CN117721782A - Foundation drilling method and electric drilling equipment thereof - Google Patents

Foundation drilling method and electric drilling equipment thereof Download PDF

Info

Publication number
CN117721782A
CN117721782A CN202410010067.7A CN202410010067A CN117721782A CN 117721782 A CN117721782 A CN 117721782A CN 202410010067 A CN202410010067 A CN 202410010067A CN 117721782 A CN117721782 A CN 117721782A
Authority
CN
China
Prior art keywords
drill
rod
drilling
electric
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410010067.7A
Other languages
Chinese (zh)
Inventor
陈陈
郑帅
孟阳
王自伟
王明涛
廖岚昊
李梁森
张志凯
王昊宇
宁欣
方洁
梅秀山
陈四平
宋长伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN202410010067.7A priority Critical patent/CN117721782A/en
Publication of CN117721782A publication Critical patent/CN117721782A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)

Abstract

本发明属于地基钎探领域,具体的说是一种地基钎探方法及其电动钎探设备,该地基钎探方法包括以下步骤:S1:放线标点:测量组根据钎探点位平面布置图分区放线,用白灰放出分区控制线,孔位要撒上白灰点,并在孔位上盖砖,砖上应按钎探点布置要求编号,在拔钎前,启动清理电推杆,清理电推杆拉动铰接座进行移动,依靠两侧铰接的连杆拉动连接架互相靠近,从而使得连接架在滑杆上进行滑动,使得清理板互相靠近合拢,依靠合拢的清理板可以对钎杆表面的泥土进行清理,以此可以减少下次使用时,泥土在钎杆表面上增大阻力,从而降低对下次钎探精度造成影响。

The invention belongs to the field of foundation drilling. Specifically, it is a foundation drilling method and electric drilling equipment. The foundation drilling method includes the following steps: S1: setting out line marking points: the measurement group is based on the layout plan of the drilling points. Pay out the wires in different areas and use white ash to release the zoning control lines. The holes should be sprinkled with white ash dots and covered with bricks. The bricks should be numbered according to the layout requirements of the drill points. Before pulling out the drill, start the cleaning electric push rod and clean it. The electric push rod pulls the hinged seat to move, and relies on the hinged connecting rods on both sides to pull the connecting frames closer to each other, so that the connecting frames slide on the sliding rod, so that the cleaning plates are close to each other. The closed cleaning plates can clean the surface of the drill rod. Clean the soil to reduce the resistance caused by soil on the surface of the drill rod when used next time, thus reducing the impact on the accuracy of the next drill.

Description

一种地基钎探方法及其电动钎探设备A foundation drilling method and its electric drilling equipment

技术领域Technical field

本发明涉及地基钎探领域,具体是一种地基钎探方法及其电动钎探设备。The invention relates to the field of foundation drilling, specifically a foundation drilling method and its electric drilling equipment.

背景技术Background technique

地基钎探是一种土层探测施工工艺,其根据钢钎进入地基土层所需的击锤数,以此可以探测土层内隐蔽构造情况或粗略估算土层的容许承载力。Foundation drilling is a soil detection construction technology. Based on the number of hammers required for the steel drill to enter the foundation soil layer, it can detect the hidden structure in the soil layer or roughly estimate the allowable bearing capacity of the soil layer.

目前现有技术中,在地基钎探时,需要根据设计图纸绘制钎探孔位平面布置图,然后按照钎探孔位平面布置图在放线孔位洒上白灰点,用作标记,之后将电动钎探机移动至钎探位置,电动钎探机的穿心锤在电机和链条驱动下,使得穿心锤进行上下往复运动,穿心锤运动的过程中锤击底部的钎杆,使钎杆打入到土层内部,在钎探杆每打入土层30cm时,工人需要记录一次钎锤对钎探杆的锤击数,在钎探点的钎探完成后,电动钎探机将钎杆从土层内拔出,之后钎杆拔出的孔洞进行盖孔保护,确保孔洞不会受到外界干扰,当所有钎探孔位验收完成后需要将中砂灌入钎探孔内,最后用灰砂砖盖住钎探孔并编号,钎杆是使用直径为22~25mm的光圆钢筋制成,钎尖呈60°,钎杆长度为2.0m,且钎杆自下而上每隔30cm留有刻痕,以便于工作人员进行记录;In the current prior art, when drilling the foundation, it is necessary to draw the layout of the drilling holes according to the design drawings, and then sprinkle white gray dots on the pay-out holes according to the layout of the drilling holes to use as marks, and then put The electric drilling machine moves to the drilling position, and the piercing hammer of the electric drilling machine is driven by the motor and chain, causing the piercing hammer to reciprocate up and down. During the movement of the piercing hammer, it hammers the drill rod at the bottom, causing the drill rod to The rod is driven into the soil layer. Every time the drill rod is driven into the soil layer 30cm, the worker needs to record the number of hammer blows of the drill hammer on the drill rod. After the drilling of the drill point is completed, the electric drill machine will The drill rod is pulled out from the soil layer, and then the hole from which the drill rod is pulled out is covered and protected to ensure that the hole will not be disturbed by the outside world. After the acceptance of all drill holes is completed, medium sand needs to be poured into the drill holes. Finally Cover the drill holes with lime sand bricks and number them. The drill rod is made of smooth round steel bars with a diameter of 22 to 25 mm. The drill tip is 60°. The length of the drill rod is 2.0m. The drill rod is spaced from bottom to top at intervals. There are notches left at 30cm to facilitate staff recording;

在地基钎探过程中,工作人员需要确保钢钎的垂直度,避免倾斜导致数据不准确,每次击锤前,要检查锤子的重量和形状,确保其符合要求,每次击锤时要保持稳定,避免摇晃导致数据不准确,在打钎过程中,要注意保护已完成的基槽,避免破坏,在拔钎时,要注意不要损坏钢钎和锤头。During the foundation drilling process, workers need to ensure the verticality of the steel drill to avoid inaccuracy in data caused by tilt. Before each hammer blow, the weight and shape of the hammer must be checked to ensure that it meets the requirements. Each hammer blow must be maintained Stable to avoid inaccurate data caused by shaking. During the drill process, attention should be paid to protecting the completed base groove to avoid damage. When pulling out, care should be taken not to damage the steel drill and hammer head.

但是在使用时,钎杆被从土层内拔出后,钎杆的表面会粘附有土层的泥土,在下次进行钎探时,钎杆表面粘附的泥土会增大钎杆插入到土层内的阻力,进而会对钎探精度造成影响;因此,针对上述问题提出一种地基钎探方法及其电动钎探设备。However, during use, after the drill rod is pulled out from the soil layer, soil from the soil layer will adhere to the surface of the drill rod. When drilling is performed next time, the soil adhered to the surface of the drill rod will increase the depth of the drill rod when the drill rod is inserted. The resistance within the soil layer will in turn affect the drilling accuracy; therefore, a foundation drilling method and its electric drilling equipment are proposed to address the above problems.

发明内容Contents of the invention

为了弥补现有技术的不足,解决背景技术中所提出的至少一个技术问题,本发明提出一种地基钎探方法及其电动钎探设备。In order to make up for the shortcomings of the existing technology and solve at least one technical problem raised in the background art, the present invention proposes a foundation drilling method and its electric drilling equipment.

本发明解决其技术问题所采用的技术方案是:本发明所述的一种地基钎探方法,该地基钎探方法包括以下步骤:The technical solution adopted by the present invention to solve the technical problem is: a foundation drilling method according to the invention, which includes the following steps:

S1:放线标点:测量组根据钎探点位平面布置图分区放线,用白灰放出分区控制线,孔位要撒上白灰点,并在孔位上盖砖,砖上应按钎探点布置要求编号;S1: Layout marking points: The measurement team sets out the wires in zones according to the plan layout of the soldering probe points, and uses white ash to release the zone control lines. The holes should be sprinkled with white ash dots, and bricks should be covered on the holes. The bricks should be according to the soldering probe points. Arrangement requirement number;

S2:就位打钎:将触探杆尖对准孔位,再把电动钎探设备拉起穿心锤18,使其自由下落,把钎杆19垂直打入土层中;S2: Drilling in place: Align the tip of the penetration probe rod with the hole position, then pull up the penetration hammer 18 of the electric drill equipment, let it fall freely, and drive the drill rod 19 vertically into the soil layer;

S3:记录锤击数:钎杆19每打入土层300mm时记录一次锤击数;S3: Record the number of hammer blows: record the number of hammer blows every time the drill rod 19 is driven into the soil layer 300mm;

S4:拔钎:当钎杆19打至钎探总深度时,操作手关闭打钎开关,打开拔钎开关,同时启动清理电推杆31,使清理板34合拢,拔钎过程中,合拢的清理板34对钎杆19表面的泥土刮除,待电动钎探设备将钢钎杆19完全拔出,移开钎探设备,用原编号砖盖孔;S4: Drilling: When the drill rod 19 reaches the total drilling depth, the operator turns off the drill switch, turns on the drill switch, and at the same time starts the cleaning electric push rod 31 to close the cleaning plate 34. During the drilling process, the closed The cleaning plate 34 scrapes off the soil on the surface of the drill rod 19. After the electric drill equipment has completely pulled out the steel drill rod 19, remove the drill equipment and cover the hole with the original numbered brick;

S5:移位:将打钎设备搬到下一孔位,以便继续打钎;S5: Shift: Move the drilling equipment to the next hole position to continue drilling;

S6:每区钎探孔作业完毕后,组织进行验槽;S6: After the drilling operation in each area is completed, organize the groove inspection;

S7:灌砂:验槽完毕后,由进行灌砂,灌砂时,每填入300mm左右用C20钢筋捣实一次,填至基槽标高;S7: Sand filling: After the trench inspection is completed, sand filling is carried out. When filling sand, fill it with C20 steel bars every 300mm or so and tamp it down to the elevation of the foundation trench;

S8:整理记录:由钎探记录组人员收集钎探原始记录表,按孔顺序编号,将锤击数填入统一表格内进行归档。S8: Arrange records: The drill record team members collect the original drill record sheets, number them according to the order of holes, and fill in the number of hammer blows in a unified form for filing.

优选的,所述S1中钎探点呈梅花形布置,探点间距1.5m,外圈钎点要距基坑支护桩内侧750mm以上,避免对支护桩产生扰动。Preferably, the soldering probe points in S1 are arranged in a plum blossom shape, with a spacing of 1.5m between probe points, and the outer ring soldering points should be at least 750mm away from the inside of the foundation pit supporting piles to avoid disturbing the supporting piles.

一种电动钎探设备,该电动钎探设备适用于上述一种地基钎探方法;该电动钎探设备包括机架、钎杆、穿心锤、振打组件;所述振打组件设在机架上;所述穿心锤设在振打组件上;所述钎杆设在穿心锤的底部,依靠上述设置,以此依靠电力驱动将钎杆打入到土层内。An electric drill equipment, which is suitable for the above-mentioned foundation drill method; the electric drill equipment includes a frame, a drill rod, a drilling hammer, and a rapping component; the rapping component is located on the machine on the frame; the piercing hammer is set on the rapping assembly; the drill rod is set on the bottom of the piercing hammer, and relying on the above arrangement, the drill rod is driven into the soil layer by electric drive.

优选的,所述机架的顶部设有拔钎组件;所述拔钎组件包括钢绳和绳盘,依靠上述设置,以此来将振打架提起,从而将振打架的底部的钎杆从土层内抽出,以此可以方便工作人员拔出钎杆,方便工作人员使用。Preferably, the top of the frame is provided with a drill assembly; the drill assembly includes a steel rope and a rope drum, relying on the above arrangement to lift the vibrating box, thereby lifting the drill rod at the bottom of the vibrating box from the soil. It can be pulled out from inside the layer, so that the staff can easily pull out the drill rod and use it conveniently.

优选的,所述机架的底部设有清理组件;所述清理组件包括清理板和清理电推杆,依靠合拢的清理板可以对钎杆表面的泥土进行清理,以此可以减少下次使用时,泥土在钎杆表面上增大阻力,从而降低对下次钎探精度造成影响。Preferably, a cleaning component is provided at the bottom of the frame; the cleaning component includes a cleaning plate and a cleaning electric push rod. The closed cleaning plate can clean the soil on the surface of the drill rod, thereby reducing the need for the next use. , the soil increases resistance on the surface of the drill rod, thereby reducing the impact on the accuracy of the next drill rod.

优选的,所述穿心锤的两侧设有计数组件;所述计数组件包括光电发射模块、光电接收模块和显示屏,依靠上述设置,以此可以方便工作人员计数和统计锤击数,从而可以方便工作人员使用。Preferably, counting components are provided on both sides of the core-piercing hammer; the counting component includes a photoelectric transmitting module, a photoelectric receiving module and a display screen. Relying on the above arrangement, it is convenient for workers to count and count the number of hammer blows, thereby Can be used conveniently by staff.

优选的,所述机架的侧面设有限长组件;所述限长组件包括绳轮和连接绳,当钎探杆打入30cm时,限位片和挡片贴合阻挡旋转,进而使得钎杆无法下移,然后工作人员进行记录,以此可以减少打入的距离超过30cm的情况。Preferably, a length-limiting component is provided on the side of the frame; the length-limiting component includes a sheave and a connecting rope. When the drill rod is driven in by 30cm, the limiting piece and the blocking piece fit together to block the rotation, thereby causing the drill rod to It cannot be moved down, and then the staff will record it, so as to reduce the situation where the driving distance exceeds 30cm.

优选的,所述显示屏的底部设有提示组件;所述提示组件包括扬声器,依靠上述设置,以此来使得扬声器通电,进而向外发出提示音,提示工作人员进行记录。Preferably, a prompt component is provided at the bottom of the display screen; the prompt component includes a speaker, which relies on the above settings to energize the speaker and then emit a prompt sound to prompt the staff to record.

本发明的有益之处在于:The benefits of the present invention are:

1.本发明通过设置清理组件,在拔钎前,启动清理电推杆,清理电推杆拉动铰接座进行移动,依靠两侧铰接的连杆拉动连接架互相靠近,从而使得连接架在滑杆上进行滑动,使得清理板互相靠近合拢,依靠合拢的清理板可以对钎杆表面的泥土进行清理,以此可以减少下次使用时,泥土在钎杆表面上增大阻力,从而降低对下次钎探精度造成影响;1. In the present invention, by setting the cleaning component, before pulling out the soldering, the cleaning electric push rod is started, the cleaning electric push rod pulls the hinge seat to move, and relies on the hinged connecting rods on both sides to pull the connecting frames closer to each other, so that the connecting frames are on the sliding rod. Slide on the drill rod so that the cleaning plates are close to each other. The closed cleaning plates can clean the soil on the surface of the drill rod. This can reduce the increase in resistance of the soil on the surface of the drill rod the next time it is used, thereby reducing the impact on the drill rod next time. The accuracy of soldering is affected;

2.本发明通过设置限长组件,在穿心锤进行锤击钎探杆时,钎探杆每次下降的距离不一致,导致钎探杆打入的距离很容易超过30cm,而且钎探杆在打入土层时,工人难以观察到钎探杆上的刻度,从而导致工人记录的锤击数误差较大,本发明实施例在使用时,钎杆下移,振打架也会同步下移,然后振打架通过连接绳拉动绳轮进行旋转,当钎探杆打入30cm时,限位片和挡片贴合阻挡旋转,进而使得钎杆无法下移,然后工作人员进行记录,以此可以减少打入的距离超过30cm的情况。2. In the present invention, by setting the length-limiting component, when the drilling hammer hammers the drilled probe rod, the distance the drilled probe rod drops each time is inconsistent, resulting in the driving distance of the drilled probe rod easily exceeding 30cm, and the drilled probe rod is in When driving into the soil layer, it is difficult for workers to observe the scale on the drill rod, which leads to a large error in the number of hammer blows recorded by workers. When the embodiment of the present invention is used, when the drill rod moves downward, the vibrating rod will also move downward simultaneously. Then the vibration fight pulls the sheave through the connecting rope to rotate. When the drill rod is driven in 30cm, the limit piece and the stopper fit together to block the rotation, making it impossible for the drill rod to move down. Then the staff records it, which can reduce When the penetration distance exceeds 30cm.

附图说明Description of the drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description are only These are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts.

图1为本发明的方法流程图;Figure 1 is a flow chart of the method of the present invention;

图2为本发明的机架结构示意图;Figure 2 is a schematic diagram of the frame structure of the present invention;

图3为本发明的清理板结构示意图;Figure 3 is a schematic structural diagram of the cleaning plate of the present invention;

图4为本发明的振打架结构示意图;Figure 4 is a schematic diagram of the vibration fighting structure of the present invention;

图5为本发明的支架结构示意图;Figure 5 is a schematic diagram of the bracket structure of the present invention;

图6为本发明的丝杆的结构示意图。Figure 6 is a schematic structural diagram of the screw rod of the present invention.

图中:11、机架;12、振打架;13、驱动轴;14、拉杆;15、振打电机;16、导向板;17、提拉架;18、穿心锤;19、钎杆;21、拔钎电机;22、绳盘;23、钢绳;24、第一滑轮;25、第二滑轮;31、清理电推杆;32、连杆;33、连接架;34、清理板;41、光电发射模块;42、光电接收模块;43、显示屏;51、支架;52、绳轮;53、升降电推杆;54、底板;55、挡片;56、限位片;61、按压开关;62、扬声器;71、丝杆;72、驱动电机。In the picture: 11. Frame; 12. Vibration fight; 13. Drive shaft; 14. Pull rod; 15. Vibration motor; 16. Guide plate; 17. Lift frame; 18. Piercing hammer; 19. Drilling rod; 21 , Pull out the drill motor; 22. Rope reel; 23. Steel rope; 24. First pulley; 25. Second pulley; 31. Clean the electric push rod; 32. Connecting rod; 33. Connecting frame; 34. Cleaning plate; 41 , Photoelectric transmitting module; 42. Photoelectric receiving module; 43. Display screen; 51. Bracket; 52. Rope pulley; 53. Lifting electric push rod; 54. Base plate; 55. Baffle; 56. Limiting piece; 61. Press Switch; 62, speaker; 71, screw rod; 72, drive motor.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present invention.

下面给出具体实施例。Specific examples are given below.

请参阅图1所示,一种地基钎探方法,该地基钎探方法包括以下步骤:Please refer to Figure 1, which shows a foundation drilling method. The foundation drilling method includes the following steps:

S1:放线标点:测量组根据钎探点位平面布置图分区放线,用白灰放出分区控制线,孔位要撒上白灰点,并在孔位上盖砖,砖上应按钎探点布置要求编号;S1: Layout marking points: The measurement team sets out the wires in zones according to the plan layout of the soldering probe points, and uses white ash to release the zone control lines. The holes should be sprinkled with white ash dots, and bricks should be covered on the holes. The bricks should be according to the soldering probe points. Layout requirement number;

S2:就位打钎:将触探杆尖对准孔位,再把电动钎探设备拉起穿心锤18,使其自由下落,把钎杆19垂直打入土层中;S2: Drilling in place: Align the tip of the penetration probe rod with the hole position, then pull up the penetration hammer 18 of the electric drill equipment, let it fall freely, and drive the drill rod 19 vertically into the soil layer;

S3:记录锤击数:钎杆19每打入土层300mm时记录一次锤击数;S3: Record the number of hammer blows: record the number of hammer blows every time the drill rod 19 is driven into the soil layer 300mm;

S4:拔钎:当钎杆19打至钎探总深度时,操作手关闭打钎开关,打开拔钎开关,同时启动清理电推杆31,使清理板34合拢,拔钎过程中,合拢的清理板34对钎杆19表面的泥土刮除,待电动钎探设备将钢钎杆19完全拔出,移开钎探设备,用原编号砖盖孔;S4: Drilling: When the drill rod 19 reaches the total drilling depth, the operator turns off the drill switch, turns on the drill switch, and at the same time starts the cleaning electric push rod 31 to close the cleaning plate 34. During the drilling process, the closed The cleaning plate 34 scrapes off the soil on the surface of the drill rod 19. After the electric drill equipment has completely pulled out the steel drill rod 19, remove the drill equipment and cover the hole with the original numbered brick;

S5:移位:将打钎设备搬到下一孔位,以便继续打钎;S5: Shift: Move the drilling equipment to the next hole position to continue drilling;

S6:每区钎探孔作业完毕后,组织进行验槽;S6: After the drill drilling operation in each area is completed, organize groove inspection;

S7:灌砂:验槽完毕后,由进行灌砂,灌砂时,每填入300mm左右用C20钢筋捣实一次,填至基槽标高;S7: Sand filling: After the trench inspection is completed, sand filling is carried out. When filling sand, fill it with C20 steel bars every 300mm or so and tamp it down to the elevation of the foundation trench;

S8:整理记录:由钎探记录组人员收集钎探原始记录表,按孔顺序编号,将锤击数填入统一表格内进行归档。S8: Arrange records: The drill record team members collect the original drill record sheets, number them according to the order of holes, and fill in the number of hammer blows in a unified form for filing.

进一步的,所述S1中钎探点呈梅花形布置,探点间距1.5m,外圈钎点要距基坑支护桩内侧750mm以上,避免对支护桩产生扰动。Furthermore, the soldering probe points in S1 are arranged in a plum blossom shape, with a spacing of 1.5m between probe points, and the outer ring soldering points should be more than 750mm away from the inside of the foundation pit supporting piles to avoid disturbing the supporting piles.

实施例一Embodiment 1

请参阅图2-5所示,一种电动钎探设备,该电动钎探设备适用于上述一种地基钎探方法;该电动钎探设备包括机架11、钎杆19、穿心锤18、振打组件;所述振打组件设在机架11上;所述穿心锤18设在振打组件上;所述钎杆19设在穿心锤18的底部;所述振打组件包括振打架12;所述振打架12通过滑轨滑动连接在机架11上;所述振打架12的顶部和底部均固接有支座;两个所述支座上转动连接有驱动轴13;两个所述驱动轴13上安装有齿轮和链条;所述支座的侧面固接有振打电机15;所述振打电机15的输出端与驱动轴13固接;所述链条上固接有拉杆14;所述振打架12的中部固接有一对导向板16;所述穿心锤18滑动连接在一对导向板16之间;所述振打架12的底部开设有通孔;所述钎杆19贯穿通孔并与其滑动连接;所述穿心锤18的顶部固接有提拉架17;所述机架11的底部固接行走轮;Please refer to Figure 2-5, an electric drill equipment, which is suitable for the above-mentioned foundation drill method; the electric drill equipment includes a frame 11, a drill rod 19, a penetrating hammer 18, The rapping assembly; the rapping assembly is located on the frame 11; the drilling hammer 18 is located on the rapping assembly; the drill rod 19 is located at the bottom of the drilling hammer 18; the rapping assembly includes a vibrating assembly. Fighter 12; the vibrator fight 12 is slidingly connected to the frame 11 through slide rails; the top and bottom of the vibrator fight 12 are fixedly connected with supports; two of the supports are rotatably connected to a drive shaft 13; two Gears and chains are installed on each of the driving shafts 13; a rapping motor 15 is fixedly connected to the side of the support; the output end of the rapping motor 15 is fixedly connected to the driving shaft 13; the chain is fixedly connected to a The pull rod 14; a pair of guide plates 16 are fixedly connected to the middle part of the vibration box 12; the piercing hammer 18 is slidingly connected between the pair of guide plates 16; a through hole is provided at the bottom of the vibration box 12; the drill The rod 19 penetrates through the through hole and is slidingly connected with it; the top of the punching hammer 18 is fixed with a lifting frame 17; the bottom of the frame 11 is fixed with a running wheel;

在使用时,启动振打电机15,振打电机15带动驱动轴13进行旋转,驱动轴13的旋转依靠齿轮驱动链条进行旋转,然后链条的运动会带动拉杆14进行运动,拉杆14会拉动提拉架17和穿心锤18上移,当穿心锤18移动至振打架12的顶部后拉杆14在链条的驱动与提拉架17分离,以此使得穿心锤18自由落体下落对钎杆19进行击打,然后随着链条的不断运动,以此将钎杆19打入到土层内,导向板16用于引导穿心锤18下落,使得穿心锤18击打在钎杆19上,依靠设置行走轮可以方便地进行移动搬运电动钎探设备,When in use, the rapping motor 15 is started, and the rapping motor 15 drives the drive shaft 13 to rotate. The rotation of the drive shaft 13 relies on the gear drive chain to rotate. Then the movement of the chain will drive the pull rod 14 to move, and the pull rod 14 will pull the lifting frame 17 and the piercing hammer 18 moves upward. When the piercing hammer 18 moves to the top of the vibration box 12, the pull rod 14 is driven by the chain and separates from the lifting frame 17, so that the piercing hammer 18 falls freely and hits the drill rod 19. , and then with the continuous movement of the chain, the drill rod 19 is driven into the soil layer. The guide plate 16 is used to guide the piercing hammer 18 to fall, so that the piercing hammer 18 hits the drill rod 19 and walks by relying on the setting. The wheel can easily move and transport the electric drilling equipment.

进一步的,如图2所示,所述机架11的顶部设有拔钎组件;所述拔钎组件包括钢绳23和绳盘22;所述振打架12的顶部固接有第一滑轮24;所述机架11的顶部固接有第二滑轮25;所述钢绳23穿设在第一滑轮24和第二滑轮25上,所述钢绳23的顶端与机架11固接;所述机架11的底部固接有拔钎电机21;所述绳盘22固接在拔钎电机21的输出端;所述钢绳23的底端与绳盘22固接;在使用时,第一滑轮24、第二滑轮25组合成滑轮组结构,以此可以方便地进行拔钎,然后通过拔钎电机21驱动绳盘22收卷钢绳23,以此来将振打架12提起,从而将振打架12的底部的钎杆19从土层内抽出,以此可以方便工作人员拔出钎杆19,方便工作人员使用。Further, as shown in Figure 2, the top of the frame 11 is provided with a puller assembly; the puller assembly includes a steel rope 23 and a rope drum 22; the top of the vibration frame 12 is fixed with a first pulley 24. ; The top of the frame 11 is fixed with a second pulley 25; the steel rope 23 is worn on the first pulley 24 and the second pulley 25, and the top of the steel rope 23 is fixed with the frame 11; so The bottom of the frame 11 is fixedly connected to the drill motor 21; the rope drum 22 is fixed to the output end of the drill motor 21; the bottom end of the steel rope 23 is fixed to the rope drum 22; when in use, the first The first pulley 24 and the second pulley 25 are combined into a pulley block structure, which can be easily pulled out, and then the pulling motor 21 drives the rope drum 22 to wind up the steel rope 23, so as to lift the vibration box 12, thereby lifting the vibration The drill rod 19 at the bottom of the drill 12 is pulled out from the soil layer, so that the worker can easily pull out the drill rod 19 and use it conveniently.

进一步的,如图3所示,所述机架11的底部设有清理组件;所述清理组件包括清理板34和清理电推杆31;所述机架11的底部固接有一对滑杆;所述滑杆上滑动连接有两个连接架33;所述清理板34固接在连接架33的底部;两个所述连接架33的顶部均铰接有连杆32;所述连杆32的端部铰接有铰接座;所述清理电推杆31固接在机架11的底部;所述清理电推杆31的输出端与铰接座固接;在拔钎前,启动清理电推杆31,清理电推杆31拉动铰接座进行移动,依靠两侧铰接的连杆32拉动连接架33互相靠近,从而使得连接架33在滑杆上进行滑动,使得清理板34互相靠近合拢,依靠合拢的清理板34可以对钎杆19表面的泥土进行清理,以此可以减少下次使用时,泥土在钎杆19表面上增大阻力,从而降低对下次钎探精度造成影响,在清理完成后,启动清理电推杆31推动铰接座进行移动,使得两个清理板34进行远离。Further, as shown in Figure 3, a cleaning assembly is provided at the bottom of the frame 11; the cleaning assembly includes a cleaning plate 34 and a cleaning electric push rod 31; a pair of sliding rods are fixed at the bottom of the frame 11; Two connecting frames 33 are slidingly connected to the sliding rod; the cleaning plate 34 is fixed to the bottom of the connecting frame 33; the tops of the two connecting frames 33 are hinged with connecting rods 32; the connecting rods 32 are The end is hinged with a hinge seat; the cleaning electric push rod 31 is fixed at the bottom of the frame 11; the output end of the cleaning electric push rod 31 is fixedly connected to the hinge seat; before unplugging, start the cleaning electric push rod 31 , the cleaning electric push rod 31 pulls the hinge seat to move, relying on the hinged connecting rods 32 on both sides to pull the connecting frames 33 closer to each other, so that the connecting frames 33 slide on the sliding rod, so that the cleaning plates 34 are close to each other, relying on the closed The cleaning plate 34 can clean the soil on the surface of the drill rod 19, thereby reducing the resistance of the soil on the surface of the drill rod 19 when used next time, thereby reducing the impact on the accuracy of the next drill rod. After the cleaning is completed, The cleaning electric push rod 31 is started to push the hinge base to move, so that the two cleaning plates 34 move away.

进一步的,如图4所示,所述穿心锤18的两侧设有计数组件;所述计数组件包括光电发射模块41、光电接收模块42和显示屏43;所述光电发射模块41和光电接收模块42分别固接在两个导向板16的中部;所述光电发射模块41和光电接收模块42位于穿心锤18的两侧;所述显示屏43固接在机架11上;在使用时,光电发射模块41的光源发射光束,然后与光电发射模块41对应的光电接收模块42进行接收,当穿心锤18穿过光电发射模块41和光电接收模块42之间时,对光束进行遮挡,显示屏43上安装有单片机,光束被遮挡一次计数一次,显示屏43用于显示数值,以此可以方便工作人员计数和统计锤击数,从而可以方便工作人员使用。Further, as shown in Figure 4, counting components are provided on both sides of the penetrating hammer 18; the counting components include a photoelectric transmitting module 41, a photoelectric receiving module 42 and a display screen 43; the photoelectric transmitting module 41 and the photoelectric The receiving modules 42 are respectively fixed in the middle of the two guide plates 16; the photoelectric transmitting module 41 and the photoelectric receiving module 42 are located on both sides of the core penetrating hammer 18; the display screen 43 is fixed on the frame 11; in use When , the light source of the photoelectric transmitting module 41 emits a light beam, and then the photoelectric receiving module 42 corresponding to the photoelectric transmitting module 41 receives it. When the penetrating hammer 18 passes between the photoelectric transmitting module 41 and the photoelectric receiving module 42 , the light beam is blocked. , a single-chip microcomputer is installed on the display screen 43, which counts each time the light beam is blocked. The display screen 43 is used to display numerical values, so that it is convenient for the staff to count and count the number of hammer blows, so that it is convenient for the staff to use.

进一步的,如图5所示,所述机架11的侧面设有限长组件;所述限长组件包括绳轮52和连接绳;所述机架11上固接有支架51;所述绳轮52转动连接在支架51的底部;所述振打架12的侧面固接有连接片;所述连接绳的顶端与绳轮52固接;所述连接绳的底端与连接片固接;所述支架51上固接有升降电推杆53;所述升降电推杆53的输出端固接有底板54;所述绳轮52的两侧均固接有限位片56;所述底板54的顶部与限位片56对应位置处固接有挡片55;在穿心锤18进行锤击钎探杆时,钎探杆每次下降的距离不一致,导致钎探杆打入的距离很容易超过30cm,而且钎探杆在打入土层时,工人难以观察到钎探杆上的刻度,从而导致工人记录的锤击数误差较大,本发明实施例在使用时,钎杆19下移,振打架12也会同步下移,然后振打架12通过连接绳拉动绳轮52进行旋转,当钎探杆打入30cm时,限位片56和挡片55贴合阻挡旋转,进而使得钎杆19无法下移,然后工作人员进行记录,以此可以减少打入的距离超过30cm的情况,记录完毕后,启动升降电推杆52推动底板52下移,以此将限位片56和挡片55分离。Further, as shown in Figure 5, a limited-length component is provided on the side of the frame 11; the length-limiting component includes a sheave 52 and a connecting rope; a bracket 51 is fixed on the frame 11; the sheave 52 is rotatably connected to the bottom of the bracket 51; a connecting piece is fixedly connected to the side of the vibration frame 12; the top end of the connecting rope is fixedly connected to the sheave 52; the bottom end of the connecting rope is fixedly connected to the connecting piece; A lifting electric push rod 53 is fixedly connected to the bracket 51; a bottom plate 54 is fixed to the output end of the lifting electric push rod 53; limit pieces 56 are fixed to both sides of the sheave 52; the top of the bottom plate 54 A blocking piece 55 is fixedly connected to the position corresponding to the limiting piece 56; when the drilling hammer 18 hammers the drilled probe rod, the distance the drilled probe rod drops each time is inconsistent, resulting in the driving distance of the drilled probe rod easily exceeding 30cm. , and when the drill rod is driven into the soil layer, it is difficult for workers to observe the scale on the drill rod, which leads to a large error in the number of hammer blows recorded by the workers. When the embodiment of the present invention is used, the drill rod 19 moves downward and vibrates. The hammer 12 will also move down synchronously, and then the vibration hammer 12 pulls the sheave 52 through the connecting rope to rotate. When the drill rod is driven in 30cm, the limit piece 56 and the stopper 55 fit together to block the rotation, thus making the drill rod 19 unable to Move down, and then the staff records, which can reduce the situation where the driving distance exceeds 30cm. After the recording is completed, start the lifting electric push rod 52 to push the base plate 52 down, thereby separating the limiting piece 56 and the blocking piece 55 .

进一步的,如图2和5所示,所述显示屏43的底部设有提示组件;所述提示组件包括扬声器62;所述挡片55上固接有按压开关61;所述扬声器62固接在显示屏43的底部;在限位片56和挡片55贴合时,其会按动按压开关61,以此来使得扬声器62通电,进而向外发出提示音,以此提示工作人员进行记录。Further, as shown in Figures 2 and 5, a prompt component is provided at the bottom of the display screen 43; the prompt component includes a speaker 62; a push switch 61 is fixed on the baffle 55; the speaker 62 is fixed At the bottom of the display screen 43; when the limiting piece 56 and the blocking piece 55 are in contact, the push switch 61 is pressed, thereby energizing the speaker 62, and then emitting a prompt sound to prompt the staff to record. .

实施例二Embodiment 2

请参阅图6所示所述机架11的侧面设有拔钎组件;所述拔钎组件包括丝杆71和驱动电机72;所述丝杆71转动连接在机架11的侧面;所述驱动电机72固接在机架11的顶部;所述驱动电机72的输出端与丝杆71固接;所述振打架12的侧面固接有螺套;所述丝杆71与螺套通过滚珠丝杠螺母副连接;在使用时,依靠驱动电机72来驱动丝杆71进行旋转,进而带动振打架12进行移动,以此来将振打架12提起,从而将振打架12的底部的钎杆19从土层内抽出,以此可以方便工作人员拔出钎杆19,方便工作人员使用。Please refer to Figure 6. A puller assembly is provided on the side of the frame 11; the puller assembly includes a screw rod 71 and a drive motor 72; the screw rod 71 is rotatably connected to the side of the frame 11; the driver The motor 72 is fixed on the top of the frame 11; the output end of the drive motor 72 is fixedly connected to the screw rod 71; a screw sleeve is fixed to the side of the vibrating box 12; the screw rod 71 and the screw sleeve are connected through ball wires. When in use, the drive motor 72 is relied upon to drive the screw rod 71 to rotate, thereby driving the vibrating box 12 to move, thereby lifting the vibrating box 12 and lifting the drill rod 19 at the bottom of the vibrating box 12 from The drill rod 19 can be pulled out from the soil layer so that the workers can easily pull out the drill rod 19 and use it conveniently.

工作原理,在使用时,启动振打电机15,振打电机15带动驱动轴13进行旋转,驱动轴13的旋转依靠齿轮驱动链条进行旋转,然后链条的运动会带动拉杆14进行运动,拉杆14会拉动提拉架17和穿心锤18上移,当穿心锤18移动至振打架12的顶部后拉杆14在链条的驱动与提拉架17分离,以此使得穿心锤18自由落体下落对钎杆19进行击打,然后随着链条的不断运动,以此将钎杆19打入到土层内,导向板16用于引导穿心锤18下落,使得穿心锤18击打在钎杆19上,依靠设置行走轮可以方便地进行移动搬运电动钎探设备,在使用时,第一滑轮24、第二滑轮25组合成滑轮组结构,以此可以方便地进行拔钎,然后通过拔钎电机21驱动绳盘22收卷钢绳23,以此来将振打架12提起,从而将振打架12的底部的钎杆19从土层内抽出,以此可以方便工作人员拔出钎杆19,方便工作人员使用,在拔钎前,启动清理电推杆31,清理电推杆31拉动铰接座进行移动,依靠两侧铰接的连杆32拉动连接架33互相靠近,从而使得连接架33在滑杆上进行滑动,使得清理板34互相靠近合拢,依靠合拢的清理板34可以对钎杆19表面的泥土进行清理,以此可以减少下次使用时,泥土在钎杆19表面上增大阻力,从而降低对下次钎探精度造成影响,在清理完成后,启动清理电推杆31推动铰接座进行移动,使得两个清理板34进行远离,在使用时,光电发射模块41的光源发射光束,然后与光电发射模块41对应的光电接收模块42进行接收,当穿心锤18穿过光电发射模块41和光电接收模块42之间时,对光束进行遮挡,显示屏43上安装有单片机,光束被遮挡一次计数一次,显示屏43用于显示数值,以此可以方便工作人员计数和统计锤击数,从而可以方便工作人员使用,在穿心锤18进行锤击钎探杆时,钎探杆每次下降的距离不一致,导致钎探杆打入的距离很容易超过30cm,而且钎探杆在打入土层时,工人难以观察到钎探杆上的刻度,从而导致工人记录的锤击数误差较大,本发明实施例在使用时,钎杆19下移,振打架12也会同步下移,然后振打架12通过连接绳拉动绳轮52进行旋转,当钎探杆打入30cm时,限位片56和挡片55贴合阻挡旋转,进而使得钎杆19无法下移,然后工作人员进行记录,以此可以减少打入的距离超过30cm的情况,记录完毕后,启动升降电推杆52推动底板52下移,以此将限位片56和挡片55分离,在限位片56和挡片55贴合时,其会按动按压开关61,以此来使得扬声器62通电,进而向外发出提示音,以此提示工作人员进行记录。The working principle is that when in use, the rapping motor 15 is started, and the rapping motor 15 drives the drive shaft 13 to rotate. The rotation of the drive shaft 13 relies on the gear drive chain to rotate, and then the movement of the chain will drive the pull rod 14 to move, and the pull rod 14 will pull The lifting frame 17 and the piercing hammer 18 move upward. When the piercing hammer 18 moves to the top of the vibrating table 12, the pull rod 14 is driven by the chain and separates from the lifting frame 17, thereby causing the piercing hammer 18 to fall freely against the drill rod 19. Hit, and then with the continuous movement of the chain, the drill rod 19 is driven into the soil layer. The guide plate 16 is used to guide the piercing hammer 18 to fall, so that the piercing hammer 18 hits the drill rod 19. The electric drill equipment can be easily moved and transported by setting the running wheels. When in use, the first pulley 24 and the second pulley 25 are combined into a pulley structure, so that drill can be easily performed, and then the drill motor 21 drives the rope. The disc 22 winds up the steel rope 23 to lift the vibrating box 12, thereby pulling out the drill rod 19 at the bottom of the vibrating box 12 from the soil layer. This makes it convenient for the staff to pull out the drill rod 19 and use it conveniently. , before pulling out the solder, start the cleaning electric push rod 31, the cleaning electric push rod 31 pulls the hinge seat to move, and relies on the hinged connecting rods 32 on both sides to pull the connecting frames 33 closer to each other, so that the connecting frames 33 slide on the sliding rod. , so that the cleaning plates 34 are close to each other, and the soil on the surface of the drill rod 19 can be cleaned by relying on the closed cleaning plates 34. This can reduce the resistance of the soil on the surface of the drill rod 19 when used next time, thereby reducing the downward pressure. The accuracy of the soldering is affected. After the cleaning is completed, the cleaning electric push rod 31 is started to push the hinge seat to move, so that the two cleaning plates 34 move away. When in use, the light source of the photoelectric emission module 41 emits a beam, and then interacts with the photoelectric emission The photoelectric receiving module 42 corresponding to the module 41 receives. When the penetrating hammer 18 passes between the photoelectric transmitting module 41 and the photoelectric receiving module 42, the light beam is blocked. A microcontroller is installed on the display screen 43. Each time the light beam is blocked, it is counted. , the display screen 43 is used to display numerical values, which can facilitate the staff to count and count the number of hammer blows, so that it can be convenient for the staff to use. When the piercing hammer 18 hammers the drill probe rod, the distance the drill probe rod drops each time Inconsistent, the distance driven into the drill rod can easily exceed 30cm, and when the drill rod is driven into the soil, it is difficult for workers to observe the scale on the drill rod, resulting in a large error in the number of hammer blows recorded by the workers. When the embodiment of the invention is in use, the drill rod 19 moves downward, and the vibrating fight 12 will also move downward simultaneously. Then the vibration fight 12 pulls the sheave 52 through the connecting rope to rotate. When the drill rod is driven in 30cm, the limiting piece 56 and The baffle 55 fits and blocks the rotation, thereby preventing the drill rod 19 from moving down. Then the staff records, which can reduce the situation where the driving distance exceeds 30cm. After the recording is completed, the lifting electric push rod 52 is started to push the base plate 52 times. Move to separate the limiting piece 56 and the blocking piece 55. When the limiting piece 56 and the blocking piece 55 are in contact, they will press the push switch 61, thereby energizing the speaker 62 and emitting a prompt sound. , to prompt the staff to record.

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, reference to the terms "one embodiment," "example," "specific example," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one aspect of the invention. in an embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。The basic principles, main features and advantages of the present invention have been shown and described above. Those skilled in the industry should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions only illustrate the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have other aspects. Various changes and modifications are possible, which fall within the scope of the claimed invention.

Claims (9)

1.一种地基钎探方法,其特征在于:该地基钎探方法包括以下步骤:1. A foundation drilling method, characterized in that: the foundation drilling method includes the following steps: S1:放线标点:测量组根据钎探点位平面布置图分区放线,用白灰放出分区控制线,孔位要撒上白灰点,并在孔位上盖砖,砖上应按钎探点布置要求编号;S1: Layout marking points: The measurement team sets out the wires in zones according to the plan layout of the soldering probe points, and uses white ash to release the zone control lines. The holes should be sprinkled with white ash dots, and bricks should be covered on the holes. The bricks should be according to the soldering probe points. Arrangement requirement number; S2:就位打钎:将触探杆尖对准孔位,再把电动钎探设备拉起穿心锤(18),使其自由下落,把钎杆(19)垂直打入土层中;S2: Drilling in place: Align the tip of the penetration rod with the hole position, then pull up the penetration hammer (18) of the electric drill equipment, let it fall freely, and drive the drill rod (19) vertically into the soil layer; S3:记录锤击数:钎杆(19)每打入土层300mm时记录一次锤击数;S3: Record the number of hammer blows: record the number of hammer blows every time the drill rod (19) is driven into the soil layer 300mm; S4:拔钎:当钎杆(19)打至钎探总深度时,操作手关闭打钎开关,打开拔钎开关,同时启动清理电推杆(31),使清理板(34)合拢,拔钎过程中,合拢的清理板(34)对钎杆(19)表面的泥土刮除,待电动钎探设备将钢钎杆(19)完全拔出,移开钎探设备,用原编号砖盖孔;S4: Drilling: When the drill rod (19) reaches the total drilling depth, the operator turns off the drill switch, turns on the drill switch, and at the same time starts the cleaning electric push rod (31) to close the cleaning plate (34) and pull out the drill. During the brazing process, the closed cleaning plate (34) scrapes off the soil on the surface of the brazing rod (19). After the electric brazing equipment completely pulls out the steel brazing rod (19), remove the brazing device and cover it with the original numbered brick. hole; S5:移位:将打钎设备搬到下一孔位,以便继续打钎;S5: Shift: Move the drilling equipment to the next hole position to continue drilling; S6:每区钎探孔作业完毕后,组织进行验槽;S6: After the drill drilling operation in each area is completed, organize groove inspection; S7:灌砂:验槽完毕后,由进行灌砂,灌砂时,每填入300mm左右用C20钢筋捣实一次,填至基槽标高;S7: Sand filling: After the trench inspection is completed, sand filling is carried out. When filling sand, fill it with C20 steel bars every 300mm or so and tamp it down to the elevation of the foundation trench; S8:整理记录:由钎探记录组人员收集钎探原始记录表,按孔顺序编号,将锤击数填入统一表格内进行归档。S8: Arrange records: The drill record team members collect the original drill record sheets, number them according to the order of holes, and fill in the number of hammer blows in a unified form for filing. 2.根据权利要求1所述的一种地基钎探方法,其特征在于:所述S1中钎探点呈梅花形布置,探点间距1.5m,外圈钎点要距基坑支护桩内侧750mm以上,避免对支护桩产生扰动。2. A foundation soldering method according to claim 1, characterized in that: the soldering points in the S1 are arranged in a plum blossom shape, the spacing between the detecting points is 1.5m, and the outer ring soldering points are away from the inner side of the foundation pit supporting piles. 750mm or more to avoid disturbing the supporting piles. 3.一种电动钎探设备,其特征在于:该电动钎探设备适用于上述权利要求1-2中任意一项所述一种地基钎探方法;该电动钎探设备包括机架(11)、钎杆(19)、穿心锤(18)和振打组件;所述振打组件设在机架(11)上;所述穿心锤(18)设在振打组件上;所述钎杆(19)设在穿心锤(18)的底部。3. An electric drill equipment, characterized in that: the electric drill equipment is suitable for a foundation drill method according to any one of the above claims 1-2; the electric drill equipment includes a frame (11) , drill rod (19), drilling hammer (18) and rapping assembly; the rapping assembly is located on the frame (11); the drilling hammer (18) is located on the rapping assembly; the drilling The rod (19) is located at the bottom of the piercing hammer (18). 4.根据权利要求3所述的一种电动钎探设备,其特征在于:所述机架(11)的顶部设有拔钎组件;所述拔钎组件包括钢绳(23)和绳盘(22)。4. A kind of electric soldering equipment according to claim 3, characterized in that: the top of the frame (11) is provided with a drill assembly; the puller assembly includes a steel rope (23) and a rope drum ( twenty two). 5.根据权利要求3所述的一种电动钎探设备,其特征在于:所述机架(11)的侧面设有拔钎组件;所述拔钎组件包括丝杆(71)和驱动电机(72)。5. An electric drill equipment according to claim 3, characterized in that: a drill assembly is provided on the side of the frame (11); the drill assembly includes a screw rod (71) and a driving motor (71). 72). 6.根据权利要求3所述的一种电动钎探设备,其特征在于:所述机架(11)的底部设有清理组件;所述清理组件包括清理板(34)和清理电推杆(31)。6. An electric soldering equipment according to claim 3, characterized in that: a cleaning assembly is provided at the bottom of the frame (11); the cleaning assembly includes a cleaning plate (34) and a cleaning electric push rod ( 31). 7.根据权利要求3所述的一种电动钎探设备,其特征在于:所述穿心锤(18)的两侧设有计数组件;所述计数组件包括光电发射模块(41)、光电接收模块(42)和显示屏(43)。7. An electric soldering equipment according to claim 3, characterized in that: counting components are provided on both sides of the penetrating hammer (18); the counting components include a photoelectric transmitting module (41), a photoelectric receiving module module (42) and display screen (43). 8.根据权利要求7所述的一种电动钎探设备,其特征在于:所述机架(11)的侧面设有限长组件;所述限长组件包括绳轮(52)和连接绳。8. An electric soldering equipment according to claim 7, characterized in that: a limited-length component is provided on the side of the frame (11); the limited-length component includes a sheave (52) and a connecting rope. 9.根据权利要求8所述的一种电动钎探设备,其特征在于:所述显示屏(43)的底部设有提示组件;所述提示组件包括扬声器(62)。9. An electric soldering equipment according to claim 8, characterized in that: a prompt component is provided at the bottom of the display screen (43); the prompt component includes a speaker (62).
CN202410010067.7A 2024-01-03 2024-01-03 Foundation drilling method and electric drilling equipment thereof Pending CN117721782A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410010067.7A CN117721782A (en) 2024-01-03 2024-01-03 Foundation drilling method and electric drilling equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410010067.7A CN117721782A (en) 2024-01-03 2024-01-03 Foundation drilling method and electric drilling equipment thereof

Publications (1)

Publication Number Publication Date
CN117721782A true CN117721782A (en) 2024-03-19

Family

ID=90199922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410010067.7A Pending CN117721782A (en) 2024-01-03 2024-01-03 Foundation drilling method and electric drilling equipment thereof

Country Status (1)

Country Link
CN (1) CN117721782A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119177644A (en) * 2024-07-15 2024-12-24 济南中鲁建设工程有限公司 Geological drill rod detecting machine and method for construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505508A (en) * 2017-02-27 2018-09-07 中咨公路工程监理咨询有限公司 A kind of project supervision spy pricker machine
AU2020101899A4 (en) * 2020-08-20 2020-09-24 East China University Of Technology A Geological Exploration Equipment
CN116377993A (en) * 2021-12-25 2023-07-04 镇江市丹徒区宜瑞建筑工程质量检测有限责任公司 An automatic light cone dynamic penetrometer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505508A (en) * 2017-02-27 2018-09-07 中咨公路工程监理咨询有限公司 A kind of project supervision spy pricker machine
AU2020101899A4 (en) * 2020-08-20 2020-09-24 East China University Of Technology A Geological Exploration Equipment
CN116377993A (en) * 2021-12-25 2023-07-04 镇江市丹徒区宜瑞建筑工程质量检测有限责任公司 An automatic light cone dynamic penetrometer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119177644A (en) * 2024-07-15 2024-12-24 济南中鲁建设工程有限公司 Geological drill rod detecting machine and method for construction

Similar Documents

Publication Publication Date Title
CN107152018A (en) A kind of safe standard penetration test (SPT) device and method of testing
JP2014006055A (en) Concrete sampling device, and method for using same
CN117721782A (en) Foundation drilling method and electric drilling equipment thereof
CN102146774A (en) Movable oil pipe box for oil/water well operation
CN107130645B (en) Multifunctional vibrating type pile well sediment detector
CN108505508A (en) A kind of project supervision spy pricker machine
CN111305178B (en) Drill rod detection vehicle
CN115262517A (en) An automatic light dynamic probe
CN114674918A (en) Building detection device with grout is full of degree and is detected function
CN105800527B (en) Material hoist for building construction
CN110206017B (en) Gantry type double-pipe plate inserting machine and plate inserting method thereof
CN202390825U (en) Double-power foundation drill rod probing device
CN118704538A (en) A system and method for real-time measurement of pipe pile penetration
CN218933064U (en) A light-duty brazing automation equipment
CN219570016U (en) Inclined strut pile construction device
CN211498802U (en) a drilling machine
CN116358471A (en) A length measuring device for the production of all-plastic elastic elevator compensation chain
CN204728298U (en) Device visited by electronic pricker
JPH07102546A (en) Measuring device for n value in standard penetration test for earth
CN108999167B (en) Automatic heavy cone dynamic sounding instrument
CN2685395Y (en) Small size construction electric drilling and investigation machine
CN213682061U (en) Light dynamic sounding instrument
CN223003454U (en) A pile foundation base drilling device
CN215448931U (en) Highway compactness test detection device
CN220468810U (en) Dynamic sounding auxiliary equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination