CN118007924A - Integrated lifting climbing frame and construction process thereof - Google Patents
Integrated lifting climbing frame and construction process thereof Download PDFInfo
- Publication number
- CN118007924A CN118007924A CN202410184306.0A CN202410184306A CN118007924A CN 118007924 A CN118007924 A CN 118007924A CN 202410184306 A CN202410184306 A CN 202410184306A CN 118007924 A CN118007924 A CN 118007924A
- Authority
- CN
- China
- Prior art keywords
- frame
- rod
- locking
- pulling
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
- E04G5/002—Protections or covers for scaffolding connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G2005/008—Hoisting devices specially adapted as part of a scaffold system
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The application relates to the field of building construction technology and discloses an integrated lifting climbing frame and a construction process thereof, wherein the integrated lifting climbing frame comprises a plurality of groups of lifting guide mechanisms and a plurality of frame bodies, the lifting guide mechanisms and the frame bodies are arranged in a one-to-one correspondence manner, each group of lifting guide mechanisms comprises a guide rail and a plurality of wall-attached supports, each wall-attached support is arranged on a building wall, the guide rails are fixedly connected with the corresponding frame bodies, the guide rails are slidably connected onto the wall-attached supports, pushing mechanisms are arranged on the frame bodies which are arranged at intervals, the frame bodies provided with the pushing mechanisms are marked as first frame bodies, the frame bodies without the pushing mechanisms are marked as second frame bodies, each group of pushing mechanisms is connected with two adjacent second frame bodies, and the pushing mechanisms are used for pushing the adjacent second frame bodies to move upwards. The application has the effect of improving the lifting operation convenience of the climbing frame.
Description
Technical Field
The application relates to the field of building construction technology, in particular to an integrated lifting climbing frame and a construction process thereof.
Background
The climbing frame is called as an attached lifting scaffold, is a novel scaffold system developed in recent years, can be realized through various forms of frame structures and auxiliary supporting structures, is mainly applied to high-rise shear wall type building trays, can ascend or descend along a building, is not limited by the height of the building, greatly saves manpower and materials, has larger improvement on the traditional scaffold in a safety angle, and has development advantages in high-rise buildings.
At present, the existing lifting climbing frame mostly comprises a main frame composed of a plurality of unit frames, wherein a blocking net is arranged on one side, which is far away from a building wall, of the main frame, a guide rail is arranged on one side, which is close to the building wall, of the main frame, meanwhile, a plurality of wall attaching supports are arranged on the built wall, a top support for supporting a supporting rod and a roller set matched with the guide rail are arranged on each wall attaching support, the guide rail on the main frame is in sliding fit with the roller set on the wall attaching support, and the main frame can slide along the vertical direction on the wall attaching support; after the main frame is erected, an electric hoist upper hanging point support is arranged on the upper portion of the main frame, an electric hoist lower hanging point is arranged at the bottom of the main frame, a wall hanging piece is arranged on a building wall body at the same time, then an integrated electric hoist is arranged among the upper hanging point support, the wall hanging frame and the lower hanging point, when the climbing frame needs to be lifted, the electric hoist is started, and the electric hoist is utilized to drive the main frame to lift and move upwards so as to realize the lifting operation of the climbing frame.
Aiming at the related technology, the inventor finds that in the lifting process of the climbing frame, constructors are required to continuously install and detach the electric hoist and the wall hanging frame on the building wall, so that the climbing frame is lifted, and the defect that the operation is complicated when the climbing frame is lifted is overcome.
Disclosure of Invention
The application provides an integrated lifting climbing frame and a construction process thereof in order to solve the problem that the operation is complicated when the climbing frame is lifted.
In a first aspect, the application provides an integrated lifting climbing frame, which adopts the following technical scheme:
The utility model provides an integrated lifting climbing frame, includes multiunit lift guiding mechanism and a plurality of support body, the multiunit lift guiding mechanism with a plurality of support body one-to-one sets up, every group lift guiding mechanism all includes guide rail and a plurality of wall support that attaches, every attach the wall support all set up on the building wall, the guide rail rather than corresponding support body fixed connection, guide rail sliding connection is a plurality of attach the wall support is last, every mutual interval sets up all be provided with pushing mechanism on the support body, be provided with pushing mechanism's support body is recorded as first support body, does not set up pushing mechanism's support body is recorded as the second support body, every group pushing mechanism all with its adjacent two second support body are connected, pushing mechanism is used for promoting its adjacent second support body moves up, when pushing mechanism promotes its adjacent after the second support body lifting, pushing mechanism will drive first support body moves up.
Through adopting above-mentioned technical scheme, utilize the cooperation of wall support and guide rail to support first support body and second support body respectively, when needs are to climbing the frame and wholly going up and down, start multiunit pushing mechanism, promote the second support body at first and rise a take the altitude, after fixed with the second support body, restart pushing mechanism, utilize pushing mechanism drive first support body to rise to flush with the second support body, can realize climbing the frame once wholly going up and down, along with the increase of building height repeatedly repeat above-mentioned operation, can realize climbing the lift of frame, improve climbing the convenience of frame lift operation.
Preferably, the pushing mechanism comprises two groups of pushing components, each group of pushing components is located at a position close to two sides of the first frame body, each group of pushing components comprises a driving motor, a screw rod and a pushing rod, the driving motor is fixedly connected to the first frame body, the screw rod is rotationally connected to the first frame body, the driving motor is in transmission connection with the screw rod, the pushing rod is sleeved on the outer side of the screw rod, the pushing rod is in sliding connection with the first frame body, the pushing rod is in threaded connection with the screw rod, and the pushing rod is fixedly connected with the second frame body.
Through adopting above-mentioned technical scheme, fixed first support body, start driving motor, utilize driving motor drive screw to rotate and can promote the ejector pin slip, a plurality of ejector pins upwards slide jointly and will promote a plurality of second support body synchronous lifting, after the second support body lifting was accomplished, fixed second support body, the dismantlement is fixed to first support body, then driving motor drive push rod reversal will drive first support body lifting, and then realizes climbing the whole lifting in proper order of frame.
Preferably, a connecting mechanism is arranged between the first frame body and the second frame body, the connecting mechanism comprises a first connecting rod and a second connecting rod, the first connecting rod is fixedly connected to the first frame body, the first connecting rod is arranged along the first frame body at intervals in the height direction, the second connecting rod is fixedly connected with the second frame body, the second connecting rod is parallel to the first connecting rod, the first connecting rod is clamped with the second connecting rod, and the first connecting rod is slidably connected with the second connecting rod along the length direction of the frame body.
Through adopting above-mentioned technical scheme, with head rod and second connecting rod joint for adjacent first support body and second support body can interconnect, improve and climb the holistic stability of frame, simultaneously, utilize the slip setting of head rod and second connecting rod, can improve and climb the frame stability at the lift in-process.
Preferably, the first connecting rod is provided with a locking mechanism, the locking mechanism comprises an adjusting component and a locking rod, the locking rod is arranged on the first connecting rod in a penetrating mode, the locking rod is connected with the first connecting rod in a sliding mode, the second connecting rod is provided with a locking hole matched with the locking rod in a matching mode, the adjusting component is connected to the frame body, and the adjusting component is connected with the locking rod to drive the locking rod to slide.
Through adopting above-mentioned technical scheme, in climbing the frame use, adjusting part drive locking lever inserts the locking hole offered by the second connecting rod, can realize that head rod and second connecting rod are fixed, improves the bulk strength who climbs the frame, when needs to climb the height of frame and adjust, control locking lever follow locking hole take out can.
Preferably, the adjusting component comprises a first motor, a screw and a sliding block, wherein the first motor is fixedly connected to the first frame body, the screw is rotationally connected to the first frame body, the first motor is in transmission connection with the screw, the sliding block is in threaded connection with the screw, the sliding block is in sliding connection with the first frame body, and the sliding block is fixedly connected with the locking rod.
Through adopting above-mentioned technical scheme, start first motor, utilize first motor drive lead screw rotation can drive the slider and remove, the slider removes and drives the locking lever and remove, realizes the adjustment to the locking lever position in succession.
Preferably, the first frame body and the second frame body are both hinged with a plurality of turning plates, a plurality of turning plates located on the first frame body are arranged at intervals along the height direction of the first frame body, a plurality of turning plates located on the second frame body are arranged at intervals along the height direction of the second frame body, the turning plates are used for being erected on building floors, the first frame body and the second frame body are both provided with pulling components, the pulling components located on the first frame body are used for pulling a plurality of turning plates located on the first frame body to turn over, and the pulling components located on the second frame body are used for pulling a plurality of turning plates located on the second frame body to turn over.
Through adopting above-mentioned technical scheme, in climbing the normal use of frame, will turn over the board and set up on the building floor, can be with the clearance shutoff between support body and the building floor, the constructor of being convenient for is under construction, guarantees constructor's security.
Preferably, each group of pulling components comprises a pulling rod, the pulling rods are slidably connected to the first frame body or the second frame body, the free end of each turning plate is fixedly connected with a pulling rope, a plurality of pulling ropes on the first frame body are fixedly connected with the pulling rods which are slidably connected to the first frame body, a plurality of pulling ropes on the second frame body are fixedly connected with the pulling rods which are slidably connected to the second frame body, and two pulling rods are connected with the sliding blocks which are close to the pulling rods.
Through adopting above-mentioned technical scheme, when first motor drive lead screw rotates and drives the slider and remove, when the slider drove the locking pole and take out from the locking hole, the slider will drive two pulling poles simultaneously and slide to the direction of keeping away from building wall to drive the upward turning of turning over the board through two stay cords, make the board before climbing the frame and go up and down, pack up from building floor, guarantee to climb the smooth lift of frame.
Preferably, each pulling rod is fixedly connected with a pulling plate, each sliding block is fixedly connected with a locking plate, the two pulling plates are abutted to the locking plates close to the sliding blocks, and when the sliding blocks slide to drive the locking rods to be pulled out from the locking holes, the locking plates drive the pulling plates to slide in a direction away from a building wall.
Through adopting above-mentioned technical scheme, with pulling plate and locking plate butt, the slider moves back and to promote pulling plate through the locking plate and remove, drives the pulling rod and slides then, realizes the drive to turning over the board, utilizes pulling plate and locking plate butt setting simultaneously, in second support body lifting in-process, pulling plate can follow the lift of second support body smoothly and go up and down, avoids causing the resistance to the lift of second support body.
Preferably, the locking plate is fixedly connected with a plurality of locking rods, the locking rods are all in sliding connection with the first connecting rod, the second connecting rod is provided with a plurality of locking holes, and the locking rods and the locking holes are in one-to-one correspondence.
Through adopting above-mentioned technical scheme, with the equal fixed connection of a plurality of locking bars on the locking plate, after climbing the frame lift and accomplishing, the locking plate drives a plurality of locking bars simultaneously and inserts in a plurality of locking holes, realizes the locking to head rod and second connecting rod, improves the stability of head rod and second connecting rod locking.
In a second aspect, the application provides an integrated lifting climbing frame construction method, which adopts the following technical scheme:
An integrated lifting climbing frame construction method comprises the following steps:
S1: installing the wall-attached support on an embedded bolt of a building wall according to design requirements;
S2: assembling the frame bodies on the ground to form, and installing pushing mechanisms on the corresponding frame bodies;
S3: the guide rail is arranged on the frame body and is arranged on the wall-attached support, so that the guide rail can slide in the wall-attached support;
s4: after the frame bodies are arranged on the building wall body, two adjacent frame bodies are arranged together through a connecting mechanism;
s5: the turning plate and the pulling component are arranged on the frame body, and the turning plate is arranged between building floors.
Through adopting above-mentioned technical scheme, will attach the construction of wall support along with building wall installs on the building wall, firstly with the support body at subaerial integrated into one piece, then install the guide rail on the support body, then install a plurality of support bodies in proper order and attach the wall support, make the guide rail with attach the wall support and assemble together, after connecting two adjacent support bodies, install again and turn over the board can, guarantee the installation effectiveness of climbing the frame.
In summary, the application at least comprises the following beneficial technical effects:
By arranging the pushing mechanisms on the first frame body, when the whole climbing frame needs to be lifted, a plurality of groups of pushing mechanisms are started, the second frame body is pushed to be lifted to a certain height, after the second frame body is fixed, the pushing mechanisms are started again, the pushing mechanisms are utilized to drive the first frame body to be lifted to be flush with the second frame body, the whole climbing frame can be lifted once, the operation is repeated repeatedly along with the increase of the height of a building, the lifting of the climbing frame can be realized, and the lifting operation convenience of the climbing frame is improved;
Through the clamping connection of the first connecting rod and the second connecting rod, the adjacent first frame body and second frame body can be connected with each other, the overall stability of the climbing frame is improved, and meanwhile, the stability of the climbing frame in the lifting process can be improved by utilizing the sliding arrangement of the first connecting rod and the second connecting rod;
Through setting up the board on the building floor, utilize the board of turning over with the clearance shutoff between support body and the building floor, the constructor of being convenient for is under construction, guarantees constructor's security.
Drawings
FIG. 1 is a schematic overall structure of an embodiment of the present application;
FIG. 2 is a schematic view of a lifting guide mechanism according to an embodiment of the present application;
FIG. 3 is a schematic view of a frame in an embodiment of the present application;
FIG. 4 is a schematic view of a pushing mechanism according to an embodiment of the present application;
FIG. 5 is a schematic view of the pushing assembly according to an embodiment of the present application;
FIG. 6 is a schematic view of a connection mechanism according to an embodiment of the present application;
FIG. 7 is a schematic view of a locking mechanism according to an embodiment of the present application;
Fig. 8 is a schematic view of the structure of the lock lever in the embodiment of the present application.
Reference numerals: 100. a frame body; 110. a first frame body; 120. a second frame body; 200. a lifting guide mechanism; 210. a guide rail; 220. a wall-attached support; 300. a pushing mechanism; 310. a pushing assembly; 311. a driving motor; 312. a screw; 313. pushing the push rod; 400. a connecting mechanism; 410. a first connecting rod; 420. a second connecting rod; 500. a locking mechanism; 510. a locking plate; 520. a locking lever; 530. an adjustment assembly; 531. a first motor; 532. a screw rod; 533. a slide block; 600. turning plate; 610. pulling the assembly; 611. a pull rope; 612. pulling the rod; 613. pulling the plate.
Detailed Description
The application is described in further detail below with reference to fig. 1-8.
The embodiment of the application discloses an integrated lifting climbing frame and a construction process thereof.
Referring to fig. 1 and 2, an integrated lifting climbing frame and a construction process thereof include a plurality of frame bodies 100, wherein the plurality of frame bodies 100 are arranged side by side and are enclosed on the outer side of a building wall to form the climbing frame. A group of lifting guide mechanisms 200 are installed on each frame 100, and the frame 100 is installed on a building wall through the lifting guide mechanisms 200.
Each group of lifting guide mechanism 200 comprises two guide rails 210 and two groups of wall-attached supports 220, each guide rail 210 is fixedly connected to one side of the frame body 100, which is close to a building wall, each guide rail 210 is arranged along the height direction of the frame body 100, and the two guide rails 210 are respectively positioned close to two sides of the frame body 100. Two sets of wall-attached supports 220 and two guide rails 210 are arranged in one-to-one correspondence, each set of wall-attached supports 220 is fixedly connected to a building wall through embedded bolts, a plurality of wall-attached supports 220 located in the same set are arranged at intervals along the height direction of the building wall, and the guide rails 210 are slidably connected to the corresponding plurality of wall-attached supports 220. Each wall-attached support 220 is hinged with a top supporting rod, a plurality of horizontally arranged connecting rods are fixedly connected to the guide rail 210, the connecting rods are arranged at intervals along the height direction of the guide rail, and the top supporting rods support the connecting rods to support the guide rail.
Referring to fig. 3 and 4, a pushing mechanism 300 is mounted on each of the spaced apart frames 100, the frame 100 mounted with the pushing mechanism 300 is denoted as a first frame 110, and the frame 100 not mounted with the pushing mechanism 300 is denoted as a second frame 120. Each pushing mechanism 300 includes two pushing assemblies 310, the two pushing assemblies 310 are mounted on the first frame 110, and the two pushing assemblies 310 are respectively located near two sides of the first frame 110.
Referring to fig. 3, 4 and 5, each group of pushing assemblies 310 includes a driving motor 311, the driving motor 311 is fixedly connected to the first frame 110, a screw 312 is rotatably connected to the first frame 110, the screw 312 is disposed along a height direction of the first frame 110, the screw 312 rotates along an axis of the screw 312, the driving motor 311 is coaxially and fixedly connected to the screw 312 to drive the screw 312 to rotate, a push rod 313 is coaxially sleeved on an outer side of the screw 312, the push rod 313 is in threaded connection with the screw 312, the push rod 313 is slidably connected to the first frame 110, and a top of the push rod 313 is fixedly connected to an adjacent second frame 120 through a connecting rod 240. In the normal use process of the climbing frame, the wall-attached support 220 is utilized to support the frame body 100, when the climbing frame needs to be lifted, the fixing of the second frame body 120 is removed, then the driving motor 311 is started, the driving motor 311 drives the screw rod 312 to rotate so as to push the second frame body 120 to move, the lifting of the second frame body 120 is realized under the common pushing of the screw rods 312, after the lifting of the second frame body 120 is completed, the second frame body 120 is fixed, the locking of the first frame body 110 is removed, the pushing mechanism 300 is started again, the driving motor 311 drives the screw rod 312 to rotate reversely, the first frame bodies 110 can be driven to move upwards synchronously, the first frame body 110 is enabled to move upwards to be in a flush state with the second frame body 120, the integral lifting of the climbing frame is realized, the lifting of the climbing frame can be realized along with the increase of the height of a building, the lifting of the climbing frame can be realized without repeatedly connecting the pushing mechanism 300 with a building wall, and the lifting operation convenience of the climbing frame is improved.
Referring to fig. 3 and 6, in order to improve the overall stability of the climbing frame, a connection mechanism 400 is provided between adjacent first and second frames 110 and 120, the connection mechanism 400 includes a first connection rod 410, the first connection rod 410 is fixedly connected to one side of the first frame 110 near the second frame 120, the first connection rod 410 is arranged along the height direction of the first frame 110, a sliding groove is formed in one side of the first connection rod 410 near the second frame 120, and the sliding grooves are arranged at intervals along the height direction of the first connection rod 410; one side of the second frame body 120, which is close to the first frame body 110, is fixedly connected with a second connecting rod 420, the second connecting rod 420 is parallel to the first connecting rod 410, the second connecting rod 420 is clamped in a sliding groove formed in the first connecting rod 410, and the first connecting rod 410 and the second connecting rod 420 can slide relatively along the vertical direction.
Referring to fig. 6, 7 and 8, a locking mechanism 500 is disposed between the first connecting rod 410 and the second connecting rod 420, the locking mechanism 500 includes a locking plate 510 slidably connected to the first frame 110, the locking plate 510 is vertically disposed, a plurality of locking rods 520 are fixedly connected to the locking rods 520, the plurality of locking rods 520 are disposed along a length direction of the locking plate 510 at intervals, the plurality of locking rods 520 are all disposed on the first connecting rod 410 in a penetrating manner, each locking rod 520 is slidably connected with the first connecting rod 410, a plurality of locking rod 520 holes are formed in the second connecting rod 420, the plurality of locking holes are disposed in one-to-one correspondence with the plurality of locking rods 520, an adjusting assembly 530 is mounted on the first frame 110, and the adjusting assembly 530 is used for driving the plurality of locking rods 520 to be inserted into the locking holes corresponding to the adjusting assembly 530.
The adjusting component 530 comprises a first motor 531, the first motor 531 is fixedly connected to the first frame 110, a spindle of the first motor 531 is fixedly connected with a screw 532, the screw 532 is rotatably connected to the first frame 110, the screw 532 is in threaded connection with a slider 533, the slider 533 is slidably connected to the first frame 110, and the slider 533 is fixedly connected to the locking plate 510. In the normal use process of the climbing frame, the first motor 531 drives the sliding block 533 to move to drive the plurality of locking rods 520 to be inserted into the plurality of locking holes formed in the second connecting rod 420, so that the first connecting rod 410 and the second connecting rod 420 can be mutually fixed, and then the adjacent first frame body 110 and second frame body 120 are connected into a whole, thereby improving the overall stability of the climbing frame; when the climbing frame needs to be lifted, the first motor 531 drives the locking rods 520 to be pulled out from the locking holes, and then the second frame body 120 and the first frame body 110 are respectively driven to lift, and the sliding arrangement of the first connecting rod 410 and the second connecting rod 420 is utilized to improve the stability of the climbing frame in the lifting process.
Referring to fig. 4, 6 and 7, each of the first and second frames 110 and 120 is hinged with a plurality of turning plates 600, the plurality of turning plates 600 located on the first frame 110 are arranged at intervals along the height direction of the first frame 110, the plurality of turning plates 600 located on the second frame 120 are arranged at intervals along the height direction of the second frame 120, the plurality of turning plates 600 located on the same first frame 110 or second frame 120 are arranged in one-to-one correspondence with the multi-storey building storeys, and each turning plate 600 is erected on the corresponding building storey. The first frame 110 or the second frame 120 are provided with the pulling assemblies 610, the pulling assemblies 610 arranged on the first frame 110 are used for pulling a plurality of turning plates 600 hinged on the first frame 110 to rotate, the pulling assemblies 610 arranged on the second frame 120 are used for pulling a plurality of turning plates 600 hinged on the second frame 120 to rotate, the structures of each group of pulling assemblies 610 are the same, the pulling assemblies 610 arranged on the first frame 110 are described in detail, the pulling assemblies 610 comprise pulling rods 612 which are connected on the first frame 110 in a sliding mode, the pulling rods 612 are vertically arranged, the pulling rods 612 slide along the direction close to or far away from a building wall, a plurality of pull ropes 611 are fixedly connected on the pulling rods 612, the pull ropes 611 are arranged at intervals along the length direction of the pulling rods 612, the pull ropes 611 are in one-to-one correspondence with the turning plates 600 hinged on the first frame 110, each pull rope 611 is fixedly connected with the corresponding turning plates 600 after bypassing the first frame 110 at one end of the pulling rods 612, the pulling plates 612 are fixedly connected with the pulling plates 613, the pulling plates 613 are arranged on the pulling rods 612 and are located on one side, which is far away from the locking plates 510, which is attached to the locking plates 510, and are located on one side, which is far from the locking plates 510, which is attached to the locking plates 510, and is located on the side, which is attached to the side, which is located on the side, which is attached to the locking plates 510. When the climbing frame needs to be lifted, the first motor 531 drives the screw rod 532 to rotate so as to drive the sliding block 533 to move, and when the sliding block 533 drives the locking rod 520 on the locking plate 510 to be pulled out of the locking hole, the locking plate 510 simultaneously pushes the two pulling plates 613 to move to the side far away from the building wall, so that the pulling rod 612 can be driven to move, the pulling rod 612 pulls the turning plate 600 to rotate through the pull rope 611, and the turning plate 600 is separated from the floor of the building, so that the turning plate 600 does not need to be manually turned, and the convenience in lifting of the climbing frame is further improved; after the climbing frame is lifted, when the locking plate 510 is driven to move back to drive the locking rod 520 to lock the first connecting rod 410 and the second connecting rod 420, the turning plate 600 will rotate downwards under the action of gravity, so that automatic closing of the turning plate 600 is realized.
The embodiment also discloses an integrated lifting climbing frame construction method, which comprises the following steps:
s1: installing the wall-attached support 220 on the embedded bolts of the building wall body according to the design requirement;
s2: assembling the frame bodies 100 on the ground to form, and installing the pushing mechanism 300 on the corresponding frame body 100;
s3: mounting the guide rail 210 on the frame body 100, and mounting the guide rail 210 on the wall-attaching support 220 so that the guide rail 210 can slide in the wall-attaching support 220;
s4: after the frame bodies 100 are installed on the building wall, two adjacent frame bodies 100 are installed together through the connecting mechanism 400;
S5: the turnover plate 600 and the pulling assembly 610 are installed on the frame 100, and the turnover plate 600 is installed between building floors.
Through adopting above-mentioned technical scheme, install the construction with attaching the wall support 220 along with building wall on the building wall, firstly with support body 100 at subaerial integrated into one piece, then install guide rail 210 on support body 100, then install a plurality of support bodies 100 in proper order and attach wall support 220, make guide rail 210 and attach wall support 220 equipment together, connect after two adjacent support bodies 100, install again and turn over board 600 can, guarantee the installation effectiveness of climbing the frame.
The embodiment of the application relates to an integrated lifting climbing frame and a construction process thereof, wherein the implementation principle is as follows: when the climbing frame is required to be lifted along with the growth of the building height, the driving motor 311 drives the screw rod 312 to rotate so as to drive the pushing rod 313 to move upwards to lift the plurality of second frame bodies 120, then the second frame bodies 120 are fixed, the driving motor 311 drives the screw rod 312 to rotate reversely, the plurality of first frame bodies 110 are driven to move upwards synchronously, the first frame bodies 110 are enabled to move upwards to be in a flush state with the second frame bodies 120, further the climbing frame is integrally lifted, the climbing frame can be lifted along with the increase of the building height by repeating the operation continuously, the pushing mechanism 300 is not required to be connected with a building wall, and the lifting operation convenience of the climbing frame is improved.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410184306.0A CN118007924A (en) | 2024-02-19 | 2024-02-19 | Integrated lifting climbing frame and construction process thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410184306.0A CN118007924A (en) | 2024-02-19 | 2024-02-19 | Integrated lifting climbing frame and construction process thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN118007924A true CN118007924A (en) | 2024-05-10 |
Family
ID=90942763
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202410184306.0A Pending CN118007924A (en) | 2024-02-19 | 2024-02-19 | Integrated lifting climbing frame and construction process thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN118007924A (en) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004003186A (en) * | 2002-05-31 | 2004-01-08 | Sumitomo Mitsui Construction Co Ltd | Building structures with track guides |
| CN1734031A (en) * | 2004-08-13 | 2006-02-15 | 深圳市特辰升降架工程有限公司 | Circulating automatic up-down scaffold |
| CN204059907U (en) * | 2014-07-04 | 2014-12-31 | 湖北汉安建筑安装工程有限公司 | A kind of lifting false work electric hoisting mechanism |
| DE102018117727A1 (en) * | 2018-07-23 | 2020-01-23 | Peri Gmbh | LIFT DRIVE FOR A RAILWAY CLIMBING SYSTEM |
| CN211736326U (en) * | 2020-01-13 | 2020-10-23 | 通州建总集团有限公司 | Fabricated outer wall climbing frame for building construction |
| CN112227695A (en) * | 2020-10-12 | 2021-01-15 | 厦门安科科技有限公司 | Integrated climbing frame system and lifting construction method thereof |
| CN115538752A (en) * | 2022-11-08 | 2022-12-30 | 上海建工一建集团有限公司 | An attached lifting scaffold and its construction method |
-
2024
- 2024-02-19 CN CN202410184306.0A patent/CN118007924A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004003186A (en) * | 2002-05-31 | 2004-01-08 | Sumitomo Mitsui Construction Co Ltd | Building structures with track guides |
| CN1734031A (en) * | 2004-08-13 | 2006-02-15 | 深圳市特辰升降架工程有限公司 | Circulating automatic up-down scaffold |
| CN204059907U (en) * | 2014-07-04 | 2014-12-31 | 湖北汉安建筑安装工程有限公司 | A kind of lifting false work electric hoisting mechanism |
| DE102018117727A1 (en) * | 2018-07-23 | 2020-01-23 | Peri Gmbh | LIFT DRIVE FOR A RAILWAY CLIMBING SYSTEM |
| CN211736326U (en) * | 2020-01-13 | 2020-10-23 | 通州建总集团有限公司 | Fabricated outer wall climbing frame for building construction |
| CN112227695A (en) * | 2020-10-12 | 2021-01-15 | 厦门安科科技有限公司 | Integrated climbing frame system and lifting construction method thereof |
| CN115538752A (en) * | 2022-11-08 | 2022-12-30 | 上海建工一建集团有限公司 | An attached lifting scaffold and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110371823B (en) | Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method | |
| CN110952755B (en) | A kind of building glass indoor side installation method | |
| CN212176541U (en) | Lightweight, turnaround and high-efficiency construction equipment | |
| CN117468684A (en) | Operation platform for building construction | |
| CN112411979A (en) | A climbing frame with automatic retractable flaps | |
| CN113982290A (en) | Assembled wall body mounting structure | |
| CN1625517A (en) | Scaffold system | |
| CN112227695B (en) | Lifting construction method of integrated type climbing frame system | |
| CN114086660B (en) | Green energy-saving assembled building and construction method | |
| CN116591296A (en) | Steel corridor and steel corridor installation method | |
| CN108005373B (en) | Integrated lifting platform system and assembling method thereof | |
| CN214739760U (en) | A construction platform for outdoor construction and interior decoration | |
| CN215254462U (en) | A kind of building climbing frame lifting synchronization device | |
| CN112922352A (en) | Construction and assembly method for light steel structure prefabricated house | |
| CN220725713U (en) | Connecting device for change structure of attached lifting scaffold on odd-even layer | |
| CN111764667A (en) | Steel structure truss installation construction equipment and installation construction method | |
| CN118639757A (en) | A synchronous lifting tool and construction process for steel corbel and large-span steel corridor | |
| CN116216514A (en) | Outer wall body heated board overhead hoist for assembly type building construction | |
| CN224226437U (en) | Old building installs elevator additional | |
| CN121361734B (en) | A hoisting device for cap beam construction | |
| CN217148219U (en) | Turnover elevator safety door | |
| CN217871681U (en) | Working platform of lifting type construction platform | |
| CN119860099B (en) | Aerial erection method for large-span steel structure high-altitude passage | |
| CN218205646U (en) | Connecting mechanism between climbing frame and wall | |
| CN114607133A (en) | Assembly type climbing frame for building and using method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |