CN118442660A - A building curtain wall indoor ventilation device for engineering decoration - Google Patents
A building curtain wall indoor ventilation device for engineering decoration Download PDFInfo
- Publication number
- CN118442660A CN118442660A CN202410694357.8A CN202410694357A CN118442660A CN 118442660 A CN118442660 A CN 118442660A CN 202410694357 A CN202410694357 A CN 202410694357A CN 118442660 A CN118442660 A CN 118442660A
- Authority
- CN
- China
- Prior art keywords
- connecting structure
- curtain wall
- building curtain
- ventilation device
- annular cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/003—Ventilation in combination with air cleaning
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/28—Arrangement or mounting of filters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/04—Ventilation with ducting systems, e.g. by double walls; with natural circulation
- F24F7/06—Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
- F24F7/08—Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit with separate ducts for supplied and exhausted air with provisions for reversal of the input and output systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
- F24F8/108—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering using dry filter elements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/90—Cleaning of purification apparatus
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Ventilation (AREA)
Abstract
本发明涉及通风装置技术领域,具体是涉及一种工程装修用建筑幕墙室内通风装置,包括移动底座、抽气机构、第一过滤机构和第二过滤机构;移动底座;抽气机构放置在移动底座上;第一过滤机构包括第一过滤组件和第一连接结构,第一过滤组件水平设置在移动底座上,第一连接结构设置在第一过滤组件的一端,第一连接结构的一端与抽气机构连接;第二过滤机构包括第二过滤组件和第三连接结构,第二过滤组件竖直设置在移动底座上,第三连接结构设置在第二组件的下端,第三连接结构与第一连接结构的另一端连接;本发明设置第一过滤机构和第二过滤机构,从而加快建筑幕墙室内空气排出室外的效率,提高工作人员在建筑幕墙室内工作的舒适度。
The present invention relates to the technical field of ventilation devices, and specifically to an indoor ventilation device for a building curtain wall used for engineering decoration, comprising a mobile base, an air extraction mechanism, a first filter mechanism and a second filter mechanism; the mobile base; the air extraction mechanism is placed on the mobile base; the first filter mechanism comprises a first filter component and a first connecting structure, the first filter component is horizontally arranged on the mobile base, the first connecting structure is arranged at one end of the first filter component, and one end of the first connecting structure is connected to the air extraction mechanism; the second filter mechanism comprises a second filter component and a third connecting structure, the second filter component is vertically arranged on the mobile base, the third connecting structure is arranged at the lower end of the second component, and the third connecting structure is connected to the other end of the first connecting structure; the present invention arranges the first filter mechanism and the second filter mechanism, thereby accelerating the efficiency of exhausting indoor air of the building curtain wall to the outdoors, and improving the comfort of staff working indoors in the building curtain wall.
Description
技术领域Technical Field
本发明涉及通风装置技术领域,具体是涉及一种工程装修用建筑幕墙室内通风装置。The invention relates to the technical field of ventilation devices, and in particular to an indoor ventilation device of a building curtain wall for engineering decoration.
背景技术Background technique
幕墙是建筑的外墙围护,不承重,像幕布一样挂上去,故又称为“帷幕墙”,是现代大型和高层建筑常用的带有装饰效果的轻质墙体。由面板和支承结构体系组成的,可相对主体结构有一定位移能力或自身有一定变形能力、不承担主体结构所作用的建筑外围护结构或装饰性结构由于现在的高层建筑外立面几乎都采用整体玻璃幕墙的建筑手法,绝大多数的办公室被设计成为封闭式窗户的空间,这主要是为了减少开窗对能量的损耗,以期达到冬季保暖与夏季制冷的效果。但是在工程装修的过程中,楼层内部的通风设备还没有进行安装,在装修的过程中产生的有害气体和灰尘无法排出,从而会对施工人员的人体健康产生影响。Curtain wall is the outer wall of the building, which is non-load-bearing and is hung like a curtain, so it is also called "curtain wall". It is a lightweight wall with decorative effect commonly used in modern large and high-rise buildings. It is composed of panels and supporting structure systems, which can have a certain displacement ability relative to the main structure or a certain deformation ability itself, and is not subject to the action of the main structure. Since the facades of high-rise buildings now almost all adopt the architectural method of integral glass curtain walls, most offices are designed as closed window spaces, which is mainly to reduce the energy loss caused by opening windows, in order to achieve the effect of keeping warm in winter and cooling in summer. However, during the decoration process, the ventilation equipment inside the floor has not been installed, and the harmful gases and dust generated during the decoration process cannot be discharged, which will affect the health of the construction workers.
中国专利CN216716475U所公开的一种用于工程装修的建筑幕墙室内通风装置,其工作原理为:通过室外机为室内机提供负压环境,使得灰尘能够被室内机吸收,利用室内机中的栅格板对杂物进行阻挡,并利用水泵和洒水管对蓄水海绵进行不间断的洒水,并通过蓄水海绵进行过滤使得水能够循环使用,以蓄水海绵作为吸附空气中的有害物质的媒介,从而使得排出的空气不会对环境造成污染。Chinese patent CN216716475U discloses an indoor ventilation device for building curtain walls used for engineering decoration, and its working principle is: a negative pressure environment is provided for an indoor unit through an outdoor unit so that dust can be absorbed by the indoor unit, a grid plate in the indoor unit is used to block debris, and a water pump and a sprinkler pipe are used to continuously sprinkle water on a water storage sponge, and the water is filtered through the water storage sponge so that the water can be recycled, and the water storage sponge is used as a medium for absorbing harmful substances in the air, so that the exhausted air will not pollute the environment.
上述方案中仍存在以下问题:The above scheme still has the following problems:
1、建筑幕墙室内的空间较大,若室内机水平放置,室内机对其所在高度层的空气吸收的效率较高,对高出室内机高度层的空气吸收效率较低,若室内机竖直设置,由于空气中杂物受重力作用,建筑幕墙室内下部的空气中的杂物较多,室内机对建筑幕墙室内下部的空气吸收效率较低;1. The indoor space of the building curtain wall is large. If the indoor unit is placed horizontally, the indoor unit has a higher efficiency in absorbing the air at the height layer where it is located, and a lower efficiency in absorbing the air at the height layer higher than the indoor unit. If the indoor unit is set vertically, there are more debris in the air at the lower part of the building curtain wall due to the effect of gravity on the debris in the air, and the indoor unit has a lower efficiency in absorbing the air at the lower part of the building curtain wall.
2、室外机在工作时,室内机内部的气压大小也不同,空气会更多的从气压较小处进入到室内机,使得室内机的局部会过度参与到过滤的过程中。2. When the outdoor unit is working, the air pressure inside the indoor unit is also different. More air will enter the indoor unit from the place with lower air pressure, causing part of the indoor unit to be overly involved in the filtering process.
发明内容Summary of the invention
针对上述问题,提供一种工程装修用建筑幕墙室内通风装置,本发明设置第一过滤机构和第二过滤机构,从而加快建筑幕墙室内空气排出室外的效率,提高工作人员在建筑幕墙室内工作的舒适度。In view of the above problems, a building curtain wall indoor ventilation device for engineering decoration is provided. The present invention is provided with a first filtering mechanism and a second filtering mechanism, thereby accelerating the efficiency of exhausting indoor air of the building curtain wall to the outside and improving the comfort of workers working indoors in the building curtain wall.
为解决现有技术问题,本发明提供一种工程装修用建筑幕墙室内通风装置,包括移动底座、抽气机构、第一过滤机构和第二过滤机构;移动底座;抽气机构放置在移动底座上,在使用通风装置时,可以将抽气机构从移动底座上取下安装在建筑幕墙的通风处;第一过滤机构包括第一过滤组件和第一连接结构,第一过滤组件水平设置在移动底座上,第一连接结构设置在第一过滤组件的一端,第一连接结构的一端与抽气机构连接;第二过滤机构包括第二过滤组件和第三连接结构,第二过滤组件竖直设置在移动底座上,第三连接结构设置在第二组件的下端,第三连接结构与第一连接结构的另一端连接。In order to solve the problems of the prior art, the present invention provides an indoor ventilation device for a building curtain wall for engineering decoration, comprising a mobile base, an exhaust mechanism, a first filter mechanism and a second filter mechanism; a mobile base; the exhaust mechanism is placed on the mobile base, and when the ventilation device is used, the exhaust mechanism can be removed from the mobile base and installed at a ventilation location of the building curtain wall; the first filter mechanism comprises a first filter component and a first connecting structure, the first filter component is horizontally arranged on the mobile base, the first connecting structure is arranged at one end of the first filter component, and one end of the first connecting structure is connected to the exhaust mechanism; the second filter mechanism comprises a second filter component and a third connecting structure, the second filter component is vertically arranged on the mobile base, the third connecting structure is arranged at the lower end of the second component, and the third connecting structure is connected to the other end of the first connecting structure.
优选的,第一过滤机构还包括第二连接结构,第二连接结构和第一连接结构分别设置在第一过滤组件的两端,第二连接结构与抽气机构连接,第二过滤机构还包括对接调整结构,对接调整结构设置在移动底座上,且对接调整结构设置在第二连接结构的下端。Preferably, the first filtering mechanism also includes a second connecting structure, the second connecting structure and the first connecting structure are respectively arranged at two ends of the first filtering assembly, the second connecting structure is connected to the air extraction mechanism, and the second filtering mechanism also includes a docking adjustment structure, the docking adjustment structure is arranged on the mobile base, and the docking adjustment structure is arranged at the lower end of the second connecting structure.
优选的,第一连接结构包括第二过滤组件和第一环形罩;第二过滤组件设置在第一过滤组件的一侧;第一环形罩设置在第二过滤组件的一侧,且第一环形罩与抽气机构连接。Preferably, the first connection structure includes a second filter assembly and a first annular cover; the second filter assembly is arranged on one side of the first filter assembly; the first annular cover is arranged on one side of the second filter assembly, and the first annular cover is connected to the air extraction mechanism.
优选的,第一连接结构还包括第一清理组件,第一清理组件设置在第一环形罩的内部。Preferably, the first connecting structure further comprises a first cleaning assembly, and the first cleaning assembly is arranged inside the first annular cover.
优选的,第一过滤机构还包括两个第一电磁阀,两个第一电磁阀分别与第一连接结构和第二连接结构对应。Preferably, the first filtering mechanism further includes two first solenoid valves, and the two first solenoid valves correspond to the first connecting structure and the second connecting structure respectively.
优选的,第一过滤机构还包括导气结构,导气结构将第一连接结构、第二连接结构和抽气机构连接。Preferably, the first filtering mechanism further includes an air guiding structure, which connects the first connecting structure, the second connecting structure and the air extraction mechanism.
优选的,第三连接结构包括第四过滤组件、第二环形罩和第二清理组件;第四过滤组件设置在第三过滤组件的一侧;第二环形罩设置在第四过滤组件的一侧,第二环形罩与第一电磁阀对应;第二清理组件设置在第二环形罩的内部。Preferably, the third connecting structure includes a fourth filter assembly, a second annular cover and a second cleaning assembly; the fourth filter assembly is arranged on one side of the third filter assembly; the second annular cover is arranged on one side of the fourth filter assembly, and the second annular cover corresponds to the first solenoid valve; the second cleaning assembly is arranged inside the second annular cover.
优选的,对接调整结构包括第一L型板和直线移动结构;第一L型板与第二环形罩连接;直线移动结构设置在移动底座上。Preferably, the docking adjustment structure includes a first L-shaped plate and a linear moving structure; the first L-shaped plate is connected to the second annular cover; and the linear moving structure is arranged on the moving base.
优选的,对接调整结构还包括抵接结构,抵接结构设置在第一L型板上。Preferably, the docking adjustment structure further includes an abutment structure, and the abutment structure is arranged on the first L-shaped plate.
优选的,对接调整结构还包括支撑结构,支撑结构包括第二L型板、第三螺套、第三螺杆、导向回弹结构和支撑块组件;第二L型板与第一L型板的一侧连接;第三螺套设置在第二L型板上;第三螺杆与第三螺套螺纹连接;导向回弹结构设置在第二L型板上;支撑块组件滑动设置在第二L型板上。Preferably, the docking adjustment structure also includes a supporting structure, which includes a second L-shaped plate, a third screw sleeve, a third screw rod, a guide rebound structure and a support block assembly; the second L-shaped plate is connected to one side of the first L-shaped plate; the third screw sleeve is arranged on the second L-shaped plate; the third screw rod is threadedly connected to the third screw sleeve; the guide rebound structure is arranged on the second L-shaped plate; and the support block assembly is slidably arranged on the second L-shaped plate.
本发明相比较于现有技术的有益效果是:Compared with the prior art, the present invention has the following beneficial effects:
1、本发明设置第一过滤机构和第二过滤机构,将第三连接结构和第一连接结构连接,第一连接结构出的低压会对第三连接结构和第二方形盒空气产生吸力,建筑幕墙室内高处的空气会被第二方形盒吸入,第二滤芯对吸入的空气进行过滤,防止灰尘等杂质进入到抽气机构内,通过第一过滤机构和第二过滤机构的配合,实现对建筑幕墙室内低处和高处空气的吸引,从而加快建筑幕墙室内空气排出室外的效率,提高工作人员在建筑幕墙室内工作的舒适度。1. The present invention is provided with a first filtering mechanism and a second filtering mechanism, and the third connecting structure is connected to the first connecting structure. The low pressure of the first connecting structure will generate suction to the third connecting structure and the air of the second square box, and the air at a high place in the building curtain wall room will be sucked in by the second square box. The second filter element filters the sucked air to prevent dust and other impurities from entering the exhaust mechanism. Through the cooperation of the first filtering mechanism and the second filtering mechanism, the air at a low place and a high place in the building curtain wall room is attracted, thereby accelerating the efficiency of exhausting the air in the building curtain wall room to the outside and improving the comfort of the staff working in the building curtain wall room.
2、本发明设置第二连接结构和对接调整结构,第一连接结构参与工作一段时间后,对接调整结构将第三连接结构调整至与第二连接结构对接,抽气机构通过第二连接结构和第三连接结构分别使第一方形盒和第二方形盒的内部形成低压,第一方形盒周围的空气大量从第一方形盒远离第一连接结构的一端被吸入到第一方向盒内,使得第一滤芯另一端的过滤能力被充分利用,从而实现第一滤芯的各处均能与被吸入到第一方形盒内的空气接触,避免第一滤芯因局部过滤的杂质较多出现的堵塞。2. The present invention is provided with a second connection structure and a docking adjustment structure. After the first connection structure has been working for a period of time, the docking adjustment structure adjusts the third connection structure to dock with the second connection structure. The exhaust mechanism forms low pressure inside the first square box and the second square box respectively through the second connection structure and the third connection structure. A large amount of air around the first square box is sucked into the first direction box from the end of the first square box away from the first connection structure, so that the filtering capacity of the other end of the first filter element is fully utilized, so that all parts of the first filter element can be in contact with the air sucked into the first square box, avoiding clogging of the first filter element due to a large number of impurities filtered locally.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1是一种工程装修用建筑幕墙室内通风装置的立体图。FIG. 1 is a perspective view of an indoor ventilation device for a building curtain wall used for engineering decoration.
图2是一种工程装修用建筑幕墙室内通风装置中第一过滤机构的立体图。FIG. 2 is a perspective view of a first filtering mechanism in an indoor ventilation device for a building curtain wall used for engineering decoration.
图3是一种工程装修用建筑幕墙室内通风装置中第一过滤组件和第一连接结构的分解图。FIG. 3 is an exploded view of a first filter assembly and a first connection structure in an indoor ventilation device for a building curtain wall used for engineering decoration.
图4是一种工程装修用建筑幕墙室内通风装置中第二过滤机构的主视图。FIG. 4 is a front view of a second filter mechanism in an indoor ventilation device for a building curtain wall used for engineering decoration.
图5是图4中A-A处的剖视图。FIG5 is a cross-sectional view taken along line A-A in FIG4.
图6是一种工程装修用建筑幕墙室内通风装置中第二过滤组件和第一清理组件的立体图。FIG. 6 is a stereoscopic view of a second filter assembly and a first cleaning assembly in an indoor ventilation device for a building curtain wall used for engineering decoration.
图7是一种工程装修用建筑幕墙室内通风装置中第一连接结构、第二连接结构和导气结构的立体图。FIG. 7 is a three-dimensional diagram of a first connection structure, a second connection structure and an air guide structure in an indoor ventilation device for a building curtain wall used for engineering decoration.
图8是一种工程装修用建筑幕墙室内通风装置中第三连接结构的分解图。FIG. 8 is an exploded view of a third connection structure in an indoor ventilation device for a building curtain wall used for engineering decoration.
图9是一种工程装修用建筑幕墙室内通风装置中第二环形罩和对接调整结构的立体图。FIG. 9 is a stereoscopic view of a second annular cover and a docking adjustment structure in an indoor ventilation device for a building curtain wall used for engineering decoration.
图10是一种工程装修用建筑幕墙室内通风装置中第二环形罩、第一L型板、直线移动结构和抵接结构的立体图。FIG. 10 is a three-dimensional diagram of a second annular cover, a first L-shaped plate, a linear moving structure and abutting structure in an indoor ventilation device for a building curtain wall used for engineering decoration.
图11是一种工程装修用建筑幕墙室内通风装置中第二环形罩、第一L型板和抵接结构的立体图。FIG. 11 is a three-dimensional diagram of a second annular cover, a first L-shaped plate and abutment structure in an indoor ventilation device for a building curtain wall used for engineering decoration.
图12是一种工程装修用建筑幕墙室内通风装置中第二环形罩和支撑结构的立体图。FIG. 12 is a three-dimensional view of a second annular cover and a supporting structure in an indoor ventilation device for a building curtain wall used for engineering decoration.
图中标号为:1、移动底座;2、抽气机构;3、第一过滤机构;31、第一过滤组件;311、第一方形盒;3111、第一格栅网;312、第一滤芯;32、第一连接结构;321、第二过滤组件;3211、第一集尘仓;3212、第一过滤网;322、第一环形罩;323、第一清理组件;3231、第一安装架;3232、第一转轴;3233、第一清理刷;3234、第一扇叶;33、第二连接结构;34、第一电磁阀;35、导气结构;351、主管;352、副管;353、第二电磁阀;354、软管;4、第二过滤机构;41、第三过滤组件;411、第二方形盒;4111、第二格栅网;412、第二滤芯;42、第三连接结构;421、第四过滤组件;4211、第二集尘仓;4212、第二过滤网;422、第二环形罩;423、第二清理组件;4231、第二安装架;4232、第二转轴;4233、第二清理刷;4234、第二扇叶;43、对接调整结构;431、第一L型板;432、直线移动结构;4321、第一矩形框;4322、第一螺杆;4323、第一导向横杆;4324、第一螺套;4325、移动块;433、抵接结构;4331、连接轴;4332、U型板;4333、第二螺套;4334、第二螺杆;4335、第一弹簧;434、支撑结构;4341、第二L型板;4342、第三螺套;4343、第三螺杆;4344、导向回弹结构;4345、支撑块组件。The numbers in the figure are: 1, mobile base; 2, air extraction mechanism; 3, first filtering mechanism; 31, first filtering assembly; 311, first square box; 3111, first grille; 312, first filter element; 32, first connecting structure; 321, second filtering assembly; 3211, first dust collecting bin; 3212, first filter; 322, first annular cover; 323, first cleaning assembly; 3231, first mounting bracket; 3232, first rotating shaft; 3233, first cleaning brush; 3234, first fan blade; 33, second connecting structure; 34, first solenoid valve; 35, air guide structure; 351, main pipe; 352, auxiliary pipe; 353, second solenoid valve; 354, hose; 4, second filtering mechanism; 41, third filtering assembly; 411, second square box; 4111, second grille; 412, second filter element; 42, third connecting structure; 421 , fourth filter assembly; 4211, second dust collection bin; 4212, second filter screen; 422, second annular cover; 423, second cleaning assembly; 4231, second mounting bracket; 4232, second rotating shaft; 4233, second cleaning brush; 4234, second fan blade; 43, docking adjustment structure; 431, first L-shaped plate; 432, linear moving structure; 4321, first rectangular frame; 4322, first screw; 432 3. First guide cross bar; 4324. First screw sleeve; 4325. Moving block; 433. Abutment structure; 4331. Connecting shaft; 4332. U-shaped plate; 4333. Second screw sleeve; 4334. Second screw rod; 4335. First spring; 434. Support structure; 4341. Second L-shaped plate; 4342. Third screw sleeve; 4343. Third screw rod; 4344. Guide rebound structure; 4345. Support block assembly.
具体实施方式Detailed ways
为能进一步了解本发明的特征、技术手段以及所达到的具体目的、功能,下面结合附图与具体实施方式对本发明作进一步详细描述。In order to further understand the features, technical means, specific objectives and functions of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
参照图1至图12所示:一种工程装修用建筑幕墙室内通风装置,包括移动底座1、抽气机构2、第一过滤机构3和第二过滤机构4;移动底座1;抽气机构2放置在移动底座1上,在使用通风装置时,可以将抽气机构2从移动底座1上取下安装在建筑幕墙的通风处;第一过滤机构3包括第一过滤组件31和第一连接结构32,第一过滤组件31水平设置在移动底座1上,第一过滤组件31包括第一方形盒311和若干个第一滤芯312,第一方形盒311水平设置,第一方形盒311的侧壁上设置有第一格栅网3111,若干个第一滤芯312设置在第一方形盒311内,第一连接结构32设置在第一过滤组件31的一端,第一连接结构32的一端与抽气机构2连接;第二过滤机构4包括第二过滤组件321和第三连接结构42,第二过滤组件321竖直设置在移动底座1上,第二过滤组件321包括第二方形盒411和若干个第二滤芯412,第二方形盒411竖直设置,第二方形盒411的侧壁上设置有第二格栅网4111,若干个第二滤芯412设置在第二方形盒411内,第三连接结构42设置在第二组件的下端,第三连接结构42与第一连接结构32的另一端连接。Referring to Figures 1 to 12: an indoor ventilation device for a building curtain wall for engineering decoration, comprising a mobile base 1, an exhaust mechanism 2, a first filter mechanism 3 and a second filter mechanism 4; a mobile base 1; the exhaust mechanism 2 is placed on the mobile base 1, and when the ventilation device is used, the exhaust mechanism 2 can be removed from the mobile base 1 and installed at a ventilation location of the building curtain wall; the first filter mechanism 3 comprises a first filter assembly 31 and a first connecting structure 32, the first filter assembly 31 is horizontally arranged on the mobile base 1, the first filter assembly 31 comprises a first square box 311 and a plurality of first filter elements 312, the first square box 311 is horizontally arranged, and a first grille 3111 is arranged on the side wall of the first square box 311, and a plurality of first filter elements 312 are arranged on the side wall of the first square box 311. 12 is arranged in the first square box 311, the first connecting structure 32 is arranged at one end of the first filter component 31, and one end of the first connecting structure 32 is connected to the exhaust mechanism 2; the second filter mechanism 4 includes a second filter component 321 and a third connecting structure 42, the second filter component 321 is vertically arranged on the mobile base 1, the second filter component 321 includes a second square box 411 and a plurality of second filter elements 412, the second square box 411 is vertically arranged, and a second grid net 4111 is arranged on the side wall of the second square box 411, and a plurality of second filter elements 412 are arranged in the second square box 411, and the third connecting structure 42 is arranged at the lower end of the second component, and the third connecting structure 42 is connected to the other end of the first connecting structure 32.
工作人员先将抽气机构2放置在移动底座1上,工作人员推动移动底座1移动到建筑幕墙室内进行工程装修的场地,降低工作人员转移通风装置的难度,然后工作人员将抽气机构2从移动底座1上取下,并将抽气机构2固定在建筑幕墙的通风口处,抽气机构2工作时,抽气机构2通过第一连接结构32将第一方形盒311内的空气朝向建筑幕墙室外排出,使得第一方形盒311的内部出现低压,建筑幕墙室内低处的空气被吸入到第一方形盒311内,第一格栅网3111将较大的杂物隔离在第一方形盒311的外部,被吸入到第一方形盒311内的空气经过第一滤芯312过滤后排出建筑幕墙,若建筑幕墙室内灰尘扬起的高度较高,工作人员将第三连接结构42和第一连接结构32连接,第一连接结构32出的低压会对第三连接结构42和第二方形盒411空气产生吸力,建筑幕墙室内高处的空气会被第二方形盒411吸入,第二滤芯412对吸入的空气进行过滤,防止灰尘等杂质进入到抽气机构2内,通过第一过滤机构3和第二过滤机构4的配合,实现对建筑幕墙室内低处和高处空气的吸引,从而加快建筑幕墙室内空气排出室外的效率,提高工作人员在建筑幕墙室内工作的舒适度。The staff first places the exhaust mechanism 2 on the mobile base 1, and the staff pushes the mobile base 1 to move to the site where the engineering decoration is carried out indoors in the building curtain wall, so as to reduce the difficulty of the staff to transfer the ventilation device. Then the staff removes the exhaust mechanism 2 from the mobile base 1 and fixes the exhaust mechanism 2 at the vent of the building curtain wall. When the exhaust mechanism 2 is working, the exhaust mechanism 2 discharges the air in the first square box 311 toward the outside of the building curtain wall through the first connecting structure 32, so that low pressure appears inside the first square box 311, and the air at the low point of the building curtain wall is sucked into the first square box 311. The first grille 3111 isolates larger debris outside the first square box 311 and is sucked into the first square box 311. The air inside is filtered by the first filter element 312 and then discharged from the building curtain wall. If the height of the dust in the building curtain wall is high, the staff will connect the third connecting structure 42 and the first connecting structure 32. The low pressure from the first connecting structure 32 will generate suction on the third connecting structure 42 and the air in the second square box 411. The air at a high place in the building curtain wall will be sucked in by the second square box 411. The second filter element 412 filters the sucked air to prevent dust and other impurities from entering the exhaust mechanism 2. Through the cooperation of the first filtering mechanism 3 and the second filtering mechanism 4, the air at the low and high places in the building curtain wall can be attracted, thereby accelerating the efficiency of exhausting the air in the building curtain wall to the outside and improving the comfort of the staff working in the building curtain wall.
参照图1、图2、图4和图5所示:第一过滤机构3还包括第二连接结构33,第二连接结构33和第一连接结构32分别设置在第一过滤组件31的两端,第二连接结构33与抽气机构2连接,第二连接结构33和第一连接结构32的结构相同,第二过滤机构4还包括对接调整结构43,对接调整结构43设置在移动底座1上,且对接调整结构43设置在第二连接结构33的下端。Referring to Figures 1, 2, 4 and 5: the first filtering mechanism 3 also includes a second connecting structure 33, the second connecting structure 33 and the first connecting structure 32 are respectively arranged at both ends of the first filtering assembly 31, the second connecting structure 33 is connected to the air exhaust mechanism 2, the second connecting structure 33 and the first connecting structure 32 have the same structure, the second filtering mechanism 4 also includes a docking adjustment structure 43, the docking adjustment structure 43 is arranged on the mobile base 1, and the docking adjustment structure 43 is arranged at the lower end of the second connecting structure 33.
由于第一连接结构32设置在第一方形盒311的一端,使得第一方形盒311靠近第一连接结构32的一端吸力较大,大量被吸入到第一方形盒311内的空气会经过第一滤芯312靠近第一连接结构32的一端,使得第一滤芯312的一端会被过度使用,而第一滤芯312的另一端的过滤能力未被充分利用,通过设置第二连接结构33和对接调整结构43,第一连接结构32参与工作一段时间后,对接调整结构43将第三连接结构42调整至与第二连接结构33对接,抽气机构2通过第二连接结构33和第三连接结构42分别使第一方形盒311和第二方形盒411的内部形成低压,第一方形盒311周围的空气大量从第一方形盒311远离第一连接结构32的一端被吸入到第一方向盒内,使得第一滤芯312另一端的过滤能力被充分利用,从而实现第一滤芯312的各处均能与被吸入到第一方形盒311内的空气接触,避免第一滤芯312因局部过滤的杂质较多出现的堵塞。Since the first connecting structure 32 is arranged at one end of the first square box 311, the suction force at the end of the first square box 311 close to the first connecting structure 32 is relatively large, and a large amount of air sucked into the first square box 311 will pass through the end of the first filter element 312 close to the first connecting structure 32, so that one end of the first filter element 312 will be overused, while the filtering capacity of the other end of the first filter element 312 is not fully utilized. By setting the second connecting structure 33 and the docking adjustment structure 43, after the first connecting structure 32 has been involved in the work for a period of time, the docking adjustment structure 43 adjusts the third connecting structure 42 When docking with the second connecting structure 33, the exhaust mechanism 2 forms low pressure inside the first square box 311 and the second square box 411 respectively through the second connecting structure 33 and the third connecting structure 42, and a large amount of air around the first square box 311 is sucked into the first direction box from the end of the first square box 311 away from the first connecting structure 32, so that the filtering capacity of the other end of the first filter element 312 is fully utilized, so that all parts of the first filter element 312 can be in contact with the air sucked into the first square box 311, avoiding clogging of the first filter element 312 due to a large number of impurities filtered locally.
参照图3和图6所示:第一连接结构32包括第二过滤组件321和第一环形罩322;第二过滤组件321设置在第一过滤组件31的一侧,第二过滤组件321包括第一集尘仓3211和第一过滤网3212,第一集尘仓3211的一端与第一方形盒311的一端连通,第一过滤网3212设置在第一集尘仓3211内部远离第一方形盒311的一侧;第一环形罩322设置在第二过滤组件321的一侧,且第一环形罩322与抽气机构2连接,第一环形罩322的内腔与第一集尘仓3211的内腔连通。Referring to Figures 3 and 6: the first connecting structure 32 includes a second filter component 321 and a first annular cover 322; the second filter component 321 is arranged on one side of the first filter component 31, and the second filter component 321 includes a first dust collecting bin 3211 and a first filter screen 3212, one end of the first dust collecting bin 3211 is connected to one end of the first square box 311, and the first filter screen 3212 is arranged on a side of the first dust collecting bin 3211 away from the first square box 311; the first annular cover 322 is arranged on one side of the second filter component 321, and the first annular cover 322 is connected to the exhaust mechanism 2, and the inner cavity of the first annular cover 322 is connected to the inner cavity of the first dust collecting bin 3211.
由于需要经常更换第一滤芯312,第一滤芯312与第一方形盒311之间的配合并非紧密配合,在第一连接结构32处的吸力较大,可能会将部分杂物吸入到第一连接结构32内,并进入到抽气机构2内,对抽气机构2造成破坏,通过设置第二过滤组件321和第一环形罩322,第一环形罩322内产生吸力,因此第一方形盒311内的空气经过第一集尘仓3211进入到第一环形罩322,第一过滤网3212对进入第一集尘仓3211内的空气再次进行过滤,从而避免部分杂物穿过第一滤芯312进入到抽气机构2内,进一步实现对抽气机构2的保护。Since the first filter element 312 needs to be replaced frequently, the fit between the first filter element 312 and the first square box 311 is not tight, and the suction force at the first connecting structure 32 is relatively large, which may cause some debris to be sucked into the first connecting structure 32 and enter the air suction mechanism 2, causing damage to the air suction mechanism 2. By setting the second filter assembly 321 and the first annular cover 322, suction is generated in the first annular cover 322. Therefore, the air in the first square box 311 passes through the first dust collecting bin 3211 and enters the first annular cover 322. The first filter net 3212 filters the air entering the first dust collecting bin 3211 again, thereby preventing some debris from passing through the first filter element 312 and entering the air suction mechanism 2, thereby further protecting the air suction mechanism 2.
参照图3和图6所示:第一连接结构32还包括第一清理组件323,第一清理组件323设置在第一环形罩322的内部,第一清理组件323包括第一安装架3231、第一转轴3232、第一清理刷3233和第一扇叶3234,第一安装架3231设置在第一集尘仓3211的侧壁上,第一转轴3232的中部与第一安装架3231的中部通过轴承连接,且第一转轴3232的一端穿过第一过滤网3212伸入到第一集尘仓3211的内腔,第一清理刷3233设置在第一转轴3232的一端,第一清理刷3233与第一过滤网3212抵紧,第一扇叶3234设置在第一转轴3232的另一端。Referring to Figures 3 and 6: the first connecting structure 32 also includes a first cleaning component 323, which is arranged inside the first annular cover 322. The first cleaning component 323 includes a first mounting frame 3231, a first rotating shaft 3232, a first cleaning brush 3233 and a first fan blade 3234. The first mounting frame 3231 is arranged on the side wall of the first dust collecting bin 3211, the middle part of the first rotating shaft 3232 is connected to the middle part of the first mounting frame 3231 through a bearing, and one end of the first rotating shaft 3232 passes through the first filter 3212 and extends into the inner cavity of the first dust collecting bin 3211. The first cleaning brush 3233 is arranged at one end of the first rotating shaft 3232, the first cleaning brush 3233 is tightly pressed against the first filter 3212, and the first fan blade 3234 is arranged at the other end of the first rotating shaft 3232.
第一环形罩322内的吸力使得杂物会吸附在第一过滤网3212上,随着第一过滤网3212上附着杂物的增多,第一过滤网3212的通过性会降低,通过设置第一清理组件323,抽气机构2对第一环形罩322内的空气产生吸力,第一环形罩322内的空气因此朝向抽气机构2流动,空气的流动带动第一扇叶3234旋转,第一扇叶3234带动第一转轴3232围绕自身轴线旋转,第一转轴3232在带动第一清理刷3233旋转,第一清理刷3233对第一过滤网3212的表面进行清理,只要抽气机构2工作使第一环形罩322内的空气流动,第一清理刷3233便能持续对第一过滤网3212进行清理,从而实现在通风装置工作的过程中持续保持第一过滤网3212的通过性。The suction force in the first annular cover 322 causes the debris to be adsorbed on the first filter screen 3212. As the amount of debris attached to the first filter screen 3212 increases, the permeability of the first filter screen 3212 decreases. By setting the first cleaning component 323, the suction mechanism 2 generates suction force on the air in the first annular cover 322, and the air in the first annular cover 322 therefore flows toward the suction mechanism 2. The flow of air drives the first fan blade 3234 to rotate, and the first fan blade 3234 drives the first rotating shaft 3232 to rotate around its own axis. The first rotating shaft 3232 drives the first cleaning brush 3233 to rotate, and the first cleaning brush 3233 cleans the surface of the first filter screen 3212. As long as the suction mechanism 2 works to make the air in the first annular cover 322 flow, the first cleaning brush 3233 can continuously clean the first filter screen 3212, thereby achieving the goal of continuously maintaining the permeability of the first filter screen 3212 during the operation of the ventilation device.
参照图2所示:第一过滤机构3还包括两个第一电磁阀34,两个第一电磁阀34分别与第一连接结构32和第二连接结构33对应,两个第一电磁阀34分别与第一连接结构32中的第一环形罩322和第二连接结构33中的第一环形罩322连接。As shown in Figure 2: the first filtering mechanism 3 also includes two first solenoid valves 34, which correspond to the first connecting structure 32 and the second connecting structure 33 respectively, and are connected to the first annular cover 322 in the first connecting structure 32 and the first annular cover 322 in the second connecting structure 33 respectively.
第一连接结构32和第三连接结构42对接时,第二连接结构33处于打开状态,第一方形盒311内产生的吸力会将杂物吸入到第二连接结构33内,导致在第三连接结构42与第二连接结构33对接时,第二连接结构33内部的杂物会被抽气机构2抽走,通过设置两个第一电磁阀34,在第一连接结构32处的第一电磁阀34在第一连接结构32与第三连接结构42对接时处于打开状态,第二连接结构33处的第一电磁阀34处于关闭状态,使得第一方形盒311的一端关闭,避免第二连接结构33处形成低压,同理第二连接结构33与第三连接结构42对接时,第一连接结构32处的第一电磁阀34关闭,避免第一连接结构32处形成低压,从而避免杂物被吸入到第一连接结构32和第二连接结构33内。When the first connection structure 32 and the third connection structure 42 are docked, the second connection structure 33 is in an open state, and the suction force generated in the first square box 311 will suck the debris into the second connection structure 33, resulting in that when the third connection structure 42 and the second connection structure 33 are docked, the debris inside the second connection structure 33 will be sucked away by the exhaust mechanism 2. By setting two first solenoid valves 34, the first solenoid valve 34 at the first connection structure 32 is in an open state when the first connection structure 32 and the third connection structure 42 are docked, and the first solenoid valve 34 at the second connection structure 33 is in a closed state, so that one end of the first square box 311 is closed to avoid the formation of low pressure at the second connection structure 33. Similarly, when the second connection structure 33 and the third connection structure 42 are docked, the first solenoid valve 34 at the first connection structure 32 is closed to avoid the formation of low pressure at the first connection structure 32, thereby preventing debris from being sucked into the first connection structure 32 and the second connection structure 33.
参照图2和图7所示:第一过滤机构3还包括导气结构35,导气结构35将第一连接结构32、第二连接结构33和抽气机构2连接,导气结构35包括主管351、两个副管352、两个第二电磁阀353和软管354,两个副管352分别设置在主管351的两端,两个第二电磁阀353分别设置在两个副管352和主管351之间,软管354的一端与主管351连通,软管354的另一端与抽气机构2连接。Referring to Figures 2 and 7: the first filtering mechanism 3 also includes an air guide structure 35, which connects the first connecting structure 32, the second connecting structure 33 and the air extraction mechanism 2. The air guide structure 35 includes a main pipe 351, two sub-pipes 352, two second solenoid valves 353 and a hose 354. The two sub-pipes 352 are respectively arranged at the two ends of the main pipe 351, and the two second solenoid valves 353 are respectively arranged between the two sub-pipes 352 and the main pipe 351. One end of the hose 354 is connected to the main pipe 351, and the other end of the hose 354 is connected to the air extraction mechanism 2.
第一连接结构32具有三个连接端口,三个连接端口分别与抽气机构2、第一方形盒311和第一电磁阀34连接,第二连接结构33同理,当第一连接结构32参与通风时,将抽气机构2与第一连接结构32的一个连接端口连接,第二连接结构33与抽气机构2的连接端口打开,会导致外部的空气从该连接端口进入到第二连接结构33,并且在更换第二连接结构33参与通风时,工作人员需要先将抽气机构2与第一连接结构32分离,然后再将抽气机构2与第二连接结构33的连接端口连接,此时第一连接结构32处的连接端口处于打开状态,通过设置导气结构35,主管351和两个副管352将第一连接结构32与抽气机构2的连接端口和第二连接结构33与抽气机构2的连接端口连接,使两个连接端口合并成一个连接端口与抽气机构2连接,第一连接结构32参与通风时,第一连接结构32两侧的第一电磁阀34和第二电磁阀353均处于打开状态,第二连接结构33两侧的第一电磁阀34和第二电磁阀353均处于关闭状态,同理第二连接结构33参与通风时,第二连接结构33两侧的第一电磁阀34和第二电磁阀353均处于打开状态,第一连接结构32两侧的第一电磁阀34和第二电磁阀353均处于关闭状态,从而省去工作人员改变抽气机构2连接对象的步骤。The first connecting structure 32 has three connecting ports, which are respectively connected to the air extraction mechanism 2, the first square box 311 and the first solenoid valve 34. The second connecting structure 33 is similar. When the first connecting structure 32 participates in ventilation, the air extraction mechanism 2 is connected to a connecting port of the first connecting structure 32, and the connecting port of the second connecting structure 33 and the air extraction mechanism 2 is opened, which will cause external air to enter the second connecting structure 33 from the connecting port. When replacing the second connecting structure 33 to participate in ventilation, the staff needs to first separate the air extraction mechanism 2 from the first connecting structure 32, and then connect the air extraction mechanism 2 to the connecting port of the second connecting structure 33. At this time, the connecting port at the first connecting structure 32 is in an open state. By setting the air guide structure 35, the main pipe 351 and the two auxiliary pipes 352 connects the first connecting structure 32 with the connecting port of the exhaust mechanism 2 and the second connecting structure 33 with the connecting port of the exhaust mechanism 2, so that the two connecting ports are merged into one connecting port connected to the exhaust mechanism 2. When the first connecting structure 32 participates in ventilation, the first solenoid valve 34 and the second solenoid valve 353 on both sides of the first connecting structure 32 are in an open state, and the first solenoid valve 34 and the second solenoid valve 353 on both sides of the second connecting structure 33 are in a closed state. Similarly, when the second connecting structure 33 participates in ventilation, the first solenoid valve 34 and the second solenoid valve 353 on both sides of the second connecting structure 33 are in an open state, and the first solenoid valve 34 and the second solenoid valve 353 on both sides of the first connecting structure 32 are in a closed state, thereby eliminating the need for staff to change the connection object of the exhaust mechanism 2.
参照图4、图5和图8所示:第三连接结构42包括第四过滤组件421、第二环形罩422和第二清理组件423;第四过滤组件421设置在第三过滤组件41的一侧,第四过滤组件421包括第二集成仓和第二过滤网4212,第二集尘仓4211与第二方形盒411连通,第二过滤网4212设置在第二集尘仓4211内部远离第二方形盒411的一侧;第二环形罩422设置在第四过滤组件421的一侧,第二环形罩422与第一电磁阀34对应,第二环形罩422的内腔与第二集尘仓4211的内腔连通;第二清理组件423设置在第二环形罩422的内部,第二清理组件423包括第二安装架4231、第二转轴4232、第二清理刷4233和第二扇叶4234,第二安装架4231与第二集尘仓4211的外壁连接,第二转轴4232的中部与第二安装架4231的中部通过轴承连接,且第二转轴4232的一端穿过第二过滤网4212的中部,第二清理刷4233安装在第二转轴4232的一端,第二扇叶4234设置在第二环形罩422内,且第二扇叶4234与第二转轴4232的另一端连接。4, 5 and 8: the third connecting structure 42 includes a fourth filter assembly 421, a second annular cover 422 and a second cleaning assembly 423; the fourth filter assembly 421 is arranged on one side of the third filter assembly 41, the fourth filter assembly 421 includes a second integrated bin and a second filter screen 4212, the second dust collecting bin 4211 is connected to the second square box 411, and the second filter screen 4212 is arranged on a side of the second dust collecting bin 4211 away from the second square box 411; the second annular cover 422 is arranged on one side of the fourth filter assembly 421, the second annular cover 422 corresponds to the first solenoid valve 34, and the inner cavity of the second annular cover 422 is aligned with the inner cavity of the second dust collecting bin 4211 Connected; the second cleaning component 423 is arranged inside the second annular cover 422, and the second cleaning component 423 includes a second mounting frame 4231, a second rotating shaft 4232, a second cleaning brush 4233 and a second fan blade 4234, the second mounting frame 4231 is connected to the outer wall of the second dust collecting bin 4211, the middle part of the second rotating shaft 4232 is connected to the middle part of the second mounting frame 4231 through a bearing, and one end of the second rotating shaft 4232 passes through the middle part of the second filter 4212, the second cleaning brush 4233 is installed at one end of the second rotating shaft 4232, the second fan blade 4234 is arranged in the second annular cover 422, and the second fan blade 4234 is connected to the other end of the second rotating shaft 4232.
第二环形罩422与第一环形罩322连通,第一环形罩322内的吸力将第二环形罩422内的空气抽走,第二环形罩422内形成低压,因此第二方形盒411内的空气朝向第二环形罩422联动,空气中未被第二滤芯412过滤的杂物会被第二过滤网4212阻拦,同时第二环形罩422内气体的流动带动第二扇叶4234旋转,第二扇叶4234通过第二转轴4232带动第二清理刷4233对第二过滤网4212进行清理,从而避免杂物从第三连接结构42处进入到通风装置内。The second annular cover 422 is connected to the first annular cover 322, and the suction force in the first annular cover 322 draws out the air in the second annular cover 422, forming a low pressure in the second annular cover 422. Therefore, the air in the second square box 411 is linked to the second annular cover 422, and the debris in the air that is not filtered by the second filter element 412 will be blocked by the second filter net 4212. At the same time, the flow of gas in the second annular cover 422 drives the second fan blades 4234 to rotate, and the second fan blades 4234 drive the second cleaning brush 4233 to clean the second filter net 4212 through the second rotating shaft 4232, thereby preventing debris from entering the ventilation device from the third connecting structure 42.
参照图4、图5、图9和图10所示:对接调整结构43包括第一L型板431和直线移动结构432;第一L型板431与第二环形罩422连接;直线移动结构432设置在移动底座1上,直线移动结构432包括第一矩形框4321、第一螺杆4322、两个第一导向横杆4323、第一螺套4324和移动块4325,第一矩形框4321安装在移动底座1上,且第一矩形框4321的两端分别对应两个第一电磁阀34,第一螺杆4322的两端分别与第一矩形框4321的两端连接,两个第一导向横杆4323分别平行设置在第一螺杆4322的两侧,第一螺套4324与第一螺杆4322传动连接,移动块4325的两端分别与两个第一导向横杆4323滑动连接,第一螺套4324与移动块4325的中部连接。4, 5, 9 and 10: the docking adjustment structure 43 includes a first L-shaped plate 431 and a linear moving structure 432; the first L-shaped plate 431 is connected to the second annular cover 422; the linear moving structure 432 is arranged on the mobile base 1, and the linear moving structure 432 includes a first rectangular frame 4321, a first screw 4322, two first guide cross bars 4323, a first screw sleeve 4324 and a moving block 4325, and the first rectangular frame 4321 is mounted on the mobile base 1 On, the two ends of the first rectangular frame 4321 correspond to the two first solenoid valves 34 respectively, the two ends of the first screw 4322 are respectively connected to the two ends of the first rectangular frame 4321, the two first guide cross bars 4323 are respectively arranged in parallel on both sides of the first screw 4322, the first screw sleeve 4324 is transmission-connected to the first screw 4322, the two ends of the moving block 4325 are respectively slidingly connected to the two first guide cross bars 4323, and the first screw sleeve 4324 is connected to the middle part of the moving block 4325.
第三过滤组件41和第三连接结构42安装在第一L型板431上,在改变第三连接结构42对应的对象时,工作人员旋转第一螺杆4322,第一螺杆4322驱动第一螺套4324沿着第一螺杆4322移动,第一螺套4324带动移动块4325沿着第一导向横杆4323移动,移动块4325通过第一L型板431带动第三过滤组件41和第三连接结构42沿着第一螺杆4322移动,当第三连接结构42与第一连接结构32对接时,移动块4325带动第三连接结构42移动至与第一连接结构32对齐,当第三连接结构42与第二连接结构33对接时,移动块4325带动第三连接结构42移动至与第二连接结构33对齐,从而实现自动调整第三连接结构42的位置,避免工作人员人工搬运第三过滤组件41和第三连接结构42。The third filter assembly 41 and the third connecting structure 42 are installed on the first L-shaped plate 431. When changing the object corresponding to the third connecting structure 42, the staff rotates the first screw 4322, and the first screw 4322 drives the first screw sleeve 4324 to move along the first screw 4322. The first screw sleeve 4324 drives the moving block 4325 to move along the first guide cross bar 4323. The moving block 4325 drives the third filter assembly 41 and the third connecting structure 42 to move along the first screw 4322 through the first L-shaped plate 431. When the third connecting structure 42 is docked with the first connecting structure 32, the moving block 4325 drives the third connecting structure 42 to move to align with the first connecting structure 32. When the third connecting structure 42 is docked with the second connecting structure 33, the moving block 4325 drives the third connecting structure 42 to move to align with the second connecting structure 33, thereby realizing automatic adjustment of the position of the third connecting structure 42 and avoiding manual carrying of the third filter assembly 41 and the third connecting structure 42 by the staff.
参照图9和图11所示:对接调整结构43还包括抵接结构433,抵接结构433设置在第一L型板431上,抵接结构433包括连接轴4331、U型板4332、第二螺杆4334、第二螺套4333和第一弹簧4335,连接轴4331的一端与第二环形罩422连接,连接轴4331的另一端伸出第一L型板431,U型板4332罩设在连接轴4331的另一端,且U型板4332的两端与第一L型板431连接,第二螺套4333设置在U型板4332的中部,第二螺杆4334与第一螺套4324螺纹连接,且第二螺杆4334的一端与连接轴4331的抵接,第一弹簧4335套设在连接轴4331上,第一弹簧4335的两端分别与连接轴4331的端部和第一L型板431抵接。9 and 11, the docking adjustment structure 43 also includes an abutment structure 433, which is arranged on the first L-shaped plate 431. The abutment structure 433 includes a connecting shaft 4331, a U-shaped plate 4332, a second screw 4334, a second screw sleeve 4333 and a first spring 4335. One end of the connecting shaft 4331 is connected to the second annular cover 422, and the other end of the connecting shaft 4331 extends out of the first L-shaped plate 431. The U-shaped plate 4332 is arranged on the connecting shaft. The other end of the connecting shaft 4331, and both ends of the U-shaped plate 4332 are connected to the first L-shaped plate 431, the second screw sleeve 4333 is set in the middle of the U-shaped plate 4332, the second screw rod 4334 is threadedly connected to the first screw sleeve 4324, and one end of the second screw rod 4334 is abutted against the connecting shaft 4331, the first spring 4335 is sleeved on the connecting shaft 4331, and the two ends of the first spring 4335 are respectively abutted against the end of the connecting shaft 4331 and the first L-shaped plate 431.
第二环形罩422与第一电磁阀34需要紧密连接才能避免二者的连接处发生泄漏,因此在之间移动第二环形罩422时,会使得第二环形罩422与第一电磁阀34发生摩擦,导致二者的接口出现磨损,通过设置抵接结构433,在移动第二环形罩422之前,工作人员转动第二螺杆4334,第二螺杆4334朝向远离第二环形罩422的一端移动,第一弹簧4335推动连接轴4331沿着连接轴4331的轴线朝向远离第二环形罩422的方向移动,连接罩带动第二环形罩422与第一电磁阀34分离,然后工作人员再转动第一螺杆4322驱动第二环形罩422移动,第二环形罩422移动到另一个第一电磁阀34处,再通过抵接结构433将第二环形罩422与第一电磁阀34连接,从而避免第二环形罩422在移动时与第一电磁阀34发生摩擦。The second annular cover 422 and the first solenoid valve 34 need to be tightly connected to avoid leakage at the connection between the two. Therefore, when the second annular cover 422 is moved between them, friction will occur between the second annular cover 422 and the first solenoid valve 34, resulting in wear on the interface between the two. By setting the abutment structure 433, before moving the second annular cover 422, the staff rotates the second screw 4334, and the second screw 4334 moves toward the end away from the second annular cover 422. The first spring 4335 pushes the connecting shaft 4331 to move along the axis of the connecting shaft 4331 toward the direction away from the second annular cover 422. The connecting cover drives the second annular cover 422 to separate from the first solenoid valve 34. Then the staff rotates the first screw 4322 again to drive the second annular cover 422 to move. The second annular cover 422 moves to another first solenoid valve 34, and then the second annular cover 422 is connected to the first solenoid valve 34 through the abutment structure 433, thereby avoiding friction between the second annular cover 422 and the first solenoid valve 34 when moving.
参照图9和图12所示:对接调整结构43还包括支撑结构434,支撑结构434包括第二L型板4341、第三螺套4342、第三螺杆4343、导向回弹结构4344和支撑块组件4345;第二L型板4341与第一L型板431的一侧连接;第三螺套4342设置在第二L型板4341上;第三螺杆4343与第三螺套4342螺纹连接;导向回弹结构4344设置在第二L型板4341上,导向回弹结构4344包括推板、两个第二导向横杆和两个第二弹簧,第三螺套4342的一端与推板的中部抵接,两个第二导向横杆平行设置在第三螺杆4343的两侧,第二导向横杆的一端与推板的一端连接,第二导向横杆的另一端与第二L型板4341滑动连接,两个第二弹簧分别套设在两个第二导向横杆上,第二弹簧的两端分别与第二L型板4341和第二导向横杆的端部抵接;支撑块组件4345滑动设置在第二L型板4341上,支撑块组件4345包括第二矩形框和若干个滚筒,第二矩形框与推板连接,若干个滚筒等间距的安装在第二矩形框上。9 and 12, the docking adjustment structure 43 also includes a support structure 434, which includes a second L-shaped plate 4341, a third screw sleeve 4342, a third screw rod 4343, a guide rebound structure 4344 and a support block assembly 4345; the second L-shaped plate 4341 is connected to one side of the first L-shaped plate 431; the third screw sleeve 4342 is arranged on the second L-shaped plate 4341; the third screw rod 4343 is threadedly connected to the third screw sleeve 4342; the guide rebound structure 4344 is arranged on the second L-shaped plate 4341, and the guide rebound structure 4344 includes a push plate, two second guide cross bars and two second springs, and the third screw sleeve One end of 4342 abuts against the middle part of the push plate, two second guide cross bars are arranged in parallel on both sides of the third screw 4343, one end of the second guide cross bar is connected to one end of the push plate, and the other end of the second guide cross bar is slidably connected to the second L-shaped plate 4341, and the two second springs are respectively mounted on the two second guide cross bars, and the two ends of the second springs abut against the second L-shaped plate 4341 and the end of the second guide cross bar respectively; the support block assembly 4345 is slidably arranged on the second L-shaped plate 4341, and the support block assembly 4345 includes a second rectangular frame and a plurality of rollers, the second rectangular frame is connected to the push plate, and the plurality of rollers are installed on the second rectangular frame at equal intervals.
在转移通风装置时,工作人员将第三过滤组件41和第三连接结构42围绕连接轴4331的轴线转动90度,使得第二方形盒411处于水平状态,便于工作人员转移通风装置,在使用通风装置时再将第二方形盒411竖起,而通风装置在工作的过程中,空气的快速流动会使装置发生震动,进而导致第二方形盒411倾倒,通过设置支撑结构434,工作人员将第二方形盒411竖起后,再转动第三螺杆4343,第三螺杆4343沿着自身的轴线方向推动推板朝向第一L型板431移动,第二弹簧被压缩,推板带动支撑块组件4345位于第二环形罩422的正下方,接着工作人员在将第二环形罩422与第一电磁阀34对接时,第二环形罩422与若干个滚筒发生滚动摩擦,减小第二环形罩422的磨损,若干个滚筒均对第二环形罩422施加竖直向上的支撑力,从而实现第二方形盒411在通风装置工作的过程中保持竖直状态。When transferring the ventilation device, the staff rotates the third filter assembly 41 and the third connecting structure 42 90 degrees around the axis of the connecting shaft 4331, so that the second square box 411 is in a horizontal state, which is convenient for the staff to transfer the ventilation device. When using the ventilation device, the second square box 411 is erected. During the operation of the ventilation device, the rapid flow of air will cause the device to vibrate, which will cause the second square box 411 to fall over. By setting the supporting structure 434, the staff erects the second square box 411 and then rotates the third screw 4343. The screw 4343 pushes the push plate along its own axial direction to move toward the first L-shaped plate 431, the second spring is compressed, and the push plate drives the support block assembly 4345 to be located directly below the second annular cover 422. Then, when the staff connects the second annular cover 422 with the first solenoid valve 34, the second annular cover 422 and several rollers have rolling friction, which reduces the wear of the second annular cover 422. Several rollers apply a vertical upward supporting force to the second annular cover 422, thereby achieving that the second square box 411 remains in a vertical state during the operation of the ventilation device.
以上实施例仅表达了本发明的一种或几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明的保护范围应以所附权利要求为准。The above embodiments only express one or several implementation modes of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410694357.8A CN118442660A (en) | 2024-05-31 | 2024-05-31 | A building curtain wall indoor ventilation device for engineering decoration |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410694357.8A CN118442660A (en) | 2024-05-31 | 2024-05-31 | A building curtain wall indoor ventilation device for engineering decoration |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN118442660A true CN118442660A (en) | 2024-08-06 |
Family
ID=92328091
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202410694357.8A Withdrawn CN118442660A (en) | 2024-05-31 | 2024-05-31 | A building curtain wall indoor ventilation device for engineering decoration |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN118442660A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118987827A (en) * | 2024-10-25 | 2024-11-22 | 江苏卓正环保科技有限公司 | Dust filtering treatment device and filtering method |
-
2024
- 2024-05-31 CN CN202410694357.8A patent/CN118442660A/en not_active Withdrawn
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118987827A (en) * | 2024-10-25 | 2024-11-22 | 江苏卓正环保科技有限公司 | Dust filtering treatment device and filtering method |
| CN118987827B (en) * | 2024-10-25 | 2024-12-24 | 江苏卓正环保科技有限公司 | Dust filtering treatment device and filtering method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113280428B (en) | High-rise building is with high-efficient clean ventilation structure | |
| CN206919316U (en) | A kind of VMC with dedusting function | |
| CN118442660A (en) | A building curtain wall indoor ventilation device for engineering decoration | |
| KR20210109765A (en) | Hood for Kitchen Ventilation | |
| CN110448239A (en) | A dust removal drone and dust removal method | |
| CN212225569U (en) | Fire-fighting smoke exhaust fan | |
| CN210767423U (en) | A double-layer curtain wall with automatic temperature adjustment | |
| CN206881369U (en) | A kind of dry dust filters Sanding Room | |
| KR101158625B1 (en) | Has the roll screen in vacuum department the window lake | |
| CN212132812U (en) | Ventilation system for multi-storey building | |
| CN116045413B (en) | Fresh air system of semiconductor factory building | |
| CN217785391U (en) | A ventilation duct with self-cleaning ability | |
| CN118031342A (en) | Easy-to-repair clean factory air duct for food | |
| CN110822697A (en) | Air filter mechanism and fresh air system applying filter mechanism | |
| CN105536366A (en) | Architectural ornament air purifying equipment | |
| CN114777253A (en) | Ventilation system for underground powerhouse of hydropower station | |
| CN208320337U (en) | Ash handling equipment is used in a kind of cutting of floor tile | |
| CN208566998U (en) | A kind of noise reduction damping device of fresh air system | |
| CN207187343U (en) | A kind of air deduster for construction | |
| CN220931303U (en) | A fresh air system based on HEPA filtration to achieve efficient dust removal | |
| CN221801826U (en) | Smoke exhaust pipe | |
| CN218544690U (en) | Semiconductor equipment heating and temperature control device | |
| CN217604299U (en) | Quick dismantling and cleaning type green building ventilation device | |
| CN219473875U (en) | Ventilation energy-saving equipment of green building | |
| CN222335539U (en) | High-rise building fire escape device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WW01 | Invention patent application withdrawn after publication | ||
| WW01 | Invention patent application withdrawn after publication |
Application publication date: 20240806 |