CN117782443A CN202311730038.XA CN202311730038A CN117782443A CN 117782443 A CN117782443 A CN 117782443A CN 202311730038 A CN202311730038 A CN 202311730038A CN 117782443 A CN117782443 A CN 117782443A
Authority
CN
China
Prior art keywords
pressure
cover plate
test
box body
radiator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311730038.XA
Other languages
Chinese (zh)
Inventor
李鹏
田杜养
蔡鹏�
陶盾
张小瑜
李凯
夏晨露
李敏敏
张斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Csic Xi'an Dong Yi Science Technology & Industry Group Co ltd
Original Assignee
Csic Xi'an Dong Yi Science Technology & Industry Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Csic Xi'an Dong Yi Science Technology & Industry Group Co ltd filed Critical Csic Xi'an Dong Yi Science Technology & Industry Group Co ltd
Priority to CN202311730038.XA priority Critical patent/CN117782443A/en
Publication of CN117782443A publication Critical patent/CN117782443A/en
Pending legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00—Energy generation of nuclear origin
    • Y02E30/30—Nuclear fission reactors

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The invention provides an airtight test device and method for a radiator. The test box body comprises a lower cover plate, an annular lining cylinder and an upper cover plate, wherein the upper cover plate is a circular cover plate, the lower cover plate is a circular cover plate, and the upper cover plate, the annular lining cylinder and the lower cover plate form a hollow cylinder with an opening at the upper end; the side wall of the annular lining cylinder is provided with a through hole; a plurality of inner pull rods are uniformly arranged between the upper cover plate and the lower cover plate in the circumferential direction; the upper end of the upper cover plate is provided with a detachable cover plate. According to the invention, the radiator is assembled on the test box body, the radiator is placed in the observable water tank, the test box body is connected with the pressurizing device through the hose, inert gas is filled into the test box body through the pressurizing device to stabilize the internal air pressure, and whether the airtight test is normally implemented is judged through the observable water tank and the pressure gauge.

Description

Air tightness test device and method for radiator
Technical Field
The invention belongs to the field of radiator airtight tests, and particularly relates to an airtight test device and method for a radiator.
Background
The main function of the radiator is to radiate magnetic field around torpedo, which is composed of several groups of coils on ring steel belt, and the surface is sealed by vulcanized rubber. The radiator is assembled outside the torpedo, and whether the air tightness of the inside of the radiator is good after the radiator is assembled directly influences the technical performance and the data acquisition effect of the product.
The publication No. CN115127753A discloses a method and a system for detecting the air tightness of a container, and the method is characterized in that the air tightness of the container is detected by estimating the equivalent aperture size of a leakage point of sealing equipment; step 1: preparing n+1 standard sealed containers with good tightness, taking n sealed containers for punching, increasing the aperture, and naming the n sealed containers as components to be tested; step 2: respectively connecting the standard sealed container and a part to be tested to the air charging device, and simultaneously respectively introducing gas with the preset pressure P into the standard sealed container and the part to be tested; step 3: stopping inflating after the pressure P of the standard sealing container and the part to be tested is reached, standing for a period of time t, and then measuring the pressure of the standard sealing container and the part to be tested to obtain a pressure difference delta P1 between the standard sealing container and the part to be tested; step 4: repeating the step 2 and the step 3 to obtain the differential pressure of the rest part to be tested and the standard sealed container as delta P2, delta P3, delta P4, delta P5, delta P6, delta P7, delta P8, delta P9 and delta P10 … delta Pn respectively; step 5: drawing a graph with an abscissa being equivalent aperture and an ordinate being differential pressure, and fitting to obtain the relationship between the equivalent aperture and the differential pressure; step 6: when the air tightness of the sealed container to be tested is evaluated, the pressure difference between the sealed container to be tested and the standard sealed container is measured according to the methods of the step 2 and the step 3, and the size of the leakage equivalent aperture of the sealed container to be tested is obtained through inverse calculation of the fitting relation obtained in the step 5, so that the air tightness of the sealed container to be tested is measured.
The method is to detect the air tightness of the container by estimating the equivalent aperture size of the leakage point of the sealing equipment. The method of the invention can eliminate the deviation caused by different pressure and temperature of the gas filled each time to the measurement of the equivalent aperture size of the to-be-measured piece, improve the measurement accuracy, directly estimate the size of the equivalent aperture of the leakage point of the to-be-measured equipment, avoid the radiation of the traditional flaw detection equipment and protect the safety of test staff.
In order to meet the air tightness test requirement of a certain radiator, the invention designs an air tightness test method of the radiator, simulates the underwater installation and working environment of the radiator, performs the air tightness test of a product, and is used for verifying the air tightness of the internal air pressure after the product is assembled.
Disclosure of Invention
In order to solve the problem that whether the airtight performance of the inside of the assembled radiator is intact or not is uncertain when the existing radiator is assembled outside a torpedo, the invention provides an airtight test device and an airtight test method of the radiator.
The invention adopts the technical scheme that:
the utility model provides a gas tightness test device of radiator, includes pressure device, water tank and test box, the test box be equipped with the radiator outward, the test box is located the water tank, pressure device be connected with the test box.
The test box body comprises a lower cover plate, an annular lining cylinder and an upper cover plate, wherein the upper cover plate is a circular cover plate, the lower cover plate is a circular cover plate, and the upper cover plate, the annular lining cylinder and the lower cover plate form a hollow cylinder with an opening at the upper end; the side wall of the annular lining cylinder is provided with a through hole; a plurality of inner pull rods are uniformly arranged between the upper cover plate and the lower cover plate in the circumferential direction; the upper end of the upper cover plate is provided with a detachable cover plate.
The upper cover plate is connected with the detachable cover plate through a rubber gasket, and the detachable cover plate seals the opening on the ground cover plate of the test box body through the first bolt and the rubber gasket.
The side wall of the annular lining cylinder is provided with a through hole, and a pressure test part is arranged in the through hole.
The pressure test part comprises a pressure test seal head, an O-shaped sealing ring, a pressure test gasket and a nut, wherein the O-shaped sealing ring is arranged on the pressure test seal head and is arranged in a through hole formed in the side wall of the annular lining barrel, and the outer end of the pressure test seal head is fixedly connected to the annular lining barrel through the pressure test gasket and the nut.
The pressurizing device is a pressurizing pump.
The pressurizing device is connected with the test box body through a hose and an inflating nozzle; the charging connector is assembled on a detachable cover plate of the test box body through an inflatable sealing gasket, and a pressure gauge is arranged on the hose.
The air tightness test method of the radiator comprises the following specific steps: firstly, performing air tightness test on a test box body, and after the test is qualified, assembling a connector of a radiator to the outer side of an annular bushing of the test box body, wherein the connector end of the radiator is arranged in a reserved through hole of the annular bushing; and the radiator is placed in an observable water tank, inert gas is filled into the test box body through a pressurizing device to stabilize the internal air pressure, and whether the air tightness of the radiator is qualified is judged through the observable water tank and a pressure gauge.
The method for testing the air tightness of the test box body comprises the following steps: the pressure test part is arranged in a through hole reserved on the side wall of the test box body and then is hung in an observable water tank, and the test box body is required to be completely immersed below the water surface; then starting the pressurizing device, flushing inert gas into the test box body, and observing the pressure rising condition through the digital display of the pressure gauge; and when the pressure rises to 150%, closing the pressurizing device to stop pressurizing, maintaining the pressure for at least 10 minutes, monitoring the pressure maintaining condition of the pressure gauge, and simultaneously observing whether bubbles exist in the water tank to obtain the test box body with perfect air tightness.
The method comprises the steps of flushing inert gas into the test box body through a pressurizing device, digitally displaying the pressure through a pressure gauge, observing the pressure rising condition, closing the pressurizing device to stop pressure rising when the pressure rises by 50%, maintaining the pressure for at least 2 minutes, monitoring the pressure maintaining condition of the pressure gauge, and simultaneously observing whether bubbles exist in the water box; after the pressure maintaining is finished, starting the pressurizing device to continuously boost pressure, maintaining the pressure for at least 10 minutes when the pressure is increased to the required pressure, monitoring the pressure maintaining condition of the pressure gauge, and simultaneously observing whether bubbles exist in the water tank or not, and if the bubbles exist, ensuring that the air tightness of the radiator is good; after the test is completed, the test box body is lifted out, the detachable cover plate is detached, the radiator is detached, and then the radiator with qualified air tightness is subjected to subsequent other functional tests.
The invention has the beneficial effects that:
in the invention, the radiator is assembled outside the annular bushing of the test box body, and the connector end of the radiator is installed in the reserved hole of the annular bushing. The airtight test device is placed in an observable water tank, the test box body is connected with a pressurizing device through a rubber hose, the pressurizing device inflates the test box body to enable the internal air pressure to be stable, and whether the airtight test is normally implemented is judged through an observation water tank instrument high-precision barometer.
The invention simulates the underwater installation and functional environment of the radiator and performs the airtight performance test of the product.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
FIG. 1 is a schematic diagram of the structure of the present invention.
FIG. 2 is a schematic view of the structure of the test chamber A-A of FIG. 1 with pressure test components installed in the annular bushing through holes.
FIG. 3 is a schematic view of the structure of the radiator installed outside the test chamber.
FIG. 4 is a schematic diagram of the structure of the test chamber.
In the drawings, reference numerals are:
1. a hose; 2. an air charging nozzle; 3. an inflatable gasket; 4. an annular bushing; 5. a connecting bolt; 6. a first gasket; 7. a first bolt; 8. a second gasket; 9. a removable cover; 10. a rubber pad; 11. an upper cover plate; 12. a seal ring; 13. an inner tie rod; 14. a lower cover plate; 15. a water tank; 16. a pressure gauge; 17. a pressurizing device; 18. pressure testing end socket; 19. an O-shaped sealing ring; 20. a pressure test gasket; 21. and (3) a nut.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are some, but not all embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Various structural schematic diagrams according to the disclosed embodiments of the present invention are shown in the accompanying drawings. The figures are not drawn to scale, wherein certain details are exaggerated for clarity of presentation and may have been omitted. The shapes of the various regions, layers and their relative sizes, positional relationships shown in the drawings are merely exemplary, may in practice deviate due to manufacturing tolerances or technical limitations, and one skilled in the art may additionally design regions/layers having different shapes, sizes, relative positions as actually required.
Example 1:
in order to solve the problem that whether the airtight performance of the inside of the assembled radiator is intact or not after the existing radiator is assembled outside a torpedo, the invention provides the airtight test device and the airtight test method of the radiator, which are shown in figures 1-4.
The air tightness test device of the radiator comprises a pressurizing device 17, a water tank 15 and a test box body, wherein the radiator is arranged outside the test box body, the test box body is positioned in the water tank 15, and the pressurizing device 17 is connected with the test box body.
As shown in fig. 1 and 4, the radiator is assembled on the test box, the test box is placed in the observable water tank 15, the pressurizing device 17 is connected with the test box through the hose 1, and the pressure gauge 16 is arranged on the hose 1. The test chamber is filled with an inert gas by the pressurizing means 17 to stabilize the internal gas pressure, and the airtight test is judged to be normal by the observation of the water tank 15 and the pressure gauge 16.
The invention simulates the underwater installation and working environment of the radiator, performs the air tightness test of the radiator product, and is used for verifying the sealing performance of the internal air pressure of the radiator product after assembly.
Example 2:
based on the embodiment 1, in this embodiment, preferably, the test chamber body includes a lower cover plate 14, an annular liner 4, and an upper cover plate 11, where the upper cover plate 11 is a circular cover plate, the lower cover plate 14 is a circular cover plate, and the upper cover plate 11, the annular liner 4, and the lower cover plate 14 form a hollow cylinder with an open upper end; the side wall of the annular lining cylinder 4 is provided with a through hole; a plurality of inner pull rods 13 are uniformly arranged between the upper cover plate 11 and the lower cover plate 14 in the circumferential direction; the upper end of the upper cover plate 11 is provided with a detachable cover plate 9.
Preferably, the upper cover plate 11 is connected with the detachable cover plate 9 through a rubber gasket 10, and the detachable cover plate 9 seals the opening on the upper cover plate 11 of the test box body through the first bolt 7 and the rubber gasket 10.
In the invention, as shown in fig. 1 and 4, the external thread end of the inner pull rod 13 is assembled on the lower cover plate 14, and the second washer 8 of the first bolt 7 is assembled on the internal thread installation surface of the inner pull rod 13 through the installation hole of the upper cover plate 11. The first gasket 6 of the upper sleeve of the connecting bolt 5 is assembled on the upper cover plate 11 through the mounting hole on the detachable cover plate 9. A rubber gasket 10 is assembled between the detachable cover plate 9 and the upper cover plate 11 for sealing.
Preferably, a through hole is formed in the side wall of the annular lining cylinder 4, and a pressure test part is arranged in the through hole.
Preferably, the pressure test part comprises a pressure test seal head 18, an O-shaped seal ring 19, a pressure test gasket 20 and a nut 21, wherein the O-shaped seal ring 19 is arranged on the pressure test seal head 18 and is arranged in a through hole formed in the side wall of the annular lining cylinder 4, and the outer end of the pressure test seal head 18 is fixedly connected to the annular lining cylinder 4 through the pressure test gasket 20 and the nut 21.
Preferably, the pressurizing device 17 is a pressurizing pump.
Preferably, the pressurizing device 17 is connected with the test box body through the hose 1 and the charging connector 2; the charging connector 2 is assembled on a detachable cover plate 9 of the test box body through an inflatable sealing gasket 3, and a pressure gauge 16 is arranged on the hose 1.
As shown in fig. 2, the pressure test part of the present invention was used for testing the air pressure sealing performance in the test chamber before the radiator test. The O-shaped sealing ring 19 is sleeved on the pressure testing seal head 18, penetrates through the reserved through hole of the annular bushing 4, is pressed by the pressure testing gasket 20 at the back, and is fastened by the M8 nut 21. A removable cushion rubber 10 is cushion-fitted to the upper cover plate 11, and each set of upper washers 6 is fitted to the upper cover plate 11 through a mounting hole in the removable cover plate 9 using 8 linking bolts 5, respectively. The charging connector 2 is assembled on the detachable cover plate 9 through the charging sealing gasket 3, and the charging connector 2 is connected with the pressurizing device 17 through the hose 1, so that reliable connection of all parts is ensured. In the present invention, the hose 1 is preferably a rubber hose.
Example 3:
based on the embodiment 1 or 2, the embodiment provides a method for testing the air tightness of a radiator, which specifically comprises the following steps: firstly, performing air tightness test on a test box body, and after the test is qualified, assembling a connector of a radiator to the outer side of an annular bushing 4 of the test box body, wherein the connector end of the radiator is arranged in a reserved through hole of the annular bushing 4; and put into the observable water tank 15, the inside air pressure of the test box is stabilized by filling inert gas into the test box through the pressurizing device 17, and whether the air tightness of the radiator is qualified is judged through the observable water tank 15 and the pressure gauge 16.
Preferably, the method for testing the air tightness of the test box body comprises the following steps: after a pressure test part is arranged in a through hole reserved on the side wall of the test box body, the test box body is hung in an observable water tank 15, and the test box body is required to be completely immersed below the water surface; then starting the pressurizing device 17, flushing inert gas into the test box body, and digitally displaying the pressure through the pressure gauge 16 to observe the pressure rising condition; when the pressure rises to 150%, the pressurizing device 17 is closed to stop pressurizing, the pressure is maintained for at least 10 minutes, the pressure maintaining condition of the pressure gauge 16 is monitored, and meanwhile whether bubbles exist in the water tank 15 is observed, so that the test box body with good air tightness is obtained.
Preferably, after the test box body is tested to be qualified, a connector of the radiator is assembled outside the annular bushing 4 of the test box body, inert gas is injected into the test box body through the pressurizing device 17, the pressure rise condition is observed through the digital display of the pressure gauge 16, the pressurizing device 17 is closed to stop pressurizing when the pressure rises by 50%, the pressure is maintained for at least 2 minutes, the pressure maintaining condition of the pressure gauge 16 is monitored, and meanwhile, whether bubbles exist in the water tank 17 is observed; after the pressure maintaining is finished, starting the pressurizing device 17 to continuously boost pressure, maintaining the pressure for at least 10 minutes when the pressure is increased to the required pressure, monitoring the pressure maintaining condition of the pressure gauge 16, and simultaneously observing whether bubbles exist in the water tank 15 or not, and if the bubbles exist, ensuring that the air tightness of the radiator is good; after the test is completed, the test box body is lifted out, the detachable cover plate 9 is detached, the radiator is detached, and then the radiator with qualified air tightness is subjected to subsequent other functional tests.
In the invention, as shown in fig. 1 and 2, before airtight test, 8 inner pull rods 13 are assembled with external screw thread ends on a lower cover plate 14, the inner pull rods are installed and fastened, 1 sealing ring is respectively arranged at two sides of an annular lining cylinder 4 and is assembled between the lower cover plate 14 and an upper cover plate 11, and corresponding washers 8 on the corresponding sets of 8 bolts 7 are respectively assembled to the internal screw thread installation surfaces of the inner pull rods 13 through installation holes on the upper cover plate 11, so that the inner pull rods are installed and fastened.
As shown in fig. 3, the radiator is assembled outside the annular bushing 4, the connector end of the radiator is installed in the reserved through hole of the annular bushing 4, and the contact part of the annular bushing 4 and the radiator is sealed by using an O-shaped sealing ring of the radiator. The charging connector 2 is assembled on the detachable cover plate 9 through the charging sealing gasket 3, and the charging connector 2 is connected with the pressurizing device 17 through the hose 1, so that reliable connection of all parts is ensured. And then the test box body is hung in the observable water tank and needs to be completely submerged below the water surface. The pressurizing device 17 is started, inert gas is filled into the test box body, and the pressure rise is observed through the digital display of the pressure gauge 16 with sensitive accuracy. When the pressure rises by 50%, the pressurizing device 17 is closed to stop pressurizing, the pressure is maintained for 2 minutes, the pressure maintaining condition of the pressure gauge is monitored, and meanwhile, whether a bubble product exists in the water tank or not is observed. After the pressure maintaining is finished, starting the pressurizing device to continuously boost, maintaining the pressure for 10 minutes when the system pressure is increased to the required pressure, monitoring the pressure maintaining condition of the pressure gauge, and simultaneously observing whether a bubble product exists in the water tank. If there is no bubble, the air tightness is good. After the test is completed, the test box body is lifted out, the detachable cover plate 9 is detached, the radiator product is detached, and subsequent other functional tests of the radiator product are carried out.
According to the invention, the underwater installation and working state of the radiator are simulated by adopting the test box body, the sealing reliability of the system is ensured by the gasket, the rubber piece and the O-shaped sealing ring, and the components are connected by bolts, so that the operation is convenient.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
It is also to be understood that the terminology used in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used in this specification and the appended claims, the singular forms "a," "an," and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise.
The foregoing examples are merely illustrative of the present invention and are not intended to limit the scope of the present invention, and all designs that are the same or similar to the present invention are within the scope of the present invention. The device structure and method steps not described in detail in the present invention are all prior art, and will not be further described in the present invention.

Claims (10)

1. An airtight test device of radiator, its characterized in that: the test box comprises a pressurizing device (17), a water tank (15) and a test box body, wherein a radiator is arranged outside the test box body, the test box body is positioned in the water tank (15), and the pressurizing device (17) is connected with the test box body.
2. The apparatus for testing the tightness of a radiator according to claim 1, wherein: the test box body comprises a lower cover plate (14), an annular lining cylinder (4) and an upper cover plate (11), wherein the upper cover plate (11) is a circular cover plate, the lower cover plate (14) is a circular cover plate, and the upper cover plate (11), the annular lining cylinder (4) and the lower cover plate (14) form a hollow cylinder with an opening at the upper end; the side wall of the annular lining cylinder (4) is provided with a through hole; a plurality of inner pull rods (13) are uniformly arranged between the upper cover plate (11) and the lower cover plate (14) in the circumferential direction; the upper end of the upper cover plate (11) is provided with a detachable cover plate (9).
3. The apparatus for testing the tightness of a radiator according to claim 2, wherein: the upper cover plate (11) is connected with the detachable cover plate (9) through a rubber gasket (10), and the detachable cover plate (9) seals the opening on the ground cover plate (11) of the test box body through the first bolt (7) and the rubber gasket (10).
4. The apparatus for testing the tightness of a radiator according to claim 1, wherein: the side wall of the annular lining cylinder (4) is provided with a through hole, and a pressure test part is arranged in the through hole.
5. The apparatus of claim 4, wherein: the pressure test part comprises a pressure test seal head (18), an O-shaped sealing ring (19), a pressure test gasket (20) and a nut (21), wherein the O-shaped sealing ring (19) is arranged on the pressure test seal head (18) and is installed in a through hole formed in the side wall of the annular lining barrel (4), and the outer end of the pressure test seal head (18) is fixedly connected to the annular lining barrel (4) through the pressure test gasket (20) and the nut (21).
6. The apparatus for testing the tightness of a radiator according to claim 1, wherein: the pressurizing device (17) is a pressurizing pump.
7. The apparatus for testing the tightness of a radiator according to claim 1, wherein: the pressurizing device (17) is connected with the test box body through the hose (1) and the charging connector (2); the air charging nozzle (2) is assembled on a detachable cover plate (9) of the test box body through an air charging sealing gasket (3), and a pressure gauge (16) is arranged on the hose (1).
8. The air tightness test device of a radiator according to any of claims 1-7 provides an air tightness test method of a radiator, characterized in that: the method comprises the following specific steps: firstly, performing air tightness test on a test box body, and after the test is qualified, assembling a connector of a radiator to the outer side of an annular bushing (4) of the test box body, wherein the connector end of the radiator is arranged in a reserved through hole of the annular bushing (4); and put into observable water tank (15), fill inert gas into the test box through pressurizing device (17) and make its inside atmospheric pressure stabilize, judge whether the gas tightness of radiator is qualified through observing water tank (15) and manometer (16).
9. The method for testing the air tightness of the radiator according to claim 8, wherein: the method for testing the air tightness of the test box body comprises the following steps: the pressure test part is arranged in a through hole reserved on the side wall of the test box body and then is hung in an observable water tank (15), and the test box body is required to be completely submerged below the water surface; then starting a pressurizing device (17), flushing inert gas into the test box body, and observing the pressure rising condition through the digital display pressure of a pressure gauge (16); when the pressure rises to 150%, the pressurizing device (17) is closed to stop pressurizing, the pressure is maintained for at least 10 minutes, the pressure maintaining condition of the pressure gauge (16) is monitored, and meanwhile whether bubbles exist in the water tank (15) or not is observed, so that the test box body with good air tightness is obtained.
10. The method for testing the air tightness of the radiator according to claim 8, wherein: the method comprises the steps of flushing inert gas into the test box body through a pressurizing device (17), digitally displaying pressure through a pressure gauge (16), observing pressure rising condition, closing the pressurizing device (17) when the pressure rises by 50%, stopping pressurizing, maintaining the pressure for at least 2 minutes, monitoring the pressure maintaining condition of the pressure gauge (16), and observing whether bubbles exist in the water tank (17) at the same time; after the pressure maintaining is finished, starting the pressurizing device (17) to continuously boost pressure, maintaining the pressure for at least 10 minutes when the pressure is increased to the required pressure, monitoring the pressure maintaining condition of the pressure gauge (16), and simultaneously observing whether bubbles exist in the water tank (15), and if the bubbles exist, ensuring that the air tightness of the radiator is good; after the test is completed, the test box body is lifted out, the detachable cover plate (9) is detached, the radiator is detached, and then the radiator with qualified air tightness is subjected to subsequent other functional tests.
CN202311730038.XA 2023-12-15 2023-12-15 Air tightness test device and method for radiator Pending CN117782443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311730038.XA CN117782443A (en) 2023-12-15 2023-12-15 Air tightness test device and method for radiator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311730038.XA CN117782443A (en) 2023-12-15 2023-12-15 Air tightness test device and method for radiator

Publications (1)

Publication Number Publication Date
CN117782443A true CN117782443A (en) 2024-03-29

Family

ID=90380737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311730038.XA Pending CN117782443A (en) 2023-12-15 2023-12-15 Air tightness test device and method for radiator

Country Status (1)

Country Link
CN (1) CN117782443A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118857583A (en) * 2024-09-20 2024-10-29 中国核工业二四建设有限公司 A magnetic intelligent nondestructive testing device and method for nuclear power plant steel lining welds
CN119078666A (en) * 2024-08-02 2024-12-06 东风汽车集团股份有限公司 Electric pedal connection structure, sealing detection method and vehicle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119078666A (en) * 2024-08-02 2024-12-06 东风汽车集团股份有限公司 Electric pedal connection structure, sealing detection method and vehicle
CN118857583A (en) * 2024-09-20 2024-10-29 中国核工业二四建设有限公司 A magnetic intelligent nondestructive testing device and method for nuclear power plant steel lining welds

Similar Documents

Publication Publication Date Title
CN108896495B (en) Environment-friendly insulating gas and metal compatibility test simulation device and test method
CN112903203A (en) Large-scale container positive pressure helium mass spectrometry detection system and detection method
CN109799046A (en) A kind of soft package lithium battery packaging effect detection device and detection method
CN109557011A (en) A kind of waterproof ventilated membrane waterproof detection method and detection device
CN113008479A (en) Method and system for monitoring sealing performance of battery pack
CN208719497U (en) A kind of explosion-proof valve for inflating spool, fast aeration detection box leakproofness
CN221781763U (en) Airtightness test device for radiator
RU91431U1 (en) HYDRAULIC STAND FOR TESTING DEEP-WATER HOUSING CASES
CN203758702U (en) Automatic submersible-type leakage test machine for water pump semi-finished products
CN114705355B (en) Fluid calibration device for soil pressure box and soil pressure box calibration method
CN109781364A (en) Gas leak detection device and method
CN213839000U (en) Double-layer isolation sleeve structure of magnetic pump
CN217845547U (en) Leakage testing tool
CN209470815U (en) A kind of hub bearing sealing ring tightness test device
CN216247061U (en) Transformer oil level thermometer seat leakage test frock
CN112229581B (en) Filter assembly test bench
CN118883405A (en) Test method and test system for measuring hydrogen absorption expansion rate of non-metallic parts
CN116858453A (en) Tightness test method in ship stabilizer installation
CN206832421U (en) A submersible motor life testing device
CN216349439U (en) Caisson valve tightness detection device
CN213842560U (en) Transformer pressurization leak test device
CN213068095U (en) Engine housing detection device
CN204405261U (en) A kind of lithium battery apparatus for testing weeping
CN118603755B (en) Instrument fracturing detection device
CN114910214A (en) Ground testing device for pulsating pressure sensor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination