CN118653434A - A stepped water discharge tunnel and energy dissipation method - Google Patents

A stepped water discharge tunnel and energy dissipation method Download PDF

Info

Publication number
CN118653434A
CN118653434A CN202410916168.0A CN202410916168A CN118653434A CN 118653434 A CN118653434 A CN 118653434A CN 202410916168 A CN202410916168 A CN 202410916168A CN 118653434 A CN118653434 A CN 118653434A
Authority
CN
China
Prior art keywords
energy dissipation
water flow
steps
energy
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410916168.0A
Other languages
Chinese (zh)
Inventor
刘广乾
兰志良
贺翠玲
常玉鹏
张鹏
蔡新合
刘少斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Northwest Engineering Corp Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN202410916168.0A priority Critical patent/CN118653434A/en
Publication of CN118653434A publication Critical patent/CN118653434A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06—Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to the technical field of water conservancy and hydropower engineering, in particular to a stepped water discharge tunnel and an energy dissipation method. The step type water draining tunnel comprises a tunnel body and an energy dissipation building, wherein the energy dissipation building comprises a plurality of energy dissipation steps which are continuously connected, each energy dissipation step comprises a first step surface and a first slope surface, and the first slope surface of the upper energy dissipation step is connected with the first step surface of the lower energy dissipation step to form a first flushing concave angle with an angle larger than 90 degrees. According to the invention, the multistage energy dissipation steps are utilized to gradually slow down when water passes through, and the first slope is utilized to guide the carried sediment and other particles, and the first flushing concave angle can prevent the sediment and other particles from permanently accumulating between two adjacent energy dissipation steps, so that the energy dissipation effect is met, the sediment is prevented from accumulating on the energy dissipation steps, the collision and abrasion degree of the sediment particles on the energy dissipation steps is reduced, the service life of a building is prolonged, and the maintenance cost is reduced.

Description

一种台阶式泄水隧洞及消能方法A stepped water discharge tunnel and energy dissipation method

技术领域Technical Field

本发明涉及水利与水电工程技术领域,特别是一种台阶式泄水隧洞及消能方法。The invention relates to the technical field of water conservancy and hydropower engineering, in particular to a stepped water discharge tunnel and an energy dissipation method.

背景技术Background Art

在水利工程中为了输水或泄洪,常穿山开挖建成封闭式的输水道,称为水工隧洞。按其担负任务的不同,可分为放水隧洞和泄水隧洞。放水隧洞用来从水库中放出用于灌溉、发电和给水等所需的水量;泄水隧洞用于配合溢洪道泄放部分洪水、泄放水电站尾水、为检修枢纽建筑物或因战备等的需要而放空水库以及排沙等。In water conservancy projects, closed water channels are often built through mountains to convey water or discharge floodwater, which are called hydraulic tunnels. According to their different tasks, they can be divided into discharge tunnels and discharge tunnels. Discharge tunnels are used to release water from reservoirs for irrigation, power generation, and water supply; discharge tunnels are used to discharge part of the floodwater in coordination with the spillway, discharge tailwater from hydropower stations, empty the reservoir for maintenance of hub buildings or for war preparations, and discharge sand.

泄水隧洞大都采用挑流消能,其次是底流消能,而消力池是常见的底流式消能建筑物。为增加消能效果,消力池需具备一定长度并且尾部常常布置一定高度的消能坎,以形成一定长度及一定深度的池子。但是,对于多泥沙河流来说,大颗粒泥沙容易在消能坎处永久淤积并不断碰撞磨损,使消能建筑物的使用寿命缩短,增加运行期维护成本。若消能、排沙等问题得不到解决,将直接威胁下游河床及泄水建筑物安全。因此,在水利水电工程中,泄水建筑物出口部位必须设置可靠的泄水消能建筑物。Most of the discharge tunnels adopt the diversion flow energy dissipation method, followed by the bottom flow energy dissipation method, and the energy dissipation pool is a common bottom flow energy dissipation structure. In order to increase the energy dissipation effect, the energy dissipation pool needs to have a certain length and a certain height of energy dissipation sill is often arranged at the tail to form a pool of a certain length and depth. However, for rivers with a lot of sediment, large particles of sediment are prone to permanent siltation at the energy dissipation sill and continuous collision and wear, which shortens the service life of the energy dissipation structure and increases the maintenance cost during the operation period. If the problems of energy dissipation and sand discharge are not solved, it will directly threaten the safety of the downstream riverbed and discharge structures. Therefore, in water conservancy and hydropower projects, reliable discharge and energy dissipation structures must be set up at the outlet of the discharge structure.

发明内容Summary of the invention

本发明实施例要解决的技术问题在于,提供一种台阶式泄水隧洞及消能方法,以解决现有技术中由于大颗粒泥沙在消能建筑物上容易永久淤积并不断碰撞磨损而导致消能建筑物被破坏,进而导致消能效率低的问题。The technical problem to be solved by the embodiments of the present invention is to provide a stepped drainage tunnel and an energy dissipation method to solve the problem in the prior art that large particles of sediment are easily permanently deposited on the energy dissipation building and continuously collide and wear, causing the energy dissipation building to be destroyed, thereby resulting in low energy dissipation efficiency.

本发明公开了一种台阶式泄水隧洞,包括洞体和设置在所述洞体内的消能建筑物,所述消能建筑物包括沿水流方向连续衔接的多级消能台阶,所述消能台阶包括对水流进行消能的第一台阶面,以及沿水流方向对泥沙导流的第一斜坡面,上一级所述消能台阶的所述第一斜坡面和下一级所述消能台阶的所述第一台阶面衔接并形成角度大于90°的第一冲刷凹角。The present invention discloses a stepped water discharge tunnel, comprising a tunnel body and an energy dissipation building arranged in the tunnel body, wherein the energy dissipation building comprises a plurality of energy dissipation steps continuously connected along a water flow direction, wherein the energy dissipation step comprises a first step surface for dissipating energy of the water flow, and a first slope surface for diverting sediment along the water flow direction, wherein the first slope surface of the energy dissipation step of the upper level is connected with the first step surface of the energy dissipation step of the lower level to form a first scouring concave angle with an angle greater than 90°.

可选地,所述消能建筑物还包括基台,所述基台沿水流方向倾斜铺设以形成对水流导流的坡度,多级所述消能台阶均设置在所述基台上,且所述消能台阶的所述第一台阶面和所述基台的坡度方向呈夹角布置,以使所述消能台阶的所述第一台阶面阻碍水流进行消能。Optionally, the energy dissipation building also includes a base, which is laid obliquely along the direction of water flow to form a slope for diverting the water flow, and multiple energy dissipation steps are arranged on the base, and the first step surface of the energy dissipation step and the slope direction of the base are arranged at an angle, so that the first step surface of the energy dissipation step hinders the water flow to dissipate energy.

可选地,所述消能台阶的所述第一台阶面沿水流方向倾斜以形成对泥沙导流的坡度,且同一个所述消能台阶上的所述第一台阶面和所述第一斜坡面衔接并形成第一过渡凸角。Optionally, the first step surface of the energy dissipation step is inclined along the water flow direction to form a slope for diverting sediment, and the first step surface and the first slope surface on the same energy dissipation step are connected to form a first transition convex angle.

可选地,所述第一斜坡面的侧边设置有沿所述第一斜坡面坡度方向连续衔接的多级交通台阶,最上级的所述交通台阶和对应所述消能台阶的所述第一台阶面衔接,最下级的所述交通台阶和下一级所述消能台阶的所述第一台阶面衔接,其中,多级所述交通台阶在竖直方向连线的高度和所述第一斜坡面在竖直方向的高度相同。Optionally, the side of the first slope surface is provided with a plurality of traffic steps continuously connected along the slope direction of the first slope surface, the uppermost traffic step is connected with the first step surface corresponding to the energy dissipation step, and the lowermost traffic step is connected with the first step surface of the next energy dissipation step, wherein the height of the vertical line connecting the plurality of traffic steps is the same as the height of the first slope surface in the vertical direction.

可选地,所述交通台阶包括对水流进行消能的第二台阶面,以及沿水流方向对泥沙导流的第二斜坡面,上一级所述交通台阶的所述第二斜坡面和下一级所述交通台阶的所述第二台阶面衔接并形成角度大于90°的第二冲刷凹角,且同一个所述交通台阶上的所述第二台阶面和所述第二斜坡面衔接并形成第二过渡凸角。Optionally, the traffic step includes a second step surface for dissipating energy of water flow, and a second slope surface for diverting sediment along the direction of water flow, the second slope surface of the previous level of the traffic step and the second step surface of the next level of the traffic step are connected to form a second scouring concave angle with an angle greater than 90°, and the second step surface and the second slope surface on the same traffic step are connected to form a second transition convex angle.

可选地,所述第一斜坡面的宽度小于所述第一台阶面的宽度,且所述第一斜坡面衔接在所述第一台阶面边缘的中部,所述第一斜坡面的两侧分别设置一组多级所述交通台阶,且多级所述交通台阶外侧边的连线和多级所述第一台阶面外侧边的连线共线。Optionally, the width of the first slope surface is smaller than the width of the first step surface, and the first slope surface is connected to the middle of the edge of the first step surface, a group of multiple traffic steps are arranged on both sides of the first slope surface, and the connecting line of the outer edges of the multiple traffic steps and the connecting line of the outer edges of the multiple first step surfaces are collinear.

可选地,所述消能建筑物还包括设置在多级所述消能台阶两侧的边墙,多级所述消能台阶外侧边的连线和对应侧所述边墙共线,以使两所述边墙之间构成水流消能区域。Optionally, the energy dissipation building further comprises side walls arranged on both sides of the multiple energy dissipation steps, and the connecting line of the outer sides of the multiple energy dissipation steps is collinear with the side walls on the corresponding sides, so that a water flow energy dissipation area is formed between the two side walls.

可选地,所述第一斜坡面上设置有多排第一消能组件,所述第一消能组件包括并排设置的多个第一消能坎,所述第一消能坎为其中一角迎向上方水流的三角形结构,且相邻两排的所述第一消能坎呈错位布置,以使并排的所述第一消能坎对沿所述第一斜坡面滑行的水流进行碰撞和漩涡消能。Optionally, multiple rows of first energy dissipation components are arranged on the first slope surface, and the first energy dissipation components include multiple first energy dissipation steps arranged side by side. The first energy dissipation steps are triangular structures with one corner facing the upward water flow, and the first energy dissipation steps in two adjacent rows are staggered so that the side-by-side first energy dissipation steps can collide with and dissipate vortex energy of the water flow sliding along the first slope surface.

可选地,所述第一台阶面上设置有多排第二消能组件,所述第二消能组件包括并排设置的多个第二消能坎,所述第二消能坎为顶点迎向上方水流的半球结构,且相邻两排的所述第二消能坎呈错位布置,以使并排的所述第二消能坎对自上一级所述消能台阶跌落的水流进行碰撞和漩涡消能。Optionally, multiple rows of second energy dissipation components are arranged on the first step surface, and the second energy dissipation components include multiple second energy dissipation steps arranged side by side. The second energy dissipation steps are hemispherical structures with their apexes facing the water flow above, and the second energy dissipation steps in two adjacent rows are staggered so that the side-by-side second energy dissipation steps can collide with and dissipate vortex energy of the water flow falling from the energy dissipation step of the previous level.

本发明还公开了一种消能方法,采用上述的台阶式泄水隧洞,包括:The present invention also discloses an energy dissipation method, which adopts the above-mentioned stepped drainage tunnel and comprises:

在泄水隧洞内布置供水流自上游向下游方向流经的多级所述消能台阶,由连续衔接的所述多级消能台阶对不同形态的水流进行消能,并基于所述第一冲刷凹角的布置无死角地冲刷所述消能台阶上流经的泥沙;Arrange multiple energy dissipation steps in the discharge tunnel through which the water flow flows from upstream to downstream, dissipate energy of water flow in different forms by the continuously connected multiple energy dissipation steps, and flush the sediment flowing on the energy dissipation steps without dead angles based on the arrangement of the first flushing concave angles;

当水流自上一级所述消能台阶的所述第一台阶面跌落至下一级所述消能台阶的所述第一台阶面,通过水流和所述第一台阶面的碰撞对水流进行连续消能;When the water flow falls from the first step surface of the energy dissipation step of the previous level to the first step surface of the energy dissipation step of the next level, the water flow is continuously energy-dissipated by the collision between the water flow and the first step surface;

当水流自上一级所述消能台阶的所述第一斜坡面滑行至下一级所述消能台阶的所述第一台阶面,通过水流在所述第一台阶面上形成横轴旋涡对后续水流进行摩擦消能。When the water flows from the first slope surface of the previous energy dissipation step to the first step surface of the next energy dissipation step, the water flows form a transverse axis vortex on the first step surface to dissipate friction energy of the subsequent water flows.

与现有技术相比,本发明实施例提供的台阶式泄水隧洞及消能方法有益效果在于:Compared with the prior art, the step-type water discharge tunnel and energy dissipation method provided by the embodiment of the present invention have the following beneficial effects:

在泄水隧洞内布置供水流自上游向下游方向流经的多级消能台阶,利用消能台阶的第一台阶面对经过的水流进行碰撞和摩擦消能,并利用消能台阶的第一斜坡面,对水流中携带的泥沙等颗粒物进行导流,同时基于第一斜坡面的设置,利用上一级消能台阶的第一斜坡面和下一级消能台阶的第一台阶面衔接并形成角度大于90°的第一冲刷凹角,可以防止相邻的两个消能台阶之间存在泥沙等颗粒物永久淤积的凹角,更利于排沙,从而在满足消能作用的同时,防止泥沙在消能台阶上淤积,减轻了泥沙颗粒对消能台阶的碰撞和磨损程度,以增长建筑物的使用寿命,降低维护成本。A multi-stage energy dissipation step is arranged in the discharge tunnel through which the water flow flows from upstream to downstream. The first step surface of the energy dissipation step is used to collide and frictionally dissipate energy with the passing water flow, and the first slope surface of the energy dissipation step is used to divert the silt and other particles carried in the water flow. At the same time, based on the setting of the first slope surface, the first slope surface of the upper energy dissipation step and the first step surface of the lower energy dissipation step are connected to form a first scouring concave angle with an angle greater than 90°, which can prevent the permanent accumulation of silt and other particles between two adjacent energy dissipation steps, and is more conducive to sand discharge. Therefore, while satisfying the energy dissipation function, it prevents silt from accumulating on the energy dissipation step, reduces the collision and wear of silt particles on the energy dissipation step, thereby increasing the service life of the building and reducing maintenance costs.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

下面将结合附图及实施例对本发明的技术方案作进一步详细的说明,附图中:The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments, in which:

图1为本发明实施例提供的台阶式泄水隧洞的整体结构示意图;FIG1 is a schematic diagram of the overall structure of a stepped drainage tunnel provided by an embodiment of the present invention;

图2为本发明实施例提供的消能台阶和交通台阶组合的结构示意图;FIG2 is a schematic structural diagram of an energy dissipation step and a traffic step combination provided in an embodiment of the present invention;

图3为本发明实施例提供的台阶式泄水隧洞的侧视图;FIG3 is a side view of a stepped drainage tunnel provided by an embodiment of the present invention;

图4为本发明实施例提供的第一消能坎和第二消能坎的分布示意图。FIG. 4 is a schematic diagram showing the distribution of the first energy dissipation ridge and the second energy dissipation ridge provided in an embodiment of the present invention.

图中各附图标记为:The reference numerals in the figures are:

1、消能台阶;11、第一台阶面;12、第一斜坡面;13、第一冲刷凹角;14、第一过渡凸角;2、基台;3、交通台阶;31、第二台阶面;32、第二斜坡面;33、第二冲刷凹角;34、第二过渡凸角;4、边墙;5、第一消能坎;6、第二消能坎。1. Energy dissipation step; 11. First step surface; 12. First slope surface; 13. First scouring concave angle; 14. First transition convex angle; 2. Base; 3. Traffic step; 31. Second step surface; 32. Second slope surface; 33. Second scouring concave angle; 34. Second transition convex angle; 4. Side wall; 5. First energy dissipation step; 6. Second energy dissipation step.

具体实施方式DETAILED DESCRIPTION

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。现结合附图,对本发明的较佳实施例作详细说明。It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. Now, in conjunction with the accompanying drawings, the preferred embodiments of the present invention are described in detail.

本发明公开了一种台阶式泄水隧洞,如图1和图2所示,包括洞体和设置在洞体内的消能建筑物。消能建筑物包括沿水流方向连续衔接的多级消能台阶1,消能台阶1包括对水流进行消能的第一台阶面11,以及沿水流方向对泥沙导流的第一斜坡面12。上一级消能台阶1的第一斜坡面12和下一级消能台阶1的第一台阶面11衔接并形成角度大于90°的第一冲刷凹角13。The present invention discloses a stepped drainage tunnel, as shown in FIG1 and FIG2, comprising a tunnel body and an energy dissipation structure arranged in the tunnel body. The energy dissipation structure comprises a plurality of energy dissipation steps 1 connected continuously along the direction of water flow, and the energy dissipation step 1 comprises a first step surface 11 for dissipating energy of water flow, and a first slope surface 12 for diverting sediment along the direction of water flow. The first slope surface 12 of the upper energy dissipation step 1 is connected with the first step surface 11 of the lower energy dissipation step 1 to form a first scouring concave angle 13 with an angle greater than 90°.

通过本实施例台阶式泄水隧洞的结构,利用消能台阶1的第一台阶面11为水流提供了碰撞、剪切、掺气和摩擦的机会,使水流中的能量得以消散,进而利用多级消能台阶1的设计提供了多个消能阶段,使水流在通过隧洞时能够逐渐减速,减少能量的传递。有效降低水流的速度和冲击力,达到消能的目的。在此基础上,利用消能台阶1的第一斜坡面12,当水流在遇到第一斜坡面12时,会沿着第一斜坡面12使水流的方向会发生改变,而水流方向的改变会导致水流的紊流度增加,紊流会增加水流与周围介质的摩擦和混合,从而进一步消耗水流的能量,以达到二级消能的效果。此外,上一级消能台阶1的第一斜坡面12和下一级消能台阶1的第一台阶面11衔接并形成角度大于90°的第一冲刷凹角13,可以防止相邻的两个消能台阶1之间出现泥沙淤积凹角,使得水流中携带的泥沙能够顺畅地通过,减少了泥沙的停滞和积聚,以避免淤积泥沙对消能台阶1产生碰撞和磨损,提高了排沙效果,以增长消能建筑物的使用寿命,降低维护成本,防止了长期淤积对隧洞性能的影响。即本发明的消能台阶1上无需设置各种高尾坎而形成消能池,在满足消能作用的同时,防止泥沙在消能台阶1上淤积,因此本发明的台阶式泄水隧洞可应用于大坝泄洪、水电站引水以及灌溉渠道等水利水电工程领域。Through the structure of the stepped discharge tunnel of this embodiment, the first step surface 11 of the energy dissipation step 1 is used to provide the water flow with opportunities for collision, shearing, aeration and friction, so that the energy in the water flow can be dissipated, and then the design of the multi-stage energy dissipation step 1 provides multiple energy dissipation stages, so that the water flow can gradually slow down when passing through the tunnel, reducing the transfer of energy. The speed and impact force of the water flow are effectively reduced to achieve the purpose of energy dissipation. On this basis, the first slope surface 12 of the energy dissipation step 1 is used. When the water flow encounters the first slope surface 12, the direction of the water flow will change along the first slope surface 12, and the change in the direction of the water flow will cause the turbulence of the water flow to increase. The turbulence will increase the friction and mixing of the water flow with the surrounding medium, thereby further consuming the energy of the water flow to achieve the effect of secondary energy dissipation. In addition, the first slope surface 12 of the upper energy dissipation step 1 and the first step surface 11 of the lower energy dissipation step 1 are connected to form a first scouring concave angle 13 with an angle greater than 90°, which can prevent the formation of silt accumulation concave angles between two adjacent energy dissipation steps 1, so that the silt carried in the water flow can pass smoothly, reducing the stagnation and accumulation of silt, so as to avoid the collision and wear of the energy dissipation step 1 by the accumulated silt, improve the sand discharge effect, increase the service life of the energy dissipation building, reduce maintenance costs, and prevent the influence of long-term siltation on the tunnel performance. That is, the energy dissipation step 1 of the present invention does not need to be provided with various high tail sills to form an energy dissipation pool, while satisfying the energy dissipation function, it prevents silt from accumulating on the energy dissipation step 1, so the step-type water discharge tunnel of the present invention can be applied to water conservancy and hydropower engineering fields such as dam flood discharge, hydropower station water diversion and irrigation channels.

优选地,第一斜坡面12的坡度为1:1的斜坡,即第一斜坡面12的垂直高度和水平距离相等,以形成较缓的坡度,避免产生较大流速的水流,有利于水流的稳定和消能,减少水流对第一斜坡面12以及下一级消能台阶1的冲刷和侵蚀。Preferably, the slope of the first slope surface 12 is a 1:1 slope, that is, the vertical height and horizontal distance of the first slope surface 12 are equal, so as to form a gentler slope, avoid generating a water flow with a large flow rate, which is beneficial to the stability and energy dissipation of the water flow, and reduce the scouring and erosion of the first slope surface 12 and the next energy dissipation step 1 by the water flow.

进一步地,结合图3所示,消能建筑物还包括基台2。基台2沿水流方向倾斜铺设以形成对水流整体导流的坡度。多级消能台阶1均设置在基台2上,且消能台阶1的第一台阶面11和基台2的坡度方向呈夹角布置,以使消能台阶1的第一台阶面11阻碍水流进行消能。通过本实施例台阶式泄水隧洞的结构,利用基台2为多级消能台阶1提供稳定的支撑基础,使多级消能台阶1能够承受水流的冲击和压力,确保整个消能系统的安全性和稳定性。同时,将消能台阶1的第一台阶面11和基台2的坡度方向呈夹角布置,使消能台阶1的第一台阶面11和水流方向形成角度,从而由第一台阶面11阻碍水流进行消能,即此时流经至消能台阶1上第一台阶面11的水流能够在第一台阶面11上形成横轴旋涡,并和上方正常下泄的水体剪切摩擦,达到消能效果,以通过基台2和多级消能台阶1的组合可以形成一个完整的消能体系,从而通过不同的消能机制,如阻力、紊流、碰撞等,进一步提高消能效率。Furthermore, in combination with what is shown in FIG3 , the energy dissipation structure also includes a base 2. The base 2 is laid obliquely along the direction of the water flow to form a slope for diverting the water flow as a whole. The multiple energy dissipation steps 1 are all arranged on the base 2, and the first step surface 11 of the energy dissipation step 1 and the slope direction of the base 2 are arranged at an angle so that the first step surface 11 of the energy dissipation step 1 hinders the water flow to dissipate energy. Through the structure of the stepped drainage tunnel of this embodiment, the base 2 is used to provide a stable supporting foundation for the multiple energy dissipation steps 1, so that the multiple energy dissipation steps 1 can withstand the impact and pressure of the water flow, thereby ensuring the safety and stability of the entire energy dissipation system. At the same time, the first step surface 11 of the energy dissipation step 1 and the slope direction of the base 2 are arranged at an angle, so that the first step surface 11 of the energy dissipation step 1 forms an angle with the water flow direction, so that the first step surface 11 hinders the water flow to dissipate energy, that is, the water flow flowing through the first step surface 11 on the energy dissipation step 1 can form a transverse axis vortex on the first step surface 11 at this time, and shear and rub with the water body normally discharged from above to achieve the energy dissipation effect, so that a complete energy dissipation system can be formed through the combination of the base 2 and the multi-stage energy dissipation step 1, thereby further improving the energy dissipation efficiency through different energy dissipation mechanisms, such as resistance, turbulence, collision, etc.

进一步地,消能台阶1的第一台阶面11沿水流方向倾斜以形成对泥沙进一步导流的坡度,且同一个消能台阶1上的第一台阶面11和第一斜坡面12衔接并形成第一过渡凸角14。通过本实施例台阶式泄水隧洞的结构,利用消能台阶1的第一台阶面11沿水流方向倾斜,以形成对泥沙导流的坡度,从而进一步使泥沙能够顺畅地通过,以减少泥沙的停滞和积聚。同时,利用第一台阶面11和第一斜坡面12衔接处的第一过渡凸角14可引起水流的紊流,增加水流的紊动程度。基于紊流的存在能够增加水流与空气的接触面积,有利于水流中的能量通过水与空气之间的摩擦、碰撞等方式消散。从而能够有效地减少水流的剩余能量,降低下游水流的速度和冲击力,提高消能效果。Furthermore, the first step surface 11 of the energy dissipation step 1 is inclined along the direction of the water flow to form a slope for further diverting the silt, and the first step surface 11 and the first slope surface 12 on the same energy dissipation step 1 are connected to form a first transition convex angle 14. Through the structure of the stepped water discharge tunnel of this embodiment, the first step surface 11 of the energy dissipation step 1 is inclined along the direction of the water flow to form a slope for diverting the silt, so that the silt can pass smoothly to reduce the stagnation and accumulation of the silt. At the same time, the first transition convex angle 14 at the junction of the first step surface 11 and the first slope surface 12 can cause turbulence of the water flow and increase the turbulence of the water flow. Based on the existence of turbulence, the contact area between the water flow and the air can be increased, which is conducive to the dissipation of energy in the water flow through friction, collision, etc. between water and air. Thereby, the residual energy of the water flow can be effectively reduced, the speed and impact force of the downstream water flow can be reduced, and the energy dissipation effect can be improved.

优选地,为了避免消能台阶1的第一台阶面11对水流产生加速而影响消能效果,消能台阶1的第一台阶面11呈微倾斜设置,即第一台阶面11的坡度优选为3%~5%。其中,假设第一台阶面11的坡度优选为3%~5%之间的a%,则a%的坡度表示在水平方向上前进100个单位的距离时,垂直方向上升或下降a个单位的高度。Preferably, in order to prevent the first step surface 11 of the energy dissipation step 1 from accelerating the water flow and affecting the energy dissipation effect, the first step surface 11 of the energy dissipation step 1 is slightly inclined, that is, the slope of the first step surface 11 is preferably 3% to 5%. Assuming that the slope of the first step surface 11 is preferably a% between 3% and 5%, the slope of a% means that when the distance of 100 units is advanced in the horizontal direction, the height of the vertical direction rises or falls by a units.

进一步地,回看图1,第一斜坡面12的侧边设置有沿第一斜坡面12坡度方向连续衔接的多级交通台阶3,最上级的交通台阶3和对应消能台阶1的第一台阶面11衔接,最下级的交通台阶3和下一级消能台阶1的第一台阶面11衔接,其中,多级交通台阶3在竖直方向连线的高度和第一斜坡面12在竖直方向的高度相同。通过本实施例台阶式泄水隧洞的结构,基于消能台阶1需要阻碍上方水流并形成旋涡进行消能,就需要确保上一级消能台阶1的第一台阶面11和下一级消能台阶1的第一台阶面11之间具有较大的高度,以满足第一台阶面11对上方水流进行碰撞和消能。此时,当相邻两消能台阶1高度较高时,如1m甚至2m高,上下消能台阶1的跨度较大,不便于人员进洞检修。因此,利用多级交通台阶3的设置,在第一斜坡面12的侧方提供连续且稳定的通道,并利用多级交通台阶3在竖直方向连线的高度和第一斜坡面12在竖直方向的高度相同,确保相邻两交通台阶3之间具备较小的跨度,以方便维修人员安全、顺畅地上下消能台阶1。Further, looking back at Figure 1, the side of the first slope surface 12 is provided with a multi-level traffic step 3 that is continuously connected along the slope direction of the first slope surface 12, the uppermost traffic step 3 is connected to the first step surface 11 of the corresponding energy dissipation step 1, and the lowermost traffic step 3 is connected to the first step surface 11 of the next energy dissipation step 1, wherein the height of the vertical line connecting the multi-level traffic steps 3 is the same as the height of the first slope surface 12 in the vertical direction. Through the structure of the stepped drainage tunnel of this embodiment, based on the need for the energy dissipation step 1 to hinder the upper water flow and form a vortex for energy dissipation, it is necessary to ensure that there is a large height between the first step surface 11 of the upper energy dissipation step 1 and the first step surface 11 of the next energy dissipation step 1, so as to meet the first step surface 11 to collide with and dissipate energy on the upper water flow. At this time, when the height of the two adjacent energy dissipation steps 1 is relatively high, such as 1m or even 2m high, the span of the upper and lower energy dissipation steps 1 is relatively large, which is inconvenient for personnel to enter the cave for maintenance. Therefore, by utilizing the setting of multi-level traffic steps 3, a continuous and stable passage is provided on the side of the first slope surface 12, and the height of the vertical line connecting the multi-level traffic steps 3 is made the same as the height of the vertical line of the first slope surface 12, ensuring a smaller span between two adjacent traffic steps 3, so as to facilitate maintenance personnel to safely and smoothly go up and down the energy dissipation steps 1.

优选地,第一斜坡面12在竖直方向的高度为0.66m,即上一级消能台阶1的第一台阶面11和下一级消能台阶1的第一台阶面11之间的高度为0.66m。每级交通台阶3的高度为0.22m,便于人员进洞检修。Preferably, the first slope surface 12 has a vertical height of 0.66 m, that is, the height between the first step surface 11 of the upper energy dissipation step 1 and the first step surface 11 of the lower energy dissipation step 1 is 0.66 m. The height of each traffic step 3 is 0.22 m, which is convenient for personnel to enter the cave for maintenance.

进一步地,交通台阶3包括对水流进行消能的第二台阶面31,以及沿水流方向对泥沙导流的第二斜坡面32。上一级交通台阶3的第二斜坡面32和下一级交通台阶3的第二台阶面31衔接并形成角度大于90°的第二冲刷凹角33,且同一个交通台阶3上的第二台阶面31和第二斜坡面32衔接并形成第二过渡凸角34。通过本实施例台阶式泄水隧洞的结构,利用第二台阶面31对水流进行消能,减少水流的速度和能量,以降低水流对交通台阶3和周围结构的冲击力。并利用第二斜坡面32有助于将泥沙导向下游区域,防止泥沙在交通台阶3附近淤积,减少堵塞和水流不畅的问题。从而在消能台阶1的基础上,利用交通台阶3的结构和消能台阶1的结构相似,当水流自上游向下游进行泄水时,利用交通台阶3同步构成对水流进行消能的设施,即当水流在每级消能台阶1上进行消能的同时,由多级交通台阶3对消能台阶1侧边的水流进行多次二级消能,以减轻水流对消能台阶1侧边建筑物的碰撞和冲刷,进而延长消能建筑物的使用寿命,并有助于保护消能建筑物周边填方或护坡等相关结构的稳定性。Furthermore, the traffic step 3 includes a second step surface 31 for dissipating energy of the water flow, and a second slope surface 32 for diverting silt along the direction of the water flow. The second slope surface 32 of the upper traffic step 3 and the second step surface 31 of the lower traffic step 3 are connected to form a second scouring concave angle 33 with an angle greater than 90°, and the second step surface 31 and the second slope surface 32 on the same traffic step 3 are connected to form a second transition convex angle 34. Through the structure of the stepped drainage tunnel of this embodiment, the second step surface 31 is used to dissipate energy of the water flow, reduce the speed and energy of the water flow, and reduce the impact of the water flow on the traffic step 3 and the surrounding structures. The second slope surface 32 is also used to help guide the silt to the downstream area, prevent the silt from accumulating near the traffic step 3, and reduce the problems of blockage and poor water flow. Therefore, on the basis of the energy dissipation step 1, the structure of the traffic step 3 is similar to that of the energy dissipation step 1. When the water flows from upstream to downstream, the traffic step 3 is used to simultaneously form a facility for dissipating the energy of the water flow. That is, when the water flow dissipates energy on each level of the energy dissipation step 1, the multi-level traffic steps 3 perform multiple secondary energy dissipations on the water flow on the side of the energy dissipation step 1 to reduce the collision and scouring of the water flow on the buildings on the side of the energy dissipation step 1, thereby extending the service life of the energy dissipation building and helping to protect the stability of related structures such as fill or slope protection around the energy dissipation building.

进一步地,第一斜坡面12的宽度小于第一台阶面11的宽度,且第一斜坡面12衔接在第一台阶面11边缘的中部。第一斜坡面12的两侧分别设置一组多级交通台阶3,且多级交通台阶3外侧边的连线和多级第一台阶面11外侧边的连线共线。通过本实施例台阶式泄水隧洞的结构,利用第一斜坡面12的两侧分别设置一组多级交通台阶3,当水流在每级消能台阶1上进行消能的同时,由多级交通台阶3对消能台阶1两侧的水流同时进行多次二级消能,以减轻水流对消能台阶1两侧建筑物的碰撞和冲刷,进而延长消能建筑物的使用寿命。Furthermore, the width of the first slope surface 12 is smaller than the width of the first step surface 11, and the first slope surface 12 is connected to the middle of the edge of the first step surface 11. A group of multi-level traffic steps 3 are respectively arranged on both sides of the first slope surface 12, and the connecting line of the outer sides of the multi-level traffic steps 3 and the connecting line of the outer sides of the multi-level first step surface 11 are collinear. Through the structure of the stepped drainage tunnel of this embodiment, a group of multi-level traffic steps 3 are respectively arranged on both sides of the first slope surface 12. When the water flow dissipates energy on each energy dissipation step 1, the multi-level traffic steps 3 simultaneously perform multiple secondary energy dissipation on the water flow on both sides of the energy dissipation step 1, so as to reduce the collision and scouring of the water flow on the buildings on both sides of the energy dissipation step 1, thereby extending the service life of the energy dissipation building.

进一步地,回看图2,消能建筑物还包括设置在多级消能台阶1两侧的边墙4,多级消能台阶1外侧边的连线和对应侧边墙4共线,以使两边墙4之间构成水流消能区域。通过本实施例台阶式泄水隧洞的结构,利用两边墙4的设置,可以引导水流沿着水流消能区域流动,即引导水流通过多级消能台阶1来逐步消耗能量,减少水流对建筑物和周围环境的冲击力。结合上述多级交通台阶3的设置,可减轻水流对两边墙4的碰撞和冲刷,有助于保护两边墙4结构的稳定性。Further, looking back at Figure 2, the energy dissipation building also includes side walls 4 arranged on both sides of the multi-level energy dissipation steps 1, and the connecting line of the outer sides of the multi-level energy dissipation steps 1 and the corresponding side walls 4 are collinear, so that a water flow energy dissipation area is formed between the two side walls 4. Through the structure of the stepped water discharge tunnel of this embodiment, the setting of the two side walls 4 can guide the water flow to flow along the water flow energy dissipation area, that is, guide the water flow to gradually consume energy through the multiple energy dissipation steps 1, and reduce the impact of the water flow on the building and the surrounding environment. Combined with the setting of the above-mentioned multi-level traffic steps 3, the collision and scouring of the water flow on the two side walls 4 can be reduced, which helps to protect the stability of the structure of the two side walls 4.

进一步地,如图4所示,第一斜坡面12上设置有多排第一消能组件,第一消能组件包括并排设置的多个第一消能坎5。第一消能坎5为其中一角迎向上方水流的三角形结构,且相邻两排的第一消能坎5呈错位布置,以使并排的第一消能坎5对沿第一斜坡面12滑行的水流进行碰撞和消能。通过本实施例台阶式泄水隧洞的结构,当水流为大流量时,利用第一消能坎5为其中一角迎向上方水流的三角形结构,使第一消能坎5顶角的两侧边用于对水流进行碰撞并进行消能,并且对流经的泥沙进行导流,以避免泥沙在第一消能坎5处淤积。进而通过多排第一消能组件增加了水流与第一消能坎5的接触和碰撞机会,以提高了消能效果。此外,利用相邻两排的第一消能坎5呈错位布置,使得水流在第一斜坡面12的不同位置均能受到第一消能坎5的消能作用,避免水流集中在某些区域,从而减少局部的冲刷和应力集中,增加了消能的均匀性和全面性。Further, as shown in FIG4 , a plurality of rows of first energy dissipation components are arranged on the first slope surface 12, and the first energy dissipation components include a plurality of first energy dissipation ridges 5 arranged side by side. The first energy dissipation ridge 5 is a triangular structure with one corner facing the water flow above, and the first energy dissipation ridges 5 of two adjacent rows are arranged in a staggered manner, so that the side-by-side first energy dissipation ridges 5 collide with and dissipate energy of the water flow sliding along the first slope surface 12. Through the structure of the stepped water discharge tunnel of this embodiment, when the water flow is a large flow, the first energy dissipation ridge 5 is a triangular structure with one corner facing the water flow above, so that the two sides of the top angle of the first energy dissipation ridge 5 are used to collide with and dissipate energy of the water flow, and to divert the sediment flowing through to avoid sediment accumulation at the first energy dissipation ridge 5. Furthermore, the contact and collision opportunities between the water flow and the first energy dissipation ridge 5 are increased by using a plurality of rows of first energy dissipation components, so as to improve the energy dissipation effect. In addition, by staggering the first energy dissipation ridges 5 in two adjacent rows, water flow at different positions on the first slope surface 12 can be affected by the energy dissipation effect of the first energy dissipation ridges 5, thereby avoiding the concentration of water flow in certain areas, thereby reducing local scouring and stress concentration, and increasing the uniformity and comprehensiveness of energy dissipation.

进一步地,第一台阶面11上设置有多排第二消能组件,第二消能组件包括并排设置的多个第二消能坎6。第二消能坎6为顶点迎向上方水流的半球结构,且相邻两排的第二消能坎6呈错位布置,以使并排的第二消能坎6对自上一级消能台阶1跌落的水流进行碰撞和消能。通过本实施例台阶式泄水隧洞的结构,当水流为小流量时,且形态为自上一级消能台阶1的第一台阶面11跌落的跌落流,此时利用第二消能坎6为顶点迎向上方水流的半球结构,使第二消能坎6的半球表面用于对上方跌落水流进行碰撞并产生漩涡消能,且第二消能坎6圆滑的外表面也不会存在泥沙淤积的凹角,进而通过多排第二消能组件增加了水流与第二消能坎6的接触和碰撞机会,以提高了消能效果。此外,第二消能坎6还能够对沿第一斜坡面12的水流进行二级碰撞并进行消能。因此利用相邻两排的第二消能坎6呈错位布置,使得滑行水流在第一台阶面11的不同位置均能受到第二消能坎6的二级消能作用,避免滑行水流集中在某些区域,从而减少局部的冲刷和应力集中,提高了消能的效率和全面性。Furthermore, multiple rows of second energy dissipation components are arranged on the first step surface 11, and the second energy dissipation components include multiple second energy dissipation steps 6 arranged side by side. The second energy dissipation step 6 is a hemispherical structure with its apex facing the water flow above, and the second energy dissipation steps 6 in two adjacent rows are arranged in a staggered manner, so that the side-by-side second energy dissipation steps 6 collide with and dissipate energy of the water flow falling from the upper energy dissipation step 1. Through the structure of the stepped water discharge tunnel of this embodiment, when the water flow is a small flow rate, and the form is a falling flow falling from the first step surface 11 of the upper energy dissipation step 1, the second energy dissipation step 6 is used as a hemispherical structure with its apex facing the water flow above, so that the hemispherical surface of the second energy dissipation step 6 is used to collide with the falling water flow above and generate a vortex to dissipate energy, and the smooth outer surface of the second energy dissipation step 6 will not have concave corners for sedimentation, and then the contact and collision opportunities between the water flow and the second energy dissipation step 6 are increased through multiple rows of second energy dissipation components, so as to improve the energy dissipation effect. In addition, the second energy dissipation ridge 6 can also perform secondary collision and energy dissipation on the water flow along the first slope surface 12. Therefore, the second energy dissipation ridges 6 in two adjacent rows are arranged in a staggered manner, so that the sliding water flow at different positions of the first step surface 11 can be subjected to the secondary energy dissipation effect of the second energy dissipation ridge 6, thereby avoiding the sliding water flow from concentrating in certain areas, thereby reducing local scouring and stress concentration, and improving the efficiency and comprehensiveness of energy dissipation.

如上所述,本发明的台阶式泄水隧洞经水工模型试验测试,可兼顾消能、过沙和交通,具有无台阶式泄洪洞以及传统台阶式泄洪洞所不具备的有益效果,具体见泄洪洞试验数据对比表。As described above, the stepped spillway tunnel of the present invention has been tested by hydraulic model tests and can take into account energy dissipation, sand passing and traffic, and has beneficial effects that non-stepped spillway tunnels and traditional stepped spillway tunnels do not have. For details, see the spillway tunnel test data comparison table.

泄洪洞试验数据对比表Comparison table of flood discharge tunnel test data

由泄洪洞试验数据对比表可看出,本发明的台阶式泄水隧洞具有较高的消能率,可以减少泄洪洞出口的能量释放,降低水流对下游结构和环境的冲击,从而减少潜在的危害和破坏。同时,过沙后消能台阶1的第一冲刷凹角13处无泥沙淤积,且过沙时携入此处的泥沙量比传统台阶少;还存在多级交通台阶3,每级垂直高度0.22m,便于人员进洞检修。It can be seen from the comparison table of test data of the flood discharge tunnel that the step-type water discharge tunnel of the present invention has a high energy dissipation rate, which can reduce the energy release at the outlet of the flood discharge tunnel, reduce the impact of water flow on downstream structures and the environment, and thus reduce potential harm and damage. At the same time, there is no sediment accumulation at the first scouring concave corner 13 of the energy dissipation step 1 after the sand passes, and the amount of sediment carried into this place during the sand passing is less than that of the traditional steps; there are also multi-level traffic steps 3, each with a vertical height of 0.22m, which is convenient for personnel to enter the tunnel for maintenance.

本发明还公开了一种消能方法,采用上述实施例的台阶式泄水隧洞,包括:The present invention also discloses an energy dissipation method, which adopts the stepped water discharge tunnel of the above embodiment, comprising:

在泄水隧洞内布置供水流自上游向下游方向流经的多级消能台阶1,由连续衔接的多级消能台阶1对不同形态的水流进行消能,并基于第一冲刷凹角13的布置无死角地冲刷消能台阶1上流经的泥沙;A multi-stage energy dissipation step 1 is arranged in the discharge tunnel for the water flow to flow from upstream to downstream. The continuously connected multi-stage energy dissipation step 1 dissipates energy of water flow in different forms, and the silt flowing on the energy dissipation step 1 is flushed without dead angles based on the arrangement of the first flushing concave angle 13.

当水流较小时,水流自上一级消能台阶1的第一台阶面11跌落至下一级消能台阶1的第一台阶面11,通过水流和第一台阶面11的碰撞对水流进行连续消能;When the water flow is small, the water flow falls from the first step surface 11 of the upper energy dissipation step 1 to the first step surface 11 of the lower energy dissipation step 1, and the water flow is continuously dissipated through the collision between the water flow and the first step surface 11;

当水流较大时,水流沿上一级消能台阶1的第一斜坡面12流至下一级消能台阶1的第一台阶面11,通过水流在第一台阶面11上形成横轴旋涡,横轴旋涡上方水流为滑移流,使横轴旋涡与上方滑移水流进行剪切摩擦消能。When the water flow is large, the water flows along the first slope surface 12 of the upper energy dissipation step 1 to the first step surface 11 of the lower energy dissipation step 1, and a transverse axis vortex is formed on the first step surface 11 by the water flow. The water flow above the transverse axis vortex is a slip flow, so that the transverse axis vortex and the upper slip water flow undergo shear friction to dissipate energy.

本发明实施例的台阶式泄水隧洞及消能方法通过在泄水隧洞内布置供水流自上游向下游方向流经的多级消能台阶1,利用消能台阶1第一台阶面11和第一斜坡面12的配合,对经过的不同形态水流进行碰撞和剪切摩擦消能,并由微倾斜的第一台阶面11,和具有一定坡度的第一斜坡面12对水流中的泥沙等颗粒物进行冲刷,并通过角度大于90°的第一冲刷凹角13,可以防止相邻的两个消能台阶1之间存在泥沙等颗粒物永久淤积的凹角,从而在满足消能作用的同时,防止泥沙在消能台阶1上淤积,减轻了泥沙颗粒对消能台阶1的碰撞和磨损程度。此外,还通过在第一斜坡面12的两侧分别设置的多级交通台阶3,提供跨度较小的上下通道,以方便维修人员安全、顺畅地上下消能台阶1,并在泄水时,配合消能台阶1的消能作用,对消能台阶1侧边的水流进行多次二级消能,以减轻水流对消能台阶1侧边建筑物的碰撞和冲刷,进而延长消能建筑物的使用寿命,并有助于保护消能建筑物周边填方或护坡等相关结构的稳定性,降低维护成本。The stepped discharge tunnel and energy dissipation method of the embodiment of the present invention arranges a multi-stage energy dissipation step 1 through which the water supply flow flows from upstream to downstream in the discharge tunnel, and utilizes the cooperation of the first step surface 11 and the first slope surface 12 of the energy dissipation step 1 to perform collision and shear friction energy dissipation on the passing water flow of different forms, and the slightly inclined first step surface 11 and the first slope surface 12 with a certain slope are used to flush the silt and other particles in the water flow, and the first flushing concave angle 13 with an angle greater than 90° can prevent the concave angle where silt and other particles are permanently deposited between two adjacent energy dissipation steps 1, thereby preventing the silt from being deposited on the energy dissipation step 1 while satisfying the energy dissipation function, thereby reducing the collision and wear degree of the silt particles on the energy dissipation step 1. In addition, by respectively setting the multi-level traffic steps 3 on both sides of the first slope surface 12, an up and down passage with a smaller span is provided to facilitate maintenance personnel to safely and smoothly go up and down the energy dissipation step 1, and when discharging water, in conjunction with the energy dissipation effect of the energy dissipation step 1, the water flow on the side of the energy dissipation step 1 is subjected to multiple secondary energy dissipation to reduce the collision and scouring of the water flow on the buildings on the side of the energy dissipation step 1, thereby extending the service life of the energy dissipation building, and helping to protect the stability of related structures such as fill or slope protection around the energy dissipation building, thereby reducing maintenance costs.

应当理解的是,以上实施例仅用以说明本发明的技术方案,而非对其限制,对本领域技术人员来说,可以对上述实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而所有这些修改和替换,都应属于本发明所附权利要的保护范围。It should be understood that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. For those skilled in the art, the technical solutions described in the above embodiments can be modified, or some of the technical features therein can be replaced by equivalents; and all these modifications and replacements should fall within the protection scope of the claims attached to the present invention.

Claims (10)

1.一种台阶式泄水隧洞,其特征在于:所述台阶式泄水隧洞包括洞体和设置在所述洞体内的消能建筑物,所述消能建筑物包括沿水流方向连续衔接的多级消能台阶,所述消能台阶包括对水流进行消能的第一台阶面,以及沿水流方向对泥沙导流的第一斜坡面,上一级所述消能台阶的所述第一斜坡面和下一级所述消能台阶的所述第一台阶面衔接并形成角度大于90°的第一冲刷凹角。1. A stepped drainage tunnel, characterized in that: the stepped drainage tunnel comprises a tunnel body and an energy dissipation building arranged in the tunnel body, the energy dissipation building comprises a plurality of energy dissipation steps continuously connected along the direction of water flow, the energy dissipation step comprises a first step surface for dissipating energy of the water flow, and a first slope surface for diverting sediment along the direction of water flow, the first slope surface of the energy dissipation step of the upper level and the first step surface of the energy dissipation step of the lower level are connected to form a first scouring concave angle with an angle greater than 90°. 2.根据权利要求1所述的台阶式泄水隧洞,其特征在于:所述消能建筑物还包括基台,所述基台沿水流方向倾斜铺设以形成对水流导流的坡度,多级所述消能台阶均设置在所述基台上,且所述消能台阶的所述第一台阶面和所述基台的坡度方向呈夹角布置,以使所述消能台阶的所述第一台阶面阻碍水流进行消能。2. The stepped drainage tunnel according to claim 1 is characterized in that: the energy dissipation structure also includes a base, the base is laid obliquely along the direction of water flow to form a slope for diverting water flow, multiple levels of energy dissipation steps are arranged on the base, and the first step surface of the energy dissipation step and the slope direction of the base are arranged at an angle, so that the first step surface of the energy dissipation step hinders the water flow for energy dissipation. 3.根据权利要求1或2所述的台阶式泄水隧洞,其特征在于:所述消能台阶的所述第一台阶面沿水流方向倾斜以形成对泥沙导流的坡度,且同一个所述消能台阶上的所述第一台阶面和所述第一斜坡面衔接并形成第一过渡凸角。3. The stepped drainage tunnel according to claim 1 or 2 is characterized in that the first step surface of the energy dissipation step is inclined along the water flow direction to form a slope for diverting sediment, and the first step surface and the first slope surface on the same energy dissipation step are connected to form a first transition convex angle. 4.根据权利要求1所述的台阶式泄水隧洞,其特征在于:所述第一斜坡面的侧边设置有沿所述第一斜坡面坡度方向连续衔接的多级交通台阶,最上级的所述交通台阶和对应所述消能台阶的所述第一台阶面衔接,最下级的所述交通台阶和下一级所述消能台阶的所述第一台阶面衔接,其中,多级所述交通台阶在竖直方向连线的高度和所述第一斜坡面在竖直方向的高度相同。4. The stepped drainage tunnel according to claim 1 is characterized in that: a plurality of traffic steps continuously connected along the slope direction of the first slope surface are arranged on the side of the first slope surface, the uppermost traffic step is connected with the first step surface corresponding to the energy dissipation step, and the lowermost traffic step is connected with the first step surface of the next energy dissipation step, wherein the height of the vertical line connecting the plurality of traffic steps is the same as the height of the first slope surface in the vertical direction. 5.根据权利要求4所述的台阶式泄水隧洞,其特征在于:所述交通台阶包括对水流进行消能的第二台阶面,以及沿水流方向对泥沙导流的第二斜坡面,上一级所述交通台阶的所述第二斜坡面和下一级所述交通台阶的所述第二台阶面衔接并形成角度大于90°的第二冲刷凹角,且同一个所述交通台阶上的所述第二台阶面和所述第二斜坡面衔接并形成第二过渡凸角。5. The stepped drainage tunnel according to claim 4 is characterized in that: the traffic step includes a second step surface for dissipating energy of the water flow, and a second slope surface for diverting sediment along the direction of the water flow, the second slope surface of the upper level of the traffic step and the second step surface of the lower level of the traffic step are connected to form a second scouring concave angle with an angle greater than 90°, and the second step surface and the second slope surface on the same traffic step are connected to form a second transition convex angle. 6.根据权利要求4或5所述的台阶式泄水隧洞,其特征在于:所述第一斜坡面的宽度小于所述第一台阶面的宽度,且所述第一斜坡面衔接在所述第一台阶面边缘的中部,所述第一斜坡面的两侧分别设置一组多级所述交通台阶,且多级所述交通台阶外侧边的连线和多级所述第一台阶面外侧边的连线共线。6. The stepped drainage tunnel according to claim 4 or 5 is characterized in that: the width of the first slope surface is smaller than the width of the first step surface, and the first slope surface is connected to the middle of the edge of the first step surface, and a group of multiple levels of traffic steps are respectively arranged on both sides of the first slope surface, and the connecting line of the outer sides of the multiple levels of the traffic steps and the connecting line of the outer sides of the multiple levels of the first step surfaces are collinear. 7.根据权利要求1所述的台阶式泄水隧洞,其特征在于:所述消能建筑物还包括设置在多级所述消能台阶两侧的边墙,多级所述消能台阶外侧边的连线和对应侧所述边墙共线,以使两所述边墙之间构成水流消能区域。7. The stepped drainage tunnel according to claim 1 is characterized in that: the energy dissipation structure also includes side walls arranged on both sides of the multiple energy dissipation steps, and the connecting line of the outer sides of the multiple energy dissipation steps and the side walls on the corresponding sides are collinear, so that a water flow energy dissipation area is formed between the two side walls. 8.根据权利要求1所述的台阶式泄水隧洞,其特征在于:所述第一斜坡面上设置有多排第一消能组件,所述第一消能组件包括并排设置的多个第一消能坎,所述第一消能坎为其中一角迎向上方水流的三角形结构,且相邻两排的所述第一消能坎呈错位布置,以使并排的所述第一消能坎对沿所述第一斜坡面滑行的水流进行碰撞和漩涡消能。8. The stepped drainage tunnel according to claim 1 is characterized in that: multiple rows of first energy dissipation components are arranged on the first slope surface, and the first energy dissipation components include multiple first energy dissipation steps arranged side by side, and the first energy dissipation steps are triangular structures with one corner facing the upward water flow, and the first energy dissipation steps in two adjacent rows are staggered so that the side-by-side first energy dissipation steps can collide and vortex to dissipate energy of the water flow sliding along the first slope surface. 9.根据权利要求1所述的台阶式泄水隧洞,其特征在于:所述第一台阶面上设置有多排第二消能组件,所述第二消能组件包括并排设置的多个第二消能坎,所述第二消能坎为顶点迎向上方水流的半球结构,且相邻两排的所述第二消能坎呈错位布置,以使并排的所述第二消能坎对自上一级所述消能台阶跌落的水流进行碰撞和漩涡消能。9. The stepped drainage tunnel according to claim 1 is characterized in that: multiple rows of second energy dissipation components are arranged on the first step surface, and the second energy dissipation components include multiple second energy dissipation steps arranged side by side, and the second energy dissipation steps are hemispherical structures with their apexes facing the water flow above, and the second energy dissipation steps in two adjacent rows are staggered so that the side-by-side second energy dissipation steps can collide and vortex to dissipate energy of the water flow falling from the energy dissipation step of the upper level. 10.一种消能方法,采用权利要求1-9任意一项所述的台阶式泄水隧洞,其特征在于,所述消能方法包括:10. An energy dissipation method, using the stepped drainage tunnel according to any one of claims 1 to 9, characterized in that the energy dissipation method comprises: 在泄水隧洞内布置供水流自上游向下游方向流经的多级所述消能台阶,由连续衔接的所述多级消能台阶对不同形态的水流进行消能,并基于所述第一冲刷凹角的布置无死角地冲刷所述消能台阶上流经的泥沙;Arrange multiple energy dissipation steps in the discharge tunnel through which the water flow flows from upstream to downstream, dissipate energy of water flow in different forms by the continuously connected multiple energy dissipation steps, and flush the sediment flowing on the energy dissipation steps without dead angles based on the arrangement of the first flushing concave angles; 当水流自上一级所述消能台阶的所述第一台阶面跌落至下一级所述消能台阶的所述第一台阶面,通过水流和所述第一台阶面的碰撞对水流进行连续消能;When the water flow falls from the first step surface of the energy dissipation step of the previous level to the first step surface of the energy dissipation step of the next level, the water flow is continuously energy-dissipated by the collision between the water flow and the first step surface; 当水流自上一级所述消能台阶的所述第一斜坡面滑行至下一级所述消能台阶的所述第一台阶面,通过水流在所述第一台阶面上形成横轴旋涡对后续水流进行剪切摩擦消能。When the water flows from the first slope surface of the previous energy dissipation step to the first step surface of the next energy dissipation step, the water flows on the first step surface to form a transverse axis vortex to dissipate the subsequent water flow by shear friction.
CN202410916168.0A 2024-07-09 2024-07-09 A stepped water discharge tunnel and energy dissipation method Pending CN118653434A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410916168.0A CN118653434A (en) 2024-07-09 2024-07-09 A stepped water discharge tunnel and energy dissipation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410916168.0A CN118653434A (en) 2024-07-09 2024-07-09 A stepped water discharge tunnel and energy dissipation method

Publications (1)

Publication Number Publication Date
CN118653434A true CN118653434A (en) 2024-09-17

Family

ID=92707578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410916168.0A Pending CN118653434A (en) 2024-07-09 2024-07-09 A stepped water discharge tunnel and energy dissipation method

Country Status (1)

Country Link
CN (1) CN118653434A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119177637A (en) * 2024-11-25 2024-12-24 中国电建集团西北勘测设计研究院有限公司 Flood drainage system and flood drainage method for pumped storage power station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119177637A (en) * 2024-11-25 2024-12-24 中国电建集团西北勘测设计研究院有限公司 Flood drainage system and flood drainage method for pumped storage power station
CN119177637B (en) * 2024-11-25 2025-06-27 中国电建集团西北勘测设计研究院有限公司 A flood discharge system and flood discharge method for a pumped storage power station

Similar Documents

Publication Publication Date Title
CN101349047B (en) Air-entrained curve ladder energy dissipator in the flood discharge tunnel
CN101476305A (en) Mud-stone flow discharge guiding groove based on step anti-flushing notched sill group and use thereof
CN206591500U (en) A kind of laterally-graded rectifier type stiling basin for river course of turning
CN111350171B (en) Used for fish passes in low head dams with high sediment content and large head fluctuations
CN114108575B (en) Stepped grading spillway with energy dissipation effect
CN119177637B (en) A flood discharge system and flood discharge method for a pumped storage power station
CN220827778U (en) Drainage structure combining diversion tunnel, drainage tunnel and vertical shaft type flood drainage tunnel
CN104264639B (en) Underflow type step absorption basin energy-dissipating system
CN210658249U (en) Flood discharge device for pumping and storing engineering
Sinha Power intake size optimization for economical hydropower
CN113136840B (en) Water conservancy project sluice downstream river diversion energy dissipation scour protection facility
CN212103957U (en) Low-head dam fishway with high silt content and large fluctuation of water head
CN221989243U (en) Stable drop-flow annular overflow weir for one-way concentrated inflow vertical shaft
CN220266475U (en) Water flow opposite-flushing energy dissipation type flood discharge steep tank
CN211256912U (en) Fold-line type flip bucket at outlet of bank spillway/flood discharge tunnel
CN109778799B (en) an asymmetric stilling pool
CN118422654A (en) A structure for improving water flow characteristics at the intersection of underground caverns and its use method
CN218373716U (en) Sand-blocking and water-binding system for head junction of hydropower station
CN113931144B (en) Energy dissipation anti-impact structure of diversion tunnel outlet
CN214194419U (en) Tail water section lures fish structure with lead wall
CN216130077U (en) Combined type flow-picking energy dissipation device suitable for narrow riverbed
CN104294802B (en) Down stream formula step plunge pool system
CN108252277A (en) More import confluences, multiple exit shunting hydraulic facility
CN201437586U (en) A swirling annular weir anti-corrosion and energy dissipation flood discharge device
CN110284468A (en) A kind of flood-discharge energy-dissipating structure for high flow rate non-pressure tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination