CN117773176A - A new type of CNC bench drill - Google Patents

A new type of CNC bench drill Download PDF

Info

Publication number
CN117773176A
CN117773176A CN202410014028.4A CN202410014028A CN117773176A CN 117773176 A CN117773176 A CN 117773176A CN 202410014028 A CN202410014028 A CN 202410014028A CN 117773176 A CN117773176 A CN 117773176A
Authority
CN
China
Prior art keywords
clamping
driving
locking
plate
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202410014028.4A
Other languages
Chinese (zh)
Other versions
CN117773176B (en
Inventor
肖小狮
叶文刚
傅立新
喻明辉
江卫峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huangshan Bench Drilling Machine Co ltd
Original Assignee
Anhui Huangshan Bench Drilling Machine Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huangshan Bench Drilling Machine Co ltd filed Critical Anhui Huangshan Bench Drilling Machine Co ltd
Priority to CN202410014028.4A priority Critical patent/CN117773176B/en
Publication of CN117773176A publication Critical patent/CN117773176A/en
Application granted granted Critical
Publication of CN117773176B publication Critical patent/CN117773176B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Drilling And Boring (AREA)

Abstract

本发明公开了一种新型数控台钻,涉及到台钻领域,包括钻床,钻床上安装有夹持组件,钻床上位于夹持组件的上方还安装有旋转钻头;夹持组件包括承载板、两组预夹持单元、预夹持同步单元、两组锁定单元、锁定驱动单元和锁定调节单元;夹持组件能够垂直移动;两组预夹持单元安装在承载板上,预夹持单元包括预夹持弹簧和夹持板。对工件预夹持和锁定仅需要推动夹持板移动,夹持板能够通过预夹持同步单元带动另一夹持板移动,从而使两块夹持板张开,松手即可将工件预夹持,之后工件上升,夹持板被锁定不需要人工操作,对工件夹持的操作更简单,上手难度低,提高夹持效率,且推动夹持板张开,松手将工件夹持的操作更方便。

The invention discloses a novel CNC bench drill, which relates to the field of bench drills, including a drilling machine, a clamping assembly installed on the drilling machine, and a rotating drill bit installed above the clamping assembly on the drilling machine; the clamping assembly includes a bearing plate, two groups of pre-clamping units, a pre-clamping synchronization unit, two groups of locking units, a locking drive unit and a locking adjustment unit; the clamping assembly can move vertically; the two groups of pre-clamping units are installed on the bearing plate, and the pre-clamping units include a pre-clamping spring and a clamping plate. Pre-clamping and locking of a workpiece only require pushing the clamping plate to move, and the clamping plate can drive another clamping plate to move through the pre-clamping synchronization unit, so that the two clamping plates are opened, and the workpiece can be pre-clamped by releasing the hands, and then the workpiece rises, and the clamping plate is locked without manual operation, so that the operation of clamping the workpiece is simpler, the difficulty of getting started is low, and the clamping efficiency is improved, and the operation of pushing the clamping plate to open and releasing the hands to clamp the workpiece is more convenient.

Description

一种新型数控台钻A new type of CNC bench drill

技术领域Technical field

本发明涉及台钻领域,特别涉及一种新型数控台钻。The invention relates to the field of bench drills, and in particular to a new type of CNC bench drill.

背景技术Background technique

数控台钻是一种机床,可以用来钻孔、攻丝和切削,这种机床通常用于金属加工行业,可以精确地控制钻孔的深度、直径和速度。数控台钻可以通过计算机程序控制,可以根据不同的加工需求进行定制;数控台钻通常由以下几个部分组成;床身:数控台钻的床身通常由铸铁或钢板制成,具有足够的刚度和稳定性,可以保证钻孔的精度;工作台:工作台是用来放置工件的位置,通常可以调节高度和倾斜角度,以适应不同形状和尺寸的工件;钻头:数控台钻通常配备多种不同类型和尺寸的钻头,可以根据加工需求进行选择;控制系统:数控台钻的控制系统通常由计算机、显示器、键盘和操作面板组成,可以用来输入和控制钻孔程序;冷却系统:数控台钻通常配备冷却系统,用来冷却钻头和工件,防止钻头过热和工件变形,数控台钻是一种高效、精确、灵活的机床,适用于各种金属加工行业。A CNC bench drill is a machine tool that can be used for drilling, tapping and cutting. This type of machine tool is often used in the metal processing industry and can accurately control the depth, diameter and speed of drilling. CNC bench drills can be controlled by computer programs and can be customized according to different processing needs; CNC bench drills usually consist of the following parts; Bed: The bed of CNC bench drills is usually made of cast iron or steel plates and has sufficient stiffness and stability, which can ensure the accuracy of drilling; workbench: the workbench is used to place the workpiece, and the height and inclination angle can usually be adjusted to adapt to workpieces of different shapes and sizes; drill bits: CNC bench drills are usually equipped with a variety of Drill bits of different types and sizes can be selected according to processing needs; Control system: The control system of a CNC bench drill usually consists of a computer, display, keyboard and operation panel, which can be used to input and control the drilling program; Cooling system: CNC table Drills are usually equipped with a cooling system to cool the drill bit and workpiece to prevent overheating of the drill bit and deformation of the workpiece. The CNC bench drill is an efficient, precise and flexible machine tool suitable for various metal processing industries.

中国专利CN111283238B公开了一种可精准定位的机械加工用台钻,包括:台钻主体;升降底座,设置在所述台钻主体的前侧底端;固定座,设置在所述升降底座的顶端;夹持机构,设置在所述固定座的顶端;定位机构,设置在所述台钻主体的前侧顶端,可便于对后续加工的工件进行钻孔定位,从而不会出现孔钻偏的情况,提高了加工质量,可适用于固定不同大小的工件,进而能够对工件进行快速地固定钻孔,以便于对工件进行批量加工,钻孔速度较快。Chinese patent CN111283238B discloses a bench drill for machining that can be accurately positioned, including: a bench drill main body; a lifting base, which is arranged at the front bottom end of the bench drill body; and a fixed seat, which is arranged at the top of the lifting base. ; The clamping mechanism is arranged on the top of the fixed seat; the positioning mechanism is arranged on the front top of the main body of the bench drill, which can facilitate drilling and positioning of the workpiece for subsequent processing, so that the hole drilling will not be offset. , improves the processing quality, can be suitable for fixing workpieces of different sizes, and can quickly fix and drill the workpieces, so as to facilitate the batch processing of the workpieces and the drilling speed is faster.

上述专利和现有技术中还存在以下缺陷:There are also the following defects in the above-mentioned patents and existing technologies:

现在台钻上均具有夹具,将待钻孔的工件夹持,保证工件在钻孔过程中的稳定性,但需要操作夹具将工件夹持,现有的台钻夹具通过螺杆带动两块夹板相向移动将工件夹持,需要转动螺杆的圈数多、速度慢,操作麻烦,导致夹持工件的效率较低。Nowadays, bench drills are equipped with clamps to clamp the workpiece to be drilled to ensure the stability of the workpiece during the drilling process. However, the clamp needs to be operated to clamp the workpiece. The existing bench drill clamp drives two splints towards each other through a screw. Mobile clamping of the workpiece requires a large number of turns of the screw, which is slow and cumbersome to operate, resulting in low efficiency in clamping the workpiece.

因此,本申请提供了一种新型数控台钻来满足需求。Therefore, this application provides a new type of CNC bench drill to meet the needs.

发明内容Contents of the invention

本申请的目的在于提供一种新型数控台钻,对工件预夹持和锁定仅需要推动夹持板移动,夹持板能够通过预夹持同步单元带动另一夹持板移动,从而使两块夹持板张开,松手即可将工件预夹持,之后工件上升,夹持板被锁定不需要人工操作,对工件夹持的操作更简单,上手难度低,提高夹持效率,且推动夹持板张开,松手将工件夹持的操作更方便。The purpose of this application is to provide a new type of CNC bench drill. To pre-clamp and lock the workpiece, only the clamping plate needs to be pushed to move. The clamping plate can drive the other clamping plate to move through the pre-clamping synchronization unit, thereby making the two The clamping plate is opened and the workpiece can be pre-clamped by letting go. Then the workpiece rises and the clamping plate is locked without manual operation. The operation of clamping the workpiece is simpler, the difficulty of getting started is low, the clamping efficiency is improved, and the clamp is pushed It is more convenient to open the holding plate and release the workpiece to clamp the workpiece.

为实现上述目的,本申请提供如下技术方案:一种新型数控台钻,包括钻床,所述钻床上安装有夹持组件,所述钻床上位于夹持组件的上方还安装有旋转钻头;In order to achieve the above purpose, this application provides the following technical solution: a new type of CNC bench drill, including a drilling machine, a clamping assembly is installed on the drilling machine, and a rotating drill bit is installed above the clamping assembly on the drilling machine;

所述夹持组件包括承载板、两组预夹持单元、预夹持同步单元、两组锁定单元、锁定驱动单元和锁定调节单元;The clamping assembly includes a load-bearing plate, two sets of pre-clamping units, two sets of pre-clamping synchronization units, two sets of locking units, a locking drive unit and a locking adjustment unit;

所述夹持组件能够垂直移动;The clamping component can move vertically;

两组预夹持单元安装在所述承载板上,所述预夹持单元包括预夹持弹簧和夹持板,两个预夹持弹簧能够驱动对应的所述夹持板移动,使两块所述夹持板相向移动将工件夹持;Two sets of pre-clamping units are installed on the load-bearing plate. The pre-clamping units include pre-clamping springs and clamping plates. The two pre-clamping springs can drive the corresponding clamping plates to move, so that the two The clamping plates move toward each other to clamp the workpiece;

当使其中一个所述预夹持单元中的所述夹持板移动时,所述预夹持同步单元能够使另一所述预夹持单元中的夹持板向相反方向移动;When the clamping plate in one of the pre-clamping units is moved, the pre-clamping synchronization unit can move the clamping plate in the other pre-clamping unit in the opposite direction;

所述锁定单元包括两块锁定块,当所述夹持组件上升后,所述锁定驱动单元能够驱动两块锁定块相对于所述承载板上升,使两块锁定块移动至夹持板远离工件的一侧将夹持板抵紧;The locking unit comprises two locking blocks. When the clamping assembly rises, the locking drive unit can drive the two locking blocks to rise relative to the carrier plate, so that the two locking blocks move to the side of the clamping plate away from the workpiece to press the clamping plate tightly.

所述锁定调节单元能够带动两块所述锁定块水平移动且移动方向相反。The locking adjustment unit can drive the two locking blocks to move horizontally and in opposite directions.

优选的,所述钻床上固定安装有固定杆,所述旋转钻头安装在所述固定杆上,所述锁定驱动单元包括驱动齿轮、驱动转轴、驱动皮带件、驱动转杆、主动锥齿轮、被动锥齿轮、驱动螺纹筒和驱动螺纹杆,所述锁定单元还包括锁定板;Preferably, a fixed rod is fixedly installed on the drilling machine, and the rotary drill bit is installed on the fixed rod. The locking drive unit includes a driving gear, a driving rotating shaft, a driving belt, a driving rotating rod, a driving bevel gear, and a passive gear. bevel gear, driving threaded barrel and driving threaded rod, the locking unit also includes a locking plate;

所述固定杆上固定安装有驱动齿条,所述驱动齿轮固定套接在所述驱动转轴上并于所述驱动齿条相啮合,所述驱动皮带件安装在所述驱动转轴和驱动转杆上,所述主动锥齿轮固定安装在驱动转杆的转动,所述被动锥齿轮固定套接在所述驱动螺纹筒上并于所述主动锥齿轮相啮合,所述驱动螺纹杆插设在所述驱动螺纹筒内并与所述驱动螺纹筒螺纹配合,所述驱动螺纹杆的顶部固定安装在所述锁定板上,两块所述锁定块通过所述锁定调节单元安装在所述锁定板上,所述锁定块的顶部为弧形设置,所述驱动皮带件包括主动皮带轮、被动皮带轮和驱动皮带,主动皮带轮固定安装在所述驱动转轴上,被动皮带轮固定安装在驱动转杆上,驱动皮带连接在主动皮带轮和被动皮带轮上。A driving rack is fixedly installed on the fixed rod, the driving gear is fixedly sleeved on the driving rotating shaft and meshes with the driving rack, and the driving belt is installed on the driving rotating shaft and the driving rotating rod. On the top, the driving bevel gear is fixedly installed on the rotation of the driving rotating rod, the passive bevel gear is fixedly sleeved on the driving threaded barrel and meshes with the driving bevel gear, and the driving threaded rod is inserted into the The top of the driving threaded rod is fixedly installed on the locking plate, and the two locking blocks are installed on the locking plate through the locking adjustment unit. , the top of the locking block is arranged in an arc shape, the driving belt component includes a driving pulley, a passive pulley and a driving belt, the driving pulley is fixedly installed on the driving shaft, the passive pulley is fixedly installed on the driving rotating rod, and the driving belt Connected to the driving pulley and passive pulley.

优选的,所述预夹持同步单元包括两块同步块、两根同步齿条、固定块和同步齿轮,两块同步块分别固定安装在两块所述夹持板的底部,所述承载板对应所述同步块的位置开设有移动孔,两块所述同步块均滑动配合在移动孔内,固定块固定安装在所述承载板的底部,所述同步齿轮转动连接在固定块上,两根同步齿条分别固定安装在对应的所述同步块上,两根所述同步齿条分别位于所述同步齿轮的两侧并与所述同步齿轮啮合。Preferably, the pre-clamping synchronization unit includes two synchronization blocks, two synchronization racks, a fixed block and a synchronization gear. The two synchronization blocks are respectively fixedly installed at the bottom of the two clamping plates. The load-bearing plate A moving hole is provided corresponding to the position of the synchronizing block. Both synchronizing blocks are slidingly fitted in the moving hole. A fixed block is fixedly installed on the bottom of the bearing plate. The synchronizing gear is rotationally connected to the fixed block. One synchronization rack is fixedly installed on the corresponding synchronization block, and two synchronization racks are respectively located on both sides of the synchronization gear and mesh with the synchronization gear.

优选的,所述锁定调节单元包括两块调节块和双向螺纹杆,两块所述调节块分别固定安装在两块锁定块的底部,所述锁定板上对应所述调节块位置开设有调节孔,两块所述调节块均滑动配合在调节孔内,所述双向螺纹杆贯穿两块所述调节块并与所述调节块螺纹连接,所述锁定板上固定安装有支撑块,所述调节块转动连接在支撑块上。Preferably, the locking adjustment unit includes two adjustment blocks and a two-way threaded rod. The two adjustment blocks are respectively fixedly installed on the bottoms of the two locking blocks. The locking plate has an adjustment hole corresponding to the position of the adjustment block. , both adjustment blocks are slidingly fitted in the adjustment holes, the two-way threaded rod penetrates the two adjustment blocks and is threadedly connected to the adjustment blocks, a support block is fixedly installed on the locking plate, and the adjustment block The block is rotationally connected to the support block.

优选的,所述承载板上固定安装有固定壳体,所述夹持组件设置在所述固定壳体内,所述固定壳体内固定安装有固定侧板,所述驱动转轴的两端分别转动连接在对应的固定侧板上,所述固定壳体内还固定安装有两块连接块,所述驱动转轴贯穿连接块并与连接块转动连接,两块连接块位于所述驱动齿轮的两侧,驱动转杆转动连接在对应的固定侧板上,固定侧板上固定安装有稳固块,所述驱动螺纹筒转动连接在稳固块上。Preferably, a fixed shell is fixedly installed on the carrier plate, the clamping assembly is arranged in the fixed shell, a fixed side plate is fixedly installed in the fixed shell, both ends of the driving shaft are rotatably connected to the corresponding fixed side plates respectively, two connecting blocks are also fixedly installed in the fixed shell, the driving shaft passes through the connecting blocks and is rotatably connected to the connecting blocks, the two connecting blocks are located on both sides of the driving gear, the driving rotating rod is rotatably connected to the corresponding fixed side plate, a stabilizing block is fixedly installed on the fixed side plate, and the driving threaded cylinder is rotatably connected to the stabilizing block.

优选的,所述锁定单元设置有两组,所述锁定调节单元对应所述锁定单元设置有两组,两组锁定调节单元中的所述驱动螺纹杆共同连接有调节同步单元,所述调节同步单元包括两个调节皮带轮和调节皮带,两个调节皮带轮分别固定调节在对应的驱动螺纹杆上,调节皮带连接在两个调节皮带轮上。Preferably, the locking unit is provided with two groups, the locking adjustment unit is provided with two groups corresponding to the locking unit, and the driving threaded rods in the two groups of locking adjustment units are jointly connected with an adjustment synchronization unit, and the adjustment synchronization unit is The unit includes two adjusting pulleys and an adjusting belt. The two adjusting pulleys are respectively fixed and adjusted on the corresponding driving threaded rods. The adjusting belt is connected to the two adjusting pulleys.

优选的,所述固定壳体的一侧开设有避让孔,两根所述驱动螺纹杆中的其中一根穿过避让孔并固定安装有转动块,所述转动块上开设有防滑槽。Preferably, a avoidance hole is provided on one side of the fixed shell, one of the two driving threaded rods passes through the avoidance hole and is fixedly mounted with a rotating block, and an anti-slip groove is provided on the rotating block.

优选的,所述钻床内固定安装有升降液压杆,所述升降液压杆的输出端固定安装在所述固定壳体的底部。Preferably, a lifting hydraulic rod is fixedly installed in the drilling machine, and the output end of the lifting hydraulic rod is fixedly installed at the bottom of the fixed housing.

优选的,两块所述夹持板相对的一侧均固定安装有橡胶块,所述预夹持单元还包括限位杆和限位块,限位块固定安装在所述承载板的底部,所述限位杆的一端固定安装在限位块上,所述限位杆的另一端固定安装在固定块上,所述预夹持弹簧的一端固定安装在限位块上,所述预夹持弹簧的另一端固定安装在所述同步块上,且所述预夹持弹簧套设在所述限位杆上,所述夹持板的底部固定安装有滑动块,所述承载板上对应滑动块位置开设有滑动槽,滑动块滑动配合在滑动槽内。Preferably, rubber blocks are fixedly installed on opposite sides of the two clamping plates, and the pre-clamping unit also includes a limit rod and a limit block, the limit block is fixedly installed on the bottom of the supporting plate, one end of the limit rod is fixedly installed on the limit block, and the other end of the limit rod is fixedly installed on the fixed block, one end of the pre-clamping spring is fixedly installed on the limit block, and the other end of the pre-clamping spring is fixedly installed on the synchronization block, and the pre-clamping spring is sleeved on the limit rod, and a sliding block is fixedly installed on the bottom of the clamping plate, and a sliding groove is opened on the supporting plate at a position corresponding to the sliding block, and the sliding block slidably fits in the sliding groove.

优选的,所述锁定板对应所述限位杆位置开设有通过孔,所述锁定板的底部固定安装有U形板,所述锁定板通过所述U形板与所述驱动螺纹杆固定安装。Preferably, the locking plate has a through hole corresponding to the position of the limiting rod, a U-shaped plate is fixedly installed at the bottom of the locking plate, and the locking plate is fixedly installed with the driving threaded rod through the U-shaped plate. .

综上,本发明的技术效果和优点:In summary, the technical effects and advantages of the present invention are:

1、本发明中,旋转钻头通过工件的上升将工件打孔,将工件放置在承载板能够使工件通过夹持板预夹持,防止工件位移,之后在工件上升的过程中,通过锁定驱动单元带动锁定块上升,锁定块能够将夹持板锁定,从而将工件夹持,保证工件继续上升被钻孔的过程中,工件不会因受力而位移,保证工件的稳定性,对工件打孔更准确,同时对工件预夹持和锁定仅需要推动夹持板移动,夹持板能够通过预夹持同步单元带动另一夹持板移动,从而使两块夹持板张开,松手即可将工件预夹持,之后工件上升,夹持板被锁定不需要人工操作,对工件夹持的操作更简单,上手难度低,提高夹持效率,且推动夹持板张开,松手将工件夹持的操作更方便;1. In the present invention, the rotary drill drills the workpiece by lifting the workpiece. Placing the workpiece on the bearing plate can pre-clamp the workpiece through the clamping plate to prevent the workpiece from being displaced. Then, during the process of the workpiece rising, the driving unit is locked Drive the locking block to rise, and the locking block can lock the clamping plate to clamp the workpiece, ensuring that when the workpiece continues to rise and is drilled, the workpiece will not be displaced due to force, ensuring the stability of the workpiece and drilling the workpiece. More accurate. Pre-clamping and locking the workpiece at the same time only requires pushing the clamping plate to move. The clamping plate can drive the other clamping plate to move through the pre-clamping synchronization unit, so that the two clamping plates open and can be released. The workpiece is pre-clamped, and then the workpiece rises and the clamping plate is locked without manual operation. The operation of clamping the workpiece is simpler, the difficulty of getting started is low, the clamping efficiency is improved, and the clamping plate is pushed open, and the workpiece is clamped by letting go. The operation is more convenient;

2、本发明中,当推动其中一块夹持板移动后,此夹持板带动对应的同步齿条移动,此同步齿条带动同步齿轮转动,同步齿轮带动另一同步齿条反向移动,另一同步齿条带动另一夹持板移动,使两块夹持板相反方向移动,在对工件夹持时,仅需推动一个夹持板移动即可,简化了操作,使用更方便;2. In the present invention, when one of the clamping plates is pushed to move, the clamping plate drives the corresponding synchronous rack to move. The synchronous rack drives the synchronous gear to rotate, and the synchronous gear drives the other synchronous rack to move in the opposite direction. One synchronous rack drives the other clamping plate to move, causing the two clamping plates to move in opposite directions. When clamping the workpiece, only one clamping plate needs to be pushed to move, which simplifies the operation and makes it more convenient to use;

3、本发明中,当工件的尺寸不同,夹持板通过预夹持弹簧夹持工件后的位置也不同,不同尺寸的工件需要调整锁定块的位置,通过转动双向螺纹杆,两块调节块在双向螺纹杆上移动,两块调节块带动对应的锁定块移动,且移动方向相反,使锁定块能够匹配不同尺寸的工件,能够将位置不同的夹持板锁定,提高了适用性。3. In the present invention, when the size of the workpiece is different, the position of the clamping plate after clamping the workpiece through the pre-clamping spring is also different. Workpieces of different sizes need to adjust the position of the locking block. By rotating the two-way threaded rod, the two adjustment blocks Moving on the two-way threaded rod, the two adjustment blocks drive the corresponding locking blocks to move in opposite directions, so that the locking blocks can match workpieces of different sizes and lock clamping plates with different positions, improving applicability.

附图说明Description of drawings

为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅是本申请的一些实施例,对于本领域技术人员来讲,在不付出创造性劳动的前提下,还能够根据这些附图获得其他的附图。In order to explain the embodiments of the present application or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description are only These are some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without exerting creative efforts.

图1为本发明中钻床、旋转钻头和夹持组件的结构示意图;Figure 1 is a schematic structural diagram of a drilling machine, a rotary drill bit and a clamping assembly in the present invention;

图2为本发明中钻床、旋转钻头、夹持组件和升降液压杆的结构示意图;Figure 2 is a schematic structural diagram of the drilling machine, rotary drill bit, clamping assembly and lifting hydraulic rod in the present invention;

图3为本发明中固定壳体、承载板、预夹持单元和驱动齿条的结构示意图;Figure 3 is a schematic structural diagram of the fixed housing, load-bearing plate, pre-clamping unit and driving rack in the present invention;

图4为本发明中承载板、预夹持单元、固定壳体、锁定驱动单元和锁定调节单元的结构示意图;Figure 4 is a schematic structural diagram of the bearing plate, pre-clamping unit, fixed housing, locking drive unit and locking adjustment unit in the present invention;

图5为本发明中承载板、夹持板、固定壳体和锁定驱动单元的结构示意图;Figure 5 is a schematic structural diagram of the bearing plate, clamping plate, fixed housing and locking drive unit in the present invention;

图6为本发明图5中A部分的放大图;Figure 6 is an enlarged view of part A in Figure 5 of the present invention;

图7为本发明中旋转钻头、固定杆和夹持板的结构示意图;Figure 7 is a schematic structural diagram of the rotary drill bit, fixed rod and clamping plate in the present invention;

图8为本发明图7中B部分的放大图;FIG8 is an enlarged view of part B in FIG7 of the present invention;

图9为本发明中锁定块、锁定板、调节块和双向螺纹杆的结构示意图;Figure 9 is a schematic structural diagram of the locking block, locking plate, adjustment block and two-way threaded rod in the present invention;

图10为本发明图9中C部分的放大图;Figure 10 is an enlarged view of part C in Figure 9 of the present invention;

图11为本发明中夹持板、同步块、限位杆、预夹持弹簧和承载板的结构示意图;Figure 11 is a schematic structural diagram of the clamping plate, synchronization block, limiting rod, pre-clamping spring and load-bearing plate in the present invention;

图12为本发明图11中D部分的放大图。Figure 12 is an enlarged view of part D in Figure 11 of the present invention.

图中:1、钻床;2、夹持组件;21、承载板;22、预夹持单元;221、预夹持弹簧;222、夹持板;223、限位杆;23、预夹持同步单元;231、同步块;232、同步齿条;233、同步齿轮;24、锁定单元;241、锁定块;242、锁定板;25、锁定驱动单元;251、驱动齿轮;252、驱动转轴;253、驱动皮带件;254、主动锥齿轮;255、被动锥齿轮;256、驱动螺纹筒;257、驱动螺纹杆;26、锁定调节单元;261、调节块;262、双向螺纹杆;3、旋转钻头;4、固定杆;5、驱动齿条;6、固定壳体;7、调节同步单元;8、转动块;9、升降液压杆;10、U形板。In the picture: 1. Drilling machine; 2. Clamping component; 21. Bearing plate; 22. Pre-clamping unit; 221. Pre-clamping spring; 222. Clamping plate; 223. Limiting rod; 23. Pre-clamping synchronization Unit; 231, synchronization block; 232, synchronization rack; 233, synchronization gear; 24, locking unit; 241, locking block; 242, locking plate; 25, locking drive unit; 251, driving gear; 252, driving shaft; 253 , Driving belt parts; 254. Driving bevel gear; 255. Passive bevel gear; 256. Driving threaded barrel; 257. Driving threaded rod; 26. Locking adjustment unit; 261. Adjusting block; 262. Bidirectional threaded rod; 3. Rotary drill bit ; 4. Fixed rod; 5. Driving rack; 6. Fixed housing; 7. Adjustment synchronization unit; 8. Rotating block; 9. Lifting hydraulic rod; 10. U-shaped plate.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present invention.

实施例:参考图1-图12所示的一种新型数控台钻,包括钻床1,钻床1上安装有夹持组件2,钻床1上位于夹持组件2的上方还安装有旋转钻头3;Embodiment: Refer to a new type of CNC bench drill shown in Figures 1 to 12, which includes a drill press 1. A clamping assembly 2 is installed on the drill press 1. A rotary drill bit 3 is also installed on the drill press 1 above the clamping assembly 2;

夹持组件2包括承载板21、两组预夹持单元22、预夹持同步单元23、两组锁定单元24、锁定驱动单元25和锁定调节单元26;The clamping assembly 2 includes a bearing plate 21, two sets of pre-clamping units 22, a pre-clamping synchronization unit 23, two sets of locking units 24, a locking drive unit 25 and a locking adjustment unit 26;

夹持组件2能够垂直移动;The clamping component 2 can move vertically;

两组预夹持单元22安装在承载板21上,预夹持单元22包括预夹持弹簧221和夹持板222,两个预夹持弹簧221能够驱动对应的夹持板222移动,使两块夹持板222相向移动将工件夹持;Two sets of pre-clamping units 22 are installed on the bearing plate 21. The pre-clamping unit 22 includes a pre-clamping spring 221 and a clamping plate 222. The two pre-clamping springs 221 can drive the corresponding clamping plates 222 to move, so that the two pre-clamping springs 221 can drive the corresponding clamping plates 222 to move. The block clamping plates 222 move toward each other to clamp the workpiece;

当使其中一个预夹持单元22中的夹持板222移动时,预夹持同步单元23能够使另一预夹持单元22中的夹持板222向相反方向移动;When the clamping plate 222 in one of the pre-clamping units 22 is moved, the pre-clamping synchronization unit 23 can move the clamping plate 222 in the other pre-clamping unit 22 in the opposite direction;

锁定单元24包括两块锁定块241,当夹持组件2上升后,锁定驱动单元25能够驱动两块锁定块241相对于承载板21上升,使两块锁定块241移动至夹持板222远离工件的一侧将夹持板222抵紧;The locking unit 24 includes two locking blocks 241. When the clamping assembly 2 rises, the locking driving unit 25 can drive the two locking blocks 241 to rise relative to the carrier plate 21, so that the two locking blocks 241 move to the side of the clamping plate 222 away from the workpiece to press the clamping plate 222 tightly.

锁定调节单元26能够带动两块锁定块241水平移动且移动方向相反。The locking adjustment unit 26 can drive the two locking blocks 241 to move horizontally in opposite directions.

推动一块夹持板222移动,夹持板222通过预夹持同步单元23带动另一夹持板222移动,且移动方向相反,使两块夹持板222张开并挤压预夹持弹簧221,将个工件放置在承载板21上两块夹持板222之间,松开夹持板222,预夹持弹簧221推动夹持板222移动,两块夹持板222移动将工件夹持并推动工件移动位于承载板21中心处;之后夹持组件2上升,承载板21带动工件上升,在上升过程中锁定驱动单元25驱动两块锁定块241上升,锁定块241上升抵紧在夹持板222远离工件的一侧,使夹持板222将工件夹持,承载板21继续上升带动工件与旋转钻头3接触,旋转钻头3转动将工件钻孔,通过锁定调节单元26能够调整锁定块241的位置,使锁定块241和夹持板222能够夹持不同尺寸的工件。Push one clamping plate 222 to move, and the clamping plate 222 drives the other clamping plate 222 to move through the pre-clamping synchronization unit 23, and the moving directions are opposite, so that the two clamping plates 222 are opened and squeeze the pre-clamping spring 221, and a workpiece is placed between the two clamping plates 222 on the carrier plate 21, and the clamping plate 222 is released. The pre-clamping spring 221 pushes the clamping plate 222 to move, and the two clamping plates 222 move to clamp the workpiece and push the workpiece to move to the center of the carrier plate 21; then the clamping assembly 2 rises, the carrying plate 21 drives the workpiece to rise, during the rising process, the locking driving unit 25 drives the two locking blocks 241 to rise, the locking blocks 241 rise and press against the side of the clamping plate 222 away from the workpiece, so that the clamping plate 222 clamps the workpiece, the carrying plate 21 continues to rise and drives the workpiece to contact with the rotating drill bit 3, the rotating drill bit 3 rotates to drill the workpiece, the position of the locking blocks 241 can be adjusted by the locking adjustment unit 26, so that the locking blocks 241 and the clamping plate 222 can clamp workpieces of different sizes.

旋转钻头3通过工件的上升将工件打孔,将工件放置在承载板21能够使工件通过夹持板222预夹持,防止工件位移,之后在工件上升的过程中,通过锁定驱动单元25带动锁定块241上升,锁定块241能够将夹持板222锁定,从而将工件夹持,保证工件继续上升被钻孔的过程中,工件不会因受力而位移,保证工件的稳定性,对工件打孔更准确,同时对工件预夹持和锁定仅需要推动夹持板222移动,夹持板222能够通过预夹持同步单元23带动另一夹持板222移动,从而使两块夹持板222张开,松手即可将工件预夹持,之后工件上升,夹持板222被锁定不需要人工操作,对工件夹持的操作更简单,上手难度低,提高夹持效率,且推动夹持板222张开,松手将工件夹持的操作更方便。The rotary drill bit 3 drills the workpiece by rising the workpiece. Placing the workpiece on the bearing plate 21 enables the workpiece to be pre-clamped by the clamping plate 222 to prevent the workpiece from being displaced. Then, during the process of the workpiece rising, the locking drive unit 25 drives the lock. Block 241 rises, and the locking block 241 can lock the clamping plate 222 to clamp the workpiece, ensuring that when the workpiece continues to rise and is drilled, the workpiece will not be displaced due to force, ensuring the stability of the workpiece and drilling the workpiece. The hole is more accurate. At the same time, pre-clamping and locking the workpiece only requires pushing the clamping plate 222 to move. The clamping plate 222 can drive the other clamping plate 222 to move through the pre-clamping synchronization unit 23, so that the two clamping plates 222 Open and let go to pre-clamp the workpiece, then the workpiece rises and the clamping plate 222 is locked without manual operation. The operation of clamping the workpiece is simpler, the difficulty of getting started is low, the clamping efficiency is improved, and the clamping plate is pushed 222 is opened and the operation of releasing the workpiece to clamp the workpiece is more convenient.

作为另一优选实施例,当工件的重力较大或与承载板21之间的接触面积较大,导致预夹持弹簧221无法推动工件移动至承载板21中心位置时,需要人工将工件放置在承载板21的中心位置,承载板21的中心处优选固定安装有与工件匹配的定位凸起,从而保证人工盲操能够将工件放置在承载板21的中心位置。As another preferred embodiment, when the gravity of the workpiece is large or the contact area with the load-bearing plate 21 is large, so that the pre-clamping spring 221 cannot push the workpiece to move to the center of the load-bearing plate 21 , the workpiece needs to be placed manually. The center of the load-bearing plate 21 is preferably fixedly installed with a positioning protrusion matching the workpiece, thereby ensuring that manual blind operation can place the workpiece at the center of the load-bearing plate 21 .

进一步地,参照图1-图12,钻床1上固定安装有固定杆4,旋转钻头3安装在固定杆4上,锁定驱动单元25包括驱动齿轮251、驱动转轴252、驱动皮带件253、驱动转杆、主动锥齿轮254、被动锥齿轮255、驱动螺纹筒256和驱动螺纹杆257,锁定单元24还包括锁定板242;Further, referring to FIGS. 1 to 12 , a fixed rod 4 is fixedly mounted on the drilling machine 1, a rotary drill bit 3 is mounted on the fixed rod 4, a locking drive unit 25 includes a driving gear 251, a driving shaft 252, a driving belt member 253, a driving rotating rod, an active bevel gear 254, a passive bevel gear 255, a driving threaded cylinder 256 and a driving threaded rod 257, and the locking unit 24 also includes a locking plate 242;

固定杆4上固定安装有驱动齿条5,驱动齿轮251固定套接在驱动转轴252上并于驱动齿条5相啮合,驱动皮带件253安装在驱动转轴252和驱动转杆上,主动锥齿轮254固定安装在驱动转杆的转动,被动锥齿轮255固定套接在驱动螺纹筒256上并于主动锥齿轮254相啮合,驱动螺纹杆257插设在驱动螺纹筒256内并与驱动螺纹筒256螺纹配合,驱动螺纹杆257的顶部固定安装在锁定板242上,两块锁定块241通过锁定调节单元26安装在锁定板242上,锁定块241的顶部为弧形设置,驱动皮带件253包括主动皮带轮、被动皮带轮和驱动皮带,主动皮带轮固定安装在驱动转轴252上,被动皮带轮固定安装在驱动转杆上,驱动皮带连接在主动皮带轮和被动皮带轮上。The driving rack 5 is fixedly installed on the fixed rod 4. The driving gear 251 is fixedly sleeved on the driving rotating shaft 252 and meshes with the driving rack 5. The driving belt 253 is installed on the driving rotating shaft 252 and the driving rotating rod. The driving bevel gear 254 is fixedly installed in the rotation of the driving rotating rod. The passive bevel gear 255 is fixedly sleeved on the driving threaded barrel 256 and meshes with the driving bevel gear 254. The driving threaded rod 257 is inserted in the driving threaded barrel 256 and is connected with the driving threaded barrel 256. The top of the driving threaded rod 257 is fixedly installed on the locking plate 242. The two locking blocks 241 are installed on the locking plate 242 through the locking adjustment unit 26. The top of the locking block 241 is arranged in an arc shape. The driving belt member 253 includes an active Pulley, passive pulley and driving belt, the driving pulley is fixedly installed on the driving shaft 252, the passive pulley is fixedly installed on the driving rotating rod, and the driving belt is connected to the driving pulley and the passive pulley.

当夹持组件2上升时,驱动齿轮251在驱动齿条5上移动,驱动齿条5与驱动齿轮251啮合使驱动齿轮251转动,驱动齿轮251带动驱动转轴252转动,驱动转轴252带动主动皮带轮转动,主动皮带轮带动驱动皮带转动,驱动皮带带动被动皮带轮转动,被动皮带轮带动主动锥齿轮254转动,主动锥齿轮254带动被动锥齿轮255转动,被动锥齿轮255带动驱动螺纹筒256转动,使驱动螺纹杆257在驱动螺纹筒256内向上移动,驱动螺纹杆257带动锁定板242向上移动,锁定板242带动锁定块241向上移动,锁定块241的弧面与夹持板222接触并将夹持板222向靠近工件方向推动,使夹持板222将工件夹紧,锁定块241继续上升与夹持板222远离工件的一侧相抵,将夹持板222抵紧。When the clamping assembly 2 rises, the driving gear 251 moves on the driving rack 5. The driving rack 5 meshes with the driving gear 251 to rotate the driving gear 251. The driving gear 251 drives the driving shaft 252 to rotate, and the driving shaft 252 drives the driving pulley to rotate. , the driving pulley drives the driving belt to rotate, the driving belt drives the passive pulley to rotate, the passive pulley drives the driving bevel gear 254 to rotate, the driving bevel gear 254 drives the passive bevel gear 255 to rotate, the passive bevel gear 255 drives the driving thread barrel 256 to rotate, so that the driving thread rod 257 moves upward in the driving threaded barrel 256, the driving threaded rod 257 drives the locking plate 242 to move upward, the locking plate 242 drives the locking block 241 to move upward, the arc surface of the locking block 241 contacts the clamping plate 222 and moves the clamping plate 222 toward Push in the direction close to the workpiece so that the clamping plate 222 clamps the workpiece. The locking block 241 continues to rise and butts against the side of the clamping plate 222 away from the workpiece to tighten the clamping plate 222.

进一步地,参照图1-图12,预夹持同步单元23包括两块同步块231、两根同步齿条232、固定块和同步齿轮233,两块同步块231分别固定安装在两块夹持板222的底部,承载板21对应同步块231的位置开设有移动孔,两块同步块231均滑动配合在移动孔内,固定块固定安装在承载板21的底部,同步齿轮233转动连接在固定块上,两根同步齿条232分别固定安装在对应的同步块231上,两根同步齿条232分别位于同步齿轮233的两侧并与同步齿轮233啮合。Further, referring to Figures 1 to 12, the pre-clamping synchronization unit 23 includes two synchronization blocks 231, two synchronization racks 232, a fixed block and a synchronization gear 233. The two synchronization blocks 231 are respectively fixedly mounted on the bottom of the two clamping plates 222. The bearing plate 21 is provided with moving holes at positions corresponding to the synchronization blocks 231. The two synchronization blocks 231 are both slidably fitted in the moving holes. The fixed block is fixedly mounted on the bottom of the bearing plate 21. The synchronization gear 233 is rotatably connected to the fixed block. The two synchronization racks 232 are respectively fixedly mounted on the corresponding synchronization blocks 231. The two synchronization racks 232 are respectively located on both sides of the synchronization gear 233 and mesh with the synchronization gear 233.

当推动其中一块夹持板222移动后,此夹持板222带动对应的同步齿条232移动,此同步齿条232带动同步齿轮233转动,同步齿轮233带动另一同步齿条232反向移动,另一同步齿条232带动另一夹持板222移动,使两块夹持板222相反方向移动,在对工件夹持时,仅需推动一个夹持板222移动即可,简化了操作,使用更方便。When one of the clamping plates 222 is pushed to move, the clamping plate 222 drives the corresponding synchronization rack 232 to move, the synchronization rack 232 drives the synchronization gear 233 to rotate, and the synchronization gear 233 drives the other synchronization rack 232 to move in the opposite direction. Another synchronous rack 232 drives the other clamping plate 222 to move, so that the two clamping plates 222 move in opposite directions. When clamping the workpiece, only one clamping plate 222 needs to be pushed to move, which simplifies the operation and uses more convenient.

进一步地,参照图1-图12,锁定调节单元26包括两块调节块261和双向螺纹杆262,两块调节块261分别固定安装在两块锁定块241的底部,锁定板242上对应调节块261位置开设有调节孔,两块调节块261均滑动配合在调节孔内,双向螺纹杆262贯穿两块调节块261并与调节块261螺纹连接,锁定板242上固定安装有支撑块,调节块261转动连接在支撑块上。Further, referring to Figures 1-12, the locking adjustment unit 26 includes two adjustment blocks 261 and a two-way threaded rod 262. The two adjustment blocks 261 are respectively fixedly installed on the bottoms of the two locking blocks 241, and the corresponding adjustment blocks are on the locking plate 242. There is an adjustment hole at position 261, and the two adjustment blocks 261 are slidably fitted in the adjustment holes. The two-way threaded rod 262 penetrates the two adjustment blocks 261 and is threadedly connected to the adjustment block 261. A support block is fixedly installed on the locking plate 242, and the adjustment block 261 is rotatably connected to the support block.

当工件的尺寸不同,夹持板222通过预夹持弹簧221夹持工件后的位置也不同,不同尺寸的工件需要调整锁定块241的位置,通过转动双向螺纹杆262,两块调节块261在双向螺纹杆262上移动,两块调节块261带动对应的锁定块241移动,且移动方向相反,使锁定块241能够匹配不同尺寸的工件,能够将位置不同的夹持板222锁定,提高了适用性。When the size of the workpiece is different, the position of the clamping plate 222 after clamping the workpiece through the pre-clamping spring 221 is also different. Workpieces of different sizes need to adjust the position of the locking block 241. By rotating the two-way threaded rod 262, the two adjustment blocks 261 are in The two-way threaded rod 262 moves upward, and the two adjustment blocks 261 drive the corresponding locking blocks 241 to move in opposite directions, so that the locking blocks 241 can match workpieces of different sizes and can lock the clamping plates 222 with different positions, improving the applicability. sex.

进一步地,参照图1-图12,承载板21上固定安装有固定壳体6,夹持组件2设置在固定壳体6内,固定壳体6内固定安装有固定侧板,驱动转轴252的两端分别转动连接在对应的固定侧板上,固定壳体6内还固定安装有两块连接块,驱动转轴252贯穿连接块并与连接块转动连接,两块连接块位于驱动齿轮251的两侧,驱动转杆转动连接在对应的固定侧板上,固定侧板上固定安装有稳固块,驱动螺纹筒256转动连接在稳固块上。Further, referring to Figures 1 to 12, a fixed housing 6 is fixedly installed on the load-bearing plate 21, the clamping assembly 2 is arranged in the fixed housing 6, a fixed side plate is fixedly installed in the fixed housing 6, and the driving shaft 252 is Both ends are rotatably connected to corresponding fixed side plates respectively. Two connecting blocks are also fixedly installed in the fixed housing 6. The driving shaft 252 penetrates the connecting block and is rotationally connected with the connecting block. The two connecting blocks are located on both sides of the driving gear 251. side, the driving rotating rod is rotatably connected to the corresponding fixed side plate, a stabilizing block is fixedly installed on the fixed side plate, and the driving threaded barrel 256 is rotatably connected to the stabilizing block.

进一步地,参照图1-图12,锁定单元24设置有两组,锁定调节单元26对应锁定单元24设置有两组,两组锁定调节单元26中的驱动螺纹杆257共同连接有调节同步单元7,调节同步单元7包括两个调节皮带轮和调节皮带,两个调节皮带轮分别固定调节在对应的驱动螺纹杆257上,调节皮带连接在两个调节皮带轮上。Further, referring to FIGS. 1-12 , two groups of locking units 24 are provided, and two groups of locking adjustment units 26 are provided corresponding to the locking units 24 . The driving threaded rods 257 in the two groups of locking adjustment units 26 are jointly connected to the adjustment synchronization unit 7 , the adjustment synchronization unit 7 includes two adjustment pulleys and an adjustment belt. The two adjustment pulleys are respectively fixed and adjusted on the corresponding driving threaded rod 257, and the adjustment belt is connected to the two adjustment pulleys.

通过两组锁定单元24,对夹持板222的抵紧效果更好,保证夹持板222的稳固性,当转动其中一根驱动螺纹杆257时,此驱动螺纹杆257带动对应的调节皮带轮转动,此调节皮带轮通过调节皮带带动另一调节皮带轮转动,另一调节皮带轮带动另一驱动螺纹杆257转动,能够同时带动两根驱动螺纹杆257转动,保证两根驱动螺纹杆257的转动量一致,对两组锁定单元24中的锁定块241的调节量一致,保证对夹持板222的抵紧效果好。Through two sets of locking units 24, the clamping plate 222 has a better tightening effect and ensures the stability of the clamping plate 222. When one of the driving threaded rods 257 is rotated, the driving threaded rod 257 drives the corresponding adjustment pulley to rotate. , this adjusting pulley drives another adjusting pulley to rotate through the adjusting belt, and the other adjusting pulley drives another driving threaded rod 257 to rotate, and can drive the two driving threaded rods 257 to rotate at the same time, ensuring that the rotation amounts of the two driving threaded rods 257 are consistent. The adjustment amounts of the locking blocks 241 in the two sets of locking units 24 are consistent to ensure a good clamping effect on the clamping plate 222 .

进一步地,参照图1-图12,固定壳体6的一侧开设有避让孔,两根驱动螺纹杆257中的其中一根穿过避让孔并固定安装有转动块8,转动块8上开设有防滑槽。Further, with reference to Figures 1 to 12, an escape hole is provided on one side of the fixed housing 6. One of the two driving threaded rods 257 passes through the escape hole and is fixedly installed with the rotating block 8. The rotating block 8 is provided with an escape hole. Has anti-slip grooves.

通过操作转动块8旋转,转动块8带动其中一根驱动螺纹杆257转动,此驱动螺纹杆257通过调节同步单元7带动另一驱动螺纹杆257移动,当锁定板242相对于承载板21向上移动时,锁定板242带动驱动螺纹杆257移动,驱动螺纹杆257在避让孔内移动。By operating the rotating block 8 to rotate, the rotating block 8 drives one of the driving threaded rods 257 to rotate. The driving threaded rod 257 drives the other driving threaded rod 257 to move by adjusting the synchronization unit 7 . When the locking plate 242 moves upward relative to the bearing plate 21 When the locking plate 242 drives the driving threaded rod 257 to move, the driving threaded rod 257 moves in the avoidance hole.

进一步地,参照图1-图12,钻床1内固定安装有升降液压杆9,升降液压杆9的输出端固定安装在固定壳体6的底部。Further, referring to FIGS. 1 to 12 , a lifting hydraulic rod 9 is fixedly installed in the drilling machine 1 , and the output end of the lifting hydraulic rod 9 is fixedly installed at the bottom of the fixed housing 6 .

升降液压杆9带动固定壳体6移动,固定壳体6带动夹持组件2移动,夹持组件2带动工件移动,使工件向上移动与旋转钻头3接触将工件钻孔。The lifting hydraulic rod 9 drives the fixed housing 6 to move, the fixed housing 6 drives the clamping assembly 2 to move, and the clamping assembly 2 drives the workpiece to move, so that the workpiece moves upward and comes into contact with the rotating drill bit 3 to drill the workpiece.

作为另一优选实施例,旋转钻头3安装在两轴移动平台上,使旋转钻头3能够水平在两个方向上移动,从而在水平面上调整位置,在工件的不同位置打孔。As another preferred embodiment, the rotary drill bit 3 is installed on a two-axis moving platform, so that the rotary drill bit 3 can move horizontally in two directions, thereby adjusting the position on the horizontal plane and drilling holes at different positions of the workpiece.

进一步地,参照图1-图12,两块夹持板222相对的一侧均固定安装有橡胶块,预夹持单元22还包括限位杆223和限位块,限位块固定安装在承载板21的底部,限位杆223的一端固定安装在限位块上,限位杆223的另一端固定安装在固定块上,预夹持弹簧221的一端固定安装在限位块上,预夹持弹簧221的另一端固定安装在同步块231上,且预夹持弹簧221套设在限位杆223上,夹持板222的底部固定安装有滑动块,承载板21上对应滑动块位置开设有滑动槽,滑动块滑动配合在滑动槽内。Further, referring to Figures 1 to 12, rubber blocks are fixedly installed on the opposite sides of the two clamping plates 222. The pre-clamping unit 22 also includes a limit rod 223 and a limit block. The limit block is fixedly installed on the load-bearing At the bottom of the plate 21, one end of the limit rod 223 is fixedly installed on the limit block, the other end of the limit rod 223 is fixedly installed on the fixed block, one end of the pre-clamping spring 221 is fixedly installed on the limit block, and the pre-clamping spring 221 is fixed on the limit block. The other end of the holding spring 221 is fixedly installed on the synchronization block 231, and the pre-clamping spring 221 is set on the limiting rod 223. A sliding block is fixedly installed on the bottom of the clamping plate 222, and the corresponding sliding block position is provided on the load-bearing plate 21. There is a sliding groove, and the sliding block slides and fits in the sliding groove.

当夹持板222移动时,夹持板222带动同步块231移动,同步块231在限位杆223上移动,使夹持板222更稳固,不易晃动,同时夹持板222带动滑动块在滑动槽内移动,进一步使夹持板222更稳固。When the clamping plate 222 moves, the clamping plate 222 drives the synchronous block 231 to move, and the synchronous block 231 moves on the limiting rod 223, making the clamping plate 222 more stable and less likely to shake. At the same time, the clamping plate 222 drives the sliding block to move in the sliding groove, further making the clamping plate 222 more stable.

锁定块241上升穿过滑动槽将夹持板222抵紧。The locking block 241 rises through the sliding groove to press the clamping plate 222 tightly.

进一步地,参照图1-图12,锁定板242对应限位杆223位置开设有通过孔,锁定板242的底部固定安装有U形板10,锁定板242通过U形板10与驱动螺纹杆257固定安装。Further, referring to Figures 1 to 12, the locking plate 242 has a through hole corresponding to the position of the limiting rod 223. The U-shaped plate 10 is fixedly installed at the bottom of the locking plate 242. The locking plate 242 passes through the U-shaped plate 10 and the driving threaded rod 257. Fixed installation.

使锁定板242带动锁定块241向上移动时,锁定板242上开设的通过孔能够避让限位杆223,提高结构的紧凑性。When the locking plate 242 drives the locking block 241 to move upward, the through hole opened in the locking plate 242 can avoid the limiting rod 223, thereby improving the compactness of the structure.

锁定板242的底部还固定安装有安装有连接杆,固定壳体6内还固定安装有连接筒,连接杆滑动配合在连接筒内,保证锁定板242移动的稳固性。A connecting rod is also fixedly installed at the bottom of the locking plate 242, and a connecting barrel is fixedly installed in the fixed housing 6. The connecting rod slides and fits in the connecting barrel to ensure the stability of the movement of the locking plate 242.

锁定板242带动锁定块241上升将夹持板222抵紧后,夹持组件2继续上升,驱动齿轮251与驱动齿条5脱离啮合,锁定块241在驱动螺纹杆257和驱动螺纹筒256的自锁作用下保持对夹持板222的抵紧,当夹持组件2下降后,驱动齿轮251与驱动齿条5啮合并带动锁定板242下降,锁定板242带动锁定块241下降,锁定块241与夹持板222脱离接触,此时夹持板222可以移动,将工件移走。After the locking plate 242 drives the locking block 241 to rise and tighten the clamping plate 222, the clamping assembly 2 continues to rise, the driving gear 251 is disengaged from the driving rack 5, and the locking block 241 automatically moves between the driving threaded rod 257 and the driving threaded barrel 256. The clamping plate 222 is kept tight under the action of the lock. When the clamping assembly 2 descends, the driving gear 251 engages with the driving rack 5 and drives the locking plate 242 to descend. The locking plate 242 drives the locking block 241 to descend, and the locking block 241 and The clamping plate 222 is out of contact. At this time, the clamping plate 222 can move to remove the workpiece.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然能够对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it is still The technical solutions described in the foregoing embodiments can be modified, or equivalent substitutions can be made to some of the technical features. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in within the protection scope of the present invention.

Claims (10)

1.一种新型数控台钻,包括钻床(1),其特征在于:所述钻床(1)上安装有夹持组件(2),所述钻床(1)上位于夹持组件(2)的上方还安装有旋转钻头(3);1. A new type of CNC bench drill, including a drilling machine (1), characterized in that: a clamping assembly (2) is installed on the drilling machine (1), and a clamping assembly (2) is located on the drilling machine (1). A rotary drill bit (3) is also installed above; 所述夹持组件(2)包括承载板(21)、两组预夹持单元(22)、预夹持同步单元(23)、两组锁定单元(24)、锁定驱动单元(25)和锁定调节单元(26);The clamping assembly (2) includes a load-bearing plate (21), two sets of pre-clamping units (22), a pre-clamping synchronization unit (23), two sets of locking units (24), a locking drive unit (25) and a locking unit. Adjustment unit(26); 所述夹持组件(2)能够垂直移动;The clamping component (2) can move vertically; 两组预夹持单元(22)安装在所述承载板(21)上,所述预夹持单元(22)包括预夹持弹簧(221)和夹持板(222),两个预夹持弹簧(221)能够驱动对应的所述夹持板(222)移动,使两块所述夹持板(222)相向移动将工件夹持;Two sets of pre-clamping units (22) are installed on the carrier plate (21). The pre-clamping unit (22) includes a pre-clamping spring (221) and a clamping plate (222). Two pre-clamping units (22) The spring (221) can drive the corresponding clamping plate (222) to move, so that the two clamping plates (222) move toward each other to clamp the workpiece; 当使其中一个所述预夹持单元(22)中的所述夹持板(222)移动时,所述预夹持同步单元(23)能够使另一所述预夹持单元(22)中的夹持板(222)向相反方向移动;When the clamping plate (222) in one of the pre-clamping units (22) is moved, the pre-clamping synchronization unit (23) can cause the clamping plate (222) in the other pre-clamping unit (22) to move. The clamping plate (222) moves in the opposite direction; 所述锁定单元(24)包括两块锁定块(241),当所述夹持组件(2)上升后,所述锁定驱动单元(25)能够驱动两块锁定块(241)相对于所述承载板(21)上升,使两块锁定块(241)移动至夹持板(222)远离工件的一侧将夹持板(222)抵紧;The locking unit (24) includes two locking blocks (241). When the clamping assembly (2) rises, the locking driving unit (25) can drive the two locking blocks (241) relative to the load bearing. The plate (21) rises, causing the two locking blocks (241) to move to the side of the clamping plate (222) away from the workpiece to tighten the clamping plate (222); 所述锁定调节单元(26)能够带动两块所述锁定块(241)水平移动且移动方向相反。The locking adjustment unit (26) can drive the two locking blocks (241) to move horizontally and in opposite directions. 2.根据权利要求1所述的一种新型数控台钻,其特征在于:所述钻床(1)上固定安装有固定杆(4),所述旋转钻头(3)安装在所述固定杆(4)上,所述锁定驱动单元(25)包括驱动齿轮(251)、驱动转轴(252)、驱动皮带件(253)、驱动转杆、主动锥齿轮(254)、被动锥齿轮(255)、驱动螺纹筒(256)和驱动螺纹杆(257),所述锁定单元(24)还包括锁定板(242);2. A new type of CNC bench drill according to claim 1, characterized in that: a fixed rod (4) is fixedly installed on the drilling machine (1), and the rotary drill bit (3) is installed on the fixed rod (4). 4), the locking drive unit (25) includes a driving gear (251), a driving rotating shaft (252), a driving belt (253), a driving rotating rod, a driving bevel gear (254), a driven bevel gear (255), Driving threaded barrel (256) and driving threaded rod (257), the locking unit (24) also includes a locking plate (242); 所述固定杆(4)上固定安装有驱动齿条(5),所述驱动齿轮(251)固定套接在所述驱动转轴(252)上并于所述驱动齿条(5)相啮合,所述驱动皮带件(253)安装在所述驱动转轴(252)和驱动转杆上,所述主动锥齿轮(254)固定安装在驱动转杆的转动,所述被动锥齿轮(255)固定套接在所述驱动螺纹筒(256)上并于所述主动锥齿轮(254)相啮合,所述驱动螺纹杆(257)插设在所述驱动螺纹筒(256)内并与所述驱动螺纹筒(256)螺纹配合,所述驱动螺纹杆(257)的顶部固定安装在所述锁定板(242)上,两块所述锁定块(241)通过所述锁定调节单元(26)安装在所述锁定板(242)上,所述锁定块(241)的顶部为弧形设置,所述驱动皮带件(253)包括主动皮带轮、被动皮带轮和驱动皮带,主动皮带轮固定安装在所述驱动转轴(252)上,被动皮带轮固定安装在驱动转杆上,驱动皮带连接在主动皮带轮和被动皮带轮上。A driving rack (5) is fixedly installed on the fixed rod (4), and the driving gear (251) is fixedly sleeved on the driving shaft (252) and meshes with the driving rack (5). The driving belt (253) is installed on the driving shaft (252) and the driving rotating rod, the driving bevel gear (254) is fixedly installed on the rotation of the driving rotating rod, and the passive bevel gear (255) is fixedly sleeved. It is connected to the driving thread barrel (256) and meshes with the driving bevel gear (254). The driving thread rod (257) is inserted into the driving thread barrel (256) and meshes with the driving thread. The barrel (256) is threaded, the top of the driving threaded rod (257) is fixedly installed on the locking plate (242), and the two locking blocks (241) are installed on the locking plate (242) through the locking adjustment unit (26). On the locking plate (242), the top of the locking block (241) is arranged in an arc shape. The driving belt member (253) includes a driving pulley, a passive pulley and a driving belt. The driving pulley is fixedly installed on the driving shaft (253). 252), the passive pulley is fixedly installed on the driving rotating rod, and the driving belt is connected to the driving pulley and the passive pulley. 3.根据权利要求2所述的一种新型数控台钻,其特征在于:所述预夹持同步单元(23)包括两块同步块(231)、两根同步齿条(232)、固定块和同步齿轮(233),两块同步块(231)分别固定安装在两块所述夹持板(222)的底部,所述承载板(21)对应所述同步块(231)的位置开设有移动孔,两块所述同步块(231)均滑动配合在移动孔内,固定块固定安装在所述承载板(21)的底部,所述同步齿轮(233)转动连接在固定块上,两根同步齿条(232)分别固定安装在对应的所述同步块(231)上,两根所述同步齿条(232)分别位于所述同步齿轮(233)的两侧并与所述同步齿轮(233)啮合。3. A new type of CNC bench drill according to claim 2, characterized in that: the pre-clamping synchronization unit (23) includes two synchronization blocks (231), two synchronization racks (232), and a fixed block. and synchronization gear (233), two synchronization blocks (231) are respectively fixedly installed at the bottom of the two clamping plates (222), and the load-bearing plate (21) is provided with a position corresponding to the synchronization block (231). The two synchronization blocks (231) are slidingly fitted in the moving hole, the fixed block is fixedly installed on the bottom of the bearing plate (21), the synchronization gear (233) is rotationally connected to the fixed block, and the two One synchronization rack (232) is fixedly installed on the corresponding synchronization block (231), and two synchronization racks (232) are respectively located on both sides of the synchronization gear (233) and connected with the synchronization gear. (233) Engagement. 4.根据权利要求2所述的一种新型数控台钻,其特征在于:所述锁定调节单元(26)包括两块调节块(261)和双向螺纹杆(262),两块所述调节块(261)分别固定安装在两块锁定块(241)的底部,所述锁定板(242)上对应所述调节块(261)位置开设有调节孔,两块所述调节块(261)均滑动配合在调节孔内,所述双向螺纹杆(262)贯穿两块所述调节块(261)并与所述调节块(261)螺纹连接,所述锁定板(242)上固定安装有支撑块,所述调节块(261)转动连接在支撑块上。4. A new type of CNC bench drill according to claim 2, characterized in that: the locking adjustment unit (26) includes two adjustment blocks (261) and a bidirectional threaded rod (262), and the two adjustment blocks (261) are respectively fixedly installed at the bottom of the two locking blocks (241). The locking plate (242) is provided with an adjustment hole corresponding to the position of the adjustment block (261). Both adjustment blocks (261) slide Fitted in the adjustment hole, the two-way threaded rod (262) penetrates the two adjustment blocks (261) and is threadedly connected with the adjustment blocks (261). A support block is fixedly installed on the locking plate (242). The adjustment block (261) is rotatably connected to the support block. 5.根据权利要求2所述的一种新型数控台钻,其特征在于:所述承载板(21)上固定安装有固定壳体(6),所述夹持组件(2)设置在所述固定壳体(6)内,所述固定壳体(6)内固定安装有固定侧板,所述驱动转轴(252)的两端分别转动连接在对应的固定侧板上,所述固定壳体(6)内还固定安装有两块连接块,所述驱动转轴(252)贯穿连接块并与连接块转动连接,两块连接块位于所述驱动齿轮(251)的两侧,驱动转杆转动连接在对应的固定侧板上,固定侧板上固定安装有稳固块,所述驱动螺纹筒(256)转动连接在稳固块上。5. A new type of CNC bench drill according to claim 2, characterized in that: a fixed housing (6) is fixedly installed on the bearing plate (21), and the clamping assembly (2) is arranged on the In the fixed housing (6), a fixed side plate is fixedly installed in the fixed housing (6), and both ends of the driving shaft (252) are respectively rotatably connected to the corresponding fixed side plates. The fixed housing (6) There are also two connecting blocks fixedly installed inside. The driving shaft (252) passes through the connecting block and is rotationally connected with the connecting block. The two connecting blocks are located on both sides of the driving gear (251) and drive the rotating rod to rotate. Connected to the corresponding fixed side plate, a stabilizing block is fixedly installed on the fixed side plate, and the driving threaded barrel (256) is rotationally connected to the stabilizing block. 6.根据权利要求2所述的一种新型数控台钻,其特征在于:所述锁定单元(24)设置有两组,所述锁定调节单元(26)对应所述锁定单元(24)设置有两组,两组锁定调节单元(26)中的所述驱动螺纹杆(257)共同连接有调节同步单元(7),所述调节同步单元(7)包括两个调节皮带轮和调节皮带,两个调节皮带轮分别固定调节在对应的驱动螺纹杆(257)上,调节皮带连接在两个调节皮带轮上。6. A new type of CNC bench drill according to claim 2, characterized in that: the locking unit (24) is provided with two groups, and the locking adjustment unit (26) is provided with two groups corresponding to the locking unit (24). Two groups, the driving threaded rods (257) in the two groups of locking adjustment units (26) are jointly connected with an adjustment synchronization unit (7), the adjustment synchronization unit (7) includes two adjustment pulleys and an adjustment belt, two The adjusting pulleys are respectively fixed and adjusted on the corresponding driving threaded rods (257), and the adjusting belts are connected to the two adjusting pulleys. 7.根据权利要求5所述的一种新型数控台钻,其特征在于:所述固定壳体(6)的一侧开设有避让孔,两根所述驱动螺纹杆(257)中的其中一根穿过避让孔并固定安装有转动块(8),所述转动块(8)上开设有防滑槽。7. A new type of CNC bench drill according to claim 5, characterized in that: an escape hole is provided on one side of the fixed housing (6), and one of the two driving threaded rods (257) The root passes through the avoidance hole and a rotating block (8) is fixedly installed. The rotating block (8) is provided with an anti-slip groove. 8.根据权利要求5所述的一种新型数控台钻,其特征在于:所述钻床(1)内固定安装有升降液压杆(9),所述升降液压杆(9)的输出端固定安装在所述固定壳体(6)的底部。8. A new type of CNC bench drill according to claim 5, characterized in that: a lifting hydraulic rod (9) is fixedly installed in the drilling machine (1), and the output end of the lifting hydraulic rod (9) is fixedly installed. at the bottom of the fixed housing (6). 9.根据权利要求3所述的一种新型数控台钻,其特征在于:两块所述夹持板(222)相对的一侧均固定安装有橡胶块,所述预夹持单元(22)还包括限位杆(223)和限位块,限位块固定安装在所述承载板(21)的底部,所述限位杆(223)的一端固定安装在限位块上,所述限位杆(223)的另一端固定安装在固定块上,所述预夹持弹簧(221)的一端固定安装在限位块上,所述预夹持弹簧(221)的另一端固定安装在所述同步块(231)上,且所述预夹持弹簧(221)套设在所述限位杆(223)上,所述夹持板(222)的底部固定安装有滑动块,所述承载板(21)上对应滑动块位置开设有滑动槽,滑动块滑动配合在滑动槽内。9. A new type of CNC bench drill according to claim 3, characterized in that: rubber blocks are fixedly installed on opposite sides of the two clamping plates (222), and the pre-clamping unit (22) It also includes a limit rod (223) and a limit block. The limit block is fixedly installed on the bottom of the load-bearing plate (21). One end of the limit rod (223) is fixedly installed on the limit block. The other end of the position rod (223) is fixedly installed on the fixed block, one end of the pre-clamping spring (221) is fixedly installed on the limit block, and the other end of the pre-clamping spring (221) is fixedly installed on the limiting block. On the synchronization block (231), and the pre-clamping spring (221) is set on the limiting rod (223), a sliding block is fixedly installed on the bottom of the clamping plate (222), and the load-bearing A sliding groove is provided on the plate (21) corresponding to the position of the sliding block, and the sliding block is slidably fitted in the sliding groove. 10.根据权利要求9所述的一种新型数控台钻,其特征在于:所述锁定板(242)对应所述限位杆(223)位置开设有通过孔,所述锁定板(242)的底部固定安装有U形板(10),所述锁定板(242)通过所述U形板(10)与所述驱动螺纹杆(257)固定安装。10. A new type of CNC bench drill according to claim 9, characterized in that: the locking plate (242) has a through hole corresponding to the position of the limiting rod (223), and the locking plate (242) A U-shaped plate (10) is fixedly installed at the bottom, and the locking plate (242) is fixedly installed with the driving threaded rod (257) through the U-shaped plate (10).
CN202410014028.4A 2024-01-05 2024-01-05 A new type of CNC bench drill Active CN117773176B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410014028.4A CN117773176B (en) 2024-01-05 2024-01-05 A new type of CNC bench drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410014028.4A CN117773176B (en) 2024-01-05 2024-01-05 A new type of CNC bench drill

Publications (2)

Publication Number Publication Date
CN117773176A true CN117773176A (en) 2024-03-29
CN117773176B CN117773176B (en) 2024-10-25

Family

ID=90390860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410014028.4A Active CN117773176B (en) 2024-01-05 2024-01-05 A new type of CNC bench drill

Country Status (1)

Country Link
CN (1) CN117773176B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118237936A (en) * 2024-05-22 2024-06-25 江苏名欧精密机械有限公司 A CNC machine tool for precision parts processing
CN119870640A (en) * 2025-03-27 2025-04-25 北京中孚悦达真空科技有限公司 Intelligent vacuum brazing furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB468393A (en) * 1936-01-14 1937-07-05 Charles Rathe Improvements in or relating to automatic multi spindle drilling machines
CN214392418U (en) * 2021-03-26 2021-10-15 上海誉亿建筑安装工程有限公司 Bench drill
CN214517673U (en) * 2021-04-21 2021-10-29 上海一建安装工程有限公司 Bench drill convenient to location

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB468393A (en) * 1936-01-14 1937-07-05 Charles Rathe Improvements in or relating to automatic multi spindle drilling machines
CN214392418U (en) * 2021-03-26 2021-10-15 上海誉亿建筑安装工程有限公司 Bench drill
CN214517673U (en) * 2021-04-21 2021-10-29 上海一建安装工程有限公司 Bench drill convenient to location

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118237936A (en) * 2024-05-22 2024-06-25 江苏名欧精密机械有限公司 A CNC machine tool for precision parts processing
CN119870640A (en) * 2025-03-27 2025-04-25 北京中孚悦达真空科技有限公司 Intelligent vacuum brazing furnace

Also Published As

Publication number Publication date
CN117773176B (en) 2024-10-25

Similar Documents

Publication Publication Date Title
CN117773176A (en) A new type of CNC bench drill
CN208496409U (en) Spool inclined hole processing tool
CN110640182B (en) A clamping mechanism for drilling a circular seat plate of a circular seat
CN210147036U (en) Clamp for mechanical drilling
CN117358986A (en) Numerical control bench drill
CN211387843U (en) Clamp structure for CNC (computer numerical control) machining
CN209811275U (en) High-efficiency radial drilling machine
CN220463032U (en) Fixed frock is used in processing of machinery spare part
CN213195699U (en) One-step forming drilling device
KR920008588B1 (en) Shearing Machine
CN214134042U (en) A kind of drilling equipment for processing hardware
CN213945938U (en) Desk-top plane grinding and polishing device with adjustable position
CN115890587B (en) Sheet metal part machining operation table
CN115741524A (en) Clamping device for machining
CN211939108U (en) Drilling machine
CN113732343A (en) Portable perforating machine
CN220178720U (en) Positioning fixture for machining
CN209754083U (en) Tubular column bench drill of high accuracy
CN221516883U (en) Novel valve processing frock
CN220196994U (en) Adjustable clamp for gantry machining center
CN214720776U (en) Inclined plane drilling device
CN220636395U (en) Drilling machine supporting workbench
CN112676844B (en) Full-automatic hinge processingequipment
CN222873407U (en) A positioning guide device for deep hole drilling machine
CN221967535U (en) Milling machine fixture with multi-angle adjustment function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A new type of CNC table drill

Granted publication date: 20241025

Pledgee: Anhui Jingde Rural Commercial Bank Co.,Ltd.

Pledgor: ANHUI HUANGSHAN BENCH DRILLING MACHINE Co.,Ltd.

Registration number: Y2025980016234