CN117966684A - A diversion tunnel gate system and method for releasing initial water storage ecological flow - Google Patents
A diversion tunnel gate system and method for releasing initial water storage ecological flow Download PDFInfo
- Publication number
- CN117966684A CN117966684A CN202410164391.4A CN202410164391A CN117966684A CN 117966684 A CN117966684 A CN 117966684A CN 202410164391 A CN202410164391 A CN 202410164391A CN 117966684 A CN117966684 A CN 117966684A
- Authority
- CN
- China
- Prior art keywords
- gate
- working
- accident
- arc
- plane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/40—Swinging or turning gates
- E02B7/42—Gates of segmental or sector-like shape with horizontal axis
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/26—Vertical-lift gates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Barrages (AREA)
Abstract
The invention belongs to the technical field of initial water storage ecological flow discharged by water conservancy and hydropower engineering, and particularly relates to a diversion tunnel gate system and method for discharging initial water storage ecological flow. The utility model provides a diversion tunnel gate system of ecological flow of initial stage retaining of releasing, includes plane accident gate, working lock chamber and radial working gate, and plane accident gate is located the upper reaches of working lock chamber, and radial working gate is located the low reaches of working lock chamber, is equipped with accident gate hydraulic hoist and radial working gate swing hydraulic hoist in the working lock chamber. The invention adopts a mode of combining relay water retaining with the plane accident gate and the arc working gate, utilizes the arc working gate to partially open the drainage ecological flow, and utilizes the plane accident gate to block the high water head generated by the rising of the water level of the upstream reservoir when the sealing is needed, thereby meeting the requirement of drainage flow to the downstream after the water conservancy and hydropower engineering is used for storing water, avoiding the arrangement of various drainage flow devices and saving the one-time engineering investment.
Description
Technical Field
The invention belongs to the technical field of initial water storage ecological flow discharged by water conservancy and hydropower engineering, and particularly relates to a diversion tunnel gate system and method for discharging initial water storage ecological flow.
Background
In the prior art, a mode of partially opening the leakage flow of the plane plugging gate is adopted, so that great hidden danger is brought to the safe operation of engineering, and the gate bottom edge flow velocity gradually increases and vibrates more and more along with the rising of an upstream water head, so that irreversible damage is brought to the gate leaf and hydraulic body type structure. The pre-buried valve bank and the pumping station pumping mode have limited drainage quantity, and the device is only used for a short time. Under the condition that the demand of the downward leakage flow is increasing, if the capacity of equipment is increased, the engineering investment is greatly increased, and the economical efficiency is poor.
Disclosure of Invention
Aiming at the problems, the invention aims to provide a diversion tunnel gate system and a diversion tunnel gate method for discharging initial water storage ecological flow, the gate system adopts a mode of combining relay water blocking by adopting a plane accident gate and an arc working gate, utilizes the arc working gate to partially open the water storage ecological flow, and utilizes the plane accident gate to block a high water head generated by rising of the water level of an upstream warehouse when the water storage ecological flow needs to be blocked, so that the requirement of downstream water storage flow after the water storage ecological engineering is carried out, the risk caused by partially opening the plane gate is avoided, various devices for discharging the water storage ecological flow are not needed, the one-time engineering investment is saved, and the waste is avoided.
The technical scheme of the invention is as follows: the utility model provides a diversion tunnel gate system of ecological flow of initial stage retaining of releasing, includes plane accident gate, working lock chamber and radial working gate, plane accident gate is located the upper reaches of working lock chamber, radial working gate is located the low reaches of working lock chamber, the working lock chamber is located diversion tunnel body section, be equipped with accident gate hydraulic hoist and radial working gate swing formula hydraulic hoist in the working lock chamber, accident gate hydraulic hoist is used for controlling plane accident gate and opens and close, radial working gate swing formula hydraulic hoist is used for controlling radial working gate and opens and close. The planar accident gate and the arc-shaped working gate adopt a mode of combining relay water retaining, the arc-shaped working gate is utilized to partially open the ecological flow, and when the blocking is needed, the planar accident gate is utilized to block a high water head generated by the rising of the water level of an upstream reservoir.
The plane accident gate is a high-pressure gate valve sliding type plane steel gate and comprises a plane accident gate leaf and a plane accident gate slot, wherein the plane accident gate leaf is positioned in the plane accident gate slot, a gate pull rod is arranged at the top of the plane accident gate leaf, and the gate pull rod is connected with an accident gate hydraulic hoist.
When the planar accident gate leaves work normally, the lifting gate pull rod of the accident gate hydraulic hoist is hung at the position 1m above the diversion tunnel orifice.
The plane accident gate is further provided with a water filling device and an air filling and exhausting device, the water filling device comprises a water filling and exhausting pipe, the water filling and exhausting pipe is in an inverted U shape, two ends of the lower portion of the inverted U shape are respectively located on the diversion tunnel wall of the upper side and the lower side of the plane accident gate, the top of the inverted U shape is located on a working lock chamber operation platform, the water filling and exhausting eccentric semi-ball valve is arranged on the inverted U shape, the water filling and exhausting device comprises a plurality of air filling and exhausting pipes, the air filling and exhausting pipes are vertically arranged on the lower side of the plane accident gate, close to the arc-shaped working gate, the bottom of the air filling and exhausting pipe is located on the top of the diversion tunnel, and the top of the air filling and exhausting pipe is located on the working lock chamber operation platform and is provided with an automatic air filling and exhausting valve and an air filling and exhausting eccentric semi-ball valve.
The plane accident gate slot is of a totally-enclosed box structure and comprises a side slot, a waist box, a top frame and a sealing cover plate from bottom to top, the accident gate hydraulic hoist is installed on the sealing cover plate, and a hydraulic hoist working hole is formed in the surface of the sealing cover plate.
The automatic emergency control device is characterized in that a plane accident gate hydraulic hoist pump station, an arc-shaped working gate hydraulic hoist pump station and an electroless operation emergency device are sequentially arranged in the working lock chamber from the upstream direction to the downstream direction of the diversion tunnel, the plane accident gate hydraulic hoist pump station is connected with the accident gate hydraulic hoist, the arc-shaped working gate hydraulic hoist pump station is connected with the arc-shaped working gate swing type hydraulic hoist, and the electroless operation emergency device is used for controlling the plane accident gate hydraulic hoist pump station and the arc-shaped working gate hydraulic hoist pump station under the condition of power failure.
The arc-shaped working gate is a double-main-beam straight-support-arm spherical hinge arc-shaped gate and comprises arc-shaped working gate leaves and arc-shaped working gate grooves.
The water retaining water head of the plane accident gate is determined by the water level of the reservoir, and the water retaining water head of the movable water gate is the same as the working water retaining water head of the arc-shaped working gate.
A method for discharging initial water storage ecological flow, which uses a diversion tunnel gate system for discharging initial water storage ecological flow as described above, comprises the following steps:
S1: during normal operation, the plane accident gate leaves of the plane accident gate are suspended at the position 1m above the orifice of the diversion tunnel by the hydraulic gate hoist through the gate pull rod, and the swing type hydraulic gate hoist of the arc-shaped working gate controls the arc-shaped working gate to be opened locally according to the designed ecological flow and the ecological flow is released;
s2: when the movable water gate is required to be plugged by the lower gate, firstly starting the swing type hydraulic hoist of the arc-shaped working gate to control the arc-shaped working gate to be closed, then starting the hydraulic hoist of the accident gate to control the plane accident gate to be closed, and then starting the swing type hydraulic hoist of the arc-shaped working gate to control the small opening lifting gate of the arc-shaped working gate to drain accumulated water between the plane accident gate and the arc-shaped working gate, and immediately plugging;
s3: if the emergency state needs to be closed by moving water, the hydraulic headstock gear of the accident gate is started to control the plane accident gate to be closed, and then the arc-shaped working gate is overhauled.
The invention has the technical effects that: 1. according to the invention, by adopting a mode of combining relay water retaining with the planar accident gate and the arc-shaped working gate, the arc-shaped working gate is utilized to partially open the drainage ecological flow, and when the sealing is needed, the planar accident gate is utilized to block the high water head generated by the rising of the water level of the upstream reservoir, so that the requirement of drainage flow to the downstream after the water storage of the lower gate of the hydraulic and hydroelectric engineering can be met, the risk caused by the partial opening of the planar gate is avoided, various drainage equipment is not needed, the one-time engineering investment is saved, and the waste is avoided; 2. the gate system can be flexibly arranged at any position of the diversion tunnel, all equipment is arranged in one gate chamber, the excavation construction work amount is saved, the upstream water retaining plane accident gate adopts a downstream arc-shaped working gate water stopping mode, the water sealing effect is good, and the blocking construction work amount is small; 3. the invention uses the fully-closed box-shaped structure gate slot as an accident gate slot, avoids digging a gate well with a vertical high-pass top, uses a plane gate to block high water head pressure generated when water is stored in an upstream reservoir area, avoids complex types such as a pressurized water seal or an eccentric hinge structure and the like of a downstream radial working gate, and has safe operation and good engineering economy.
Further description will be made below with reference to the accompanying drawings.
Drawings
Fig. 1 is a schematic structural diagram of a diversion tunnel gate system for discharging initial water storage ecological flow according to an embodiment of the present invention.
FIG. 2 is a cross-sectional view taken along line A-A of FIG. 1.
Fig. 3 is a schematic view of a water filling device according to an embodiment of the present invention.
Fig. 4 is a schematic structural diagram of an air charging and discharging device according to an embodiment of the present invention.
Fig. 5 is a schematic view of a planar accident gate slot.
Reference numerals: 1-a planar accident gate; 2-a water filling device; 3-a plane accident gate slot; 4-gate pull rod; 5-charging and discharging device; 6-an accident gate hydraulic hoist; 7-a working lock chamber; 8-an arc-shaped working gate swing type hydraulic hoist; 9-arc-shaped working gates; 10-arc-shaped working gate grooves; 11-an electrically operated emergency device; 12-an arc-shaped working gate hydraulic hoist pump station; 13-a hydraulic headstock gear pump station of a plane accident gate; 14-water filling and draining working eccentric semi-ball valve; 15-filling and draining overhauling eccentric half ball valve; 16-a water filling and draining pipe; 17-automatic air charging and discharging valve; 18-charging and discharging overhauling eccentric half ball valve; 19-side grooves; 20-waist box; 21-a top frame; 22-sealing cover plate; 23-charging and discharging pipe.
Detailed Description
Example 1
As shown in figures 1-5, the diversion tunnel gate system for the initial stage of water storage ecological flow discharge comprises a plane accident gate 1, a working gate chamber 7 and an arc-shaped working gate 9, wherein the plane accident gate 1 is positioned at the upstream of the working gate chamber 7, the arc-shaped working gate 9 is positioned at the downstream of the working gate chamber 7, the working gate chamber 7 is positioned at a diversion tunnel body section, an accident gate hydraulic hoist 6 and an arc-shaped working gate swing type hydraulic hoist 8 are arranged in the working gate chamber 7, the accident gate hydraulic hoist 6 is used for controlling the opening and closing of the plane accident gate 1, the arc-shaped working gate swing type hydraulic hoist 8 is used for controlling the opening and closing of the arc-shaped working gate 9, the plane accident gate 1 and the arc-shaped working gate 9 adopt a combined relay water blocking mode, the arc-shaped working gate 9 is utilized to partially open the ecological flow, and the plane accident gate 1 is utilized for blocking a high water head generated by the elevation of the water level of an upstream reservoir when the blocking is required.
In the actual use process, when the invention works normally, the plane accident gate leaves of the plane accident gate 1 are suspended at the position 1m above the orifice of the diversion tunnel by the accident gate hydraulic hoist 6 through the gate pull rod 4, and the arc-shaped working gate swing type hydraulic hoist 8 controls the arc-shaped working gate 9 to be opened locally according to the designed ecological flow and the ecological flow is released; when the gate is required to be closed by blocking water, the accident gate hydraulic hoist 6 is started to control the plane accident gate 1 to be closed, and then the radial working gate swing hydraulic hoist 8 is started to control the radial working gate 9 to be opened locally, so that accumulated water between the plane accident gate 1 and the radial working gate 9 is discharged to avoid that the accumulated water is communicated with upstream reservoir water to exceed the designed water retaining head of the radial working gate 9. According to the invention, by adopting a mode of combining relay water retaining with the planar accident gate and the arc-shaped working gate, the arc-shaped working gate is utilized to partially open the drainage ecological flow, and when the sealing is needed, the planar accident gate is utilized to block the high water head generated by the rising of the water level of the upstream reservoir, so that the requirement of drainage flow to the downstream after the water storage of the lower gate of the hydraulic and hydroelectric engineering can be met, the risk caused by the partial opening of the planar gate is avoided, various drainage equipment is not needed, the one-time engineering investment is saved, and the waste is avoided; the gate system can be flexibly arranged at any position of the diversion tunnel, all equipment is arranged in one gate chamber, the excavation construction work amount is saved, the upstream water retaining plane accident gate adopts a downstream arc-shaped working gate water stopping mode, the water sealing effect is good, and the blocking construction work amount is small.
Example 2
Preferably, in this embodiment, on the basis of embodiment 1, preferably, the planar accident gate 1 is a high-pressure gate valve sliding planar steel gate, including a planar accident gate leaf and a planar accident gate slot 3, where the planar accident gate leaf is located in the planar accident gate slot 3, and a gate pull rod 4 is disposed at the top of the planar accident gate leaf, and the gate pull rod 4 is connected with an accident gate hydraulic hoist 6.
In the actual use process, the plane accident gate leaves of the plane accident gate 1 of the invention move up and down in the plane accident gate groove 3 through the gate pull rod 4 by the accident gate hydraulic hoist 6, so as to realize the opening and closing of the plane accident gate 1.
Example 3
Preferably, in this embodiment, when the planar accident gate leaf works normally, the accident gate hydraulic hoist 6 lifts the gate pull rod 4 to hang at 1m above the diversion tunnel orifice.
In the actual use process, the plane accident gate leaves of the plane accident gate 1 are hung at the position 1m above the diversion tunnel orifice by the accident gate hydraulic hoist 6 through the gate pull rod 4, and when the arc-shaped working gate 9 has a problem and needs to be overhauled or the engineering needs to be blocked by a lower gate, the plane accident gate 1 can be quickly closed for retaining water.
Example 4
Preferably, in this embodiment, on the basis of embodiment 1 or embodiment 3, preferably, the planar accident gate 1 is further provided with a water filling device 2 and a water filling and exhausting device 5, the water filling device 2 includes a water filling and exhausting pipe 16, the water filling and exhausting pipe 16 is in an inverted U shape, two ends of the lower part of the inverted U shape are respectively located on the diversion tunnel wall of the upper side and the downstream side of the planar accident gate 1, the top of the inverted U shape is located on the operation platform of the working gate 7, a water filling and exhausting working eccentric half ball valve 14 and a water filling and exhausting overhauling eccentric half ball valve 15 are arranged on the inverted U shape, the water filling and exhausting device 5 includes a plurality of air filling and exhausting pipes 23, the air filling and exhausting pipe 23 is vertically arranged on the downstream side of the planar accident gate 1 close to the radial working gate 9, the bottom of the air filling and exhausting pipe 23 is located in the top of the diversion tunnel, and the top of the air filling and exhausting pipe 23 is located on the operation platform of the working gate 7 and is provided with an automatic air filling and exhausting valve 17 and an automatic air filling and exhausting overhauling half ball valve 18.
In the actual use process, the plane accident gate 1 is also provided with the water filling device 2 and the air filling and exhausting device 5, when the plane accident gate 1 needs to be lifted after being closed, the downstream arc-shaped working gate 9 is closed first, and the water filling device 2 and the air filling and exhausting device 5 are opened, so that the plane accident gate 1 is convenient to open safely under the manufacturing condition of water filling and flat pressing.
Example 5
Preferably, in this embodiment, on the basis of embodiment 1 or embodiment 4, preferably, the planar emergency gate slot 3 is a totally enclosed box structure, and includes, from bottom to top, a side slot 19, a waist box 20, a top frame 21, and a sealing cover plate 22, where the emergency gate hydraulic hoist 6 is mounted on the sealing cover plate 22, and a hydraulic hoist working hole is provided on the surface of the sealing cover plate 22.
In the actual use process, the planar accident gate slot 3 is of a totally-enclosed box structure, so that a gate well with a vertical top is prevented from being excavated, the planar accident gate slot can be flexibly arranged at any section of the cavity of the diversion tunnel, the construction risk is reduced, and the investment is saved.
Example 6
Preferably, in this embodiment, on the basis of embodiment 1, preferably, a plane accident gate hydraulic hoist pump station 13, an arc-shaped working gate hydraulic hoist pump station 12 and a power-free operation emergency device 11 are further disposed in the working lock chamber 7 in the downstream direction from the upstream of the diversion tunnel in sequence, the plane accident gate hydraulic hoist pump station 13 is connected with the accident gate hydraulic hoist 6, the arc-shaped working gate hydraulic hoist pump station 12 is connected with the arc-shaped working gate swing type hydraulic hoist 8, and the power-free operation emergency device 11 is used for controlling the plane accident gate hydraulic hoist pump station 13 and the arc-shaped working gate hydraulic hoist pump station 12 under the power-off condition.
In the actual use process, the non-electric operation emergency device 11 is used for controlling the plane accident gate hydraulic hoist pump station 13 and the radial working gate hydraulic hoist pump station 12 under the condition of power failure, so that the opening or closing of the plane accident gate 1 and the radial working gate 9 is ensured to be adjusted by the working of the hydraulic system.
Example 7
Preferably, in this embodiment, the radial working gate 9 is a double main beam straight arm spherical hinge radial gate, and includes a radial working gate leaf and a radial working gate slot 10.
In the actual use process, the arc-shaped working gate 9 is a double-main-beam straight-support-arm spherical hinge arc-shaped gate, can partially open and control the lower leakage flow, and is operated by the swing type hydraulic hoist, so that the operation is simple and convenient.
Example 8
Preferably, in this embodiment, on the basis of embodiment 1 or embodiment 7, it is preferable that the water blocking head of the planar accident gate 1 is determined by the reservoir water level, and the water blocking head is the same as the working water blocking head of the radial working gate 9.
In the actual use process, the dynamic water gate closing head of the plane accident gate 1 is the same as the working water blocking head of the arc-shaped working gate 9, so that the risk that the gate slot is damaged and the gate is failed due to severe vibration caused by locally opening the plane blocking gate when the gate is opened for water storage in the water conservancy and hydropower engineering is avoided, the problem of short-term current interruption of a downstream river during the gate-opening water storage period is solved, the operation safety is realized, the ecological environment safety of the river is protected, and the downstream production and living water is ensured.
Example 9
A method for discharging initial water storage ecological flow, which uses a diversion tunnel gate system for discharging initial water storage ecological flow as described above, comprises the following steps:
S1: during normal operation, the plane accident gate leaves of the plane accident gate 1 are suspended at the position 1m above the diversion tunnel orifice by the accident gate hydraulic hoist 6 through the gate pull rod 4, and the arc-shaped working gate swing type hydraulic hoist 8 controls the arc-shaped working gate 9 to be opened locally according to the designed ecological flow and the ecological flow is lowered;
S2: when the movable water gate is required to be plugged by the lower gate, firstly starting the swing type hydraulic headstock gear 8 of the arc-shaped working gate to control the arc-shaped working gate 9 to be closed, then starting the hydraulic headstock gear 6 of the accident gate to control the plane accident gate 1 to be closed, and then starting the swing type hydraulic headstock gear 8 of the arc-shaped working gate to control the small opening degree of the arc-shaped working gate 9 to lift the gate to drain accumulated water between the plane accident gate 1 and the arc-shaped working gate 9, and then plugging;
s3: when the emergency state needs to be closed by moving water, the emergency gate hydraulic hoist 6 is started to control the plane emergency gate 1 to be closed, and then the arc-shaped working gate 9 is overhauled.
The present invention is not limited to the above-mentioned embodiments, and any changes or substitutions that can be easily understood by those skilled in the art within the technical scope of the present invention are intended to be included in the scope of the present invention.
Claims (9)
1. Diversion tunnel gate system for discharging initial water storage ecological flow, which is characterized in that: including plane accident gate (1), working lock chamber (7) and radial working lock gate (9), plane accident gate (1) is located the upper reaches of working lock chamber (7), radial working lock gate (9) are located the low reaches of working lock chamber (7), working lock chamber (7) are located diversion tunnel shaft section, be equipped with accident gate hydraulic hoist (6) and radial working lock gate swing hydraulic hoist (8) in working lock chamber (7), accident gate hydraulic hoist (6) are used for controlling plane accident gate (1) and open and close, radial working lock gate swing hydraulic hoist (8) are used for controlling radial working lock gate (9) and open and close, and plane accident gate (1) and radial working lock gate (9) adopt the mode of joint relay manger plate, utilize radial working lock gate (9) to open down and let out ecological flow, utilize plane accident gate (1) to block the high water head that the rise of upper reaches storehouse water level produced when needs shutoff.
2. A diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 1, wherein: the plane accident gate (1) is a high-pressure gate valve sliding type plane steel gate and comprises a plane accident gate leaf and a plane accident gate slot (3), wherein the plane accident gate leaf is positioned in the plane accident gate slot (3), a gate pull rod (4) is arranged at the top of the plane accident gate leaf, and the gate pull rod (4) is connected with an accident gate hydraulic hoist (6).
3. A diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 2, wherein: when the planar accident gate leaves work normally, the accident gate hydraulic hoist (6) lifts the gate pull rod (4) to hang at the position 1m above the diversion tunnel orifice.
4. A diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 2, wherein: the plane accident gate (1) is further provided with a water filling device (2) and a water filling and exhausting device (5), the water filling and exhausting device (2) comprises a water filling and exhausting pipe (16), the water filling and exhausting pipe (16) is in an inverted U shape, two ends of the lower portion of the inverted U shape are respectively located on the diversion tunnel wall of the upper side and the lower side of the plane accident gate (1), the top of the inverted U shape is located on an operating platform of a working gate chamber (7), an eccentric half ball valve (14) for water filling and exhausting and an eccentric half ball valve (15) for water filling and exhausting are arranged on the inverted U-shaped top, the air filling and exhausting device (5) comprises a plurality of air filling and exhausting pipes (23), the air filling and exhausting pipe (23) is vertically arranged on the downstream side of one side of the plane accident gate (1) close to the arc-shaped working gate (9), the bottom of the air filling and exhausting pipe (23) is located on the top of the diversion tunnel, and the top of the air filling and exhausting pipe (23) is located on the operating platform of the working gate chamber (7) and is provided with an automatic air filling and exhausting valve (17) and an eccentric half ball valve (18) for water filling and exhausting.
5. A diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 2, wherein: the plane accident gate slot (3) is of a totally-enclosed box type structure and comprises a side slot (19), a waist box (20), a top frame (21) and a sealing cover plate (22) from bottom to top, the accident gate hydraulic hoist (6) is installed on the sealing cover plate (22), and a hydraulic hoist working hole is formed in the surface of the sealing cover plate (22).
6. A diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 1, wherein: the automatic hydraulic control system is characterized in that a plane accident gate hydraulic hoist pump station (13), an arc-shaped working gate hydraulic hoist pump station (12) and a non-electric operation emergency device (11) are sequentially arranged in the working lock chamber (7) from the upstream direction to the downstream direction of the guide flow hole, the plane accident gate hydraulic hoist pump station (13) is connected with the accident gate hydraulic hoist (6), the arc-shaped working gate hydraulic hoist pump station (12) is connected with the arc-shaped working gate swing type hydraulic hoist (8), and the non-electric operation emergency device (11) is used for controlling the plane accident gate hydraulic hoist pump station (13) and the arc-shaped working gate hydraulic hoist pump station (12) under the power failure condition.
7. A diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 1, wherein: the arc-shaped working gate (9) is a double-main-beam straight-support-arm spherical hinge arc-shaped gate and comprises arc-shaped working gate leaves and arc-shaped working gate grooves (10).
8. A diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 1, wherein: the water retaining water head of the plane accident gate (1) is determined by the water level of the reservoir, and the water retaining water head of the movable water closing gate is the same as the working water retaining water head of the arc-shaped working gate (9).
9. A method for discharging initial water storage ecological flow, which uses the diversion tunnel gate system for discharging initial water storage ecological flow as claimed in claim 1, and is characterized in that: the method comprises the following steps:
S1: during normal operation, the plane accident gate leaves of the plane accident gate (1) are suspended at the position 1m above the diversion tunnel orifice by the accident gate hydraulic hoist (6) through the gate pull rod (4), and the arc-shaped working gate swing type hydraulic hoist (8) controls the arc-shaped working gate (9) to be opened locally according to the designed ecological flow and the ecological flow is lowered;
S2: when the gate is required to be closed by water, firstly starting the swing type hydraulic headstock gear (8) of the arc-shaped working gate to control the arc-shaped working gate (9) to be closed, then starting the hydraulic headstock gear (6) of the accident gate to control the plane accident gate (1) to be closed, and then starting the swing type hydraulic headstock gear (8) of the arc-shaped working gate to control the small opening lifting gate of the arc-shaped working gate (9) to drain accumulated water between the plane accident gate (1) and the arc-shaped working gate (9), and then performing blocking;
S3: when the emergency state needs to be closed by moving water, the hydraulic headstock gear (6) of the accident gate is started to control the plane accident gate (1) to be closed, and then the arc-shaped working gate (9) is overhauled.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410164391.4A CN117966684A (en) | 2024-02-05 | 2024-02-05 | A diversion tunnel gate system and method for releasing initial water storage ecological flow |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410164391.4A CN117966684A (en) | 2024-02-05 | 2024-02-05 | A diversion tunnel gate system and method for releasing initial water storage ecological flow |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN117966684A true CN117966684A (en) | 2024-05-03 |
Family
ID=90862464
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202410164391.4A Pending CN117966684A (en) | 2024-02-05 | 2024-02-05 | A diversion tunnel gate system and method for releasing initial water storage ecological flow |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN117966684A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118422646A (en) * | 2024-06-28 | 2024-08-02 | 中水东北勘测设计研究有限责任公司 | An auxiliary equipment for solving water discharge during freezing period of water conservancy and hydropower projects in cold regions |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107938621A (en) * | 2017-12-30 | 2018-04-20 | 中国电建集团贵阳勘测设计研究院有限公司 | Improved method and structure of down-the-hole plane gate water filling valve pipe |
| CN109518666A (en) * | 2018-12-21 | 2019-03-26 | 中国电建集团贵阳勘测设计研究院有限公司 | Water retaining structure and plugging method for low-rise diversion tunnel |
| CN110541404A (en) * | 2019-08-26 | 2019-12-06 | 中国电建集团贵阳勘测设计研究院有限公司 | moisture-proof combined gate |
| CN110894717A (en) * | 2019-10-17 | 2020-03-20 | 中国电建集团贵阳勘测设计研究院有限公司 | Gate combining blocking and discharging of diversion tunnel |
| CN213296265U (en) * | 2020-09-09 | 2021-05-28 | 中国电建集团贵阳勘测设计研究院有限公司 | Plane emergency accident gate capable of preventing top exposed type arc gate from bearing landslide and surge impact |
| CN114108543A (en) * | 2021-11-29 | 2022-03-01 | 郑州大学 | Hydraulic gate and hoist fault injection device, system and method |
-
2024
- 2024-02-05 CN CN202410164391.4A patent/CN117966684A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107938621A (en) * | 2017-12-30 | 2018-04-20 | 中国电建集团贵阳勘测设计研究院有限公司 | Improved method and structure of down-the-hole plane gate water filling valve pipe |
| CN109518666A (en) * | 2018-12-21 | 2019-03-26 | 中国电建集团贵阳勘测设计研究院有限公司 | Water retaining structure and plugging method for low-rise diversion tunnel |
| CN110541404A (en) * | 2019-08-26 | 2019-12-06 | 中国电建集团贵阳勘测设计研究院有限公司 | moisture-proof combined gate |
| CN110894717A (en) * | 2019-10-17 | 2020-03-20 | 中国电建集团贵阳勘测设计研究院有限公司 | Gate combining blocking and discharging of diversion tunnel |
| CN213296265U (en) * | 2020-09-09 | 2021-05-28 | 中国电建集团贵阳勘测设计研究院有限公司 | Plane emergency accident gate capable of preventing top exposed type arc gate from bearing landslide and surge impact |
| CN114108543A (en) * | 2021-11-29 | 2022-03-01 | 郑州大学 | Hydraulic gate and hoist fault injection device, system and method |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118422646A (en) * | 2024-06-28 | 2024-08-02 | 中水东北勘测设计研究有限责任公司 | An auxiliary equipment for solving water discharge during freezing period of water conservancy and hydropower projects in cold regions |
| CN118422646B (en) * | 2024-06-28 | 2024-10-01 | 中水东北勘测设计研究有限责任公司 | A method for using auxiliary equipment to solve water discharge during freezing period of water conservancy and hydropower projects in cold regions |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201473933U (en) | Combined layout structure of tailwater accident gate and tailwater surge tank of pumped storage power station | |
| CN201125377Y (en) | Air-actuated thyroid shutter | |
| CN109339194A (en) | Shut-off device with bladder, diverter well and control system thereof | |
| WO2020228620A1 (en) | Flushing and overhauling system, flushing method and overhauling method for drainage pipeline | |
| WO2016165513A1 (en) | Hydraulic lifting weir | |
| CN113463583B (en) | Method for rapidly disassembling large oil cylinder of gate in water inlet accident of high-water-head power station on site | |
| CN2820957Y (en) | Downward spleeping type rotary bear-trap gate | |
| CN204570625U (en) | Waterpower elevating and falling weir | |
| CN111101487A (en) | A new type of maintenance gate | |
| JP2019112860A (en) | Hydraulic control device | |
| CN113062280B (en) | A curved bonnet door device for hydraulic opening and closing and using method thereof | |
| CN212900956U (en) | an emergency inflatable device | |
| CN210713124U (en) | Flushing and overhauling system for drainage pipeline | |
| CN217923434U (en) | Hydraulic operation valve system capable of replacing tail gate chamber gate and headstock gear of pumped storage power station | |
| CN208793042U (en) | A kind of constructing metro tunnel safety-door device | |
| CN217781938U (en) | Emergency accident drainage system for leakage water collecting well of large hydropower station | |
| CN211472429U (en) | A tailgate arrangement structure for the tailgate chamber of a pumped-storage power station | |
| CN111305168A (en) | Bag type water stop structure for gate | |
| KR100845143B1 (en) | Gravity type automatic floodgate energy supply/without energy supply | |
| CN214143599U (en) | Emptying hole structure for updating and transforming reservoir emptying system | |
| CN215329800U (en) | A Navigation Facility Clearance Filling and Horizontal Pressure Device | |
| CN116464014A (en) | A layout structure of water filling and discharging pipelines in the docking gap of a ship lift equipped with a water storage main pipe | |
| CN115030115B (en) | A hydraulically operated valve system that can replace the tailgate chamber gate and hoist of a pumped-storage power station | |
| CN209620223U (en) | Shutters and diverter wells | |
| CN109853495B (en) | Method and device for temporarily plugging gate shaft of diversion tunnel body |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |