CN118065572A - Ancient building tile hanging construction auxiliary device and method - Google Patents

Ancient building tile hanging construction auxiliary device and method Download PDF

Info

Publication number
CN118065572A
CN118065572A CN202410393304.2A CN202410393304A CN118065572A CN 118065572 A CN118065572 A CN 118065572A CN 202410393304 A CN202410393304 A CN 202410393304A CN 118065572 A CN118065572 A CN 118065572A
Authority
CN
China
Prior art keywords
tiles
hanging
tile
roof
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202410393304.2A
Other languages
Chinese (zh)
Other versions
CN118065572B (en
Inventor
陈静
刘梦瑶
黄斌
马嘉阳
王心慈
王星
王晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN202410393304.2A priority Critical patent/CN118065572B/en
Publication of CN118065572A publication Critical patent/CN118065572A/en
Application granted granted Critical
Publication of CN118065572B publication Critical patent/CN118065572B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application relates to the technical field of ancient building tile hanging construction, and discloses an ancient building tile hanging construction auxiliary device and method, wherein the ancient building tile hanging construction auxiliary device provides laser marking indication auxiliary for the steps of an ancient building tile hanging construction method by generating a plurality of marking lasers irradiating a sloping roof, and the ancient building tile hanging construction auxiliary device comprises a supporting mechanism, a hanging guide rod and a transverse marking mechanism; according to the application, the marking mechanism is arranged above the sloping roof to be tile-hung to provide laser marking indication assistance for the installation of tile hanging strips and roof tiles in the tile hanging construction process, and fasteners for installing the tile hanging strips, the tile hanging strips and the roof tiles are respectively installed in a staggered manner, so that the installation stability of the tile hanging strips, the tile hanging strips Shui Tiao and the roof tiles can be effectively improved, the laying neatness and the attractiveness of the roof tiles are improved, and the waterproof effectiveness of a waterproof layer is ensured by adopting tung oil lime glue for joint filling and sealing at the internal corner part where the tile hanging strips are connected with the sloping roof base layer.

Description

一种古建筑挂瓦施工辅助装置及方法Ancient building tile hanging construction auxiliary device and method

技术领域Technical Field

本发明属于古建筑挂瓦施工技术领域,具体的说,涉及一种古建筑挂瓦施工辅助装置及方法。The invention belongs to the technical field of ancient building tile hanging construction, and specifically relates to an ancient building tile hanging construction auxiliary device and method.

背景技术Background technique

在古建筑、仿古建筑以及部分低层民宅建筑中,坡屋面的屋顶设计十分普遍,坡屋面大多使用瓦片进行砌顶和装饰,而屋面瓦的施工质量是建筑物防水性能优劣和使用寿命长短的关键所在。In ancient buildings, antique buildings and some low-rise residential buildings, sloping roof designs are very common. Sloping roofs are mostly built and decorated with tiles, and the construction quality of roof tiles is the key to the waterproof performance and service life of the building.

传统瓦屋面施工包括湿铺法和干挂法,其中,干挂法施工需要在坡屋面上安装顺水条和挂瓦条用于铺挂屋面瓦。目前的挂瓦施工中,对于顺水条、挂瓦条、屋面瓦之间的安装,通常只根据屋面瓦尺寸考虑挂瓦条在顺水条上的安装间距、将顺水条等间距阵列安装,而不会整体考虑三者之间的安装紧固件的安装位置关系,因此容易出现在安装挂瓦条时挂瓦条与顺水条的交叉点处正好是安装顺水条的紧固件所在位置的情况,使得挂瓦条难以安装或只能偏离交叉点中央安装紧固件,这就容易造成挂瓦条安装稳定性差、可靠性差的问题,以及容易出现在安装屋面瓦时屋面瓦上的钻孔挂瓦位置正好是安装挂瓦条的紧固件所在位置的情况,使得屋面瓦难以安装或需要稍偏离预定位置才能安装,这就容易造成屋面瓦安装稳定性差、可靠性差的问题,以及会造成屋面瓦排布错乱、整齐美观度不佳的问题。Traditional tile roof construction includes wet laying and dry hanging methods, among which, dry hanging construction requires the installation of water strips and tile hanging strips on the sloping roof for laying and hanging roof tiles. In the current tile hanging construction, for the installation of water strips, tile hanging strips, and roof tiles, usually only the installation spacing of the tile hanging strips on the water strips is considered according to the size of the roof tiles, and the water strips are installed in an array with equal spacing, without considering the installation position relationship of the installation fasteners between the three as a whole. Therefore, it is easy to appear that when installing the tile hanging strips, the intersection of the tile hanging strips and the water strips is exactly the location of the fasteners for installing the water strips, making the tile hanging strips difficult to install or the fasteners can only be installed away from the center of the intersection, which easily leads to the problem of poor stability and reliability of the installation of the tile hanging strips, and it is easy to appear that when installing the roof tiles, the drilling hole tile hanging position on the roof tiles is exactly the location of the fasteners for installing the tile hanging strips, making the roof tiles difficult to install or need to be slightly deviated from the predetermined position to be installed, which easily leads to the problem of poor stability and reliability of the installation of the roof tiles, and the problem of disordered arrangement of the roof tiles and poor neatness and aesthetics.

此外,由于顺水条是后期二次固定在坡屋面的防水层上,使得防水层被用于安装顺水条的紧固件打穿,破坏了防水层的防水性能,虽然防水层被破坏的缺口位置将被顺水条覆盖,但是顺水条与坡屋面相接处仍然存在缝隙,防水层缺口处仍处于与外界连通的状态,因此,在屋面瓦施工质量不高或屋面瓦自身存在质量问题的情况下,遇到强降雨天气时仍然会出现雨水进入坡屋面造成渗漏和侵蚀建筑物屋顶的情况。In addition, since the water strip is fixed to the waterproof layer of the sloping roof at a later stage, the waterproof layer is pierced by the fasteners used to install the water strip, which destroys the waterproof performance of the waterproof layer. Although the damaged gap in the waterproof layer will be covered by the water strip, there is still a gap at the junction of the water strip and the sloping roof, and the gap in the waterproof layer is still connected to the outside world. Therefore, if the construction quality of the roof tiles is not high or there are quality problems with the roof tiles themselves, rainwater will still enter the sloping roof in heavy rainfall, causing leakage and erosion of the roof of the building.

因此,有必要提供一种可提高顺水条、挂瓦条、屋面瓦的安装稳定性和屋面瓦的整齐美观度、以及可保障坡屋面防水能力的古建筑挂瓦施工辅助装置及挂瓦施工方法。Therefore, it is necessary to provide an ancient building tile hanging construction auxiliary device and a tile hanging construction method which can improve the installation stability of water-smoothing strips, tile hanging strips, and roof tiles and the neatness and beauty of roof tiles, as well as ensure the waterproof ability of slope roofs.

发明内容Summary of the invention

为解决或部分解决相关技术中存在的问题,本申请提供一种古建筑挂瓦施工辅助装置及方法,该古建筑挂瓦施工辅助装置及方法,通过在待挂瓦坡屋面上方设置标线机构为挂瓦施工过程中挂瓦条和屋面瓦的安装提供激光标线指示辅助,并通过使用于安装各顺水条、挂瓦条、屋面瓦的紧固件分别错位安装,可有效提高挂瓦条、顺水条、屋面瓦的安装稳定性以及提高屋面瓦的铺挂整齐美观度,通过在顺水条与坡屋面基层相接的阴角部分采用桐油石灰胶进行填缝封堵,保障了防水层的防水有效性。In order to solve or partially solve the problems existing in the related technology, the present application provides an auxiliary device and method for the construction of tile hanging in ancient buildings. The auxiliary device and method for the construction of tile hanging in ancient buildings provide laser marking instructions to assist the installation of tile hanging strips and roof tiles during the tile hanging construction process by arranging a marking mechanism above the sloping roof to be hung with tiles, and staggered installation of fasteners used for installing each water-following strip, tile hanging strip, and roofing tile can effectively improve the installation stability of the tile hanging strip, water-following strip, and roofing tile, and improve the neatness and beauty of the laying of the roof tiles. The internal corner where the water-following strip meets the sloping roof base is sealed with tung oil lime glue, thereby ensuring the waterproof effectiveness of the waterproof layer.

本申请第一方面提供了一种古建筑挂瓦施工辅助装置,所述古建筑挂瓦施工辅助装置通过产生若干照向坡屋面的标线激光为古建筑挂瓦施工方法的步骤提供激光标线指示辅助,包括:The first aspect of the present application provides an auxiliary device for the construction of ancient building tile hanging, which provides laser marking instructions for the steps of the ancient building tile hanging construction method by generating a plurality of marking lasers directed toward the sloping roof, including:

支撑机构,所述支撑机构包括可吸附在坡屋面或屋面瓦上的吸盘以及球头接头、支撑杆、第一调节管、连接杆、第二调节管,所述吸盘可转动安装在所述球头接头上,所述球头接头上端固定安装在所述支撑杆下端,所述支撑杆通过螺纹可伸缩安装在所述第一调节管内,所述连接杆固定安装在所述第一调节管上端,所述第二调节管固定安装在所述连接杆末端,挂瓦施工中需要提供激光标线指示辅助时,通过调整所述球头接头的角度使所述第二调节管的长度方向平行于坡屋面的倾斜方向;A support mechanism, the support mechanism includes a suction cup that can be adsorbed on a sloping roof or roofing tiles, a ball joint, a support rod, a first adjustment tube, a connecting rod, and a second adjustment tube. The suction cup can be rotatably mounted on the ball joint, the upper end of the ball joint is fixedly mounted on the lower end of the support rod, the support rod is telescopically mounted in the first adjustment tube through a thread, the connecting rod is fixedly mounted on the upper end of the first adjustment tube, and the second adjustment tube is fixedly mounted on the end of the connecting rod. When laser marking line indication assistance is required during tile hanging construction, the length direction of the second adjustment tube is parallel to the inclination direction of the sloping roof by adjusting the angle of the ball joint;

悬挂导杆,所述悬挂导杆平行于坡屋面的倾斜方向倾斜安装在坡屋面上方,所述悬挂导杆上端可伸缩、可拆卸安装在所述第二调节管内,下端通过直角扣件可伸缩安装在搭设于建筑物待挂瓦坡屋面外周侧的施工脚手架的水平杆上,所述悬挂导杆上可滑动套设有若干横向标线机构,所述横向标线机构用于产生平行于坡屋面水平方向的横向激光标线。A hanging guide rod is installed above the sloping roof in an inclined direction parallel to the sloping roof. The upper end of the hanging guide rod is telescopically and detachably installed in the second adjusting tube, and the lower end is telescopically installed on the horizontal rod of the construction scaffolding erected on the outer peripheral side of the sloping roof of the building to be tiled through a right-angle fastener. A plurality of transverse marking mechanisms are slidably sleeved on the hanging guide rod, and the transverse marking mechanisms are used to generate transverse laser markings parallel to the horizontal direction of the sloping roof.

可选的,在一个方案中,所述横向标线机构包括套管、固定螺母、调紧螺钉、卡环、激光标线器,所述套管可滑动套设在所述悬挂导杆上,所述悬挂导杆为方管结构,所述套管为与所述悬挂导杆横截面形状相匹配的中空方管结构,且所述套管的内径略大于所述悬挂导杆的外径,所述套管顶部固定安装有固定螺母,所述固定螺母上通过螺纹安装有贯穿套管顶部可与所述悬挂导杆外壁抵紧的调紧螺钉,所述套管一外侧壁上固定安装有所述卡环,所述激光标线器为一字线型的激光灯,所述激光标线器可拆卸卡装在所述卡环内。Optionally, in one scheme, the transverse marking mechanism includes a sleeve, a fixing nut, a tightening screw, a retaining ring, and a laser marker, the sleeve can be slidably mounted on the suspension guide rod, the suspension guide rod is a square tube structure, the sleeve is a hollow square tube structure matching the cross-sectional shape of the suspension guide rod, and the inner diameter of the sleeve is slightly larger than the outer diameter of the suspension guide rod, a fixing nut is fixedly installed on the top of the sleeve, an adjusting screw is threadedly installed on the fixing nut and passes through the top of the sleeve and can be tightened against the outer wall of the suspension guide rod, the retaining ring is fixedly installed on an outer side wall of the sleeve, the laser marker is a straight-line laser light, and the laser marker can be removably mounted in the retaining ring.

可选的,在一个方案中,所述第二调节管为与所述悬挂导杆横截面形状相匹配的中空方管结构,且所述第二调节管的内径略大于所述悬挂导杆的外径,所述第二调节管上开设有沿所述第二调节管长度方向延伸的腰形孔,所述悬挂导杆上端开设有与所述腰形孔在同一竖直平面内的通孔,所述悬挂导杆上端延伸至所述第二调节管内并通过锁紧螺栓贯穿通孔与第二调节管固定。Optionally, in one scheme, the second adjusting tube is a hollow square tube structure that matches the cross-sectional shape of the suspension guide rod, and the inner diameter of the second adjusting tube is slightly larger than the outer diameter of the suspension guide rod, and the second adjusting tube is provided with a waist-shaped hole extending along the length direction of the second adjusting tube, and the upper end of the suspension guide rod is provided with a through hole in the same vertical plane as the waist-shaped hole, and the upper end of the suspension guide rod extends into the second adjusting tube and is fixed to the second adjusting tube by a locking bolt passing through the through hole.

可选的,在一个方案中,所述悬挂导杆上还可滑动套设有至少一个斜向标线机构,所述斜向标线机构用于产生可与坡屋面上第一列上方第一张完整主瓦的右下角、第二列第二张完整主瓦的右下角、第三列第三张完整主瓦的右下角的连线重合的斜向激光标线,所述斜向标线机构的结构与所述横向标线机构的结构一致,所述激光标线器的激光标线方向通过转动所述激光标线器在卡环内的卡装角度实现调节。Optionally, in one embodiment, at least one oblique marking mechanism may be slidably sleeved on the suspension guide rod, and the oblique marking mechanism is used to generate an oblique laser marking that coincides with a line connecting the lower right corner of the first complete main tile above the first row, the lower right corner of the second complete main tile in the second row, and the lower right corner of the third complete main tile in the third row on the sloping roof. The structure of the oblique marking mechanism is consistent with that of the transverse marking mechanism, and the laser marking direction of the laser marking device is adjusted by rotating the clamping angle of the laser marking device in the clamping ring.

本申请第二方面提供了一种古建筑挂瓦施工方法,采用上述权利要求1-图4任一项所述的古建筑挂瓦施工辅助装置,所述古建筑挂瓦施工方法至少包括如下具体步骤:The second aspect of the present application provides a method for hanging tiles on an ancient building, using the auxiliary device for hanging tiles on an ancient building as described in any one of claims 1 to 4 above, and the method for hanging tiles on an ancient building at least comprises the following specific steps:

S1:前期准备工作:准备施工材料、施工工具,清理建筑物待挂瓦坡屋面,在建筑物待挂瓦坡屋面的外周侧搭建施工脚手架,并将辅助施工装置安装在待挂瓦坡屋面上方;S1: Preliminary preparation: prepare construction materials and tools, clean the sloping roof of the building to be tiled, build a construction scaffold on the outer side of the sloping roof of the building to be tiled, and install auxiliary construction equipment above the sloping roof;

S2:顺水条预安装:在坡屋面的矩形坡屋面区域的一端放置一个平行于坡屋面流水方向的顺水条,并在该顺水条内侧预排瓦,在该顺水条两端以及若干位于与预排屋面瓦外露部分的横向中心线等高的位置处钻孔,采用沉头内膨胀螺栓贯穿该顺水条并延伸到坡屋面的基层上进行固定;S2: Pre-installation of water strips: Place a water strip parallel to the water flow direction of the slope roof at one end of the rectangular slope roof area of the slope roof, and pre-drain tiles on the inner side of the water strip. Drill holes at both ends of the water strip and at several positions at the same height as the horizontal center line of the exposed part of the pre-drained roof tiles. Use countersunk internal expansion bolts to penetrate the water strip and extend to the base of the slope roof for fixing;

S3:标线位置确定:根据步骤S2中预排屋面瓦的位置和数量,在辅助施工装置上安装相应数量的横向标线机构,并调节横向标线机构的横向激光标线位置,使各横向标线机构的横向激光标线分别水平贯穿各屋面瓦的钻孔挂瓦位置,随后撤下预排屋面瓦;S3: Determine the marking position: According to the position and number of the pre-arranged roof tiles in step S2, install a corresponding number of transverse marking mechanisms on the auxiliary construction device, and adjust the transverse laser marking positions of the transverse marking mechanisms so that the transverse laser markings of each transverse marking mechanism horizontally pass through the drilling and hanging positions of each roof tile, and then remove the pre-arranged roof tiles;

S4:顺水条安装:以采用沉头内膨胀螺栓贯穿顺水条并延伸到坡屋面的基层上进行固定的方式安装剩余顺水条,各顺水条上下两端超出步骤S3中的外侧横向激光标线至少一个沉头内膨胀螺栓安装位,其中,在坡屋面的矩形坡屋面区域,等间距阵列安装顺水条,在坡屋面的三角形坡屋面区域,以位于顺水条外侧部分的挂瓦条上预留有至少一个沉头自攻螺钉安装位的形式安装顺水条,且位于各顺水条两端之间的沉头内膨胀螺栓的安装位置位于步骤S3中的相邻横向激光标线之间;S4: Installation of water-adjusting strips: The remaining water-adjusting strips are installed by using countersunk internal expansion bolts to penetrate the water-adjusting strips and extend to the base layer of the sloping roof for fixing, and the upper and lower ends of each water-adjusting strip extend beyond at least one countersunk internal expansion bolt installation position of the outer horizontal laser marking line in step S3, wherein, in the rectangular sloping roof area of the sloping roof, the water-adjusting strips are installed in an array with equal spacing, and in the triangular sloping roof area of the sloping roof, the water-adjusting strips are installed in the form of at least one countersunk self-tapping screw installation position reserved on the tile hanging strip located on the outer part of the water-adjusting strip, and the installation position of the countersunk internal expansion bolts located between the two ends of each water-adjusting strip is located between the adjacent horizontal laser marking lines in step S3;

S5:顺水条找平:对坡屋面上所有顺水条进行找平并调整,确保所有顺水条的顶面所在平面共面,并使该平面与坡屋面平行;S5: Leveling of water strips: Level and adjust all water strips on the slope roof to ensure that the top surfaces of all water strips are on the same plane and that the plane is parallel to the slope roof;

S6:挂瓦条安装:沿各横向标线机构3的横向激光标线位置在顺水条平面上横向安装相应数量的挂瓦条,使挂瓦条的横向中心线与横向激光标线重合,采用沉头自攻螺钉在挂瓦条与顺水条的交叉位置处将两者固定;S6: Installation of tile hanging strips: Install a corresponding number of tile hanging strips on the water-following strip plane along the transverse laser marking positions of each transverse marking mechanism 3, so that the transverse center line of the tile hanging strip coincides with the transverse laser marking line, and fix the tile hanging strip and the water-following strip at the intersection position with countersunk self-tapping screws;

S7:坡屋面防水修复:顺水条与坡屋面基层相接的阴角部分采用桐油石灰胶进行填缝封堵,桐油石灰胶抹成三角状或圆角状;S7: Sloped roof waterproofing repair: The inner corner where the water strip meets the slope roof base is sealed with tung oil lime glue, and the tung oil lime glue is applied into a triangular or rounded shape;

S8:檐口瓦、主瓦铺挂:整体下移辅助施工装置上的横向标线机构的位置,使各横向标线机构的横向激光标线分别与铺挂后屋面瓦主瓦的下端重合,按照先檐口瓦、后主瓦的顺序,以从下到上、从左到右的形式,采用沉头自攻螺钉将檐口瓦和主瓦逐张铺挂安装到挂瓦条上;S8: Laying and hanging eaves tiles and main tiles: the horizontal marking mechanism on the auxiliary construction device is moved downward as a whole, so that the horizontal laser marking lines of each horizontal marking mechanism coincide with the lower ends of the main tiles of the roof after laying and hanging, and the eaves tiles and the main tiles are laid and installed on the tile hanging strips one by one in the order of eaves tiles first and then the main tiles, from bottom to top and from left to right, using countersunk self-tapping screws;

S9:挂瓦坡屋面切换:一侧坡屋面的檐口瓦、主瓦铺挂完成后,将辅助施工装置移动安装到下一待挂瓦坡屋面,重复执行步骤S2-步骤S9,直至建筑物的所有待挂瓦坡屋面完成檐口瓦、主瓦的铺挂后,拆除辅助施工装置;S9: Switching the tiling sloping roof: After the eaves tiles and main tiles of one side of the sloping roof are laid, the auxiliary construction device is moved and installed to the next sloping roof to be tiled, and steps S2 to S9 are repeated until the eaves tiles and main tiles of all the sloping roofs to be tiled are laid, and then the auxiliary construction device is removed;

S10:正脊瓦、斜脊瓦铺挂:步骤S8中完成一侧坡屋面的檐口瓦、主瓦铺挂后,在铺挂与该坡屋面相背的坡屋面的主瓦时,同时进行两坡屋面顶部之间正脊瓦的安装,在建筑物的所有待挂瓦坡屋面的檐口瓦、主瓦铺挂完成后,进行坡屋面相邻侧面之间斜脊瓦的安装;S10: Laying and hanging ridge tiles: After the eaves tiles and main tiles of one side of the slope roof are laid in step S8, the ridge tiles between the tops of the two slope roofs are installed at the same time when the main tiles of the slope roof opposite to the slope roof are laid. After the eaves tiles and main tiles of all the slope roofs to be tiled are laid, the ridge tiles between the adjacent sides of the slope roofs are installed;

S11:清理检查:安装完所有屋面瓦后,对屋面瓦整体进行防水测试检查有无渗水现象,若存在问题及时对不合格屋面瓦进行返工处理。S11: Cleaning and inspection: After installing all the roof tiles, conduct a waterproof test on the roof tiles as a whole to check for water seepage. If there are any problems, rework the unqualified roof tiles in time.

可选的,在一个方案中,步骤S2中,预排瓦的方法为:位于坡屋面下端的檐口瓦向滴水方向向外伸出5-8cm,再从下到上依次排主瓦,最后一张主瓦按照“大瓦取整、小瓦切割”的原则进行。Optionally, in one scheme, in step S2, the method of pre-arranging tiles is as follows: the eaves tiles located at the lower end of the sloping roof extend outward by 5-8 cm in the dripping direction, and then the main tiles are arranged in sequence from bottom to top, and the last main tile is arranged according to the principle of "rounding large tiles and cutting small tiles".

可选的,在一个方案中,步骤S2中,预排瓦时还可在第一列预排瓦内侧上端再预排至少两列主瓦,其中,第二列至少预排两张完整主瓦,第三列至少预排三张完整主瓦,对应的,在步骤S3中,还可在辅助施工装置上安装至少一个斜向标线机构,并调节斜向标线机构的斜向激光标线位置,使斜向激光标线与第一列上方第一张完整主瓦的右下角、第二列第二张完整主瓦的右下角、第三列第三张完整主瓦的右下角的连线重合。Optionally, in one scheme, in step S2, when pre-arranging tiles, at least two rows of main tiles can be pre-arranged on the inner upper end of the first row of pre-arranged tiles, wherein at least two complete main tiles are pre-arranged in the second row, and at least three complete main tiles are pre-arranged in the third row. Correspondingly, in step S3, at least one oblique marking mechanism can be installed on the auxiliary construction device, and the oblique laser marking position of the oblique marking mechanism can be adjusted to make the oblique laser marking coincide with the line connecting the lower right corner of the first complete main tile above the first row, the lower right corner of the second complete main tile in the second row, and the lower right corner of the third complete main tile in the third row.

可选的,在一个方案中,步骤S7中,对于步骤S5中用于垫平顺水条的垫块与坡屋面基层相接的阴角部分采用桐油石灰胶进行填缝封堵,桐油石灰胶抹成三角状或圆角状,且垫块与顺水条之间的接缝采用桐油石灰胶进行填缝封堵。Optionally, in one scheme, in step S7, tung oil lime glue is used to seal the inner corner where the pad used to level the water strip in step S5 meets the sloping roof base, the tung oil lime glue is spread into a triangular or rounded shape, and the joint between the pad and the water strip is sealed with tung oil lime glue.

可选的,在一个方案中,步骤S7中,桐油石灰胶为体积比为1∶4∶1的桐油、石灰粉、环氧树脂均匀混合形成的混合物。Optionally, in one solution, in step S7, the tung oil lime glue is a mixture formed by uniformly mixing tung oil, lime powder and epoxy resin in a volume ratio of 1:4:1.

可选的,在一个方案中,步骤S4中,根据屋面瓦的宽度尺寸,顺水条的安装间距应满足挂瓦条与顺水条的交叉位置与各屋面瓦上的钻孔挂瓦位置在顺水条平面内的投影不重合。Optionally, in one solution, in step S4, according to the width of the roof tiles, the installation spacing of the water follower strips should satisfy the requirement that the intersection position of the tile hanging strips and the water follower strips does not coincide with the projection of the drilled tile hanging positions on each roof tile in the plane of the water follower strips.

本申请的有益效果:Beneficial effects of this application:

本申请通过在待挂瓦坡屋面上方设置横向标线机构,产生若干照向坡屋面的横向标线激光为挂瓦施工过程中挂瓦条和屋面瓦的安装提供激光标线指示辅助,从而为挂瓦条和屋面瓦的安装位置提供精确指示,可有效提高挂瓦条、顺水条的安装稳定性,进而可有效提高屋面瓦的整体铺挂稳定性,以及可有效提高屋面瓦的铺挂整齐度,保障屋面瓦瓦沟顺直、整齐而美观;The present application provides a transverse marking mechanism above the sloping roof to be tiled, generates a number of transverse marking lasers directed toward the sloping roof, and provides laser marking instructions to assist in the installation of tile strips and roof tiles during the tile hanging construction process, thereby providing accurate instructions for the installation positions of tile strips and roof tiles, which can effectively improve the installation stability of tile strips and water-smoothing strips, and further effectively improve the overall laying stability of roof tiles, and effectively improve the laying neatness of roof tiles, ensuring that the grooves of roof tiles are straight, neat and beautiful;

本申请通过预排屋面瓦并以横向激光标线指示的方式,确定顺水条和挂瓦条的安装位置及其紧固件安装位置,使用于安装各顺水条、挂瓦条、屋面瓦的紧固件分别错位安装,从而避免各紧固件的安装位置重合或过于相近,以避免各紧固件发生碰撞或相互干扰,进而可确保顺水条、挂瓦条的安装稳定性以及屋面瓦的整体铺挂稳定性;The present application determines the installation positions of the water strips and tile hanging strips and the installation positions of their fasteners by pre-arranging the roof tiles and indicating them with horizontal laser marking lines, so that the fasteners used to install the water strips, tile hanging strips, and roof tiles are staggered and installed respectively, thereby avoiding the installation positions of the fasteners to overlap or be too close, so as to avoid collision or mutual interference between the fasteners, and thus ensuring the installation stability of the water strips and tile hanging strips and the overall laying stability of the roof tiles;

本申请通过在顺水条与坡屋面基层相接的阴角部分采用桐油石灰胶进行填缝封堵,可有效封堵顺水条外侧与被破坏的防水层之间的缝隙,避免了被破坏的防水层缺口与外界连通,从而消除了安装顺水条破坏的防水层缺口对防水层的影响,有效保障了防水层的防水有效性。The present application uses tung oil and lime glue to fill and seal the inner corners where the water-adapting strip meets the sloping roof base, which can effectively seal the gap between the outer side of the water-adapting strip and the damaged waterproof layer, avoiding the connection between the gap in the damaged waterproof layer and the outside world, thereby eliminating the impact of the gap in the waterproof layer damaged by the installation of the water-adapting strip on the waterproof layer, and effectively ensuring the waterproof effectiveness of the waterproof layer.

应当理解的是,以上的一般描述和后文的细节描述仅是示例性和解释性的,并不能限制本申请。It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单的介绍,显而易见,下面描述中的附图仅仅是本发明的一些实施例,对于本领域技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. It is obvious that the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

图1是本申请一实施例中古建筑挂瓦施工辅助装置的整体结构示意图;FIG1 is a schematic diagram of the overall structure of a construction auxiliary device for hanging tiles on ancient buildings according to an embodiment of the present application;

图2是本申请一实施例中横向标线机构的结构及安装位置示意图;FIG2 is a schematic diagram of the structure and installation position of a transverse marking mechanism in one embodiment of the present application;

图3是本申请一实施例中古建筑挂瓦施工方法的施工流程图;FIG3 is a construction flow chart of a method for hanging tiles on a traditional Chinese building according to an embodiment of the present invention;

图4是本申请一实施例中施工方法步骤S2中的顺水条预安装示意图、屋面瓦预排示意图及步骤S2中的横向激光标线位置示意图;4 is a schematic diagram of the pre-installation of the water-shunting strip in step S2 of the construction method in one embodiment of the present application, a schematic diagram of the pre-arrangement of the roof tiles, and a schematic diagram of the position of the horizontal laser marking line in step S2;

图5是本申请一实施例中施工方法步骤S4中的顺水条安装示意图、及步骤S6中的挂瓦条安装示意图;5 is a schematic diagram of the installation of the water-smoothing strip in step S4 of the construction method in one embodiment of the present application, and a schematic diagram of the installation of the tile-hanging strip in step S6;

图6是图5的A部分放大图;FIG6 is an enlarged view of part A of FIG5 ;

图7是本申请一实施例中施工方法步骤S7中的桐油石灰胶的涂抹横截面示意图;FIG7 is a schematic cross-sectional view of the application of tung oil lime glue in step S7 of the construction method in one embodiment of the present application;

图8是本申请一实施例中施工方法步骤S8中的屋面瓦铺挂示意图、及一实施例中的斜向激光标线位置示意图;FIG8 is a schematic diagram of the laying of roof tiles in step S8 of the construction method in one embodiment of the present application, and a schematic diagram of the position of the oblique laser marking line in one embodiment;

图9是图8的B部分放大图。FIG. 9 is an enlarged view of part B of FIG. 8 .

图中各附图标记:1、支撑机构;11、吸盘;12、球头接头;13、支撑杆;14、第一调节管;15、连接杆;16、第二调节管;160、腰形孔;Reference numerals in the figures: 1, support mechanism; 11, suction cup; 12, ball joint; 13, support rod; 14, first adjustment tube; 15, connecting rod; 16, second adjustment tube; 160, waist-shaped hole;

2、悬挂导杆;4、锁紧螺栓;5、斜向标线机构;2. Suspension guide rod; 4. Locking bolt; 5. Oblique marking mechanism;

3、横向标线机构;31、套管;32、固定螺母;33、调紧螺钉;34、卡环;35、激光标线器;3. Horizontal marking mechanism; 31. Sleeve; 32. Fixing nut; 33. Tightening screw; 34. Snap ring; 35. Laser marking device;

100、坡屋面;200、施工脚手架;300、顺水条;400、屋面瓦;401、檐口瓦;402、主瓦;500、沉头内膨胀螺栓;600、沉头自攻螺钉;700、挂瓦条;800、桐油石灰胶。100, sloping roof; 200, construction scaffolding; 300, water-following strips; 400, roof tiles; 401, eaves tiles; 402, main tiles; 500, countersunk internal expansion bolts; 600, countersunk self-tapping screws; 700, tile hanging strips; 800, tung oil and lime glue.

其中,图4中的虚线为步骤S2中预排屋面瓦外露部分横向中心线的延长线;Among them, the dotted line in FIG4 is the extension line of the horizontal center line of the exposed part of the pre-arranged roof tile in step S2;

图4、图5、图6、图8、图9中的水平双点划线为横向标线机构产生的横向激光标线示意;The horizontal double-dotted lines in Figures 4, 5, 6, 8 and 9 are schematic representations of the transverse laser markings generated by the transverse marking mechanism;

图8、图9中的倾斜双点划线为斜向标线机构产生的斜向激光标线示意。The inclined double-dotted dashed lines in FIG8 and FIG9 are schematic diagrams of the oblique laser marking lines generated by the oblique marking mechanism.

具体实施方式Detailed ways

下面结合附图和实施例,对本申请的具体实施方式作进一步详细描述。以下实施例用于说明本申请,但不用来限制本申请的范围。同样的,以下实施例仅为本申请的部分实施例而非全部实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application, but are not intended to limit the scope of the present application. Similarly, the following examples are only some embodiments of the present application rather than all embodiments, and all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“横向”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”、“轴向”、“径向”、“周向”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “lateral”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。在本发明的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接或彼此可通讯;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

在本发明中,除非另有明确的规定和限定,第一特征在第二特征“上”或“下”可以是第一和第二特征直接接触,或第一和第二特征通过中间媒介间接接触。而且,第一特征在第二特征“之上”、“上方”和“上面”可是第一特征在第二特征正上方或斜上方,或仅仅表示第一特征横向高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”可以是第一特征在第二特征正下方或斜下方,或仅仅表示第一特征横向高度小于第二特征。In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in lateral height than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in lateral height than the second feature.

在本发明中,术语“一个实施例”、“一些实施例”、“示例”、“具体示例”、或“一些示例”等意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不必须针对的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任一个或多个实施例或示例中以合适的方式结合。此外,在不相互矛盾的情况下,本领域的技术人员可以将本说明书中描述的不同实施例或示例以及不同实施例或示例的特征进行结合和组合。In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

在本发明中,“大致呈”这一概念描述了一个整体结构或形状的主要特征。在描述物体形状时,这意味着物体主要呈现某种特定形状,但在非功能性的细节上可能有所不同。这些细节差异不影响整体特征,因此可以归类为“大致呈”某种形状。例如,描述矩形物体时,表述为“大致呈矩形”,意味着物体整体形状为圆形,但在某些非功能性细节上存在差异。同样地,描述立方体时,表述为“大致呈立方体”,意味着物体整体形状为立方体,但在某些非功能性细节上存在差异。In the present invention, the concept of "roughly" describes the main features of an overall structure or shape. When describing the shape of an object, it means that the object mainly presents a certain specific shape, but may differ in non-functional details. These detailed differences do not affect the overall characteristics, so they can be classified as "roughly" a certain shape. For example, when describing a rectangular object, the expression "roughly rectangular" means that the overall shape of the object is round, but there are differences in some non-functional details. Similarly, when describing a cube, the expression "roughly cubic" means that the overall shape of the object is a cube, but there are differences in some non-functional details.

目前的挂瓦施工中,顺水条、挂瓦条、屋面瓦之间紧固件的安装位置杂乱,使得挂瓦条、屋面瓦的安装存在安装稳定性差、可靠性差的问题以及屋面瓦整齐美观度不佳的问题;以及由于顺水条的安装破坏了坡屋面的防水层,使得坡屋面防水能力下降的问题。In the current tile hanging construction, the installation positions of the fasteners between the water-adjusting strips, tile hanging strips and roof tiles are messy, resulting in poor installation stability and reliability in the installation of the tile hanging strips and roof tiles, as well as poor neatness and aesthetics of the roof tiles; and the installation of the water-adjusting strips destroys the waterproof layer of the sloping roof, thereby reducing the waterproof ability of the sloping roof.

针对上述问题,本申请进行改进创新,提出如下实施例。In view of the above problems, the present application makes improvements and innovations and proposes the following embodiments.

在一些实施方式中,请参阅图1-图2,提供了一种古建筑挂瓦施工辅助装置,古建筑挂瓦施工辅助装置通过产生若干照向坡屋面100的标线激光为古建筑挂瓦施工方法的步骤提供激光标线指示辅助,包括:In some embodiments, referring to FIG. 1-FIG 2, an auxiliary device for ancient building tile hanging construction is provided. The auxiliary device for ancient building tile hanging construction provides laser marking instructions for the steps of the ancient building tile hanging construction method by generating a plurality of marking lasers directed toward the sloping roof 100, including:

支撑机构1,支撑机构1包括可吸附在坡屋面100或屋面瓦400上的吸盘11以及球头接头12、支撑杆13、第一调节管14、连接杆15、第二调节管16,吸盘11可转动安装在球头接头12上,球头接头12上端固定安装在支撑杆13下端,支撑杆13通过螺纹可伸缩安装在第一调节管14内,连接杆15固定安装在第一调节管14上端,第二调节管16固定安装在连接杆15末端,挂瓦施工中需要提供激光标线指示辅助时,通过调整球头接头12的角度使第二调节管16的长度方向平行于坡屋面100的倾斜方向;The supporting mechanism 1 comprises a suction cup 11 which can be adsorbed on the sloping roof 100 or the roofing tile 400, a ball joint 12, a supporting rod 13, a first adjusting tube 14, a connecting rod 15, and a second adjusting tube 16. The suction cup 11 can be rotatably mounted on the ball joint 12. The upper end of the ball joint 12 is fixedly mounted on the lower end of the supporting rod 13. The supporting rod 13 is telescopically mounted in the first adjusting tube 14 through a thread. The connecting rod 15 is fixedly mounted on the upper end of the first adjusting tube 14. The second adjusting tube 16 is fixedly mounted on the end of the connecting rod 15. When a laser marking line is required to assist in the tile hanging construction, the length direction of the second adjusting tube 16 is parallel to the inclination direction of the sloping roof 100 by adjusting the angle of the ball joint 12.

悬挂导杆2,悬挂导杆2平行于坡屋面100的倾斜方向倾斜安装在坡屋面100上方,悬挂导杆2上端可伸缩、可拆卸安装在第二调节管16内,下端通过直角扣件可伸缩安装在搭设于建筑物待挂瓦坡屋面100外周侧的施工脚手架200的水平杆上,悬挂导杆2上可滑动套设有若干横向标线机构3,横向标线机构3用于产生平行于坡屋面100水平方向的横向激光标线。A hanging guide rod 2 is installed above the sloping roof 100 in an inclined direction parallel to the sloping roof 100. The upper end of the hanging guide rod 2 is telescopically and detachably installed in the second adjusting tube 16, and the lower end is telescopically installed on the horizontal rod of the construction scaffolding 200 erected on the outer peripheral side of the sloping roof 100 of the building to be tiled through a right-angle fastener. A plurality of transverse marking mechanisms 3 are slidably sleeved on the hanging guide rod 2, and the transverse marking mechanisms 3 are used to generate transverse laser markings parallel to the horizontal direction of the sloping roof 100.

如此,通过在待挂瓦坡屋面100上方设置横向标线机构3,产生若干照向坡屋面100的横向标线激光为挂瓦施工过程中挂瓦条700和屋面瓦400的安装提供激光标线指示辅助,从而为挂瓦条700和屋面瓦400的安装位置提供精确指示,可有效提高挂瓦条700、顺水条300的安装稳定性,进而可有效提高屋面瓦400的整体铺挂稳定性,以及可有效提高屋面瓦400的铺挂整齐度,保障屋面瓦400瓦沟顺直、整齐而美观。In this way, by setting a transverse marking mechanism 3 above the sloping roof 100 to be tiled, a number of transverse marking lasers are generated to illuminate the sloping roof 100, which provide laser marking instructions to assist the installation of the tile strips 700 and the roofing tiles 400 during the tile hanging construction process, thereby providing accurate instructions for the installation positions of the tile strips 700 and the roofing tiles 400, which can effectively improve the installation stability of the tile strips 700 and the water-guiding strips 300, and further effectively improve the overall laying stability of the roofing tiles 400, as well as effectively improve the laying neatness of the roofing tiles 400, and ensure that the grooves of the roofing tiles 400 are straight, neat and beautiful.

本实施例中,安装本挂瓦施工辅助装置时,可根据坡屋面倾斜角度以及施工脚手架200的位置,通过调节支撑机构1中支撑杆13在第一调节管14内的高度,使悬挂导杆2在吸盘11安装完成后处于平行于坡屋面100的倾斜方向的状态,以便于保障悬挂导杆2上的各横向标线机构3的激光照射方向垂直于坡屋面,从而保障横向标线机构3的横向激光标线的精准度。In this embodiment, when installing the tile hanging construction auxiliary device, the height of the support rod 13 in the support mechanism 1 in the first adjustment tube 14 can be adjusted according to the inclination angle of the sloping roof and the position of the construction scaffolding 200, so that the hanging guide rod 2 is in a state parallel to the inclination direction of the sloping roof 100 after the suction cup 11 is installed, so as to ensure that the laser irradiation direction of each horizontal marking mechanism 3 on the hanging guide rod 2 is perpendicular to the sloping roof, thereby ensuring the accuracy of the horizontal laser marking of the horizontal marking mechanism 3.

本实施例中,通过采用球头接头12在支撑杆13下端安装吸盘11,可通过将吸盘11吸附在坡屋面100或屋面瓦400上的方式实现支撑机构1的安装,并可通过球头接头12调节吸盘11角度,使吸盘11方向与坡屋面100倾斜角度相匹配。具体地,在第一个坡屋面100进行挂瓦时,将吸盘11吸附在与该坡屋面100相背的坡屋面100基层表面,并可通过进一步清洁坡屋面100或洒水的方式提高吸盘11的吸附稳定性,在铺挂与第一个坡屋面100相背的坡屋面100时,可将吸盘11吸附在已完成铺挂的屋面瓦400上。In this embodiment, by using the ball joint 12 to install the suction cup 11 at the lower end of the support rod 13, the support mechanism 1 can be installed by adsorbing the suction cup 11 on the sloping roof 100 or the roofing tile 400, and the angle of the suction cup 11 can be adjusted by the ball joint 12 so that the direction of the suction cup 11 matches the inclination angle of the sloping roof 100. Specifically, when the first sloping roof 100 is hung with tiles, the suction cup 11 is adsorbed on the base surface of the sloping roof 100 opposite to the sloping roof 100, and the adsorption stability of the suction cup 11 can be improved by further cleaning the sloping roof 100 or sprinkling water, and when the sloping roof 100 opposite to the first sloping roof 100 is hung, the suction cup 11 can be adsorbed on the roofing tile 400 that has been hung.

在一些实施方式中,请参阅图1-图2,横向标线机构3包括套管31、固定螺母32、调紧螺钉33、卡环34、激光标线器35,套管31可滑动套设在悬挂导杆2上,悬挂导杆2为方管结构,套管31为与悬挂导杆2横截面形状相匹配的中空方管结构,且套管31的内径略大于悬挂导杆2的外径,套管31顶部固定安装有固定螺母32,固定螺母32上通过螺纹安装有贯穿套管31顶部可与悬挂导杆2外壁抵紧的调紧螺钉33,套管31一外侧壁上固定安装有卡环34,激光标线器35为一字线型的激光灯,激光标线器35可拆卸卡装在卡环34内。如此,可通过松紧调紧螺钉33对套管31进行滑动或锁紧,从而实现对激光标线器35在悬挂导杆2上的位置的调节,进而便于对各横向标线机构3的安装位置进行调节,以使各激光标线器35的横向激光标线指示与各挂瓦条700安装位置相匹配。本实施例中,通过采用方管结构的悬挂导杆2和套管31,并将套管31可滑动套设在悬挂导杆2上,可有效避免通过卡环34卡装在套管31上的激光标线器35发生偏转,便于保障激光标线器35的安装一致性。In some embodiments, please refer to Figures 1-2, the horizontal marking mechanism 3 includes a sleeve 31, a fixing nut 32, a tightening screw 33, a retaining ring 34, and a laser marker 35. The sleeve 31 can be slidably mounted on the suspension guide rod 2. The suspension guide rod 2 is a square tube structure. The sleeve 31 is a hollow square tube structure that matches the cross-sectional shape of the suspension guide rod 2, and the inner diameter of the sleeve 31 is slightly larger than the outer diameter of the suspension guide rod 2. A fixing nut 32 is fixedly installed on the top of the sleeve 31. The fixing nut 32 is threadedly installed with a tightening screw 33 that passes through the top of the sleeve 31 and can be tightened against the outer wall of the suspension guide rod 2. A retaining ring 34 is fixedly installed on an outer wall of the sleeve 31. The laser marker 35 is a straight-line laser light. The laser marker 35 is detachably mounted in the retaining ring 34. In this way, the sleeve 31 can be slid or locked by loosening and tightening the screw 33, so as to adjust the position of the laser marker 35 on the suspension guide rod 2, and then facilitate the adjustment of the installation position of each transverse marking mechanism 3, so that the transverse laser marking indication of each laser marker 35 matches the installation position of each tile hanging strip 700. In this embodiment, by adopting a square tube structure suspension guide rod 2 and sleeve 31, and slidably sleeved sleeve 31 on the suspension guide rod 2, the laser marker 35 clamped on the sleeve 31 by the clamp ring 34 can be effectively prevented from deflecting, so as to facilitate the installation consistency of the laser marker 35.

在一些实施方式中,请参阅图1-图2,第二调节管16为与悬挂导杆2横截面形状相匹配的中空方管结构,且第二调节管16的内径略大于悬挂导杆2的外径,第二调节管16上开设有沿第二调节管16长度方向延伸的腰形孔160,悬挂导杆2上端开设有与腰形孔160在同一竖直平面内的通孔,悬挂导杆2上端延伸至第二调节管16内并通过锁紧螺栓4贯穿通孔与第二调节管16固定。如此,可通过松紧直角扣件调节悬挂导杆2下端与施工脚手架200的安装位置,通过松紧锁紧螺栓4对悬挂导杆2上端在第二调节管16内的长度进行调节,从而可实现对悬挂导杆2上各激光标线器35位置的整体调节。In some embodiments, please refer to FIG. 1-FIG. 2, the second adjustment tube 16 is a hollow square tube structure matching the cross-sectional shape of the suspension guide rod 2, and the inner diameter of the second adjustment tube 16 is slightly larger than the outer diameter of the suspension guide rod 2, and a waist-shaped hole 160 extending along the length direction of the second adjustment tube 16 is provided on the second adjustment tube 16, and a through hole in the same vertical plane as the waist-shaped hole 160 is provided on the upper end of the suspension guide rod 2, and the upper end of the suspension guide rod 2 extends into the second adjustment tube 16 and is fixed to the second adjustment tube 16 by passing through the through hole through the locking bolt 4. In this way, the installation position of the lower end of the suspension guide rod 2 and the construction scaffold 200 can be adjusted by loosening and tightening the right-angle fastener, and the length of the upper end of the suspension guide rod 2 in the second adjustment tube 16 can be adjusted by loosening and tightening the locking bolt 4, so as to realize the overall adjustment of the position of each laser marker 35 on the suspension guide rod 2.

在一些实施方式中,请参阅图1-图2,悬挂导杆2上还可滑动套设有至少一个斜向标线机构5,斜向标线机构5用于产生可与坡屋面100上第一列上方第一张完整主瓦402的右下角、第二列第二张完整主瓦402的右下角、第三列第三张完整主瓦402的右下角的连线重合的斜向激光标线,斜向标线机构5的结构与横向标线机构3的结构一致,激光标线器35的激光标线方向通过转动激光标线器35在卡环34内的卡装角度实现调节。如此,可通过斜向激光标线指示出屋面瓦400铺挂后的其中一条对角线在坡屋面100上的完整位置和方向,进而便于在步骤S8中铺挂所有屋面瓦400时,以判断第N列第N张完整主瓦402的右下角是否位于斜向激光标线上的方式,判断屋面瓦400的铺挂位置是否准确,便于进一步提高屋面瓦400的铺挂整齐度,保障屋面瓦400瓦沟顺直、整齐而美观。In some embodiments, referring to FIGS. 1-2 , at least one oblique marking mechanism 5 may be slidably sleeved on the suspension guide rod 2, and the oblique marking mechanism 5 is used to generate an oblique laser marking that can coincide with the lower right corner of the first complete main tile 402 on the first column, the lower right corner of the second complete main tile 402 in the second column, and the lower right corner of the third complete main tile 402 in the third column on the sloping roof 100. The structure of the oblique marking mechanism 5 is consistent with the structure of the transverse marking mechanism 3, and the laser marking direction of the laser marking device 35 is adjusted by rotating the clamping angle of the laser marking device 35 in the clamping ring 34. In this way, the complete position and direction of one of the diagonal lines of the roofing tile 400 after laying on the sloping roof 100 can be indicated by the oblique laser marking line, so as to facilitate the laying of all the roofing tiles 400 in step S8. By judging whether the lower right corner of the Nth complete main tile 402 in the Nth column is located on the oblique laser marking line, it is judged whether the laying position of the roofing tile 400 is accurate, so as to further improve the laying uniformity of the roofing tiles 400 and ensure that the grooves of the roofing tiles 400 are straight, neat and beautiful.

在一些实施方式中,请参阅图1-图9,与前述古建筑挂瓦施工辅助装置实施例相对应,本申请还提供了一种古建筑挂瓦施工方法及相应的实施例。In some embodiments, please refer to Figures 1-9. Corresponding to the aforementioned ancient building tile hanging construction auxiliary device embodiment, the present application also provides an ancient building tile hanging construction method and corresponding embodiments.

一种古建筑挂瓦施工方法,至少包括如下具体步骤:A method for hanging tiles on an ancient building comprises at least the following specific steps:

S1:前期准备工作:准备施工材料、施工工具,清理建筑物待挂瓦坡屋面100,在建筑物待挂瓦坡屋面100的外周侧搭建施工脚手架200,并将辅助施工装置安装在待挂瓦坡屋面100上方;S1: Preliminary preparation: prepare construction materials and construction tools, clean the building's sloping roof 100 to be tiled, build a construction scaffold 200 on the outer periphery of the building's sloping roof 100 to be tiled, and install auxiliary construction equipment above the sloping roof 100 to be tiled;

S2:顺水条预安装:在坡屋面100的矩形坡屋面100区域的一端放置一个平行于坡屋面100流水方向的顺水条300,并在该顺水条300内侧预排瓦,在该顺水条300两端以及若干位于与预排屋面瓦400外露部分的横向中心线等高的位置处钻孔,采用沉头内膨胀螺栓500贯穿该顺水条300并延伸到坡屋面100的基层上进行固定;S2: Pre-installation of water-smoothing strips: a water-smoothing strip 300 parallel to the water flow direction of the sloping roof 100 is placed at one end of the rectangular sloping roof 100 area of the sloping roof 100, and tiles are pre-drained inside the water-smoothing strip 300, holes are drilled at both ends of the water-smoothing strip 300 and at a plurality of positions at the same height as the transverse center line of the exposed portion of the pre-drained roof tiles 400, countersunk internal expansion bolts 500 are used to penetrate the water-smoothing strip 300 and extend to the base of the sloping roof 100 for fixing;

S3:标线位置确定:根据步骤S2中预排屋面瓦400的位置和数量,在辅助施工装置上安装相应数量的横向标线机构3,并调节横向标线机构3的横向激光标线位置,使各横向标线机构3的横向激光标线分别水平贯穿各屋面瓦400的钻孔挂瓦位置,随后撤下预排屋面瓦400;S3: Determine the marking position: According to the position and number of the pre-arranged roof tiles 400 in step S2, install a corresponding number of transverse marking mechanisms 3 on the auxiliary construction device, and adjust the transverse laser marking positions of the transverse marking mechanisms 3 so that the transverse laser markings of each transverse marking mechanism 3 horizontally penetrate the drilling and hanging positions of each roof tile 400, and then remove the pre-arranged roof tiles 400;

S4:顺水条安装:以采用沉头内膨胀螺栓500贯穿顺水条300并延伸到坡屋面100的基层上进行固定的方式安装剩余顺水条300,各顺水条300上下两端超出步骤S3中的外侧横向激光标线至少一个沉头内膨胀螺栓500安装位,其中,在坡屋面100的矩形坡屋面100区域,等间距阵列安装顺水条300,在坡屋面100的三角形坡屋面100区域,以位于顺水条300外侧部分的挂瓦条700上预留有至少一个沉头自攻螺钉600安装位的形式安装顺水条300,且位于各顺水条300两端之间的沉头内膨胀螺栓500的安装位置位于步骤S3中的相邻横向激光标线之间;S4: Installation of water-adapting strips: The remaining water-adapting strips 300 are installed by using countersunk internal expansion bolts 500 to penetrate the water-adapting strips 300 and extend to the base layer of the sloping roof 100 for fixing. The upper and lower ends of each water-adapting strip 300 exceed at least one countersunk internal expansion bolt 500 installation position of the outer horizontal laser marking line in step S3. In the rectangular sloping roof 100 area of the sloping roof 100, the water-adapting strips 300 are installed in an array with equal spacing. In the triangular sloping roof 100 area of the sloping roof 100, the water-adapting strips 300 are installed in the form of at least one countersunk self-tapping screw 600 installation position reserved on the tile hanging strip 700 located on the outer part of the water-adapting strip 300, and the installation position of the countersunk internal expansion bolts 500 located between the two ends of each water-adapting strip 300 is located between the adjacent horizontal laser marking lines in step S3.

S5:顺水条找平:对坡屋面100上所有顺水条300进行找平并调整,确保所有顺水条300的顶面所在平面共面,并使该平面与坡屋面100平行;具体地,对于顶面较低的顺水条300采用木楔子垫平,对于顶面较高的顺水条300通过额外安装沉头内膨胀螺栓500的方式压低。S5: Leveling of water-relief strips: Level and adjust all water-relief strips 300 on the sloping roof 100 to ensure that the planes on which the top surfaces of all water-relief strips 300 are located are coplanar and the planes are parallel to the sloping roof 100; specifically, the water-relief strips 300 with lower top surfaces are leveled with wooden wedges, and the water-relief strips 300 with higher top surfaces are pressed down by additionally installing countersunk internal expansion bolts 500.

S6:挂瓦条安装:沿各横向标线机构3的横向激光标线位置在顺水条300平面上横向安装相应数量的挂瓦条700,使挂瓦条700的横向中心线与横向激光标线重合,采用沉头自攻螺钉600在挂瓦条700与顺水条300的交叉位置处将两者固定;S6: Installation of tile hanging strips: Install a corresponding number of tile hanging strips 700 horizontally on the plane of the water-following strip 300 along the horizontal laser marking position of each horizontal marking mechanism 3, so that the horizontal center line of the tile hanging strip 700 coincides with the horizontal laser marking line, and use countersunk self-tapping screws 600 to fix the tile hanging strip 700 and the water-following strip 300 at the intersection position;

S7:坡屋面防水修复:顺水条300与坡屋面100基层相接的阴角部分采用桐油石灰胶800进行填缝封堵,桐油石灰胶800抹成三角状或圆角状;S7: Sloped roof waterproofing repair: The inner corner where the water strip 300 meets the slope roof 100 base layer is sealed with tung oil lime glue 800, and the tung oil lime glue 800 is applied into a triangular or rounded shape;

S8:檐口瓦401、主瓦402铺挂:整体下移辅助施工装置上的横向标线机构3的位置,使各横向标线机构3的横向激光标线分别与铺挂后屋面瓦400主瓦402的下端重合,按照先檐口瓦401、后主瓦402的顺序,以从下到上、从左到右的形式,采用沉头自攻螺钉600将檐口瓦401和主瓦402逐张铺挂安装到挂瓦条700上;S8: Laying and hanging eaves tiles 401 and main tiles 402: The position of the transverse marking mechanism 3 on the auxiliary construction device is moved downward as a whole, so that the transverse laser marking lines of each transverse marking mechanism 3 respectively coincide with the lower ends of the main tiles 402 of the roof tiles 400 after laying and hanging, and the eaves tiles 401 and the main tiles 402 are laid and installed one by one on the tile hanging strip 700 in the order of eaves tiles 401 first and then the main tiles 402, from bottom to top and from left to right, using countersunk self-tapping screws 600;

在步骤S8中,辅助施工装置整体下移距离为下排主瓦402的钻孔挂瓦位置与上排主瓦402的下端之间在顺水条300平面方向上的间距,从而使各横向标线机构3的横向激光标线分别与铺挂后屋面瓦400主瓦402的下端重合,以便于以横向激光标线指示的方式,确定各屋面瓦400主瓦402的安装位置是否准确,可有效保障屋面瓦400的铺挂整齐度。具体地,通过松紧直角扣件调节悬挂导杆2下端与施工脚手架200的安装位置,通过松紧锁紧螺栓4调节悬挂导杆2上端在第二调节管16内的长度,即可整体下移辅助施工装置中悬挂导杆2上的各横向标线机构3,从而下移各激光标线器35的横向激光标线。具体应用中,若建筑物待挂瓦坡屋面100整体为矩形坡屋面100区,则需要先铺挂边瓦,若建筑物两个待挂瓦坡屋面100相接形成阴角,则需要先在两坡屋面100之间的阴角处铺挂沟瓦,随后再进行檐口瓦401、主瓦402的铺挂。In step S8, the overall downward movement distance of the auxiliary construction device is the distance between the drilling and tile hanging position of the lower row main tile 402 and the lower end of the upper row main tile 402 in the plane direction of the water strip 300, so that the transverse laser markings of each transverse marking mechanism 3 respectively coincide with the lower end of the main tile 402 of the roof tile 400 after laying, so as to determine whether the installation position of each main tile 402 of the roof tile 400 is accurate by indicating the transverse laser markings, which can effectively ensure the neatness of the laying of the roof tile 400. Specifically, by adjusting the installation position of the lower end of the suspension guide rod 2 and the construction scaffolding 200 by loosening and tightening the right-angle fastener, and adjusting the length of the upper end of the suspension guide rod 2 in the second adjustment tube 16 by loosening and tightening the locking bolt 4, each transverse marking mechanism 3 on the suspension guide rod 2 in the auxiliary construction device can be moved downward as a whole, thereby moving the transverse laser markings of each laser marker 35 downward. In a specific application, if the sloping roof 100 of the building to be tiled is a rectangular sloping roof 100 area as a whole, it is necessary to lay the edge tiles first. If two sloping roofs 100 of the building to be tiled are connected to form a negative angle, it is necessary to lay the ditch tiles at the negative angle between the two sloping roofs 100 first, and then lay the eaves tiles 401 and the main tiles 402.

S9:挂瓦坡屋面切换:一侧坡屋面100的檐口瓦401、主瓦402铺挂完成后,将辅助施工装置移动安装到下一待挂瓦坡屋面100,重复执行步骤S2-步骤S9,直至建筑物的所有待挂瓦坡屋面100完成檐口瓦401、主瓦402的铺挂后,拆除辅助施工装置;S9: Switching the tile-hanging sloping roof: After the eaves tiles 401 and the main tiles 402 of the sloping roof 100 on one side are laid, the auxiliary construction device is moved and installed to the next sloping roof 100 to be tiled, and steps S2 to S9 are repeated until the eaves tiles 401 and the main tiles 402 of all the sloping roofs 100 to be tiled are laid, and then the auxiliary construction device is removed;

S10:正脊瓦、斜脊瓦铺挂:步骤S8中完成一侧坡屋面100的檐口瓦401、主瓦402铺挂后,在铺挂与该坡屋面100相背的坡屋面100的主瓦402时,同时进行两坡屋面100顶部之间正脊瓦的安装,在建筑物的所有待挂瓦坡屋面100的檐口瓦401、主瓦402铺挂完成后,进行坡屋面100相邻侧面之间斜脊瓦的安装;S10: Laying and hanging ridge tiles: After the eaves tiles 401 and main tiles 402 of one side of the sloping roof 100 are laid in step S8, the ridge tiles between the tops of the two sloping roofs 100 are installed at the same time when the main tiles 402 of the sloping roof 100 opposite to the sloping roof 100 are laid. After the eaves tiles 401 and main tiles 402 of all the sloping roofs 100 to be tiled are laid, the ridge tiles between the adjacent sides of the sloping roofs 100 are installed;

S11:清理检查:安装完所有屋面瓦400后,对屋面瓦400整体进行防水测试检查有无渗水现象,若存在问题及时对不合格屋面瓦400进行返工处理。S11: Cleaning and inspection: After installing all the roof tiles 400, conduct a waterproof test on the roof tiles 400 as a whole to check for water seepage. If there is a problem, rework the unqualified roof tiles 400 in time.

如此,在步骤S4中,通过预排屋面瓦400并以横向激光标线指示的方式,确定顺水条300和挂瓦条700的安装位置及其紧固件安装位置,使位于各顺水条300两端之间的沉头内膨胀螺栓500的安装位置不与步骤S3中的横向激光标线重合,具体地,将各顺水条300两端之间的沉头内膨胀螺栓500的安装位置布置在与屋面瓦400外露部分的横向中心线等高的位置处,从而可避免用于安装挂瓦条700的沉头自攻螺钉600的安装位置与用于安装顺水条300的沉头内膨胀螺栓500的安装位置重合或过于相近,以避免用于安装挂瓦条700的沉头自攻螺钉600与用于安装顺水条300的沉头内膨胀螺栓500发生碰撞或相互干扰,进而可确保沉头自攻螺钉600和沉头内膨胀螺栓500分别对挂瓦条700、顺水条300的安装稳定性,可有效提高屋面瓦400的整体铺挂稳定性;对于坡屋面100的三角形坡屋面100区域,通过以位于顺水条300外侧部分的挂瓦条700上预留有至少一个沉头自攻螺钉600安装位的形式安装顺水条300,可便于位于坡屋面100左右两外侧位置处的屋面瓦400的铺挂,确保位于坡屋面100左右两外侧位置处的屋面瓦400在挂瓦条700两端有沉头自攻螺钉600安装位置,可避免用于安装此处屋面瓦400的沉头自攻螺钉600的安装位置与顺水条300上端的沉头内膨胀螺栓500的安装位置重合。Thus, in step S4, the installation positions of the water-adjusting strips 300 and the tile-hanging strips 700 and the installation positions of their fasteners are determined by pre-arranging the roof tiles 400 and indicating them with transverse laser markings, so that the installation positions of the countersunk internal expansion bolts 500 located between the two ends of each water-adjusting strip 300 do not coincide with the transverse laser markings in step S3. Specifically, the installation positions of the countersunk internal expansion bolts 500 between the two ends of each water-adjusting strip 300 are arranged at a position at the same height as the transverse center line of the exposed portion of the roof tile 400, thereby avoiding the installation positions of the countersunk self-tapping screws 600 used to install the tile-hanging strips 700 from coinciding with or being too close to the installation positions of the countersunk internal expansion bolts 500 used to install the water-adjusting strips 300, thereby avoiding the countersunk self-tapping screws 600 used to install the tile-hanging strips 700 from colliding with or being too close to the countersunk internal expansion bolts 500 used to install the water-adjusting strips 300. Interference with each other can ensure the installation stability of the countersunk self-tapping screws 600 and the countersunk internal expansion bolts 500 on the tile hanging strips 700 and the water-following strips 300 respectively, which can effectively improve the overall laying stability of the roof tiles 400; for the triangular sloping roof 100 area of the sloping roof 100, the water-following strip 300 is installed in the form of at least one countersunk self-tapping screw 600 installation position reserved on the tile hanging strip 700 located on the outer part of the water-following strip 300, which can facilitate the laying of the roof tiles 400 located at the left and right outer positions of the sloping roof 100, and ensure that the roof tiles 400 located at the left and right outer positions of the sloping roof 100 have countersunk self-tapping screw 600 installation positions at both ends of the tile hanging strips 700, which can avoid the installation position of the countersunk self-tapping screws 600 used to install the roof tiles 400 here from overlapping with the installation position of the countersunk internal expansion bolts 500 at the upper end of the water-following strip 300.

在步骤S7中,通过在顺水条300与坡屋面100基层相接的阴角部分采用桐油石灰胶800进行填缝封堵,并将桐油石灰胶800在阴角处抹成三角状或圆角状。如此,通过采用桐油石灰胶800对顺水条300与坡屋面100基层相接处的连接缝进行填缝封堵,从而可有效封堵顺水条300外侧与被破坏的防水层之间的缝隙,避免了安装顺水条300时被沉头内膨胀螺栓500破坏的防水层缺口与外界连通,从而消除了安装顺水条300破坏的防水层缺口对防水层的影响,有效保障了防水层的防水有效性,保障了坡屋面100的防水能力;具体地,桐油石灰胶800为体积比为1∶4∶1的桐油、石灰粉、环氧树脂均匀混合形成的混合物。具体应用中,也可在步骤S7中涂抹的桐油石灰胶800干燥后开始屋面瓦400安装,以进一步确保桐油石灰胶800的封堵质量。In step S7, tung oil lime glue 800 is used to seal the inner corner where the water strip 300 and the base of the sloping roof 100 are connected, and the tung oil lime glue 800 is applied to the inner corner to form a triangle or a rounded shape. In this way, by using tung oil lime glue 800 to seal the joint seam where the water strip 300 and the base of the sloping roof 100 are connected, the gap between the outer side of the water strip 300 and the damaged waterproof layer can be effectively blocked, and the gap in the waterproof layer damaged by the countersunk internal expansion bolt 500 when installing the water strip 300 is prevented from being connected to the outside, thereby eliminating the influence of the gap in the waterproof layer damaged by the installation of the water strip 300 on the waterproof layer, effectively ensuring the waterproof effectiveness of the waterproof layer, and ensuring the waterproof ability of the sloping roof 100; specifically, the tung oil lime glue 800 is a mixture formed by uniformly mixing tung oil, lime powder, and epoxy resin in a volume ratio of 1:4:1. In a specific application, the roofing tile 400 can also be installed after the tung oil lime glue 800 applied in step S7 is dry, so as to further ensure the sealing quality of the tung oil lime glue 800.

在一些实施方式中,请参阅图1-图6,步骤S2中,预排瓦的方法为:位于坡屋面100下端的檐口瓦401向滴水方向向外伸出5-8cm,再从下到上依次排主瓦402,最后一张主瓦402按照“大瓦取整、小瓦切割”的原则进行。具体地,第一张檐口瓦401向滴水方向向外伸出5-8cm进行预排,步骤S8中所有檐口瓦401的安装高度与步骤S2中预排檐口瓦401的高度相一致,以通过向外伸出设置的檐口瓦401对雨水的导流作用避免雨水对檐口瓦401下方的建筑物墙体或结构造成侵蚀;具体地,最后一张主瓦402按照“大瓦取整、小瓦切割”的原则进行预排,即:最后一张主瓦402根据坡屋面100上端剩余安装空间选择,若剩余安装空间刚好可铺挂一张主瓦402则采用完整主瓦402预排,若剩余安装空间不足则需要测量并记录主瓦402所需切割的长度,随后对需要切割主瓦402数量的主瓦402进行切割以备用。In some embodiments, referring to FIGS. 1-6 , in step S2, the method for pre-arranging tiles is as follows: the eaves tile 401 at the lower end of the sloping roof 100 extends outward by 5-8 cm in the dripping direction, and then the main tiles 402 are arranged in sequence from bottom to top, and the last main tile 402 is arranged according to the principle of "rounding large tiles and cutting small tiles". Specifically, the first eaves tile 401 is pre-arranged by extending outward by 5-8 cm in the dripping direction, and the installation height of all eaves tiles 401 in step S8 is consistent with the height of the pre-arranged eaves tiles 401 in step S2, so as to avoid rainwater erosion on the building wall or structure below the eaves tile 401 by the diversion effect of the eaves tiles 401 extended outward. Specifically, the last main tile 402 is pre-arranged according to the principle of "rounding large tiles and cutting small tiles", that is: the last main tile 402 is selected according to the remaining installation space at the upper end of the sloping roof 100. If the remaining installation space is just enough to lay one main tile 402, the complete main tile 402 is pre-arranged. If the remaining installation space is insufficient, it is necessary to measure and record the length of the main tile 402 that needs to be cut, and then cut the main tiles 402 of the number of main tiles 402 that need to be cut for backup.

在一些实施方式中,请参阅图1-图6、图8-图9,步骤S2中,预排瓦时还可在第一列预排瓦内侧上端再预排至少两列主瓦402,其中,第二列至少预排两张完整主瓦402,第三列至少预排三张完整主瓦402,对应的,在步骤S3中,还可在辅助施工装置上安装至少一个斜向标线机构,并调节斜向标线机构的斜向激光标线位置,使斜向激光标线与第一列上方第一张完整主瓦402的右下角、第二列第二张完整主瓦402的右下角、第三列第三张完整主瓦402的右下角的连线重合。如此,通过在第一列预排瓦内侧上端再预排两列主瓦402,可确定屋面瓦400主瓦402完成铺挂后其中一条对角线的所在位置和方向,并通过设置斜向标线机构在坡屋面100上形成倾斜向下的激光标线指示,使斜向激光标线与第一列上方第一张完整主瓦402的右下角、第二列第二张完整主瓦402的右下角、第三列第三张完整主瓦402的右下角的连线重合,以此类推,从而以斜向激光标线指示出屋面瓦400铺挂后的其中一条对角线在坡屋面100上的完整位置和方向,进而便于在步骤S8中铺挂所有屋面瓦400时,以判断第N列第N张完整主瓦402的右下角是否位于斜向激光标线上的方式,判断屋面瓦400的铺挂位置是否准确,便于进一步提高屋面瓦400的铺挂整齐度,保障屋面瓦400瓦沟顺直、整齐而美观。In some embodiments, please refer to Figures 1-6 and 8-9. In step S2, when pre-arranging tiles, at least two rows of main tiles 402 can be pre-arranged on the inner upper end of the first row of pre-arranged tiles, wherein at least two complete main tiles 402 are pre-arranged in the second row, and at least three complete main tiles 402 are pre-arranged in the third row. Correspondingly, in step S3, at least one oblique marking mechanism can be installed on the auxiliary construction device, and the oblique laser marking position of the oblique marking mechanism can be adjusted to make the oblique laser marking coincide with the line connecting the lower right corner of the first complete main tile 402 at the top of the first row, the lower right corner of the second complete main tile 402 in the second row, and the lower right corner of the third complete main tile 402 in the third row. In this way, by pre-arranging two more rows of main tiles 402 at the inner upper end of the first row of pre-arranged tiles, the position and direction of one of the diagonal lines of the roofing tiles 400 after the main tiles 402 are completed can be determined, and by setting an oblique marking mechanism, a laser marking indication inclined downward is formed on the sloping roof 100, so that the oblique laser marking coincides with the line connecting the lower right corner of the first complete main tile 402 on the top of the first row, the lower right corner of the second complete main tile 402 in the second row, and the lower right corner of the third complete main tile 402 in the third row. By analogy, the oblique laser marking line is used to indicate the complete position and direction of one of the diagonal lines of the roofing tile 400 after it is laid on the sloping roof 100, so that when laying all the roofing tiles 400 in step S8, it is convenient to judge whether the laying position of the roofing tile 400 is accurate by judging whether the lower right corner of the Nth complete main tile 402 in the Nth column is located on the oblique laser marking line, so as to further improve the laying uniformity of the roofing tiles 400 and ensure that the grooves of the roofing tiles 400 are straight, neat and beautiful.

在一些实施方式中,请参阅图1-图7,步骤S7中,对于步骤S5中用于垫平顺水条300的垫块与坡屋面100基层相接的阴角部分采用桐油石灰胶800进行填缝封堵,桐油石灰胶800抹成三角状或圆角状,且垫块与顺水条300之间的接缝采用桐油石灰胶800进行填缝封堵。如此,通过采用桐油石灰胶800对用于垫平顺水条300的垫块与坡屋面100基层、顺水条300之间的连接处进行填缝封堵,从而可有效封堵顺水条300外侧与木楔子垫块之间的缝隙,避免了顺水条300与木楔子垫块之间的缝隙与外界连通,进而避免了安装顺水条300时被沉头内膨胀螺栓500破坏的防水层缺口与外界连通,以消除安装顺水条300破坏的防水层缺口对防水层的影响,有效保障了防水层的防水有效性;具体地,对用于垫平顺水条300的垫块与坡屋面100基层、顺水条300之间的连接处进行填缝封堵的桐油石灰胶800为体积比为1∶4∶1的桐油、石灰粉、环氧树脂均匀混合形成的混合物。In some embodiments, referring to FIGS. 1-7 , in step S7 , tung oil lime glue 800 is used to seal the inner corner where the pad used to level the water-adjusting strip 300 in step S5 meets the base layer of the sloping roof 100 . The tung oil lime glue 800 is spread into a triangular or rounded shape, and the joint between the pad and the water-adjusting strip 300 is sealed with tung oil lime glue 800 . In this way, by using tung oil lime glue 800 to fill and seal the joints between the pads used to level the water strip 300 and the base layer of the sloping roof 100 and the water strip 300, the gap between the outer side of the water strip 300 and the wooden wedge pad can be effectively blocked, avoiding the gap between the water strip 300 and the wooden wedge pad from being connected to the outside world, thereby avoiding the gap in the waterproof layer damaged by the countersunk expansion bolt 500 when installing the water strip 300 from being connected to the outside world, thereby eliminating the influence of the gap in the waterproof layer damaged by the installation of the water strip 300 on the waterproof layer, and effectively ensuring the waterproof effectiveness of the waterproof layer; specifically, the tung oil lime glue 800 used to fill and seal the joints between the pads used to level the water strip 300 and the base layer of the sloping roof 100 and the water strip 300 is a mixture formed by uniformly mixing tung oil, lime powder and epoxy resin in a volume ratio of 1:4:1.

在一些实施方式中,请参阅图1-图6、图8-图9,步骤S4中,根据屋面瓦400的宽度尺寸,顺水条300的安装间距应满足挂瓦条700与顺水条300的交叉位置与各屋面瓦400上的钻孔挂瓦位置在顺水条300平面内的投影不重合。通过使顺水条300的安装间距应与步骤S8中铺挂的屋面瓦400宽度相匹配,即:各屋面瓦400上的钻孔挂瓦位置全部位于相邻顺水条300之间、或同一屋面瓦400上的钻孔挂瓦位置分布于顺水条300两侧。具体地,对于较宽的屋面瓦400而言,可使每张屋面瓦400均同时跨越两个顺水条300,相邻两张屋面瓦400的搭接部分位于顺水条300上方、每张屋面瓦400上的钻孔挂瓦位置位于相邻顺水条300之间;对于较窄的屋面瓦400而言,可在相邻顺水条300之间铺挂多张屋面瓦400,同时使位于顺水条300上方的各屋面瓦400以钻孔挂瓦位置分布于顺水条300两侧的状态进行铺挂。如此,可有效避免用于安装屋面瓦400的沉头自攻螺钉600的安装位置与用于安装挂瓦条700的沉头自攻螺钉600的安装位置重合或过于相近,从而可有效避免用于安装屋面瓦400的沉头自攻螺钉600与用于安装挂瓦条700的沉头自攻螺钉600发生碰撞或相互干扰,进而可确保两层沉头自攻螺钉600对屋面瓦400、挂瓦条700的安装稳定性,可有效提高屋面瓦400的整体铺挂稳定性。In some embodiments, please refer to Figures 1-6, 8-9, in step S4, according to the width of the roofing tile 400, the installation spacing of the water strip 300 should satisfy the intersection position of the tile hanging strip 700 and the water strip 300 and the projection of the drilling hole tile hanging position on each roofing tile 400 in the plane of the water strip 300 do not overlap. By making the installation spacing of the water strip 300 match the width of the roofing tile 400 laid in step S8, that is, the drilling hole tile hanging position on each roofing tile 400 is all located between adjacent water strips 300, or the drilling hole tile hanging position on the same roofing tile 400 is distributed on both sides of the water strip 300. Specifically, for wider roof tiles 400, each roof tile 400 can span two water-adapting strips 300 at the same time, the overlapping parts of two adjacent roof tiles 400 are located above the water-adapting strips 300, and the drilled tile hanging positions on each roof tile 400 are located between adjacent water-adapting strips 300; for narrower roof tiles 400, multiple roof tiles 400 can be laid between adjacent water-adapting strips 300, and at the same time, each roof tile 400 located above the water-adapting strips 300 can be laid with the drilled tile hanging positions distributed on both sides of the water-adapting strips 300. In this way, it is possible to effectively avoid the installation position of the countersunk self-tapping screws 600 used to install the roof tiles 400 and the installation position of the countersunk self-tapping screws 600 used to install the tile hanging strips 700 from overlapping or being too close to each other, thereby effectively avoiding the countersunk self-tapping screws 600 used to install the roof tiles 400 and the countersunk self-tapping screws 600 used to install the tile hanging strips 700 from colliding or interfering with each other, thereby ensuring the installation stability of the two layers of countersunk self-tapping screws 600 on the roof tiles 400 and the tile hanging strips 700, and effectively improving the overall laying stability of the roof tiles 400.

最后,还需要说明的是,尽管上面已经示出和描述了本发明的实施例,可以理解的是,上述实施例是示例性的,不能理解为对本发明的限制,本领域的普通技术人员在本发明的范围内可以对上述实施例进行变化、修改、替换和变型,均应包含在本申请的保护范围之内。Finally, it should be noted that although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention, which should all be included in the scope of protection of this application.

Claims (10)

1.一种古建筑挂瓦施工辅助装置,其特征在于:所述古建筑挂瓦施工辅助装置通过产生若干照向坡屋面(100)的标线激光为古建筑挂瓦施工方法的步骤提供激光标线指示辅助,包括:1. An auxiliary device for the construction of tile hanging in ancient buildings, characterized in that: the auxiliary device for the construction of tile hanging in ancient buildings provides laser marking instructions for the steps of the construction method of tile hanging in ancient buildings by generating a plurality of marking lasers directed toward the sloping roof (100), comprising: 支撑机构(1),所述支撑机构(1)包括可吸附在坡屋面(100)或屋面瓦(400)上的吸盘(11)以及球头接头(12)、支撑杆(13)、第一调节管(14)、连接杆(15)、第二调节管(16),所述吸盘(11)可转动安装在所述球头接头(12)上,所述球头接头(12)上端固定安装在所述支撑杆(13)下端,所述支撑杆(13)通过螺纹可伸缩安装在所述第一调节管(14)内,所述连接杆(15)固定安装在所述第一调节管(14)上端,所述第二调节管(16)固定安装在所述连接杆(15)末端,挂瓦施工中需要提供激光标线指示辅助时,通过调整所述球头接头(12)的角度使所述第二调节管(16)的长度方向平行于坡屋面(100)的倾斜方向;A support mechanism (1), the support mechanism (1) comprising a suction cup (11) that can be adsorbed on a sloping roof (100) or a roof tile (400), a ball joint (12), a support rod (13), a first adjustment tube (14), a connecting rod (15), and a second adjustment tube (16); the suction cup (11) can be rotatably mounted on the ball joint (12); the upper end of the ball joint (12) is fixedly mounted on the lower end of the support rod (13); the support rod (13) is telescopically mounted in the first adjustment tube (14) through a thread; the connecting rod (15) is fixedly mounted on the upper end of the first adjustment tube (14); the second adjustment tube (16) is fixedly mounted on the end of the connecting rod (15); when a laser marking line is required to assist in the tile hanging construction, the angle of the ball joint (12) is adjusted so that the length direction of the second adjustment tube (16) is parallel to the inclination direction of the sloping roof (100); 悬挂导杆(2),所述悬挂导杆(2)平行于坡屋面(100)的倾斜方向倾斜安装在坡屋面(100)上方,所述悬挂导杆(2)上端可伸缩、可拆卸安装在所述第二调节管(16)内,下端通过直角扣件可伸缩安装在搭设于建筑物待挂瓦坡屋面(100)外周侧的施工脚手架(200)的水平杆上,所述悬挂导杆(2)上可滑动套设有若干横向标线机构(3),所述横向标线机构(3)用于产生平行于坡屋面(100)水平方向的横向激光标线。A hanging guide rod (2) is installed above the sloping roof (100) in an inclined manner parallel to the inclination direction of the sloping roof (100); the upper end of the hanging guide rod (2) is telescopically and detachably installed in the second adjustment tube (16); the lower end is telescopically installed on a horizontal rod of a construction scaffold (200) erected on the outer peripheral side of the sloping roof (100) of the building to be tiled through a right-angle fastener; a plurality of transverse marking mechanisms (3) are slidably sleeved on the hanging guide rod (2); the transverse marking mechanisms (3) are used to generate transverse laser markings parallel to the horizontal direction of the sloping roof (100). 2.根据权利要求1所述的一种古建筑挂瓦施工辅助装置,其特征在于:所述横向标线机构(3)包括套管(31)、固定螺母(32)、调紧螺钉(33)、卡环(34)、激光标线器(35),所述套管(31)可滑动套设在所述悬挂导杆(2)上,所述悬挂导杆(2)为方管结构,所述套管(31)为与所述悬挂导杆(2)横截面形状相匹配的中空方管结构,且所述套管(31)的内径略大于所述悬挂导杆(2)的外径,所述套管(31)顶部固定安装有固定螺母(32),所述固定螺母(32)上通过螺纹安装有贯穿套管(31)顶部可与所述悬挂导杆(2)外壁抵紧的调紧螺钉(33),所述套管(31)一外侧壁上固定安装有所述卡环(34),所述激光标线器(35)为一字线型的激光灯,所述激光标线器(35)可拆卸卡装在所述卡环(34)内。2. An auxiliary device for hanging tiles on ancient buildings according to claim 1, characterized in that: the transverse marking mechanism (3) comprises a sleeve (31), a fixing nut (32), a tightening screw (33), a clamping ring (34), and a laser marking device (35); the sleeve (31) can be slidably sleeved on the hanging guide rod (2); the hanging guide rod (2) is a square tube structure; the sleeve (31) is a hollow square tube structure matching the cross-sectional shape of the hanging guide rod (2); and the sleeve (31) The inner diameter of the sleeve (31) is slightly larger than the outer diameter of the suspension guide rod (2); a fixing nut (32) is fixedly installed on the top of the sleeve (31); a tightening screw (33) is threadedly installed on the fixing nut (32) and passes through the top of the sleeve (31) and can be tightly pressed against the outer wall of the suspension guide rod (2); a retaining ring (34) is fixedly installed on an outer side wall of the sleeve (31); the laser marker (35) is a straight-line laser lamp; the laser marker (35) is detachably mounted in the retaining ring (34). 3.根据权利要求1所述的一种古建筑挂瓦施工辅助装置,其特征在于:所述第二调节管(16)为与所述悬挂导杆(2)横截面形状相匹配的中空方管结构,且所述第二调节管(16)的内径略大于所述悬挂导杆(2)的外径,所述第二调节管(16)上开设有沿所述第二调节管(16)长度方向延伸的腰形孔(160),所述悬挂导杆(2)上端开设有与所述腰形孔(160)在同一竖直平面内的通孔,所述悬挂导杆(2)上端延伸至所述第二调节管(16)内并通过锁紧螺栓(4)贯穿通孔与第二调节管(16)固定。3. An auxiliary device for hanging tiles on ancient buildings according to claim 1, characterized in that: the second adjusting tube (16) is a hollow square tube structure that matches the cross-sectional shape of the hanging guide rod (2), and the inner diameter of the second adjusting tube (16) is slightly larger than the outer diameter of the hanging guide rod (2), and the second adjusting tube (16) is provided with a waist-shaped hole (160) extending along the length direction of the second adjusting tube (16), and the upper end of the hanging guide rod (2) is provided with a through hole in the same vertical plane as the waist-shaped hole (160), and the upper end of the hanging guide rod (2) extends into the second adjusting tube (16) and is fixed to the second adjusting tube (16) by a locking bolt (4) passing through the through hole. 4.根据权利要求3所述的一种古建筑挂瓦施工辅助装置,其特征在于:所述悬挂导杆(2)上还可滑动套设有至少一个斜向标线机构(5),所述斜向标线机构(5)用于产生可与坡屋面(100)上第一列上方第一张完整主瓦(402)的右下角、第二列第二张完整主瓦(402)的右下角、第三列第三张完整主瓦(402)的右下角的连线重合的斜向激光标线,所述斜向标线机构(5)的结构与所述横向标线机构(3)的结构一致,所述激光标线器(35)的激光标线方向通过转动所述激光标线器(35)在卡环(34)内的卡装角度实现调节。4. An auxiliary device for hanging tiles on ancient buildings according to claim 3, characterized in that: at least one oblique marking mechanism (5) can be slidably sleeved on the hanging guide rod (2), and the oblique marking mechanism (5) is used to generate an oblique laser marking line that can coincide with the line connecting the lower right corner of the first complete main tile (402) on the first row above the sloping roof (100), the lower right corner of the second complete main tile (402) in the second row, and the lower right corner of the third complete main tile (402) in the third row. The structure of the oblique marking mechanism (5) is consistent with that of the horizontal marking mechanism (3), and the laser marking direction of the laser marking device (35) is adjusted by rotating the clamping angle of the laser marking device (35) in the clamping ring (34). 5.一种古建筑挂瓦施工方法,其特征在于,采用上述权利要求1-图4任一项所述的古建筑挂瓦施工辅助装置,所述古建筑挂瓦施工方法至少包括如下具体步骤:5. A method for hanging tiles on an ancient building, characterized in that the auxiliary device for hanging tiles on an ancient building as described in any one of claims 1 to 4 is used, and the method for hanging tiles on an ancient building comprises at least the following specific steps: S1:前期准备工作:准备施工材料、施工工具,清理建筑物待挂瓦坡屋面(100),在建筑物待挂瓦坡屋面(100)的外周侧搭建施工脚手架(200),并将辅助施工装置安装在待挂瓦坡屋面(100)上方;S1: Preliminary preparation work: preparing construction materials and construction tools, cleaning the sloping roof (100) of the building to be tiled, building a construction scaffold (200) on the outer peripheral side of the sloping roof (100) of the building to be tiled, and installing auxiliary construction equipment above the sloping roof (100) to be tiled; S2:顺水条预安装:在坡屋面(100)的矩形坡屋面(100)区域的一端放置一个平行于坡屋面(100)流水方向的顺水条(300),并在该顺水条(300)内侧预排瓦,在该顺水条(300)两端以及若干位于与预排屋面瓦(400)外露部分的横向中心线等高的位置处钻孔,采用沉头内膨胀螺栓(500)贯穿该顺水条(300)并延伸到坡屋面(100)的基层上进行固定;S2: Pre-installation of water-smoothing strips: a water-smoothing strip (300) parallel to the water flow direction of the sloping roof (100) is placed at one end of the rectangular sloping roof (100) area of the sloping roof (100), and tiles are pre-drained inside the water-smoothing strip (300), holes are drilled at both ends of the water-smoothing strip (300) and at a plurality of positions at the same height as the transverse center line of the exposed portion of the pre-drained roof tiles (400), countersunk internal expansion bolts (500) are used to penetrate the water-smoothing strip (300) and extend to the base of the sloping roof (100) for fixing; S3:标线位置确定:根据步骤S2中预排屋面瓦(400)的位置和数量,在辅助施工装置上安装相应数量的横向标线机构(3),并调节横向标线机构(3)的横向激光标线位置,使各横向标线机构(3)的横向激光标线分别水平贯穿各屋面瓦(400)的钻孔挂瓦位置,随后撤下预排屋面瓦(400);S3: Determine the marking position: according to the position and number of the pre-arranged roof tiles (400) in step S2, install a corresponding number of transverse marking mechanisms (3) on the auxiliary construction device, and adjust the transverse laser marking positions of the transverse marking mechanisms (3) so that the transverse laser markings of each transverse marking mechanism (3) horizontally penetrate the drilling and hanging positions of each roof tile (400), and then remove the pre-arranged roof tiles (400); S4:顺水条安装:以采用沉头内膨胀螺栓(500)贯穿顺水条(300)并延伸到坡屋面(100)的基层上进行固定的方式安装剩余顺水条(300),各顺水条(300)上下两端超出步骤S3中的外侧横向激光标线至少一个沉头内膨胀螺栓(500)安装位,其中,在坡屋面(100)的矩形坡屋面(100)区域,等间距阵列安装顺水条(300),在坡屋面(100)的三角形坡屋面(100)区域,以位于顺水条(300)外侧部分的挂瓦条(700)上预留有至少一个沉头自攻螺钉(600)安装位的形式安装顺水条(300),且位于各顺水条(300)两端之间的沉头内膨胀螺栓(500)的安装位置位于步骤S3中的相邻横向激光标线之间;S4: Installation of water-adjusting strips: The remaining water-adjusting strips (300) are installed by using countersunk internal expansion bolts (500) to penetrate the water-adjusting strips (300) and extend to the base layer of the sloping roof (100) for fixing, and the upper and lower ends of each water-adjusting strip (300) exceed at least one countersunk internal expansion bolt (500) installation position of the outer horizontal laser marking line in step S3, wherein, in the rectangular sloping roof (100) area of the sloping roof (100), the water-adjusting strips (300) are installed in an array with equal spacing, and in the triangular sloping roof (100) area of the sloping roof (100), the water-adjusting strips (300) are installed in the form of at least one countersunk self-tapping screw (600) installation position reserved on the tile hanging strip (700) located on the outer part of the water-adjusting strip (300), and the installation position of the countersunk internal expansion bolt (500) located between the two ends of each water-adjusting strip (300) is located between the adjacent horizontal laser marking lines in step S3; S5:顺水条找平:对坡屋面(100)上所有顺水条(300)进行找平并调整,确保所有顺水条(300)的顶面所在平面共面,并使该平面与坡屋面(100)平行;S5: Leveling the water-adjusting strips: Leveling and adjusting all the water-adjusting strips (300) on the sloping roof (100) to ensure that the planes on which the top surfaces of all the water-adjusting strips (300) are located are coplanar and the planes are parallel to the sloping roof (100); S6:挂瓦条安装:沿各横向标线机构(3)的横向激光标线位置在顺水条(300)平面上横向安装相应数量的挂瓦条(700),使挂瓦条(700)的横向中心线与横向激光标线重合,采用沉头自攻螺钉(600)在挂瓦条(700)与顺水条(300)的交叉位置处将两者固定;S6: Installation of tile hanging strips: A corresponding number of tile hanging strips (700) are installed horizontally on the plane of the water-following strip (300) along the horizontal laser marking positions of each horizontal marking mechanism (3), so that the horizontal center line of the tile hanging strip (700) coincides with the horizontal laser marking line, and countersunk self-tapping screws (600) are used to fix the tile hanging strip (700) and the water-following strip (300) at the intersection of the two; S7:坡屋面防水修复:顺水条(300)与坡屋面(100)基层相接的阴角部分采用桐油石灰胶(800)进行填缝封堵,桐油石灰胶(800)抹成三角状或圆角状;S7: Sloped roof waterproofing repair: The inner corner where the water-smoothing strip (300) meets the base of the sloping roof (100) is sealed with tung oil lime glue (800), and the tung oil lime glue (800) is applied into a triangular or rounded shape; S8:檐口瓦(401)、主瓦(402)铺挂:整体下移辅助施工装置上的横向标线机构(3)的位置,使各横向标线机构(3)的横向激光标线分别与铺挂后屋面瓦(400)主瓦(402)的下端重合,按照先檐口瓦(401)、后主瓦(402)的顺序,以从下到上、从左到右的形式,采用沉头自攻螺钉(600)将檐口瓦(401)和主瓦(402)逐张铺挂安装到挂瓦条(700)上;S8: Laying and hanging eaves tiles (401) and main tiles (402): the position of the transverse marking mechanism (3) on the auxiliary construction device is moved downward as a whole, so that the transverse laser marking lines of each transverse marking mechanism (3) respectively coincide with the lower ends of the main tiles (402) of the roof tiles (400) after laying and hanging, and the eaves tiles (401) and the main tiles (402) are laid and installed one by one on the tile hanging strip (700) in the order of eaves tiles (401) first and then the main tiles (402) from bottom to top and from left to right using countersunk self-tapping screws (600); S9:挂瓦坡屋面(100)切换:一侧坡屋面(100)的檐口瓦(401)、主瓦(402)铺挂完成后,将辅助施工装置移动安装到下一待挂瓦坡屋面(100),重复执行步骤S2-步骤S9,直至建筑物的所有待挂瓦坡屋面(100)完成檐口瓦(401)、主瓦(402)的铺挂后,拆除辅助施工装置;S9: Switching of tile-hanging sloping roof (100): After the eaves tiles (401) and main tiles (402) of one side of the sloping roof (100) are laid, the auxiliary construction device is moved and installed to the next sloping roof (100) to be tiled, and steps S2 to S9 are repeated until the eaves tiles (401) and main tiles (402) are laid on all the sloping roofs (100) to be tiled, and the auxiliary construction device is removed; S10:正脊瓦、斜脊瓦铺挂:步骤S8中完成一侧坡屋面(100)的檐口瓦(401)、主瓦(402)铺挂后,在铺挂与该坡屋面(100)相背的坡屋面(100)的主瓦(402)时,同时进行两坡屋面(100)顶部之间正脊瓦的安装,在建筑物的所有待挂瓦坡屋面(100)的檐口瓦(401)、主瓦(402)铺挂完成后,进行坡屋面(100)相邻侧面之间斜脊瓦的安装;S10: paving and hanging ridge tiles: after the eaves tiles (401) and main tiles (402) of one side of the sloping roof (100) are paved and hung in step S8, the ridge tiles between the tops of the two sloping roofs (100) are installed while the main tiles (402) of the sloping roof (100) opposite to the sloping roof (100) are paved and hung, and after the eaves tiles (401) and main tiles (402) of all the sloping roofs (100) to be tiled are paved and hung, the ridge tiles between the adjacent sides of the sloping roofs (100) are installed; S11:清理检查:安装完所有屋面瓦(400)后,对屋面瓦(400)整体进行防水测试检查有无渗水现象,若存在问题及时对不合格屋面瓦(400)进行返工处理。S11: Cleaning and inspection: After all roof tiles (400) are installed, a waterproof test is performed on the roof tiles (400) to check whether there is any water seepage. If there is any problem, the unqualified roof tiles (400) are promptly reworked. 6.根据权利要求5所述的一种古建筑挂瓦施工方法,其特征在于:步骤S2中,预排瓦的方法为:位于坡屋面(100)下端的檐口瓦(401)向滴水方向向外伸出5-8cm,再从下到上依次排主瓦(402),最后一张主瓦(402)按照“大瓦取整、小瓦切割”的原则进行。6. A method for installing tiles on an ancient building according to claim 5, characterized in that: in step S2, the method for pre-arranging tiles is as follows: the eaves tile (401) at the lower end of the sloping roof (100) extends outward by 5-8 cm in the dripping direction, and then the main tiles (402) are arranged in sequence from bottom to top, and the last main tile (402) is arranged according to the principle of "rounding large tiles and cutting small tiles". 7.根据权利要求5所述的一种古建筑挂瓦施工方法,其特征在于:步骤S2中,预排瓦时还可在第一列预排瓦内侧上端再预排至少两列主瓦(402),其中,第二列至少预排两张完整主瓦(402),第三列至少预排三张完整主瓦(402),对应的,在步骤S3中,还可在辅助施工装置上安装至少一个斜向标线机构,并调节斜向标线机构的斜向激光标线位置,使斜向激光标线与第一列上方第一张完整主瓦(402)的右下角、第二列第二张完整主瓦(402)的右下角、第三列第三张完整主瓦(402)的右下角的连线重合。7. A method for hanging tiles on ancient buildings according to claim 5, characterized in that: in step S2, when pre-arranging tiles, at least two rows of main tiles (402) can be pre-arranged on the inner upper end of the first row of pre-arranged tiles, wherein at least two complete main tiles (402) are pre-arranged in the second row, and at least three complete main tiles (402) are pre-arranged in the third row. Correspondingly, in step S3, at least one oblique marking mechanism can be installed on the auxiliary construction device, and the oblique laser marking position of the oblique marking mechanism can be adjusted so that the oblique laser marking coincides with the line connecting the lower right corner of the first complete main tile (402) above the first row, the lower right corner of the second complete main tile (402) in the second row, and the lower right corner of the third complete main tile (402) in the third row. 8.根据权利要求5所述的一种古建筑挂瓦施工方法,其特征在于:步骤S7中,对于步骤S5中用于垫平顺水条(300)的垫块与坡屋面(100)基层相接的阴角部分采用桐油石灰胶(800)进行填缝封堵,桐油石灰胶(800)抹成三角状或圆角状,且垫块与顺水条(300)之间的接缝采用桐油石灰胶(800)进行填缝封堵。8. A method for hanging tiles on an ancient building according to claim 5, characterized in that: in step S7, tung oil lime glue (800) is used to seal the inner corner where the pad used to level the water strip (300) in step S5 is connected to the base of the sloping roof (100), the tung oil lime glue (800) is applied into a triangular or rounded shape, and the joint between the pad and the water strip (300) is sealed with tung oil lime glue (800). 9.根据权利要求8所述的一种古建筑挂瓦施工方法,其特征在于:步骤S7中,桐油石灰胶(800)为体积比为1∶4∶1的桐油、石灰粉、环氧树脂均匀混合形成的混合物。9. A method for hanging tiles on ancient buildings according to claim 8, characterized in that: in step S7, the tung oil lime glue (800) is a mixture of tung oil, lime powder and epoxy resin uniformly mixed in a volume ratio of 1:4:1. 10.根据权利要求5所述的一种古建筑挂瓦施工方法,其特征在于:步骤S4中,根据屋面瓦(400)的宽度尺寸,顺水条(300)的安装间距应满足挂瓦条(700)与顺水条(300)的交叉位置与各屋面瓦(400)上的钻孔挂瓦位置在顺水条(300)平面内的投影不重合。10. A method for installing tiles on ancient buildings according to claim 5, characterized in that: in step S4, according to the width of the roof tiles (400), the installation spacing of the water-adapting strips (300) should satisfy the requirement that the intersection of the tile-hanging strips (700) and the water-adapting strips (300) does not overlap with the projection of the drilling hole tile-hanging positions on each roof tile (400) in the plane of the water-adapting strips (300).
CN202410393304.2A 2024-04-02 2024-04-02 Auxiliary device and method for tile hanging construction of ancient building Active CN118065572B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410393304.2A CN118065572B (en) 2024-04-02 2024-04-02 Auxiliary device and method for tile hanging construction of ancient building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410393304.2A CN118065572B (en) 2024-04-02 2024-04-02 Auxiliary device and method for tile hanging construction of ancient building

Publications (2)

Publication Number Publication Date
CN118065572A true CN118065572A (en) 2024-05-24
CN118065572B CN118065572B (en) 2024-09-13

Family

ID=91095427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410393304.2A Active CN118065572B (en) 2024-04-02 2024-04-02 Auxiliary device and method for tile hanging construction of ancient building

Country Status (1)

Country Link
CN (1) CN118065572B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790595A (en) * 2015-05-15 2015-07-22 山西五建集团有限公司 Construction method for adjustable tile hanging system of pitched roof
CN208251471U (en) * 2018-05-31 2018-12-18 中建八局第二建设有限公司 A kind of convenient dismountable Sloping roof tile hanging device
CN114658171A (en) * 2022-03-31 2022-06-24 中国化学工程第十四建设有限公司 Method for installing and reinforcing slope metal plate tiles of archaized building roof
CN220666701U (en) * 2023-08-14 2024-03-26 中建海峡建设发展有限公司 Oblique roofing tile hanging device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790595A (en) * 2015-05-15 2015-07-22 山西五建集团有限公司 Construction method for adjustable tile hanging system of pitched roof
CN208251471U (en) * 2018-05-31 2018-12-18 中建八局第二建设有限公司 A kind of convenient dismountable Sloping roof tile hanging device
CN114658171A (en) * 2022-03-31 2022-06-24 中国化学工程第十四建设有限公司 Method for installing and reinforcing slope metal plate tiles of archaized building roof
CN220666701U (en) * 2023-08-14 2024-03-26 中建海峡建设发展有限公司 Oblique roofing tile hanging device

Also Published As

Publication number Publication date
CN118065572B (en) 2024-09-13

Similar Documents

Publication Publication Date Title
CN111197400A (en) Device and method for installing and leveling wall and floor tiles
CN106639301A (en) An aluminum formwork concrete wall bottom rotten root protection structure
CN118065572B (en) Auxiliary device and method for tile hanging construction of ancient building
JP2002047782A (en) Floor plate fixture
CN216042637U (en) Embedded part for electric embedded pipe
CN106481057A (en) A kind of floor system laying method for computer room construction
CN210421794U (en) Vertical insertion mounting structure of assembled floor veneer
CN112196221A (en) Ground leveling system and installation method
CN219100721U (en) Inclined template supporting device for cornice structure
CN214942119U (en) Dry-method paving ceramic tile connecting piece
CN217924329U (en) Combination structure of pitched roof and solar photovoltaic panel device
CN212026888U (en) Waterproof eaves gutter of pitched roof
CN214785433U (en) Roof waterproof structure
CN210482878U (en) Stone floor connecting structure
CN210239024U (en) An up-down leveling device for prefabricated decoration and decoration wall
CN209339334U (en) A kind of Architectural Structure Design wall column foot Quick Connect Kit
TWM605543U (en) Improved structure of track type construction
CN222376084U (en) Water accumulation through the board
CN207829366U (en) A kind of outdoor heat-preserving decorative wall board mounting structure
CN222009393U (en) Overhead heat insulation roof of assembled building
CN215631203U (en) High-strength delicate wall tile paving structure
JP3838727B2 (en) Joint fitting of joist and flooring material in wooden floor structure and laying method of wooden flooring material
CN213979640U (en) Improved structure of track type construction
CN222456596U (en) A waterproof steel structure with an annular cantilevered eaves structure
CN223753457U (en) Drainage ditch for hydraulic engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant