CN118007536A - Civil engineering turnover mould process - Google Patents
Civil engineering turnover mould process Download PDFInfo
- Publication number
- CN118007536A CN118007536A CN202410293983.6A CN202410293983A CN118007536A CN 118007536 A CN118007536 A CN 118007536A CN 202410293983 A CN202410293983 A CN 202410293983A CN 118007536 A CN118007536 A CN 118007536A
- Authority
- CN
- China
- Prior art keywords
- template
- lifting
- layer
- frame
- crank arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 230000008569 process Effects 0.000 title claims abstract description 32
- 230000007306 turnover Effects 0.000 title claims abstract description 32
- 238000009415 formwork Methods 0.000 claims description 20
- 230000009194 climbing Effects 0.000 claims description 17
- 238000009434 installation Methods 0.000 claims description 9
- 230000007246 mechanism Effects 0.000 claims description 9
- 210000001503 joint Anatomy 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000002002 slurry Substances 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 239000000725 suspension Substances 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 17
- 238000005516 engineering process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention relates to the technical field of mold turning, in particular to a civil engineering mold turning process, which comprises the following steps: installing a template; pouring concrete; installing an outer frame; dismantling, lifting and installing a lower-layer template; lifting the outer bracket; supporting an inner template and a lower template on the top of a bearing platform, and supporting an upper template on the lower template and connecting the upper template with the lower template; and fixing the inner template, the lower template and the upper template on the fixed support system by using the fixed support system as a support, wherein the inner template, the lower template and the upper template are enclosed to form a pouring cavity. The civil engineering turnover mould process has the advantages of less template input and higher utilization rate. The inner template, the first template and the second template are fixed by adopting the fixed bracket system, a pull rod is not needed, and the fixing effect is good.
Description
Technical Field
The invention relates to the technical field of mold turning, in particular to a civil engineering mold turning process.
Background
With rapid development of traffic and increasing progress of bridge technology, modern bridges gradually develop to a large span direction, and bridge piers with heights exceeding hundred meters and cable towers with heights of several hundred meters (applied to cable-stayed bridges and suspension bridges) in bridge design are not rare due to structural requirements and topography constraints at bridge sites, which puts higher demands on construction technology.
Through retrieval, the patent with the Chinese patent publication number of CN102561196A discloses a high pier turnover formwork construction process, which comprises the following process steps: pouring pier columns according to the height of the templates in a layered manner, and carrying out self-climbing turnover construction on the brackets and the templates; the construction sequence of the turnover mould is as follows: after pouring of each layer of pier body is completed, the mould is turned upwards when the concrete strength is enough, a cross beam is installed at the top of the pier body, a support is manually turned up by using a chain block, after the support is in place, the support and a pier body template fixed knot are firmly supported, then the lower template is removed, the template is turned up to the height of the next layer by using the chain block, the template is installed, the support leg is installed between the support and the pier body, and the next layer of pier column pouring construction operation is carried out after the stability is confirmed. In the construction process, only layered height templates are processed in the high pier construction, so that template investment is saved; during construction, a bracket is not required to be additionally erected, so that the investment of the bracket is saved; and secondly, climbing automatically when climbing the mould, so that the investment of hoisting tools is saved.
The above patent suffers from the following disadvantages: the process of turning over the mold is not automated yet, resulting in a longer time for the process of turning over the mold. In view of this, we propose a civil engineering turnover process.
Disclosure of Invention
The invention aims to provide a civil engineering turnover mould process for solving the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: a civil engineering turnover mould process comprises the following steps:
S1: template installation
Supporting an inner template and a lower template on the top of a bearing platform, and supporting an upper template on the lower template and connecting the upper template with the lower template; the inner template, the lower template and the upper template are fixed on the fixed support system by using the fixed support system as a support, and the inner template, the lower template and the upper template are enclosed to form a pouring cavity;
S2: pouring concrete
Pouring concrete into the pouring cavity, when the concrete reaches preset strength, removing the inner template and the lower template positioned at the lower layer, lifting the inner template to a formed concrete block along the height direction of the inner template, lifting the lower template to the upper template to be in butt joint with the upper template, and fixing the lower template to the fixed support system, so that a new pouring cavity is formed between the inner template and the upper template as well as between the lower template;
S3: outer frame mounting
The height of the outer frame is set to be equivalent to the height of the three-section template, the outer frame comprises a vertical guide rail, the vertical guide rail is arranged on the outer side of the template and extends to the upper side of the upper template from the lower template, one end of a crank arm is connected to the vertical guide rail, and the other end of the crank arm is detachably connected to the upper template; the crank arm, the vertical guide rail and the template enclose a template lifting interval for the template to pass through; the mould turning climbing frame system is connected with a driving system for driving the mould turning climbing frame system to work; the turnover formwork climbing frame system comprises a telescopic device and a lifting device, and the lifting device is connected in a sliding manner in the vertical direction of the vertical guide rail; the telescopic devices are respectively connected to the upper end and the lower end of the lifting device, and the telescopic devices are detachably connected with the upper-layer template and the lower-layer template through template beams;
s4: dismantling, lifting and installing lower-layer template
Firstly, connecting a telescopic device with a template of a lower template; then removing the reinforced transverse back ridge connecting piece between two adjacent templates of the lower template; then starting the telescopic device to enable the telescopic device to shrink, so as to drive the template to separate from the first layer of concrete; meanwhile, the template is ensured to be positioned in a template lifting interval; then the telescopic device moves upwards until the lower layer template is lifted to a position above the upper layer template; driving the telescopic device to extend to move the templates to a specified position, and then connecting the reinforced transverse back edges on two adjacent templates through the reinforced transverse back edge connecting piece; then pouring the third layer of concrete;
S5: lifting the outer support
Firstly, fixing a telescopic device on a template of a lower template; then the crank arm cross beam is disassembled, and the whole lifting outer bracket is moved to a specified position; when the outer support is lifted to a specified position, the crank arm cross beam is reinstalled, and finally the fixed connection between the telescopic device and the template is released, so that the telescopic device freely slides down onto the upper template to be connected with the template of the upper template.
Preferably, the fixing bracket system comprises a plurality of support pipes pre-buried in the pouring cavity, a platform supported by the support pipes, a lifting mechanism mounted on the platform, an inner die frame assembly and an outer die frame assembly, wherein the outer die frame assembly is configured to fix the lower die plate and the upper die plate, the inner die frame assembly is configured to fix the inner die plate, the outer die frame assembly comprises a cross beam and an outer frame connected with the cross beam, the outer frame is provided with a mounting hole, and the lower die plate and the upper die plate are fixed on the outer frame by penetrating through the mounting hole.
Preferably, the lifting of the outer frame comprises the steps of:
s3.1, enabling the lifting device and the telescopic device to integrally slide downwards to the position of the upper-layer template along the vertical guide rail through operating the driving system;
S3.2, operating the telescopic device to enable the telescopic device to extend out, and connecting one end of the telescopic device to a template beam of the upper template to enable the upper template to be fixed;
S3.3, connecting and removing the crank arm and the upper template, and operating the crank arm to move outwards;
S3.4, taking the upper layer template as a support, and controlling the lifting device through the driving system to enable the lifting device to drive the outer frame and the crank arm to integrally and gradually lift upwards until the outer frame and the crank arm are lifted to a specified position;
s3.5, operating the crank arm again to enable the crank arm to move inwards, and connecting the outer frame with the template through the crank arm.
Preferably, a lifting mechanism is mounted on the cross beam and is configured to lift the inner mold frame assembly, the inner mold frame assembly comprises an inner mold frame and a screw rod, the screw rod penetrates through the inner mold frame to prop against the inner mold plate to fix the inner mold plate on the inner mold frame, the lifting mechanism is a top suspension wall lifting machine, the lower mold plate is connected to a lifting hook of the lifting machine through a steel wire rope, the lower mold plate positioned at the lower layer is detached, the mold plate is pushed out of the pier body to a gap between the pier body and the outer frame, and the lower mold plate is lifted to the outer mold plate of the upper layer by the lifting machine to be in butt joint with the outer mold plate of the upper layer.
Preferably, the fixed bracket system further comprises a hydraulic jack, the hydraulic jack is fixed on the supporting tube, and a power output shaft of the hydraulic jack is connected with the cross beam; and lifting the lower-layer template to the upper-layer template, abutting the upper-layer template, temporarily fixing the lower-layer template, lifting the cross beam and the outer frame by using the hydraulic jack, and fixing the lower-layer template on the outer frame.
Preferably, the lifting device comprises an upper guide frame, a middle guide frame, a lower guide frame, a supporting rod, an inclined strut and a lifting cylinder, wherein an upper locking cylinder, a middle locking cylinder and a lower locking cylinder are respectively arranged on the upper guide frame, the middle guide frame and the lower guide frame, the upper guide frame, the middle guide frame and the lower guide frame are connected with a vertical guide rail in a sliding fit manner, so that the lifting device can slide up and down along the vertical guide rail, the lifting cylinder is arranged between the lower guide frame and the middle guide frame, one end of the supporting rod is connected with the lower guide frame, the other end of the supporting rod is connected with the upper guide frame, one end of the inclined strut is connected with the upper guide frame, the other end of the inclined strut is detachably connected with a template, and the telescopic device is respectively connected with the upper guide frame and the lower guide frame.
Preferably, a lifting device for driving the telescopic device to slide up and down is arranged on the vertical guide beam, an operation platform bearing rod for building an operation platform is arranged on the vertical guide beam, the operation platform is built on the operation platform bearing rod, and a horizontal inclined support is arranged between the telescopic device and the template.
Preferably, a crank arm push-pull device for enabling the crank arm to horizontally move is arranged on the vertical guide rail, at least two turnover mould climbing frame systems are arranged on each side face of the high pier body, positioning blocks are arranged on the vertical guide rail, an operation platform bearing rod for building an operation platform is arranged on the vertical guide rail, an operation platform is built on the operation platform bearing rod, an energy accumulator and a manual oil pump are arranged at the hydraulic system, and a displacement sensor and a hydraulic lock are arranged on the lifting cylinder.
Preferably, when concrete pouring is performed, the winch is used for lifting the concrete slurry, and the concrete slurry is distributed to the side walls from the intermediate wall of the hollow pier.
Preferably, the outer frame comprises a first layer, a second layer and a third layer, wherein the first layer is a concrete surface cleaning and curing operation layer, the second layer is an installation and concrete vibrator operation layer, and the third layer is a steel bar installation, concrete pouring and lifting operation layer.
Compared with the prior art, the invention has the beneficial effects that:
1. the civil engineering turnover mould process has the advantages of less template input and higher utilization rate. The inner template, the first template and the second template are fixed by adopting the fixed bracket system, a pull rod is not needed, and the fixing effect is good.
2. According to the civil engineering turnover formwork process, the demolding of the formwork is realized through the telescopic device, the demolding process is light, and the lifting of the formwork and the external frame is realized through the lifting device.
3. The civil engineering turnover formwork process can realize the recycling of the upper and lower formwork systems, thereby saving construction materials, avoiding a large amount of construction waste in the construction process and realizing green construction.
Drawings
FIG. 1 is a schematic illustration of the process flow of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Pouring pier columns according to the height of the templates in a layered manner, and carrying out self-climbing turnover construction on the brackets and the templates; the construction sequence of the turnover mould is as follows: after pouring of each layer of pier body is completed, the mould is turned upwards when the concrete strength is enough, a cross beam is installed at the top of the pier body, a support is manually turned up by using a chain block, after the support is in place, the support and a pier body template fixed knot are firmly supported, then the lower template is removed, the template is turned up to the height of the next layer by using the chain block, the template is installed, the support leg is installed between the support and the pier body, and the next layer of pier column pouring construction operation is carried out after the stability is confirmed. In the construction process, only layered height templates are processed in the high pier construction, so that template investment is saved; during construction, a bracket is not required to be additionally erected, so that the investment of the bracket is saved; and secondly, climbing automatically when climbing the mould, so that the investment of hoisting tools is saved.
The process of turning over the mold is not automated yet, resulting in a longer time for the process of turning over the mold.
As shown in fig. 1, a civil engineering turnover process includes the following steps:
S1: template installation
Supporting the inner template and the lower template on the top of the bearing platform, and supporting the upper template on the lower template and connecting the upper template with the lower template; the inner template, the lower template and the upper template are fixed on the fixed support system by using the fixed support system as a support, and the inner template, the lower template and the upper template are enclosed to form a pouring cavity;
S2: pouring concrete
Pouring concrete into the pouring cavity, when the concrete reaches preset strength, detaching the inner template and the lower template positioned at the lower layer, lifting the inner template to a formed concrete block along the height direction of the inner template, lifting the lower template to the upper template to be in butt joint with the upper template, and fixing the lower template to a fixed bracket system, so that a new pouring cavity is formed between the inner template and the upper template as well as between the lower template;
S3: outer frame mounting
The height of the outer frame is set to be equivalent to that of the three sections of templates, the outer frame comprises a vertical guide rail, the vertical guide rail is arranged on the outer side of the templates and extends to the upper side of the upper template from the lower template, one end of a crank arm is connected to the vertical guide rail, and the other end of the crank arm is detachably connected to the upper template; the crank arm, the vertical guide rail and the template enclose a template lifting section for the template to pass through; the mould turning climbing frame system is connected with a driving system for driving the mould turning climbing frame system to work; the turnover formwork climbing frame system comprises a telescopic device and a lifting device, and the lifting device is connected in a sliding manner in the vertical direction of the vertical guide rail; the telescopic devices are respectively connected to the upper end and the lower end of the lifting device, and the telescopic devices are detachably connected with the upper-layer template and the lower-layer template through template beams;
s4: dismantling, lifting and installing lower-layer template
Firstly, connecting a telescopic device with a template of a lower template; then removing the reinforced transverse back ridge connecting piece between two adjacent templates of the lower template; then starting the telescopic device to enable the telescopic device to shrink, so as to drive the template to separate from the first layer of concrete; meanwhile, the template is ensured to be positioned in a template lifting interval; then the telescopic device moves upwards until the lower layer template is lifted to a position above the upper layer template; driving the telescopic device to extend to move the templates to a specified position, and then connecting the reinforced transverse back edges on two adjacent templates through the reinforced transverse back edge connecting piece; then pouring the third layer of concrete;
S5: lifting the outer support
Firstly, fixing a telescopic device on a template of a lower template; then the crank arm cross beam is disassembled, and the whole lifting outer bracket is moved to a specified position; when the outer support is lifted to a specified position, the crank arm cross beam is reinstalled, and finally the fixed connection between the telescopic device and the template is released, so that the telescopic device freely slides down onto the upper template to be connected with the template of the upper template.
In the embodiment of the invention, the fixed bracket system comprises a plurality of support pipes which are pre-buried in a pouring cavity, a platform supported on the support pipes, a lifting mechanism arranged on the platform, an inner die frame assembly and an outer die frame assembly, wherein the outer die frame assembly is configured to fix a lower die plate and an upper die plate, the inner die frame assembly is configured to fix an inner die plate, the outer die frame assembly comprises a cross beam and an outer frame connected with the cross beam, the outer frame is provided with mounting holes, and the lower die plate and the upper die plate are fixed on the outer frame by penetrating through the mounting holes through the mounting pieces.
In an embodiment of the present invention, the lifting of the outer frame comprises the steps of:
s3.1, enabling the lifting device and the telescopic device to integrally slide downwards to the position of the upper-layer template along the vertical guide rail through operating the driving system;
S3.2, operating the telescopic device to enable the telescopic device to extend out, and connecting one end of the telescopic device to a template beam of the upper template to enable the upper template to be fixed;
S3.3, connecting and removing the crank arm and the upper template, and operating the crank arm to move outwards;
S3.4, taking the upper layer template as a support, and controlling the lifting device through the driving system to enable the lifting device to drive the outer frame and the crank arm to integrally and gradually lift upwards until the outer frame and the crank arm are lifted to a specified position;
s3.5, operating the crank arm again to enable the crank arm to move inwards, and connecting the outer frame with the template through the crank arm.
In the embodiment of the invention, a lifting mechanism is arranged on a cross beam and is configured to lift an inner die frame assembly, the inner die frame assembly comprises an inner die frame and a screw rod, the screw rod penetrates through the inner die frame to be propped against an inner die plate to fix the inner die plate on the inner die frame, the lifting mechanism is a top suspension wall lifting machine, a lower die plate is connected to a lifting hook of the lifting machine by a steel wire rope, the lower die plate positioned at the lower layer is detached, the die plate is pushed to a gap between a pier body and an outer die frame to lift the lower die plate to an upper die plate by the lifting machine to be in butt joint with the upper die plate.
In the embodiment of the invention, the fixed bracket system further comprises a hydraulic jack, the hydraulic jack is fixed on the supporting tube, and a power output shaft of the hydraulic jack is connected with the cross beam; after the lower layer template is lifted to the upper layer template and is in butt joint with the upper layer template, the lower layer template is temporarily fixed, the cross beam and the outer frame are lifted by utilizing a hydraulic jack, and then the lower layer template is fixed on the outer frame.
In the embodiment of the invention, the lifting device comprises an upper guide frame, a middle guide frame, a lower guide frame, a supporting rod, an inclined strut and a lifting cylinder, wherein an upper locking cylinder, a middle locking cylinder and a lower locking cylinder are respectively arranged on the upper guide frame, the middle guide frame and the lower guide frame, the upper guide frame, the middle guide frame and the lower guide frame are connected with the vertical guide rail in a sliding fit manner so as to enable the upper guide frame, the middle guide frame and the lower guide frame to slide up and down along the vertical guide rail, the lifting cylinder is arranged between the lower guide frame and the middle guide frame, one end of the supporting rod is connected with the lower guide frame, the other end of the supporting rod is connected with the upper guide frame, one end of the inclined strut is connected with the upper guide frame, the other end of the inclined strut is detachably connected with the template, and the telescopic device is respectively connected with the upper guide frame and the lower guide frame.
In the embodiment of the invention, a lifting device for driving a telescopic device to slide up and down is arranged on a vertical guide beam, an operation platform bearing rod for erecting an operation platform is arranged on the vertical guide beam, the operation platform is arranged on the operation platform bearing rod, and a horizontal inclined support is arranged between the telescopic device and a template.
In the embodiment of the invention, a crank arm push-pull device which enables a crank arm to horizontally move is arranged on a vertical guide rail, at least two turnover mould climbing frame systems are arranged on each side face of a high pier body, positioning blocks are arranged on the vertical guide rail, an operation platform bearing rod which is used for erecting an operation platform is arranged on the vertical guide rail, an operation platform is arranged on the operation platform bearing rod, an energy accumulator and a manual oil pump are arranged at a hydraulic system, and a displacement sensor and a hydraulic lock are arranged on a lifting cylinder.
In the embodiment of the invention, when concrete pouring is carried out, the winch is used for lifting the concrete slurry, and the concrete slurry is distributed to the side walls from the intermediate wall of the hollow pier.
In the embodiment of the invention, the outer frame comprises a first layer, a second layer and a third layer, wherein the first layer is a concrete surface cleaning and curing operation layer, the second layer is an installation and concrete vibrator operation layer, and the third layer is a steel bar installation, concrete pouring and lifting operation layer.
The foregoing has shown and described the basic principles, principal features and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above-described embodiments, and that the above-described embodiments and descriptions are only preferred embodiments of the present invention, and are not intended to limit the invention, and that various changes and modifications may be made therein without departing from the spirit and scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (10)
1. The civil engineering turnover mould process is characterized by comprising the following steps of:
S1: template installation
Supporting an inner template and a lower template on the top of a bearing platform, and supporting an upper template on the lower template and connecting the upper template with the lower template; the inner template, the lower template and the upper template are fixed on the fixed support system by using the fixed support system as a support, and the inner template, the lower template and the upper template are enclosed to form a pouring cavity;
S2: pouring concrete
Pouring concrete into the pouring cavity, when the concrete reaches preset strength, removing the inner template and the lower template positioned at the lower layer, lifting the inner template to a formed concrete block along the height direction of the inner template, lifting the lower template to the upper template to be in butt joint with the upper template, and fixing the lower template to the fixed support system, so that a new pouring cavity is formed between the inner template and the upper template as well as between the lower template;
S3: outer frame mounting
The height of the outer frame is set to be equivalent to the height of the three-section template, the outer frame comprises a vertical guide rail, the vertical guide rail is arranged on the outer side of the template and extends to the upper side of the upper template from the lower template, one end of a crank arm is connected to the vertical guide rail, and the other end of the crank arm is detachably connected to the upper template; the crank arm, the vertical guide rail and the template enclose a template lifting interval for the template to pass through; the mould turning climbing frame system is connected with a driving system for driving the mould turning climbing frame system to work; the turnover formwork climbing frame system comprises a telescopic device and a lifting device, and the lifting device is connected in a sliding manner in the vertical direction of the vertical guide rail; the telescopic devices are respectively connected to the upper end and the lower end of the lifting device, and the telescopic devices are detachably connected with the upper-layer template and the lower-layer template through template beams;
s4: dismantling, lifting and installing lower-layer template
Firstly, connecting a telescopic device with a template of a lower template; then removing the reinforced transverse back ridge connecting piece between two adjacent templates of the lower template; then starting the telescopic device to enable the telescopic device to shrink, so as to drive the template to separate from the first layer of concrete; meanwhile, the template is ensured to be positioned in a template lifting interval; then the telescopic device moves upwards until the lower layer template is lifted to a position above the upper layer template; driving the telescopic device to extend to move the templates to a specified position, and then connecting the reinforced transverse back edges on two adjacent templates through the reinforced transverse back edge connecting piece; then pouring the third layer of concrete;
S5: lifting the outer support
Firstly, fixing a telescopic device on a template of a lower template; then the crank arm cross beam is disassembled, and the whole lifting outer bracket is moved to a specified position; when the outer support is lifted to a specified position, the crank arm cross beam is reinstalled, and finally the fixed connection between the telescopic device and the template is released, so that the telescopic device freely slides down onto the upper template to be connected with the template of the upper template.
2. The civil engineering turnover formwork process as defined in claim 1, wherein: the fixed support system comprises a plurality of support pipes which are pre-buried in the pouring cavity, a platform which supports the support pipes, a lifting mechanism which is installed on the platform, an inner mold frame assembly and an outer mold frame assembly, wherein the outer mold frame assembly is configured to fix the lower mold plate and the upper mold plate, the inner mold frame assembly is configured to fix the inner mold plate, the outer mold frame assembly comprises a cross beam and an outer frame which is connected with the cross beam, the outer frame is provided with a mounting hole, and the lower mold plate and the upper mold plate are fixed on the outer frame by penetrating through the mounting hole.
3. The civil engineering turnover formwork process as defined in claim 1, wherein: the lifting of the outer frame comprises the following steps:
s3.1, enabling the lifting device and the telescopic device to integrally slide downwards to the position of the upper-layer template along the vertical guide rail through operating the driving system;
S3.2, operating the telescopic device to enable the telescopic device to extend out, and connecting one end of the telescopic device to a template beam of the upper template to enable the upper template to be fixed;
S3.3, connecting and removing the crank arm and the upper template, and operating the crank arm to move outwards;
S3.4, taking the upper layer template as a support, and controlling the lifting device through the driving system to enable the lifting device to drive the outer frame and the crank arm to integrally and gradually lift upwards until the outer frame and the crank arm are lifted to a specified position;
s3.5, operating the crank arm again to enable the crank arm to move inwards, and connecting the outer frame with the template through the crank arm.
4. The civil engineering turnover formwork process as defined in claim 1, wherein: the lifting mechanism is arranged on the cross beam and is configured to lift the inner die frame assembly, the inner die frame assembly comprises an inner die frame and a screw rod, the screw rod penetrates through the inner die frame to be propped against the inner die plate to fix the inner die plate on the inner die frame, the lifting mechanism is a top suspension wall lifting machine, the lower die plate is connected onto a lifting hook of the lifting machine through a steel wire rope, the lower die plate positioned at the lower layer is detached, the die plate is pushed out of a pier body to a gap between the pier body and the outer die plate, and the lower die plate is lifted to the outer die plate of the upper layer by the lifting machine to be in butt joint with the outer die plate of the upper layer.
5. The civil engineering turnover formwork process as defined in claim 1, wherein: the fixed bracket system further comprises a hydraulic jack, the hydraulic jack is fixed on the supporting tube, and a power output shaft of the hydraulic jack is connected with the cross beam; and lifting the lower-layer template to the upper-layer template, abutting the upper-layer template, temporarily fixing the lower-layer template, lifting the cross beam and the outer frame by using the hydraulic jack, and fixing the lower-layer template on the outer frame.
6. The civil engineering turnover formwork process as defined in claim 1, wherein: the lifting device comprises an upper guide frame, a middle guide frame, a lower guide frame, a supporting rod, an inclined strut and a lifting cylinder, wherein an upper locking cylinder, a middle locking cylinder and a lower locking cylinder are respectively arranged on the upper guide frame, the middle guide frame and the lower guide frame, the upper guide frame, the middle guide frame and the lower guide frame are connected with a vertical guide rail in a sliding fit manner, so that the lifting device can slide up and down along the vertical guide rail, the lifting cylinder is arranged between the lower guide frame and the middle guide frame, one end of the supporting rod is connected with the lower guide frame, the other end of the supporting rod is connected with the upper guide frame, one end of the inclined strut is connected with the upper guide frame, the other end of the inclined strut is detachably connected with a template, and the telescopic device is respectively connected with the upper guide frame and the lower guide frame.
7. The civil engineering turnover formwork process as defined in claim 1, wherein: the lifting device for driving the telescopic device to slide up and down is arranged on the vertical guide beam, the operation platform bearing rod for erecting the operation platform is arranged on the vertical guide beam, the operation platform is arranged on the operation platform bearing rod, and the horizontal inclined support is arranged between the telescopic device and the template.
8. The civil engineering turnover formwork process as defined in claim 1, wherein: the turnover formwork climbing frame system is characterized in that a crank arm push-pull device which enables the crank arm to horizontally move is arranged on a vertical guide rail, at least two turnover formwork climbing frame systems are arranged on each side face of a high pier body, positioning blocks are arranged on the vertical guide rail, an operation platform bearing rod for building an operation platform is arranged on the vertical guide rail, the operation platform is built on the operation platform bearing rod, an energy accumulator and a manual oil pump are arranged at a hydraulic system, and a displacement sensor and a hydraulic lock are arranged on a lifting cylinder.
9. The civil engineering turnover formwork process as defined in claim 1, wherein: when concrete pouring is carried out, the winch is used for lifting concrete slurry, and the concrete slurry is distributed to the side walls from the intermediate wall of the hollow pier.
10. The civil engineering turnover formwork process as defined in claim 1, wherein: the outer frame comprises a first layer, a second layer and a third layer, wherein the first layer is a concrete surface cleaning and curing operation layer, the second layer is an installation and concrete vibrator operation layer, and the third layer is a steel bar installation, concrete pouring and lifting operation layer.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410293983.6A CN118007536A (en) | 2024-03-14 | 2024-03-14 | Civil engineering turnover mould process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410293983.6A CN118007536A (en) | 2024-03-14 | 2024-03-14 | Civil engineering turnover mould process |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN118007536A true CN118007536A (en) | 2024-05-10 |
Family
ID=90948605
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202410293983.6A Pending CN118007536A (en) | 2024-03-14 | 2024-03-14 | Civil engineering turnover mould process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN118007536A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118532002A (en) * | 2024-06-28 | 2024-08-23 | 中国十七冶集团有限公司 | Hydraulic climbing formwork equipment, control system and use method |
-
2024
- 2024-03-14 CN CN202410293983.6A patent/CN118007536A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118532002A (en) * | 2024-06-28 | 2024-08-23 | 中国十七冶集团有限公司 | Hydraulic climbing formwork equipment, control system and use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100351484C (en) | Liftable hydraulic climbing template and construction method thereof | |
| CN202090591U (en) | Lift type climbing formwork of building operations | |
| CN111119071A (en) | Construction method for assembling precast concrete segment box girder | |
| CN215629458U (en) | Slidable cast-in-situ box girder wing plate template | |
| CN201962944U (en) | Hydraulic climbing formwork for building construction | |
| CN107815971A (en) | Self-climbing hydraulic formwork turning system for high pier | |
| CN212563260U (en) | Prefabricated box culvert trolley | |
| CN108005684B (en) | Separated steel mould trolley and construction method thereof | |
| CN219100670U (en) | Low-level jacking climbing construction platform | |
| CN101457587B (en) | Template mutually lifting climbing apparatus and method | |
| CN210636798U (en) | Climbing formwork applied to vertical walls and frame columns in corner sections of wind tunnels | |
| CN100526581C (en) | Reciprocating self-climbing type climbing form system and its climbing form method | |
| CN109252656B (en) | High-rise building climbing template and assembling, pouring and lifting method | |
| CN120757007A (en) | A hydraulically driven reverse-hanging modular bottom formwork and its construction method | |
| CN203200664U (en) | Slip-form construction device for variable cross-section hollow high pier | |
| CN115110765A (en) | Construction method and device for shear wall at deformation joint | |
| CN107829408B (en) | Rectangular aqueduct construction steel mould trolley | |
| CN115613455A (en) | A prestressed tensioning operation platform for 0# block transverse diaphragm of liftable cantilevered beam | |
| CN113502756A (en) | Thin-wall pier hydraulic creeping formwork system and construction method thereof | |
| CN220581039U (en) | Small-span high side wall tunnel integration platform truck | |
| CN218624216U (en) | Shaft door slot construction equipment | |
| CN118007543A (en) | Pier climbing frame turnover formwork construction device and construction method | |
| CN112502431A (en) | Hydraulic reverse formwork construction method for light aluminum alloy formwork of square chimney | |
| CN215758549U (en) | Thin-wall pier hydraulic creeping formwork system | |
| CN217299021U (en) | Prefabricated portal frame assembled box culvert |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |