CN118127932A - A vertical step-by-step lifting and installation method for the tie beam of a large-span cross-channel tied arch bridge - Google Patents

A vertical step-by-step lifting and installation method for the tie beam of a large-span cross-channel tied arch bridge Download PDF

Info

Publication number
CN118127932A
CN118127932A CN202410308641.7A CN202410308641A CN118127932A CN 118127932 A CN118127932 A CN 118127932A CN 202410308641 A CN202410308641 A CN 202410308641A CN 118127932 A CN118127932 A CN 118127932A
Authority
CN
China
Prior art keywords
tie
tie beam
lifting
rod
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410308641.7A
Other languages
Chinese (zh)
Inventor
肖喻涛
卢德锋
江洪涛
阮建富
赵春艳
朱海凡
黄传广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinzhu Transportation Construction Co Ltd
Original Assignee
Zhejiang Jinzhu Transportation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinzhu Transportation Construction Co Ltd filed Critical Zhejiang Jinzhu Transportation Construction Co Ltd
Priority to CN202410308641.7A priority Critical patent/CN118127932A/en
Publication of CN118127932A publication Critical patent/CN118127932A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00—Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a large-span cross-channel tie bar arch bridge tie beam vertical stepping lifting installation method, which comprises the following steps of: the tie beam connecting devices of the lifting devices are respectively connected with a tie beam pre-supporting connecting piece, the upper ends of the tie bars are connected with the arch ribs, and the tie beams are in a horizontal state at the moment; secondly, lifting the tie beam: extending the hollow jack, rotating the lower suspension nut to be abutted against the bottom wall, enabling the hollow jack to shrink, rotating the upper suspension nut to be abutted against the open center jack, and repeating the second step until the height of the tie beam meets the requirement; and thirdly, connecting the tie beam and the arch rib through a rope, and removing the lifting device from between the tie beam and the arch rib. The invention aims to have the advantages of being capable of conveniently and reliably lifting the position of the tie beam to meet the requirements, and solves the problem of high lifting cost caused by the fact that the existing lifting equipment is supported by the underwater lap joint support platform to lift the tie beam.

Description

Large-span cross-channel tied arch bridge tie beam vertical stepping lifting installation method
Technical Field
The invention relates to the technical field of bridge construction, in particular to a vertical stepping lifting installation method for a tie bar arch bridge tie beam of a large-span cross-channel.
Background
The construction quality of the tie beam of the steel box tied arch bridge by the arch-first and beam-second method not only determines the line shape of the bridge and is closely related to the constant-load internal force of the structure. Therefore, it is necessary to determine a reasonable construction process so that the state at the time of bridge formation tends to the design state. The traditional method for hoisting the tie beam mainly comprises a bracket method and a large-scale floating crane method. The construction period of the bracket method is long, and the river channel needs to be continuously sealed, so that serious traffic damage is caused; the floating crane method has high requirements on the capacity of hoisting equipment and the external environment, the inclination angle of a suspension arm is limited during hoisting, and the safety, stability and construction quality are not easy to control, so that a high-quality and high-efficiency large-span cross-channel tie bar arch bridge tie beam hoisting method is needed.
Disclosure of Invention
The invention aims to provide a vertical stepping lifting installation method for a tie beam of a large-span cross-channel tied arch bridge, which can conveniently and reliably lift the position of the tie beam to meet the requirements, and solves the problem of high lifting cost caused by the fact that the existing underwater lap joint support platform supports lifting equipment to carry out tie beam lifting locks.
In order to achieve the above object, the present invention adopts the following technology: the tie bar arch bridge comprises arch ribs and tie bars, wherein the tie bars are provided with a plurality of tie bar prefabricated connecting pieces distributed along the extending direction of the tie bars, and the tie bar arch bridge is characterized by being lifted through a plurality of lifting devices, the lifting devices comprise tie bar connecting devices, vertical threaded rods, tie bar connecting frames positioned above the tie bar connecting devices, upwards telescopic hollow jacks connected to the tie bar connecting frames and tie bars with lower ends connected to the tie bar connecting frames, the lower ends of the hollow jacks are connected with the upper ends of connecting sleeves, bottom walls are arranged in the connecting sleeves, the lower ends of the vertical threaded rods are connected with the tie bar connecting devices, the upper ends of the vertical threaded rods sequentially penetrate through the connecting sleeves and the hollow jacks and are connected with upper suspension nuts, the upper suspension nuts are used for suspending the vertical threaded rods on the hollow jacks, the vertical threaded rods are in threaded connection with lower suspension nuts, and the lower suspension nuts are used for suspending on the bottom walls to suspend the vertical threaded rods on the connecting sleeves; the specific process for lifting the tie beam is as follows: step one, part connection: the method comprises the steps that an arch rib is erected, tie beams are sent to the lower portion of the arch rib through a ship, tie beam connecting devices of a plurality of lifting devices are respectively connected to one tie beam pre-supporting connecting piece, the distance between a tie rod connecting frame and the tie beam connecting devices is adjusted until a hollow jack is in a contracted state, when an upper suspension nut is suspended on the open jack, the upper end of the tie rod can be connected to the arch rib, the upper end of the tie rod is connected with the arch rib, the tie beams are in a horizontal state at the moment, and the lower suspension nut is adjusted to be abutted against the bottom wall; secondly, lifting the tie beam: extending the hollow jack by a set distance, rotating the lower suspension nut to be abutted against the bottom wall, enabling the hollow jack to shrink and reset, rotating the upper suspension nut to be abutted against the open center jack, and repeating the second step until the height of the tie beam meets the requirement; and thirdly, connecting the tie beam and the arch rib through a rope, and removing the lifting device from between the tie beam and the arch rib.
Preferably, the number of the vertical threaded rods is two, the two vertical threaded rods penetrate through the two hollow jacks in a one-to-one correspondence manner, and when the prefabricated connecting pieces of the homologous beams of the tie beam connecting device are connected together, the two vertical threaded rods are positioned on two sides of a vertical plane passing through the gravity center of the tie beam. The tie beam can be lifted without transverse inclination.
Preferably, the vertical threaded rod is located on either side of a vertical plane passing through the center of gravity of the tie beam. The tie beam can be lifted without transverse inclination.
Preferably, two of the vertically disposed threaded rods are located on both sides of the tie rod in the width direction of the tie rod.
Preferably, one of the lifting devices is provided with two tie bars, the two tie bars being distributed in the width direction of the tie beam.
Preferably, the tie bar connecting frame comprises an upper frame and a lower connecting plate, the hollow jack is connected to the upper frame, and the lower end of the connecting sleeve is connected with the lower connecting plate. The connection reliability can be improved.
Preferably, the tie bar is secured to both the upper and lower tie plates. The connection reliability is good.
Preferably, the tie bar is penetrated on the lower connecting plate, the lower end of the tie bar is provided with a large-diameter section, a holding step is formed between the large-diameter section and the tie bar, and the lower connecting plate is placed on the holding step. The connection is convenient.
Preferably, the tie bar connecting frame comprises an upper frame, the upper frame comprises two connecting rings, two upper transverse connecting rods connecting the two connecting rings together, two longitudinal connecting rods connecting the two ends of the upper transverse connecting rods together in a one-to-one correspondence manner, and two lower transverse connecting rods connecting the two longitudinal connecting rods together, the two hollow jacks penetrate through the two connecting rings in a one-to-one correspondence manner and are fixed with the connecting rings, two tie bars are arranged, one tie bar is fixed with one longitudinal connecting rod, one connecting ring, one end of the two upper transverse connecting rods and one end of the two lower transverse connecting rods, and the other tie bar is fixed with the other longitudinal connecting rod, the other connecting ring, the other end of the two upper transverse connecting rods and the other end of the two lower transverse connecting rods. The vertical lifting can be ensured more reliably during use.
Preferably, the adjacent tie beam connecting devices are connected together through a connecting rope, a rigid section is arranged in the middle of the connecting rope, the rigid section is connected with a hanging wire and a rigid rod extending downwards, the rigid rod is perpendicular to the rigid section, and the lower end of the hanging wire is connected with a pendant which enables the hanging wire to be in a straightening state. In the lifting process of the tie beam, if an included angle is formed between the rigid rod and the suspension line, the fact that the distance of each lifting device for lifting the tie beam deviates to enable the tie beam to incline is indicated, and at the moment, the lifting device with small lifting distance independently lifts the tie beam to enable the tie beam to recover to be horizontal. Whether inclination is generated in the lifting process of the tie beam or not and whether the tie beam is corrected to be horizontal or not can be conveniently known.
Preferably, the adjacent tie beam connecting devices are connected together through a connecting rope, a rigid section is arranged in the middle of the connecting rope, the rigid section is connected with a hanging wire and a downwardly extending rigid rod, the rigid rod is perpendicular to the rigid section, and the lower end of the hanging wire is connected with a pendant for enabling the hanging wire to be in a straightening state; in the lifting process of the tie beam, if an included angle is formed between the rigid rod and the suspension line, the distance for lifting the tie beam by each lifting device is deviated, so that the tie beam is inclined, and at the moment, the lifting devices with small lifting distances independently lift the tie beam, so that the tie beam is restored to be horizontal. Whether inclination is generated in the lifting process of the tie beam or not and whether the tie beam is corrected to be horizontal or not can be conveniently known. .
The invention has the following beneficial effects: the tie beam adopts an integral lifting installation process, and has the advantages of high precision, good structural integrity, good linear control, short construction period, easy quality assurance, simple and convenient construction, small influence on navigation, safety and reliability.
The construction speed is high: the hoisting process breaks through the traditional hoisting method of tie-bar arch bridge tie beams, the self-grinding hoisting system is convenient to install and operate, construction interference is small, the tie beams can be guaranteed to be fast and stably hoisted, and the hoisting and installing efficiency of the tie beams are guaranteed.
The construction quality is good: the formed arch rib is used as a bearing system, and the lifting points are uniformly arranged, so that the positioning is accurate, the stress state of the tie beam in the lifting and mounting process is close to the design state, and the deformation of the tie beam can be effectively controlled.
The economic and social benefits are obvious: and the transportation capacity of large members of the under-bridge channel is fully utilized by tie beam transportation, so that the transportation cost is effectively controlled. The in-situ hoisting effect range of the tie bars is small, so that the bridge approach part can be synchronously constructed, and meanwhile, the influence on channel traffic is reduced.
Drawings
FIG. 1 is a schematic view of the present invention as it is used to raise a tie beam;
FIG. 2 is a schematic view of a lifting device according to a first embodiment;
Fig. 3 is a partial schematic view of a second embodiment of the present invention.
In the figure: arch rib 1, tie beam 2, tie beam prefabricated connection 3, lifting device 4, longitudinal connection plate 5, transverse connection plate 6, tie beam connection device 7, vertical threaded rod 8, hollow jack 9, tie rod 10, connection sleeve 11, bottom wall 12, upper suspension nut 13, lower suspension nut 14, top plate 15, suspension lugs 16, suspension pin 17, operating platform 18, lower connection plate 19, large diameter section 20, connection ring 21, upper transverse connection rod 22, longitudinal connection rod 23, lower transverse connection rod 24, connection cable 25, rigid section 26, suspension wire 27, rigid rod 28, pendant 29, upper frame 30.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In a first embodiment, referring to fig. 1 and 2, a method for installing a tie beam of a long-span cross-channel tie-bar arch bridge in a vertically stepping lifting manner includes a rib 1 and tie beams 2 provided with a plurality of tie beam prefabricated connectors 3 distributed along the extending direction of the tie beams. The tie beam prefabricated connecting piece comprises two longitudinal connecting plates 5 which are welded together by the tie beam and are distributed transversely (the transverse bridge direction is transverse, and the longitudinal bridge direction is longitudinal) and a longitudinal connecting plate 6 which is welded together by the tie beam and is distributed longitudinally and is used for connecting the two longitudinal connecting plates together, and the longitudinal connecting plates are provided with shaft holes which extend transversely. Lifting the tie beam is performed by means of several lifting devices 4. The lifting device comprises a tie beam connecting device 7, a vertically arranged threaded rod 8, a tie rod connecting frame arranged above the tie beam connecting device, an upward telescopic hollow jack 9 connected to the tie rod connecting frame and a tie rod 10 with the lower end connected to the tie rod connecting frame. The lower end of the hollow jack is connected with the upper end of a connecting sleeve 11, a bottom wall 12 is arranged in the connecting sleeve, and the lower end homologous beam connecting device of the vertical threaded rod is connected together. The upper end of the vertical threaded rod sequentially passes through the connecting sleeve and the hollow jack and then is connected with an upper suspension nut 13, and the upper suspension nut is used for suspending the vertical threaded rod on the hollow jack. The vertical threaded rod is threadedly connected to a lower suspension nut 14 for suspending the vertical threaded rod from the connecting sleeve by suspending it from the bottom wall. The tie beam connecting device comprises a top plate 15 and two pairs of hanging lugs connected to the lower surface of the top plate and provided with hanging holes, a connecting gap is formed between the two hanging lugs 16 of the same pair of hanging lugs, two longitudinal connecting plates are correspondingly penetrated in the telescopic gaps of the two pairs of hanging lugs one by one, and two hanging pins 17 correspondingly penetrated in the telescopic shaft holes of the two longitudinal connecting plates and the hanging holes of the two pairs of hanging lugs one by one connect the hanging lugs with the longitudinal connecting plates. The lifting device is also provided with an operating platform 18.
The number of the vertically arranged threaded rods is two. The two vertical threaded rods penetrate through the two hollow jacks in a one-to-one correspondence manner, and are positioned on two sides of a vertical plane passing through the gravity center of the tie beam when the tie beam connecting device is connected with the prefabricated connecting piece of the tie beam. The two vertical threaded rods are positioned on two sides of the tie rod along the width direction of the tie rod. One lifting device is provided with two tie bars distributed in the width direction of the tie beam. The tie bar connecting frame comprises an upper frame 30 and a lower connecting plate 19, the hollow jack is connected with the upper frame, and the lower end of the connecting sleeve is connected with the lower connecting plate. The tie bar is arranged on the lower connecting plate in a penetrating way, the lower end of the tie bar is provided with a large-diameter section 20, a holding step is formed between the large-diameter section and the tie bar, and the lower connecting plate is placed on the holding step. The upper frame comprises two connecting rings 21, two upper transverse connecting rods 22 for connecting the two connecting rings together, two longitudinal connecting rods 23 for connecting the two ends of the upper transverse connecting rods together in a one-to-one correspondence manner, and two lower transverse connecting rods 24 for connecting the two longitudinal connecting rods together, wherein two hollow jacks are arranged in the two connecting rings in a penetrating manner in a one-to-one correspondence manner and are fixed with the connecting rings (such as fixed by welding), one root rod is fixed with one longitudinal connecting rod, one connecting ring, one end of the two upper transverse connecting rods and one end of the two lower transverse connecting rods, and the other root rod, the tie rod, the other longitudinal connecting rods, the other connecting ring, the other ends of the two upper transverse connecting rods and the other ends of the two lower transverse connecting rods are fixed together.
The specific process for lifting the tie beam is as follows: step one, part connection: the method comprises the steps that an arch rib is erected, tie bars are sent to the lower portion of the arch rib through a ship, tie bar connecting devices of a plurality of lifting devices are respectively connected to one tie bar pre-supporting connecting piece on the tie bars, the distance between a tie bar connecting frame and the tie bar connecting devices is adjusted until a hollow jack is in a contracted state, when an upper suspension nut is suspended on the open jack, the upper ends of tie bars can be connected to the arch rib, the upper ends of the tie bars are connected with the arch rib, and the tie bars are in a horizontal state; secondly, lifting the tie beam: extending the hollow jack, rotating the lower suspension nut to be abutted against the bottom wall, enabling the hollow jack to shrink, rotating the upper suspension nut to be abutted against the open center jack, and repeating the second step until the height of the tie beam meets the requirement; and thirdly, connecting the tie beam and the arch rib through a rope, and removing the lifting device from between the tie beam and the arch rib.
Embodiment two differs from embodiment one in that: the adjacent tie beam connecting devices are connected together through a connecting rope 25, a rigid section 26 with a linear structure is arranged in the middle of the connecting rope, the rigid section is connected with a hanging wire 27 and a rigid rod 28 extending downwards, the rigid rod is perpendicular to the rigid section, and the lower end of the hanging wire is connected with a pendant 29 which enables the hanging wire to be in a straightening state. In the lifting process of the tie beam, if an included angle is formed between the rigid rod and the sling, the fact that the distance of each lifting device for lifting the tie beam deviates to enable the tie beam to incline is indicated, and at the moment, the lifting device with small lifting distance independently lifts the tie beam to enable the tie beam to recover to be horizontal.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1.一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,系杆拱桥包括拱肋和系梁,所述系梁设有沿系梁延伸方向分布的若干系梁预制连接件,其特征在于,通过若干提升装置进行提升,所述提升装置包括系梁连接装置、竖置螺纹杆、位于系梁连接装置上方的系杆连接架、连接在系杆连接架上的朝上伸缩的空心千斤顶和下端连接在系杆连接架上的系杆,所述空心千斤顶的下端同连接套筒的上端连接在一起,所述连接套筒内设有底壁,所述竖置螺纹杆的下端同所述系梁连接装置连接在一起,所述竖置螺纹杆的上端依次穿过所述连接套筒和空心千斤顶后同上悬挂螺母连接在一起,所述上悬挂螺母用于将竖置螺纹杆悬挂在所述空心千斤顶上,所述竖置螺纹杆螺纹连接有下悬挂螺母,所述下悬挂螺母用于悬挂在所述底壁上而将竖置螺纹杆悬挂在所述连接套筒上;进行系梁提升的具体过程为:第一步、部件连接:架设好拱肋,通过船舶将系梁送到拱肋的下方,将若干所述提升装置的系梁连接装置各连接在一个所述系梁预支连接件,调整系杆连接架和系梁连接装置之间的距离到空心千斤顶处于收缩状态且上悬挂螺母悬挂在开心千斤顶上时系杆的上端能够连接在拱肋上,将系杆的上端同拱肋连接在一起,此时系梁处于水平状态,调整下悬挂螺母到抵接在所述底壁上;第二步、系梁提升:使空心千斤顶伸长,转动下悬挂螺母到抵接在所述底壁上,使空心千斤顶收缩,转动上悬挂螺母到抵接在空心千斤顶上,重复第二步直到系梁的高度符合要求;第三步、将系梁和拱肋通过若果吊索连接在一起,将提升装置从系梁和拱肋之间拆除。The lifting mechanism is a kind of lifting and lowering mechanism, and its lower end is connected with the lifting and lowering mechanism, and its lower end is connected with the lifting and lowering mechanism on the upper end of the lifting and lowering mechanism. The vertical threaded rod is hung on the bottom wall and the vertical threaded rod is hung on the connecting sleeve; the specific process of lifting the tie beam is as follows: the first step, component connection: the arch rib is erected, the tie beam is sent to the bottom of the arch rib by the ship, the tie beam connecting devices of the several lifting devices are connected to one of the tie beam pre-supported connecting pieces, the distance between the tie rod connecting frame and the tie beam connecting device is adjusted until the upper end of the tie rod can be connected to the arch rib when the hollow jack is in a contracted state and the upper hanging nut is suspended on the open jack, the upper end of the tie rod is connected to the arch rib together, at this time the tie beam is in a horizontal state, and the lower hanging nut is adjusted to abut against the bottom wall; the second step, lifting the tie beam: the hollow jack is extended, the lower hanging nut is turned to abut against the bottom wall, the hollow jack is contracted, the upper hanging nut is turned to abut against the hollow jack, and the second step is repeated until the height of the tie beam meets the requirements; the third step, the tie beam and the arch rib are connected together by a sling, and the lifting device is removed from between the tie beam and the arch rib. 2.根据权利要求1所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,所述竖置螺纹杆有两根,所述空心千斤顶有两个,两根所述竖置螺纹杆一一对应地穿设在两个所述空心千斤顶内,系梁连接装置同系梁预制连接件连接在一起时两根所述竖置螺纹杆位于经过所述系梁的重心的竖平面的两侧。能够使得提升系梁时系梁不产生横向倾斜。2. A method for vertical step-by-step lifting and installation of a tie beam of a long-span cross-channel tie-bar arch bridge according to claim 1, characterized in that there are two vertical threaded rods and two hollow jacks, and the two vertical threaded rods are correspondingly inserted into the two hollow jacks, and when the tie beam connection device is connected with the tie beam prefabricated connection piece, the two vertical threaded rods are located on both sides of the vertical plane passing through the center of gravity of the tie beam. This can prevent the tie beam from tilting laterally when lifting the tie beam. 3.根据权利要求2所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,两根所述竖置螺纹杆位于沿系梁的宽度方向分布在所述系杆的两侧。3. A method for vertical step-by-step lifting and installation of a tie beam of a large-span cross-channel tie-bar arch bridge according to claim 2, characterized in that the two vertical threaded rods are located on both sides of the tie beam along the width direction of the tie beam. 4.根据权利要求1或2或3所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,一个所述提升装置设有两个所述系杆,两根所述系杆沿系梁的宽度方向分布。4. A method for vertical step-by-step lifting and installation of a tie beam of a large-span cross-channel tie-bar arch bridge according to claim 1, 2 or 3, characterized in that one lifting device is provided with two tie rods, and the two tie rods are distributed along the width direction of the tie beam. 5.根据权利要求1或2或3所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,所述系杆连接架包括上架和下连接板,所述空心千斤顶连接于所述上架,所述连接套筒的下端同所述下连接板连接在一起。能够提高连接可靠性。5. A method for vertical step-by-step lifting and installation of a tie beam of a long-span tied arch bridge across a waterway according to claim 1, 2 or 3, characterized in that the tie rod connecting frame comprises an upper frame and a lower connecting plate, the hollow jack is connected to the upper frame, and the lower end of the connecting sleeve is connected to the lower connecting plate, which can improve the connection reliability. 6.根据权利要求5所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,所述系杆同所述上架和下连接板都固定在一起。连接可靠性好。6. A method for vertical step-by-step lifting and installation of tie beams of a long-span tied arch bridge across a waterway according to claim 5, characterized in that the tie rods are fixed together with the upper frame and the lower connecting plate, and the connection reliability is good. 7.根据权利要求6所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,所述系杆穿设在所述下连接板上,所述系杆的下端设有大径段,大径段和所述系杆之间形成托持台阶,所述下连接板搁置在所述托持台阶上。连接方便。7. A method for vertical step-by-step lifting and installation of a tie beam of a long-span tied arch bridge across a waterway according to claim 6, characterized in that the tie rod is passed through the lower connecting plate, a large diameter section is provided at the lower end of the tie rod, a supporting step is formed between the large diameter section and the tie rod, and the lower connecting plate is placed on the supporting step. Connection is convenient. 8.根据权利要求2或3所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,所述系杆连接架包括上架,所述上架包括两个连接环、将两个连接环连接在一起的两根上横连接杆、两根一一对应地将上横连接杆的两端连接在一起的两个纵连接杆和将两根纵连接杆连接在一起的两个下横连接杆,两根所述空心千斤顶一一对应地穿设在两个所述连接环内且同连接环固定在一起,系杆有两根,一根所述系杆同一根纵连接杆、一个连接环、两根上横连接杆的一端和两根下横连接杆的一端都固定在一起,另一根所述系杆同另一根纵连接杆、另一个连接环、两根上横连接杆的另一端和两根下横连接杆的另一端都固定在一起。能够更为可靠的保证使用时为竖直提升。8. A method for vertical step-by-step lifting and installation of a tie beam of a long-span tied arch bridge across a waterway according to claim 2 or 3, characterized in that the tie rod connecting frame includes an upper frame, the upper frame includes two connecting rings, two upper horizontal connecting rods connecting the two connecting rings together, two longitudinal connecting rods correspondingly connecting the two ends of the upper horizontal connecting rods together, and two lower horizontal connecting rods connecting the two longitudinal connecting rods together, the two hollow jacks are correspondingly inserted into the two connecting rings and fixed together with the connecting rings, there are two tie rods, one of which is fixed together with a longitudinal connecting rod, a connecting ring, one end of the two upper horizontal connecting rods and one end of the two lower horizontal connecting rods, and the other tie rod is fixed together with another longitudinal connecting rod, another connecting ring, the other end of the two upper horizontal connecting rods and the other end of the two lower horizontal connecting rods. It can more reliably ensure vertical lifting during use. 9.根据权利要求1或2或3所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,所述系梁预制连接件包括同系梁焊接在一起的两块横向分布的纵向连接板和同系梁焊接在一起的将两块纵向连接板连接在一起的纵向分布的横向连接板,所述纵连接板上设有轴孔,所述系梁连接装置包括顶板和连接在顶板下表面的设悬挂孔的两对悬挂耳,同一对悬挂耳的两个悬挂耳之间形成连接间隙,两块纵向连接板一一对应地穿设在两对悬挂耳的伸缩间隙内,两根悬挂销一一对应地穿设在两个纵连接板的伸缩轴孔和一对悬挂耳的所述悬挂孔内将悬挂耳同纵向连接板连接在一起。9. A method for vertically stepping and lifting installation of a tie beam of a large-span cross-channel tie-bar arch bridge according to claim 1, 2 or 3, characterized in that the prefabricated tie beam connecting parts include two transversely distributed longitudinal connecting plates welded together with the tie beam and longitudinally distributed transverse connecting plates welded together with the tie beam for connecting the two longitudinal connecting plates together, an axial hole is provided on the longitudinal connecting plate, and the tie beam connecting device includes a top plate and two pairs of hanging ears connected to the lower surface of the top plate and provided with hanging holes, a connecting gap is formed between the two hanging ears of the same pair of hanging ears, the two longitudinal connecting plates are correspondingly inserted into the telescopic gaps of the two pairs of hanging ears, and two hanging pins are correspondingly inserted into the telescopic axial holes of the two longitudinal connecting plates and the hanging holes of a pair of hanging ears to connect the hanging ears with the longitudinal connecting plates together. 10.根据权利要求1或2或3所述的一种大跨度跨航道系杆拱桥系梁竖向步进提升安装方法,其特征在于,相邻的系梁连接装置通过连接索连接在一起,所述连接索的正中间设有刚性段,所述刚性段连接有吊线和朝下延伸的刚性杆,所述刚性杆垂直于所述刚性段,所述吊线的下端连接有使吊线处于伸直状态的坠子;在系梁提升的过程中,如果刚性杆同吊线之间产生夹角,则表示各个提升装置提升系梁的距离产生偏差而导致了系梁产生倾斜,此时使提升距离小的提升装置独立对系梁进行提升而使得系梁恢复水平。10. A method for vertically stepping up and installing the tie beams of a large-span cross-channel tie-arch bridge according to claim 1, 2 or 3, characterized in that adjacent tie beam connection devices are connected together by connecting cables, a rigid section is provided in the middle of the connecting cable, the rigid section is connected with a suspension line and a rigid rod extending downward, the rigid rod is perpendicular to the rigid section, and the lower end of the suspension line is connected with a sinker that straightens the suspension line; during the process of lifting the tie beam, if an angle is formed between the rigid rod and the suspension line, it means that the lifting distance of the tie beam by each lifting device deviates, causing the tie beam to tilt, at this time, the lifting device with a smaller lifting distance lifts the tie beam independently to restore the tie beam to a horizontal state.
CN202410308641.7A 2024-03-18 2024-03-18 A vertical step-by-step lifting and installation method for the tie beam of a large-span cross-channel tied arch bridge Pending CN118127932A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410308641.7A CN118127932A (en) 2024-03-18 2024-03-18 A vertical step-by-step lifting and installation method for the tie beam of a large-span cross-channel tied arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410308641.7A CN118127932A (en) 2024-03-18 2024-03-18 A vertical step-by-step lifting and installation method for the tie beam of a large-span cross-channel tied arch bridge

Publications (1)

Publication Number Publication Date
CN118127932A true CN118127932A (en) 2024-06-04

Family

ID=91235256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410308641.7A Pending CN118127932A (en) 2024-03-18 2024-03-18 A vertical step-by-step lifting and installation method for the tie beam of a large-span cross-channel tied arch bridge

Country Status (1)

Country Link
CN (1) CN118127932A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119319441A (en) * 2024-11-29 2025-01-17 上海电气风电集团股份有限公司 Assembly method and assembly tool for driving chain of wind driven generator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1811070A (en) * 2005-01-28 2006-08-02 上海市第七建筑有限公司 First-arch-then-beam concrete steel skeleton constructing process for through arch bridge with mooring post of steel pipe concrete
JP2016023449A (en) * 2014-07-18 2016-02-08 オックスジャッキ株式会社 PC steel strand winding device
CN113152313A (en) * 2021-04-19 2021-07-23 南京润华建设集团有限公司 Suspender replacing structure of tied arch bridge and construction method thereof
CN218320177U (en) * 2022-06-15 2023-01-17 江苏法尔胜缆索有限公司 Temporary horizontal tie bar cable span middle section lifting device for through arch bridge
CN222275268U (en) * 2024-03-18 2024-12-31 浙江交工金筑交通建设有限公司 A vertical step-by-step lifting structure for the tie beam of a large-span tied arch bridge across a waterway

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1811070A (en) * 2005-01-28 2006-08-02 上海市第七建筑有限公司 First-arch-then-beam concrete steel skeleton constructing process for through arch bridge with mooring post of steel pipe concrete
JP2016023449A (en) * 2014-07-18 2016-02-08 オックスジャッキ株式会社 PC steel strand winding device
CN113152313A (en) * 2021-04-19 2021-07-23 南京润华建设集团有限公司 Suspender replacing structure of tied arch bridge and construction method thereof
CN218320177U (en) * 2022-06-15 2023-01-17 江苏法尔胜缆索有限公司 Temporary horizontal tie bar cable span middle section lifting device for through arch bridge
CN222275268U (en) * 2024-03-18 2024-12-31 浙江交工金筑交通建设有限公司 A vertical step-by-step lifting structure for the tie beam of a large-span tied arch bridge across a waterway

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119319441A (en) * 2024-11-29 2025-01-17 上海电气风电集团股份有限公司 Assembly method and assembly tool for driving chain of wind driven generator

Similar Documents

Publication Publication Date Title
CN111335187B (en) Construction process for triangular area of open-web rigid frame bridge
CN111794119B (en) Temporary supporting system and hoisting method for basket type steel box tie bar arch
CN104963301A (en) Dragging, translating and lowering device and method for dismantling pier top beam section and pier
CN112376440B (en) A construction technology for the main beam of a cable-stayed bridge without closing and hoisting
CN112554076B (en) A hanging basket bottom basket continuous small stroke lowering device and construction method
CN113023544B (en) Special-shaped pedestrian landscape bridge arched girder section hoisting posture adjusting device
CN110258293A (en) Construction method for erection of steel truss girder main tower pier of cable-stayed bridge
CN116732887A (en) Bottom die bent construction method for super-high beam of super-large bridge main tower
CN107227686A (en) A kind of tunnel-type anchorage pre-stress system locating support construction method
CN112049017A (en) Bailey frame integral frame falling device for cast-in-place box girder and construction process
CN116853963B (en) A hoisting device and hoisting method for main beam of cable-stayed bridge
CN222275268U (en) A vertical step-by-step lifting structure for the tie beam of a large-span tied arch bridge across a waterway
CN219951710U (en) Integral lifting construction system for arch rib of steel pipe concrete arch bridge
CN117449261A (en) A kind of installation technology of plate-type ship-side components
CN117328355A (en) A hoisting construction method for the main beam of a large-span upward-supporting arch bridge
CN210288140U (en) Simple and easy prefabricated decking hoist and mount platform truck
CN110374006A (en) A kind of construction method for removing space opposite sex large-tonnage steel beam bracket
CN113863164B (en) Traction sliding installation method for large-span steel box girder passing through existing overwater bridge
CN220450686U (en) Rigid suspension safety structure for dismantling bracket of upper beam bracket of cable tower
CN117188309B (en) A construction method for cast-in-place steel pipe sections with fewer supports
CN119507321A (en) A mobile maintenance platform for the arch columns of reinforced concrete arch bridges
CN118498225A (en) Construction method for storing large-section beam in low position in cable-less area under tower and integrally lifting large-section beam
CN218643229U (en) Jacking installation system for shipping of lattice beam of steel structure arch bridge
CN111335172A (en) Movable pier column beam prestressed tension hanger construction platform and construction method
CN109914223B (en) Hoisting system suitable for suspension bridge steel structure bridge deck system and operation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination