CN118699427A - A double-head gantry CNC flange drilling machine with hydraulic chuck - Google Patents

A double-head gantry CNC flange drilling machine with hydraulic chuck Download PDF

Info

Publication number
CN118699427A
CN118699427A CN202410969803.1A CN202410969803A CN118699427A CN 118699427 A CN118699427 A CN 118699427A CN 202410969803 A CN202410969803 A CN 202410969803A CN 118699427 A CN118699427 A CN 118699427A
Authority
CN
China
Prior art keywords
drill bit
mounting table
clamping
drilling machine
hydraulic chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410969803.1A
Other languages
Chinese (zh)
Inventor
樊金锋
张玉涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Zhongqing Metallurgical Valve Co Ltd Qinhuangdao Metallurgical Zhongqing Valve Co ltd
Original Assignee
Qinhuangdao Zhongqing Metallurgical Valve Co Ltd Qinhuangdao Metallurgical Zhongqing Valve Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Zhongqing Metallurgical Valve Co Ltd Qinhuangdao Metallurgical Zhongqing Valve Co ltd filed Critical Qinhuangdao Zhongqing Metallurgical Valve Co Ltd Qinhuangdao Metallurgical Zhongqing Valve Co ltd
Priority to CN202410969803.1A priority Critical patent/CN118699427A/en
Publication of CN118699427A publication Critical patent/CN118699427A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B41/00Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Boring (AREA)

Abstract

本发明公开了一种配合液压卡盘的双头龙门数控法兰钻孔专机,包括底座、控制柜、安装台、钻头;所述控制柜对称设置在底座的两侧,两个控制柜之间设置有横梁,钻头对称安装在横梁上;所述横梁上还安装有带动钻头横向动作的水平移动机构以及带动钻头上下移动的竖直移动机构;本发明通过设置水平移动机构和竖直移动机构实现了对钻头水平位置和竖直位置的调节,同时设置夹紧调节机构对法兰进行调节,保证了操作过程中的稳定性,还通过设置控制柜以及到位行程开关能够对钻头位置进行精准定位,提高了定位精度,同时设置驱动安装台旋转的回转驱动机构能够快速多次对法兰件进行钻孔,减少了上下料的次数,有效提高了钻孔效率。

The invention discloses a double-head gantry CNC flange drilling machine matched with a hydraulic chuck, comprising a base, a control cabinet, a mounting table and a drill bit; the control cabinets are symmetrically arranged on both sides of the base, a crossbeam is arranged between the two control cabinets, and the drill bit is symmetrically arranged on the crossbeam; a horizontal movement mechanism for driving the drill bit to move horizontally and a vertical movement mechanism for driving the drill bit to move up and down are also arranged on the crossbeam; the invention realizes the adjustment of the horizontal position and the vertical position of the drill bit by arranging the horizontal movement mechanism and the vertical movement mechanism, and at the same time, a clamping adjustment mechanism is arranged to adjust the flange, thereby ensuring the stability during operation; the control cabinet and the in-position stroke switch are arranged to accurately position the drill bit position, thereby improving the positioning accuracy; at the same time, a rotary drive mechanism for driving the mounting table to rotate is arranged to quickly and repeatedly drill holes in the flange part, thereby reducing the number of loading and unloading times and effectively improving the drilling efficiency.

Description

一种配合液压卡盘的双头龙门数控法兰钻孔专机A double-head gantry CNC flange drilling machine with hydraulic chuck

技术领域Technical Field

本发明涉及数控钻床技术领域,具体涉及一种配合液压卡盘的双头龙门数控法兰钻孔专机。The invention relates to the technical field of CNC drilling machines, and in particular to a double-head gantry CNC flange drilling machine matched with a hydraulic chuck.

背景技术Background Art

法兰连接是指由法兰、垫片及螺栓三者相互连接作为一组组合密封结构的可拆连接,法兰上有孔眼,螺栓使两法兰紧连,法兰间用衬垫密封。法兰上的孔眼一般采用数控钻床进行钻孔,操作精度高,钻孔迅速。Flange connection refers to a detachable connection in which flange, gasket and bolts are connected to each other as a combined sealing structure. There are holes on the flange, bolts make the two flanges tightly connected, and gaskets are used to seal between the flanges. The holes on the flange are generally drilled by CNC drilling machines, which have high operating accuracy and fast drilling.

目前常见的数控法兰钻床一般都是采用单钻头进行钻孔,手动进行定位,钻孔效率慢,钻孔精度不高,而且由于钻孔过程中会有碎渣碎屑飞出,一方面不易清理,另一方面,不能够控制碎屑的移动方向,容易误伤操作人员。Currently, common CNC flange drilling machines generally use a single drill bit for drilling and manual positioning. The drilling efficiency is slow and the drilling accuracy is not high. In addition, since debris will fly out during the drilling process, it is not easy to clean it up. On the other hand, the moving direction of the debris cannot be controlled, which may easily injure the operator.

现有数控法兰钻床也不能够对钻头的水平位置和竖直位置进行精确的调节,一般只能使用单一尺寸的钻床对特定型号的法兰进行钻孔,生产成本比较高。The existing CNC flange drilling machine is also unable to accurately adjust the horizontal and vertical positions of the drill bit. Generally, only a single-size drilling machine can be used to drill holes in flanges of a specific model, resulting in relatively high production costs.

发明内容Summary of the invention

本发明需要解决的技术问题是提供一种配合液压卡盘的双头龙门数控法兰钻孔专机,能够解决人工定位钻孔效率慢、精度低的问题,同时能够对钻头的上下位置和水平位置进行调节,以适应不同尺寸的法兰。The technical problem to be solved by the present invention is to provide a double-head gantry CNC flange drilling machine equipped with a hydraulic chuck, which can solve the problems of slow efficiency and low precision of manual positioning drilling, and at the same time can adjust the up and down position and horizontal position of the drill bit to adapt to flanges of different sizes.

为解决上述技术问题,本发明所采取的技术方案如下。In order to solve the above technical problems, the technical solutions adopted by the present invention are as follows.

一种配合液压卡盘的双头龙门数控法兰钻孔专机,包括底座、控制柜、安装台、钻头;所述控制柜对称设置在底座的两侧,两个控制柜之间设置有横梁,钻头对称安装在横梁上;所述横梁上还安装有带动钻头横向动作的水平移动机构以及带动钻头上下移动的竖直移动机构,钻头安装在竖直移动机构上,竖直移动机构滑动设置于水平移动机构上;所述安装台设置于底座的中心且安装台的中心与两个钻头连线的中心对齐;所述底座上还设置有围挡,围挡的敞口端面与两个控制柜连接形成护栏;所述控制柜内设置有控制器,控制柜侧面面板上设置有便于操作的显示屏。A double-head gantry CNC flange drilling machine for use with a hydraulic chuck, comprising a base, a control cabinet, a mounting platform, and a drill bit; the control cabinets are symmetrically arranged on both sides of the base, a crossbeam is arranged between the two control cabinets, and the drill bit is symmetrically installed on the crossbeam; a horizontal moving mechanism for driving the drill bit to move horizontally and a vertical moving mechanism for driving the drill bit to move up and down are also installed on the crossbeam, the drill bit is installed on the vertical moving mechanism, and the vertical moving mechanism is slidably arranged on the horizontal moving mechanism; the mounting platform is arranged at the center of the base and the center of the mounting platform is aligned with the center of the line connecting the two drill bits; a fence is also arranged on the base, and the open end surface of the fence is connected to the two control cabinets to form a guardrail; a controller is arranged in the control cabinet, and a display screen for easy operation is arranged on the side panel of the control cabinet.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述水平移动机构包括安装在横梁上、与竖直移动机构螺纹配装的丝杆,丝杆受第二电机驱动,第二电机的受控端与控制器的输出端连接;所述竖直移动机构上下两端分别与设置在横梁上下两侧的滑轨滑动配装;所述横梁的两端和中部分别设置有用于安装丝杆的安装支架,两端的安装支架分别与丝杆的外端部连接,中间的安装支架分别与两个丝杆的内端部连接。The above-mentioned double-head gantry CNC flange drilling machine with a hydraulic chuck, the horizontal moving mechanism includes a screw installed on the crossbeam and threadedly matched with the vertical moving mechanism, the screw is driven by a second motor, and the controlled end of the second motor is connected to the output end of the controller; the upper and lower ends of the vertical moving mechanism are respectively slidably matched with the slide rails arranged on the upper and lower sides of the crossbeam; the two ends and the middle part of the crossbeam are respectively provided with mounting brackets for mounting the screw, the mounting brackets at the two ends are respectively connected to the outer ends of the screw, and the middle mounting bracket is respectively connected to the inner ends of the two screws.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述竖直移动机构包括与丝杆螺纹配装的滑板,滑板上滑动设置有竖直安装板,竖直安装板的顶部安装有驱动竖直安装板上下移动的第三电机,第三电机的受控端与控制器的输出端连接;所述钻头安装在竖直安装板的下端且朝向安装台端面设置,钻头受第一电机驱动,第一电机的受控端与控制器的输出端连接。The above-mentioned double-head gantry CNC flange drilling machine with a hydraulic chuck, the vertical moving mechanism includes a slide plate matched with the screw thread, a vertical mounting plate is slidably arranged on the slide plate, a third motor for driving the vertical mounting plate to move up and down is installed on the top of the vertical mounting plate, and the controlled end of the third motor is connected to the output end of the controller; the drill bit is installed at the lower end of the vertical mounting plate and is arranged toward the end face of the mounting table, the drill bit is driven by the first motor, and the controlled end of the first motor is connected to the output end of the controller.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述竖直安装板上还安装有到位行程开关,到位行程开关的输出端与控制器的输入端连接。The above-mentioned double-head gantry CNC flange drilling machine equipped with a hydraulic chuck is also provided with an in-place travel switch on the vertical mounting plate, and the output end of the in-place travel switch is connected to the input end of the controller.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述竖直安装板上安装有对钻头进行冷却的水冷组件;所述水冷组件包括安装在钻头一侧的喷头,喷头通过送水管与设置在底座上的水箱连通。The above-mentioned double-head gantry CNC flange drilling machine equipped with a hydraulic chuck has a water cooling assembly for cooling the drill bit installed on the vertical mounting plate; the water cooling assembly includes a nozzle installed on one side of the drill bit, and the nozzle is connected to a water tank arranged on the base through a water supply pipe.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述安装台底部周侧与围挡和防护板之间安装有对安装台进行支撑的托板,托板的两侧对称设置有向下凹陷的排水槽;所述排水槽的底部安装有表面开设有排水孔的滤水底板,滤水底板设置于水箱的顶部并与水箱连通。The above-mentioned double-head gantry CNC flange drilling machine equipped with a hydraulic chuck has a support plate for supporting the mounting platform installed between the bottom side of the mounting platform and the enclosure and the protective plate, and downwardly recessed drainage grooves are symmetrically arranged on both sides of the support plate; a water filter bottom plate with drainage holes on the surface is installed at the bottom of the drainage groove, and the water filter bottom plate is arranged on the top of the water tank and is connected to the water tank.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述安装台的底部设置有套装在安装台内部的支架,支架与安装台之间设置有驱动安装台转动的回转驱动机构;所述回转驱动机构包括安装在支架顶部的主动齿轮,主动齿轮与设置在支架内部的第四电机连接,第四电机的受控端与控制器的输出端连接;所述安装台内部中心的连接柱底部安装有与主动齿轮啮合传动的从动齿轮。The above-mentioned double-head gantry CNC flange drilling machine equipped with a hydraulic chuck, the bottom of the mounting table is provided with a bracket mounted inside the mounting table, and a rotary drive mechanism for driving the mounting table to rotate is provided between the bracket and the mounting table; the rotary drive mechanism includes a driving gear installed on the top of the bracket, the driving gear is connected to the fourth motor arranged inside the bracket, and the controlled end of the fourth motor is connected to the output end of the controller; a driven gear meshing with the driving gear is installed at the bottom of the connecting column in the center of the mounting table.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,位于主动齿轮相对侧的支架上设置有对安装台进行夹紧的夹紧机构;所述夹紧机构包括夹紧气缸,夹紧气缸的两侧分别对称连接有铰接座,铰接座的另一端与第一铰接杆铰接,第一铰接杆的另一端通过设置在支架上的铰接轴与第二铰接杆铰接,第二铰接杆与安装台内部中心的连接柱限位连接。The above-mentioned double-head gantry CNC flange drilling machine equipped with a hydraulic chuck is provided with a clamping mechanism for clamping the mounting table on the bracket located on the opposite side of the driving gear; the clamping mechanism includes a clamping cylinder, and the two sides of the clamping cylinder are symmetrically connected with articulated seats, the other end of the articulated seat is hinged to the first articulated rod, and the other end of the first articulated rod is hinged to the second articulated rod through an articulated shaft arranged on the bracket, and the second articulated rod is limitedly connected to the connecting column at the center of the mounting table.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述安装台顶部端面上均匀分布有对法兰进行夹持的若干卡块,卡块与径向开设在安装台上的滑槽滑动连接,安装台内部还设置有对卡块位置进行调整的夹持调节机构。The above-mentioned double-head gantry CNC flange drilling machine equipped with a hydraulic chuck has a plurality of clamping blocks evenly distributed on the top end surface of the mounting table for clamping the flange, the clamping blocks are slidably connected to the slide grooves radially opened on the mounting table, and a clamping adjustment mechanism for adjusting the position of the clamping blocks is also provided inside the mounting table.

上述一种配合液压卡盘的双头龙门数控法兰钻孔专机,所述夹持调节机构包括与卡块底部铰接的连杆,连杆的另一端与设置在连接柱顶部的法兰座铰接;其中对称设置的一组卡块为主动件,其余为从动件,作为主动件的两个卡块并分别与设置在安装台内部的调节气缸连接,调节气缸的受控端与控制器的输出端连接。The above-mentioned double-head gantry CNC flange drilling machine equipped with a hydraulic chuck, the clamping and adjusting mechanism includes a connecting rod hinged to the bottom of the clamping block, and the other end of the connecting rod is hinged to the flange seat arranged on the top of the connecting column; wherein a group of symmetrically arranged clamping blocks are active parts, and the rest are driven parts, and the two clamping blocks serving as active parts are respectively connected to the adjusting cylinders arranged inside the mounting table, and the controlled end of the adjusting cylinder is connected to the output end of the controller.

由于采用了以上技术方案,本发明所取得技术进步如下。Due to the adoption of the above technical scheme, the technical progress achieved by the present invention is as follows.

本发明提供了一种配合液压卡盘的双头龙门数控法兰钻孔专机,通过设置水平移动机构和竖直移动机构实现了对钻头水平位置和竖直位置的调节,能够适用于不同尺寸的法兰进行钻孔,同时设置夹紧调节机构对法兰进行调节,保证了操作过程中的稳定性。The present invention provides a double-head gantry CNC flange drilling machine matched with a hydraulic chuck. By setting a horizontal moving mechanism and a vertical moving mechanism, the horizontal and vertical positions of the drill bit can be adjusted. It can be suitable for drilling flanges of different sizes. At the same time, a clamping adjustment mechanism is set to adjust the flange, thereby ensuring stability during operation.

本发明通过设置控制柜以及到位行程开关能够对钻头位置进行精准定位,提高了定位精度,同时设置驱动安装台旋转的回转驱动机构能够快速多次对法兰件进行钻孔,减少了上下料的次数,有效提高了钻孔效率。The present invention can accurately locate the drill bit position by arranging a control cabinet and an in-position stroke switch, thereby improving the positioning accuracy. At the same time, a rotary drive mechanism that drives the mounting table to rotate can quickly drill holes in the flange multiple times, thereby reducing the number of loading and unloading times and effectively improving the drilling efficiency.

本发明还通过设置水冷组件对钻头进行冷却,避免了钻头表面温度过热影响钻孔效率,同时设置托板配合围挡对钻孔时的碎屑进行防护,使碎屑集中落在托板上进行收集,减轻了碎屑清理的难度,还在托板上设置与水箱连通的排水槽有效地将水冷后的水进行了回收,并通过设置滤水底板对碎屑与水冷后的水进行分离,避免了碎屑进入水箱内影响水箱内水的使用。The present invention also cools the drill bit by arranging a water cooling component, thereby preventing the surface temperature of the drill bit from overheating and affecting the drilling efficiency. At the same time, a support plate is arranged to cooperate with a fence to protect the debris during drilling, so that the debris falls on the support plate for collection, thereby reducing the difficulty of debris cleaning. A drainage trough connected to the water tank is also arranged on the support plate to effectively recycle the water after water cooling, and a water filter bottom plate is arranged to separate the debris from the water after water cooling, thereby preventing the debris from entering the water tank and affecting the use of the water in the water tank.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本发明的具体结构示意图;Fig. 1 is a schematic diagram of the specific structure of the present invention;

图2为本发明的主视图;Fig. 2 is a front view of the present invention;

图3为本发明所述回转驱动机构的具体结构示意图;FIG3 is a schematic diagram of the specific structure of the rotary drive mechanism of the present invention;

图4为本发明所述夹持调节机构的具体结构示意图;FIG4 is a schematic diagram of the specific structure of the clamping adjustment mechanism of the present invention;

图5为本发明所述夹紧机构的具体结构示意图。FIG. 5 is a schematic diagram of the specific structure of the clamping mechanism of the present invention.

其中:1.底座,2.控制柜,3.横梁,4.安装台,5.围挡,6.钻头,7.第一电机,8.水平移动机构,81.丝杆,82.第二电机,83.滑轨,9.竖直移动机构,91.滑板,92.第三电机,93.竖直安装板,10.支架,11.卡块,12.连接柱,13.第四电机,14.主动齿轮,15.从动齿轮,16.滑槽,17.法兰座,18.连杆,19.调节气缸,20.夹紧气缸,21.铰接座,22.第一铰接杆,23.铰接轴,24.第二铰接杆,25.托板,26.排水槽,27.滤水底板,28.水箱。Wherein: 1. base, 2. control cabinet, 3. crossbeam, 4. mounting table, 5. enclosure, 6. drill bit, 7. first motor, 8. horizontal moving mechanism, 81. screw, 82. second motor, 83. slide rail, 9. vertical moving mechanism, 91. slide plate, 92. third motor, 93. vertical mounting plate, 10. bracket, 11. block, 12. connecting column, 13. fourth motor, 14. driving gear, 15. driven gear, 16. slide groove, 17. flange seat, 18. connecting rod, 19. adjusting cylinder, 20. clamping cylinder, 21. articulated seat, 22. first articulated rod, 23. articulated shaft, 24. second articulated rod, 25. support plate, 26. drain trough, 27. water filter bottom plate, 28. water tank.

具体实施方式DETAILED DESCRIPTION

下面将结合附图和具体实施方式对本发明进行进一步详细说明。The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

一种配合液压卡盘的双头龙门数控法兰钻孔专机,如图1至图4所示,包括底座1、控制柜2、安装台4、钻头6,控制柜2对称设置在底座1的两侧,两个控制柜2之间设置有横梁3,横梁3上对称安装有钻头6以及驱动钻头6动作的第一电机7,安装台4设置于底座1的中心且安装台4的中心与两个钻头6连线的中心对齐。A double-head gantry CNC flange drilling machine for use with a hydraulic chuck, as shown in Figures 1 to 4, includes a base 1, a control cabinet 2, a mounting platform 4, and a drill bit 6. The control cabinets 2 are symmetrically arranged on both sides of the base 1, a crossbeam 3 is arranged between the two control cabinets 2, and the drill bit 6 and a first motor 7 for driving the drill bit 6 are symmetrically installed on the crossbeam 3. The mounting platform 4 is arranged at the center of the base 1 and the center of the mounting platform 4 is aligned with the center of the line connecting the two drill bits 6.

底座1上还设置有围挡5,围挡5的敞口端面与两个控制柜2连接形成护栏,起一定的防护作用,防止铁屑到处乱跑。The base 1 is also provided with a fence 5, the open end surface of which is connected to the two control cabinets 2 to form a guardrail, which plays a certain protective role and prevents iron filings from running around.

围挡5上开设有若干透明窗口,能够对内部钻孔情况进行观察,同时增加护栏内部亮度。A plurality of transparent windows are provided on the enclosure 5, through which the internal drilling conditions can be observed and the internal brightness of the guardrail can be increased.

控制柜2内设置有控制器,控制柜2侧面面板上设置有便于操作的显示屏。A controller is arranged in the control cabinet 2, and a display screen for easy operation is arranged on the side panel of the control cabinet 2.

横梁3上还安装有带动钻头6横向动作的水平移动机构8以及带动钻头6上下移动的竖直移动机构9,钻头6安装在竖直移动机构9上,竖直移动机构9滑动设置于水平移动机构8上。The crossbeam 3 is also provided with a horizontal moving mechanism 8 for driving the drill bit 6 to move horizontally and a vertical moving mechanism 9 for driving the drill bit 6 to move up and down. The drill bit 6 is installed on the vertical moving mechanism 9, and the vertical moving mechanism 9 is slidably arranged on the horizontal moving mechanism 8.

所述水平移动机构8包括安装在横梁3上的丝杆81以及设置在横梁3上下两侧的滑轨83,如图2所示,丝杆81受第二电机82驱动,第二电机82的受控端与控制器的输出端连接。The horizontal moving mechanism 8 includes a screw rod 81 installed on the beam 3 and slide rails 83 arranged on the upper and lower sides of the beam 3. As shown in FIG. 2 , the screw rod 81 is driven by a second motor 82, and the controlled end of the second motor 82 is connected to the output end of the controller.

横梁3的两端部和中部分别设置有用于安装丝杆81的安装支架,两端的安装支架分别与丝杆81的外端部连接,中间的安装支架分别与两个丝杆81的内端部连接。Mounting brackets for mounting the screw rods 81 are respectively provided at the two ends and the middle of the cross beam 3 . The mounting brackets at both ends are respectively connected to the outer ends of the screw rods 81 , and the middle mounting bracket is respectively connected to the inner ends of the two screw rods 81 .

竖直移动机构9与丝杆81螺纹配装,且竖直移动机构9上下两端分别与滑轨83滑动配装。The vertical moving mechanism 9 is threadedly mounted on the screw rod 81 , and the upper and lower ends of the vertical moving mechanism 9 are slidably mounted on the slide rails 83 .

所述竖直移动机构9包括与丝杆81螺纹配装的滑板91,滑板91上滑动设置有竖直安装板93,竖直安装板93的顶部安装有驱动竖直安装板93上下移动的第三电机92,第三电机92的受控端与控制器的输出端连接。The vertical moving mechanism 9 includes a slide plate 91 threadedly mounted on the lead screw 81, a vertical mounting plate 93 is slidably arranged on the slide plate 91, a third motor 92 for driving the vertical mounting plate 93 to move up and down is installed on the top of the vertical mounting plate 93, and a controlled end of the third motor 92 is connected to the output end of the controller.

竖直安装板93上还安装有到位行程开关,到位行程开关的输出端与控制器的受控端连接,能够保证精准调节钻头6的位置。An in-position travel switch is also installed on the vertical mounting plate 93 , and the output end of the in-position travel switch is connected to the controlled end of the controller, which can ensure accurate adjustment of the position of the drill bit 6 .

钻头6和第一电机7分别安装在竖直安装板93的下端且朝向安装台4端面设置,第一电机7的受控端与控制器的输出端连接。The drill bit 6 and the first motor 7 are respectively mounted on the lower end of the vertical mounting plate 93 and are arranged toward the end surface of the mounting platform 4, and the controlled end of the first motor 7 is connected to the output end of the controller.

竖直安装板93上安装有对钻头6进行冷却的水冷组件,所述水冷组件包括安装在钻头6一侧的喷头,喷头通过送水管与设置在底座1上的水箱连通。A water cooling assembly for cooling the drill bit 6 is mounted on the vertical mounting plate 93 , and the water cooling assembly includes a nozzle mounted on one side of the drill bit 6 , and the nozzle is connected to a water tank disposed on the base 1 through a water supply pipe.

安装台4底部周侧与围挡5和防护板之间安装有对安装台4进行支撑的托板25,托板25的两侧对称设置有向下凹陷的排水槽26,排水槽26的底部安装有表面开设有排水孔的滤水底板27,滤水底板27设置于水箱28的顶部并与水箱28连通。A support plate 25 for supporting the mounting platform 4 is installed between the bottom periphery of the mounting platform 4 and the enclosure 5 and the protective plate. Downward-concave drainage grooves 26 are symmetrically arranged on both sides of the support plate 25. A water filter bottom plate 27 with drainage holes on its surface is installed at the bottom of the drainage groove 26. The water filter bottom plate 27 is arranged on the top of the water tank 28 and is connected to the water tank 28.

滤水底板27能够对钻孔时的碎屑进行阻挡,防止碎屑随水流一起进入水箱,造成水箱堵塞。The water filtering bottom plate 27 can block the debris generated during drilling, preventing the debris from entering the water tank along with the water flow and causing clogging of the water tank.

安装台4的底部设置有支架10,支架10与安装台4之间设置有驱动安装台4转动的回转驱动机构。A bracket 10 is provided at the bottom of the mounting platform 4 , and a rotary driving mechanism for driving the mounting platform 4 to rotate is provided between the bracket 10 and the mounting platform 4 .

所述回转驱动机构包括安装在支架10顶部的主动齿轮14,如图3所示,主动齿轮14与设置在支架10内部的第四电机13连接,第四电机13的受控端与控制器的输出端连接。The rotary drive mechanism includes a driving gear 14 installed on the top of the bracket 10. As shown in FIG. 3, the driving gear 14 is connected to a fourth motor 13 disposed inside the bracket 10, and a controlled end of the fourth motor 13 is connected to an output end of the controller.

安装台4内部中心的连接柱12底部安装有与主动齿轮14啮合传动的从动齿轮15,通过从动齿轮15带动安装台4转动。A driven gear 15 meshing with a driving gear 14 is installed at the bottom of the connecting column 12 at the center of the mounting platform 4 , and the mounting platform 4 is driven to rotate by the driven gear 15 .

位于主动齿轮14相对侧的支架10上设置有对安装台4进行夹紧的夹紧机构,能够防止钻孔时安装台发生移动影响钻孔精度。A clamping mechanism for clamping the mounting platform 4 is provided on the bracket 10 located on the opposite side of the driving gear 14 , so as to prevent the mounting platform from moving during drilling and affecting the drilling accuracy.

所述夹紧机构包括夹紧气缸20,夹紧气缸20的两侧分别对称连接有铰接座21,铰接座21的另一端与第一铰接杆22铰接,第一铰接杆22的另一端通过设置在支架10上的铰接轴23与第二铰接杆24铰接,第二铰接杆24与安装台4内部中心的连接柱12限位连接。The clamping mechanism includes a clamping cylinder 20, and the two sides of the clamping cylinder 20 are symmetrically connected with an articulated seat 21, the other end of the articulated seat 21 is hinged to the first articulated rod 22, and the other end of the first articulated rod 22 is hinged to the second articulated rod 24 through an articulated shaft 23 arranged on the bracket 10, and the second articulated rod 24 is limitedly connected to the connecting column 12 at the inner center of the mounting platform 4.

通过夹紧气缸20动作,带动第一铰接杆22和第二铰接杆24动作,通过两个第二铰接杆24配合对安装台4内部的连接柱12进行夹紧,完成对安装台的固定,防止钻孔时安装台发生移动。The clamping cylinder 20 is actuated to drive the first hinge rod 22 and the second hinge rod 24 to actuate, and the two second hinge rods 24 cooperate to clamp the connecting column 12 inside the mounting platform 4 to fix the mounting platform and prevent the mounting platform from moving during drilling.

安装台4顶部端面上均匀分布有对法兰进行夹持的若干卡块11,卡块11与径向开设在安装台4上的滑槽16滑动连接,安装台4内部还设置有对卡块11位置进行调整的夹持调节机构。A plurality of clamping blocks 11 for clamping the flange are evenly distributed on the top end surface of the mounting platform 4. The clamping blocks 11 are slidably connected to the sliding grooves 16 radially opened on the mounting platform 4. A clamping adjustment mechanism for adjusting the position of the clamping blocks 11 is also provided inside the mounting platform 4.

如图4所示,所述夹持调节机构包括与卡块11底部铰接的连杆18,连杆18的另一端与设置在连接柱12顶部的法兰座17铰接,其中对称设置的一组卡块11为主动件,其余为从动件。As shown in FIG4 , the clamping adjustment mechanism includes a connecting rod 18 hinged to the bottom of the clamping block 11 , and the other end of the connecting rod 18 is hinged to a flange seat 17 arranged on the top of the connecting column 12 , wherein a group of symmetrically arranged clamping blocks 11 are active parts, and the rest are driven parts.

作为主动件的两个卡块11并分别与调节气缸19连接,调节气缸19的受控端与控制器的输出端连接,通过调节气缸19带动主动件卡块11动作,并通过连杆18与法兰座17配合实现从动件卡块11的移动,以实现对夹持范围的调节。The two clamping blocks 11 serving as active parts are respectively connected to the adjusting cylinder 19. The controlled end of the adjusting cylinder 19 is connected to the output end of the controller. The active part clamping block 11 is driven to move by the adjusting cylinder 19, and the movement of the driven part clamping block 11 is realized through the cooperation of the connecting rod 18 and the flange seat 17, so as to realize the adjustment of the clamping range.

使用时,首先将法兰件放置在安装台4上,并通过夹紧调节机构对法兰件进行夹紧。When in use, the flange is first placed on the mounting platform 4 and then clamped by the clamping and adjusting mechanism.

然后,在显示屏上输入法兰件的具体尺寸和需要打孔的数量,通过控制柜控制水平移动机构和竖直移动机构动作,完成对钻头位置的调节后,控制钻头开始打孔。Then, input the specific size of the flange and the number of holes to be drilled on the display screen, control the horizontal and vertical moving mechanisms through the control cabinet, and after adjusting the drill position, control the drill to start drilling.

打孔过程中,为防止安装台移动导致打孔精度出现误差,还需要通过控制夹紧气缸20动作,带动第一铰接杆22和第二铰接杆24动作,通过两个第二铰接杆24配合对安装台4内部的连接柱12进行夹紧,从而完成对安装台的紧固。During the drilling process, in order to prevent the movement of the mounting platform and cause errors in the drilling accuracy, it is also necessary to control the movement of the clamping cylinder 20 to drive the movement of the first hinged rod 22 and the second hinged rod 24, and the two second hinged rods 24 cooperate to clamp the connecting column 12 inside the mounting platform 4, thereby completing the fastening of the mounting platform.

此外,打孔时,为避免钻头过热出现故障,通过水冷组件向钻头打孔处进行水冷喷淋,喷淋后的水会经排水槽26进入水箱28中循环使用,并通过滤水底板27对钻孔时的碎渣进行阻挡,防止碎渣进入水箱造成堵塞,影响水冷效果。In addition, when drilling, in order to avoid overheating of the drill bit and malfunction, water cooling is sprayed on the drill hole through the water cooling component. The sprayed water will enter the water tank 28 through the drainage groove 26 for recycling, and the debris during drilling will be blocked by the water filter bottom plate 27 to prevent the debris from entering the water tank and causing blockage, which will affect the water cooling effect.

一组打孔完成后,控制柜会根据输入的数据对安装台旋转角度进行计算,并通过回转驱动机构带动安装台转动合适的角度,进行下一组打孔,重复上述操作,打孔完成后,停止钻头动作,松开卡块对法兰件的夹持,将工件取下即可。After a set of drilling is completed, the control cabinet will calculate the rotation angle of the mounting table according to the input data, and drive the mounting table to rotate to the appropriate angle through the rotary drive mechanism to perform the next set of drilling. Repeat the above operations. After the drilling is completed, stop the drill bit action, release the clamping block on the flange, and remove the workpiece.

本发明提供了一种配合液压卡盘的双头龙门数控法兰钻孔专机,通过设置水平移动机构和竖直移动机构实现了对钻头水平位置和竖直位置的调节,能够适用于不同尺寸的法兰进行钻孔,同时设置夹紧调节机构对法兰进行调节,保证了操作过程中的稳定性。The present invention provides a double-head gantry CNC flange drilling machine matched with a hydraulic chuck. By setting a horizontal moving mechanism and a vertical moving mechanism, the horizontal and vertical positions of the drill bit can be adjusted. It can be suitable for drilling flanges of different sizes. At the same time, a clamping adjustment mechanism is set to adjust the flange, thereby ensuring stability during operation.

本发明通过设置控制柜以及到位行程开关能够对钻头位置进行精准定位,提高了定位精度,同时设置驱动安装台旋转的回转驱动机构能够快速多次对法兰件进行钻孔,减少了上下料的次数,有效提高了钻孔效率。The present invention can accurately locate the drill bit position by arranging a control cabinet and an in-position stroke switch, thereby improving the positioning accuracy. At the same time, a rotary drive mechanism that drives the mounting table to rotate can quickly drill holes in the flange multiple times, thereby reducing the number of loading and unloading times and effectively improving the drilling efficiency.

Claims (10)

1. Double-end longmen numerical control flange drilling special plane of cooperation hydraulic chuck, its characterized in that: comprises a base (1), a control cabinet (2), an installation table (4) and a drill bit (6); the control cabinets (2) are symmetrically arranged on two sides of the base (1), a cross beam (3) is arranged between the two control cabinets (2), and the drill bit (6) is symmetrically arranged on the cross beam (3); the horizontal moving mechanism (8) for driving the drill bit (4) to transversely move and the vertical moving mechanism (9) for driving the drill bit (6) to move up and down are also arranged on the cross beam (3), the drill bit (6) is arranged on the vertical moving mechanism (9), and the vertical moving mechanism (9) is arranged on the horizontal moving mechanism (8) in a sliding mode; the mounting table (4) is arranged at the center of the base (1), and the center of the mounting table (4) is aligned with the center of the connecting line of the two drill bits (6); the base (1) is also provided with a fence (5), the open end face of the fence (5) is connected with the two control cabinets (2) to form a guardrail, and a protection plate is arranged between the two control cabinets (2) positioned behind the cross beam; the control cabinet (2) is internally provided with a controller, and a display screen convenient to operate is arranged on a side face panel of the control cabinet (2).
2. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck, as set forth in claim 1, is characterized in that: the horizontal moving mechanism (8) comprises a screw rod (81) which is arranged on the cross beam (3) and is in threaded fit with the vertical moving mechanism (9), the screw rod (81) is driven by a second motor (82), and the controlled end of the second motor (82) is connected with the output end of the controller; the upper end and the lower end of the vertical moving mechanism (9) are respectively in sliding fit with sliding rails (83) arranged on the upper side and the lower side of the cross beam (3); the two ends and the middle part of the cross beam (3) are respectively provided with a mounting bracket for mounting the screw rods (81), the mounting brackets at the two ends are respectively connected with the outer end parts of the screw rods (81), and the middle mounting bracket is respectively connected with the inner end parts of the two screw rods (81).
3. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck as set forth in claim 2, wherein: the vertical moving mechanism (9) comprises a sliding plate (91) which is in threaded fit with the screw rod (81), a vertical mounting plate (93) is arranged on the sliding plate (91) in a sliding manner, a third motor (92) for driving the vertical mounting plate (93) to move up and down is arranged at the top of the vertical mounting plate (93), and the controlled end of the third motor (92) is connected with the output end of the controller; the drill bit (6) is arranged at the lower end of the vertical mounting plate (93) and is arranged towards the end face of the mounting table (4), the drill bit (6) is driven by the first motor (7), and the controlled end of the first motor (7) is connected with the output end of the controller.
4. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck as set forth in claim 3, wherein: and the vertical mounting plate (93) is also provided with an in-place travel switch, and the output end of the in-place travel switch is connected with the input end of the controller.
5. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck as set forth in claim 3, wherein: a water cooling assembly for cooling the drill bit (6) is arranged on the vertical mounting plate (93); the water cooling assembly comprises a spray head arranged on one side of the drill bit (6), and the spray head is communicated with a water tank (28) arranged on the base (1) through a water supply pipe.
6. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck, as set forth in claim 5, is characterized in that: a supporting plate (25) for supporting the mounting table (4) is arranged between the periphery side of the bottom of the mounting table (4) and the enclosure (5) and the protection plate, and drainage grooves (26) which are downwards concave are symmetrically formed in two sides of the supporting plate (25); the bottom of water drainage tank (26) is installed and is offered drainage hole's drainage bottom plate (27) on the surface, and drainage bottom plate (27) set up in the top of water tank (28) and with water tank (28) intercommunication.
7. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck, as set forth in claim 1, is characterized in that: a bracket (10) sleeved in the mounting table (4) is arranged at the bottom of the mounting table (4), and a rotary driving mechanism for driving the mounting table (4) to rotate is arranged between the bracket (10) and the mounting table (4); the rotary driving mechanism comprises a driving gear (14) arranged at the top of the bracket (10), the driving gear (14) is connected with a fourth motor (13) arranged in the bracket (10), and the controlled end of the fourth motor (13) is connected with the output end of the controller; the bottom of a connecting column (12) at the inner center of the mounting table (4) is provided with a driven gear (15) which is meshed with the driving gear (14) for transmission.
8. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck, as set forth in claim 7, is characterized in that: a clamping mechanism for clamping the mounting table (4) is arranged on the bracket (10) positioned on the opposite side of the driving gear (14); the clamping mechanism comprises a clamping cylinder (20), two sides of the clamping cylinder (20) are symmetrically connected with a hinge seat (21) respectively, the other end of the hinge seat (21) is hinged with a first hinge rod (22), the other end of the first hinge rod (22) is hinged with a second hinge rod (24) through a hinge shaft (23) arranged on a bracket (10), and the second hinge rod (24) is in limiting connection with a connecting column (12) in the inner center of the mounting table (4).
9. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck, as set forth in claim 1, is characterized in that: a plurality of clamping blocks (11) for clamping the flange are uniformly distributed on the top end face of the mounting table (4), the clamping blocks (11) are in sliding connection with sliding grooves (16) radially formed in the mounting table (4), and a clamping and adjusting mechanism for adjusting the positions of the clamping blocks (11) is further arranged in the mounting table (4).
10. The special double-headed gantry numerical control flange drilling machine matched with the hydraulic chuck, as set forth in claim 9, is characterized in that: the clamping and adjusting mechanism comprises a connecting rod (18) hinged with the bottom of the clamping block (11), and the other end of the connecting rod (18) is hinged with a flange seat (17) arranged at the top of the connecting column (12); the two clamping blocks (11) serving as driving parts are respectively connected with an adjusting cylinder (19) arranged in the mounting table, and the controlled end of the adjusting cylinder (19) is connected with the output end of the controller.
CN202410969803.1A 2024-07-19 2024-07-19 A double-head gantry CNC flange drilling machine with hydraulic chuck Pending CN118699427A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410969803.1A CN118699427A (en) 2024-07-19 2024-07-19 A double-head gantry CNC flange drilling machine with hydraulic chuck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410969803.1A CN118699427A (en) 2024-07-19 2024-07-19 A double-head gantry CNC flange drilling machine with hydraulic chuck

Publications (1)

Publication Number Publication Date
CN118699427A true CN118699427A (en) 2024-09-27

Family

ID=92805658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410969803.1A Pending CN118699427A (en) 2024-07-19 2024-07-19 A double-head gantry CNC flange drilling machine with hydraulic chuck

Country Status (1)

Country Link
CN (1) CN118699427A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119115015A (en) * 2024-11-14 2024-12-13 莱州华鲁汽车配件有限公司 A drilling device for brake disc production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119115015A (en) * 2024-11-14 2024-12-13 莱州华鲁汽车配件有限公司 A drilling device for brake disc production

Similar Documents

Publication Publication Date Title
CN108188823B (en) A CNC machine tool that can be cleaned automatically
CN118699427A (en) A double-head gantry CNC flange drilling machine with hydraulic chuck
CN112317807A (en) Drilling machine is used in processing of cylindrical work piece side opening of high accuracy
CN222077412U (en) A rotary hydraulic component production cleaning device
CN207789347U (en) A kind of combined wall cutting machine
CN118046023A (en) Punching device for power transformer production
CN217224699U (en) A drilling and milling machine that is easy to disassemble and easy to clean
CN212778097U (en) Cooling device with water circulation function for plate processing
CN219521486U (en) Cutter head flushing processing device of shield tunneling machine
CN218856352U (en) Milling machine with high cooling performance
CN114309722B (en) Protection device for machining metal forging and use method thereof
CN216934865U (en) Recovery unit of flat grinder cutting fluid
CN117260339A (en) A machine tool rest and machine tool
CN223477086U (en) Workpiece processing dust reduction device
CN219357984U (en) Drilling machine
CN116619118A (en) A gantry milling machine table
CN209836250U (en) Special cooling mechanism of gear laser quenching machine
CN108501125A (en) Multi-shaft type automatic plate processing center
CN218800853U (en) Milling machine for machining steel castings
CN208391663U (en) A kind of water of keeping away of ultra-clean keeps away dirt formula milling machine
CN114346751A (en) Shock-absorbing high-speed machining center and method of use
CN218657155U (en) A slotting device for mold processing
CN219521201U (en) Horizontal six-head servo drilling and tapping integrated machine
CN208528835U (en) A kind of four shaft vertical linkage processing equipments
CN221870343U (en) Solder mask copper plate processingequipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination