point; 63-bridge deck crossbeam; 7-crane; 8-threaded connector; 9-pin.
具体实施方式DETAILED DESCRIPTION
下面结合试验例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
在没有特别说明的情况下,在本发明具体实施例的描述中,出现“上”“下”“左”“右”“中心”“内”“外”...等指示的方位或位置关系的表述术语,都是基于附图所示的方位或位置关系的表达,或者是该发明产品/设备/装置惯常使用时,摆放的方位或位置关系。这些方位或位置关系的术语,仅仅是为了便于描述本发明方案或简化具体实施例中的描述,便于技术人员快速理解方案,而不是指示或暗示特定的装置/部件/元件必须具有特定的方位,或以特定的位置关系进行构造和操作,因此不能理解为对本发明的限制。Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or the orientation or position relationship when the invented product/equipment/device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, rather than indicating or implying that a specific device/component/element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
此外,若出现术语“水平”“竖直”“悬垂”“平行”等术语,并不表示要求相应的装置/部件/元件绝对水平或竖直或悬垂或平行,而是可以稍微倾斜或存在偏差。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。或者,可以简化理解为相应的装置/部件/元件,处于“水平”“竖直”“悬垂”“平行”等方向设置,能够相对于相应的方向设置具有±10%的误差/偏差,更优选±8%以内的误差/偏差,更优选±6%以内的误差/偏差,更优选±5%以内的误差/偏差,更优选±4%以内的误差/偏差。只要相应的装置/部件/元件在误差/偏差范围内,依然能够实现其在本发明方案中的作用即可。In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices/components/elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices/components/elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error/deviation of ±10% relative to the corresponding direction setting, more preferably an error/deviation within ±8%, more preferably an error/deviation within ±6%, more preferably an error/deviation within ±5%, and more preferably an error/deviation within ±4%. As long as the corresponding device/component/element is within the error/deviation range, it can still achieve its role in the scheme of the present invention.
此外,术语中出现“第一”“第二”“第三”等表述,仅仅是用于区分相同或相似部件的描述,而不应理解为强调或暗示特定部件的相对重要性。In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
此外,在本发明实施例的描述中,“几个”“多个”“若干个”代表至少2个。可以是2个、3个、4个、5个、6个、7个、8个、9个等任意情况,甚至可以是超过9个的情况。In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
此外,在本发明技术方案的描述中,除非另有明确的规定/限定/限制,出现术语“设置”“安装”“相连”“连接”“设有”“铺设”“布置”的地方应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接,可以是焊接、铆接、栓接、螺纹连接等本领域常用的连接手段。这种连接可以是机械连接,也可以是电连接或通信连接;可以是直接相连,也可以通过中间媒介物进行间接相连,可以是两个元件内部的连通。In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified/defined/restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.
实施例1Example 1
如图1至图8所示,一种用于吊装主梁构件的扁担梁,包含横梁1、旋转关节2、第一支撑3和吊装结构4;旋转关节2包含第一连接部21和第二连接部22,第一连接部21能相对第二连接部22旋转,第一连接部21连接于横梁1的中部,第二连接部22用于和主梁构件6连接;第一支撑3连接于横梁1的其中一端,第一支撑3远离横梁1的一端用于和主梁构件6抵接;吊装结构4连接于横梁1的另一端,吊装结构4用于和吊机7连接。As shown in Figures 1 to 8, a shoulder pole beam for hoisting a main beam component comprises a crossbeam 1, a rotating joint 2, a first support 3 and a hoisting structure 4; the rotating joint 2 comprises a first connecting portion 21 and a second connecting portion 22, the first connecting portion 21 can rotate relative to the second connecting portion 22, the first connecting portion 21 is connected to the middle part of the crossbeam 1, and the second connecting portion 22 is used to connect with the main beam component 6; the first support 3 is connected to one end of the crossbeam 1, and the end of the first support 3 away from the crossbeam 1 is used to abut against the main beam component 6; the hoisting structure 4 is connected to the other end of the crossbeam 1, and the hoisting structure 4 is used to connect with a crane 7.
可选的实施方式中,如图1至图5所示,横梁1和第一支撑3均为钢箱构件,且组成横梁1和第一支撑3的钢板厚度大于或等于16mm,以确保横梁1和第一支撑3的强度和刚度;第一支撑3具体连接于横梁1如图1所示的下端右侧面。In an optional embodiment, as shown in Figures 1 to 5, the crossbeam 1 and the first support 3 are both steel box components, and the thickness of the steel plates constituting the crossbeam 1 and the first support 3 is greater than or equal to 16 mm to ensure the strength and rigidity of the crossbeam 1 and the first support 3; the first support 3 is specifically connected to the right side surface of the lower end of the crossbeam 1 as shown in Figure 1.
可选的实施方式中,如图1所示,吊装结构4具体采用吊耳,且连接于横梁1如图1所示的上端左侧面。In an optional embodiment, as shown in FIG. 1 , the lifting structure 4 specifically adopts a lifting lug, and is connected to the left side of the upper end of the beam 1 as shown in FIG. 1 .
可选的实施方式中,如图1和图3所示,旋转关节2的第一连接部21包含左右两个侧板,而第二连接部22包含一个侧板,在连接第一连接部21和第二连接部22时,可通过第一连接部21夹住第二连接部22从而实现快速定位,以及横梁1相对主梁构件6沿纵桥向的限位;且第一连接部21的两个侧板之间还设置有弧形限位卡板,其底部为圆弧形弧面,且尺寸与第二连接部22的顶部弧面匹配,从而能帮助第一连接部21和第二连接部22更快速地进行定位和组装;第一连接部21和第二连接部22之间通过销轴23转动连接;且销轴23和横梁1之间还通过钢丝绳连接,以避免销轴23掉落和丢失。In an optional embodiment, as shown in Figures 1 and 3, the first connection part 21 of the rotary joint 2 includes two left and right side plates, and the second connection part 22 includes a side plate. When connecting the first connection part 21 and the second connection part 22, the second connection part 22 can be clamped by the first connection part 21 to achieve rapid positioning, as well as the limitation of the crossbeam 1 relative to the main beam member 6 along the longitudinal bridge direction; and an arc-shaped limiting clamp is also provided between the two side plates of the first connection part 21, the bottom of which is an arc-shaped arc surface, and the size matches the top arc surface of the second connection part 22, thereby helping the first connection part 21 and the second connection part 22 to be positioned and assembled more quickly; the first connection part 21 and the second connection part 22 are rotatably connected by a pin shaft 23; and the pin shaft 23 and the crossbeam 1 are also connected by a wire rope to prevent the pin shaft 23 from falling and being lost.
可选的实施方式中,第一支撑3底面形心至旋转关节2轴线的距离沿横梁1长度方向的分量,应大于或等于吊装结构4沿至旋转关节2轴线的距离沿横梁1长度方向的分量,从而避免旋转关节2的销轴23处承受到超过2倍的吊装结构4处的起吊力,使第一连接部21和第二连接部22之间、旋转关节2与主梁构件6之间、第一支撑3与主梁构件6之间的受力最优化,避免应力超限。In an optional embodiment, the component of the distance from the centroid of the bottom surface of the first support 3 to the axis of the rotary joint 2 along the length direction of the cross beam 1 should be greater than or equal to the component of the distance from the lifting structure 4 to the axis of the rotary joint 2 along the length direction of the cross beam 1, thereby avoiding the pin 23 of the rotary joint 2 from being subjected to a lifting force that is more than twice that of the lifting structure 4, thereby optimizing the forces between the first connection part 21 and the second connection part 22, between the rotary joint 2 and the main beam member 6, and between the first support 3 and the main beam member 6 to avoid excessive stress.
可选的实施方式中,横梁1上还连接有第二支撑5,第二支撑5位于旋转关节2背离第一支撑3的一侧,第二支撑5远离横梁1的一端用于和主梁构件6抵接。In an optional embodiment, a second support 5 is further connected to the cross beam 1 . The second support 5 is located on a side of the rotary joint 2 away from the first support 3 . An end of the second support 5 away from the cross beam 1 is used to abut against the main beam component 6 .
可选的实施方式中,第二支撑5包含至少两个分段51,最靠近横梁1的分段51连接于横梁1,最远离横梁1的分段51用于和主梁构件6抵接,相邻两个分段51之间角度可调。具体地,如图6和图7所示,本实施例具体包含两个分段51,其中位于上侧的分段51顶部与横梁1底面连接,位于下侧的分段51底面用于和主梁构件6顶面抵接,两个分段51之间采用合页进行连接;如图6所示,当两个分段51的夹角为180°时,则第二支撑5的长度达到最大,能够与主梁构件6顶面抵接;如图7所示,当两个分段51的夹角为0°时,则第二支撑5的长度达到最小,能够脱离与主梁构件6顶面抵接。In an optional embodiment, the second support 5 includes at least two segments 51, the segment 51 closest to the cross beam 1 is connected to the cross beam 1, and the segment 51 farthest from the cross beam 1 is used to abut against the main beam member 6, and the angle between two adjacent segments 51 is adjustable. Specifically, as shown in Figures 6 and 7, this embodiment specifically includes two segments 51, wherein the top of the segment 51 located on the upper side is connected to the bottom surface of the cross beam 1, and the bottom surface of the segment 51 located on the lower side is used to abut against the top surface of the main beam member 6, and the two segments 51 are connected by hinges; as shown in Figure 6, when the angle between the two segments 51 is 180°, the length of the second support 5 reaches the maximum and can abut against the top surface of the main beam member 6; as shown in Figure 7, when the angle between the two segments 51 is 0°, the length of the second support 5 reaches the minimum and can be separated from the abutment with the top surface of the main beam member 6.
可选的实施方式中,相邻两个分段51之间还设置有锁定结构,锁定结构用于锁定相邻两个分段51之间的角度。具体地,如图6所示,在上侧分段51的底部,以及下侧分段51的顶部均设置有限位板,限位板上设置有插孔,当两个分段51的夹角为180°时,限位板上的插孔能够对齐,向其中插入插销52即可锁定两个分段51之间的角度;如图7所示,在上侧分段51的上部,以及下侧分段51的底部也均设置有限位板,限位板上设置有插孔,当两个分段51的夹角为0°时,限位板上的插孔能够对齐,向其中插入插销52即可锁定两个分段51之间的角度。In an optional embodiment, a locking structure is further provided between two adjacent segments 51, and the locking structure is used to lock the angle between the two adjacent segments 51. Specifically, as shown in FIG6 , a limit plate is provided at the bottom of the upper segment 51 and the top of the lower segment 51, and a plug hole is provided on the limit plate. When the angle between the two segments 51 is 180°, the plug holes on the limit plate can be aligned, and the angle between the two segments 51 can be locked by inserting the latch 52 therein; as shown in FIG7 , a limit plate is also provided at the upper part of the upper segment 51 and the bottom of the lower segment 51, and a plug hole is provided on the limit plate. When the angle between the two segments 51 is 0°, the plug holes on the limit plate can be aligned, and the angle between the two segments 51 can be locked by inserting the latch 52 therein.
可选的实施方式中,第一支撑3沿横梁1长度方向的位置可调,和/或,吊装结构4沿横梁1长度方向的位置可调。In an optional embodiment, the position of the first support 3 along the length direction of the beam 1 is adjustable, and/or the position of the hoisting structure 4 along the length direction of the beam 1 is adjustable.
可选的实施方式中,横梁1上设置有至少两个安装结构,安装结构沿横梁1的长度方向间隔分布,安装结构用于安装第一支撑3或吊装结构4。具体地,如图1所示,本实施例的第一支撑3和吊装结构4均通过螺纹连接件8连接于横梁1,因此对应的,本实施例在横梁1的两端均间隔设置多组用于安装螺纹连接件8的通孔作为安装结构,且横梁1两端安装结构中各通孔的间距分别与第一支撑3上通孔的间距,以及吊装结构4上通孔的间距匹配,从而能通过改变第一支撑3和吊装结构4的安装位置,调节他们沿横梁1长度方向的尺寸;同时也能方便对横梁1、第一支撑3和吊装结构4进行拆装和更换,有利于通过更换不同尺寸规格和强度的横梁1、第一支撑3和吊装结构4来改变吊重能力,从而形成多种不同吊重的标准化方案。In an optional embodiment, at least two mounting structures are provided on the crossbeam 1, and the mounting structures are spaced apart along the length direction of the crossbeam 1, and the mounting structures are used to mount the first support 3 or the hanging structure 4. Specifically, as shown in FIG1 , the first support 3 and the hanging structure 4 of this embodiment are both connected to the crossbeam 1 through a threaded connector 8, so correspondingly, in this embodiment, multiple groups of through holes for mounting the threaded connector 8 are spaced apart at both ends of the crossbeam 1 as mounting structures, and the spacing of each through hole in the mounting structures at both ends of the crossbeam 1 matches the spacing of the through holes on the first support 3 and the spacing of the through holes on the hanging structure 4, respectively, so that the dimensions of the first support 3 and the hanging structure 4 along the length direction of the crossbeam 1 can be adjusted by changing the mounting positions of the first support 3 and the hanging structure 4; at the same time, it is also convenient to disassemble and replace the crossbeam 1, the first support 3 and the hanging structure 4, which is conducive to changing the lifting capacity by replacing the crossbeam 1, the first support 3 and the hanging structure 4 of different sizes and strengths, thereby forming a standardized solution for a variety of different lifting weights.
在上述实施方式中,更具体的,如图1和图4所示,第一支撑3和横梁1之间除了设置有螺纹连接件8连接,还设置有卡销9;卡销9同样连接于用于安装第一支撑3的安装结构的通孔中,且卡销9的直径小于螺纹连接件8的直径2mm,在进行第一支撑3的组装作业时,相比于螺纹连接件8能更容易插入安装结构中,从而能帮助第一支撑3更快速地与横梁1上的安装结构对齐,进而提高第一支撑3的组装速度。In the above embodiment, more specifically, as shown in Figures 1 and 4, in addition to the threaded connection 8, a bayonet 9 is also provided between the first support 3 and the beam 1; the bayonet 9 is also connected to the through hole of the mounting structure for mounting the first support 3, and the diameter of the bayonet 9 is 2 mm smaller than the diameter of the threaded connection 8. When assembling the first support 3, it can be more easily inserted into the mounting structure than the threaded connection 8, thereby helping the first support 3 to be aligned with the mounting structure on the beam 1 more quickly, thereby increasing the assembly speed of the first support 3.
在上述实施方式中,更具体的,螺纹连接件8采用不小于M24的8.8级普通螺栓;对应的,安装螺纹连接件8的螺纹孔直径不小于27mm;用于安装吊装结构4的安装结构的通孔距离横梁1边缘至少40cm,通孔之间的间距宜处在40cm~50cm之间;用于安装第一支撑3的安装结构的通孔距离横梁1边缘至少20cm,通孔之间的间距宜处在30cm~40cm之间。In the above embodiment, more specifically, the threaded connector 8 adopts an 8.8-grade ordinary bolt that is not less than M24; correspondingly, the diameter of the threaded hole for installing the threaded connector 8 is not less than 27 mm; the through hole of the mounting structure for installing the lifting structure 4 is at least 40 cm away from the edge of the beam 1, and the spacing between the through holes is preferably between 40 cm and 50 cm; the through hole of the mounting structure for installing the first support 3 is at least 20 cm away from the edge of the beam 1, and the spacing between the through holes is preferably between 30 cm and 40 cm.
可选的实施方式中,如图1和图2所示,在横梁1用于安装吊装结构4的一端的顶面还设置有安装卡板41;安装卡板41的中部设置有形状尺寸均与吊装结构4匹配的凹槽,在组装吊装结构4时,将吊装结构4放入安装卡板41的凹槽内,即可帮助吊装结构4更快速地与横梁1上的安装结构对齐,进而提高吊装结构4的组装速度。In an optional embodiment, as shown in Figures 1 and 2, a mounting clamp 41 is also provided on the top surface of one end of the beam 1 for mounting the lifting structure 4; a groove whose shape and size match the lifting structure 4 is provided in the middle portion of the mounting clamp 41. When assembling the lifting structure 4, the lifting structure 4 is placed in the groove of the mounting clamp 41, which can help the lifting structure 4 to align with the mounting structure on the beam 1 more quickly, thereby increasing the assembly speed of the lifting structure 4.
可选的实施方式中,在横梁1安装吊装结构4的一端的侧壁还开设有条形孔,且条形孔的位置和间距均与用于安装吊装结构4的通孔的位置和间距匹配,从而方便操作人员在对应位置放入螺纹连接件8;条形孔沿横梁1长度方向的尺寸宜处在20cm~40cm,沿横梁1高度方向的尺寸宜处在10cm~20cm。In an optional embodiment, a strip hole is further provided on the side wall of one end of the beam 1 for installing the lifting structure 4, and the position and spacing of the strip holes match the position and spacing of the through holes for installing the lifting structure 4, thereby facilitating the operator to insert the threaded connector 8 at the corresponding position; the size of the strip hole along the length direction of the beam 1 is preferably between 20cm and 40cm, and the size along the height direction of the beam 1 is preferably between 10cm and 20cm.
可选的实施方式中,第一支撑3远离横梁1的一端设置有胶垫31。胶垫31宜采用具有抗张力高、耐腐蚀、缓冲性能良好以及较好的粘接性的材质,从而更好地与第一支撑3底部粘接并作为抗压、抗剪材料使用。In an optional embodiment, a rubber pad 31 is provided at one end of the first support 3 away from the cross beam 1. The rubber pad 31 is preferably made of a material with high tensile strength, corrosion resistance, good buffering performance and good adhesion, so as to better bond with the bottom of the first support 3 and be used as a compression and shear resistance material.
可选的实施方式中,横梁1、旋转关节2的第一连接部21和第二连接部22、第一支撑3、吊装结构4均应能满足当前设计吊重下的承载能力,且应具有不小于额定起重量4倍的安全系数。主梁构件6与第一支撑3、第二连接部22接触的局部部位应经过受力检算,最大应力不应超过主梁构件6材质的容许应力值。In an optional embodiment, the cross beam 1, the first connection portion 21 and the second connection portion 22 of the rotating joint 2, the first support 3, and the hoisting structure 4 should all be able to meet the load-bearing capacity under the current design lifting weight, and should have a safety factor of not less than 4 times the rated lifting weight. The local part where the main beam component 6 contacts the first support 3 and the second connection portion 22 should be subjected to force inspection, and the maximum stress should not exceed the allowable stress value of the material of the main beam component 6.
可选的实施方式中,旋转关节2的销轴23宜采用45#钢,其余构件宜采用Q235、Q345钢;In an optional embodiment, the pin 23 of the rotary joint 2 is preferably made of 45# steel, and the remaining components are preferably made of Q235 or Q345 steel;
可选的实施方式中,横梁1与旋转关节2的第一连接部21、横梁1与第二支撑5之间采用焊接连接,且焊接均采取破口熔透焊满焊,焊缝高度不应小于母材厚度。In an optional embodiment, welding is used to connect the crossbeam 1 to the first connection portion 21 of the rotating joint 2 and the crossbeam 1 to the second support 5, and the welding is full penetration welding, and the weld height should not be less than the thickness of the parent material.
实施例2Example 2
如图11所示,一种主梁构件吊装方法,包含如下步骤:As shown in FIG11 , a main beam component hoisting method includes the following steps:
S1、在主梁构件6沿横桥向的两侧均安装至少两个实施例1中的一种用于吊装主梁构件的扁担梁,用于吊装主梁构件的扁担梁沿纵桥向间隔分布;S1, at least two shoulder beams for hoisting the main beam members according to Embodiment 1 are installed on both sides of the main beam member 6 along the transverse direction of the bridge, and the shoulder beams for hoisting the main beam member are distributed at intervals along the longitudinal direction of the bridge;
S2、将吊机7连接于吊装结构4,提升主梁构件6并移动至指定位置。S2. Connect the crane 7 to the hoisting structure 4, lift the main beam member 6 and move it to a designated position.
可选的实施方式中,步骤S1包含:In an optional implementation, step S1 includes:
S11、根据主梁构件6的重量、吊机7的左右幅宽度,从已设计的各种不同规格的横梁1、第一支撑3、吊装结构4等标准化构件中选取合适的构件,组合为适用于该主梁构件6吊装的用于吊装主梁构件的扁担梁;S11, according to the weight of the main beam component 6 and the left and right widths of the crane 7, suitable components are selected from the standardized components such as the cross beam 1, the first support 3, the hoisting structure 4 and other standardized components of various specifications that have been designed, and they are combined into a shoulder pole beam for hoisting the main beam component 6;
S12、在主梁构件6上的预定吊点62处焊接旋转关节2的第二连接部22,且第二连接部22的轴线平行于纵桥向;吊点62相对主梁构件6的布置如图10所示,在主梁构件6沿横桥向的左右两侧均要设置至少两个吊点62,单侧的吊点62沿纵桥向间隔分布;该步骤宜在工厂预制;S12, welding the second connection part 22 of the rotary joint 2 at the predetermined hanging point 62 on the main beam member 6, and the axis of the second connection part 22 is parallel to the longitudinal bridge direction; the arrangement of the hanging point 62 relative to the main beam member 6 is shown in FIG10, at least two hanging points 62 are arranged on both sides of the main beam member 6 along the transverse bridge direction, and the hanging points 62 on one side are spaced apart along the longitudinal bridge direction; this step is preferably prefabricated in a factory;
S13、将用于吊装主梁构件的扁担梁的剩余组件运抵现场,展开第二支撑5,使第二支撑5能够抵接于主梁构件6顶面,并插入插销52锁死第二支撑5的长度;通过汽车吊吊起横梁1,使横梁1上用于连接第一支撑3的安装结构与第一支撑3大致对齐,随后插入卡销9使第一支撑3和安装结构完全对齐,汽车吊松勾,安装第一支撑3和横梁1之间的螺纹连接件8;通过汽车吊吊起吊装结构4,将吊装结构4放入安装卡板41的凹槽内,安装吊装结构4和横梁1之间的螺纹连接件8;S13, transport the remaining components of the shoulder beam used for hoisting the main beam member to the site, unfold the second support 5 so that the second support 5 can abut against the top surface of the main beam member 6, and insert the latch 52 to lock the length of the second support 5; lift the cross beam 1 by the truck crane so that the mounting structure for connecting the first support 3 on the cross beam 1 is roughly aligned with the first support 3, then insert the bayonet 9 to completely align the first support 3 and the mounting structure, release the hook of the truck crane, and install the threaded connector 8 between the first support 3 and the cross beam 1; lift the hoisting structure 4 by the truck crane, put the hoisting structure 4 into the groove of the mounting clamp 41, and install the threaded connector 8 between the hoisting structure 4 and the cross beam 1;
S14、通过汽车吊将布置S13组装后的用于吊装主梁构件的扁担梁吊装至主梁构件6上方,并使旋转关节2的第一连接部21和第二连接部22对齐,汽车吊松勾;此时第一支撑3和第二支撑5共同将横梁1支撑于主梁构件6,旋转关节2不受力,可以较为轻松地安装销轴23,并通过钢丝绳将销轴23连接于横梁1;重复该步骤直至在所有的吊点62处均安装了用于吊装主梁构件的扁担梁;S14, hoist the shoulder pole beam for hoisting the main beam member assembled in S13 to the top of the main beam member 6 by means of a car crane, and align the first connection portion 21 and the second connection portion 22 of the rotary joint 2, and release the hook of the car crane; at this time, the first support 3 and the second support 5 jointly support the cross beam 1 on the main beam member 6, and the rotary joint 2 is not subjected to force, so the pin 23 can be installed relatively easily, and the pin 23 is connected to the cross beam 1 by means of a steel wire rope; repeat this step until the shoulder pole beam for hoisting the main beam member is installed at all the lifting points 62;
而步骤S2具体包含:Step S2 specifically includes:
S21、如图9所示,吊机7下钩通过钢丝绳和卸扣连接至吊装结构4,随后各吊点62处同时下挂起升,通过第一支撑3和销轴23提供反力相互平衡使得主梁构件6升起,随后移动主梁构件6至指定位置,连接吊杆,完成主梁构件6的安装;此过程中可收起第二支撑5,使第二支撑5无法抵接于主梁构件6顶面,并插入插销52锁死第二支撑5的长度;S21, as shown in FIG9 , the lower hook of the crane 7 is connected to the hoisting structure 4 through a steel wire rope and a shackle, and then each lifting point 62 is simultaneously suspended and lifted, and the reaction force provided by the first support 3 and the pin 23 is balanced to make the main beam component 6 rise, and then the main beam component 6 is moved to the specified position, and the suspension rod is connected to complete the installation of the main beam component 6; during this process, the second support 5 can be retracted so that the second support 5 cannot abut against the top surface of the main beam component 6, and the pin 52 is inserted to lock the length of the second support 5;
S22、展开第二支撑5,使第二支撑5能够抵接于主梁构件6顶面,并插入插销52锁死第二支撑5的长度;吊机7松钩;此时第一支撑3和第二支撑5共同将横梁1支撑于主梁构件6,旋转关节2不受力,可以较为轻松地拆除销轴23,并将用于吊装主梁构件的扁担梁除第二连接部22以外的部分与主梁构件6相互分离;将用于吊装主梁构件的扁担梁吊回至起吊位置,等待下一次主梁构件6吊装。S22, unfold the second support 5 so that the second support 5 can abut against the top surface of the main beam member 6, and insert the pin 52 to lock the length of the second support 5; the crane 7 releases the hook; at this time, the first support 3 and the second support 5 jointly support the crossbeam 1 on the main beam member 6, and the rotating joint 2 is not subjected to force, so the pin 23 can be removed relatively easily, and the part of the shoulder pole beam used for lifting the main beam member except the second connecting part 22 is separated from the main beam member 6; the shoulder pole beam used for lifting the main beam member is lifted back to the lifting position, waiting for the next lifting of the main beam member 6.
可选的实施方式中,用于吊装主梁构件的扁担梁均设置于主梁构件6具有横隔板61的位置,如图10所示,4个吊点62均设置在主梁构件6具有横隔板61的位置,从而使焊接于其上的4个第二连接部22也位于横隔板61的上方;而对应的,当第一支撑3设置完成后,第一支撑3位于桥面板横梁63的上方,从而使本实施例对主梁构件6所施加的载荷均作用于主梁构件6强度和刚度较大的位置。In an optional embodiment, the shoulder beams used for lifting the main beam components are all arranged at the positions where the main beam components 6 have the transverse partition 61. As shown in Figure 10, the four lifting points 62 are all arranged at the positions where the main beam components 6 have the transverse partition 61, so that the four second connection parts 22 welded thereon are also located above the transverse partition 61; and correspondingly, when the first support 3 is set, the first support 3 is located above the bridge deck cross beam 63, so that the load applied to the main beam component 6 by this embodiment acts on the position where the strength and stiffness of the main beam component 6 are greater.
可选的实施方式中,在步骤S2中,吊机7采用缆索吊机;且更进一步的,本实施例采用的缆索吊机包含能沿横桥向移动的索道,从而能带动索道下方的起重跑车沿横桥向移动,使其中跑车下方的吊钩能更容易与吊装结构4对齐,提高吊装作业效率。In an optional embodiment, in step S2, the crane 7 adopts a cable crane; and further, the cable crane adopted in this embodiment includes a cableway that can move along the transverse direction of the bridge, so that the lifting sports car under the cableway can be driven to move along the transverse direction of the bridge, so that the hook under the sports car can be more easily aligned with the lifting structure 4, thereby improving the efficiency of the lifting operation.
以上仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202411268573.2A CN118790864B (en) | 2024-09-11 | 2024-09-11 | A shoulder beam for hoisting a main beam component and a main beam component hoisting method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202411268573.2A CN118790864B (en) | 2024-09-11 | 2024-09-11 | A shoulder beam for hoisting a main beam component and a main beam component hoisting method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN118790864A true CN118790864A (en) | 2024-10-18 |
| CN118790864B CN118790864B (en) | 2024-12-24 |
Family
ID=93021739
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202411268573.2A Active CN118790864B (en) | 2024-09-11 | 2024-09-11 | A shoulder beam for hoisting a main beam component and a main beam component hoisting method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN118790864B (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2016404A (en) * | 1978-03-16 | 1979-09-26 | Blohm Voss Ag | A cross-beam for hoists |
| EP0492669A2 (en) * | 1990-12-28 | 1992-07-01 | GKS SICHERHEITSTECHNIK GmbH | Load suspension arrangement |
| CN209522474U (en) * | 2018-12-13 | 2019-10-22 | 山东铁鹰建设工程有限公司 | A kind of hanging apparatus of tee girder template |
| CN110606430A (en) * | 2019-08-28 | 2019-12-24 | 中铁大桥局集团有限公司 | A cofferdam hanging system and method |
| CN211366682U (en) * | 2019-12-05 | 2020-08-28 | 青岛北海船舶重工有限责任公司 | Combined hanging beam |
| CN212639671U (en) * | 2020-06-24 | 2021-03-02 | 中国二十冶集团有限公司 | Carrying pole beam for hoisting rolling mill frame |
| US20210078835A1 (en) * | 2019-09-16 | 2021-03-18 | Thomas Spencer | Devices And Methods For Lifting Precast Concrete Domes |
| CN113602955A (en) * | 2021-08-02 | 2021-11-05 | 山海关船舶重工有限责任公司 | Turning method and auxiliary tool for staggered hull sections |
| CN114572804A (en) * | 2022-03-15 | 2022-06-03 | 中铁大桥局集团有限公司 | Lifting appliance system and using method thereof |
| CN216997234U (en) * | 2022-03-01 | 2022-07-19 | 天津蓝巢特种吊装工程有限公司 | Carrying pole beam for unloading wind power engine room |
-
2024
- 2024-09-11 CN CN202411268573.2A patent/CN118790864B/en active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2016404A (en) * | 1978-03-16 | 1979-09-26 | Blohm Voss Ag | A cross-beam for hoists |
| EP0492669A2 (en) * | 1990-12-28 | 1992-07-01 | GKS SICHERHEITSTECHNIK GmbH | Load suspension arrangement |
| CN209522474U (en) * | 2018-12-13 | 2019-10-22 | 山东铁鹰建设工程有限公司 | A kind of hanging apparatus of tee girder template |
| CN110606430A (en) * | 2019-08-28 | 2019-12-24 | 中铁大桥局集团有限公司 | A cofferdam hanging system and method |
| US20210078835A1 (en) * | 2019-09-16 | 2021-03-18 | Thomas Spencer | Devices And Methods For Lifting Precast Concrete Domes |
| CN211366682U (en) * | 2019-12-05 | 2020-08-28 | 青岛北海船舶重工有限责任公司 | Combined hanging beam |
| CN212639671U (en) * | 2020-06-24 | 2021-03-02 | 中国二十冶集团有限公司 | Carrying pole beam for hoisting rolling mill frame |
| CN113602955A (en) * | 2021-08-02 | 2021-11-05 | 山海关船舶重工有限责任公司 | Turning method and auxiliary tool for staggered hull sections |
| CN216997234U (en) * | 2022-03-01 | 2022-07-19 | 天津蓝巢特种吊装工程有限公司 | Carrying pole beam for unloading wind power engine room |
| CN114572804A (en) * | 2022-03-15 | 2022-06-03 | 中铁大桥局集团有限公司 | Lifting appliance system and using method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN118790864B (en) | 2024-12-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103526699B (en) | Method for replacing pipe bridge hanging steel ropes | |
| BRPI0805009A2 (en) | crane boom linkage system | |
| US20110140469A1 (en) | Method and apparatus for hoisting objects using a modular lifting beam | |
| US20190242128A1 (en) | Modular Truss | |
| CN103526688A (en) | Pipe bridge hanging system | |
| JP7657261B2 (en) | Truss and truss construction method | |
| CN201809032U (en) | Self-adjusting stay device with combinable hanger | |
| CN116253231B (en) | Hoisting mechanism and use method | |
| CN112623921A (en) | Light lifting appliance for hoisting lattice beam cable of arch bridge | |
| CN116853963A (en) | A hoisting device and hoisting method for the main beam of a cable-stayed bridge | |
| CN209958161U (en) | Linear adjusting equipment of track beam | |
| CN105780659A (en) | Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge | |
| CN215326417U (en) | Adjustable lifting appliance for lifting laminated plate bracket | |
| CN115776968A (en) | Extension yoke for a jack-up crane, jack-up wind turbine crane with an extension yoke and use of an extension yoke | |
| CN118790864B (en) | A shoulder beam for hoisting a main beam component and a main beam component hoisting method | |
| CN119083725A (en) | A temporary fixing method for steel columns during sliding construction | |
| CN111379227A (en) | Variable-width platform device for hydraulic creeping formwork for quickly constructing double-limb cable tower and construction method | |
| CN114541775B (en) | Multipoint control boundary cable lifting installation structure and method | |
| CN215329402U (en) | Light movable assembled hanging basket for bridge maintenance | |
| CN212893471U (en) | Lifting appliance for T-shaped beam template | |
| CN211569857U (en) | Concrete block brickwork component prefabricated construction hoist device | |
| CN111335188B (en) | The hanging beam of the prefabricated No. 1 box beam with small curvature radius and the cast-in-place No. 0 box beam | |
| CN203545431U (en) | Device for vertically hoisting whole large-diameter rebar in high pier construction | |
| CN110606430B (en) | A cofferdam hanging system and method | |
| CN217629487U (en) | Suspension cross beam for guyed cradle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |