CN118479385A CN202410676591.8A CN202410676591A CN118479385A CN 118479385 A CN118479385 A CN 118479385A CN 202410676591 A CN202410676591 A CN 202410676591A CN 118479385 A CN118479385 A CN 118479385A
Authority
CN
China
Prior art keywords
guide
steel
rods
lifting
steel strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410676591.8A
Other languages
Chinese (zh)
Inventor
马云峰
刘汝超
王维鑫
初善忠
张宝谦
樊子烁
韩思宇
纪茗远
于良博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202410676591.8A priority Critical patent/CN118479385A/en
Publication of CN118479385A publication Critical patent/CN118479385A/en
Pending legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28—Other constructional details
    • B66D1/36—Guiding, or otherwise ensuring winding in an orderly manner, of ropes, cables, or chains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of guide frames, in particular to a steel strand guide frame for hydraulic synchronous lifting of a steel structure and a use method thereof. Its technical scheme includes the hoist beam, still includes: the lifter is arranged on the upper surface of the lifting beam and is provided with a plurality of steel strands; the supporting component is positioned at one side of the lifter and used for supporting, and the supporting component is fixedly arranged on the upper surface of the lifting beam; the guide posts are fixedly arranged at the upper ends of the supporting components, guide rods are arranged between the guide posts, the lower ends of the guide rods are fixedly connected with the lifting beams, guide grooves are respectively formed in two sides of the guide rods, and a positioning component used for limiting and arranging the steel strands is movably arranged between the guide posts and the guide rods. The invention can divide the steel strands into a plurality of groups for guiding, is more stable in the moving process, prevents sliding, avoids the steel strands from winding, and improves the construction efficiency and quality.

Description

Steel strand guide frame for hydraulic synchronous lifting of steel structure and use method
Technical Field
The invention relates to the technical field of guide frames, in particular to a steel strand guide frame for hydraulic synchronous lifting of a steel structure and a use method thereof.
Background
The hydraulic integral lifting technology for large-scale components is a novel building installation technology, which uses a hydraulic lifter as a lifting tool and uses steel strands as bearing rigs for lifting the components, and realizes the integral lifting installation of the large-scale components by lifting and lowering the hydraulic lifter.
The steel strand guide frame for hydraulic synchronous lifting of the steel structure comprises a guide frame support frame and a guide frame, wherein the guide frame support frame comprises a vertical support rod, an inclined support rod, a longitudinal support rod and a transverse support rod; the vertical support rods are a pair of parallel vertical support rods with equal length, and the two vertical support rods are connected by a longitudinal support rod; the two oblique support rods are parallel and equal in length, one ends of the two oblique support rods are fixed at the same height of the vertical support rod, the other ends of the two oblique support rods are supported on the lifting beam, and a longitudinal support rod is arranged between the two oblique support rods; the vertical support rod is connected with the inclined support rod through a transverse support rod; the guide frame comprises two triangular frames which are mirror symmetry with each other, and three corners of the two triangular frames are respectively connected by three parallel supporting round tubes; one of the supporting round pipes of the guide frame is arranged between two vertical supporting rods on the upper part of the support frame of the guide frame. The invention can obtain materials locally, can be reused, and can effectively support the steel strand.
Above-mentioned when using the tripod to support the steel strand wires, because the tripod does not possess limit function itself, and the steel strand wires have certain elasticity again, consequently when the steel strand wires remove, the condition that the steel strand wires appear the landing easily, in case the steel strand wires landing, will cause the winding of steel strand wires, makes it be difficult to arrange in order, and this kind of condition not only can influence the efficiency of construction, still probably can cause harmful effects to construction quality.
Therefore, the invention provides the steel strand guide frame for hydraulic synchronous lifting of the steel structure.
Disclosure of Invention
The invention aims at solving the problems in the background art and provides a steel strand guide frame for hydraulic synchronous lifting of a steel structure and a use method thereof.
The technical scheme of the invention is as follows: a steel strand wires leading truck for steel construction hydraulic pressure promotes in step, including promoting the roof beam, still include: the lifter is arranged on the upper surface of the lifting beam and is provided with a plurality of steel strands; the supporting component is positioned at one side of the lifter and used for supporting, and the supporting component is fixedly arranged on the upper surface of the lifting beam; the guide posts are fixedly arranged at the upper ends of the supporting components, guide rods are arranged between the guide posts, the lower ends of the guide rods are fixedly connected with the lifting beams, guide grooves are respectively formed in two sides of the guide rods, and a positioning component used for limiting and arranging the steel strands is movably arranged between the guide posts and the guide rods.
Optionally, the locating component includes the connecting block, the mounting groove has been seted up to the upper surface of connecting block, the inside roller bearing that is provided with that rotates of mounting groove, the one end fixedly connected with guide block of connecting block, guide block and guide groove sliding connection, the first cover piece of the other end fixedly connected with of connecting block, first cover piece cup joints with the guide post activity, the first fixed block of outer wall fixedly connected with of first cover piece.
Optionally, the locating component still includes the activity and cup joints the limiting plate on guide post and guide bar, the limiting plate is located directly over the connecting block, the both sides of limiting plate are fixed respectively and are provided with the second fixed block, the screw thread runs through on the second fixed block has the adjusting threaded rod, the adjusting threaded rod runs through with first fixed block screw thread.
Optionally, the supporting component includes two sets of vertical support bars and oblique branch, fixedly provided with multiunit cross brace between the vertical support bar, oblique branch is the slope setting, and the upper end and the vertical support bar fixed connection of oblique branch, fixedly provided with horizontal stiffener between vertical support bar and the oblique branch.
Optionally, the guide groove and the guide block are arranged in a convex structure.
Optionally, a group of reinforcing plates are fixedly arranged at the connection parts of the vertical supporting rods, the inclined supporting rods and the lifting beams.
The application method of the steel strand guide frame for hydraulic synchronous lifting of the steel structure comprises the following steps:
Installing a guide post and a guide rod on the support component;
Installing a lifter and the support assembly on a lifting beam;
Installing a first set of connection blocks;
running the lifter until the free end of the steel strand extends to the guide rod;
dividing the free ends of the first row of steel strands close to the supporting component into two groups, and respectively passing through the two connecting blocks of the first group;
Installing a second group of connecting blocks, and dividing the free ends of the second row of steel strands close to the supporting component into two groups, wherein the two groups respectively penetrate through the two connecting blocks of the second group;
repeating the steps until the fixing of the free ends of all the steel strands is completed;
continuing to operate the lifter;
And pulling the free ends of each group of steel strands to one side of the supporting component.
Compared with the prior art, the invention has the following beneficial technical effects:
According to the invention, the steel strands are placed on the rolling shafts in the mounting grooves, and then the limiting plates are sleeved on the outer walls of the guide posts and the guide rods, so that the adjusting threaded rods are rotated on the first fixed blocks, the limiting plates vertically move downwards, the steel strands placed on the rolling shafts are limited, and in the moving process of the steel strands, the steel strands drive the rolling shafts to rotate in the mounting grooves, so that the steel strands can be divided into a plurality of groups for guiding and limiting, the steel strands are more stable in the moving process, the sliding is prevented, the steel strands are prevented from being wound, the construction efficiency is improved, and the construction quality is improved;
Furthermore, the guide rods are arranged between the guide posts, so that the guide blocks at one end of the connecting block are in sliding connection with the guide grooves on the guide rods, and the two groups of the connecting blocks can be arranged, thereby realizing grouping guide and limiting of the steel strands, avoiding winding, crossing and knotting of the steel strands, reducing the abrasion and fracture risks of the steel strands, and improving the safety.
Drawings
FIG. 1 shows a schematic diagram of a steel strand guide frame for hydraulic synchronous lifting of a steel structure;
FIG. 2 shows a front cross-sectional view of FIG. 1 of the present invention;
Fig. 3 is a schematic cross-sectional view of the positioning assembly of fig. 1 according to the present invention.
Reference numerals:
1. lifting the beam; 2. a lifter; 3. steel strand;
4. A support assembly; 41. a vertical support rod; 42. an inclined strut; 43. a cross brace; 44. a transverse reinforcing rod;
5. A guide post; 6. a guide rod; 7. a guide groove;
8. A positioning assembly; 81. a connecting block; 82. a mounting groove; 83. a roller; 84. a guide block; 85. a first set of blocks; 86. a first fixed block; 87. a limiting plate; 88. a second fixed block; 89. adjusting a threaded rod;
9. reinforcing plate.
Detailed Description
The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, but not all embodiments, and all other embodiments obtained by those skilled in the art without making creative efforts based on the embodiments of the present invention are included in the protection scope of the present invention.
In order that the invention may be readily understood, a more complete description of the invention will be rendered by reference to the appended drawings. Several embodiments of the invention are presented in the figures. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "mounted" on another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like are used herein for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used herein in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
Examples
As shown in fig. 1 and 2, the steel strand guide frame for hydraulic synchronous lifting of a steel structure provided by the invention comprises a lifting beam 1 and further comprises: the lifter 2 is arranged on the upper surface of the lifting beam 1, a plurality of steel strands 3 are arranged on the lifter 2, and particularly, a plurality of through holes are formed in the lifter 2, and the steel strands 3 penetrate through the through holes; the supporting component 4 is positioned at one side of the lifter 2 and used for supporting, and the supporting component 4 is fixedly arranged on the upper surface of the lifting beam 1 and used for stably supporting the steel strand 3; the fixed guide posts 5 that set up in supporting component 4 upper end, and guide posts 5 are the symmetry setting, intermediate position is provided with guide bar 6 between the guide posts 5, guide bar 6's lower extreme and lifting beam 1 fixed connection, guide slot 7 has been seted up respectively to guide bar 6's both sides, the activity is provided with the locating component 8 that is used for spacing arrangement to steel strand wires 3 between guide post 5 and the guide bar 6, be convenient for divide into the steel strand wires 3 into the multiunit and carry out spacing and direction, avoid steel strand wires 3 winding, alternately and knot, reduce the wearing and tearing of steel strand wires 3 and cracked risk, improve the security.
As shown in fig. 1 and 3, positioning assembly 8 includes connecting block 81, and connecting block 81 is "U" font structure setting, be convenient for pass simultaneously to many steel strands 3, mounting groove 82 has been seted up to the upper surface of connecting block 81, the inside roller bearing 83 that is provided with through the bearing rotation of mounting groove 82, and a plurality of guide grooves have been seted up to roller bearing 83's outer wall, avoid many steel strands 3 landing or intercrossing in the removal in-process, connecting block 81's one end fixedly connected with guide block 84, guide block 84 and guide groove 7 sliding connection, connecting block 81's the other end fixedly connected with first cover piece 85, first cover piece 85 cup joints with guide post 5 activity, first cover piece 85's outer wall fixedly connected with fixed block 86, can set up connecting block 81 simultaneously in guide post 5's left side and right side, thereby divide into many steel strands 3 into the multiunit and lead and spacing, avoid steel strand 3 winding, cross and tie, reduce steel strand 3's wearing and tearing and cracked risk, improve the security.
Further, positioning assembly 8 still includes the activity and cup joints limiting plate 87 on guide post 5 and guide bar 6, limiting plate 87 is located directly over connecting block 81, the both sides of limiting plate 87 are fixed respectively and are provided with second fixed block 88, the screw thread runs through on the second fixed block 88 has adjusting threaded rod 89, and adjusting threaded rod 89's upper end is provided with the hand screw cap, adjusting threaded rod 89 runs through with first fixed block 86 screw thread, can install multiunit connecting block 81 simultaneously, and second fixed block 88 can carry out spacingly to steel strand wires 3 on the connecting block 81 of the uppermost layer, guarantee the stability that steel strand wires 3 removed, avoid appearing the landing knot.
As shown in fig. 1, the supporting component 4 includes two sets of vertical supporting rods 41 and inclined supporting rods 42, a plurality of groups of cross supports 43 are fixedly arranged between the vertical supporting rods 41, the vertical supporting rods 41 and the cross supports 43 are in welded connection, so that the vertical supporting rods 41 are stably supported, the inclined supporting rods 42 are obliquely arranged, the connecting parts are in welded connection, the upper ends of the inclined supporting rods 42 are fixedly connected with the vertical supporting rods 41, the vertical supporting rods 41 and the inclined supporting rods 42 form a triangle, so that the vertical supporting rods 41 and the inclined supporting rods 42 have good stability, transverse reinforcing rods 44 are fixedly arranged between the vertical supporting rods 41 and the inclined supporting rods 42, and the vertical supporting rods 41 and the inclined supporting rods 42 are in welded connection with the transverse reinforcing rods 44, so that the stability of the supporting component 4 can be further improved, and the stability of supporting the steel stranded wires 3 is improved.
Secondly, guide way 7 and guide block 84 are "protruding" font structure setting, can increase the stability and the intensity of connecting block 81, are convenient for set up corresponding connecting block 81 according to the group number of steel strand wires 3 and lead steel strand wires 3, and it is more stable to lead steel strand wires 3, avoids appearing the intercrossing and knotting of steel strand wires 3 simultaneously.
Furthermore, a group of reinforcing plates 9 are fixedly arranged at the connection parts of the vertical supporting rods 41 and the inclined supporting rods 42 and the lifting beam 1, so that the stability of the vertical supporting rods 41 and the inclined supporting rods 42 is improved.
The working principle of the embodiment is as follows: according to the number of rows of the steel strands 3 arranged on the lifter 2, the guide block 84 at one end of the connecting block 81 is slidably arranged in the guide groove 7, and meanwhile, the first set of blocks 85 at the other end of the connecting block 81 are sleeved on the outer wall of the guide post 5, so that the connecting block 81 slides to the bottommost end of the guide post 5. Then, according to the number of rows of the steel strands 3, the steel strands 3 in the first row are divided into two groups, the steel strands 3 are respectively placed on the rolling shafts 83 in the mounting grooves 82 on two sides of the guide rod 6, and each group of steel strands 3 is respectively placed in the corresponding guide grooves on the rolling shafts 83, so that the steel strands 3 are conveniently guided, and the steel strands 3 are prevented from being mutually crossed and wound in the moving process.
Further, after the placement of the first row of steel strands 3 is completed, the second set of connection blocks 81 are placed on the first set of connection blocks 81 again according to the above description, which is not described herein. Then, the second row of steel strands 3 is divided into two groups, and the second row of steel strands 3 is placed in the corresponding guide grooves on the rolling shafts 83, so that the steel strands 3 are guided and supported in a row manner, the rolling shafts 83 are driven to rotate in the mounting grooves 82 by the steel strands 3 in the moving process of the steel strands, the steel strands are guided in the moving process of the steel strands, and slipping, crossing and winding are avoided, so that the safety is improved.
In a specific embodiment, the number of rows of steel strands 3 is set according to the arrangement of through holes on the lifter 2, while the number of rows of connection blocks 81 of the positioning assembly 8 arranged from bottom to top matches the number of rows of steel strands 3.
Still further, after the completion is placed to steel strand wires 3, cup joint limiting plate 87 activity on guide post 5 and guide bar 6 to the lower extreme with adjusting threaded rod 89 is connected with the screw hole on the first fixed block 86, the manual nut of rotatory adjusting threaded rod 89 upper end afterwards makes limiting plate 87 vertical downwardly moving, connects connecting block 81 and limiting plate 87, thereby avoids steel strand wires 3 to appear the landing, avoids causing the winding, thereby improves the efficiency of construction, increases the quality of construction.
Furthermore, as the lifter 2 moves, the length of the steel strand 3 passing through the positioning assembly 8 is continuously increased, so that the steel strand 3 needs to be manually assisted to dial the free ends of the steel strand 3 to the two sides of the supporting assembly 4 to avoid falling onto the supporting assembly 4, and the steel strand 3 can naturally fall.
Example 2
The application method of the steel strand guide frame for hydraulic synchronous lifting of the steel structure comprises the following steps:
installing a guide post 5 and a guide rod 6 on the support component 4;
installing the lifter 2 and the support assembly 4 to the lifting beam 1;
installing a first set of connection blocks 81; specifically, the number of the first group of connection blocks 81 is two, the guide block 84 of each connection block 81 is arranged in the guide groove 7, and the first set of blocks 85 is arranged in the guide column 5; the first set of connection blocks 81 are the connection blocks 81 closest to the support assembly 4;
running the lifter 2 to the free end of the steel strand 3 to extend to the guide rod 6; in the process, an operator is required to manually guide the free end of the steel strand 3 to extend towards the guide rod 6;
Dividing the free ends of the first row of steel strands 3 adjacent to the support assembly 4 into two groups, respectively passing through the two connection blocks 81 of the first group; specifically, each set of strands extends from one side of roller 83 to the other;
Installing a second set of connection blocks 81, the second set of connection blocks 81 being located above the first set of connection blocks 81; dividing the free ends of the second row of steel strands 3 adjacent to the support assembly 4 into two groups, respectively passing through two connection blocks 81 of the second group; repeating the steps until the fixing of the free ends of all the steel strands 3 is completed;
continuing to operate the lifter 2;
the free ends of each group of steel strands 3 are pulled to one side of the supporting component 4; specifically, the free ends of the two groups of steel strands 3 are respectively pulled to the far side, so that the steel strands 3 drop downwards from the side surface of the supporting component 4 at the same side.
The above-described embodiments are merely a few alternative embodiments of the present invention, and many alternative modifications and combinations of the above-described embodiments will be apparent to those skilled in the art based on the technical solutions of the present invention and the related teachings of the above-described embodiments.

Claims (7)

1. Steel strand guide frame for hydraulic synchronous lifting of steel structures, comprising a lifting beam (1), and being characterized by further comprising:
the lifter (2) is arranged on the upper surface of the lifting beam (1), and a plurality of steel strands (3) are arranged on the lifter (2);
The supporting component (4) is positioned at one side of the lifter (2) and used for supporting, and the supporting component (4) is fixedly arranged on the upper surface of the lifting beam (1);
The guide posts (5) are fixedly arranged at the upper ends of the supporting components (4), guide rods (6) are arranged between the guide posts (5), the lower ends of the guide rods (6) are fixedly connected with the lifting beams (1), guide grooves (7) are respectively formed in two sides of the guide rods (6), and positioning components (8) used for limiting and arranging the steel strands (3) are movably arranged between the guide posts (5) and the guide rods (6).
2. The steel strand guide frame for hydraulic synchronous lifting of a steel structure according to claim 1, wherein: positioning component (8) are including connecting block (81), mounting groove (82) have been seted up to the upper surface of connecting block (81), inside rotation of mounting groove (82) is provided with roller bearing (83), one end fixedly connected with guide block (84) of connecting block (81), guide block (84) and guide groove (7) sliding connection, the other end fixedly connected with of connecting block (81) is first set of piece (85), first set of piece (85) cup joints with guide post (5) activity, the outer wall fixedly connected with first fixed block (86) of first set of piece (85).
3. A steel strand guide frame for hydraulic synchronous lifting of a steel structure according to claim 2, wherein: the positioning assembly (8) further comprises a limiting plate (87) movably sleeved on the guide post (5) and the guide rod (6), the limiting plate (87) is located right above the connecting block (81), second fixing blocks (88) are fixedly arranged on two sides of the limiting plate (87) respectively, an adjusting threaded rod (89) penetrates through threads on the second fixing blocks (88), and the adjusting threaded rod (89) penetrates through threads on the first fixing blocks (86).
4. The steel strand guide frame for hydraulic synchronous lifting of a steel structure according to claim 1, wherein: the supporting assembly (4) comprises two groups of vertical supporting rods (41) and inclined supporting rods (42), a plurality of groups of cross supports (43) are fixedly arranged between the vertical supporting rods (41), the inclined supporting rods (42) are obliquely arranged, the upper ends of the inclined supporting rods (42) are fixedly connected with the vertical supporting rods (41), and transverse reinforcing rods (44) are fixedly arranged between the vertical supporting rods (41) and the inclined supporting rods (42).
5. A steel strand guide frame for hydraulic synchronous lifting of a steel structure according to claim 2, wherein: the guide groove (7) and the guide block (84) are arranged in a convex structure.
6. The steel strand guide frame for hydraulic synchronous lifting of a steel structure according to claim 4, wherein: a group of reinforcing plates (9) are fixedly arranged at the joint of the vertical supporting rods (41) and the inclined supporting rods (42) and the lifting beam (1).
7. The method of using a steel strand guide frame for hydraulic synchronous lifting of a steel structure according to any one of claims 1 to 6, comprising the steps of:
installing a guide post (5) and a guide rod (6) on the support component (4);
Installing a lifter (2) and a supporting component (4) on the lifting beam (1);
-mounting a first set of connection blocks (81);
operating the lifter (2) until the free end of the steel strand (3) extends to the guide rod (6);
Dividing the free ends of the first row of steel strands (3) close to the supporting component (4) into two groups, and respectively passing through two connecting blocks (81) of the first group;
A second group of connecting blocks (81) are installed, the free ends of the second row of steel strands (3) close to the supporting component (4) are divided into two groups, and the two groups of the steel strands respectively penetrate through the two connecting blocks (81) of the second group until the fixing of the free ends of all the steel strands (3) is completed;
Continuing to operate the lifter (2);
and (3) pulling the free ends of each group of steel strands (3) to one side of the supporting component (4).
CN202410676591.8A 2024-05-29 2024-05-29 Steel strand guide frame for hydraulic synchronous lifting of steel structure and use method Pending CN118479385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410676591.8A CN118479385A (en) 2024-05-29 2024-05-29 Steel strand guide frame for hydraulic synchronous lifting of steel structure and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410676591.8A CN118479385A (en) 2024-05-29 2024-05-29 Steel strand guide frame for hydraulic synchronous lifting of steel structure and use method

Publications (1)

Publication Number Publication Date
CN118479385A true CN118479385A (en) 2024-08-13

Family

ID=92194702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410676591.8A Pending CN118479385A (en) 2024-05-29 2024-05-29 Steel strand guide frame for hydraulic synchronous lifting of steel structure and use method

Country Status (1)

Country Link
CN (1) CN118479385A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120684014A (en) * 2025-06-27 2025-09-23 中冶(上海)钢结构科技有限公司 Grooming device, dredging method and system for multi-steel strand hoist

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120684014A (en) * 2025-06-27 2025-09-23 中冶(上海)钢结构科技有限公司 Grooming device, dredging method and system for multi-steel strand hoist

Similar Documents

Publication Publication Date Title
CN111021779B (en) Integral descending and dismantling construction method for space net rack and auxiliary supporting mechanism
CN110805138B (en) Construction method for jacking two sides of large-span net rack
CN107178211B (en) Truss hanging system for installing steel structure
CN107355067A (en) The automatic lifting purlin crane system construction operation platform of Steel Structure Installation
JP2001254668A (en) Wind turbine tower assembling apparatus and method
CN114592429A (en) Arch rib and wind bracing assisted splicing construction system and construction method of tied arch bridge
DE202022102775U1 (en) Pre-assembly platform frame for arched roof of an assembled subway station
CN210766435U (en) A hanging basket for multi-truss ultra-wide bridge construction
CN205309598U (en) Board unit predeformation dismouting device
CN114033154A (en) Clamp type operation hanging basket suspension device and use method thereof
CN210238297U (en) Detaching device for bent cap support
CN222498505U (en) Steel strand guide frame for hydraulic synchronous lifting of steel structure
JP2004346652A (en) Construction and construction method of raised tower
CN217106054U (en) Safe operation platform for truss high-altitude construction
CN218659768U (en) Stress compensation device for pre-tensioned prestressed steel beam
JP3988937B2 (en) Steel tower raising method
CN217924788U (en) High overhead position climbing frame climbing fixing auxiliary device
CN216108099U (en) Box girder steel strand penetrating device
CN202861759U (en) Mounting device for harness cord mounting
CN212359072U (en) Construction equipment of roofing of encorbelmenting
CN217376979U (en) New jersey guardrail horizontal type prefabrication method steel reinforcement framework integral hoisting device
CN214243693U (en) A outer operation hanging flower basket of tower for high tower
CN212201344U (en) Support for penetrating steel strand
CN210315237U (en) Construction device for binding reinforcement cage
CN223440986U (en) An integrated slat support suitable for manually winding steel cage stirrups

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination