CN117722011A - A construction method for installing viscous damping walls - Google Patents

A construction method for installing viscous damping walls Download PDF

Info

Publication number
CN117722011A
CN117722011A CN202311563087.9A CN202311563087A CN117722011A CN 117722011 A CN117722011 A CN 117722011A CN 202311563087 A CN202311563087 A CN 202311563087A CN 117722011 A CN117722011 A CN 117722011A
Authority
CN
China
Prior art keywords
concrete
construction method
viscous damping
damping wall
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311563087.9A
Other languages
Chinese (zh)
Inventor
万思坊
周青
王云杰
薛吉林
李林凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202311563087.9A priority Critical patent/CN117722011A/en
Publication of CN117722011A publication Critical patent/CN117722011A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to the technical field of damping wall construction, and discloses a construction method for viscous damping wall installation, which mainly comprises the following construction processes: installing an inclined roof formwork, binding reinforcing steel bars, arranging a closure plugboard, setting up an operation platform, pouring inclined roof concrete, and dismantling the formwork; according to the construction method for mounting the viscous damping wall, the problems that in construction, lateral pressure of a template is large, local offset of a ridge line is caused by uneven stress at a ridge position during concrete pouring, the internal angle is deformed due to insufficient rigidity and the like can be effectively solved by adopting the internal angle elevation and angle adjustable device of the ridge; pulling out the plate before the first setting is poured by the plate. When the method is used for construction, the concrete can be prevented from naturally sliding on the slope surface without constraint when the concrete is vibrated by the vibration rod point vibration, the effect of internal solid external light is achieved, the slope roof can effectively resist seepage and leak, insulate heat and preserve heat, smoothly drain water, and the living environment of the top layer is improved; and has low economic cost.

Description

Construction method for mounting viscous damping wall
Technical Field
The invention relates to the technical field of damping wall construction, in particular to a construction method for viscous damping wall installation.
Background
In recent years, many civil buildings employ sloping roof designs. The sloping roof can effectively prevent seepage and leakage, insulate heat and preserve heat, smoothly drain water and improve the living environment of the top layer; but also increases the space for building, improves the space utilization rate and increases the beautiful effect. This is compatible with the increasing demands of residential construction markets.
The prior heavy-gradient sloping roof generally adopts two methods: one is to pour concrete by a manual clapping method, the method is more common, but the compactness of the concrete is difficult to control, the condition of divulging tendons on pitted surfaces is easy to occur, and quality common problems such as roof leakage and the like are caused; a double-sided template method is characterized in that concrete is not vibrated in place, quality problems such as honeycomb dog holes and the like are easy to occur, and the construction cost is high.
The method is provided for controlling the ridge angle and elevation of the large-gradient (more than or equal to 45 ℃) pitched roof template, forming concrete in pouring, small working surface of constructors on the pitched roof, large working difficulty and the like. The adoption of the ridge internal angle elevation and angle adjustable device can effectively solve the problems that in construction, the lateral pressure of a template is large, the ridge line is locally offset due to uneven stress at the ridge position, the internal angle is deformed due to insufficient rigidity and the like during concrete pouring; pulling out the plate before the first setting is poured by the plate.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the invention provides a construction method for mounting a viscous damping wall, which has the advantage of standardized construction and solves the problems of numerous construction steps and high economic cost.
(II) technical scheme
In order to achieve the above purpose, the present invention provides the following technical solutions: a construction method for mounting viscous damping wall mainly comprises the following steps:
installing an inclined roof formwork, binding reinforcing steel bars, arranging a closure plugboard, setting up an operation platform, pouring inclined roof concrete, and dismantling the formwork;
the installation of the inclined roof formwork comprises the following steps: the formwork adopts a wood plywood, the roof gradient is strictly controlled according to the drawing requirements, the force transmission paths of the horizontal pull rod and the vertical rod are controlled, and the flatness and the stability of the formwork are ensured; according to the construction scheme of the scaffold, the vertical and horizontal spacing of the vertical pipes is 1.2m, the vertical and horizontal sweeping rods are longitudinally and transversely arranged at the position, which is not more than 20cm away from the ground, of the vertical pipes, and the vertical and horizontal pulling rods are arranged at intervals of 1.5 m. The periphery of the steel pipe support and the middle of the steel pipe support are provided with a longitudinal scissor support at intervals of four rows of support upright rods, and the longitudinal scissor supports are continuously arranged from bottom to top;
the steel bar binding: drawing a bidirectional steel bar interval according to the drawing requirement when the pitched roof panel ribs are bound, firstly placing bent steel bars in the double-slope direction, then placing horizontal steel bars, and simultaneously carrying out temporary binding and fixing;
the shutoff plugboard is arranged: after the reinforcement is bound, placing a plugboard every 1.35 m along the length direction of the sloping roof;
the operation platform is set up: setting up an operation platform right above a ridge before concrete pouring, arranging upright rods and cross bars in the same way as a full scaffold, lifting the upright rods to a position 1.5 meters above the operation platform, setting at least two cross bars as handrails in the range, and setting diagonal braces in the bottom area of the slab;
the inclined roof concrete is poured: when pouring, the concrete is poured from bottom to top in a sectional mode, the distance between the two partition boards is taken as a section, 1.35 m is taken as the optimal sectional distance, the concrete in the slump of 140-160 mm can realize point vibration within the distance, the concrete cannot freely slide down and be stacked in a large range, and the vibration difficulty of the concrete is reduced.
Preferably, a ridge template angle and elevation adjustable device is arranged below the ridge template, and the device is formed by hinging equilateral angle steel L75X5 to serve as an internal angle rigid support angle frame.
Preferably, the support of the template is reinforced by placing anti-skid fixing blocks with U-shaped brackets on the sloping roof at certain intervals (the distance between the upright posts of the scaffold).
Preferably, each intersection point is firmly bound when binding the reinforcing steel bars, and the iron threads of the adjacent binding points are required to form splayed shapes so as to prevent the deformation and deflection of the reinforcing steel bar meshes. The round concrete cushion block for the lower part of the double-layer bidirectional plate steel bar meets the requirement of a steel bar protection layer, and the double-layer steel bar is firmly bound with the upper layer steel bar by adopting a concrete split heads.
Preferably, the equilateral angle steel of the spot welding L30X3 on the two sides above the plugboard is used for controlling the casting thickness when casting concrete.
Preferably, the pouring is carried out step by step from the periphery to the top, vibration is carried out, a vibrating rod is inserted into a sloping roof, the vibrating rod is inserted into the sloping roof quickly and pulled out slowly, commercial concrete surface is used for grouting during vibration, no obvious sinking is caused, and no bubbles and bleeding are caused.
Preferably, the commercial concrete is cured after pouring, and a plastic film method can be adopted to cover the plastic film on the surface of the concrete.
Preferably, the operating platform is removable when the concrete reaches about 1 Mpa.
(III) beneficial effects
Compared with the prior art, the invention provides a construction method for mounting a viscous damping wall, which has the following beneficial effects:
according to the construction method for mounting the viscous damping wall, the problems that in construction, lateral pressure of a template is large, local offset of a ridge line is caused by uneven stress at a ridge position during concrete pouring, the internal angle is deformed due to insufficient rigidity and the like can be effectively solved by adopting the internal angle elevation and angle adjustable device of the ridge; pulling out the plate before the first setting is poured by the plate. When the method is used for construction, the concrete can be prevented from naturally sliding on the slope surface without constraint when the concrete is vibrated by the vibration rod point vibration, the effect of internal solid external light is achieved, the slope roof can effectively resist seepage and leak, insulate heat and preserve heat, smoothly drain water, and the living environment of the top layer is improved; and has low economic cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described, and it will be obvious to those skilled in the art that other drawings can be obtained according to these drawings without inventive effort.
FIG. 1 is an overall setup view of an external scaffolding system, an operator platform frame and a sloping roof system of the present invention;
FIG. 2 is a schematic view of a ridge inside corner rigid support corner frame;
FIG. 3 is a schematic view of an anti-skid mounting block with a U-shaped bracket;
FIG. 4 is a schematic view of a board according to the present invention;
FIG. 5 is a schematic view of a shutoff board installation of the present invention;
FIG. 6 is a schematic view of a roofing platform system of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the following examples in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
The principles of the invention will be further described with reference to the drawings and specific examples.
Examples
Referring to fig. 1-4, a construction method for installing a viscous damping wall mainly comprises the following construction processes:
installing an inclined roof formwork, binding reinforcing steel bars, arranging a closure plugboard 4, erecting an operation platform, pouring inclined roof concrete, and dismantling the formwork;
the installation of the inclined roof formwork comprises the following steps: the formwork 1 adopts a wood plywood, the roof gradient is strictly controlled according to the drawing requirements, the force transmission paths of the horizontal pull rod 2 and the vertical rod 3 are well controlled, and the flatness and the stability of the formwork 1 are ensured; according to the construction scheme of the scaffold, the vertical and horizontal spacing of the vertical pipes is 1.2m, the vertical and horizontal sweeping rods 8 are arranged at the position, which is not more than 20cm away from the ground, of the vertical pipes, and the vertical and horizontal pulling rods are arranged at intervals of 1.5 m. The periphery and the middle of the steel pipe bracket are provided with a longitudinal scissor support at intervals of four rows of bracket vertical rods 3, and the longitudinal scissor supports are continuously arranged from bottom to top;
the steel bar binding: when the pitched roof panel ribs are bound, the distance between two-way reinforcing steel bars 5 is drawn according to the drawing requirement, the reinforcing steel bars are bent in the double-slope direction and then the horizontal reinforcing steel bars are placed, and meanwhile temporary binding and fixing are carried out;
the shutoff plugboard 4 is arranged: after the reinforcement is bound, placing a plugboard at intervals of about 1.35 m along the length direction of the sloping roof, wherein the plugboard has the functions of controlling the elevation, the flatness and the thickness of concrete in the concrete pouring process, and also can be used as a closure barrier to reduce the gravity drop so as to realize the sectional pouring of the concrete;
the operation platform is set up: setting up an operation platform right above a ridge before concrete pouring, setting up an operation platform right above the ridge in a vertical rod 3 cross rod arrangement mode with a full scaffold, lifting the vertical rod 3 to a position 1.5m above the operation platform, setting at least two cross rods as handrails in the range, setting up diagonal braces in a plate bottom area, setting up the operation platform right above the ridge before concrete pouring, setting up the vertical rod 3 cross rod arrangement mode with the full scaffold, lifting the vertical rod 3 to a position 1.5m above the operation platform, setting at least two cross rods as handrails in the range, and setting up diagonal braces in the plate bottom area. The construction staff can conveniently work on the platform and can avoid trampling the steel bars;
the inclined roof concrete is poured: when pouring, the concrete is poured from bottom to top in a sectional mode, the distance between the two partition boards is taken as a section, 1.35 m is taken as the optimal sectional distance, the concrete in the slump of 140-160 mm can realize point vibration within the distance, the concrete cannot freely slide down and be stacked in a large range, and the vibration difficulty of the concrete is reduced.
The angle and elevation adjustable device of the ridge template 1 is arranged below the ridge template 1, the device is formed by hinging equilateral angle steels L75X5 to serve as an internal angle rigid support angle frame 7, the bottom edge length is calculated according to the ridge angle, the equilateral angle steels with the equal length L75X5 are connected with the equilateral angle steels to form a stable tripod, a flat plate support is welded below the bottom edge of the tripod, and the elevation of the ridge is controlled by adjusting the elevation of a jackscrew, so that the elevation and the angle of the template 1 are controlled.
The scaffold upright 3 distance is separated on the sloping roof, the anti-skid fixing block 6 with the U-shaped support is placed to strengthen the support of the template 1, the bottom size of the anti-skid fixing block 6 is equal to the inner side size of the U-shaped jacking, the anti-skid fixing block and the U-shaped jacking are placed without gaps, the upper inclined plane is consistent with the roof gradient, and the non-deformation of the gradient of the template 1 is effectively ensured.
When the steel bars are bound, each cross point is firmly bound, and the iron threads of the adjacent binding points are required to form splayed shapes so as to prevent the steel bar meshes from deforming and skewing. The round concrete cushion block for the lower part of the double-layer bidirectional plate steel bar meets the requirement of a steel bar protection layer, and the double-layer steel bar is firmly bound with the upper layer steel bar by adopting a concrete split heads so as to avoid deformation and deflection of the steel bar net sheet. The round concrete cushion block for the lower part of the double-layer bidirectional plate steel bar meets the requirement of a steel bar protection layer, and the double-layer steel bar is firmly bound with the upper layer steel bar by adopting a concrete split heads. The bending of the steel bar is completed by a cold bending machine according to the design angle so as to ensure the structural dimension of the steel bar.
Equal side angle steel of picture peg top both sides spot welding L30X3 is used for controlling when pouring the concrete and pours thickness, and 75mm department above the angle steel opens the round hole of diameter 50mm and is used for inserting the scaffold pipe in vertical direction and fixes the picture peg, spot welding L shaped steel muscle on the bottom muscle is as the fixed position of steel sheet of clamp solid muscle.
When pouring, the periphery starts to be gradually poured upwards in a segmented way, vibration is carried out, a vibrating rod is inserted into a vertical sloping roof, the vibrating rod is inserted into the vertical sloping roof quickly and pulled out slowly, commercial concrete surface is used for grouting during vibration, no obvious sinking is caused, no bubbles and bleeding are caused, and meanwhile, a scraping rule is matched to slide in parallel along angle steel to ensure that the concrete slab surface is folded and compacted. Before the concrete is initially set, the plugboards at all levels are removed, and the plugboards are slowly pulled up from one end to the other end of the plugboards during the removal.
After the commercial concrete is poured, curing is carried out, and a plastic film method can be adopted to cover the plastic film on the surface of the concrete, so that the concrete member is isolated from air, and the moisture in the concrete is not evaporated any more to complete hydration.
When the concrete reaches about 1Mpa, the operation platform can be removed, and sundries on the platform can be removed in time before the operation platform is removed. The side plates and the bottom plate are arranged at the front side when the template 1 is removed. When the mould is removed, the hard knocking of the sledge hammer and the crow bar is forbidden as much as possible. The detached templates 1 and accessories are placed in order for the next turnover.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (8)

1. A construction method for mounting viscous damping wall is characterized in that;
the main construction flow comprises the following steps:
s1, installing an inclined roof formwork;
s2, binding reinforcing steel bars;
s3, arranging a shutoff plugboard (4);
s4, setting up an operation platform;
s5, pouring concrete on the inclined roof;
s6, dismantling the die carrier;
the installation of the inclined roof formwork comprises the following steps: the formwork (1) adopts a wood plywood, the roof gradient is strictly controlled according to the drawing requirement, the force transmission way of the horizontal pull rod (2) and the vertical rod (3) is well controlled, and the flatness and the stability of the formwork (1) are ensured; according to the construction scheme of the scaffold, vertical rods (3) are longitudinally and transversely arranged at intervals of 1.2m, a sweeping rod (8) is longitudinally and transversely arranged at a position, which is not more than 20cm away from the ground, of the vertical pipe, and longitudinal and transverse pull rods are arranged at intervals of 1.5 m; the periphery and the middle of the steel pipe bracket are provided with a longitudinal scissor support at intervals of four rows of bracket vertical rods (3), and the longitudinal scissor supports are continuously arranged from bottom to top;
the steel bar binding: when the pitched roof panel ribs are bound, the distance between two-way reinforcing steel bars (5) is drawn according to the drawing requirement, firstly, bending reinforcing steel bars in the double-slope direction are placed, then horizontal reinforcing steel bars are placed, and meanwhile temporary binding and fixing are carried out;
the shutoff plugboard (4) is arranged: after the reinforcement is bound, a closure plugboard (4) is placed at intervals of about 1.35 m along the length direction of the sloping roof;
the operation platform is set up: setting up an operation platform right above a ridge before concrete pouring, arranging vertical rods (3) in the same cross rod arrangement mode as a full scaffold, lifting the vertical rods (3) to a position 1.5 meters above the operation platform, setting at least two cross rods as handrails in the range, and setting diagonal braces in the plate bottom area;
the inclined roof concrete is poured: when pouring, pouring is carried out from bottom to top in a sectional mode, the distance between the two partition boards is taken as a section, 1.35 m is taken as a sectional distance, and the slump is 140-160 mm.
2. The construction method for mounting a viscous damping wall according to claim 1, wherein: an angle and elevation adjustable device of the ridge template (1) is arranged below the ridge template (1), and the device is formed by hinging equilateral angle steel L75X5 to serve as an internal angle rigid support angle frame (7).
3. The construction method for mounting a viscous damping wall according to claim 2, wherein: the scaffold upright (3) is spaced on the sloping roof, and the antiskid fixed block (6) with the U-shaped support is placed to strengthen the support of the template (1).
4. The construction method for mounting a viscous damping wall according to claim 1, wherein: when the steel bars are bound, each intersection is firmly bound, and the iron threads of the adjacent binding points are required to form splayed shapes so as to prevent the steel bar meshes from deforming and skewing; the round concrete cushion block for the lower part of the double-layer bidirectional plate steel bar meets the requirement of a steel bar protection layer, and the double-layer steel bar is firmly bound with the upper layer steel bar by adopting a concrete split heads.
5. The construction method for mounting a viscous damping wall according to claim 1, wherein: and the equal angle steel of the spot welding L30X3 on the two sides above the intercepting plugboard (4) is used for controlling the casting thickness when casting concrete.
6. The construction method for mounting a viscous damping wall according to claim 1, wherein: when pouring, the periphery starts to be gradually poured upwards in a segmented way, vibration is carried out, a vibrating rod is inserted into a vertical sloping roof, the vibrating rod is quickly inserted and slowly pulled out, commercial concrete surface is used for grouting during vibration, no obvious sinking is caused, and no bubbles and bleeding are caused.
7. The construction method for mounting a viscous damping wall according to claim 6, wherein: curing is carried out after commercial concrete pouring is completed, and a plastic film method is adopted to cover the plastic film on the surface of the concrete.
8. The construction method for mounting a viscous damping wall according to claim 7, wherein: when the concrete reaches about 1Mpa, the operation platform can be removed.
CN202311563087.9A 2023-11-22 2023-11-22 A construction method for installing viscous damping walls Pending CN117722011A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311563087.9A CN117722011A (en) 2023-11-22 2023-11-22 A construction method for installing viscous damping walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311563087.9A CN117722011A (en) 2023-11-22 2023-11-22 A construction method for installing viscous damping walls

Publications (1)

Publication Number Publication Date
CN117722011A true CN117722011A (en) 2024-03-19

Family

ID=90207717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311563087.9A Pending CN117722011A (en) 2023-11-22 2023-11-22 A construction method for installing viscous damping walls

Country Status (1)

Country Link
CN (1) CN117722011A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118407603A (en) * 2024-05-30 2024-07-30 中国十七冶集团有限公司 A single-side formwork support system for inclined retaining wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IL61258A0 (en) * 1980-10-13 1980-12-31 Mordechai Shechter Method of prefabricated construction, and building structure constructed in accordance with such method
CN101196071A (en) * 2007-12-28 2008-06-11 中设建工集团有限公司 Anti-leakage construction process for inclined roof
CN115182514A (en) * 2022-07-16 2022-10-14 中交第四公路工程局有限公司 Construction method beneficial to improving concrete compactness of slope slab
CN116607777A (en) * 2023-06-29 2023-08-18 贵州建工第八建设集团有限公司 Auxiliary device and method for concrete pouring construction of heavy-gradient inclined roof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IL61258A0 (en) * 1980-10-13 1980-12-31 Mordechai Shechter Method of prefabricated construction, and building structure constructed in accordance with such method
CN101196071A (en) * 2007-12-28 2008-06-11 中设建工集团有限公司 Anti-leakage construction process for inclined roof
CN115182514A (en) * 2022-07-16 2022-10-14 中交第四公路工程局有限公司 Construction method beneficial to improving concrete compactness of slope slab
CN116607777A (en) * 2023-06-29 2023-08-18 贵州建工第八建设集团有限公司 Auxiliary device and method for concrete pouring construction of heavy-gradient inclined roof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118407603A (en) * 2024-05-30 2024-07-30 中国十七冶集团有限公司 A single-side formwork support system for inclined retaining wall

Similar Documents

Publication Publication Date Title
KR100938821B1 (en) Prefabricated mold structure of waterway and construction method of drainage canal
CN111058631B (en) Concrete construction method for large-gradient inclined roof
CN108677962B (en) Subway entrance and exit segment foundation pit formwork installing and dismantling method
CN112411882A (en) Method for building ultrahigh and oversized space inclined cylindrical column
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN116607777A (en) Auxiliary device and method for concrete pouring construction of heavy-gradient inclined roof
CN115182514A (en) Construction method beneficial to improving concrete compactness of slope slab
CN116122169B (en) Steel plate composite beams and construction methods
CN114934548B (en) A kind of advanced water-stopping basement top plate settlement post-casting strip and its construction method
CN116122342A (en) Shear wall post-pouring belt die carrier device and construction method
LU600833B1 (en) Arched tunnel structure and arched tunnel construction method
CN115492371A (en) Installation method of multi-curved-surface combined high and large template
CN113232152B (en) Method for prefabricating concrete well chamber
CN115467368A (en) Prefabricated retaining wall and its construction method
CN214401884U (en) Basement outer wall unilateral formwork stress system
CN113622328A (en) Box culvert construction assembly, application thereof and box culvert construction method
CN119824948A (en) Basement exterior wall construction method in ultra-narrow foundation trench environment
CN216616835U (en) An ultra-high and over-limit combined formwork system
CN214530768U (en) A cast-in-place integrated pipe gallery formwork support structure
CN215289758U (en) Internal mold system of cantilever casting construction closure section
CN214531911U (en) Oversized-section frame column formwork system
CN213806724U (en) A beam enlargement and reinforcement device for reconstruction projects
CN212388856U (en) Cast-in-place clear water concrete batter post structure of prestressing force
CN112746628A (en) Cast-in-place comprehensive pipe gallery formwork supporting structure and cast-in-place comprehensive pipe gallery construction method
CN113756497A (en) Concrete floor slab adopting hollow template and rapid construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination