CN118125315B - A connection device for tower crane attached to wall - Google Patents

A connection device for tower crane attached to wall Download PDF

Info

Publication number
CN118125315B
CN118125315B CN202410489099.XA CN202410489099A CN118125315B CN 118125315 B CN118125315 B CN 118125315B CN 202410489099 A CN202410489099 A CN 202410489099A CN 118125315 B CN118125315 B CN 118125315B
Authority
CN
China
Prior art keywords
fixing
folding
frame
wall
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202410489099.XA
Other languages
Chinese (zh)
Other versions
CN118125315A (en
Inventor
肖仲华
赵雪媛
王保强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Gongjian Intelligent Equipment Co ltd
Original Assignee
Hubei Industrial Construction Group Co Ltd HICC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Industrial Construction Group Co Ltd HICC filed Critical Hubei Industrial Construction Group Co Ltd HICC
Priority to CN202410489099.XA priority Critical patent/CN118125315B/en
Publication of CN118125315A publication Critical patent/CN118125315A/en
Application granted granted Critical
Publication of CN118125315B publication Critical patent/CN118125315B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/16Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种塔吊附着墙体的连接装置,涉及建筑施工技术领域,包括折叠架,折叠固定机构,所述折叠固定机构包括第一固定块,所述第一固定块通过转轴活动安装在折叠架的前端,高度调节机构,所述高度调节机构包括支撑架,所述高度调节机构共有两组且分别活动设置在折叠架远离折叠固定机构的一端。本发明通过设计安装了高度调节机构和墙体夹持机构,通过使第一连接臂与第二连接臂的交点升高,并且通过使装置可根据墙体之间的距离与墙体高度进行适应性调节,通过夹持板夹持墙体,使得装置整体固定在墙体上,避免进行塔吊附着连接时需破坏墙体,便于安装拆卸,节省了安装时间,节省施工人员体力,提高施工效率。

The present invention discloses a connection device for attaching a tower crane to a wall, which relates to the technical field of building construction, and includes a folding frame, a folding fixing mechanism, wherein the folding fixing mechanism includes a first fixing block, and the first fixing block is movably installed at the front end of the folding frame through a rotating shaft, and a height adjustment mechanism, wherein the height adjustment mechanism includes a support frame, and the height adjustment mechanism has two groups and is movably arranged at one end of the folding frame away from the folding fixing mechanism. The present invention is designed to install a height adjustment mechanism and a wall clamping mechanism, and by raising the intersection of the first connecting arm and the second connecting arm, and by enabling the device to be adaptively adjusted according to the distance between the walls and the wall height, the wall is clamped by a clamping plate, so that the device is fixed on the wall as a whole, avoiding the need to destroy the wall when attaching and connecting the tower crane, facilitating installation and disassembly, saving installation time, saving the physical strength of construction personnel, and improving construction efficiency.

Description

一种塔吊附着墙体的连接装置A connection device for tower crane attached to wall

技术领域Technical Field

本发明涉及建筑施工技术领域,具体为一种塔吊附着墙体的连接装置。The invention relates to the technical field of building construction, in particular to a connection device for attaching a tower crane to a wall.

背景技术Background Art

塔吊是一种动臂装在高耸塔身上部的旋转起重机,塔吊的作业空间大,主要用于房屋建筑施工中物料的垂直和水平输送及建筑构件的安装,由金属结构、工作机构和电气系统三部分组成,塔吊通常需要与附着墙体进行安装,在申请号为202120610794.9的中国专利公开了“一种塔吊墙体埋件用墙体清理装置,主要涉及塔吊预埋件设置领域。包括固定组件和滑动设置在固定装置上的打磨组件;所述打磨组件包括磨轮和电机,所述电机与磨轮相连接,带动磨轮进行旋转。所述打磨组件连接有测量组件,所述测量组件为测绘拉杆或电动伸缩杆。所述打磨组件通过滑动件与固定装置滑动连接,所述滑动件上设置有用于安置电机的电机腔。所述电机输出轴与磨轮连接处设置有减震缓冲组件。本实用新型的有益效果在于:能够在需要安装塔吊墙体的预埋件时,能够使预埋件与建筑墙体充分接触,避免因为墙面粗糙而使预埋件不能够与墙体充分接触,致使出现预埋件松动等危险问题”;A tower crane is a rotating crane with a boom mounted on the top of a tall tower. It has a large operating space and is mainly used for vertical and horizontal transportation of materials and installation of building components in housing construction. It consists of three parts: a metal structure, a working mechanism, and an electrical system. A tower crane usually needs to be installed with an attached wall. A Chinese patent with application number 202120610794.9 discloses a "wall cleaning device for embedded parts of a tower crane wall, which mainly relates to the field of embedded parts setting of tower cranes. It includes a fixed assembly and a grinding assembly slidably arranged on the fixed assembly; the grinding assembly includes a grinding wheel and a motor, and the motor Connected to the grinding wheel, driving the grinding wheel to rotate. The grinding assembly is connected to a measuring assembly, and the measuring assembly is a surveying pull rod or an electric telescopic rod. The grinding assembly is slidably connected to the fixing device through a sliding part, and the sliding part is provided with a motor cavity for accommodating the motor. A shock-absorbing buffer assembly is provided at the connection between the motor output shaft and the grinding wheel. The beneficial effect of the utility model is that when the embedded parts of the tower crane wall need to be installed, the embedded parts can be fully contacted with the building wall, avoiding the embedded parts from being unable to fully contact with the wall due to the rough wall surface, resulting in dangerous problems such as loosening of the embedded parts. "

该技术方案仅仅解决了塔吊与附着墙体时容易出现埋件位置移动或者螺栓松动的问题,目前塔吊附着墙体的时,通常在墙体上埋入连接件,通过埋件使墙体与塔吊进行连接,但是在塔吊安装时大量的埋件工作,导致人工成本难以控制,同时在塔吊拆除时,留在墙体内的埋件往往需要花费大量时间才能拆除,而且拆除埋件后的墙体往往需要进行修补,导致施工成本增加。This technical solution only solves the problem that the embedded parts are prone to movement or the bolts are loose when the tower crane is attached to the wall. At present, when the tower crane is attached to the wall, connecting parts are usually embedded in the wall to connect the wall and the tower crane. However, a large amount of embedded parts work during the installation of the tower crane makes it difficult to control the labor cost. At the same time, when the tower crane is dismantled, the embedded parts left in the wall often take a lot of time to remove, and the wall after the embedded parts are removed often needs to be repaired, which increases the construction cost.

发明内容Summary of the invention

本发明的目的在于提供一种塔吊附着墙体的连接装置,以解决上述背景技术中提出的问题。The object of the present invention is to provide a connection device for attaching a tower crane to a wall, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本发明提供如下技术方案:一种塔吊附着墙体的连接装置,包括折叠架;To achieve the above-mentioned object, the present invention provides the following technical solutions: a connecting device for attaching a tower crane to a wall, comprising a folding frame;

折叠固定机构,所述折叠固定机构包括第一固定块,所述第一固定块通过转轴活动安装在折叠架的前端;A folding and fixing mechanism, the folding and fixing mechanism comprising a first fixing block, the first fixing block being movably mounted on the front end of the folding frame via a rotating shaft;

高度调节机构,所述高度调节机构包括支撑架,所述高度调节机构共有两组且分别活动设置在折叠架远离折叠固定机构的一端,所述支撑架通过转轴活动安装在折叠架的前端;A height adjustment mechanism, the height adjustment mechanism comprises a support frame, the height adjustment mechanism has two groups and is movably arranged at one end of the folding frame away from the folding fixing mechanism, and the support frame is movably mounted at the front end of the folding frame through a rotating shaft;

墙体夹持机构,所述墙体夹持机构包括连接杆,所述墙体夹持机构共有四组且分别活动设置在两组高度调节机构的侧边上、下端,所述连接杆活动设置在支撑架远离折叠架的侧边。The wall clamping mechanism comprises connecting rods, which have four groups and are respectively movably arranged at the upper and lower ends of the sides of the two groups of height adjustment mechanisms, and the connecting rods are movably arranged at the side of the support frame away from the folding frame.

优选的,所述折叠固定机构包括第二固定块和固定架,所述第二固定块通过转轴活动安装在折叠架的前端,所述第一固定块与第二固定块的侧壁均开设有插孔,所述固定架通过插入活动安装在第一固定块与第二固定块上的插孔内。Preferably, the folding and fixing mechanism includes a second fixing block and a fixing frame, the second fixing block is movably mounted on the front end of the folding frame through a rotating shaft, the side walls of the first fixing block and the second fixing block are both provided with sockets, and the fixing frame is movably mounted in the sockets on the first fixing block and the second fixing block by insertion.

优选的,所述折叠固定机构包括固定孔和固定插销,所述固定孔共有若干个且均匀地开设在固定架上,所述固定插销通过插入活动安装在固定架上靠近第二固定块的一组固定孔中。Preferably, the folding and fixing mechanism comprises fixing holes and fixing pins, the fixing holes are in total a plurality and are evenly arranged on the fixing frame, and the fixing pins are movably installed in a group of fixing holes on the fixing frame close to the second fixing block by insertion.

优选的,所述高度调节机构包括第一螺纹杆和蜗轮,所述第一螺纹杆通过插入活动安装在支撑架远离折叠架的一侧中间,所述蜗轮通过螺栓固定套接在第一螺纹杆位于支撑架内的一端。Preferably, the height adjustment mechanism includes a first threaded rod and a worm gear, the first threaded rod is movably installed in the middle of a side of the support frame away from the folding frame by insertion, and the worm gear is fixedly sleeved on one end of the first threaded rod located in the support frame by bolts.

优选的,所述高度调节机构包括蜗杆和第一转把,所述蜗杆通过插入活动安装在支撑架的内部底端中间,所述第一转把通过螺栓固定安装在蜗杆远离折叠固定机构的一端,所述蜗杆位于蜗轮的底端且通过啮合活动连接。Preferably, the height adjustment mechanism includes a worm and a first handle, the worm is installed in the middle of the inner bottom end of the support frame by insertion, the first handle is fixed by bolts on the end of the worm away from the folding and fixing mechanism, the worm is located at the bottom end of the worm wheel and is connected by meshing.

优选的,所述高度调节机构包括滑块、第一连接臂和第二连接臂,所述滑块通过螺纹活动套接在第一螺纹杆上,所述第一连接臂共有两根且靠近支撑架的一端分别通过转轴活动安装在支撑架远离折叠架的一侧的上、下端,所述第二连接臂共有两个且靠近支撑架的一端分别通过转轴活动安装在滑块的上、下端,所述滑块远离折叠固定机构的一侧中间通过转轴活动安装有塔吊连接杆。Preferably, the height adjustment mechanism includes a slider, a first connecting arm and a second connecting arm, the slider is movably connected to the first threaded rod by a thread, there are two first connecting arms and one end close to the support frame is movably mounted on the upper and lower ends of the support frame on a side away from the folding frame by a rotating shaft, there are two second connecting arms and one end close to the support frame is movably mounted on the upper and lower ends of the slider by a rotating shaft, and a tower crane connecting rod is movably mounted on the middle of the side of the slider away from the folding fixing mechanism by a rotating shaft.

优选的,所述墙体夹持机构包括连接板、限位滑杆和第二螺纹杆,所述连接杆通过插入活动安装在第一连接臂与第二连接臂远离支撑架的一端中间,所述连接板通过螺栓固定安装在连接杆的两端,所述限位滑杆通过螺栓固定安装在两块连接板之间的中间处,所述第二螺纹杆通过插入活动安装在两块连接板远离连接杆的一端之间。Preferably, the wall clamping mechanism includes a connecting plate, a limiting sliding rod and a second threaded rod, the connecting rod is installed in the middle of the first connecting arm and the second connecting arm away from the support frame through insertion, the connecting plate is fixedly installed at both ends of the connecting rod by bolts, the limiting sliding rod is fixedly installed in the middle between the two connecting plates by bolts, and the second threaded rod is installed between the ends of the two connecting plates away from the connecting rod through insertion.

优选的,所述墙体夹持机构包括支撑板、夹持板和第二转把,所述支撑板通过螺栓固定套接在限位滑杆与第二螺纹杆的中间,所述夹持板在每组墙体夹持机构上共有两块且分别通过螺纹活动套接在第二螺纹杆的两端,且靠近限位滑杆的一侧活动套接在限位滑杆上,所述第二转把通过螺栓固定安装在第二螺纹杆远离折叠固定机构的一端。Preferably, the wall clamping mechanism includes a support plate, a clamping plate and a second handle. The support plate is fixedly sleeved between the limiting slide rod and the second threaded rod by bolts. There are two clamping plates on each set of wall clamping mechanisms and they are movably sleeved on both ends of the second threaded rod by threads, and the side close to the limiting slide rod is movably sleeved on the limiting slide rod. The second handle is fixedly installed on the end of the second threaded rod away from the folding fixing mechanism by bolts.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the present invention has the following beneficial effects:

本发明通过设计安装了高度调节机构和墙体夹持机构,通过滑块带动第一连接臂和第二连接臂转动,使得第一连接臂与第二连接臂的交点升高,并且通过折叠架调节两组高度调节机构之间的距离,使得装置可根据墙体之间的距离与墙体高度进行适应性调节,通过夹持板夹持墙体,使得装置整体固定在墙体上,避免进行塔吊附着连接时破坏墙体,便于安装拆卸,节省了安装时间,节省施工人员体力,提高施工效率。The present invention is designed and installed with a height adjustment mechanism and a wall clamping mechanism. The first connecting arm and the second connecting arm are driven to rotate by a slider, so that the intersection of the first connecting arm and the second connecting arm is raised, and the distance between the two sets of height adjustment mechanisms is adjusted by a folding frame, so that the device can be adaptively adjusted according to the distance between the walls and the wall height. The wall is clamped by a clamping plate, so that the device is fixed on the wall as a whole, avoiding damage to the wall when the tower crane is attached and connected, facilitating installation and disassembly, saving installation time, saving the physical strength of construction workers, and improving construction efficiency.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本发明实施例提供整体结构示意图;FIG1 is a schematic diagram of the overall structure of an embodiment of the present invention;

图2为本发明实施例提供的折叠固定机构示意图;FIG2 is a schematic diagram of a folding and fixing mechanism provided in an embodiment of the present invention;

图3为本发明实施例提供的高度调节机构与墙体夹持机构整体示意图;FIG3 is an overall schematic diagram of a height adjustment mechanism and a wall clamping mechanism provided by an embodiment of the present invention;

图4为本发明实施例提供的高度调节机构示意图;FIG4 is a schematic diagram of a height adjustment mechanism provided by an embodiment of the present invention;

图5为本发明实施例提供的墙体夹持机构示意图。FIG. 5 is a schematic diagram of a wall clamping mechanism provided in an embodiment of the present invention.

图中:1、折叠架;2、折叠固定机构;21、第一固定块;22、第二固定块;23、固定架;24、固定孔;25、固定插销;3、高度调节机构;31、支撑架;32、第一螺纹杆;33、蜗轮;34、蜗杆;35、第一转把;36、滑块;37、第一连接臂;38、第二连接臂;4、墙体夹持机构;41、连接杆;42、连接板;43、限位滑杆;44、第二螺纹杆;45、支撑板;46、夹持板;47、第二转把;5、塔吊连接杆。In the figure: 1. folding frame; 2. folding fixing mechanism; 21. first fixing block; 22. second fixing block; 23. fixing frame; 24. fixing hole; 25. fixing pin; 3. height adjustment mechanism; 31. support frame; 32. first threaded rod; 33. worm gear; 34. worm; 35. first turning handle; 36. slider; 37. first connecting arm; 38. second connecting arm; 4. wall clamping mechanism; 41. connecting rod; 42. connecting plate; 43. limit sliding rod; 44. second threaded rod; 45. support plate; 46. clamping plate; 47. second turning handle; 5. tower crane connecting rod.

具体实施方式DETAILED DESCRIPTION

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

请参阅图1-5,本发明提供一种技术方案:一种塔吊附着墙体的连接装置,包括折叠架1;Please refer to Figures 1-5, the present invention provides a technical solution: a connection device for attaching a tower crane to a wall, comprising a folding frame 1;

折叠固定机构2,折叠固定机构2包括第一固定块21,第一固定块21通过转轴活动安装在折叠架1的前端;A folding and fixing mechanism 2, the folding and fixing mechanism 2 comprises a first fixing block 21, and the first fixing block 21 is movably mounted on the front end of the folding frame 1 through a rotating shaft;

高度调节机构3,高度调节机构3包括支撑架31,高度调节机构3共有两组且分别活动设置在折叠架1远离折叠固定机构2的一端,支撑架31通过转轴活动安装在折叠架1的前端;A height adjustment mechanism 3, the height adjustment mechanism 3 comprises a support frame 31, there are two groups of height adjustment mechanisms 3 and they are movably arranged at one end of the folding frame 1 away from the folding fixing mechanism 2, and the support frame 31 is movably installed at the front end of the folding frame 1 through a rotating shaft;

墙体夹持机构4,墙体夹持机构4包括连接杆41,墙体夹持机构4共有四组且分别活动设置在两组高度调节机构3的侧边上、下端,连接杆41活动设置在支撑架31远离折叠架1的侧边。The wall clamping mechanism 4 includes a connecting rod 41 . There are four sets of wall clamping mechanisms 4 , which are movably arranged at the upper and lower ends of the sides of the two sets of height adjustment mechanisms 3 . The connecting rod 41 is movably arranged at the side of the support frame 31 away from the folding frame 1 .

折叠固定机构2包括第二固定块22和固定架23,第二固定块22通过转轴活动安装在折叠架1的前端,第一固定块21与第二固定块22的侧壁均开设有插孔,固定架23通过插入活动安装在第一固定块21与第二固定块22上的插孔内;通过固定架23插入第一固定块21与第二固定块22内,使得折叠架1的张开角度固定,使得两组高度调节机构3之间的距离固定;The folding and fixing mechanism 2 includes a second fixing block 22 and a fixing frame 23. The second fixing block 22 is movably mounted on the front end of the folding frame 1 through a rotating shaft. The side walls of the first fixing block 21 and the second fixing block 22 are provided with insertion holes. The fixing frame 23 is movably mounted in the insertion holes on the first fixing block 21 and the second fixing block 22 through insertion. The fixing frame 23 is inserted into the first fixing block 21 and the second fixing block 22, so that the opening angle of the folding frame 1 is fixed, so that the distance between the two sets of height adjustment mechanisms 3 is fixed.

折叠固定机构2包括固定孔24和固定插销25,固定孔24共有若干个且均匀地开设在固定架23上,固定插销25通过插入活动安装在固定架23上靠近第二固定块22的一组固定孔24中;通过将固定插销25插进距离第二固定块22最近的一组固定孔24中,防止固定架23脱落离开第一固定块21和第二固定块22;The folding fixing mechanism 2 includes fixing holes 24 and fixing pins 25. There are a plurality of fixing holes 24 evenly arranged on the fixing frame 23. The fixing pins 25 are installed in a group of fixing holes 24 on the fixing frame 23 close to the second fixing block 22 by insertion. By inserting the fixing pins 25 into the group of fixing holes 24 closest to the second fixing block 22, the fixing frame 23 is prevented from falling off from the first fixing block 21 and the second fixing block 22.

高度调节机构3包括第一螺纹杆32和蜗轮33,第一螺纹杆32通过插入活动安装在支撑架31远离折叠架1的一侧中间,蜗轮33通过螺栓固定套接在第一螺纹杆32位于支撑架31内的一端;通过蜗轮33带动第一螺纹杆32转动;The height adjustment mechanism 3 includes a first threaded rod 32 and a worm gear 33. The first threaded rod 32 is installed in the middle of the side of the support frame 31 away from the folding frame 1 by insertion, and the worm gear 33 is fixedly sleeved on one end of the first threaded rod 32 located in the support frame 31 by bolts; the first threaded rod 32 is driven to rotate by the worm gear 33;

高度调节机构3包括蜗杆34和第一转把35,蜗杆34通过插入活动安装在支撑架31的内部底端中间,第一转把35通过螺栓固定安装在蜗杆34远离折叠固定机构2的一端,蜗杆34位于蜗轮33的底端且通过啮合活动连接;通过第一转把35带动蜗杆34转动,通过蜗杆34带动蜗轮33转动,使得第一螺纹杆32跟随蜗轮33同时转动;The height adjustment mechanism 3 includes a worm 34 and a first turning handle 35. The worm 34 is installed in the middle of the inner bottom end of the support frame 31 by insertion. The first turning handle 35 is fixedly installed at the end of the worm 34 away from the folding fixing mechanism 2 by bolts. The worm 34 is located at the bottom end of the worm wheel 33 and is connected by meshing. The worm 34 is driven to rotate by the first turning handle 35, and the worm wheel 33 is driven to rotate by the worm 34, so that the first threaded rod 32 rotates simultaneously with the worm wheel 33.

高度调节机构3包括滑块36、第一连接臂37和第二连接臂38,滑块36通过螺纹活动套接在第一螺纹杆32上,第一连接臂37共有两根且靠近支撑架31的一端分别通过转轴活动安装在支撑架31远离折叠架1的一侧的上、下端,第二连接臂38共有两个且靠近支撑架31的一端分别通过转轴活动安装在滑块36的上、下端,滑块36远离折叠固定机构2的一侧中间通过转轴活动安装有塔吊连接杆5;通过滑块36带动第一连接臂37和第二连接臂38转动,使得第一连接臂37与第二连接臂38的交点升高,通过塔吊连接杆5连接塔吊,使塔吊附着墙体;The height adjustment mechanism 3 includes a slider 36, a first connecting arm 37 and a second connecting arm 38. The slider 36 is movably sleeved on the first threaded rod 32 through a thread. There are two first connecting arms 37, and one end close to the support frame 31 is movably installed at the upper and lower ends of the side of the support frame 31 away from the folding frame 1 through a rotating shaft. There are two second connecting arms 38, and one end close to the support frame 31 is movably installed at the upper and lower ends of the slider 36 through a rotating shaft. A tower crane connecting rod 5 is movably installed in the middle of the side of the slider 36 away from the folding fixing mechanism 2 through a rotating shaft; the first connecting arm 37 and the second connecting arm 38 are driven to rotate by the slider 36, so that the intersection of the first connecting arm 37 and the second connecting arm 38 is raised, and the tower crane is connected through the tower crane connecting rod 5, so that the tower crane is attached to the wall;

墙体夹持机构4包括连接板42、限位滑杆43和第二螺纹杆44,连接杆41通过插入活动安装在第一连接臂37与第二连接臂38远离支撑架31的一端中间,连接板42通过螺栓固定安装在连接杆41的两端,限位滑杆43通过螺栓固定安装在两块连接板42之间的中间处,第二螺纹杆44通过插入活动安装在两块连接板42远离连接杆41的一端之间;通过连接杆41跟随第一连接臂37和第二连接臂38升高,通过限位滑杆43进行限位;The wall clamping mechanism 4 includes a connecting plate 42, a limiting slide rod 43 and a second threaded rod 44. The connecting rod 41 is installed in the middle of the first connecting arm 37 and the second connecting arm 38 away from the support frame 31 by being inserted and movably mounted. The connecting plate 42 is fixedly mounted at both ends of the connecting rod 41 by bolts. The limiting slide rod 43 is fixedly mounted in the middle between the two connecting plates 42 by bolts. The second threaded rod 44 is installed in the middle of the two connecting plates 42 away from the ends of the connecting rod 41 by being inserted and movably mounted. The connecting rod 41 follows the first connecting arm 37 and the second connecting arm 38 to rise, and is limited by the limiting slide rod 43.

墙体夹持机构4包括支撑板45、夹持板46和第二转把47,支撑板45通过螺栓固定套接在限位滑杆43与第二螺纹杆44的中间,夹持板46在每组墙体夹持机构4上共有两块且分别通过螺纹活动套接在第二螺纹杆44的两端,且靠近限位滑杆43的一侧活动套接在限位滑杆43上,第二转把47通过螺栓固定安装在第二螺纹杆44远离折叠固定机构2的一端;通过转动第二转把47带动第二螺纹杆44转动,当第二螺纹杆44转动时,通过限位滑杆43的限位,使得两块夹持板46向支撑板45移动,通过夹持板46夹持墙体,使得装置整体固定在墙体上。The wall clamping mechanism 4 includes a support plate 45, a clamping plate 46 and a second turning handle 47. The support plate 45 is fixedly sleeved in the middle of the limiting slide rod 43 and the second threaded rod 44 by bolts. There are two clamping plates 46 on each set of wall clamping mechanisms 4 and they are respectively movably sleeved on the two ends of the second threaded rod 44 by threads, and the side close to the limiting slide rod 43 is movably sleeved on the limiting slide rod 43. The second turning handle 47 is fixedly installed on the end of the second threaded rod 44 away from the folding and fixing mechanism 2 by bolts; the second threaded rod 44 is driven to rotate by rotating the second turning handle 47. When the second threaded rod 44 rotates, the limiting slide rod 43 is used to limit the two clamping plates 46 to move toward the support plate 45, and the wall is clamped by the clamping plates 46, so that the device is fixed to the wall as a whole.

工作原理:本发明在使用时,转动折叠架1调节两个高度调节机构3之间的距离,然后将固定架23插入第一固定块21与第二固定块22内,再将固定插销25插进距离第二固定块22最近的一组固定孔24中,此时折叠架1的张开角度固定,使得两组高度调节机构3之间的距离固定;Working principle: When the present invention is used, the folding frame 1 is rotated to adjust the distance between the two height adjustment mechanisms 3, and then the fixing frame 23 is inserted into the first fixing block 21 and the second fixing block 22, and then the fixing pin 25 is inserted into a group of fixing holes 24 closest to the second fixing block 22. At this time, the opening angle of the folding frame 1 is fixed, so that the distance between the two groups of height adjustment mechanisms 3 is fixed;

转动第一转把35,通过第一转把35带动蜗杆34转动,通过蜗杆34带动蜗轮33转动,使得第一螺纹杆32跟随蜗轮33同时转动,当第一螺纹杆32转动时,带动滑块36在第一螺纹杆32上向远离支撑架31的方向转动,在滑块36移动的同时,通过滑块36带动第一连接臂37和第二连接臂38转动,使得第一连接臂37与第二连接臂38的交点升高;The first turning handle 35 is turned to drive the worm 34 to rotate through the first turning handle 35, and the worm gear 33 is driven to rotate through the worm 34, so that the first threaded rod 32 rotates simultaneously with the worm gear 33. When the first threaded rod 32 rotates, the slider 36 is driven to rotate on the first threaded rod 32 in a direction away from the support frame 31. When the slider 36 moves, the first connecting arm 37 and the second connecting arm 38 are driven to rotate through the slider 36, so that the intersection of the first connecting arm 37 and the second connecting arm 38 rises;

通过第一连接臂37和第二连接臂38带动连接杆41旋转升高,高度调节完成后,通过转动第二转把47带动第二螺纹杆44转动,当第二螺纹杆44转动时,通过限位滑杆43的限位,使得两块夹持板46向支撑板45移动,通过夹持板46夹持墙体,使得装置整体固定在墙体上,通过塔吊连接杆5连接塔吊,使得塔吊附着墙体。The connecting rod 41 is driven to rotate and rise by the first connecting arm 37 and the second connecting arm 38. After the height adjustment is completed, the second threaded rod 44 is driven to rotate by turning the second turning handle 47. When the second threaded rod 44 rotates, the two clamping plates 46 are moved toward the supporting plate 45 through the limiting sliding rod 43. The wall is clamped by the clamping plates 46 so that the device is fixed on the wall as a whole. The tower crane is connected by the tower crane connecting rod 5 so that the tower crane is attached to the wall.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims (3)

1. The utility model provides a connecting device of tower crane adhesion wall body, includes folding leg (1), its characterized in that:
The folding fixing mechanism (2) comprises a first fixing block (21), and the first fixing block (21) is movably arranged at the front end of the folding frame (1);
The folding fixing mechanism (2) further comprises a second fixing block (22) and a fixing frame (23), the second fixing block (22) is movably arranged at the front end of the folding frame (1) through a rotating shaft, insertion holes are formed in the side walls of the first fixing block (21) and the second fixing block (22), and the fixing frame (23) is movably arranged in the insertion holes in the first fixing block (21) and the second fixing block (22) through insertion;
The folding fixing mechanism (2) further comprises a plurality of fixing holes (24) and fixing bolts (25), wherein the fixing holes (24) are uniformly formed in the fixing frame (23), and the fixing bolts (25) are movably installed in a group of fixing holes (24) close to the second fixing block (22) on the fixing frame (23) through insertion;
The folding device comprises a folding frame (1) and a folding fixing mechanism (2), and is characterized by further comprising a height adjusting mechanism (3), wherein the height adjusting mechanism (3) comprises a supporting frame (31), the two groups of the height adjusting mechanisms (3) are respectively movably arranged at one end of the folding frame (1) far away from the folding fixing mechanism (2), and the supporting frame (31) is movably arranged at the front end of the folding frame (1);
The height adjusting mechanism (3) further comprises a first threaded rod (32) and a worm wheel (33), the first threaded rod (32) is movably installed in the middle of one side, far away from the folding frame (1), of the supporting frame (31) through insertion, and the worm wheel (33) is fixedly sleeved at one end, located in the supporting frame (31), of the first threaded rod (32) through bolts;
The height adjusting mechanism (3) further comprises a worm (34) and a first rotating handle (35), the worm (34) is movably installed in the middle of the inner bottom end of the supporting frame (31) through insertion, the first rotating handle (35) is fixedly installed at one end, far away from the folding fixing mechanism (2), of the worm (34) through bolts, and the worm (34) is located at the bottom end of the worm wheel (33) and is in meshed movable connection;
The height adjusting mechanism (3) further comprises a sliding block (36), a first connecting arm (37) and a second connecting arm (38), wherein the sliding block (36) is movably sleeved on the first threaded rod (32) through threads, one ends of the first connecting arms (37), which are in total two and close to the support frame (31), are respectively movably installed at the upper end and the lower end of one side, far away from the folding frame (1), of the support frame (31) through rotating shafts, one ends of the second connecting arm (38), which are in total two and close to the support frame (31), are respectively movably installed at the upper end and the lower end of the sliding block (36) through rotating shafts, and a tower crane connecting rod (5) is movably installed in the middle of one side, far away from the folding and fixing mechanism (2), of the sliding block (36) through rotating shafts;
Still include wall body fixture (4), wall body fixture (4) include connecting rod (41), wall body fixture (4) are four sets of and respectively movable mounting are on the side of two sets of high adjustment mechanism (3), lower extreme, connecting rod (41) activity sets up in support frame (31) keep away from the side of folding leg (1).
2. The connection device for a tower crane attachment wall according to claim 1, wherein: the wall body fixture (4) comprises a connecting plate (42), a limiting slide rod (43) and a second threaded rod (44), wherein the connecting rod (41) is movably installed in the middle of one end of the first connecting arm (37) and one end of the second connecting arm (38), which is far away from the supporting frame (31), the connecting plate (42) is fixedly installed at two ends of the connecting rod (41) through bolts, the limiting slide rod (43) is fixedly installed in the middle between the two connecting plates (42) through bolts, and the second threaded rod (44) is movably installed between one ends of the two connecting plates (42), which are far away from the connecting rod (41).
3. The connection device for a tower crane attachment wall according to claim 2, wherein: the wall body fixture (4) comprises a supporting plate (45), a clamping plate (46) and a second rotating handle (47), the supporting plate (45) is fixedly sleeved in the middle of a limiting sliding rod (43) and a second threaded rod (44) through bolts, the clamping plate (46) is totally two on each group of wall body fixture (4) and is movably sleeved at two ends of the second threaded rod (44) through threads respectively, one side, close to the limiting sliding rod (43), of the clamping plate (46) is movably sleeved on the limiting sliding rod (43), and the second rotating handle (47) is fixedly mounted at one end, far away from the folding fixing mechanism (2), of the second threaded rod (44) through bolts.
CN202410489099.XA 2024-04-23 2024-04-23 A connection device for tower crane attached to wall Active CN118125315B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410489099.XA CN118125315B (en) 2024-04-23 2024-04-23 A connection device for tower crane attached to wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410489099.XA CN118125315B (en) 2024-04-23 2024-04-23 A connection device for tower crane attached to wall

Publications (2)

Publication Number Publication Date
CN118125315A CN118125315A (en) 2024-06-04
CN118125315B true CN118125315B (en) 2024-08-16

Family

ID=91239314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410489099.XA Active CN118125315B (en) 2024-04-23 2024-04-23 A connection device for tower crane attached to wall

Country Status (1)

Country Link
CN (1) CN118125315B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118670285B (en) * 2024-06-07 2025-03-07 湖北省工业建筑集团有限公司 High support formwork body upright pole spacing measuring device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112623976A (en) * 2020-12-18 2021-04-09 张家港市中联建设机械有限公司 Heavy tower crane with transverse supporting and stabilizing equipment
CN214879742U (en) * 2021-06-07 2021-11-26 舟山市万里行交通设施有限公司 Tower crane attachment pull rod

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH094037A (en) * 1995-06-23 1997-01-07 Kamisu Concrete Kogyo Kk Structure of clamping device of concrete-made side ditch cover
JP2018104167A (en) * 2016-12-27 2018-07-05 弘信 今野 Lift and raising and lowering method
CN217921178U (en) * 2022-06-17 2022-11-29 中建二局第二建筑工程有限公司 Tower crane counterfort connecting device for building

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112623976A (en) * 2020-12-18 2021-04-09 张家港市中联建设机械有限公司 Heavy tower crane with transverse supporting and stabilizing equipment
CN214879742U (en) * 2021-06-07 2021-11-26 舟山市万里行交通设施有限公司 Tower crane attachment pull rod

Also Published As

Publication number Publication date
CN118125315A (en) 2024-06-04

Similar Documents

Publication Publication Date Title
CN118125315B (en) A connection device for tower crane attached to wall
CN118746318A (en) An outdoor environment monitoring instrument
CN219470695U (en) A pier body top mold support device
CN111099517A (en) Mobile lifting device
CN220585917U (en) Connector for cable bridge
CN219736073U (en) Gas plate heat exchanger with back-blowing cleaning function
CN219033989U (en) Equipment installation construction operation hanging basket
CN218149810U (en) External corner reinforcing device for concrete pouring in house building construction
CN213670094U (en) Bracket convenient to fixed high-pressure squirt
CN221614463U (en) An electrical control cabinet
CN221834334U (en) A hydropower station inspection robot
CN219999772U (en) Electrical cabinet base convenient to dock fast and assemble
CN214186878U (en) Support is used in processing of power cable protection pipe
CN220042688U (en) Debugging cabinet for power engineering
CN222289897U (en) General bracket for machining
CN219760388U (en) Outdoor rainproof type wall built-up pole box convenient for maintenance and inspection
CN219632999U (en) Rotatory clamping car spare part frock
CN220061100U (en) Wall hanging mechanism of air detector
CN221397085U (en) Mounting equipment for electromechanical equipment
CN219469643U (en) An easy-to-adjust electrical engineering maintenance stand
CN218919781U (en) Relay protection terminal lifting device
CN221455728U (en) Cylinder positioning device for parts
CN218324291U (en) Safety device is used in construction in room
CN223775527U (en) A gas turbine cleaning and maintenance equipment
CN218769864U (en) Liftable battery energy storage cabinet of carrying

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250620

Address after: 430000 Hubei Province, Wuhan City, Donghu New Technology Development Zone, No. 1 Room, 2nd Floor, Building B14, Phase II of Wuhan Software Park, South of Huacheng Avenue

Patentee after: Hubei Gongjian Intelligent Equipment Co.,Ltd.

Country or region after: China

Address before: 430000 No. 42 Xiongchu Street, Wuchang District, Wuhan City, Hubei Province

Patentee before: HUBEI INDUSTRIAL CONSTRUCTION GROUP Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right