Disclosure of Invention
Aiming at the technical problems, the invention provides an anti-overturning reinforcement method for a scaffold of a high-rise ultra-high concrete structure.
The technical scheme is that the method comprises the following steps:
S1, building an outer scaffold foundation;
s2, manufacturing a lattice column on site according to the designed specification;
S3, constructing a main structure floor slab and embedding lattice column mounting bolts;
S4, installing the lattice column on the main structure floor slab;
S5, the outer scaffold is erected upwards layer by layer and fixedly connected with the lattice column.
Preferably, the specific steps of step S1 are:
carrying out outer scaffold arrangement according to engineering construction drawings and field plane arrangement, determining construction parameters such as the erection height, the vertical rod spacing, the step distance and the like of the outer scaffold, carrying out outer scaffold calculation by using BIM construction simulation software, and simultaneously determining the arrangement mode of outer scaffold wall connecting pieces;
and finally, setting up the outer scaffold foundation.
Preferably, the lattice column in the step S2 is formed by splicing an upper column and a lower column, wherein the upper column and the lower column are of rectangular columnar structures formed by a plurality of steel pipes, and two adjacent steel pipes are fixedly connected through a plurality of cross bars.
Preferably, an external thread is arranged at the upper end part of each steel pipe of the lower column, and each external thread is connected with a fine tuning piece in a threaded manner;
the fine tuning piece comprises an inserting rod movably arranged on the steel pipe, the diameter of the inserting rod is smaller than the inner diameter of the steel pipe, a sleeve is rotatably arranged at the lower end of the inserting rod, and the sleeve is in threaded connection with the external thread;
The rod body of the inserted rod is provided with a plurality of positioning holes in an array mode, and the positioning holes are formed along the axis of the inserted rod.
Preferably, a plurality of limiting holes are formed in the lower end portion of each steel pipe of the upper column in an array mode, a plug pin is inserted into one of the limiting holes, and the plug pin is inserted into one of the positioning holes.
Preferably, each of the upper posts is fixedly provided with a rectangular mounting plate at the upper end, a plurality of mounting holes are formed in the mounting plate and correspond to bolts, and the upper posts are fixed on the main body structure floor slab through bolts penetrating through the mounting plate.
Preferably, each lower end of the steel pipe of the lower column is fixedly provided with a rectangular mounting plate, a plurality of mounting holes are formed in the lower portion of the mounting plate, the mounting holes correspond to the bolts, and the lower column is fixed below the main body structure floor slab through the bolts penetrating through the mounting plate.
Preferably, the specific steps in step S4 are as follows:
and the lattice column is fixedly connected with the floor slab through the mounting plates at the two ends of the lattice column.
After the lattice column is installed, a plurality of diagonal braces are arranged on the lattice column, two ends of each diagonal brace are respectively used for fixing two adjacent steel pipes,
Preferably, the specific steps in step S3 are as follows:
In the construction process of the main body structure floor slab, the bolts are positioned corresponding to the arrangement mode of the mounting holes before the main body structure floor slab 6 is poured.
Preferably, the specific steps in step S5 are as follows:
After the lattice column is installed, the outer scaffold can be continuously erected upwards and fixed with the main structure floor slab through the wall connecting piece, and the column holding and pulling structure is carried out through the cross bars extending out on the outer scaffold and the lattice column.
The technical scheme provided by the embodiment of the invention has the beneficial effects that: the problem of the insufficient quantity of wall connecting pieces is solved through the mode of arranging the lattice column in the middle of the main body structure column in the building, the lattice column can adapt to the requirements of different layer heights through the adjustment of the vertical rod heights, the lattice column can be processed and produced in a modularized mode, a disc buckle frame or a fastener type steel pipe scaffold can be used for field refitting, the lattice column can be used in a turnover mode along with the scaffold, the safety of construction operators is guaranteed, good economic benefits and social benefits are achieved, and the lattice column can be widely popularized in the construction of the same type of structural system.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. Of course, the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other.
In the description of the invention, it should be understood that the terms "center," "longitudinal," "transverse," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships that are based on the orientation or positional relationships shown in the drawings, merely to facilitate describing the invention and simplify the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be configured and operate in a particular orientation, and therefore should not be construed as limiting the invention. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first", "a second", etc. may explicitly or implicitly include one or more such feature. In the description of the invention, unless otherwise indicated, the meaning of "a plurality" is two or more.
In the description of the invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the creation of the present invention can be understood by those of ordinary skill in the art in a specific case.
Example 1
Referring to fig. 1 to 2, the invention provides a scaffold anti-overturning reinforcing method for a high-rise ultra-high concrete structure, which comprises the following steps:
S1, building an outer scaffold 1 foundation;
s2, manufacturing a lattice column 3 on site according to the designed specification;
S3, constructing a main structure floor slab 6 and embedding the lattice column 3 with the bolts 4;
S4, installing the lattice column 3 on the main structure floor slab 6;
s5, the outer scaffold 1 is erected upwards layer by layer and fixedly connected with the lattice column 3.
The specific steps of the step S1 are as follows:
Arranging the outer scaffold 1 according to an engineering construction drawing and field plane arrangement, determining construction parameters such as the erection height, the vertical rod spacing, the step distance and the like of the outer scaffold 1, calculating the outer scaffold 1 by using BIM construction simulation software, and determining the arrangement mode of the wall connecting pieces 2 of the outer scaffold 1;
and finally, setting up the foundation of the outer scaffold 1.
The lattice column 3 in the step S2 is formed by splicing an upper column and a lower column, wherein the upper column and the lower column are rectangular columnar structures formed by a plurality of steel pipes, and two adjacent steel pipes are fixedly connected through a plurality of cross rods 5.
Before the lattice column 3 is manufactured, construction simulation analysis is carried out by using BIM construction simulation software, parameter designs such as a main structure wall connecting piece 2, the lattice column 3, bolts 4, a column holding drawknot between the outer scaffold 1 and the lattice column 3 are carried out, each construction material and section selection are determined, steel pipes such as 2X 2 and 3X 3 can be selected for the lattice column 3, stress calculation can be met, and the wall connecting piece 2, the column holding and the bolts 4 are not damaged under the action of wind load, and the lattice column 3 is not unstable.
The upper end part of each steel pipe of the lower column is provided with an external thread, and each external thread is connected with a fine tuning piece through threads;
The fine tuning piece comprises an inserting rod movably arranged on the steel pipe, the diameter of the inserting rod is smaller than the inner diameter of the steel pipe, a sleeve 8 is rotatably arranged at the lower end of the inserting rod, and the sleeve 8 is in threaded connection with the external thread;
furthermore, two pulling rods are fixedly arranged on the outer wall of the sleeve 8, so that a user can conveniently pull the sleeve 8, and convenience in use is improved;
the rod body of the inserted link is provided with a plurality of positioning holes in an array manner, and the positioning holes are arranged along the axis of the inserted link.
The lower end part of each steel pipe of the upper column is provided with a plurality of limiting holes 9 in an array manner, a bolt 10 is inserted into one of the limiting holes 9, and the bolt 10 is inserted into one of the positioning holes.
The upper end of each steel pipe of the upper column is fixedly provided with a rectangular mounting plate 7, a plurality of mounting holes are formed in the mounting plate 7 and correspond to the bolts 4, and the upper column is fixed on the main structure floor slab 6 through the bolts 4 penetrating through the mounting plate 7.
The lower extreme of every steel pipe of lower post is all fixed and is set up a rectangular mounting panel 7, sets up a plurality of mounting hole under the mounting panel 7, and the mounting hole corresponds with bolt 4, and the lower post is fixed under main structure floor 6 through the bolt 4 that runs through mounting panel 7.
The specific steps in the step S4 are as follows:
the lattice column 3 is fixedly connected with the floor slab through the bolts 4 and the mounting plates 7 at the two ends of the lattice column 3, so that the anti-lateral deformation capacity is good.
After the lattice column 3 is installed, a plurality of diagonal braces are arranged on the lattice column 3, two ends of each diagonal brace are respectively used for fixing two adjacent steel pipes,
The specific steps in the step S3 are as follows:
In the construction process of the main structure floor slab 6, the bolts 4 are poured before the main structure floor slab 6, and the positions of the bolts 4 correspond to the setting mode of the mounting holes 7.
The specific steps in the step S5 are as follows:
After the lattice column 3 is installed, the outer scaffold 1 can be continuously erected upwards and fixed with the main structure floor slab 6 through the wall connecting piece 2, the cross rod 5 extending out of the outer scaffold 1 is in column holding and tie with the lattice column 3, and the lattice column 3 and column holding are arranged at the position where the wall connecting piece 2 cannot be arranged between the site and the main structure according to the required number and positions of the outer scaffold 1 and the wall connecting piece 2 to replace the position, so that the stability of the outer scaffold 1 under the action of wind load in site construction can be ensured.
The foregoing description of the preferred embodiments of the invention is not intended to limit the invention to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and scope of the invention are intended to be included within the scope of the invention.